IESCO Online Consumer Bill

1
1/2/2015 IESCO Online Consumer Bill http://www.wapda.gov.pk/iescobill/netbill/gbDcn.asp?qstr1=10143272437100 1/1 ISLAMABAD ELECTRIC SUPPLY COMPANY ELECTRICITY CONSUMER BILL (FOR CONNECTIONS UPTO 40KW LOAD) SUBDIVISION ED@ BILL MONTH READING DATE ISSUE DATE DUE DATE PIR WADHAI 1.5 Dec 2014 12 Dec 2014 23 Dec 2014 7 Jan 2015 REFERENCE No. TARIFF LOAD OLD A/C No. 10 14327 2437100U A1(01) 3 10143271484204 NAME & ADDRESS CONN. DATE 31 MAR 11 WEB PRINTED BILL (Valid For Payment) Var.FPA= 62.34 GST FPA= 11 ET FPA= 0 ED FPA= 0.94 IT FPA= 0 MUHAMMAD EJAZ S/O AHMED HASAN GST No. ST NO.15 PHASE II BRITISH HOME RWP NTN No. METER No. PREVIOUS PRESENT MF UNITS STATUS 215326 9567 9662 1 95 TOTAL UNITS CONSUMED TOTAL COST OF ELECTRICITY METER RENT SRVC. RENT INCOME TAX WITH HELD 95 550.05 0 E. D. /Further Tax INSTALLMENT BILL ADJ. MONTH UNITS BILL PAYMENT DEC13 83 296 0 JAN14 80 68 0 FEB 90 595 595 MAR 105 663 0 APR 105 1573 1573 MAY 124 779 779 JUN 236 2191 2191 JUL 382 5818 5818 AUG 284 3174 0 SEP 166 5012 5012 OCT 130 1416 0 NOV 96 543 0 8.25 Further Tax=0 1220.78 FPA= 74.28 PTV FEE G.S.T. UNPAID DEBT DEFERRED AMOUNT 35 100 FEEDER RAJA ABAD RWP CITY DIVISION PINDI CITY For Electric Supply Failure Contact SDO Contact : /03328561598 BILL CALCULATION NEPRA SubSidy GOP Units 10.5000 04.7100 = 05.7900 X 95 00.0000 00.0000 = 00.0000 X 000000 N.J.Sur=9.5 MNFG CD: 08 DCN NO: CURRENT BILL 731 ARREARS/AGE 590 / 1 TARIFF SUBSIDY + GST 0 PAYABLE WITHIN DUE DATE 2468 L.P. SURCHARGE 59 GST ON LPS PAYABLE AFTER DUE DATE 2527 * Total Cost of Electricity includes Energy / Minimum / Fixed Charges, Fuel Adjustment Surcharge, Surcharge & Additional Surcharge. Prog. I.Tax Paid= 0 Prog. GST Paid= 0 ISLAMABAD ELECTRIC POWER COMPANY ELECTRICITY CONSUMER BILL (FOR CONNECTIONS UPTO 40KW LOAD) WEB PRINTED BILL (Valid For Payment) Dec 2014 10 14327 2437100U 2468 7 Jan 2015 6 BILL MONTH DUE DATE REFERENCE No. PAYABLE WITHIN DUE DATE 2468 Dec 2014 7 Jan 2015 10 14327 2437100U PAYABLE AFTER DUE DATE 2527

description

IESCO Online Consumer Bill

Transcript of IESCO Online Consumer Bill

Page 1: IESCO Online Consumer Bill

1/2/2015 IESCO Online Consumer Bill

http://www.wapda.gov.pk/iescobill/netbill/gbDcn.asp?qstr1=10143272437100 1/1

ISLAMABAD ELECTRIC SUPPLY COMPANY ­ ELECTRICITY CONSUMER BILL(FOR CONNECTIONS UPTO 40KW LOAD)

 SUB­DIVISION  ED@  BILL MONTH  READING DATE  ISSUE DATE  DUE DATE

 PIR WADHAI 1.5 Dec 2014     12 Dec 2014    23 Dec 2014    7 Jan 2015

 REFERENCE No.  TARIFF  LOAD  OLD A/C No.

 10 14327 2437100U A­1(01)  3  10143271484204

 NAME & ADDRESS  CONN. DATE  31 MAR 11

WEB PRINTED BILL(Valid For Payment)

Var.FPA= ­62.34 GST FPA= ­11 ET FPA= 0ED FPA= ­0.94 IT FPA= 0

 MUHAMMAD EJAZ S/O AHMED HASAN  GST No.

 ST NO.15 PHASE II BRITISHHOME RWP  NTN No.

  

 METER No.  PREVIOUS  PRESENT  MF  UNITS  STATUS

 215326  9567   9662   1  95  

           

           

           

 TOTAL UNITS CONSUMED

 TOTAL COST OF ELECTRICITY  METER RENT  SRVC.

 RENT INCOME TAX WITH HELD

 95  550.05      

   0      

 E. D. /Further Tax  INSTALLMENT  BILL ADJ.

MONTH UNITS BILL PAYMENT

 DEC­13  83  ­296  0

 JAN­14  80  ­68  0

 FEB­  90  595  595

 MAR­  105  663  0

 APR­  105  1573  1573

 MAY­  124  779  779

 JUN­  236  2191  2191

 JUL­  382  5818  5818

 AUG­  284  3174  0

 SEP­  166  5012  5012

 OCT­  130  ­1416  0

 NOV­  96  543  0

  8.25Further Tax=0   1220.78   FPA= ­74.28

 PTV FEE  G.S.T.  UNPAID DEBT  DEFERRED AMOUNT

  35  100    

 FEEDER  RAJA ABAD RWP CITY

 DIVISION  PINDI CITY

 For Electric Supply Failure Contact

 

 

 SDO Contact : /03328561598

 

 BILL CALCULATION

  NEPRA   SubSidy  GOP   Units

  10.5000 ­ 04.7100 = 05.7900 X 95

  00.0000 ­ 00.0000 = 00.0000 X 000000

  N.J.Sur=9.5

  MNFG CD: 08DCN NO: 

 CURRENT BILL 731 

 ARREARS/AGE 590 / 1  

 TARIFF SUBSIDY + GST 0 

 PAYABLE WITHIN DUE DATE 2468 

 L.P. SURCHARGE 59 

 GST ON LPS  

 PAYABLE AFTER DUE DATE 2527 

 * Total Cost of Electricity includes Energy / Minimum / Fixed Charges, FuelAdjustment Surcharge, Surcharge &  Additional Surcharge.

Prog. I.Tax Paid= 0Prog. GST Paid= 0 

ISLAMABAD ELECTRIC POWER COMPANY ­ ELECTRICITY CONSUMER BILL(FOR CONNECTIONS UPTO 40KW LOAD)

WEB PRINTED BILL(Valid For Payment)

 Dec 2014 ­ 10 14327 2437100U ­ 2468 ­ 7 Jan 2015 ­ 6

   BILL MONTH  DUE DATE  REFERENCE No.  PAYABLE WITHIN DUE DATE 2468      Dec 2014  7 Jan 2015  10 14327 2437100U  PAYABLE AFTER DUE DATE 2527