APPLICATION FORM The Eighth ASEAN Best Practice Competition for Energy Management in Buildings and Industries ASEAN Energy Award 2013 1 IMPLEMENTATION OF INTEGRATED ENERGY MANAGEMENT TO OBTAINED THE ENERGY EFFICIENT CONTINOUSLY ENERGY MANAGEMENT IN BUILDING (SMALL & MEDIUM ) GRHA WONOKOYO WONOKOYO GROUP – SURABAYA INDONESIA

Transcript of IMPLEMENTATION OF INTEGRATED ENERGY …peen.ebtke.esdm.go.id/upload/files/B.3.ME. Kecil dan Menengah...

APPLICATION FORM The Eighth ASEAN Best Practice Competition for Energy Management

in Buildings and Industries ASEAN Energy Award 2013

1

IMPLEMENTATION OF INTEGRATED ENERGY MANAGEMENT TO OBTAINED

THE ENERGY EFFICIENT CONTINOUSLY

ENERGY MANAGEMENT IN BUILDING

(SMALL & MEDIUM )

GRHA WONOKOYO WONOKOYO GROUP – SURABAYA INDONESIA

APPLICATION FORM The Eighth ASEAN Best Practice Competition for Energy Management

in Buildings and Industries ASEAN Energy Award 2013

2

Category: Building ( Small & Medium ) Industri Title of Activity / Project / Theme:

Applicant General Information Name of Company : WONOKOYO GROUP Business Address : GRHA WONOKOYO, JL.TAMAN BUNGKUL 1-7

SURABAYA - INDONESIA Number of Employees : 350 ( ONLY AT HEAD OFFICE ) Type of Building : OFFICE BUILDING Age of Building : 9 YEARS Nature of Business : INTEGRATED POULTRY INDUSTRY Contact Person Name : BETAL JEMUR Position : HEAD OF PROPERTY MANAGEMENT DIVISION Telephone : + 62 31 2956000 Mobile phone : +62 85731952000 Fax : +62 31 2956004 E-mail : [email protected]

Introduction.

IMPLEMENTATION OF INTEGRATED ENERGY MANAGEMENT TO OBTAINED THE ENERGY EFFICIENT CONTINOUSLY

Grha Wonokoyo which is the head office of Wonokoyo Group has been desigend as an energy-efficient building. It is called, “ Passive Design Approach”. But not only with the design we can get significant efficiency.It also need a way to get a significant energy efficiency and can be applied continously, by applying Integrated Energy Management. This concept is an integration of operational management equipment system,consistenly checking, well planned maintanance program and also completed with building occupants behaviour. In general, electricity energy consumption in buildings is 40% of the operational costs, but for to Grha Wonokoyo that applied Integrated Energy Management electricity consumption is only 21% of the operational costs.

X

APPLICATION FORM The Eighth ASEAN Best Practice Competition for Energy Management

in Buildings and Industries ASEAN Energy Award 2013

3

CERTIFICATION AND ENDORSEMENT

The Management of WONOKOYO GROUP here by agreed to allow the ASEAN Board of Judges and other experts that may be designated by ACE to visit the building and verify the authenticity of the data. However, two weeks advance notice is required to allow for necessary arrangements. We also here by agreed that ACE can publish the whole submission in ACE publications and website, without any prior consent of the owner of the buildings. If the submission will be published in other publications, the consent of the concerned building would be required. We, the undersigned certified that the information given is true and accurate and prepared with the consent of the party/ies involved.

Endorsed by Focal Point

Mr.Djojo Kusumo Presiden Director

Mr.Betal Jemur Head of Property Management Division Email: [email protected]

Ms.Maritje Hutapea ASEAN EE & C – SSN National Focal Point Director for Energy Conservation DGNREEC – MEMR Indonesia Tel : 6221 3983007 Fax 6221 31901087 Email :[email protected]

Mr. Heru Wibisono Head of Tecnical Departement Email :[email protected]

APPLICATION FORM The Eighth ASEAN Best Practice Competition for Energy Management

in Buildings and Industries ASEAN Energy Award 2013

4

GENERAL VIEW & SUMMARY AKTIVITY

The profile of Grha Wonokoyo Building : Site Area: + 1.870.00 M2 Total Building Floor Area : 7.836.67 M2 *Basement : 1.217.94 M2 *Ground Floor : 1.056.29 M2 *2nd Floor : 702.43 M2 *3rd Floor : 692.59 M2 *4th Floor : 680.82 M2 *Typical Floor : 588.24 M2 (5th Floor s/d 9th Floor ) *10th Floor : 545,40 M2 Air Conditioner Floor : 4.103,14 M2 (2004-2010) 4.573.14 M2 ( 2011 – now ) Non Air Conditioner Floor : 2.515,59 M2 (exc.basement) KLB (Coef of Building Area ) : 4,12 Occupancy Rate : 91 %

Integrated Energy Management is an implementation of electrical equipment systematization, consistenly checking, well planned maintenance program and the building occupants behavior concern in using energy. Include :

A. Equipment Systematization. 1.1.1. Air Conditioner Systematization

- Air Conditioner activated configuration, from 6 units, there are only 4 units that being activated at office room and each configuration is rotated every week. There are 3 configurations for this activated and each configuration, already calculated each cooling load for the convenience the occupants.

- Activated hour limitation, being non active ineffective hour at office and meeting room.

- Set at local remote temperature between 22⁰C up to 24⁰C ( office area ). - All this system is centralized with Centralized Remote so the building

occupants can not change. This arrangement is to minimize the load of wasted Air Conditioner, it can reduce the use of Electrical Energy .

Centralized Remote for Systematization Operated Air Conditioner

APPLICATION FORM The Eighth ASEAN Best Practice Competition for Energy Management

in Buildings and Industries ASEAN Energy Award 2013

5

1.1.2. Lighting Systematization - Lighting activation for office room arrange as below :

07.00 AM – 08.00 AM active 50% from total amount of lights 08.00 AM – 12.00 AM active 100 % 12.00 AM – 01.00 PM inactive 100 % 01.00 PM – 04.00 PM active100% 04.00 PM – 05.00 PM active 50 % from total amount of lights 05.00 PM – 07.00 AM inactive 100 %

At inactive 100 % only Emergency Light keeps active. This arrangement is centralized using timer. This arrangement is done so there will be no use of electrical energy at ineffective hour

Timer for Control Lighting Operated System

B. The checking is done in tight control and continously. Form of checking equipment

APPLICATION FORM The Eighth ASEAN Best Practice Competition for Energy Management

in Buildings and Industries ASEAN Energy Award 2013

6

Picture of checking electricity cubicle

Picture of checking electricity transformer

C. Maintenance program is well arranged and applied consistently.

Preventive maintanance program for all equipment also give contribution to this electrical energy saving. So it is needed to framing preventive maintanance program and consistently applied. Based on experience, a good preventive maintanance program can contribute 11% of electrical energy saving.

APPLICATION FORM The Eighth ASEAN Best Practice Competition for Energy Management

in Buildings and Industries ASEAN Energy Award 2013

7

Picture of aktivity maintanance panel system

Picture of aktivity maintanance pump equipment

APPLICATION FORM The Eighth ASEAN Best Practice Competition for Energy Management

in Buildings and Industries ASEAN Energy Award 2013

8

D. Building Occupants Awareness Building occupants awareness for this electrical energy saving done by get the all occupants used to unplugg all the electrical equipment from its power outlet after office hour. To make sure this activity, Floor Manager has to control and check this. If the electrical equipment still plugg on its power outlet, even the equipment already turn off, but still can cause flowing electrical energy.

Picture of floor manager meeting for evaluate behavior of building occupants about energy awareness programe

The next target is despite the occupancy rate increased until 100% (currently 91%) but the Energy Efficiency Index (EEI) can still be less than 100 kwh/m2/year (based on operational 2000 hour / year)

APPLICATION FORM The Eighth ASEAN Best Practice Competition for Energy Management

in Buildings and Industries ASEAN Energy Award 2013

9

1. IMPACT

1.1. Energy Saving. Grha Wonokoyo at its early operation already implemented Integrated Energy Management so the energy using, especially in electrical can be more efficient. So the energy efficient that we obtained, we compare between Equipment System Design ( HVAC, Lighting & Power Outlet ) . List of arrangement equipment & building occupant behavior for continously energy saving, as below.

EQUIPMENT SYSTEMATIZATION INVESMENT OBJECTIVE

Air Conditioner

Configuration for activated, there are only 4 units that

being from 6 units indoor at office room & rotated every

week

None Reduce energy

consumtion for air conditioner, but still comfort for occupant

Regrouping for centralized remote system

US$ 579 Easier for control of

operated air conditioner system

Lighting Arrangement of lighting

activated with timer US$ 350

Reduce energy consumtion for

lighting, but still comfort for occupant

OCCUPANT ACTIVITY INVESMENT OBJECTIVE

Building Occupant at each floor

Unplugg all the electrical equipment from its power

outlet after office hour None

Reduce of pasive energy from electrical

equipmnet

Grafik – grafik achievement

APPLICATION FORM The Eighth ASEAN Best Practice Competition for Energy Management

in Buildings and Industries ASEAN Energy Award 2013

10

APPLICATION FORM The Eighth ASEAN Best Practice Competition for Energy Management

in Buildings and Industries ASEAN Energy Award 2013

11

1.2. Impact on The Environment If 1,0 kWh equivalent with 0,891 kg CO2 ( based on Circulars Ministry Of Energy

& Mineral Resources Republic Of Indonesia # 3783/21/600.5/2008),as below

1.3. Impact on Company Economics YEAR 2010 2011 2012

IMPROVEMENT Instalation of

timer for lighting control

Instalation VRV Air Condtioner & timer

system for lighting at 7th floor

Adding centralized remote system for Air Conditiner

INVESMENT US$ 300 US$ 37,333 US$ 579 COST SAVING /YEAR ( BY ENERGY SAVING ) US$ 43,427 US$ 50,157 US$ 51,652

PAYBACK PERIOD 3 days 9 month 4 days

1.4. Energy Efficiency Index. Based on operational hour 2000 hours per year and only for the Air Conditioner area,as below.

KWh/M2/Year

APPLICATION FORM The Eighth ASEAN Best Practice Competition for Energy Management

in Buildings and Industries ASEAN Energy Award 2013

12

2. SUSTAINABILITY

2.1. Level Of Participation and Involvement The implementation of Integrated Energy Management, as daily activity for management, control and framing work program done by team of Tecnical Departement with organizational structure as below :

Head Of Property Management

Divison

Responsibilty of Achieved The Energy

Management Programe

Head Of Technical

Departemen

Floor Manager

Team for implement of energy

management programe

Head of Sub Section Planning

Head Of Sub Section Electrical

Head Of Sub Section

Mechanical

Coordination Line

Number of team Head of Technical Departement = 1 person Head of Sub Section Planning = 1 person Head of Sub Section Electrical = 1 person Head of Sub Section Mechanical = 1 person Floor Manager = 7 person Head Of Tecnical Department as Energy Manager that coordinating with all team members for the implementation of the energy management program Head Of Sub Section Planning role as team members that make the programs related to energy management and equipment maintenance program. Head Of Sub Section Electrical role as team members that control the electrical equipment according to the program of work specified. Head Of Sub Section Mechanical role as team members that control the mechanical equipment in according with the work program specified. Floor Manager is part of a team that is a outstanding members role in the control of occupant behavior related to the concern for energy efficient on each floor.

APPLICATION FORM The Eighth ASEAN Best Practice Competition for Energy Management

in Buildings and Industries ASEAN Energy Award 2013

13

2.2. Top Level Management Commitment The Key of success on Energy Management Programme is Top Level management commitment. The commitment of Wonokoyo Group on energy efficiency is clearly express strongly in the company strategic ie. to be cost leader, competitive and grow. To realize the management commitment, the building has been design & installed with VRV system for Air Conditiner. We also do a good housekeeping through maintenance program which is done periodicly. The Commitment of Wonokoyo Group Management to support energy efficiency the Grha Wonokoyo explains as follow :

- Energy Management Implementation. - Human resources development. - Health, safety and environment. - Adding new equipment ie : timer & centralized remote system for air conditioner. - Arrangement aktivated time of lighting & air conditioner. - Arrangement configuration for aktivated of air conditioner at office area.

Example memo Approved from Presiden Director

APPLICATION FORM The Eighth ASEAN Best Practice Competition for Energy Management

in Buildings and Industries ASEAN Energy Award 2013

14

2.3. Long and Short Term Plann

AKTIVITY PLANNING OF WORK

REMARK 2012 2013 2014 2015

Adding centralized remote Air Conditioner & regrouping the system

Has been finished

Replacement balast transformation to electronic transformation at lighting

system

Adding Building Automation System for control all equipment that uses

electricity energy

APPLICATION FORM The Eighth ASEAN Best Practice Competition for Energy Management

in Buildings and Industries ASEAN Energy Award 2013

15

2.4. Organization The Organization Chart for Energy Management as below.

Head Of Technical

Departemen

Floor Manager ( as

awareness program control )

( as Energy Manager )

Head of Sub Section Planning

Head of Sub Section Electrical

Head of Sub Section

Mechanical

( as program frammer )

( as administrator of electrical system

)

( as administrator of

mechanical system )

Coordination line

Energy Manager responsible of all programs related to Manajemen Energi Terpadu ( Integrated Energy Management ) and achievements energy efficiency index targets. Energy Manager also evaluate work program effectiveness and improve to increase Manajemen Energi Terpadu ( Integrated Energy Management ) program performance. Head of Sub Section Planning responsible of all work program framing to Manajemen Energi Terpadu ( Integrated Energy Management )especially maintenance routine program. And also the documentation of paper work. Head of Sub Section Electrical responsible of all management and regulation, all the related electrical equipments to obtained targeted levels of energy consumption. Head of Sub Section Mechanical responsible of all management and regulation, all the related mechanical equipments, to obtained targeted levels of energy consumption. Floor Manager is functional officials at every floor in charge of management regulation. In relation with this management energy their duties is to make sure that all floor occupants have the awareness of electrical energy consumption.

APPLICATION FORM The Eighth ASEAN Best Practice Competition for Energy Management

in Buildings and Industries ASEAN Energy Award 2013

16

2.5. Building Capacity The companies competitiveness and high efficiency has been develope by capacity building to the human resources through in house training, seminar, workshop & campaign to building occupants

In house training for maintanance programe

Poster for Campaign Program Energy Saving to Building Occupants

APPLICATION FORM The Eighth ASEAN Best Practice Competition for Energy Management

in Buildings and Industries ASEAN Energy Award 2013

17

3. REPLICABILITY 3.1. Management Practices & Measure.

Management Practise Target for efficiency is continuously improved from year to year based on last operation performance and compiled in company budget. To achieve the target, activities done based on standard operating procedure. The standard operating procedure is reviewed periodically to adapt new condition to achieve better operation and more efficient performance.

Energy Efficient

Integrated Energy Mangement

Pillar 1 : Planning, Organizing, Actuating & Target Setting

Pillar 2 : Getting Commitment ( Top Management, Team Energy Management,Floor Manager, Building Occupant

Pillar 3 : Implementation Action Plan Pill

ar

4 :

Co

ntro

l & M

oni

tori

ng

Flow of Energy Management

Management Measure

1. Power Consumption Measurement. Power consumption is monitored & recorded daily by technician and monthly by PLN (power supply company of Indonesia ).

2. Ampere Measurement.

Measuring the load of each phase in each MCCB in panel LVMDP every one hour by technician.

MCCB at LVDB Panel

Recording Reporting Evaluation

Decision Management

Action

Flow of Ampere Measurement

APPLICATION FORM The Eighth ASEAN Best Practice Competition for Energy Management

in Buildings and Industries ASEAN Energy Award 2013

18

3.2. Technology The latest technoloy that being used are :

- VRV system in Air Conditioner. - Centralized Remote to control activation menu in Air Conditioner.

4. ORIGINALITY

4. Creativity / Innovation . Some creativity and innovation in Integrated Energy Management programe are :

- Configuration of activated Air Conditioner,without reduce comfort of building occupant.

- Floor Manager in every floor responsible in controlling building occupants awareness