Goran Tesevic Civil and Structural Engineer
![Page 2: Goran Tesevic](https://reader037.fdocuments.net/reader037/viewer/2022102709/589c1d911a28ab007e8b6b89/html5/thumbnails/2.jpg)
Key Projects:1. Reconstruction of reinforced concrete highway bridge
L=12+29.50+12 m……………………………………………………......3-8
2. Reconstruction of concrete beam bridge L=8.50 m…………… .9-103. Reconstruction of concrete beam bridge L=9.0 m……………..11-144. Reconstruction of concrete beam bridge L=7.0 m……………..15-165. Reconstruction of concrete beam bridge L=7.5 m…………………176. Demolition and removal of old expansion joints and construction
of new ones…………………………………………………………….18-207. Production of reinforced T beams……………………………….........21
![Page 3: Goran Tesevic](https://reader037.fdocuments.net/reader037/viewer/2022102709/589c1d911a28ab007e8b6b89/html5/thumbnails/3.jpg)
1. Reconstruction of reinforced concrete highway bridge L=12+29.50+12 m.
Replacement of damaged post-tensioning beam
Installation of highway safety traffic barriers
![Page 4: Goran Tesevic](https://reader037.fdocuments.net/reader037/viewer/2022102709/589c1d911a28ab007e8b6b89/html5/thumbnails/4.jpg)
Setting load of 150 KN in order to preserve the existing deflection
Installation of a temporary support
![Page 5: Goran Tesevic](https://reader037.fdocuments.net/reader037/viewer/2022102709/589c1d911a28ab007e8b6b89/html5/thumbnails/5.jpg)
Isolation of pre-stressed T beam New pre-stressed T beam
![Page 6: Goran Tesevic](https://reader037.fdocuments.net/reader037/viewer/2022102709/589c1d911a28ab007e8b6b89/html5/thumbnails/6.jpg)
Replacement of damaged pre-stressed T beam
![Page 7: Goran Tesevic](https://reader037.fdocuments.net/reader037/viewer/2022102709/589c1d911a28ab007e8b6b89/html5/thumbnails/7.jpg)
New longitudinal connection between the top of flanges
Detail during work
![Page 8: Goran Tesevic](https://reader037.fdocuments.net/reader037/viewer/2022102709/589c1d911a28ab007e8b6b89/html5/thumbnails/8.jpg)
Repairing cracks in concrete by injecting epoxy resin
Repair and rehabilitation of cracks
![Page 9: Goran Tesevic](https://reader037.fdocuments.net/reader037/viewer/2022102709/589c1d911a28ab007e8b6b89/html5/thumbnails/9.jpg)
2. Reconstruction of concrete beam bridge L=8.50 m
Removing of damaged precast concrete deck modules and laying reinforced concrete T beams
![Page 10: Goran Tesevic](https://reader037.fdocuments.net/reader037/viewer/2022102709/589c1d911a28ab007e8b6b89/html5/thumbnails/10.jpg)
Concreting Installation waterproofing membranes
![Page 11: Goran Tesevic](https://reader037.fdocuments.net/reader037/viewer/2022102709/589c1d911a28ab007e8b6b89/html5/thumbnails/11.jpg)
3. Reconstruction of concrete beam bridge L=9.0 m
Damaged precast concrete deck modules
![Page 12: Goran Tesevic](https://reader037.fdocuments.net/reader037/viewer/2022102709/589c1d911a28ab007e8b6b89/html5/thumbnails/12.jpg)
Start removing of damaged precast concrete deck modules and new deck slab
![Page 13: Goran Tesevic](https://reader037.fdocuments.net/reader037/viewer/2022102709/589c1d911a28ab007e8b6b89/html5/thumbnails/13.jpg)
Concreting Detail between two concrete T beams
![Page 14: Goran Tesevic](https://reader037.fdocuments.net/reader037/viewer/2022102709/589c1d911a28ab007e8b6b89/html5/thumbnails/14.jpg)
Ready for installation waterproofing membrane A new bridge safety fence and guardrail barriers
![Page 15: Goran Tesevic](https://reader037.fdocuments.net/reader037/viewer/2022102709/589c1d911a28ab007e8b6b89/html5/thumbnails/15.jpg)
4. Reconstruction of concrete beam bridge L=7.0 m
Expanding of bridge sidewalks
![Page 16: Goran Tesevic](https://reader037.fdocuments.net/reader037/viewer/2022102709/589c1d911a28ab007e8b6b89/html5/thumbnails/16.jpg)
New sidewalk with a safety fence
![Page 17: Goran Tesevic](https://reader037.fdocuments.net/reader037/viewer/2022102709/589c1d911a28ab007e8b6b89/html5/thumbnails/17.jpg)
5. Reconstruction of concrete beam bridge L=7.0 m
Expanding of bridge sidewalks New sidewalks with a safety fences
![Page 18: Goran Tesevic](https://reader037.fdocuments.net/reader037/viewer/2022102709/589c1d911a28ab007e8b6b89/html5/thumbnails/18.jpg)
Bridge 1 Preparing for extension joint replacement
![Page 19: Goran Tesevic](https://reader037.fdocuments.net/reader037/viewer/2022102709/589c1d911a28ab007e8b6b89/html5/thumbnails/19.jpg)
New extension joint
![Page 20: Goran Tesevic](https://reader037.fdocuments.net/reader037/viewer/2022102709/589c1d911a28ab007e8b6b89/html5/thumbnails/20.jpg)
Bridge 2 Expansion joint during installation
![Page 21: Goran Tesevic](https://reader037.fdocuments.net/reader037/viewer/2022102709/589c1d911a28ab007e8b6b89/html5/thumbnails/21.jpg)
Production of reinforced T beams