Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 ....

34
Glenn Springs Holdings, Inc. A subsidiary of Occidental Petroleum Joe Branch 7601 Old Channel Trail Project Manager Montague, MI 49437 Direct Dial (231) 670-6809 April 30, 2020 Reference No. 001069 Ms. Jaclyn Kondrk Mr. Brian P. Sadowski USEPA NYSDEC Region II, Site Investigation & Compliance Branch 270 Michigan Avenue 290 Broadway, 20th Floor Buffalo, NY 14203-2999 New York, NY 10007-1866 Dear Ms. Kondrk and Mr. Sadowski: Re: Quarterly Operations Report - First Quarter 2020 Hyde Park Remedial Program Bedrock and Overburden Monitoring Programs NYSDEC Site No. 932021 In accordance with the July 2006 "Performance Monitoring Plan" (PMP), the following is the Quarterly Operations Report for the Hyde Park Remedial Program for the period January 1, 2020 through March 31, 2020. A total of 11.04 million gallons of aqueous phase liquid (APL) were collected, treated, and discharged in compliance with the Site's City of Niagara Falls Publicly Owned Treatment Works (POTW) Significant Industrial Users (SIU) Wastewater Discharge Permit #49. Two drums (approximately 988 pounds) of non-aqueous phase liquid (NAPL) and twelve drums (approximately 2,646 pounds) of personal protective equipment (PPE) were shipped for disposal this quarter. The potentiometric contours are consistent with previous interpretations. Flow Zones 6, 7, and 9 have dewatered areas between the landfill and the gorge face. The current data continue to support the interpretation of effective hydraulic containment and inward gradients. The performance monitoring data are presented as follows: Figures 1-9: Showing the potentiometric surface for the bedrock flow zones and overburden Figure 10: Showing continuously recorded water levels at flow zone 9 piezometer PMW-1M-09 Table 1: Water level elevation summary Tables 2 and 3: Daily and weekly treatment system effluent monitoring data Attachment A: Purge well performance graphs indicating daily level and flow information Due to a barometric transducer malfunction, the water elevations presented for the flow zone 9 piezometer PMW-1M-09 for this quarterly reporting period have not been compensated for barometric pressure. Compensating the water elevations removes the pressure exerted on the water level transducer by the overlying atmosphere, leaving only the pressure exerted on the transducer by the overlying water column. This results in “real” water elevations that are lower relative to the uncompensated elevations. As the uncompensated water elevations are already below the water elevation of 526 feet above mean sea level (ft. AMSL) required to be maintained in flow zone FZ-09 between the landfill and the APL purge wells, the compensated water elevations would also be below that target elevation. As such, the FZ-09 outcrop along the New York Power Authority (NYPA) access road remained unsaturated during the quarterly reporting period. The small number of water

Transcript of Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 ....

Page 1: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

Glenn Springs Holdings, Inc.A subsidiary of Occidental Petroleum

Joe Branch 7601 Old Channel Trail Project Manager Montague, MI 49437 Direct Dial (231) 670-6809

April 30, 2020 Reference No. 001069 Ms. Jaclyn Kondrk Mr. Brian P. Sadowski USEPA NYSDEC Region II, Site Investigation & Compliance Branch 270 Michigan Avenue 290 Broadway, 20th Floor Buffalo, NY 14203-2999 New York, NY 10007-1866

Dear Ms. Kondrk and Mr. Sadowski:

Re: Quarterly Operations Report - First Quarter 2020 Hyde Park Remedial Program Bedrock and Overburden Monitoring Programs NYSDEC Site No. 932021

In accordance with the July 2006 "Performance Monitoring Plan" (PMP), the following is the Quarterly Operations Report for the Hyde Park Remedial Program for the period January 1, 2020 through March 31, 2020. A total of 11.04 million gallons of aqueous phase liquid (APL) were collected, treated, and discharged in compliance with the Site's City of Niagara Falls Publicly Owned Treatment Works (POTW) Significant Industrial Users (SIU) Wastewater Discharge Permit #49. Two drums (approximately 988 pounds) of non-aqueous phase liquid (NAPL) and twelve drums (approximately 2,646 pounds) of personal protective equipment (PPE) were shipped for disposal this quarter. The potentiometric contours are consistent with previous interpretations. Flow Zones 6, 7, and 9 have dewatered areas between the landfill and the gorge face. The current data continue to support the interpretation of effective hydraulic containment and inward gradients.

The performance monitoring data are presented as follows:

• Figures 1-9: Showing the potentiometric surface for the bedrock flow zones and overburden

• Figure 10: Showing continuously recorded water levels at flow zone 9 piezometer PMW-1M-09

• Table 1: Water level elevation summary

• Tables 2 and 3: Daily and weekly treatment system effluent monitoring data

• Attachment A: Purge well performance graphs indicating daily level and flow information

Due to a barometric transducer malfunction, the water elevations presented for the flow zone 9 piezometer PMW-1M-09 for this quarterly reporting period have not been compensated for barometric pressure. Compensating the water elevations removes the pressure exerted on the water level transducer by the overlying atmosphere, leaving only the pressure exerted on the transducer by the overlying water column. This results in “real” water elevations that are lower relative to the uncompensated elevations. As the uncompensated water elevations are already below the water elevation of 526 feet above mean sea level (ft. AMSL) required to be maintained in flow zone FZ-09 between the landfill and the APL purge wells, the compensated water elevations would also be below that target elevation. As such, the FZ-09 outcrop along the New York Power Authority (NYPA) access road remained unsaturated during the quarterly reporting period. The small number of water

Page 2: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

April 30, 2020 Reference No. 001069

- 2 -

elevations that were compensated with the barometric data from the barometric transducer early in the quarter before the transducer malfunction were approximately 515.5 ft. AMSL. In addition, the quarterly groundwater elevation in piezometer PMW-1M-09 measured manually on March 3, 2020 was 517.25 feet above mean sea level (AMSL), confirming that the FZ-09 outcrop along the NYPA access road was unsaturated. The barometric transducer will be replaced in April 2020.

The pumping wells were operational and functioning as designed during the first quarter 2020. The pumps are operated to maintain a water level between a typical range of 2.5 feet above (pump on) and 2.5 feet below (pump off) a specific setpoint in accordance with the setpoint range defined in the Operation & Maintenance Manual. The following minor operational and setpoint issues were investigated or resolved during the first quarter of 2020:

• The water level in PW-2UR exceeded setpoint range from January 1 through January 7 due to pump maintenance. The water level returned to within setpoint range on January 8.

• The water level in PW-6UR exceeded setpoint range from January 1 through January 14 due to rain and snow melt. The water level returned to within setpoint range on January 15.

• The water level in PW-3M exceeded setpoint range on January 11 due to leak detection switch trip and on March 2 due to rain and snow melt. The water level returned to within setpoint range on January 12 and March 3, respectively.

• The water level in APW-1 exceeded setpoint range due to rain and snow melt from January 11 through January 12, January 24 through January 30, February 17 through February 20, and March 2 through March 6. The water level returned to within setpoint range on January 13, January 31, February 21, and March 7, respectively.

• The water level in APW-1 exceeded setpoint range on March 29 due to a pump fault. The pump was reset and the water level returned to within setpoint range on March 30.

• The water levels in the following wells exceeded setpoint range due to a heat trace failure:

− PW-1L, PW-8U, PW-10U, and APW-2 on January 29. The water levels in these wells returned to within setpoint range on January 30.

− PW-1U, PW-2UR, PW-2L, PW-3L, PW-5U, PW-6MR, PW-6UR, and PW-7U from January 29 through January 30. The water levels in these wells returned to within setpoint range on January 31.

• The water level in PW-4U exceeded setpoint range on the following dates:

− January 29 through January 31 and February 1, February 10, and February 15 due to an electrical fault. The pump was reset and the water level returned to within setpoint range on February 2, February 11 and February 15, respectively.

− March 1 and March 2 due to rain and snow melt. The water level returned to within setpoint range on March 3.

− March 11 and March 13 through March 14 due to communication faults. The pump was reset and the water level returned to within setpoint range on March 12 and March 15, respectively.

− March 19 for cleaning and maintenance of the water level transducer. The water level returned to within setpoint range on March 20.

Page 3: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

April 30, 2020 Reference No. 001069

- 3 -

• The water levels in the following wells exceeded setpoint range due to effluent tank process controlmaintenance:

− PW-4U from February 22 (due to an electrical fault) and February 23 through February 25. Thewater level returned to within setpoint range on February 26.

− PW-1L from February 23 through February 26. The water level returned to within setpoint range onFebruary 27.

− PW-1U, PW-2UR, PW-2L, PW-3L, PW-5UR, PW-6UR, PW-6MR, PW-8U, and PW-10U fromFebruary 23 through February 25. The water levels returned to within setpoint range onFebruary 26.

− PW-2M and PW-3M from February 24 through February 26. The water levels returned to withinsetpoint range on February 27.

− APW-2 from February 23 through February 24. The water level returned to within setpoint range onFebruary 25.

− APW-1 from February 23 through February 24 and February 26 through February 27. The waterlevel returned to within setpoint range on February 25 and February 28, respectively.

• The water level in PW-7U exceeded setpoint range from March 12 through March 20 and from March 22through March 23 due to a communication issue with the pump. The water levels returned to within setpointrange on March 21 and March 24, respectively. Select communication equipment associated with PW-7Uwill be replaced in the second quarter of 2020.

• The water level in PW-9U exceeded set point range from January 16 to March 25 due to water leveltransducer issues. The transducer was removed and reset on March 25. The water level decreased;however, the transducer could not be placed to a depth where set point could be achieved. Cleaning of thiswell will occur in the second quarter such that the transducer can be reset to the required depth.

If you have any questions, please feel free to contact me at (231) 670-6809 or by email at [email protected].

Very truly yours,

GLENN SPRINGS HOLDINGS, INC.

Joe Branch Project Manager 231-670-6809 Cell

JB/eew/5 Encl.

cc: G. May, NYSDECJ. Robinson, NYSDOH D. Hoyt, GHDJ. Pentilchuk, GHD M. Popek, GHD

Page 4: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

G1U-01

G6-01

H2U-01

H5-01

I1-01

PW-6UR

606.98

605.50

614.73

595.79

602.98

~595

figure 1FZ-01 Potentiometric Surface March 2020

1st Quarter ReportHyde Park Landfill Site

Glenn Springs Holdings, Inc.Niagara Falls, New York

Dewatered area offlow zone

Piezometer usedin contouring

Piezometer consideredunreliable - data notused in contouring

Purge Well - data notused in contouring

Tilde at a piezometerindicates that the flowzone is dewatered. At apurge well, the pumpingwater level is below theflow zone, but the flowzone is not necessarilydewatered. Valueshown is the flow zoneelevation.

~ 525

Legend

2003 Delineationof NAPL Limits

Potentiometric Contour(ft AMSL)

Flow Zone Subcrop

Glenn Springs Holdings, Inc.

0 200 400 600

Page 5: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

PW-5UR

PW-6UR

PW-4U

F2U-02

F4U-02

G1-02

G6-02

H2U-02

H5-02

I1-02

J2U-02

J5U-02

J6-02

~577

~574

~577

577.01

588.04

594.63

593.07

595.98

595.67

592.57

600.49

600.74

603.11

figure 2FZ-02 Potentiometric Surface March 2020

1st Quarter ReportHyde Park Landfill Site

Glenn Springs Holdings, Inc.Niagara Falls, New York

Dewatered area offlow zone

Piezometer usedin contouring

Piezometer consideredunreliable - data notused in contouring

Purge Well - data notused in contouring

Tilde at a piezometerindicates that the flowzone is dewatered. At apurge well, the pumpingwater level is below theflow zone, but the flowzone is not necessarilydewatered. Valueshown is the flow zoneelevation.

~ 525

Legend

2003 Delineationof NAPL Limits

Potentiometric Contour(ft AMSL)

Flow Zone Subcrop

Glenn Springs Holdings, Inc.

0 200 400 600

Page 6: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

PW-2UR

PW-10U

PW-5UR

PW-6UR

PW-4U

AFW-2U-04

D1U-04D2U-04

E6-04

F2U-04

F4U-04

F6-04

G1U-04

G6-04

H5-04

I1-04

J2U-04

J5U-04

J6-04

~570

~572

~563

~560

571.90

578.88

584.46582.97

566.96

579.91

587.73

570.75

594.71

593.43

595.62

586.86

596.93

589.21

583.54

figure 3FZ-04 Potentiometric Surface March 2020

1st Quarter ReportHyde Park Landfill Site

Glenn Springs Holdings, Inc.Niagara Falls, New York

Dewatered area offlow zone

Piezometer usedin contouring

Piezometer consideredunreliable - data notused in contouring

Purge Well - data notused in contouring

Tilde at a piezometerindicates that the flowzone is dewatered. At apurge well, the pumpingwater level is below theflow zone, but the flowzone is not necessarilydewatered. Valueshown is the flow zoneelevation.

~ 525

Legend

2003 Delineationof NAPL Limits

Potentiometric Contour(ft AMSL)

Flow Zone Subcrop

Glenn Springs Holdings, Inc.

0 200 400 600

Page 7: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

PW-10U

PW-1U

PW-2UR

PW-3M

PW-4UPW-5UR

PW-6UR

AFW-2U-05

AGW-1U-05

D1U-05D2U-05

E6-05

F2U-05

F4U-05

F6-05

G6-05

H2M-05

H5-05

I1-05

J2U-05

J5U-05

J6-05

PMW-1U-05

565.10

~564

~562

520.90

~572

560.30

559.30

578.88

589.40

582.99582.76

567.36

580.18

587.59

570.65

593.23

595.47

594.28

552.81

581.91

582.04

583.12

580.72

figure 4FZ-05 Potentiometric Surface March 2020

1st Quarter ReportHyde Park Landfill Site

Glenn Springs Holdings, Inc.Niagara Falls, New York

Dewatered area offlow zone

Piezometer usedin contouring

Piezometer consideredunreliable - data notused in contouring

Purge Well - data notused in contouring

Tilde at a piezometerindicates that the flowzone is dewatered. At apurge well, the pumpingwater level is below theflow zone, but the flowzone is not necessarilydewatered. Valueshown is the flow zoneelevation.

~ 525

Legend

2003 Delineationof NAPL Limits

Potentiometric Contour(ft AMSL)

Flow Zone Subcrop

Glenn Springs Holdings, Inc.

0 200 400 600

Page 8: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

PW-10U

PW-1U

PW-2M

PW-3M PW-4M

PW-6UMR

PW-7U

PW-8U PW-9U

ABP-7-06

AFW-1U-06

AFW-2U-06

AGW-1U-06

B2U-06

C3-06

D1U-06

D2U-06

E6-06F2M-06

F4M-06

F6-06

G1M-06

G6-06

H2M-06

H5-06

I1-06

J2M-06

J5M-06

J6-06

PMW-1U-06

565.10

549.00

~543

~539

~537

~534

~548 ~547

549.50 ~548

~554

558.08

545.34

554.55

555.12

~551

549.53550.75

575.03

552.40

551.33

574.91

575.06

577.50

585.21

590.24

546.24

552.97

549.09

554.75

549.23

figure 5FZ-06 Potentiometric Surface March 2020

1st Quarter ReportHyde Park Landfill Site

Glenn Springs Holdings, Inc.Niagara Falls, New York

Dewatered area offlow zone

Piezometer usedin contouring

Piezometer consideredunreliable - data notused in contouring

Purge Well - data notused in contouring

Tilde at a piezometerindicates that the flowzone is dewatered. At apurge well, the pumpingwater level is below theflow zone, but the flowzone is not necessarilydewatered. Valueshown is the flow zoneelevation.

~ 525

Legend

2003 Delineationof NAPL Limits

Potentiometric Contour(ft AMSL)

Flow Zone Subcrop

Glenn Springs Holdings, Inc.

0 200 400 600

PW-8M

Page 9: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

APW-1

PW-2M

PW-3M

PW-4M

PW-6UMR

PW-8M

ABP-1-07 547.02

ABP-7-07

AFW-1M-07

AFW-2M-07

AGW-1M-07

B2M-07

C3-07

D1M-07D2M-07

E6-07

F2M-07

F4M-07

F6-07

G1M-07

G6-07

H5-07

I1-07

J5M-07

J6-07

PMW-1M-07

~536

~523

520.90

524.20

~514

~527

534.95

~534

~528

546.75

~531

546.51

532.07524.10

554.82

517.78

529.14

567.49

585.79

585.16

555.26

543.06

545.66

545.22

529.63

figure 6FZ-07 Potentiometric Surface March 2020

1st Quarter ReportHyde Park Landfill Site

Glenn Springs Holdings, Inc.Niagara Falls, New York

Dewatered area offlow zone

Piezometer usedin contouring

Piezometer consideredunreliable - data notused in contouring

Purge Well - data notused in contouring

Tilde at a piezometerindicates that the flowzone is dewatered. At apurge well, the pumpingwater level is below theflow zone, but the flowzone is not necessarilydewatered. Valueshown is the flow zoneelevation.

~ 525

Legend

2003 Delineationof NAPL Limits

Potentiometric Contour(ft AMSL)

Flow Zone Subcrop

Glenn Springs Holdings, Inc.

0 200 400 600

Page 10: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

APW-1

APW-2

PW-1L

PW-2M

PW-3M

PW-4M

PW-6UMR

PW-8M

ABP-1-09 534.76

ABP-7-09

AFW-1M-09

AFW-2M-09

AGW-1M-09

B2M-09

C3-09

D1M-09D2M-09

E6-09

F2M-09

F4M-09

F6-09

G1M-09

G6-09

H2M-09

H5-09

I1-09

J2M-09

J5M-09

J6-09

PMW-1M-09

528.50

~526

~519

~514

520.90

524.20

~506

519.70

534.75

526.40

521.11

546.56

obstructed @59.88 ft BTOC

543.76

517.21517.09

553.69

516.83

516.85

570.94

581.94

586.36

553.32

543.98

563.10

545.26

545.53

566.02

517.25

figure 7FZ-09 Potentiometric Surface March 2020

1st Quarter ReportHyde Park Landfill Site

Glenn Springs Holdings, Inc.Niagara Falls, New York

Dewatered area offlow zone

Piezometer usedin contouring

Piezometer consideredunreliable - data notused in contouring

Purge Well - data notused in contouring

Tilde at a piezometerindicates that the flowzone is dewatered. At apurge well, the pumpingwater level is below theflow zone, but the flowzone is not necessarilydewatered. Valueshown is the flow zoneelevation.

~ 525

Legend

2003 Delineationof NAPL Limits

Potentiometric Contour(ft AMSL)

Flow Zone Subcrop

Glenn Springs Holdings, Inc.

0 200 400 600

Page 11: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

585

APW-1

APW-2

PW-1L

PW-2L

PW-3L

AFW-1L-11

AFW-2L-11

AGW-1L-11

B2L-11

D1L-11D2L-11

E6-11

F2L-11

F4L-11

F6-11

G1L-11

G6-11

H2L-11

H5-11

I1-11

J5L-11

J6-11

PMW-1L-11

528.50

512.10

497.70

495.00

499.40

514.14

497.14

584.64

500.87

504.00523.76

535.10

554.25

572.14

530.21

593.16

594.75

559.90

542.09

545.23

556.27

587.26

514.28

figure 8FZ-11 Potentiometric Surface March 2020

1st Quarter ReportHyde Park Landfill Site

Glenn Springs Holdings, Inc.Niagara Falls, New York

Dewatered area offlow zone

Piezometer usedin contouring

Piezometer consideredunreliable - data notused in contouring

Purge Well - data notused in contouring

Tilde at a piezometerindicates that the flowzone is dewatered. At apurge well, the pumpingwater level is below theflow zone, but the flowzone is not necessarilydewatered. Valueshown is the flow zoneelevation.

~ 525

Legend

2003 Delineationof NAPL Limits

Potentiometric Contour(ft AMSL)

Flow Zone Subcrop

Glenn Springs Holdings, Inc.

0 200 400 600

Page 12: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

CMW-11OB

CMW-12OB

CMW-1OB

CMW-2OB

CMW-3OB

CMW-4OB

CMW-5OB

CMW-6OB

CMW-7OB

CMW-8OB

CMW-9OB

OMW-1

OMW-10R

OMW-11ROMW-12R

OMW-13R

OMW-14ROMW-15

OMW-16R

OMW-2

OMW-3OMW-4R

OMW-5R

OMW-6

OMW-7 OMW-8R2

OMW-9WW-D

WW-C

571.35

591.03

571.79

590.97

576.63

Well Surcharged

580.73

WellSurcharged

606.74

Dry

569.44

601.19

590.25

593.42

593.21

591.85

595.84

603.29

603.93

603.60

594.58

590.35

589.27

586.06

586.88 588.48

590.12

sp.580

sp.583

Niagara Falls, New York

figure 9Overburden Potentiometric Surface March 2020

1st Quarter ReportHyde Park Landfill Site

Glenn Springs Holdings, Inc.

Well usedin contouring

Well consideredunreliable - data notused in contouring

Indicates the well isdry.

Dry

Legend

Existing BarrierCollection System

Potentiometric Contour(ft AMSL)

Overburden BarrierCollection System

0ft. 200ft. 400ft. 600ft.

Note: Data values may overlap.If illegible, refer to tabulateddata in the report.

Niagara River

Glenn Springs Holdings, Inc.

OBCWS Wet Wellspumped for recovery.Posted levels indicatethe pumping setpoints.Setpoint levels wereused for contouring.

Page 13: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

figure 10

PMW-1M-09 1st Quarter 2020 - Hourly Water Level Elevation1st Quarter Report

Hyde Park Landfill SiteGlenn Springs Holdings, Inc.

Riser

Top of Casing = 597.80 ft AMSL

500

505

510

515

520

525

530

535

540

545

550

555

560

565

570

575

580

585

590

595

600

Ele

vati

on

(F

t. A

MS

L) Reference Elevation = 526 ft AMSL

Screened Interval

Uncompensated Water Level Elevation

FZ-9

Screen and Sandpack

Page 14: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

Table 1

Water Level Elevation SummaryFirst Quarter - 2020

Hyde Park RRT Program

Page 1 of 5

Well Reference Elevation Depth to Water Water Level Elevation(ft AMSL) (ft) (ft AMSL)

Overburden

CMW-2OB 590.79 -0.18 590.97CMW-3OB 582.13 5.50 576.63CMW-4OB 574.28 Surcharged 574.28CMW-5OB 583.43 2.70 580.73CMW-6OB 571.89 Surcharged 571.89CMW-7OB 611.00 4.26 606.74CMW-8OB 616.11 Dry -CMW-9OB 571.76 2.32 569.44CMW-1OB 576.80 5.01 571.79CMW-11OB 572.85 1.50 571.35CMW-12OB 594.74 3.71 591.03MH20 605.87 4.66 601.21MH21 599.77 6.06 593.71MH22 593.37 6.62 586.75MH23 587.05 7.84 579.21MH24 582.57 1.36 581.21MH25 583.82 0.99 582.83MH26 584.48 2.54 581.94MH27 586.12 5.73 580.39MH28 585.23 5.68 579.55MH29 604.58 NM -MH30 599.49 7.58 591.91MH31 590.10 8.61 581.49MH32 592.01 9.59 582.42MH33 592.51 8.64 583.87MH34 598.34 7.10 591.24MH35 605.69 6.55 599.14MH35A 605.69 7.14 598.55OMW-1 605.28 4.09 601.19OMW-2 605.99 2.39 603.60OMW-3 598.63 4.05 594.58OMW-4R 601.17 10.82 590.35OMW-5R 591.31 2.04 589.27OMW-6 587.62 1.56 586.06OMW-7 592.74 5.86 586.88OMW-8R2 594.67 6.19 588.48OMW-9 595.27 5.15 590.12OMW-10R 595.13 4.88 590.25OMW-11R 597.52 4.10 593.42OMW-12R 596.71 3.50 593.21OMW-13R 601.50 9.65 591.85OMW-14R 599.64 3.80 595.84OMW-15 607.48 4.19 603.29OMW-16R 607.62 3.69 603.93SC-2 625.61 22.64 602.97SC-3 638.72 40.58 598.14SC-4 639.35 39.22 600.13SC-5 634.07 Obstructed -SC-6 631.15 17.51 613.64

001069Kondrk-Sadowski-5-Tbls.xlsx

Page 15: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

Table 1

Water Level Elevation SummaryFirst Quarter - 2020

Hyde Park RRT Program

Page 2 of 5

Well Reference Elevation Depth to Water Water Level Elevation(ft AMSL) (ft) (ft AMSL)

Shallow Bedrock

CMW-1SH 576.11 10.56 565.55CMW-2SH 590.51 16.17 574.34CMW-3SH 581.91 25.99 555.92CMW-4SH 574.16 16.52 557.64CMW-5SH 583.36 Surcharged 583.36CMW-6SH 572.05 9.27 562.78CMW-7SH 610.58 10.23 600.35CMW-8SH 615.95 3.45 612.50CMW-9SH 571.96 11.02 560.94CMW-11SH 573.21 7.48 565.73CMW-12SH 597.02 21.64 575.38

Flow Zone 1

G1U-01 617.08 10.10 606.98G6-01 609.24 3.74 605.50H2U-01 620.92 6.19 614.73H5-01 617.61 21.82 595.79I1-01 625.58 22.60 602.98

Flow Zone 2

F2U-02 599.89 22.88 577.01F4U-02 602.32 14.28 588.04G1-02 616.86 22.23 594.63G6-02 608.65 15.58 593.07H2U-02 620.88 24.90 595.98H5-02 617.47 21.80 595.67I1-02 625.47 32.90 592.57J2U-02 609.66 9.17 600.49J5U-02 606.21 5.47 600.74J6-02 609.23 6.12 603.11

Flow Zone 4

AFW-2U-04 593.48 14.60 578.88D1U-04 593.77 9.31 584.46D2U-04 590.65 7.68 582.97E6-04 578.23 11.27 566.96F2U-04 599.76 19.85 579.91F4U-04 602.19 14.46 587.73F6-04 588.06 17.31 570.75G1U-04 616.96 22.25 594.71G6-04 609.15 15.72 593.43H5-04 617.40 21.78 595.62I1-04 625.30 38.44 586.86J2U-04 609.42 12.49 596.93J5U-04 606.05 16.84 589.21J6-04 609.12 25.58 583.54

001069Kondrk-Sadowski-5-Tbls.xlsx

Page 16: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

Table 1

Water Level Elevation SummaryFirst Quarter - 2020

Hyde Park RRT Program

Page 3 of 5

Well Reference Elevation Depth to Water Water Level Elevation(ft AMSL) (ft) (ft AMSL)

Flow Zone 5

AFW-2U-05 593.33 14.45 578.88AGW-1U-05 591.80 2.40 589.40D1U-05 593.51 10.52 582.99D2U-05 590.56 7.80 582.76E6-05 578.04 10.68 567.36F2U-05 599.64 19.46 580.18F4U-05 602.06 14.47 587.59F6-05 587.85 17.20 570.65G6-05 609.13 15.90 593.23H2M-05 621.59 26.12 595.47H5-05 617.31 23.03 594.28I1-05 625.25 72.44 552.81J2U-05 609.30 27.39 581.91J5U-05 605.87 23.83 582.04J6-05 609.02 25.90 583.12PMW-1U-05 598.00 17.28 580.72

Flow Zone 6

ABP-7-06 575.78 Dry -AFW-1U-06 571.83 13.75 558.08AFW-2U-06 593.22 47.88 545.34AGW-1U-06 591.66 37.11 554.55B2U-06 589.29 34.17 555.12C3-06 585.78 37.19 548.59D1U-06 593.25 43.72 549.53D2U-06 590.38 39.63 550.75E6-06 577.99 2.96 575.03F2M-06 599.06 46.66 552.40F4M-06 602.05 50.72 551.33F6-06 587.84 12.93 574.91G1M-06 616.75 41.69 575.06G6-06 609.09 31.59 577.50H2M-06 621.42 36.21 585.21H5-06 617.17 26.93 590.24I1-06 625.15 78.91 546.24J2M-06 608.94 55.97 552.97J5M-06 606.22 57.13 549.09J6-06 608.93 54.18 554.75PMW-1U-06 597.92 48.69 549.23

001069Kondrk-Sadowski-5-Tbls.xlsx

Page 17: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

Table 1

Water Level Elevation SummaryFirst Quarter - 2020

Hyde Park RRT Program

Page 4 of 5

Well Reference Elevation Depth to Water Water Level Elevation(ft AMSL) (ft) (ft AMSL)

Flow Zone 7

ABP-1-07 575.20 28.18 547.02ABP-7-07 575.73 40.78 534.95AFW-1M-07 571.41 38.78 532.63AFW-2M-07 593.44 66.73 526.71AGW-1M-07 592.91 46.16 546.75B2M-07 589.52 Dry -C3-07 585.62 39.11 546.51D1M-07 594.15 62.08 532.07D2M-07 590.77 66.67 524.10E6-07 577.91 23.09 554.82F2M-07 598.91 81.13 517.78F4M-07 601.91 72.77 529.14F6-07 587.68 20.19 567.49G1M-07 616.68 30.89 585.79G6-07 609.06 23.90 585.16H5-07 617.05 61.79 555.26I1-07 625.14 82.08 543.06J5M-07 606.07 60.41 545.66J6-07 608.85 63.63 545.22PMW-1M-07 598.50 68.87 529.63

Flow Zone 9

ABP-1-09 575.19 40.43 534.76ABP-7-09 575.67 40.92 534.75AFW-1M-09 571.12 44.72 526.40AFW-2M-09 593.32 72.21 521.11AGW-1M-09 592.75 46.19 546.56B2M-09 589.34 Obstructed -C3-09 585.00 41.24 543.76D1M-09 594.02 76.81 517.21D2M-09 590.66 73.57 517.09E6-09 577.82 24.13 553.69F2M-09 598.71 81.88 516.83F4M-09 601.79 84.94 516.85F6-09 587.53 16.59 570.94G1M-09 616.58 34.64 581.94G6-09 608.98 22.62 586.36H2M-09 621.32 68.00 553.32H5-09 616.93 72.95 543.98I1-09 624.91 61.81 563.10J2M-09 608.77 63.51 545.26J5M-09 605.82 60.29 545.53J6-09 608.76 42.74 566.02PMW-1M-09 598.34 81.09 517.25

001069Kondrk-Sadowski-5-Tbls.xlsx

Page 18: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

Table 1

Water Level Elevation SummaryFirst Quarter - 2020

Hyde Park RRT Program

Page 5 of 5

Well Reference Elevation Depth to Water Water Level Elevation(ft AMSL) (ft) (ft AMSL)

Flow Zone 11

AFW-1L-11 572.10 57.96 514.14AFW-2L-11 593.43 96.29 497.14AGW-1L-11 592.71 8.07 584.64B2L-11 589.65 88.78 500.87D1L-11 593.80 89.80 504.00D2L-11 590.21 66.45 523.76E6-11 577.72 42.62 535.10F2L-11 598.94 44.69 554.25F4L-11 602.22 30.08 572.14F6-11 587.40 57.19 530.21G1L-11 616.84 23.68 593.16G6-11 608.89 14.14 594.75H2L-11 620.73 60.83 559.90H5-11 616.81 74.72 542.09I1-11 624.75 79.52 545.23J5L-11 607.20 50.93 556.27J6-11 608.68 21.42 587.26PMW-1L-11 598.84 84.56 514.28

Purge Wells

APW-1 564.98 36.48 528.50APW-2 569.89 57.79 512.10PW-1L 593.16 95.46 497.70PW-1U 593.50 44.50 549.00PW-2L 597.29 102.29 495.00PW-2M 596.61 85.21 511.40PW-2UR 594.75 35.85 558.90PW-3L 599.05 99.65 499.40PW-3M 597.79 76.89 520.90PW-4M 606.93 82.73 524.20PW-4U 604.85 32.95 571.90PW-5UR 601.31 41.01 560.30PW-6UMR 609.31 106.11 503.20PW-6UR 608.47 49.17 559.30PW-7U 592.47 52.17 540.30PW-8M 592.67 72.97 519.70PW-8U 589.27 39.77 549.50PW-9U 587.47 40.37 547.10PW-10U 593.54 28.44 565.10

Notes:

"-" - Not applicableft AMSL - Feet above mean sea levelNM - Not measured due to overlying ice and snowDry - No water present at the time of measurement

001069Kondrk-Sadowski-5-Tbls.xlsx

Page 19: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

Table 2

Leachate Treatment System Daily Effluent Monitoring DataFirst Quarter - 2020

Hyde Park RRT Program

Page 1 of 3

EffluentDate pH Flow

(su) (gal)

01/01/20 7.1 257,00001/02/20 7.2 166,00001/03/20 7.2 51,00001/04/2001/05/2001/06/20 7.8 262,00001/07/20 7.8 319,00001/08/20 7.1 103,00001/09/20 7.1 171,00001/10/2001/11/2001/12/20 7.0 335,00001/13/20 7.0 291,00001/14/2001/15/20 7.0 299,00001/16/2001/17/20 7.1 263,00001/18/2001/19/2001/20/20 7.0 316,00001/21/20 7.0 192,00001/22/20 7.1 73,00001/23/20 7.0 68,00001/24/2001/25/2001/26/20 7.0 199,00001/27/20 7.0 340,00001/28/20 7.0 280,00001/29/20 7.0 20,00001/30/20 7.0 125,00001/31/20 7.1 75,00002/01/2002/02/2002/03/20 7.0 317,00002/04/20 6.9 323,00002/05/20 6.9 88,00002/06/20 7.5 202,000

001069Kondrk-Sadowski-5-Tbls.xlsx

Page 20: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

Table 2

Leachate Treatment System Daily Effluent Monitoring DataFirst Quarter - 2020

Hyde Park RRT Program

Page 2 of 3

EffluentDate pH Flow

(su) (gal)

02/07/20 6.9 32,00002/08/2002/09/2002/10/20 7.5 228,00002/11/20 7.4 275,00002/12/20 6.9 24,00002/13/20 7.0 178,00002/14/20 7.1 41,00002/15/2002/16/2002/17/20 7.0 282,00002/18/20 7.0 83,00002/19/20 7.1 59,00002/20/20 7.5 82,00002/21/2002/22/2002/23/2002/24/2002/25/20 7.5 55,00002/26/20 7.3 37,00002/27/20 7.3 293,00002/28/20 7.2 290,00002/29/2003/01/2003/02/20 7.2 43,00003/03/20 7.2 249,00003/04/20 7.2 278,00003/05/20 7.2 246,00003/06/20 7.1 68,00003/07/2003/08/2003/09/20 7.0 203,00003/10/20 7.1 404,00003/11/20 7.3 219,00003/12/20 7.3 30,00003/13/20 7.2 220,00003/14/20

001069Kondrk-Sadowski-5-Tbls.xlsx

Page 21: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

Table 2

Leachate Treatment System Daily Effluent Monitoring DataFirst Quarter - 2020

Hyde Park RRT Program

Page 3 of 3

EffluentDate pH Flow

(su) (gal)

03/15/2003/16/20 7.3 238,00003/17/20 7.2 255,00003/18/20 7.1 58,00003/19/20 7.0 261,00003/20/2003/21/2003/22/2003/23/20 7.1 216,00003/24/20 7.0 275,00003/25/2003/26/20 7.1 134,00003/27/20 7.1 56,00003/28/2003/29/2003/30/20 7.2 201,00003/31/20 7.1 296,000

Total 11,044,000

Notes:

su - Standard Unitgal - Gallons

001069Kondrk-Sadowski-5-Tbls.xlsx

Page 22: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

Table 3

Analytical Results SummaryWeekly Sampling - Leachate Treatment System

First Quarter - 2020Hyde Park RRT Program

Page 1 of 2

EffluentParameter Units 01/02/2020 01/08/2020 01/15/2020 01/22/2020 01/29/2020 02/05/2020

Volatiles1,1,1-Trichloroethane µg/L 0.28 J 0.48 J 0.40 J 0.52 J 0.73 J 1.11,1,2,2-Tetrachloroethane µg/L 0.61 J 1.1 0.71 J 1.6 3.5 5.21,1,2-Trichloroethane µg/L 1.0 U 1.0 U 1.0 U 1.0 U 0.41 J 0.49 J1,1-Dichloroethane µg/L 2.3 2.0 2.3 2.7 2.8 2.91,1-Dichloroethene µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U1,2,4-Trichlorobenzene µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U1,2-Dichlorobenzene µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U1,2-Dichloroethane µg/L 1.8 2.3 1.8 2.7 2.7 3.91,2-Dichloropropane µg/L 1.0 U 1.0 U 1.0 U 1.0 U 0.43 J 0.54 J1,3-Dichlorobenzene µg/L 1.0 U 0.24 J 1.0 U 1.0 U 1.0 U 1.0 U1,4-Dichlorobenzene µg/L 1.0 U 0.55 J 1.0 U 1.0 U 1.0 U 1.0 U2-Chlorotoluene µg/L 1.0 U 0.79 J 1.0 U 1.0 U 1.0 U 1.0 U3-Chlorotoluene µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U4-Chlorotoluene µg/L 1.0 U 0.25 J 1.0 U 1.0 U 1.0 U 1.0 UBenzene µg/L 0.37 J 0.86 J 0.44 J 1.0 3.0 4.6Bromodichloromethane µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 UBromoform µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 UBromomethane (Methyl bromide) µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 UCarbon disulfide µg/L 29 4.1 15 33 22 21Carbon tetrachloride µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 UChlorobenzene µg/L 1.0 U 0.38 J 1.0 U 1.0 U 1.0 U 1.0 UChloroethane µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 UChloroform (Trichloromethane) µg/L 1.3 1.8 1.4 1.6 3.3 4.8Chloromethane (Methyl chloride) µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 Ucis-1,2-Dichloroethene µg/L 0.27 J 0.66 J 0.29 J 0.49 J 0.68 J 0.85 Jcis-1,3-Dichloropropene µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 UDichlorodifluoromethane (CFC-12) µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 UEthylbenzene µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 Um&p-Xylenes µg/L 2.0 U 2.0 U 2.0 U 2.0 U 2.0 U 2.0 Um-Monochlorobenzotrifluoride µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 UMethylene chloride µg/L 1.0 U 1.0 U 1.0 U 1.0 U 0.38 J 1.0 Uo-Monochlorobenzotrifluoride µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 Uo-Xylene µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 Up-Monochlorobenzotrifluoride µg/L 1.0 U 0.45 J 1.0 U 1.0 U 1.0 U 1.0 UStyrene µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 UTetrachloroethene µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 UToluene µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 Utrans-1,2-Dichloroethene µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 Utrans-1,3-Dichloropropene µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 UTrichloroethene µg/L 1.0 U 0.21 J 1.0 U 1.0 U 1.0 U 1.0 UTrichlorofluoromethane (CFC-11) µg/L 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 UVinyl acetate µg/L 2.0 U 2.0 U 2.0 U 2.0 U 2.0 U 2.0 UVinyl chloride µg/L 140 120 130 150 170 140Xylenes (total) µg/L 3.0 U 3.0 U 3.0 U 3.0 U 3.0 U 3.0 U

General ChemistryPhenolics (total) mg/L 0.0011 J 0.0045 J 0.0037 J 0.0027 J 0.0050 0.0188

Notes:

J - Estimated concentrationU - Not detected at the associated reporting limitmg/L - Milligrams per literµg/L - Micrograms per liter

001069Kondrk-Sadowski-5-Tbls.xlsx

Page 23: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

Table 3

Analytical Results SummaryWeekly Sampling - Leachate Treatment System

First Quarter - 2020Hyde Park RRT Program

Page 2 of 2

EffluentParameter Units

Volatiles1,1,1-Trichloroethane µg/L1,1,2,2-Tetrachloroethane µg/L1,1,2-Trichloroethane µg/L1,1-Dichloroethane µg/L1,1-Dichloroethene µg/L1,2,4-Trichlorobenzene µg/L1,2-Dichlorobenzene µg/L1,2-Dichloroethane µg/L1,2-Dichloropropane µg/L1,3-Dichlorobenzene µg/L1,4-Dichlorobenzene µg/L2-Chlorotoluene µg/L3-Chlorotoluene µg/L4-Chlorotoluene µg/LBenzene µg/LBromodichloromethane µg/LBromoform µg/LBromomethane (Methyl bromide) µg/LCarbon disulfide µg/LCarbon tetrachloride µg/LChlorobenzene µg/LChloroethane µg/LChloroform (Trichloromethane) µg/LChloromethane (Methyl chloride) µg/Lcis-1,2-Dichloroethene µg/Lcis-1,3-Dichloropropene µg/LDichlorodifluoromethane (CFC-12) µg/LEthylbenzene µg/Lm&p-Xylenes µg/Lm-Monochlorobenzotrifluoride µg/LMethylene chloride µg/Lo-Monochlorobenzotrifluoride µg/Lo-Xylene µg/Lp-Monochlorobenzotrifluoride µg/LStyrene µg/LTetrachloroethene µg/LToluene µg/Ltrans-1,2-Dichloroethene µg/Ltrans-1,3-Dichloropropene µg/LTrichloroethene µg/LTrichlorofluoromethane (CFC-11) µg/LVinyl acetate µg/LVinyl chloride µg/LXylenes (total) µg/L

General ChemistryPhenolics (total) mg/L

Notes:

J - Estimated concentrationU - Not detected at the associated reporting limitmg/L - Milligrams per literµg/L - Micrograms per liter

02/12/2020 02/19/2020 02/28/2020 03/04/2020 03/10/2020 03/17/2020 03/25/2020

0.93 J 0.76 J 0.57 J 1.0 1.1 1.1 1.24.7 3.1 2.6 6.2 9.0 7.0 12

0.50 J 0.34 J 0.33 J 0.56 J 0.85 J 0.63 J 0.81 J3.3 J 3.4 J 3.4 3.1 3.1 3.3 3.41.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U4.2 3.9 3.2 4.1 5.1 5.0 6.3

0.69 J 0.51 J 0.50 J 0.59 J 0.65 J 0.67 J 0.83 J1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 0.79 J 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 0.41 J 1.0 U 1.0 U 1.0 U4.7 2.7 2.1 6.6 11 9.8 16

1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U

40 28 35 14 19 20 351.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 0.98 J 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U4.5 3.4 3.5 6.5 6.7 3.7 5.4

1.0 U 1.0 U 1.0 U 1.0 U 0.89 J 1.0 U 1.0 U0.83 J 0.74 J 0.61 J 1.2 1.5 1.6 2.01.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 0.21 J 1.0 U 1.0 U 1.0 U2.0 U 2.0 U 2.0 U 0.59 J 2.0 U 0.21 J 2.0 U1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 0.48 J 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 0.43 J 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 0.58 J 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 0.66 J 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U1.0 U 1.0 U 1.0 U 0.25 J 0.23 J 1.0 U 0.28 J1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U 1.0 U2.0 U 2.0 U 2.0 U 2.0 U 2.0 U 2.0 U 2.0 U160 140 160 130 130 140 150

3.0 U 3.0 U 3.0 U 1.0 J 3.0 U 3.0 U 3.0 U

0.0157 0.0146 0.0143 0.0399 0.0374 0.0234 0.0434

001069Kondrk-Sadowski-5-Tbls.xlsx

Page 24: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

GHD | 001069Kondrk-Sadowski-5

Attachment A

First Quarter 2020 Pumping Well Performance Graphs

Page 25: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

ATTACHMENT A

FIRST QUARTER 2020 - PUMPING WELL PERFORMANCE GRAPHS

HYDE PARK

Page 1 of 10

0.0

0.5

1.0

1.5

2.0

2.5

3.0

490

500

510

520

530

540

550

560

570

Flow

(GPM

)

Gro

undw

ater

Ele

vatio

n (ft

AM

SL)

Well APW-1

Elevation (ft AMSL) Setpoint Upper/Lower Bounds (ft AMSL) Flow (GPM)

0.00.20.40.60.81.01.21.41.61.8

500

505

510

515

520

525

530

Flow

(GPM

)

Gro

undw

ater

Ele

vatio

n (ft

AM

SL)

Well APW-2

Elevation (ft AMSL) Setpoint Upper/Lower Bounds (ft AMSL) Flow (GPM)

Page 26: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

ATTACHMENT A

FIRST QUARTER 2020 - PUMPING WELL PERFORMANCE GRAPHS

HYDE PARK

Page 2 of 10

0.0

2.0

4.0

6.0

8.0

490

495

500

505

510

515

Flow

(GPM

)

Gro

undw

ater

Ele

vatio

n (ft

AM

SL)

Well PW-1L

Elevation (ft AMSL) Setpoint Upper/Lower Bounds (ft AMSL) Flow (GPM)

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

530535540545550555560565570575

Flow

(GPM

)

Gro

undw

ater

Ele

vatio

n (ft

AM

SL)

Well PW-1U

Elevation (ft AMSL) Setpoint Upper/Lower Bounds (ft AMSL) Flow (GPM)

Page 27: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

ATTACHMENT A

FIRST QUARTER 2020 - PUMPING WELL PERFORMANCE GRAPHS

HYDE PARK

Page 3 of 10

0.0

0.5

1.0

1.5

2.0

490

495

500

505

510

515

520

525

Flow

(GPM

)

Gro

undw

ater

Ele

vatio

n (ft

AM

SL)

Well PW-2L

Elevation (ft AMSL) Setpoint Upper/Lower Bounds (ft AMSL) Flow (GPM)

0

10

20

30

40

50

60

70

505

510

515

520

525

530

535

Flow

(GPM

)

Gro

undw

ater

Ele

vatio

n (ft

AM

SL)

Well PW-2M

Elevation (ft AMSL) Setpoint Upper/Lower Bounds (ft AMSL) Flow (GPM)

Page 28: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

ATTACHMENT A

FIRST QUARTER 2020 - PUMPING WELL PERFORMANCE GRAPHS

HYDE PARK

Page 4 of 10

0.0

0.5

1.0

1.5

2.0

550

560

570

580

590

600

610

620

Flow

(GPM

)

Gro

undw

ater

Ele

vatio

n (ft

AM

SL)

Well PW-2UR

Elevation (ft AMSL) Setpoint Upper/Lower Bounds (ft AMSL) Flow (GPM)

0.0

2.0

4.0

6.0

8.0

495

500

505

510

515

520

525

Flow

(GPM

)

Gro

undw

ater

Ele

vatio

n (ft

AM

SL)

Well PW-3L

Elevation (ft AMSL) Setpoint Upper/Lower Bounds (ft AMSL) Flow (GPM)

Page 29: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

ATTACHMENT A

FIRST QUARTER 2020 - PUMPING WELL PERFORMANCE GRAPHS

HYDE PARK

Page 5 of 10

0.0

5.0

10.0

15.0

20.0

515

520

525

530

535

540

545

Flow

(GPM

)

Gro

undw

ater

Ele

vatio

n (ft

AM

SL)

Well PW-3M

Elevation (ft AMSL) Setpoint Upper/Lower Bounds (ft AMSL) Flow (GPM)

0.0

0.1

0.2

0.3

0.4

0.5

0.6

510

515

520

525

530

535

540

545

550

Flow

(GPM

)

Gro

undw

ater

Ele

vatio

n (ft

AM

SL)

Well PW-4M

Elevation (ft AMSL) Setpoint Upper/Lower Bounds (ft AMSL) Flow (GPM)

Page 30: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

ATTACHMENT A

FIRST QUARTER 2020 - PUMPING WELL PERFORMANCE GRAPHS

HYDE PARK

Page 6 of 10

0.0

0.2

0.4

0.6

0.8

1.0

560

565

570

575

580

585

590

595

600

Flow

(GPM

)

Gro

undw

ater

Ele

vatio

n (ft

AM

SL)

Well PW-4U

Elevation (ft AMSL) Setpoint Upper/Lower Bounds (ft AMSL) Flow (GPM)

0.0

1.0

2.0

3.0

4.0

5.0

555

565

575

585

595

605

615

625

Flow

(GPM

)

Gro

undw

ater

Ele

vatio

n (ft

AM

SL)

Well PW-5UR

Elevation (ft AMSL) Setpoint Upper/Lower Bounds (ft AMSL) Flow (GPM)

Page 31: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

ATTACHMENT A

FIRST QUARTER 2020 - PUMPING WELL PERFORMANCE GRAPHS

HYDE PARK

Page 7 of 10

0.0

1.0

2.0

3.0

545

555

565

575

585

595

605

Flow

(GPM

)

Gro

undw

ater

Ele

vatio

n (ft

AM

SL)

Well PW-6UR

Elevation (ft AMSL) Setpoint Upper/Lower Bounds (ft AMSL) Flow (GPM)

0.0

2.0

4.0

6.0

8.0

10.0

500505510515520525530535540545550

Flow

(GPM

)

Gro

undw

ater

Ele

vatio

n (ft

AM

SL)

Well PW-6MR

Elevation (ft AMSL) Setpoint Upper/Lower Bounds (ft AMSL) Flow (GPM)

Page 32: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

ATTACHMENT A

FIRST QUARTER 2020 - PUMPING WELL PERFORMANCE GRAPHS

HYDE PARK

Page 8 of 10

0.0

0.2

0.4

0.6

0.8

1.0

530

540

550

560

570

580

Flow

(GPM

)

Gro

undw

ater

Ele

vatio

n (ft

AM

SL)

Well PW-7U

Elevation (ft AMSL) Setpoint Upper/Lower Bounds (ft AMSL) Flow (GPM)

0.0

0.5

1.0

1.5

515

520

525

530

535

540

Flow

(GPM

)

Gro

undw

ater

Ele

vatio

n (ft

AM

SL)

Well PW-8M

Elevation (ft AMSL) Setpoint Upper/Lower Bounds (ft AMSL) Flow (GPM)

Page 33: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

ATTACHMENT A

FIRST QUARTER 2020 - PUMPING WELL PERFORMANCE GRAPHS

HYDE PARK

Page 9 of 10

0.0

0.5

1.0

1.5

2.0

2.5

3.0

540

545

550

555

560

565

570

575

580

Flow

(GPM

)

Gro

undw

ater

Ele

vatio

n (ft

AM

SL)

Well PW-8U

Elevation (ft AMSL) Setpoint Upper/Lower Bounds (ft AMSL) Flow (GPM)

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

535

540

545

550

555

560

Flow

(GPM

)

Gro

undw

ater

Ele

vatio

n (ft

AM

SL)

Well PW-9U

Elevation (ft AMSL) Setpoint Upper/Lower Bounds (ft AMSL) Flow (GPM)

Page 34: Glenn Springs Holdings, Inc. · 2020. 4. 30. · 290 Broadway, 20th Floor Buffalo, NY 14203-2999 . New York, NY 10007-1866 . Dear Ms. Kondrk and Mr ... Wastewater Discharge Permit

ATTACHMENT A

FIRST QUARTER 2020 - PUMPING WELL PERFORMANCE GRAPHS

HYDE PARK

Page 10 of 10

0.0

1.0

2.0

3.0

4.0

5.0

6.0

550555560565570575580585590595

Flow

(GPM

)

Gro

undw

ater

Ele

vatio

n (ft

AM

SL)

Well PW-10U

Elevation (ft AMSL) Setpoint Upper/Lower Bounds (ft AMSL) Flow (GPM)