Agenda for this talk
• Green Team Members
• Work Activities Posters
• The Business Continuity Plan /
Climate Change Preparation Survey
• Dissemination to Higher Education
• Pointers from earlier Green workshop
3Connect | Communicate | Collaborate
The GN3Plus NA3-T3 Team
NA3 Activity Leader John Dyer (TERENA)Task Leader Andrew Mackarel (HEAnet – Ireland)
Team Members
Vasiliki Giannikopoulou (GRNET - Greece)
Magnus Stromdahl (NORDUnet, UNINETT – Norway)
Tamàs Maray (NIIF – Hungary)
Josef Vojtech (CESNET – Czech Republic)Milan Kuzelka (AMRES – Serbia) Belgrade UniversityJelena Prodanovic
Nikoletta Tsioroli (CYNET – Cyprus)
Albert Hankel (SURFnet - Netherlands) withUniversity of Amsterdam partners
Please consider joining the team in GN4 and encourage support for our work. Tell us the areas that you see environmental challenges in your daily activities
4Connect | Communicate | Collaborate
Some Active Test Cases / Best Practices (Posters outside )
Some
Active Test Cases / Best Practices
(Posters outside )
5Connect | Communicate | Collaborate
The
Business Continuity Plan
Climate Change
Preparation Survey Results
6Connect | Communicate | Collaborate
BCP survey results
1.Do you as an NREN document risks as part of each large activity in network or service development and deployment?
Yes 65%
No 35%
2. Does your NREN maintain a Business Risk Register ?
Yes 24%
No 76%
3. Do you as an NREN have an active Business Continuity Plan?
Yes 53%
No 47%
4, Do you think that having BCP is important for an NREN?
Yes 94%
No 6 %
7Connect | Communicate | Collaborate
BCP survey results -2
5 . Have you experienced any major network outages because of severe weather disturbances?
Yes 24 %
No 76%
6. Have you as an NREN ever had to consider the location of some of your network equipment due to irregular climatic operational problems , extreme heat or cold, humidity/ flooding or seismic activities?
Yes 24 %
No 76%
7. Electrical supply in Europe will change radically in the next 10 years due to the increase in use of renewable energy technologies and interconnection of these technologies into the distribution grids. Do you as an NREN track national planning and implementation activities in this area?
Yes 24 %
No 76%
8. As part of the normal NREN operational activity do you check that each of your PoPs have Power Resilience
Yes 94%
No 6%
8Connect | Communicate | Collaborate
BCP survey results -3
9. Have you implemented full diverse path resilience for fibre connectivity in your network to your major PoPs?
Yes 76%
No 24%
10. As an NREN do you offer the opportunity for staff Teleworking/ Remote Working?
Yes 82%
No 18%
11. Are you collaborating with other organisations (such as commercial telco’s) to reduce the risks (such as sharing infrastructure when disaster strikes)?
Yes 47%
No 53 %
12. Would your NREN like to be kept informed of any Green Team initiatives in the area of Business Continuity or Climatic Change Planning?
Yes 88%
No 12%
9Connect | Communicate | Collaborate
Electrical supply in Europe changing
The impact switching to Renewable Energy sources which power our networks.Grid Technologies to support this radical shift have to be designed yet. - Frequency change mitigation - Supply surges in areas => Trip outs locally
10Connect | Communicate | Collaborate
GEANT Green Team Climate Change Planning Future
Establish how many NRENS have Business Continuity Plans
Survey out of 17 NRENs, just over 50% have a BCP
Ask NRENs to document fully o Level of Resilience supported in their Network
o Location, Power , Path, Equipment Some answers in surveyo all PoP GPS co-ordinates including Altitudeo Identify if earthquakes or natural disturbances are common occurrenceso Identify if any large water sources or mountains etc are close to PoPso Establish where national energy supplies are obtained and what are any
potential threats or disruption to these supplies
Suggest solution is for GEANT Environmental team to build a template of how this data is presented and produce sample reports
Model impact of climate change in parts of GEANT area and present to NREN audience in 2015
– Scheduled start is Feb 2015
11Connect | Communicate | Collaborate
Some National Climate Change policies
EC Document http://www.climateadaptation.eu/
Irish Climate Change Policy document
http://www.environ.ie/en/Publications/Environment/ClimateChange/FileDownLoad,32467,en.pdf
Some GEANT team which already identified equivalent Policy documents the UK , France, Czech Republic and Cyprus. Most of these place an obligation on you as a Service Provider to protect
your services against climate change
UK have a Department of Energy and Climate Change (DECC) since 2008.
12Connect | Communicate | Collaborate
Higher Education Dissemination work
13Connect | Communicate | Collaborate
Higher Education Dissemination
International Program called eco-University targeting 3rd Level Campus
Student promoted activity with college management support
The seven steps of the programme are:
Establishing a Green Campus committee
incorporating and staff representatives.
Undertaking an environmental review.
Implementing an action plan.
Monitoring and evaluating actions carried out.
Linking the programme to learning on campus.
Informing and involving the campus and wider community.o Joint Workshops with other Green Campus memberso Participate in An Taisce ( Co-ordinator) Events
Develop a Green Charter.
14Connect | Communicate | Collaborate
Green Campus Areas of Focus
These seven steps focus on areas such as
Litter and waste prevention.
Reduction / management.
Energy conservation/reduction.
Water.
Travel.
Biodiversity.
Procurement and Environmental risk.
Remember to Switch off and Plug out all unnecessary electrical equipment in offices, classrooms and labs. You not only save electricity and money required to pay the bills - you also help reduce harmful emissions to the atmosphere. Always think WASTE PREVENTION
15Connect | Communicate | Collaborate
Useful Sites for FEE Green schools
Federation for Environmental Education
• www.fee-international.org/ 61 Countries Members
Eco-schools site
http://www.eco-schools.org/
3600 schools in Ireland 82% have Green Flag Status
17,000 schools registered in UK and again over 70% have some level
of Green Flag Status
16Connect | Communicate | Collaborate
Pointers from Green Workshop Discussion
Good work being done in the Green Team but how to get the message out? Ec02meter and Sustaining Policy Template essential
More communication through various fora such as TF-MSP
Microsite / theme-site on Green ICT for NRENs
More best practices Student
Flying audit team for Green practices and Audits
Have green team members participate in other GN4-tasks
Green sticker / label for NRENs?
Additional future topics
Advise how to best organize Green ICT for NRENs
Show examples of Green ICT adoption in NRENs
Expand business continuity and disaster recovery plans with climate change
17Connect | Communicate | Collaborate
Thanks
Thanks to Martin and John and all the TF-MSP members for letting us
engage with you at your meeting
&
Thanks for all your attendance at our earlier workshop and all the input
we received which we will translate into our work plans
18Connect | Communicate | Collaborate
System complexityIf you are not convinced; is greening bad?
19Connect | Communicate | Collaborate