Green Technology in Malaysia

Four pillars of the Malaysia Green Technology Policy (announced on 24 July 2009):

EnergyEnvironmentEconomySocial

Focuses on 4 key areas/sectors:EnergyBuildingsWater and waste managementTransportation

Page 3: GREEN IT IN MALAYSIA

Green Technology in Malaysia

Five Strategic Thrusts:1. Strengthen the institutional frameworks 2. Provide Conducive Environment for Green

Technology Development 3. Intensify Human Capital Development in

Green Technology 4. Intensify Green Technology Research and

Innovations5. Promotion and Public Awareness

Page 4: GREEN IT IN MALAYSIA

Green Technology / application in Buildings

-The green technology in building is mostly refer to the technology and applications to reduce impact to the Energy and Environmentrelated to building services

a) Design : Energy Efficiency, Renewable Energy & Water Management.

b) Office appliances

c) Operation: Energy management in the O&M.

d) Renovation / retrofits

e) Other - Paper and water recycling

- Indoor air quality.

- Solid waste management / separation

f) End users awareness

Page 5: GREEN IT IN MALAYSIA

Relation between use of energy and the environment

Source: Clean Development Mechanism (CDM) Malaysia 2007 Benchmarking Report by Malaysia energy Centre.

0.684 kg of CO2 emitted to the atmosphere for each 1 kWh electricity generated by power plant (Peninsula Malaysia)

1.516 kg CO2 / kwjSabah0.873 kg CO2 / kwjSarawak0.684 kg CO2 / kwjPeninsular Malaysia

2007Location

Page 6: GREEN IT IN MALAYSIA

Continuous Improvement project of Energy Efficient buildings in Malaysia

Energy Indices ( kWh/m2year)

0

50

100

150

200

250

300

Normal Buildings

Typical Consumption200 – 300 kWh/m2year

2001 2006 ( 2015) Benchmark year:

LEO Building

EC Building

GEO Building

MS 1525:2007 / EE in Building Guideline (1989)

136

MS 1525:2007 – Code of Practise Use of EE & RE for Non-residential buildings

Green Energy (PV)

Solar Electric generation

Energy Consumption

Page 7: GREEN IT IN MALAYSIA

- Lighting Management System (DALI System, OS, PS)

- EE office equipment (laptops, LCD monitors, networked printers)- EE IT Network (75% wireless network) & server room (24 degC)- Building Management System(VSDs, VAVs, CO2, BMS / Energy monitoring)

Green IT features in Green Energy Office, Malaysia Energy Centre (PTM)

Page 8: GREEN IT IN MALAYSIA

Energy Efficient Lighting Control System

Suspended T5 Tube (2x) Up/down

lighter c/w DALI Ballast

300 – 400 lux level

- Lighting system are controlled by the Lighting Management System using DALI (Digital Addressable Lighting Interface) technology.

- Smart features & Integrated with Occupancy and Daylight Sensors.

a) Lights will OFF when nobody in the rooms.

b) Lights will OFF when enough daylight.

c) Easy to reconfigure during renovation without extensive physical wiring.-

Page 9: GREEN IT IN MALAYSIA

Present Sensor -Physical sensors / movement detector-Thermal movement (Infra red) detection

Control & Sensors

Lighting Control Strategy : “Manual ON and Automatic/Manual OFF”

Page 10: GREEN IT IN MALAYSIA

Daylight Sensor -The brightness sensor (ranges from 1 to 20000 lux) can send switching signals through the EIB protocol to the actuators when the brightness exceeds or falls below a specified threshold.

Control & Sensors

Page 11: GREEN IT IN MALAYSIA

Energy Efficient Office Equipment

• Laptop is the least energy consuming (1/4 only) in comparison to PCwith CRT monitor and PC with LCD monitor.

• 80 % of the PC used in the ZEO Building is laptop.• Less energy consumed and less heat generated thus save A/C energy.

Page 12: GREEN IT IN MALAYSIA

Sharing Networked Printers

Most of the printing works are through the networked printers.

Benefits : a) Save energy – Reduce standby losses of the individual printers.b) Reduce printing time – No need to wait for printer to warming up and

waste energy.c) Save space – Clean and manageable workspace area.d) Easy maintenance – since number of printers are less.e) Cost effective – printing cost is lesser due to high performance

system.f) Others – Most networked printers (good one) have dual pages printing

capability, save paper.

Page 13: GREEN IT IN MALAYSIA

Wireless IT Distribution Network

• 75% of the IT distribution network are wireless. Most laptops already have support WiFi feature.

Benefits : a) Mobility – Provide flexibility to officer to work anywhere in the building.b) Easy to manage – No complicated wiring on the floor / table.c) Save cost – less IT equipment (hubs / switches).d) Save energy – less IT equipment to operate and no additional

cooling system.

• Only 25% are networked through the structured cabling system (CAT5e).To support the critical / high end equipment such as servers, printers, fax.

Page 14: GREEN IT IN MALAYSIA

High Temperature Server Room

• Server room operates at higher temperature room, 24 – 25 degC, still within the recommended operating temperature.

• Normal server rooms temperature are normally set at 19 –20 degC, which is normally recommended by IT consultants.

• Benefits : a) Save energy – Reduce energy for cooling.b) Prolog lifespan of cooling equipment – work less.c) Low maintenance cost – Less wear & tear due to less compressor loading.d) No need de-humidifier – No risk of condensation.e) Better working environment (not too cold) for the IT operators.

Page 15: GREEN IT IN MALAYSIA

Building Management System

> Open protocol system : Using TCP-IP and LonWorks system

Page 16: GREEN IT IN MALAYSIA

• Incorporate Building Automation System- Operate building services automatically especially the cooling system.- Reduce operation & maintenance time to operate the building.- Reduce troubleshooting time to rectify problems.

• Incorporate Energy Management System.- Records energy consumption.- Auto generate Building Energy Index (BEI) on daily and monthly basis.- Records energy generated by the Solar PV.- Records energy imported and exported to the grid (TNB).- Load apportioning, as input for energy audit analysis.- Temperature and humidity

• Can be access remotely via internet / intranet.- Save time for building manager to access from anywhere to monitor /

program the system.

Building Management System

Page 17: GREEN IT IN MALAYSIA

Issues and Challenges

Introduction and implementation of economic instrumentTo ensure availability of skilled, qualified, competent and productive human resource to support green IT growthTo foster research, development and demonstration in green ITPromotion and public awareness

Page 18: GREEN IT IN MALAYSIA

Conclusion

Green IT development in Malaysia is still at the early stage. Greater efforts and promotion is required to ensure the success of development and implementation of Green Technology Policy in Malaysia.

Page 19: GREEN IT IN MALAYSIA

Thank YouPusat Tenaga Malaysia

No. 2, Jalan 9/10

Persiaran Usahawan

Section 9

43650 Bandar Baru Bangi

Selangor

Website : www.ptm.org.myE-mail: [email protected]

Tel : +603-89210800