GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER...

124

Transcript of GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER...

Page 1: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 2: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

GUAM POWER AUTHORITYATURIDAT ILEKTRESEDAT GUAHAN

P.O.BOX 2977 AGANA, GUAM U.S.A. 96932-2977

July 12, 2011

MEMORANDUM

To: Staff Attorney

Via: General Manager

From: Assistant General Manager, Operations (Acting)

Subject: Compliance Reports

Please transmit the attached Compliance Reports to the PUC. The reports are for thereporting period April - June 2011.

/MEUNDA’k. CAMACHO, P.E.

Cc: CFOAssistant CFOManager (A), Engineering

Page 3: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

GUAM POWER AUTHORITYATURIDAT ILEKTRESEDAT GUAHAN

P.O.BOX 2977 AGANA, GUAM U.S.A. 96932-2977

July 12, 2011

MEMORANDUM

To: General Manager

From: AGMO (A)

Subject: Compliance Reports

Attached for your review are the project status reports for Engineering CapitalImprovement Projects for the Quarter of April - June 2011.

Should you have any questions regarding these CIP reports, please let me know.

Lelinda . Camacho, P.E.

/attachments

cc: CFOAssistant CFOManager (A), Engineering

Page 4: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

6%A GUAM POWER AUTHORITYATURIDAT ILEKTRESEDAT GUAHAN

P.O.BOX 2977 AGANA. GUAM U.S.A. 96932-2977•.

I

Engineering Capital Improvement Projects

Submitted herewith are the April - June 2011 Progress and Compliance Reports for thefollowing projects:

Project Name Engineering Section1 Agana Heights Pole Hardening and Reconductoring Distribution2 Barrigada Village Upgrading and Pole Hardening Distribution3 Dededo Kaiser Pole Hardening Phase II Distribution4 Dededo Kaiser Pole Hardening Phase III Distribution5 Distribution System Improvements Distribution6 Tumon Bay Lateral Underground Conversion Distribution7 Agat Village Pole Hardening & Hybrid Conversion Distribution8 P-003 Underground Extension to Port Authority Distribution9 Line Reclosing and Load Profiling Distribution

10 Tenjo Diesel Power Plant Project Management11 Fire Protection Upgrades at Power Plants Project Management12 Underground Fuel Pipeline Conversion Project Management13 Ambient Air Quality Monitoring Project Management14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission15 Hagatna Substation Transformer Capacity Upgrade Substation/Transmission16 Dededo Substation Upgrade Substation/Transmission17 Marbo to Pagat 34.5 kV Line Substation/Transmission18 System Stability and Relay Coordination Substation/Transmission19 Tumon Substation Transformer Capacity Upgrade Substation/Transmission

V ncent J. Sablan, P.E.Engineering Manager (A)

Page 5: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Engineering DistributionProject Status Reports

4c..April - June 2011

Page 6: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Submitted are the April 2011 through June 2011 Progress Reports and Compliance Reports forthe following projects:

Project Name Engineer Job Order

1 Agana Heights Upgrading VJS 100009

2 Barrigada Village Upgrade VJS 100015

3 Dededo Kaiser Phase II VJS 100012

Dededo Kaiser Phase III VJS 100013

5 Distribution System Improvements LCC 100081

6 Tumon Bay Lateral Underground Conversion EKC 100114

7 Agat Village Pole Hardening & Hybrid ADM 100115Conversion

8 P-003 Underground Extension to Port EKC 100116Authority

9 Line Reclosing and Load Profiling EKC 100111

\tincent J. Sablan, P.E.

Page 7: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

DIS

TR

IBU

TIO

NE

NG

INE

ER

ING

Pro

ject

Com

plia

nce

Rep

ort

Sum

mar

yA

pril

2011

-June2

011

App

rove

dL

ates

tE

ngg.

Corn

mtm

entt

oB

alan

ceof

Act

uals

Pro

ject

Bud

get

Est

imat

eD

ate

App

r’dB

udge

t1

Aga

naH

eigh

tsP

ole

Har

deni

ngan

dR

econ

duct

orin

g1,

685,

000

5,31

4,68

516

7,10

216

7,10

21,

517,

898

2B

arri

gada

Vill

age

Upg

radi

ngan

dPo

leH

arde

ning

1,46

3,00

03,

334,

844

1,32

91,

329

1,46

1,67

13

Old

Ded

edo

Kai

ser

Pol

eH

arde

ning

Pha

seII

905,

000

3,12

3,16

30

090

5,00

04

Old

Ded

edo

Kai

ser

Pol

eH

arde

ning

Pha

seIll

1,07

2,00

02,

914,

856

925

925

1,07

1,07

55

Dis

trib

utio

nS

yste

mIm

prov

emen

ts10

00,0

001,

000,

000

118,

051

95,2

1688

1,94

96

Tum

onB

ayL

ater

alU

nder

grou

ndC

onve

rsio

n6,

582,

838

6,58

2,83

80

06,

582,

838

7A

gat

Vill

age

Pol

eH

arde

ning

&H

ybrid

Con

vers

ion

3,80

0,00

03,

800,

000

00

3,80

0,00

08

P-0

03U

nder

grou

ndE

xten

sion

toPo

rtA

utho

rity

4,77

5,65

03,

880,

375

990

990

4,77

4,66

09

Lin

eR

eclo

sing

and

Loa

dPr

ofili

ng1,

200,

000

1,20

0,00

068

,922

01,

131,

078

Page 8: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

MONTHLY PROGRESS REPORT

Report Date: July 11, 2011

Project: Agana Heights Pole Hardening & Reconductoring

Business Unit: 100009

Funding Source: Bond Funds

Project Description: Installation of manholes, handholes, undergroundconduits, underground conductors and pad mountedtransformers to eliminate voltage problems andenhance system reliability.

Design: GPA Engineering

As-builSurvey Services: Duenas & Associates, Inc. (RFP 99-017) - Completed

Construction Contractor:

Contract Amount: $106,920.00 2313-000 OP (Duenas & Assoc.)$58,080.00 6475 OP (Duenas & Assoc)

Completed October 5, 2000

Administrative Activities: Reprogramming of funds under consideration.Request for PUC approval of underground projectwithdrawn.

Construction Activities:

Project Schedule: Completion of Base Map: October 25, 2000Planned Start Construction:Planned Finish:

Completed to Date: Survey Base Map - Completed, Design 45%Completed

Progress Payment: 65,000 — Base Map

Reviewed By: IrJ. bla .

Approved By: iiI4. R. Camacho, P.E.

Engineering Department Monthly Status ReportDistribution April - June 2011

Page 9: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Agana Heights Pole Hardening and ReconductoringCOMPLIANCE REPORTApril2011 - June 2011

Approved Latest Eng’g. Commitment to Balance ofDescription of Worlclltem Budget Estimate Date Actuals Appr’d Budget Remarks

DesignIn-House Labor 15,000 90,000 1,067 1,067 13,933

Garageirravel/Overhead/Others 0 5000 1034 1,034 (1,034)Survey Services 150000 165.000 165,000 165,000 (15000) 2313/6475 OP

(Duenas & Associates) CompletedTotal Design 165,000 260,000 167,102 167,102 (2,102)

Contractor FurnishedEquipment/Materials

OmniRupter Switches 15,000 0 0 0 15,00045’ Concrete Poles 200,000 0 0 0 200,00035’CorrcretePoles 160,000 0 0 0 160,000

Conductors 175,000 0 0 0 175,000Line Hardware 80,000 0 0 0 80,000

Transformers & Accessones 75,000 0 0 0 75,000Pad Mounted Transformer 0 21,825 0 0 0

Pad Mounted Switch 0 180,000 0 0 0Riser Tremination 0 3,600 0 0 0

l5KVJunctionsandElbows 0 61,714 0 0 015KV Underground Cable 0 300,000 0 0 0

600 V Underground Cable Ass. 0 349,200 0 0 0600 V Underground Cable 0 87,300 0 0 0

Total Equipment/Materials 705,000 1,003,639 0 0 705,000

Construction ManagementEngineering Labor 20.000 20,000 0 0 20,000

T&D Labor 20,000 20,000 0 0 20,000Total Construction Management 40,000 40,000 0 0 40,000

Construction Contractor WorkMobilization & Demobilization 40,000 0 0 0 40,000

Survey & StakeoutlCleanng 30,000 0 0 0 30,00045’ Concrete Pole Installation 150,000 0 0 0 150,000

35’ Concrete Poles 115,000 0 0 0 115,000Pole Framing 80,000 0 0 0 80,000

Primary line Installation 95,000 0 0 0 95,000Secondary Line Installation 93,000 0 0 0 93,000

Transformer Installation 45,000 0 0 0 45,000lnstallalionofServiceWires 20,000 0 0 0 20,000

Pole Numbering 2,000 0 0 0 2,000Pole/Hardware&LineRemoval 100,000 0 0 0 100,000

Testing & Energization 5,000 0 0 0 5,000Primary Handholes 0 206,714 0 0 0

Secondary Handhdes 0 349,200 0 0 0Primary Risers 0 4,000 0 0 0

SwitchPad 0 4,500 0 0 0Pad Mtd X-fmr Concrete Pad 0 24,250 0 0 0

Trenching 0 259,700 0 0 0Installation of 2-6 PVC Sch. 40 Conduit 0 36,000 0 0 0Installation of 2-4 PVC Sch. 40 Condui 0 270,000 0 0 0Instaltation of 1-4” PVC Sch. 40 Conduit 0 523,800 0 0 0

Concrete Encasement 0 519,400 0 0 0Asphalt/Concrete Driveway Restoration 0 236,474 0 0 0

Pad Mounted X-Fmr Termination 0 21,825 0 0 0Riser Termination 0 6,000 0 0 0

15 kV Junction & Elbow Installation 0 46,286 0 0 015 kV luG Cable Installation 0 90,000 0 0 0600 V U/C Cable Installation 0 185,076 0 0 0

600 V U/C Cable Termination 0 12,440 0 0 0Trenching 0 162,960 0 0 0

Installation of 2” PVC Sch. 40 Conduit 0 325,920 0 0 00/H to U/C Service Entrance Conversion & Pedestal 0 582,000 0 0 0

Restoration 0 145,500 0 0 0Total Construction 775,000 4,011,045 0 0 775,000

TOTAL 1,685,000 5,314,685 167,102 167,102 1,517,898

Page 10: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

MONTHLY PROGRESS REPORT

Report Date: July 11, 2011

Project: Barrigada Village Upgrading and Pole Hardening

Business Unit: 100015

Funding Source: Bond Funds

Project Description: Installation of manholes, handholes, undergroundconduits, underground conductors and pad mountedtransformers to eliminate voltage problems andenhance system reliability.

Design: GPA Engineering

Construction Contractor:

Contract Amount:

Administrative Activities: Reprogramming of funds under consideration.Request for PUC approval of underground projectwithdrawn.

Construction Activities:

Project Schedule: Planned Start Construction:Planned Finish:

Completed to Date: Survey Base Map - Completed, Design 25%Completed

Progress Payment:

Reviewed By:

_________________________

J. S blan .E.Approved By:

_________________________

M. R. Camacho, P.E.

Engineering Department Monthly Status ReportDistribution April - June 2011

Page 11: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Barrigada Village Upgrading and Pole HardeningCOMPLIANCE REPORTApril 2011 -June 2011

Approved Latest Eng’g. Commitment to Balance ofDescription of Work/Item Budget Estimate Date Actuals Appr’d Budget Remarks

DesignIn-House Labor 30,000 90,000 846 846 29,154

Garage/Travel/Overhead/Others 0 65,000 483 483 (4831Total Design 30000 155,000 1,329 1,329 28,671

Contractor FurnishedEquipment/Materials

45’ Concrete Poles 180,000 0 0 0 180,00035’ Concrete Poles 202,500 0 0 0 202,500

Conductors 75,000 0 0 0 75,000Line Hardware 100,000 0 0 0 100,000

Transformers & Accessories 60,000 0 0 0 60,000Pad Mounted Transformer 0 12,000 0 0 0

Pad Mounted Switch 0 180,000 0 0 0Riser Treminatton 0 3,600 0 0 0

15KV Junctions and Etbows 0 53,369 0 0 015KV Underground Cable 0 233,490 0 0 0

600VUndergroundCabteAss. 0 192,000 0 0 0600 V Underground Cable 0 48,000 0 0 0

Total Equipment/Materials 617,500 722,459 0 0 617,500

Construction ManagementEngineering Labor 20,000 20,000 0 0 20,000

T&D Labor 20,000 20,000 0 0 20,000Total Construction Management 40,000 40,000 0 0 40000

Construction Contractor WorkMobilization & Demobilization 35,000 0 0 0 35,000

Survey&StakeoutlClearing 15,000 0 0 0 15,00045’ Concrete Poles w/ Foundation 200,000 0 0 0 200,00035’ Concrete Poles w/Foundation 298,820 0 0 0 298,820

Pole Framing 54,870 0 0 0 54,870Down Guys w/Anchors 12,760 0 0 0 12,760

Primary Line Installation 32,500 0 0 0 32,500Secondary Line Installation 26,000 0 0 0 26,000Relocate Existing Laterals 10,000 0 0 0 10,000

Underbuild Equip & Secondary 15,000 0 0 0 15,000Removals 60,000 0 0 0 60,000

Pole Numbering 11,550 0 0 0 11,550Testing & Energization 4,000 0 0 0 4,000

Primary Handholes 0 177,897 0 0 0Secondary Handholes 0 192,000 0 0 0

Primary Risers 0 4,000 0 0 0Switch Pad 0 4,500 0 0 0

Pad Mtd X-fmr Concrete Pad 0 13,333 0 0 0Trenching 0 155,585 0 0 0

Installation of 2-6” PVC Scfl. 40 Conduit 0 0 0 0 0Installation of 2-4” PVC Sch. 40 Conduit 0 233,490 0 0 0Installation of 1-4” PVC Sch. 40 Conduit 0 288,000 0 0 0

Concrete Encasement 0 311,170 0 0 0Asphalt/Concrete Driveway Restoration 0 131,936 0 0 0

Pad Mounted X-Fmr Termination 0 12,000.00 0 0 0Riser Termination 0 6,000.00 0 0 0

15 kV Junction & Elbow Installation 0 40,026.86 0 0 015 kV U/G Cable Installation 0 70,047.00 0 0 0600 V U/G Cable Installation 0 101,760.00 0 0 0

600 V U/G Cable Termination 0 6,840.00 0 0 0Trenching 0 89,600.00 0 0 0

Installation of 2” PVC Sch. 40 Conduit 0 179,200.00 0 0 00/H to U/G Service Entrance Conversion & Pedestal 0 320,000.00 0 0 0

Restoration 0 80,000.00 0 0 0Total Construction 775,500 2,417,385 0 0 775,500

, TOTAL 1,463,000 3,334,844 1,329 1,329 1,461,671

Page 12: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

MONTHLY PROGRESS REPORT

Report Date: July 11, 2011

Project: Old Dededo Kaiser Pole Hardening Phase II

Business Unit: 100012

Funding Source: Bond Funds

Project Description: Installation of concrete power poles with concretefoundations. Relocation and upgrade of poles torights-of-way along traveled roads. Reconductoringand rephasing of primary lines. Upgrade ofsecondary system to eliminate voltage problems andenhance system reliability.

Design: GPA Engineering

Construction Contractor:

Contract Amount:

Administrative Activities: Reprogramming of funds under consideration.Request for PUC approval of underground projectwithdrawn.

Construction Activities:

Project Schedule: Planned Start Construction:Planned Finish:

Completed to Date: Survey Base Map - Completed, Design 30%Completed

Progress Payment:

Reviewed By:

_________________________

,1.J. Sablan .E.

Approved By:

_________________________

‘Iv!. R. Camacho, P.E.

Engineering Department Monthly Status ReportDistribution April - June 2011

Page 13: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Old Dededo Kaiser Pole Hardening Phase I!COMPLIANCE REPORTApril2011 -June2011

Approved Latest Eng’g. Commitment to Balance ofDescription of Work/Item Budget Estimate Date Actuals Appr’d Budget Remarks

DesignIn-House Labor 10000 90,000 0 0 10,000

Garage/Travel/Overhead/Others 0 65,000 0 0 0Total Design 10,000 155,000 0 0 10,000

Equipment/Materials

45’ Concrete Poles 134,400 0 0 0 134,40035’ Concrete Poles 37,800 0 0 0 37,800

Conductors 44,680 0 0 0 44,680Line Hardware 100,480 0 0 0 100.480

Transformers & Accessories 57,000 0 0 0 57,000Pad Mounted Transformer 0 13,463 0 0 0

Pad Mounted Switch 0 160,000 0 0 0Riser Trernination 0 1,800 0 0 0

15KV Junctions and Elbows 0 33,600 0 0 015KV Underground Cable 0 189,000 0 0 0

600 V Underground Cable Ass. 0 215.400 0 0 0600 V Underground Cable 0 53,850 0 0 0

Total EquipmentiMatenals 374,360 667,113 0 0 374,360

Construction ManagementEngineering Labor 12,000 12,000 0 0 12,000

T&D Labor 10,000 10,000 0 0 10,000Total Construction Management 22,000 22.000 0 0 22,000

ConstructionMobilization & Demobilization 35,000 0 0 0 35,000

Survey&Stskeout/Clearing 15,000 0 0 0 15,00045’ Concrete Poles wI Foundation 179,200 0 0 0 179,20035’ Concrete Poles w/Foundation 67,200 0 0 0 67,200

Pole Framing 33,600 0 0 0 33,600Down Guys w/Anchors 13,200 0 0 0 13,200

Primary Line Installation 32,760 0 0 0 32,760Secondary Line Installation 26,520 0 0 0 26,520Relocate Existing Laterals 10,000 0 0 0 10,000

Underbuild Equip & Secondary 15,000 0 0 0 15,000Removals 55,400 0 0 0 55,400

Pole Numbering 11,760 0 0 0 11,760Testing & Energization 4,000 0 (1 0 4,000

PrimaryHandholes 0 112,000 0 0 0Secondary Handholes 0 215,400 0 0 0

Primary Risers 0 2,000 0 0 0Switch Pad 0 4,000 0 0 0

Pad Mtd X-fmr Concrete Pad 0 14,958 0 0 0Trenching 0 160,930 0 0 0

Installation of 2-6” PVC Sch. 40 Conduit 0 50,400 0 0 0Installation of 2-4” PVC Sch. 40 Conduit 0 147,000 0 0 0Installation of 1-4” PVC Sch. 40 Conduit 0 323,100 0 0 0

Concrete Encasement 0 321,860 0 0 0Asphalt/Concrete Driveway Restoration 0 145,369 0 0 0

Pad Mounted X-Fmr Termination 0 13,463 0 0 0Riser Termination 0 3,000 0 0 0

15 kV Junction & Elbow Installation 0 25,200 0 0 015 kV U/G Cable Installation 0 56,700 0 0 0600 V U/G Cable Installation 0 114,162 0 0 0

600 V U/G Cable Termination 0 7,674 0 0 0Trenching 0 37,695 0 0 0

Installation of 2” PVC Sch. 40 Conduit 0 75,390 0 0 00/H to U/G Service Entrance Conversion & Pedestal 0 359,000 0 0 0

Restoration 0 89,750 0 0 0Total Construction 498,640 2,279,050 0 0 498,640

TOTAL 905,000 3,123,163 0 0 905,000

Page 14: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

MONTHLY PROGRESS REPORT

Report Date: July 11, 2011

Project: Old Dededo Kaiser Pole Hardening Phase III

Business Unit: 100013

Funding Source: Bond Funds

Project Description: Installation of concrete power poles with concretefoundations. Relocation and upgrade of poles torights-of-way along traveled roads. Reconductoringand re-phasing of primary lines. Upgrade ofsecondary system to eliminate voltage problems andenhance system reliability.

Design: GPA Engineering

Construction Contractor:

Contract Amount:

Administrative Activities: Reprogramming of funds under consideration.Request for PUC approval of underground projectwithdrawn.

Construction Activities:

Project Schedule: Planned Start Construction:Planned Finish:

Completed to Date: Survey Base Map - Completed, Design 65%Completed

Progress Payment:

Reviewed By:

_________________________

Approved By:E

M. R. Camacho, P.E.

Engineering Department Monthly Status ReportDistribution April - June 2011

Page 15: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Old Dededo Kaiser Pole Hardening Phase II!COMPLIANCE REPORTApril2011 - June 2011

Approved Latest Eng’g. Commitment to Balance ofDescription of Work/Item Budget Estimate Date Actuals Appfd Budget Remarks

DesignIn-House Labor 10,000 90,000 334 334 9,666

GaragelTravel/OverheadlOthers 0 65,000 591 591 (591)Total Design 10,000 155,000 925 925 9,075

Equipment/Materials

45’ Concrete Poles 132,000 0 0 0 132,00035’ Concrete Poles 81,000 0 0 0 81,000

Conductors 43,720 0 0 0 43,720Line Hardware 116600 0 0 0 116,600

Transformers & Accessories 70,000 0 0 0 70,000Pad Mounted Transformer 0 11288 0 0 0

Pad Mounted Switch 0 180,000 0 0 0Riser Tremination 0 2.700 0 0 0

15KV Junctions and Elbows 0 37,371 0 0 015KV Underground Cable 0 216,000 0 0 0

600VUndorgroundCableAss. 0 180,600 0 D 0600 V Underground Cable 0 45,150 0 0 0

Total Equipment/Materials 443,320 673,109 0 0 443,320

Construction ManagementEngineering Labor 12,000 12,000 0 0 12,000

T&D Labor 10,000 10,000 0 0 10,000Total Construction Management 22,000 22,000 0 0 22,000

ConstructionMobirization & Demobization 35,000 0 0 0 35,000

Survey&Stakeout/Cleanng 15,000 0 0 0 15,00045’ConcretePolesw/Fourolation 176,000 0 0 0 176,00035’ Concrete Poles w/Foundation 144,000 0 0 0 144,000

Pole Framing 54,870 0 0 0 54,870Down Guys w/Anchors 12,760 0 0 0 12,760

Primary Line Installation 32,500 0 0 0 32,500Secondary Line Installation 26,000 0 0 0 28,000Relocate Existing Laterals 10,000 0 0 0 10,000

Underbuild Equip & Secondary 15,000 0 0 0 15,000Removals 60,000 0 0 0 60,000

Pole Numbering 11,550 0 0 0 11,550Testing & Energization 4,000 0 0 0 4,000

Primary Handholes 0 124,571 0 0 0Secondary Handholes 0 180,600 0 0 0

Primary Risers 0 3,000 0 0 0SwitchPad 0 4,500 0 0 0

Pad Mid X-fmr Concrete Pad 0 12,542 0 0 0Trenching 0 145,670 0 0 0

Installation of 2-6W PVC Sch. 40 Conduit 0 63,000 0 0 0Installation of 2-4 PVC Sch. 40 Conduit 0 163,500 0 0 0Installationofl-4”PVCSch.4oConduit 0 270,900 0 0 0

Concrete Encasement 0 291340 0 0 0Aaptwlt/Concrete Driveway Restoration 0 123,291 0 0 0

Pad Mounted X-FmrTermination 0 11,288 0 0 0Riser Termination 0 4,500 0 0 0

15 kV Junction 8 Elbow Installation 0 28,029 0 0 015 kV Ui’G Cable Installation 0 64,800 0 0 0600 V LuG Cable Installation 0 95,718 0 0 0

600 V U/G Cable Termination 0 6,434 0 0 0Trenching 0 31,605 0 0 0

lnstallationof 2” PVC Sch. 40 Conduit 0 63,210 0 0 00/H to U/G Service Entrance Conversion & Pedestal 0 301,000 0 0 0

Restoration 0 75,250 0 0 0Total Construction 596,680 2,064,747 0 0 596,680

TOTAL 1,072,000 2,914,856 925 925 1.071,075

Page 16: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

MONTHLY PROGRESS REPORT

Report Date: July 11, 2011

Project: Distribution System Improvements

Business Unit: 100081

Funding Source: Bond Funds

Project Description: The Distribution System Improvements Project will analyzethe existing GPA distribution system against industry-accepted voltage standards & equipment load ratings andrecommend specific corrective capital improvement projects(CIP’s). The project will implement these correctiverecommendations, and address distribution systemdeficiencies such as unbalances, overloads, power factor andoverall power quality one feeder at a time. Design andconstruction follow the priority feeder listing.

Design: In-House - Currently in progress

Construction Contractor: GPA T&D

Contract Amount:

Construction Activities: - P-112 New Feeder design completed. Awaiting customerconnection (Ukudu Workforce Housing).

- Feeder P-323 phase balancing, capacitor placement andfusing completed.

- Feeder P-ill reconductoring completed- Feeder P-261 and P-087 re-conductoring- Feeder P-261 and P-340 fusing completed- Feeders P-280, P-281, P-282, P-283 Design in progress- Switched Capacitors Ordered under 221620R, GPA Bid

#45-Il.

Project Schedule: Planned Start Construction: September 2010Actual Start Construction: September 2010Planned Finish: September 2013Actual Finish:

Completed to Date: 14%

Progress Payment $95,216 - GPA T&D Labor, Equipment, and Materials

Engineering Department Monthly Status ReportDistribution April - June 2011

Page 17: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Prepared By:

Reviewed By:

Approved By:

Engineering DepartmentDistribution

L itmacho

4—‘Vj Sablan, P.E.

M. R. Camacho, P.E.

Monthly Status ReportApril - June 2011

Page 18: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

C

‘S

C

C

C

>.

E

0

0

.4 ow

H

Page 19: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Distribution System lmprovmentsCOMPLIANCE REPORTApril 2011 - June 2011

Approved Latest Engg. Commitment to Balance of Remarks (PO# orDescription of Work/Item Budget Estimate Date Actuals Appr’d Budget Work Order #

GPA PurchasedEquipment/Materials

Switches 200,000 200,000 - - 200,000Switched Capacitors 240,000 240,000 22,835 - 217,165 Switched Cap.

Garage and Miscellaneous 10,000 10,000 12,059 12,059 (2,059) 160530PTotal GPA Purchased Equipment/Materials 450,000 450,000 34,894 12059 415,106

GPA Warehouse FurnishedEquipment/Materials 100,000 100,000 37,412 37,412 62,588

Total GPA Warehouse Equipment/Materials 100,000 100,000 37,412 37,412 62588

Construction ManagementEngineering Labor 75,000 75,000 - - 75,000

Garage/Travel/Overhead/Others 10,000 10,000 - - 10,000Total Construction Management 85,000 85,000 - - 85,000

Construction by T&DSwitch Installation 23,750 23,750 - - 23,750

Capacitor Installation 23,750 23,750 - - 23,750

Fuse Installation and Reconductoring 217,500 217,500 45,745 45,745 171,755

Travel/Overhead/Others 100,000 100,000 - - 100,000

Total Construction 365,000 365,000 45,745 45,745 319,255

TOTAL 1,000,000 1,000,000 118,051 95,216 881,949

Page 20: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

MONTHLY PROGRESS REPORT

Report Date: July 11, 2011

Project: Tumon Bay Lateral Underground Conversion

Business Unit: 100114

Funding Source: Bond Funds

Project Description: The Tumon Bay Lateral Underground Conversion Project isdesigned to convert the existing overhead laterals along SanVitores Road to an underground system. The project willalso upgrade the system to address voltage delivery issues.This project will provide an underground system that willremain intact in the event of a typhoon, consequentlyeliminating restoration efforts for this area. The project willinstall a primary and secondary underground system alongselected side roads at San Vitores Road in Tumon. Theprimary line will be placed underground and residential andcommercial customers within the project area will beconverted to an underground service through pad-mountedtransformers.

Design: In-House - Currently in Progress

Activities: • As-Built — CompletedUnderground conversion designs for 3 lateralsites out of 11 sites are completed.

Construction Contractor:

Contract Amount:

Construction Activities:

Project Schedule: Planned Start Construction: June 2011Actual Start:Planned Finish: May 2013

Completed to Date: 35% - Design

Progress Payment: $ -0-

Engineering Department Monthly Status ReportDistribution April - June 2011

Page 21: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Cruz

Prepared By:

EdWard KReviewed By:

_____________

Approved By:

_____________

M. R. Camacho, P.E.

Engineering Department Monthly Status ReportDistribution April - June 2011

Page 22: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Tumon Bay Lateral Underground ConversionCOMPLIANCE REPORTApril 2011 -June 2011

Approved Latest Eng’g. Commitment to Balance ofDescription of Work/Item Budget Estimate Date Actuals Apprd Budget Remarks

DesignIn-House Labor 15,000 15,000 - - 15,000

GaragelTravel/Overhead/Others 1,500 1,500 - - 1,500Total Design 16,500 16,500 - - 16,500

Construction ManagementEngineering Labor 63,000 63,000 - - 63,000

T&D Labor 75,000 75,000 - - 75,000Garage/TravellOverhead/Others 50,000 50,000 - - 50,000

Total Construction Management 188,000 188,000 - - 188,000

Construction Contractor WorkPermits & Mobilization 100,000 100,000 - - 100,000

Primary Manhole 660,000 660,000 - - 660,000Primary Handhole 65,000 65,000 - - 65,000

Secondary [-fandhole 300,000 300,000 - - 300,000Pad Mounted Transformer 304,000 304,000 - - 304,000

Switch Pad 740,000 740,000 - - 740,000Conduit Installation and Restoration 2,076,505 2,076,505 - - 2,076,505

Street Lights 250,000 250,000 - - 250,000Removal of Existing Overhead Distribution System 80,000 80,000 - - 80,000

Primary Cable and Termination 717,019 717,019 - - 717,019Secondary Cable and Termination 746,040 746,040 - - 746,040

Conversion of Existing Service to Underground 211,000 211,000 - - 211,000Testing and Energization 28,774 28,774 - - 28,774

Archaeological Work 100,000 100,000 - - 100,000Total Construction 6,378,338 6,378,338 - - 6,378,338

TOTAL 6,582,838 6,582,838 - - 6,582,838

Page 23: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

MONTHLY PROGRESS REPORT

Report Date: July 11, 2011

Project: Agat Village Pole Hardening and Hybrid Conversion

Business Unit: 100115

Funding Source: Bond Funds

Project Description: The Agat Village Pole Hardening & Hybrid Project isdesigned to minimize restoration efforts in the Villageof Agat in the event of a typhoon. The project wifiharden the existing overhead primary system andconvert the existing secondary system to anunderground system within the village of Agat.

Design: In-House- Currently in Progress

Activities: . As-Built Completed• Underground Hybrid Design Completed• Pending Final Review

Construction Contractor:

Contract Amount:

Construction Activities:

Project Schedule: Planned Start Construction: August 2011Actual Start:Planned Finish: January 2013

Completed to Date: 99% - Design ( Design currently in review process)

Progress Payment: $ -0-

Prepared By:

_________________________

i .Mat

___

Reviewed By:/aP.E.

Approved By:

_________________________

M. R. Camacho, P.E.Engineering Department Monthly Status ReportDistribution April - June 2011

Page 24: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Agat Pole Hardening and Hybrid ConversionCOMPLIANCE REPORTApril2011 - June 2011

Approved Latest Engg. Commitment to Balance ofDescription of Work/Item Budget Estimate Date Actuals Appr’d Budget Remarks

DesignIn-HouseLabor 21,000 21,000 - - 21,000

Garage/Travel/Overhead/Others 2,000 2,000 - - 2,000Total Design 23,000 23,000 - - 23,000

Construction ManagementEngineering Labor 54,000 54,000 - - 54,000

T&D Labor 60,000 10,000 - - 60,000Garage/Travel/Overhead/Others 50,000 100,000 - - 50,000

Total Construction Management 164,000 164,000 - - 164,000

Construction Contractor WorkMobilization & Demobilization 75,000 75,000 - - 75,000

Overhead Pole and Line Work 600,000 600,000 - - 600,000Secondary Riser 59,500 59,500 - - 59,500

Secondary Handhole 418,000 418,000 - - 418,000Trenching & Concrete Encasement(Roadway) 1,130,981 1,130,981 - - 1,130,981

Installation of PVC Conduits 577,925 577,925 - - 577,925Secondary Conductor and Termination 363,094 363,094 - - 363,094

Customer Conversion 208,500 208,500 - - 208,500Removal 80,000 80,000 - - 80,000

Archaeological Work 100,000 100,000 - - 100,000Total Construction 3,613,000 3,613,000 - - 3,613,000

TOTAL 3,800,000 3,800,000 - - 3,800,000

Page 25: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

MONTHLY PROGRESS REPORT

Report Date: July 11, 2011

Project: P-003 Underground Extension to Port Authority

Business Unit: 100116

Funding Source: Bond Funds

Project Description: The P003 Piti to Cabras Underground Conversion, Extensionto Port Authority Project is designed to minimize restorationefforts along Route 11 in the event of a typhoon. The projectwill install a primary and secondary underground systemfrom the GPA Generation Administration Building andCabras power plants to the Port Authority of Guam and Fuelcompanies in the surrounding area.

Design: In-House — 100% Completed

Construction Contractor:

Contract Amount: $-0-

Construction Activities:

Project Schedule: Planned Start Construction: August 2011Planned Finish: August 2013

Completed to Date: 100% - Design completed. Project bid process completed.Awaiting CCU Resolution approval and awarding of NTPto bid winner.

Progress Payment: $ 90- Design

Prepared By:

_________________________

E)rard K. CruzReviewed By: i -c---.-—

4f’Sablan, P.E.Approved By:

M. R. Camacho, P.E.

Engineering Department Monthly Status ReportDistribution April - June 2011

Page 26: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

P.003 Underground Extesnsion to Port AuthorityCOMPLIANCE REPORTApril 2011 -June2011

Approved Latest Eng’g. Commitment to Balance ofDescription of Work/item Budget Estimate Date Actuals Appfd Budget Remarks

DesignIn-House Labor 6,000 6,000 990 990 5,010

Garage/Travel/Overhead/Others 500 500 - - 500Total Design 6,500 6,500 990 990 5,510

Construction ManagementEngineering Labor 18,000 18,000 - - 18,000

T&D Labor 75,000 75,000 - - 75,000Garage/Travel/Overhead/Others 50,000 50,000 - - 50,000

Total Construction Management 143,000 143,000 - - 143,000

Construction Contractor WorkPermits & Mobilization 100,000 250,000 - - 100,000

Primary Cable and Termination 842,570 842,570 - - 842,570Pad Mounted Transformers 161,500 161,500 - - 161,500

Pad Mounted Switches 200,000 200,000 - - 200,000Street Lights 225,000 225,000 - - 225,000

Secondary Cable and Termination 497,400 497,400 - - 497,400Conduit Installation and Restoration 1,703,550 808,275 - - 1,703,550

New Primary Manholes 315,000 315,000 - - 315,000New Secondary Handhole 140,000 140,000 - - 140,000

Removal of Existing Overhead Distribution System 80,000 80,000 - - 80,000Conversion of Existing Service to underground 292,500 142,500 - - 292,500

Testing and Energization 18,630 18,630 - - 18,630Archaeological Work 50,000 50,000 - - 50,000

Total Construction 4,626,150 3,730,875 - - 4,626,150

TOTAL 4,775,650 3,880,375 990 990 4,774,660

Page 27: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

MONTHLY PROGRESS REPORT

Report Date: July 11, 2011

Project Line Reclosing and Load Profiling

Business Unit: 100111

Funding Source: Bond Funds

Project Description: The Line Reclosing and Load Profiling project will installfeeder line reclosing relays and metering devices in GPA’ssubstations. Reclosing devices will function with the 13.8kV breakers at the substation and will be designed to recloseafter 5 seconds that the breaker has opened to clear a fault.The metering devices will track individual feeder loadprofiling for use with distribution system studies such as lineloss as well as feeder voltage balancing.

Design: In-House - In Progress

Activities: • As-builts ongoing

Construction Contractor: GPA T&D

Contract Amount $-0-

Construction Activities: • Installation of SEL 734 and SEL 751 for P-240completed. P-241 is in progress.GPA T&D Relayshop work slightly delayedpending the delivery of required materials.

Project Schedule: Planned Start Construction: March 2011Actual Start Construction: June 2011Planned Finish: June 2013

Completed to Date: 45% - Design

Progress Payment: $ 8,922 — Materials

Prepared By:EcJvard K. Cruz

Reviewed By:

________________________

V.J/ablan, P.E.Approved By:

_________________________

M. R. Camacho, P.E.Engineering Department Monthly Status ReportDistribution April - June 2011

Page 28: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Line Reclosing and Load ProfilingCOMPLIANCE REPORTApril 2011 -June2011

Approved Latest Engg. Commitment to Balance ofDescription of Work/Item Budget Estimate Date Actuals App,d Budget Remarks (PO# or Work Order #

DesignIn-House Labor 38,500 38,500 - - 38,500

Garage/Travel/Overhead/Others 1,500 1500 - - 1,500Total Design 40,000 40,000 - - 40,000

GPA Purchased

Equipment/Materials

SEL 734 177,950 177,950 26,728 - 151,222 157670P - Schweitzer EngineeringSEL 751-A 161,250 161,250 30,979 - 130,271 157670P - Schweitzer EngineeringSEL 351-6 38,000 38,000 - - 38,000

Misc. Materials 10,000 10,000 11,215 - (1,215) 157670P - Schweitzer EngineeringTotal GPA Purchased Equipment/Materials 387,200 387,200 68,922 - 318,278

Construction ManagementEngineering Labor 45,000 45,000 - - 45,000

T&D Labor 150,000 150,000 - - 150,000Garage/Travel/Overhead/Others 100,000 100,000 - - 100,000

Total Construction Management 295,000 295,000 - - 295,000

Construction Contractor WorkPermits & Mobilization 121 .800 121,800 - - 121,800

Circuit As-Built 75,000 75,000 - - 75,000Installation of SEL-734-6 8,000 8,000 - - 8,000Installation of SEL-751-A 45,000 45,000 - - 45,000

Installation of SEL-734 53,000 53,000 - - 53,000Removal of Existing Relays and Devices 50,000 50,000 - - 50,000

Testing 125,000 125,000 - - 125,000Total Construction 477,800 477,800 - - 477,800

TOTAL 1,200,000 1,200,000 68,922 - 1,131,078

Page 29: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Engineering Project ManagementProject Status Reports

4c..April - June 2011

Page 30: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

GUAM POWER AUTHORITYATURIDAT ILEKTRESEDAT GUAHAN

P.O.BOX 2977 • AGANA, GUAM U.S.A. 96932-2977

Engineering Project ManagementCapital Improvement Projects

Submitted herewith is the June 2011 Quarterly Compliance Reports for the followingprojects:

Project Name Project Engineer

1. Tenjo Diesel Power Plant SCB

2. Fire Protection Upgrades at Power Plants SCB

3. Underground Fuel Pipeline Conversion MMM

4. Ambient Air Quality Monitoring MMM

Supervisor

Page 31: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

GUAM POWER AUTHORITYP.O. BOX 2977 AGANA, GUAM 96910

QUARTERLY COMPLIANCE REPORTTHREE MONTHS ENDING:

PUBLIC UTILITY COMMISSIONJune 30, 2011 DOCKET NO.: 92-010

B. DESIGN, ENGINEERING AND CONSTRUCTION MANAGEMENT

DESIGN OP UNITS 5 & 6 INSTALLATION

DESIGN OF TRANSMISSION LINE ALONG ROUTE 2A

C. CONSTRUCTION AND MAJOR EQUIPMENT PROCUREMENT

DEMOLITION OF OLD 6MM POWER PLANT/RELOCATE BLDG. TO T&D

DELIVERY OF 3OMVA TRANSFORMER

INSTALLATION OF CEM SYSTEM

COMPLETED

DELETED

JUNE. I999

COMPLETED JULY, 1999

CONSTRUCTION OF PHASE II COMPLETED APRIL 15. 2000

D. STARTUP, TESTING, COMMISSIONING OF MAJOR PLANTS

START-UP & COMMISSIONING OF UNIT NO 5

START-UP &COMMISSIONINGOFUNITNO. 6

Page 1 of2TITLE OF PROJECT: LOCATION: GPA WORK ORDER NO:TENJO DIESEL POWER PLANT TENJO, GUAM E-23I9-92

DESCRIPTION OF PROJECT:

PHASE I - Install four 4.88 MW dielel engine generators in a concrete building at Tenjo adjacent to the Shell OilProvide two 30,000 gallon fuel tanks, three 85 exhaust stack, and onsite drainage as required by GEPA. Provideadditional switchgear and install new 30 MVA transfonner and high voltage line for connection into the IslandPower Gnd

PHASE II - Relocation of two 4.88 MW diesel generators and its auxilliasy equipment from old OM}I Power Plant toTenjo. Provide new smoke stack, additional 30 MVA transformer for the substation and extend 34.5kVTransmission Line along Route 2A to Route I.

ESTIMATED ESTIMATEDAWARD/SUBMITTAL/ COMPLETION/

SUMMARY OF ACTIVITIES STATUS START DATE DELIVERY DATE

PHASE I

A PERMITtING (PSD/EIA/PERMIT TO CONSTRUCTION & OPERATE) COMPLETED

B. DESIGN. ENGINEERING AND CONSTRUCTION MANAGEMENT COMPLETED

C. CONSTRUCTION AND MAJOR EQUIPMENT PROCUREMENT COMPLETED

D. STARTUP, TESTING, COMMISSIONING OP MAJOR PLANTS COMPLETED

PHASE II

A. PERMITTING (PSD/EL4/PERMIT TO CONSTRUCTION & OPERATE)

PREVENTION OF SIGNIFICANT DETERIORATION (PSI)) COMPLETED lAN. 1999

GEPA PERMIT TO CONSTRUCT COMPLETED FEB 1999

GEPA PERMIT TO OPERATE COMPLETED JAN. 2000

EASEMENT FOR ROUTE ZA PENDING To be delerenined

COMPLETED

COMPLETED

JAN. 5. 1999

AUG. 15, 199t

COMPLETED

COMPLETED

JUNE 7. 2000

MAY 2001

Page 32: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Page2 of2BALANCE OF

APPROVED BALANCE OFBUDGET APPROVED BUDGET

LATEST BASED PROM BASED FROMENGINEERING COMMITMENTS TO ENGINEERINI COMMITMENTS TO REMARKS (STATUS

APPROVED BUDGET ESTIMATE DATE ESTIMATE DATE OF ACTIVITY)

PHASE I

TURNKEY CONSTRUCTION &

LAND ACQUISITION BUDGET 10,674,000

1. DIESEL ENGINE GENERATOR SET 7193100 7,893,100 COMPLETED

2. LAND ACQUISITION 1,013,394 1,013,394 COMPLETED

3. 30 MVA TRANSFORMER 352,000 352,000 COMPLETED

4. GAA LAND LEASE 309,000 301,584 COMPLETED

5. TEMPORARY LOCATION OF UNITS 3,239,077 3,208,227 3,208,227 COMPLETED

6. SITE CLEARING & GRADING AT TENJO 714,000 784,000 COMPLETED

7. CONSTRUCTION OF TENJO POWER PLANT 6,169,640 7,101,500 7,101,500 COMPLETED

0. CHANGE ORDERS 121,446 121,446 COMPLETED

SUBTOTAL FOR PHASE I 20,782,717 20,782,667 00,782,250

PHASE II

1. INSTALLATION OF CEM SYSTEM 400,000 389,607 369,607 COMPLETED

2. 30 MVA TRANSFORMER ACQUISITION 490,000 COMPLETED

3. INSTALLATION OF 34.5KV TRANSMISSION

LINE ALONG ROUTE 2A 790,000 780,000 ON-HOLD

4. INSTALLATION OF TWO 4.81 MW ENGINE-

GENERATORS AND AUXILLIARY EQPT. 1,525,141 1,115,000 1,115,000 COMPLETED

5. BUILDING PERMIT 9,230 9,230 COMPLETED

6. CHANGE ORDER

I PROVIDE MISSING PARTS AND REPAIR 60.585 60.585 COMPLETED

OF OFCI EQUIPMENT

2 PAINTING OF SMOKE STACK AND 106,628 106,620 COMPLETED

EXISTING PIPING. INSTALLATION OF

SUMP PUMPS FOR SWITCHGEAR AREAS.

SUBTOTAL FOR PHASE 11 3,205,141 2,461,050 1,681,550

TOTAL CONSTRUCTION COST 23,987,858 23,243,717 22,463,301

COMPLETED

COST FOR BOTHPERMITTING 410,000 404,782 404,782 PHASE I AND PHASE

II PROJECTS

CONSTRUCTION ADMINISTRATION 950,000 942,163 942,163 CO Ills AS

AlE DESIGN FEE/INSPECTION 870,000 869,000 869,000 COMPLETED

BASED ON LATESTTOTAL FOR THIS PROJECT 26,217,858 05,459,662 24,679,246 758,196 ENG’G ESTIMATE

REMARKS:

INSTALLATION OF 34.5KV TRANSMISSION LINE ALONG ROUTE 2A IS ON HOLD,

PENDING FINAL DECISION FROM ENGINEERING SUBSTATION ON FINAL DESIGN

PREPARED BY: SUBMITTED BY. APROVED BY:

dSTE C. BAUTISTA PR B. TA DOC CENT 3. SABLAN, P.R.PROJECT ENGINEER ENG SUP RVISOR MANAGER OF ENGINEERING (A)

Page 33: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

GUAM POWER AUTHORITY

P.O. BOX 2977 AGANA. GUAM 96910

QUARTERLY COMPLIANCE REPORT

THREE MONTliS ENDING: June 30, 2011

PUBLIC UTILITY COMMISSION

DOCKET NO.:

Page 1 of2

TITLE OF PROJECT: LOCATION: GPA WORK ORDER NO:

FIRE PROTECTION UPGRADES AT GPA VARIOUS FACILITIES 100096 / 100101 / 100118/100120/100121/100122/100123/100124FACILITIES

DESCRIPTION OF PROJECT:

Upgrade of Fire Protection at Various Facilities Project is designed to upgrade the existing fire protection systems at various GPA facilities to meet the requirements of the latestedition of the National Fire Protection Association (NFPA) codes and standards. Additionally, the project will bring the facilities in compliance with the risk survey reportpertaining to the Fire Protection System. The facilities include Macheche CT, Yigo CT, Dededo Diesel, Tenjo Diesel, Manenggon Diesel, Talofofo Diesel, Marbo CT andCabras I &2 power plants.The work involves the following:

• Assessment of the existing fire protection systems• Installation of new water supply lines, fire hydrants and fire lines• Installation of diesel- engine driven pumps and electric jockey pumps.• Installation of new fire protection systems such as carbon dioxide, FM 200 extinguishing system, foam system and sprinkler system• Installation of new fire alarm and smoke detection system.• Testing and commissioning

SUMMARY OF ACTWITIES STATUS ESTIMATED AWARD EST. COMPLETION ISTART DATE DELIVERY DATE

A. DESIGN and ENGINEERING

Prepare construction documents for Upgrade of Fire Protection at Various Facilities Completed January, 2007Prepare construction documents for Upgrade of Fire Protection at Macheche CT Completed January, 2007Prepare construction documents for Upgrade ofFire Protection at Yigo CT Completed January, 2007Prepare construction documents for Upgrade of Fire Protection at Dededo Diesel Completed January, 2007Prepare construction documents for Upgrade of Fire Protection at Tenjo Diesel Completed January, 2007Prepare construction documents for Upgrade of Fire Protection at Manenggon Diesel Completed January, 2007Prepare construction documents for Upgrade of Fire Protection at Talofofo Diesel Completed Tanuary, 2007Prepare construction documents for Upgrade of Fire Protection at Marbo CT Completed January, 2007Prepare construction documents for Upgrade of Fire Protection at Cabras I &2 Completed June, 2006

B. CONSTRUCTION and MAJOR EQUIPMENT PROCUREMENT

Award contract for construction of Upgrade of Fire Protection at Macheche CT Completed September, 2010Award contract for construction of Upgrade of Fire Protection at Yigo CT In progress March, 2011 December, 2011Award contract for construction of Upgrade of Fire Protection at Dededo Diesel In progress March, 2011 December, 201 1Award contract for construction of Upgrade ofFire Protection at Tenjo Diesel June, 2011 March, 2012Award contract for construction of Upgrade of Fire Protection at Manenggon Diesel June, 2011 March, 2012Award contract for construction of Upgrade of Fire Protection at Talofofo Diesel December, 2011 September, 2012Award contract for construction of Upgrade of Fire Protection at Marbo CT December, 2011- September, 2012Award_contract_for_construction_of Upgrade_of Fire_Protection_at_Cabras_I &2

C. STARTUP, TESTING and COMMISSIONING

Testing and commissioning of new fire protection system at Macheche CT Completed ,nfmh 7010-•‘ orotectron system at Yrso CT““,6”-’,”,-,’,.

Testing and commissioning of new fire protection system at Dededo Dieseleptember, 2011

,k.. ‘nh1

Tetrnernd commissioning ofnew fire protection system at Tenjo DieselTesting and commissicrnine of new fire orotection system at Maneason DieselTesting and commissioning of new fire protection system at Talofofo DieselTesting and ,‘nmmiccinn,nc nfnw fire nrntertlnn evct,m cit Mcirhn CT

Testing and commissioning of new fire protection system at Cabras I&2

lecember. 2011ecember. 2011

‘101 ‘1

roe. 2012

Page 34: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

GUAM POWER AUTHORITYP.O. BOX 2977 AGANA. GUAM 96910 Page 2 of 2

APPROVED LATEST ENGG COMMITMENTS BALM’JCE OFCOST CATEGORY BUDGET ESTIMATE TO DATE APPV’D BUDGET REMARKS (STATUS OF ACTIVITY)

A/E SERVICES FOR DESIGN Completed, EMCE

CONSTRUCTION 3,808,000 3,808,000

1. MACHECHE CT (100096) 350,0001.1 Mobilization/Demobilization 20,000 20,0001.2 Fire Pump & Foam Building 45,506 45,5061.3 Fire Line for Fire Protection System 29,547 29,547I.4FiceHydrant 14,199 14,1991.5 Re-Commissioning CO2 System 14,432 14,4321 6 FM-200 System 42,694 42,6841.7 Wet Fire Protection System and Fire Pump 160,906 160,906l.8FoomSystem 115,100 115,1001.9 Fire Alarm Syotem 46,255 46,255Sub-Total Macheche CT 350,000 488,629 488,629 Completed, GEMCCO

2. YIGO CT (100101) 428,000 428,000 363,309 Notice to Proceed issued to MIDONG E&Con 3/16/2011

3. DEDEDO DIESEL (100118) 360,000 360,000 337,980 Notice to Proceed issued to GEMCCOon 3/16/2011

4. TENJO DIESEL (100120) 428,000 428,000 Preparation ofBid Package in Progress

5. MANENGGON DIESEL (100121) 520,000 520,000 Preparation ofBid Package in Progress

6. TALOFOFO DIESEL (100122) 340,000 340,000

7. MARBO CT (100123) 445,000 445,000

8. CABRAS 1&2 (100124) 750,000 750,000 Bid Solicitation in Progress

TOTAL CONSTRUCTION BUDGET 3,621,000 3,759,629 1,189,918

GPA CONSTRUCTION MANAGEMENT 149,500 149,500 20,379 Commitments as of 06/30/11AlE CONSTRUCTION SUPPORT 37,500 37,500 8,649 EMCE CSS Macheche CT as of 06/30/11

TOTAL CONSTRUCTION BUDGET 3,808,000 3,946,629 1,218,946(Includes Project Manangement)

TOTAL FOR TillS PROJECT 3,808,000 3,946,629 1,218,946 2,589,054 Balance based from commitments to date

REMARKS:

1’PREP D BY:’ SUB D APROVED BY:

.

STEVTh AUTITA PERY B. T DOC VCENT J. SABLAN, P. E.PROJECT ENGINEER ENGIIR S ERVISOR MANAGER OF ENGINEERING (A)

Page 35: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

GUAM POWER AUTHORITYP.O. BOX 2977 AGANA, GUAM 96910

QUARTERLY COMPLIANCE REPORT

THREE MONTliS ENDING: June 30, 2011

PUBLIC UTILITY COMMISSION

DOCKET NO.:

Page 1 of2

TIThE OF PROJECT: LOCATION: GPA WORK ORDER NO:

UNDERGROUND FUEL PIPELINE BARRIGADA POST OFFICE 100082CONVERSION TO AIRPORT ACCESS ROAD

DESCRIPTION OF PROJECT:

The Underground Fuel Oil Pipeline Project runs from Barrigada Post Office to the Airport. This project is designed to replace approximately 160 miles of above ground fuel pipelinewith an underground pipeline to eliminate the risks of disastrous environmental accidents. The project will also install fuel metering systems to maintain accountability of fuel usageand prevent losses.The work involves the following:

• Installation of 8,500 LF of new 8-inch underground fuel oil pipeline• Installation of 2 isolation valves with manholes, 3 high point vent/pit and 3 low point vent/pit• Installation of cathodic protection• Installation of signs• Removal and disposal of existing 8-inch aboveground pipeline• Fuel Metering• Testing and commissioning

SUMMARY OF ACTWITIES STATUS ESTIMATED AWARD EST. COMPLETION ISTART DATE DELWERY DATE

A. DESIGN and ENGINEERING

Prepare construction documents for Underground Fuel Pipeline Project In Progress November, 2008 May, 2011

Prepare construction documents_for Fuel Metering

B. CONSTRUCTION and MAJOR EQUIPMENT PROCUREMENT

A 4 c,,.- A Dineline Proiectn””’ June. 2011 ?.L,.,i. ‘fl1

Award contract for Fuel Metering

C. STARTUP, TESTING and COMMISSIONING

Testing ‘n rn,,,,rn of new Underground Pipeline vIarch. 2012

Testine and commissioning of new Fuel Meterina

Page 36: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

GUAM POWER AUTHORITYP.O. BOX 2977 AGANA, GUAM 96910 Page 2 of 2

1 APPROVED LATEST ENGG COMMITMENTS BALANCE OFCOST CATEGORY J_BUDGET ESTIMATE TO DATE APPVD BUDGET REMARKS (STATUS OF ACTIVITY)

A/E SERVICES FOR DESIGN 150,000 150,000 In progress (95% submittal on hold pending POL easementdiscrepancy), NC. Macado & Associates

CONSTRUCTION 1,900,000 1,900,000

1. UNDERGROUND PIPELINE 1,700,000 1,700,000CONVERSION

1.1 Underground pipeline - 8”

1.2 Isolation valves, manholes, vent/pit

1.3 Cathodic Protection

1.4 Signs

1.5 Removal/disposal of exist. 8’ aboveground_pipeline

1.6 Testing & commissioning

2. FUEL METERING 200,000 200,000

TOTAL CONSTRUCTION BUDGET 1,900,000 1,900,000 -

GPA CONSTRUCTION MANAGEMENT 60,000 60,000AlE CONSTRUCTION SUPPORT 40,000 40,000

TOTAL CONSTRUCTION BUDGET 2,000,000 2,000,000 -

(Includes Project Manangement)

TOTAL FOR THIS PROJECT 2,100,000 2,100,000 0 2,100,000 Balance based from commitments to date

REMARKS:

Design of Underground Pipeline Conversion in progress (95% submittal on hold) pending POL easement discrepancy with Navy.

(P1RED BY: SUBMIT B — APROVED BY:

“4a,c&t C.

M4NUEL M. MINA PERRY TA )OC V’INCENT J. SABLAN, P. E.PTDJECT ENGINEE ENGINESUP - VISOR MANAGER OF ENGINEERING (A)

Page 37: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

DESCRIPTION OF PROJECT:

The project is designed to establish, operate and maintain an air quality monitoring network on Guam.The monitoring network will be used to obtain satisfactory, reliable ambientair quality data for submittal to the United States Environmental Protection Agency (USEPA) and to satisfy ambient air quality monitoring requirements of Guam EPA (GEPA).

The proposed air quality monitoring stations will be located at five (5) different locations that will be established upon approval of the Ambient Air Quality Monitoring Plan byUnited States Environmental Protection Agency (USEPA) and Guam Environmental Protection Agency (GEPA).

The work involves the following:• Preparation of Ambient Air Monitoring Plan to be reviewed and approved by USEPA and GEPA• Implementation of the approved plan and engage services of a qualified contractor to operate and maintain the AAQM.• Construction ofMeteorological (IvIET) Tower.• Construction of air monitoring concrete shelter with air conditioning.• Perimeter security fence.• Installation of contractor supplied equipment and instrument such as SO2 and NOX analyzer, portable calibrator, data logger. PM 2.5 1-lI-VOL sampling system, strip chart

recorder, laptop computer, UPS and others.• Preparation of QAIQC Plan to be reviewed and approved by USEPA and GEPA• System Integration and Testing• Routine and Quarterly Operations• Reporting and Audits

SUMMARY OF ACTIVITIES STATUS ESTIMATED AWARD / EST. COMPLETION ISTART DATE DELIVERY DATE

A. DESIGN and ENGINEERING

Prepare Ambient Air Monitoring Plan for USEPA and GEPA approval September, 2011 September, 2012

Prepare construction documents for MET tower, air monitoring shelter and fencing. September, 2012 September, 2013

Prepare construction documents for installation of equipment and instrument September, 2012 September, 2013

Prepare QA/QC Plan to be reviewed and approved by USEPA and GEPA September, 2012 September, 2013

B. CONSTRUCTION and MAJOR EQUIPMENT PROCUREMENT

Award contract to engage services of a oualified contractor to onerate and maintain the AAOM

Award contract for ,‘n,,tr,,r’tinn of MPT tower, air.ofrr,,rn h.tt,- ,nrl fnd,

Award contract for installation of eauinment and instrument

Award contract to implement QAIQC plan, routine and quarterly operations and reporting

C. STARTUP, TESTING and COMMISSIONING

System Integration and Testing

D,,...., ‘—‘i Ouarterlv Onerations

Reporting and Audits

Sentember, 2011

5,nt,mh., 701?

Seotember. 2012

September, 2012

September, 2013

Seotember. 2013

September. 2013

September, 2012

,,tmhr 701

C*...1,,._ ‘012

September, 2013

QUARTERLY COMPLIANCE REPORT

THREE MONTHS ENDING:

GUAM POWER AUTHORITYP.O. BOX 2977 AGANA, GUAIM 96910

PUBLIC UTILITY COMMISSION

DOCKET NO.:June 30, 2011

TITLE OF PROJECT: LOCATION: GPA WORK ORDER NO:

AMBIENT AIR QUALITY MONITORING VARIOUS LOCATIONS 100119I’4ETWORK

Page 1 of2

Page 38: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

GUAM POWER AUTHORITYP.O. BOX 2977 AGANA, GUAM 96910 Page 2 of 2

APPROVED ILATEST ENGG COMMITMENTS BALANCE OFCOST CATEGORY BUDGET [ ESTIMATE TO DATE APPVD BUDGET REMARKS (STATUS OF ACTIVITY)

CONSULTANT SERVICES 200,000 200,000

CONSTRUCTION 750,000 750,000

I. MET TOWER 350,000 350,000

2. MONITORING SHELTER 350,000 350,000

3. PERIMETER FENCE 50,000 50,000

TOTAL CONSTRUCTION BUDGET 750,000 750,000

EQUIPMENT & INSTRUMENT 450,000 450,000

MONITORING/REPORTING 400,000 400,000

GPA CONSTRUCTION MANAGEMENT 60,000 60,000A/E CONSTRUCTION SUPPORT 40,000 40,000

TOTAL BUDGET 1,700,000 1,700,000(Includes Project Manangement)

TOTAL FOR TillS PROJECT 1,900,000 1,900,000 1,900,000

REMARKS:

M.MINA DOC LISABLAN,E.P JECT ENGINE7 JPERV1SOR MANAGER OF ENGINEERING (A)

Page 39: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Engineering Substation / TransmissionProject Status Reports

April - June 2011

Page 40: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

j% GUAM POWER AUTHORITYATURIDAT ILEKTRESEDAT GUAHAN

P.O.BOX 2977 AGANA, GUAM U.S.A. 96932-2977

..

Engineering Substation/TransmissionCapital Improvement Projects

Submitted herewith are the April - June 2011 Progress and Compliance Reports for thefollowing projects:

Project Name Job Order No. Engineer

1. Hagatna Substation 115 kV and 34.5 kV 100098 J. L. QuintoBreaker Replacement

2. Hagatna Substation Transfomier Capacity 100113 W. T. ChenUpgrade

3. Dededo Substation Upgrade 100110 J. U. Pabunan

4. MarbotoPagat34.5kVLine 100025 J. U. Pabunan

5. System Stability and Relay Coordination 100049/ I. B. Loyola100125

6. Tumon Substation Transformer Capacity 100112 J. L. QuintoUpgrade

Jovi G. Acosta, P.E.

Page 41: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Sub

stat

ion/

Tra

nsm

issi

onE

ngin

eeri

ngP

roje

ctC

ompl

ianc

eR

epo

rtS

umm

ary

Apr

il-

June

2011

Bal

ance

ofF

undi

ngA

ppro

ved

Lat

est

Eng

’gC

omm

itm

ent

Act

ual

App

rove

dP

roje

ctN

ame

Sour

ceB

udge

tE

stim

ate

toD

ate

Exp

endi

ture

Bud

get

1H

agat

naS

ubst

atio

n11

5kV

and

34.5

kVB

reak

erR

epla

cem

ent

Bon

ds$

2,94

0,00

0$

2,94

0,00

0$

1,30

1,32

7$

1,28

2,66

2$

1,65

7,33

82

Hag

atna

Sub

stat

ion

Tra

nsfo

rmer

Cap

acit

yU

pgra

deB

onds

$1,

250,

000

$1,

250,

000

$-

$-

$1,

250,

000

3D

eded

oS

ubst

atio

nU

pgra

deB

onds

$4,

655,

000

$4,

655,

000

$2,

572

$2,

572

$4,

652,

428

4M

arbo

toP

agat

34.5

kVL

ine

-B

onds

$3,

225,

000

$5,

436,

757

$28

5,55

3$

275,

081

$2,

949,

919

5Sy

stem

Sta

bili

tyan

dR

elay

Coo

rdin

atio

nB

onds

$1,

893,

000

$1,

893,

000

$31

7,44

6$

317,

446

$1,

575,

554

Rev

enue

$60

1,37

5$

601,

375

$60

1,37

5$

601,

375

$-

6T

umon

Sub

stat

ion

Tra

nsfo

rmer

Cap

acit

yU

pgra

deB

onds

$1,

530,

000

$1,

530,

000

$-

$-

-$

1,53

0,00

0

Page 42: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

MONTHLY PROGRESS REPORT

Report Date: 07/12/11

Project: Hagatna Substation 115 kV and 34.5 kVBreaker Replacement

Business Unit: 100098

Funding Source: Bond Funds

Project Description: The project will replace existing outdoor 115 kVand 34.5 kV breakers and disconnect switches withnew equipment at the Agana Substation. Theexisting 115 kV breakers and 34.5 kV breakers arevintage 1974 and as early as 1950 respectively.Potential transformers and associated bus fittingswill also be replaced.

Contracts: In-House Design - Currently in progress115 kV Breakers - R&D Marketing34.5 kV Breakers - Benson GuamConstruction - Gemcco

Activities: • Design was begun in November 2008Completed Designo AC Schematics for 115 kV and 34.5 kVo DC Schematics for 115 kV and 34.5 kVo Control panels for 115 kV and 34.5 kVo Cable Schedule Listingo AC and DC Panel Layouto Substation Site Layouto One-line Diagram

• 115 kV and 34.5 kV breakers have beenpurchased and received.

Construction• Construction NTP was issued to GEMCCO

on March 23, 2011.• Required permits have been secured.• Approximately 50% of control cables and

conduits have been delivered.• Work planning and submittal reviews are

in progress.

Hagatna Substation 115 kV and 345 kV Breaker Replacement Quarterly Status ReportEngineering Department April - June 2011Substation/Transmission

Page 43: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Project Schedule:

Completed to Date:

Planned Start Design:Actual Start Design:Planned Finish Design:Actual Finish Design:

Planned StartConstruction:Actual StartConstruction:Planned FinishConstruction:Actual FinishConstruction:

100% Design

November 20, 2008November 20, 2008June 21, 2009November 3, 2010

July 6, 2010

March 23, 2011

March 23, 2012

Progress Payments: $103,222.81 Construction is inprogress.

Prepared By:

Reviewed By:

1-lagatna Substation 115 kV and 34.5 kV Breaker ReplacementEngineering DepartmentSubstation/Transmission

Acosta, P.E.Approved By: —

M. R. Camacho, P.E.

Quarterly Status ReportApril - June 2011

Page 44: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

IzLULUC.,

0.

LULU4UJO

>,-

0

0z•-‘

,ina

‘-

I

U)

cL

o_

0.0

000

00

C)

Q4

CD

CD

LI.‘t-oo

000

0000

000C

D00000000oo00cD

oS

ooooo

ooo

o,

‘io

oo

c0

—0

00

00

00

00

00

0f-

00

00

00

00

00

00

01—

00

00

00

00

00

00

00

0.

00

—w

0Q

r-

000

00

0o

ocd

,.

LUQ

C)

(0

001

-C

OQ

C!)N

.00

N-

0N

.CO

00

-N

.C

40

00

C’JCO

0N

.‘-

00

00

)0

00

000

CDCD

N-

—CO

COZ

0.

OC

DC

O0)0

-O

)N-C

S1U

)N

.L

66

r--

c$

6t6

0)

N.

N-

CDCD

CDCO

CDCO

C’4C%1

C’.

CO‘I

C4

C’ICD

—CO

0C’J

0(N

0)

N-

CO0)

CD4

<—

U)

ci

U)

U)

—U

)U

)U

)N

U)

U)

U)

U)

U)

U)

U)

—U

)U

)U

)U

)U

)—

——

—U

)0)

N-

N0

)CD

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

UI

U)

CD00

CD000

0000

000

CD0000,-

00

00

00

00

000000

0000

0000

00

TCD

00

—F

0CD

00

CO000

000

00

00

N.00000

000000

00

(N0000

CD00

00

00

00

00

0CO

CO0

0CD

CD-W

ocS

odd

dddo

dd

ddodddodddddddd0ddddod

cddd

c4

U)

COU

)U

)CO

CDt

0U

)U

)U

)U

)CD

U)

U)

If)U

)U

)U

)U

)0

U)

U)

U)

U)

U)

CDU

)U

)CD

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

NCO

0)

U)

NCO

DZ

CN

)C

NN

0)

(N(N

0)

CD0)

NN

NN

CD

I—LU

CDC

00)

—U

)(N

CO—

COC

—00.

COCO

—(N

q—

COU

)—

(N0

C).

0)

CD4)<

U)

U)

COCD

—U

)U

)U

)U

)U

)—

U)-

-N

wU

)U

)U

)U

)U

)U

)

1C

000C

D000

—0

0,-

OO

OC

O00oorooooooooN

.ooooN

.0

000

QO

OQ

OO

QC

O0

—-C

OZ

CD

00

CO

000

CO

00C

)0

00

N.0000C

O00000000(N

0000

CD

000000000000

CO

0C

O0-

UJW

CD

00C

dC

dC

OO

Ca>

00000d0

00

0O

dO

d00O

OdO

dd

ddd

dC

CO

dC

DN

COU

)U

)CO

CD0

0)

U)

U)

0)

0U

)U

)(N

U)

U)

U)

U)

CDU

)U

)U

)U

)U

)0

U)

U)

0)

U)

U)

U)

U)

CDU

)U

)U

)U

)U

)U

)U

)U

)U

)U

)U

)0)

CO00)0)

N.4

(NN

0)C

’4C

4—

—N

.N

.0

(NCD

NN

‘-

CDCO

OCD

CO0

--

N.

N-

fU

)t

(NC

CO

VR

COCO

—(N

U)

U)

—CO

U)

CO—

COU

)—

0U

)U

)CO

CD—

U)

U)

U)

U)

U)

—U

)—

COI-

U)U

)U

):

U),.

C.)U

)U

)

co00

CD000

00

000000000000000000000000000

00000

000

CD0

‘00

CD0

0CO

000

00

—-

00

000000000000

00

00

00

00

00

00

000

0000

00

CO0

00)

ZC

D00

dod

dd.-

ooodddddddddddodooddddddddo

ddddd

ddd

âad

dL

U<

CO

U)U

)C)

(0

10

QO

CO

CO

00

00

00

00

00

00

00

00000

00

c,oQ

oo

CO

OC

000

i...(N

N0)

(NN

00

CD0

)(N0(0

U)

CN‘-

,-

N.

CD(N

N.C

D—

CO0

)U

)CO

CD0)

N-C

sJ0

)0

LO

CO

CD(C)

CD‘

N0

U)—

CD”CO

0-.

U)-,-

)U

)C

R0N

.CD

CC

5C

OG

SC

U)f

0-‘-a

reuJI

COCO

—(N

CD

CD

CD

CD

U)N

.L

OU

)U

)CD

CN

LO

-C

ON

.0

CO

cj’t

0)

CO

qC

Oa)

.C

l)U

)U

)CO

CDe-

U)

U)

U)

NU

)U

)U

)U

)U

)U

)U

)-

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)-

—‘.

—U

)U

)N

0)

LUU

)U

),.

U)

U)

U)

U)

U)

U)

,..U

)U

)U

)U

)U

)

00000

000

0000

00

00

00000

000

0000

000000000000000000000000000

0000

0000

00

00

0L

U-.

dood

dod

dddd

ddodddddddddddddddddddddddod

ddd

dddd

dd

dd

d>

LUooo

coo

0000

U)U

)O

U)O

0O

U)U

)O

U)U

)0U

)U

)U

)O

U)Q

QQ

U)U

)U

)Q

U)U

)Q

QQ

QQ

Q0

000

00

00

C)

0C

)0

0CD

000i-

N.

00

00

CD0

N.

0000

00

00

00

CD0)

00

0)

00

CD

CD

U)N

’ood’

U)L

6o

co

cN

.0

CO

N.(N

N.

‘ON

.0

ON

-CO

CDD

CU

IC

Oro

acd

0.

CON

.U

)CD

-0)

CDCD

CDCO

COCO

(NCN

COCO

COCN

CDCO

0(N

0(N

‘c-CO

—0)

CO0)

.UI

U)

COCO

0)

NU

)U

)U

)N

U)

U)

U)

U)

U)

U)

U)

U)

U)

—U

)U

)U

)U

)—

——

—U

)0

CON

N0

0)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

U)

ZU

iz

S2IL

.

00

00

LUc

CQ

LI.•0

0-j

U)

0I—

4‘-

CU

CE

CE

0C

UC

C-..

.u.

z00

2CO

00

WZ

!O

(00

...J

Ui

>0

CC

t3CU

.tsL

UC

E4

a.

Ef-

Cl)

C.

.sf.>

>0

20

LUC

D.C

C._

DW

)D

CCU

0C

a>z

a>C)

——

COCO

(U0

OC

Ui>

>Z

C€

-<

‘E

E<

<<

0L

I.

•5(U<

a>C

0CD

C.

oo

00t

..J0

4>

LUa>

Cit

E(U

CUt

.C

CE

n

0C

)(N

(N00

(UU

)C

OC

.C—

—CO

(N0

0Z

Z

C2

Z.C

C)a>

C.00

00

C4

LU

ZE

—o

5n

—0O

•c

RC)

0()C

CD

CD

0a>

<0D0

0Q

U)

°C

LI.

QC

922

Ca>

OC

NQ

DC0C

OU

)u

)>

u..Z

DO

(UC

UZ

C0

CD

CC

D(1>

.0c

EC

.0C

0a>

t2a

10000(U

OW

0C

a>Z

(•(j<

0.

..Q

DC

ici

d—

cd—

ci(5

’cj-u

)LU

CI

>0

0C

0.

0U

)CD

N.

CD0

)—

——

——

—(N

COU

)CD

N.

CD0)

——

——

(NCO

U)

DW

00

00&

w<

OcJ’cJ

oo

oc

Q<

<<

<<

<<

<<

<<

<<

<3rj

U)0

00

c)i-

-(N

CO(C)

CDN

.CD

0)

0—

(NCO

(C)CD

N.

CD0

)0-

(NCO

CC)CD

N.

CD0

)0—

(NCO

LI)CD

N.

CD0)

0—

(NCO

IC)CD

N—

——

——

——

——

(‘4(N

(N(N

(‘4(N

(N(N

(N(N

COCO

COCO

COCO

COCO

COCO

Page 45: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

MONTHLY PROGRESS REPORT

Report Date: 07/12/11

Project: Hagatna Substation Transformer CapacityUpgrade

Business Unit: 100113

Funding Source: Bond Funds

Project Description: The project will replace Hagatna Substation’s T-6522.4 MVA vintage 1968 power transformer with anew 30 MVA power transformer. A new oilcontainment and transformer pad will also be built,as well as associated bus fittings, disconnectswitches, and primary and secondary cable will bereplaced.

Contracts: In-House Design Currently in progress(Electrical) -

Activities: • RFP for Civil Work was issued andresponses were received on April 19, 2011.Successfully negotiated a contract withEMCE in the amount of $53K for oilcontainment design and other requiredcivil work and electrical work. Pendingrelease of purchase order.

Project Schedule: Planned Start Design: September 01, 2010Actual Start Design: September 01, 2010Planned Finish Design: February 01, 2011Actual Finish Design:

Planned Start June 01, 2011Construction:Actual StartConstruction:Planned Finish February 2012Construction:Actual FinishConstruction:

Hagatna Substation Transformer Capacity Upgrade Quarterly Status ReportEngineering Department April - June 2011Substation/Transmission

Page 46: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Completed to Date: 0% Design

Progress Payments: None.

Prepared By:

___________________________

Wei T. ChenReviewed By:

J. Acosta, P.E.Approved By:

M. R. Camacho, P.E.

Hagatna Substation Transformer Capacity Upgrade Quarterly Status Report

Engineering Department April - June 2011Substation/Transmission

Page 47: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

x C)

z C,,

a w 0)

‘-

zC

Cl)

—,1

)D

00

-0

-m

0> > C

,

C C)

‘ii

-0

CD

J?C

Jooocjc.rn

>m

àxx0

00

-U

zO

OO

Q)O

C00000

>>

>>

>O

)gz.3.<

cgg<

iri-ri

.>

Q)

1CD

uo

nm

.O

CCD

mooO

mCD

0zZ

Cco

C)

ZC0C

-I3

Qog

oo

-Icam

iD

C)D

ooo

2.

00iz

!—

><

--,

3z

0C

)®1

—.

0!.

—‘1

-‘zz?

-<

-i

CDm

;o

aC

—G

)0

0C

)CD

—ir

mCl

)-

C)

C)

C)

C)

0o

oo

o--

----

----

--

-------------

,

,,

)co

WtJ

U1

U1

OO

-I)O

CoIr)4

c)0

o-

CE

J0

CO

0-4

(n

CO

0C

)-r3(yI0(o

k)O

CJ1

O0

00

0-4c0

00

Co100

Joo

oo

bo

ib

bb

bO

’O

bb

‘bobb

oo

bb

bb

obbb

000000

0000000000

00

00

00

00

000000

0000

m<

00000

op

00

00

00

00

00

00

00

00

00

00

00

0000

-(m

bbobo

öbbö

bb

bo

bbbbbb

bbbb

00000

00

00

00

00

00

0000

00

00

00

00

00

0000

I

m13

i.CO

Eft

ACO

Ci)

mciicn

co

..o

.EA

-k)c

yi

co

rz.

-co

a-cn

0CD

0-J

01CD

0C

)-

t..)

010

01

CD0

r.3

001

00000

-C

).

000

0101

00

ob

’b

’b

obbbbbbb’bb

‘bbbo

bobb

obbbbb

obbb

00000

00

00

00

00

00

00

00

00

00

000000

0000

>m

00000

00

00

00

00

00

0000

00

00

00

00

00

0000

-IZ

m00000

00

00

00

00

00

00

00

0000

00

00

00

00

0 C)

d00000

00

00

00

00

00

00

00

00

00

00

00

00

mm

b000b

oooc

,bob

bb

bo

bbbbbb

0000

00000

00

00

00

00

00

00

00

0000

000000

0000

m x C zj>

CI

xi m

,w

,1%

)13

CDI%

36

CO3

OW

C3IC

TIC

O.O

)-)C

YI

cor’

.)r\

)4.-C

0C

D-01

Crj>

0C

004C

fl

CO

0C

OO

1C

DO

r’30010

00

00

4C

00

0.S

PP

EJ,,

zo

oo

bO

bbrZ

Obbbb

‘bob

bb

bb

0000

00000

00

00

00

00

00

00

00

00

00

000000

0000

m-

m00000

00

00

00

00

00

00

00

00

00

00

00

00

0000

oobob

ob

bb

bb

bb

bb

•o

•c

•obbb

bO

bO

bb

bb

co

000000

00

00

00

00

00

00

00

00

00

00

00

00

0000

a CD 3 C) - (4)

Page 48: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

MONTHLY PROGRESS REPORT

Report Date: 07/12/11

Project: Dededo Indoor Substation Upgrade

Business Unit: 100110

Funding Source: Bond Funds

Project Description: The project will upgrade the existing DededoSubstation inclusive of the old power transformerwhich involves a capacity upgrade from 22.4 MVAto 30 MVA. A new oil containment andtransformer pad will be built and associated busfittings and cable will be replaced. The existing34.5 kV outdoor and 13.8 kV breakers and busesalong with the associated controls/status andprotective relay devices will be converted to anindoor system enclosed in a concrete building,which will greatly improve the reliability of thissubstation—mitigating typhoon damage.

Contracts: In-House Design - Currently in progress

Activities: • RFP for design services was issued onMarch 24, 2011

• RFP responses received on April 15,2011• Currently in negotiations with EMCE for

design

Project Schedule: Planned Start Design: September 01, 2010Actual Start Design: November 8, 2010Planned Finish Design: July 01, 2011Actual Finish Design:

Planned Start October, 2011Construction:Actual StartConstruction:Planned Finish April, 2013Construction:Actual FinishConstruction:

Dededo Indoor Substation Upgrade Quarterly Status ReportEngineering Department April - June 2011Substation/Transmission

Page 49: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Completed to Date: 20% Design

Progress Payments: $1,809.72 In-House

Prepared By:

_____________________________

Lt,ha4 U. PabunanReviewed By:

J.3Z)Acosta, P.E.Approved By:

M. R. Camacho, P.E.

Dededo Indoor Substation Upgrade Quarterly Status ReportEngineering Department April - June 2011Substation/Transmission

Page 50: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

e 0.

>.‘o

0

C

-

0CD

CD.4

0)

CDC

)t

-0

CDC

D.4

0)

CDC.

)()

-0

CDCD

-40)

LCD

C.)

1%)

.-

0CD

CD.4

0)

CDC.

)C.

)-

0CD

CD.4

0)

CD.

C.)

I.)

cw

wD

CD

CD

CD

03

OC

DC

DD

CD

C

00

-.

m0

(D

0)C

DU

1(flC

J1

‘—-1

—-.

—•

•CD

CDCD

00

CD—

Co-‘

DC

Cfl

CDCD

CDCD

C)

3Z—

.CC

)Cl

(0Cl

)C

.Cl

)CD

-C

)

- —I

(0•3

DbC

D(D

0CD

(0D

CC

CD

C9

CD

CD

CD

CD

wa-

nCD

CD

m0

Z(D

(0

3-

C.)

C.)

DCCO

DCDC

:a

cC

0.

-‘-,

bioi

CD

OC

)CD

W.

—c.

CD0

CD

L))

cn

00

(OC

D—

OiC

))

..

•fl

C,(

-D

_C

D<

<<

CD

)C0

.0-

D<

<<

<(-

0)013

,<

<)c

,c.

CC

DC—

II

<<

<<

C)oo

CC

Dg

0CD

D.C

D.C

aoa

gaa

-

CD9

69

— -69

69

6969

69

69

69

69

69

69

696969

CD,

69

-69

69

69

69

69

(069

69

69

69

69

C.)

69

69

69

69

69

69

C.)

--

69

69

69

CL)

-6

9CD

.4P4

69

69

C’)

C-Q

69

CD

96

9--

.4D

-0C

))0C

31P

46969C

.)01

00

)C

CD

69C

.)0)0

)069696969C

DC

06969000

.4C

D9

C.)

C.3

0P

PP

P??P

9P

9P

95?’P

99

$P

?9

P$P

9P

P99

°P

P000C

DC

D000C

00000000Q

0Q

0000

C.)000

00

00000

00000ofl4000

00000

00

00

00

00

00

00

0)

00

00

e0

00

o0

00

00

0o

00

00

00

00

00

0)

00

00

00

00

00

00

00

00

fl<

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

0)

00

00

00

00

00

00

00

00

00

00

0rn

oo

obo

oo

bb

oo

bo

oo

oobobo

oooo

bb

boeoo

boooo’obbboob

oo•oo

00000000000000000000000000

0000

00

00000

000000000000

00000

C

CD9

419

,11

a69

68

68

69

69

69

69

69

69

P469

696969

69

rn6

86

969

69

69

CD69

69

68

-89

69

I.)

69

69

--

89.

8969

69

C.)

--

.*698969

P-

69

CD.4

P46

86

9C’

)l

696969--

CD

0C

D0

0iC

’)

6969C

.)o))

CC

))C

06

9C

.)0

)0

)0

69

69

6969C

DC

D6969000

.489C

.)C

.)0

9:

9$))999999999999$D

99

P!’)P

$))9

9))9

P9

9Q

j0C

)iC

J10

0C

DC

0000C

.)000000000000000

C.)000

00

00000

000

000i.4000

00000

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00000000000000000000000000

0000

00

00000

000000000000

00000

obboobb

ob

bco

oo

bb

oo

oo

ob

oo

booob

•ooobo

OO

Ob

OO

bO

bO

Ooobob

m0

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

0

C,

-.jO0

CD’

-

!1’

)(C

DC)

)>

l6969696969696

96

96

96

96

9696969696969696969696969696969

69698969

69

69

69

69

69

69

69

419

69

69696969696969696969

.46

96

94

69

-400000000000000000000000000

0000

00

00000

000000000000

M00C

’)0

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

0P4

00

C.)

0

‘ii x mC

)z-

469

89

!M

0I

CD69

419

418

.4.4

00

0)

Cr

0•0

•00

00

0)

0)

m

w4, h

69

4(9

4(9

69

69

69

69

69

4(9

CL)

69694.9

69

69

4194(9

69

69

68

CD6

96

96

9-

6969

1.)

4949

--

69

68

69

69

C.)

--

-69

69

69

-—

--CD

-.4

P46

99

18

C.)

C6

96

96

9-a

-0

Cfl0C

DP

L)

69

69

C.)

01

CC

))C

06

9C

.)0

)0

)0

69

41

96

9419C

DC

D4194(9000

69C

.)P

40

6969P

99999?999999

S9

°4

CD

0C

I)Q

(310)0

)C

DC

D90C

D0)99P

4C

D0

1.4

90

(CD

CD0

0CD

CD0

00

C.

00

00

00

00

00

00

00

0C

.)0

00

00

00

00

00

00

.0

0U

i4

00

0o

00

0Q

C)

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

0P4

00

C’)

00

00

00

00

00

00

)0

00

00

00

00

00

00

o0

00

0o

00

00

00

00

00

00

00

00

QP

0-

00

40

mO

bO

OO

OböbbO

OO

bbO

ObO

OO

OO

OO

•ooob

ob

ob

bb

bbobbbbbbooo

(0

00

(0

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

0)

00

00

00

00

00

00

0CD

0 DCm

0C Co 0 •1

1

Page 51: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 52: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

MONTHLY PROGRESS REPORT

Report Date: 07/12/ 11

Project: Marbo to Pagat 34.5 kV Line

Business Unit: 100025

Funding Source: Bond Funds

Project Description: Installation of new underground 34.5 kV transmissionline from Marbo Substation via Latte Heights to PagatSubstation to ioop feed the Pagat Substation. TheMarbo to Radio Barrigada transmission line will beintercepted in the Latte Heights area and routed toPagat Substation and thence from Pagat to RadioBarrigada Substation. The project includes theupgrade of existing X-62, X-64, X-65, X-66, X-67 34.5kV breakers. Additionally, installation of groundingtransformer at Pagat Substation to limit fault currentsis also included.

Design: GPA Engineering

Contract Amount: $ 103,975.36 Fiber Optics (TransPac)$ 1,105.44 RTU/HMI (TransPac)$ 5,058,000.00 Construction (Helix Electric)

Administrative Activities: • GPA is currently revising plans and specificationsto reflect routing of line via Latte Heights to PagatSubstation.

• Completed Designo Routing plano Construction Detailso Manhole Scheduleo AC/DC Schematicso Marbo Substation One-lineo Marbo Substation Protection Devices

• GPA Legal Counsel and Procurement havereviewed project specifications for Procurementcompliance.

• CCU resolution to request PUC approval andsubsequently authorize expenditure was secured

Marbo to Pagat 34.5 kV Underground Line Conversion Quarterly Status ReportEngineering Department April - June 2011Substation/Transmission

Page 53: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

on January 11, 2011

Construction Activities: • IFB for construction services has been advertized.Bid opening was scheduled on November 4, 2010.

• Bid opening was conducted on November 18, 2010• Evaluation committee nomination of Helix Electric

was approved by the General Manager on January10,2011.

• NTP was issued to Helix Electric on March 24,2011.

• Required construction permits have been secured,except for Highway Encroachment Permit. DPW iscurrently reviewing the traffic control plan.

Project Schedule: Design Planned Finish:Design Actual Finish:

November 27, 2006September 30, 2010

Completed to Date:

Planned Start Construction:Actual Start Construction:Planned Finish:Actual Finish:

100% (Design)Construction is in progress.

July 6, 2010March 24,2011March 24, 2012

Jbunan

J.1Acosta, P.E.

R. Camacho, P.E.

Marbo to Pagat 34.5 kV Underground Line ConversionEngineering DepartmentSubstation/Transmission

Quarterly Status ReportApril - June 2011

Prepared By:

Reviewed By:

Approved By:

Page 54: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

CD

)

(DO

00

)

m 0(1

Qi

0) oz

CC.

3W

CC

..(.

1()

Cr’

s)1’

.)h)

M1’

.)N

)N

)N

)N

)-

--

--

--

--

-4O

)CJ1

..W

0O

-.j

CO

cN

)-

-

0000m

c-

OC

DO

1O1>

<C

oO

‘°°°o

D°’

01o

rn-lzzC

igoo

:z

“&

,z

•çg

‘cn

0‘1

Uaa<

<-.—

1-I

Caoo!

0O5

z

-.

0V

fl)(C

)O

oo

>c

Dc)o

.,m

0.C

(D

00

-1-i-iZ

!m

m-

O•-O

-D

G)0

00

r00

OC

l)_

:—

U0

cn

o0

0zz?

-0

.V

3(_

)CD

m3

h-

z-

—cm

Ocø

-i.

o>

0m

-‘—

1<-I

>r

Z0

>r

cn

9C

CD1Q

)•f

l3m

r0

Oc

0“

F-<

o-i

iz

mC

0Z

ZC)

m0

00

01

-Z

m,

?‘

1%)

I.,

--

-—

-cx.

--

N)

N)

C0

01

0)

N)

CO4.O

)CX

i0

)0

10

O,C

0(,)

0101

-r

00

9-

00

010

0101.

40

00

010

010

CD0

00

001

00

G)0

oà,

bobààb

‘bb

m<

00

00

0000

00

00

00

00

00

00

00

00000

00

00

00

000

-Irn

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

.-

--

C3I

C.3

-C

.-

-m

>-

--4

010)

-CO

--

-N

)C

.)01

Cl)

C.)

CDC

.)-

COCD

-C.

)-

-CO

N)

-.J-

--.

1-

N)

—.J

CO-

0)

C.)

01..

-01

010

CO-

4CO

COCO

iA

lO

)C.3

VIC

OC

OW

01

C0

0o

CO

01

01

C.)

01

,o

oo

010010

CO

010C

.)0000

0)

Ib

bb

bb

bb

bb

bb

bb

b0

CO

bob

Db

bD

0b

b’O

CO

cOI

10100.•

4-4

00

00000Q

00O

000Q

0O

Q0

0000

400-.10000

-1-.

)flI

10

0.D

.01

40000

00

00

00

00

00

00

00

00

.-

00

VI00010000

-1z

II00

00000000000000000000

ObO

OO

..

00

0)

0000

00000000000000000

00

00

010

00

)0000

00

CO

CO

CO

CO

C)

CD

CO

CDCD

oo

coa

O($

10

-C

liCO

00

--

VI

-C

.)CO

COI

1:iD

00

-0-

CD

CD

>11

04

COCD

00

40

)0

-CD

CD0

(D

00

001(Y

)m

ml

OIO

CD

CO

J0

ao

-4--

.’zI

Cli0

0)0

CD0

00)

0)

04

0)

CDCD

-.

ICO

,,

CO

m11%

)-

--

x!

4CO

0CO

COCO

00

COCO

(Il-

(Il

CO-

-V

I-

C.)

CO00

0’O

00

0-C

0C

OO

-0)

0V

ICD

00

0)

0-.‘

CD(0

ZC

00

0C

C0

00

01

(71

CD

(D0

)>

(Il

0CO

40

00

)..

C.)

Al

FCD

00

CD0

00

).

0)

CDCD

V4

CO

CO4

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

fr1!%

‘1C

0-

-0)

--

--

CO.

-.-

I0

)-

N)

N)

ID

000

-1N

)-0C

OC

.0)0

0)

400C

C,)

C.)

C.)

1CD

0Cl

iC

.)CD

-N

)0

0.

0)-400

01001C

.l1-

-00

CDC

.)0

01

0C

.)CO

00

001

91

9‘

zi1C

000C

DC

D000

00

0O

OO

bC

Obbb

01000

CDCO

0000

CD

CD

1-00a.C

D000

00

00

00

00

00

00

00

0I.)000

-C

DN

)0

00

0C

DC

Dm

1CD

OO

CD

CD

000,

,0

.0

00

00

00

00

00

oO

op

00

9(D

,0000

CO

CO

DA

lIrD

00

00

0co

oco

co

bacaco

ac

0000

t%)

010)0000

-4

.’01

-10)1111

—>

Cfl

01

-000C

C0

00

00

00

00

00

00

00

00

0.

00

00

0)

..0000

CDCD

m —-o

co

I0.

0

Page 55: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

MONTHLY PROGRESS REPORT

Report Date: 07/12/il

Project: System Stability and Relay CoordinationUnderground Fiber Optic Lines

Business Unit: 100049 ($601,375.00)100125 ($1,893,000.00)

Funding Source GPA Revenue Funds (100049)GPA Bond Funds (100125)

Project Description: In 2004, GPA engaged Electric Power Systems, Inc. toconduct a study to examine the robustness of GPA’s powersystem against certain generator outages as well as faults ongenerators and transmission lines. This project willimplement a portion of the recommendations from theSystem Stability and Relay Coordination Study Report toenhance system reliability and improve protection of GPAassets. Implementation includes the following:• Replacement of electromechanical relays with SEL

electronic type relays• Development of revised and new relay settings• Installation of GPS clocks for time synchronization of

event reporting• Installation of Trip Coil Monitoring devices to eliminate

nuisance trips.Additionally, fiber optic line installation from substation tosubstation to effectuation mirror-bit scheme protection willbe done for the following:• GAAtoGIAT• Macheche to GAA• Harmon to Macheche

Contractor: EPS, Inc. A/E - Study

Contract Amount: $249,302 BPS, Inc. 8432 OP

Administrative Activities: • System stability and relay coordination study wascompleted on August 2005.

• Implementation of study recommendations is inprogress.

System Stability and Relay Coordmation Quarterly Status ReportEngineering Department April - June 2011Substation/Transmission

Page 56: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

• Fiber optic line from substation to substationdesign is in progress.

Construction Activities: • GPS Clocks have been installed in 28 (out of 28)locations: San Vitores, Pagat, Pulantat, GAA, andAgana 115 kV and 34.5 kV, Anigua, Tamuning,Yigo, Apra, Cabras 1&2, Barrigada, Umatac,Macheche, Andersen, Dededo Dsl, Dededo CT,GIAT, Marbo, Radio Barrigada, Talofofo, Cabras3&4, Orote, Temes CT, Tumon, Tenjo Sub, TenjoPlant and Tanguisson

• 78 of 120 Trip Coil Monitors have been installed.• 22 existing SEL communication processors have

been programmed to communicate with existingrelays at various substations.

• Development of revised and new relay settings hasbeen completed on 68 out of 80 (85%) relays.

• 54 out of 54 (100%) relays requiring replacementhave been completed.

• 4 out of 4 (100%) relays for backup protection havebeen installed.

• Installation of Tesla Fault Recorder at Cabras Plantto monitor Cabras 1, 2,3, and 4 generators.

Project Schedule: Relays and Other Protective DevicesPlanned Start Design: August 1, 2004Actual Start Design: August 1, 2004Planned Finish Design: December 8, 2004Actual Finish Design: August 23, 2005

Planned Start Implementation: January 2006Actual Start Implementation: June 1, 2006Planned Finish Implementation: March 25, 2009Actual Finish Implementation:

Fiber Optic LinesPlanned Start Design: September 1, 2010Actual Start Design: September 1, 2010Planned Finish Design: June 2011Actual Finish Design:

Planned Start Const: September 2011Actual Start Const:

System Stability and Relay Coordination Quarterly Status ReportEngineering Department April - June 2011Substation/Transmission

Page 57: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Planned Finish Const: September 2012Actual Finish Const:

Completed to Date:

Progress Payments:

Prepared By:

Reviewed By:

Approved By:

100% Study72.8% Relay Improvements10% Fiber Optic Lines Design0% Fiber Optic Lines Construction

See Worksheet.

rwin B. Loyola, P.E.

M. R. Camacho, P.E.

System Stability and Relay CoordinationEngineering DepartmentSubstation/Transmission

Quarterly Status ReportApril - June 2011

r’-”-J’Q? Acosta, P.E.( JN

Page 58: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

C.)

C.)

C.)

C.)

C.)

C.)

F\.))

I\)

rjr’.

)1’

.)‘3

N)

N)

N)-

--

--

--

—-

-01

4C.

)f\

)—

0CD

CD-

-J0

)01

-.

C.)

N)-

0CD

-0

)0)0

1.

C..)

N)-

0CD

CX)

--.I

0)

01.

C.)

N)-

uth

mZ

iZi.

ZiZ

ZjZ

im

-5

OO

X000000

—i

DQ

om

mm

mm

mm

m.

<-4-4-1-I-I

m-I2

.c-r-ci,9.D

--

20.>

-rj

0.

rrrrrr

N)C

.W01014c.c

,or-

,m

))0)

00

-0

0)

N)

-C)

0)0

—.

--

-4-

-4-

On’in-n,i

.r5

oD

—-o

—I--o

0coO

OO

OO

øC

D0

...,

‘0U

.(D

ØQ

WD

CD-

=oO

Oc,

.c

r-

0,i

>r

-‘o,

<z

U)

Vrn

0cI)

oC

fl•

00

aL

c0

m0

r—

-—

I•)

0Cl

)-

--<

C)-

-

a-----

----0

.

0,

(A(A

(A(A

(A0

.C

oC

o.

C.)

Co

C.)

C.)4

4.

(A(A

(A(A

a)(A

N)-

(A(A

0(A

(AC

(AN

)Q-

0(0

CD

1U

iCo(0..

hC

o-0)0)

(A

-.(

A-(A

-...

Co

C.)

01

00

1N

)(A

__

N)C

D0)Z

W(A

N)N

)(A

01

4-C

.).0

-4

..h

oQ

I0000

-IN

)JN

)O

)0)

N)0

0-....0

10)

0(31(000,

C3IC

00)(0

o‘bbb

b‘o

bJ)oij’b

.bco

bb

o.-

10

-40-C

fl0O

000

0-0

0-4

o.r.o

C.fl0

00

00

01

00

000

cocoa

00)N

)0

CoO

Co0C

0000)

000

0(0

00

(0

00

00

00

00

00

00

0.00

00

00

00)40N

)0

C.

ob

bbbbbo

bb

OO

Ob

OàO

bobobobbbbb

bo

bcD

bo

ob

o..

.0

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

0-

00

00

(A Co

(0 C.)

0 0 0 0 0

(A 0)

0 - C.)

-I Co

0 0

(A 1%)

C.)

-.4 Co

0 0

(A(A

C.)

(A0)

CoC

oa)

00

)j3

0-C

opC

D0

cb

b0

00

(A CD 0 1.)

0 0 0 0

(A C.)- C

o1.

30 0)

0 0

(A C..)

Co

0 0 0 0 0 0

(A 0 0 0 p 0 0

(A 0)

0 0 0 p a 0

(A 0)

0 0 0 p 0 0

(A(A

(A(A

(A0)

(ACI

I(A

-(A

—(A

-C

oC.

)1

.N)0

))

--.J

a)ao

r.)a,4

—(.

3-4

.0

0-..o

4c)

CoO

D0

0C

0ao

opa

0000000

00

000000o

00

(A N)

01 N)

0 0 0)

0

(A -a 0 0 a 0 0 0 0

(A (Il

0)

0 0 0 0 0

(A N)

0 0 p 0 0

(A(A

(A

..aa

NC

.)a

0).a

N)

01

00

p00

000

000

0)3

N)

cii

CD 0 0 0 0

C

(A CO C.)

N)

0 0 0 0

(A(A

(A(A

(A0

)C

D(A

C.)

N)N

)0

)0(31(0001

0)

1.3

04

.0

co

00

00

00

00

00

00

•0booco

000000

(A(A

C.)

(AN

)-.(

AQ

14

.D

ON

)0

)0

C.)

00

)N

)0

ON

)0000

0000

Cl)

0)0

‘0

V’3

Z—

00

-0

-C

)CD 00. C) •1.

0

(A(A

(A(A

(A(A

(A(A

(A05

C.)

CD(A

Co

(AC

.)(A

(A(A

(AC

II(A

N)

(A(A

(A(A

(A(A

(A(A

(AC.

)(A

N)

0-h

-C

o0.

-C

o(A

-(A

-(A

-0

-C

.)C

.).

-(A

(AN

)(3

1(3

).

N)

--

(A(i

i.

-4

Co

.-I-C

o.N

)C

.)-4N

)0i4

..IN

)0)—

CD

01

0)0)01C

.)0)

h(A

01

(31

(1

1(0

03

(0

Co

(0(1

101.3

C0

00

N)0

)N

)b

,0,-

aN

)I\)

O)N

)’b1O

)a‘bN

)0

CX)

I%)O

)0C

.)•-.I

.1.)

(A

CoO

)(0o

(A

(A

(A

(A

Co000)...-)

0).a

C.)

Qi.

.0)

(D

34

-01

(0

-4

0-

0O

)a0

Coo)

-h0C

1iC

na

0000

11

P0

01

CO

00

00

)C

.)4

).c

00l0

—.I

C.)

0)

ppo

cC

.)(D

N)

01.3

1.3

01.3

1.)

C.)

.000

0‘.)0

0C

.)0

30

0I3N

)C

J10100

00

00

0C

.)C

.)0

0.N

)-0

0C.

)C

.)0

-C

li0)-

000

0-

00(310)00

Co-

0-

00

00

00

00)

0)

00

-h

0)

010

(A(A

(A(A

(A(A

(A(A

(A0)

C.)

CD(A

Co

(AC

.)(A

(A(A

(AC

o(A

N)

(A(A

(A(A

(A(A

(A(A

(AC.

)(A

N)

0.

-C

o0.

..h

Co

(A-

(A-

(A-

0-

C.)

C.).

-(A

(AN

)0

10

3.

N)

--

(A(3

1a.’

.D..—

4-h

Co

—4N

)o14

.4M

O)a(D

01

0)0

)0

1C

.0)

.(A

C3

101

CoC

O0)C

DC

.).

Co

CD

Co01.)

C000N

)o)N

)0)

Co

a0

14

..N

)N

)0

)N

)0

10

)4

0N

)0

0)

‘.3

3C

C.)

I..

I%)(

13C

11C

oC

Ø0

(A

(A

(A

(A

CoO

00)4..

-.C

.C

ohC

.)(fla

0)

CO

4ao

CD

—la

-p

ip

).h

0C

)1C

J1C

o.

poop

Co000iC

Dop

Co

D0

C.c0

C310-IC

.)0)

0)0

)0

93.t

hC

.)(D

N)

01.)

1.30’.3).3c

00

00

l.3

00

C.)0

30

01

.)N

)0

-i0

10

00

00

00

C.)

C.0

0..N

)-.0

0C.

)C.

)0

-C

liC

o-

00

00

-0

00

10

)00

Co-

0-

00

00

00

00

)0)0

0-

0)

010

(A(A

(A(A

-(A

(J3

(A

(AC

oC

oC

.)-

(AC.

.).

44

-(A

(A(A

(A(A

(A(A

-4-4

Co

(A-I.

Co-

CX)

0)

(A(A

(A1

N)-

0)

(A(A

(A(A

(AC.

)(A

-N

)(A

Co

CoO

1.)

C.)

(00000

1.)

-a-a

(.013(A

CD

43..0C

DC

oC

o0C

o-.4

-0000

0)

(A

aN

)N

)10101

0)N

)C

OC

.)C

.ah.1

4.0

CD

(AC

oC

o0

05

Co

0c.q

0000

Co(A

(A-Q

1C

.)--

.lC

o0

)0

)4

0)a(3

10

0)0

,0)4

.0N

)0O

0)

(A(A

(A(A

p$.)

$.)pc..)

PpO

pC

.)p

p9

)p

pp

P-O

01O

C.)

-4N

)$..

)hP

0M

.a000

0-.’

-40-.4

-.4

0)C

o0000

-.4

00

0)a0

0-440,4-O

0a0ooao

0)0

)0

00

CJ1—

J0)0

0-I

-4

0CD

Co.

(00000

(0000,

40

0C

o0

)0

CD0

.0

00

00

00

-.

000

CD4

010

a.L

k—

a-

C.)

C.)

C.)

N)

C.)

C.)

.0

)(3

10

)0

)CO

0)0

)0)

(001

J0

CD-1

-4—1

C.)

4—

4o

C.)

0—

JCD

COCD

—0

)CD

0)

C.)

N)

00

00

0000

0-U

-D-0

-U-0

-0-0

-U-

-U

mm

Cli

—U

)3

—L

g’ C) 0

I3

L3 em

m x CD•1

-0. 0

.0-I

C)—

m

Page 59: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

MONTHLY PROGRESS REPORT

Report Date: 07/12/ 11

Project: Tumon Substation Transformer CapacityUpgrade

Business Unit: 100112

Funding Source: Bond Funds

Project Description: The project will replace Tumon Substation’s T-6022 MVA vintage 1969 power transformer with anew 30 MVA power transformer. A new oilcontainment and transformer pad will also be builtand associated bus fittings and cable will bereplaced. Additionally, the existing chain linkfence surrounding the substation will be replacedby a solid concrete masonry fence.

Contracts: In-House Design Currently in progress(Electrical)

Activities: • RFP for Civil Work was issued andresponses were received on April 19, 2011.

• Successfully negotiated a contract withEMCE in the amount of $70K for oilcontainment design and other requiredcivil work and electrical work. Pendingrelease of purchase order.

Project Schedule: Planned Start Design: September 01, 2010Actual Start Design: September 01, 2010Planned Finish Design: February 01, 2011Actual Finish Design:

Planned Start June 01, 2011Construction:Actual StartConstruction:Planned Finish February 2012Construction:Actual FinishConstruction:

Tumon Substation Transformer Capacity Upgrade Quarterly Status ReportEngineering Department April - June 2011Substation/Transmission

Page 60: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

Completed to Date: 0% Design

None.

JokIiiy Jtuinto

Tumon Substation Transformer Capacity UpgradeEngineering DepartmentSubstation/Transmission

Quarterly Status ReportApril - June 2011

Progress Payments:

Prepared By:

Reviewed By:

Approved By:

R. Camacho, P.E.

Page 61: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission

—I

C 0 z 0

mm

4_

-

—I

—n

‘0

3z .c

n

Z 0

C, ni m z —I

Jt%

jZ

--

0‘O

Co-

CD)-

-01.

C-

CCD

O-

0)

01.

C.)

MC

CDOD

-0

)(3

1.

C.)

i’.)-

thm

mS

öo

xX

0Q

o-U

O0

O)0

000000

Q-

<m

ø(D

O,riri-

oom

>O

CD

?C

DD

m•

m>

3.

0O

Om

wO

ZZ

CC

nCD

C0

-

cC

)3

sg

—Ic

OzC

oc.o

c-D

0.

-Im

O:ao

rr

30

0

—3

C,D

9.0o

CD

D)

DD

)a

Cfl0

0Z

CD3

-a

o1Z

Z<

coi3

.—

mç-O

)0

cC

)C

D—

CD0

33

0C

CD0

0—

C,

—C)

c•)C)

00

00

(fl

DU

IU

I-------------

----------.----

, Ui

Ci

Co

Ci

r..)

COo

,W

t)C

oI\)4

-c

•cU

0C

o0-4C

31

0jI

’s)Q

1C

C3

1O

CD

O)C

C310

0000

.1C

.)4.000

CIiC

)100

tJ

o’ooob

bb

bb

bb

bo

bbob

‘obbo

oo

ob

bb

bbbb

G)O

00

00

00

00

00

0C

00

00

00

0C

00

00

00

0C

00

00

00

m<

00

00

00

00

00

00

00

00

00

00

0000

00

00

00

0000

mb

ob

oo

ob

bb

öb

bb

àO

bC

o•o

àbbè,b

öbb

00

00

00

00

00

00

00

00

0000

00

00

00

00

00

0000

r,

m-

UI

Ci

CO4

Ui

EAF.

)C

o0

)(0

mC

p5

C)C

ot.

O)

-F

.Z

01

-C

.)0

O)-C

YI

0CO

0-4

Ci

0)

0C

.)—

F’s)

010

(71

0(0

0t)

0(7

10

00

00

.4C

.)4.0

00

CI

(710

0—

‘bobob

ob

bo

bb

bb

bb

obbob

ob

bb

boobbb

obbb

00

00

00

00

00

00

00

00

00

00

0000

00

00

00

0000

>m

00

00

00

00

00

00

00

00

00

00

0000

oo

oo

oo

oooo

-IZ

bobb

obb

oèob

mQ

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

C0

0G5 C) 0

d4

,,

,

00000

0000C

0000C

0000

0000

00

00

00

0000

mm

bb

bb

bbbàbbbbbbbà

CöO

Cob

bb

bbböbà

0000

z00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

0000

-

m x > Cr

;u m

—--

Cli

UI

Co

Ci

\)C

o0)

——

U)

WC

,3C

o..O

)-N

)C

J1

-C

.)0

Oi-.01

0C

00lC

iC

oC

C.)

-4(71C

01C

(0C

1’)0C

310

0000

%lC

.)..C

00

Ui0

’I0

Obb

bo

bbbbbbbbbbb

ooob

bbbb

ObbC

Cb

0000

00

00

00

00

00

00

00

00

0000

00

00

00

00

00

m-m

00

00

00

00

00

00

00

00

0000

0000

00

00

00

0000

-bbboo

bbbbbbbbbb

bbbb

bàbo

bC

öC

àb

•o

•o

00

00

00

00

00

00

00

00

00000

00

00

00

00

00

0000

J CD 3 C) -‘ 7-

(I,

Page 62: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 63: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 64: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 65: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 66: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 67: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 68: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 69: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 70: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 71: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 72: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 73: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 74: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 75: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 76: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 77: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 78: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 79: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 80: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 81: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 82: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 83: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 84: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 85: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 86: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 87: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 88: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 89: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 90: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 91: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 92: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 93: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 94: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 95: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 96: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 97: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 98: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 99: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 100: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 101: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 102: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 103: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 104: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 105: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 106: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 107: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 108: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 109: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 110: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 111: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 112: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 113: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 114: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 115: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 116: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 117: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 118: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 119: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 120: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 121: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 122: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 123: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission
Page 124: GUAM POWER AUTHORITYguampowerauthority.com/.../documents/7.15.11QtrlyComplianceReport.pdfGUAM POWER AUTHORITY ... 14 Hagatna Substation 115 kV and 34.5 kV Breaker Replacement Substation/Transmission