General Tolling Requirements (GTR)

James E. Beverly Jr.

2019

Page 2: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Why does the GTR exist?

• Toll systems have specific infrastructure requirements for accuracy of performance

2

Page 3: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Why does the GTR exist?

• Detailed criteria that provides toll site infrastructure for:• Toll site (includes tolling pavement area), (civil and electrical)

• Toll equipment building (TEB) (architectural, structural, mechanical, and electrical)

• Toll gantry (structural and electrical)

3

Page 4: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Why does the GTR exist?

• Developed Tolling Infrastructure Requirements (TIR) for each project:• Created confusion for everyone

• Required staff to develop a TIR for each project

4

Page 5: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Why does the GTR exist?

• A single document that can be used for FDOT toll sites, (including express lanes) which support all Tolling Equipment Contractors (TECs)

5

Page 6: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Why does the GTR need to be updated?

• TEC’s toll system requirements change

• New TEC toll system is added

• Governing codes change (FBC, NEC, NFPA)

• Standard plans and specifications change

• Lessons learned during construction

• When specified equipment is no longer available

6

Page 7: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

PD&E

Design

Construction,Implementation,& Go-Live

Invo

lve

me

nt

AnnualT&R

O&M,Reporting, Sys. Monitoring,Troubleshooting,General support

Lifecycleequipment replacement

Time

Planning Design Construction Operations & Maintenance

When do you need the GTR?

• As early as possible

• During PD&E• Express lane diagram development• Validates approved concept alternative

• Before and during design

7

Page 8: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Who is the GTR addressing?

• Written to the EOR• Blue boxes are for non-

conventional projects

• GTR Part 2, Appendix - 1 TSP sections are written to the Contractor

8

Page 9: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 1 – Development and Processes

• Purpose• Procedure• Key terms

• Toll Site and Toll Facility• General Toll Lane (GTL)• General Use Lane (GUL)• Toll Equipment Building • Toll loop pavement area• Toll site envelope• Tolling movement

• Responsibilities• Department

• AOR/EOR

• TEC

• TSTM and GTR deviations

• Standard forms and templates

• Plan development process

9

Page 10: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 1 – Development and Processes

10

Page 11: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 1 – Development and Processes

11

Page 12: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 1 – Development and Processes

• Toll Site and Toll Facility

• General Toll Lane (GTL)

• General Use Lane (GUL)

• Toll Equipment Building

• Toll loop pavement area

• Toll site envelope

• Tolling movement

12

Page 13: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 1 – Development and Processes

• Prepare the Toll Siting Technical Memorandum (TSTM) from the approved PD&E concept alternative• Preliminary TSTM

• Express lane diagram

• GTR deviation form identifies and provides justification for design criteria that cannot be met

13

Page 14: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 1 – Development and Processes

• Accepted express lane diagram must be included in the TSTM

14

Page 15: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 1 – Development and Processes

15

Page 16: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 1 – Development and Processes

16

Page 17: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Design Criteria

• Toll site

• Toll Building (TEB)

• Toll gantry

• Communications

• Building permits

• Appendix -1 (TSP)

17

Page 18: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Design Criteria

18

Page 19: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Design Criteria

19

Page 20: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Design Criteria

20

Page 21: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Design Criteria

21

Page 22: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Design Criteria

22

Page 23: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Design Criteria

23

Page 24: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Design Criteria

• Gantry types• Non-accessible

• Cantilever (Standard plans 700-040)

• Span (Standard plans 700-041)

• Accessible

24

Page 25: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Design Criteria

• Gantry types• Non-accessible

• Cantilever (Standard plans 700-040)

• Span (Standard plans 700-041)

• Accessible

25

Page 26: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Design Criteria

• Gantry types• Non-accessible

• Cantilever (Standard plans 700-040)

• Span (Standard plans 700-041)

• Accessible

26

Page 27: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Design Criteria

• Toll equipment layout• Horizontal

Adjustability

27

Page 28: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Design Criteria

• Toll equipment layout• Non-accessible

28

Page 29: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Design Criteria

• Toll equipment layout• Accessible

29

Page 30: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Design Criteria

• Gantry electrical• Non-accessible

30

Page 31: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Design Criteria

• Gantry typical section• Accessible

31

Page 32: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Design Criteria

32

Page 33: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Design Criteria

• Gantry electrical• Accessible

33

Page 34: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Design Criteria

34

Page 35: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Design Criteria

• Communications• Black and red

buffer tubes (fusion spliced into each TEB)

35

Page 36: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Design Criteria

36

Page 37: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 2 – Instructions to Contractor

• Technical Special Provision (TSP)• Provided for EOR• Part 2 – Appendix - 1

• Civil• Structural• Architectural• Mechanical• Electrical

• Shop Drawings• Included in each TSP section

37

Page 38: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 3 – Plans Production

• Toll submittal requirements• Conventional

• Non-conventional

38

Page 39: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 3 – Plans Production

• Master plans• Master key sheet

• Signature sheet(s)

• Toll site location map

39

Page 40: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 3 – Plans Production

• Subcomponents• Toll facility demolition plans

• Toll facility site plans

• Toll facility building plans

• Toll facility gantry plans

40

Page 41: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 3 – Plans Production

• Subcomponents• Toll facility demolition plans

• Toll facility site plans

• Toll facility building plans

• Toll facility gantry plans

41

Page 42: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 3 – Plans Production

• Phase submittals• Conventional

• Non-conventional

42

Page 43: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 3 – Plans Production

• Phase submittals• Conventional

• Non-conventional

43

Page 44: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 3 – Plans Production

• Design analysis reports• Mechanical

• Building load analysis and equipment selection

• Fuel oil piping

• Electrical• Power design

• Short circuit calculations

• Electrical distribution

• Generator sizing

• Photometric calculations

44

Page 45: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 3 – Plans Production

• Pay items• Each toll site (lump sum) per Basis of Estimates (BOE)

• New construction – Toll plaza

• Modify existing or phased demolition – Toll plaza (Modify existing)

• Toll plaza island / lane work – Toll plaza island

• Toll site demolition – Clearing and grubbing

45

Page 46: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

Part 3 – Plans Production

• Roadway pay items not included in the Toll’s lump sum pay item• Roadway pavement

• Concrete barriers

• Guardrail

• Sodding

• Traffic control

• Retaining walls (any type)

• CIAC for primary power

• Removal pavement, sidewalks, slabs, etc.

• Delivery of salvageable materials

• Flowable fill

46

Page 47: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

How to obtain the GTR and related documents?

• GTR (redacted)

• TSTM template

• GTR deviation form

• EOR estimates template

• External website:• http://www.floridasturnpike.com/design.html

47

Page 48: General Tolling Requirements (GTR)...(TSTM) from the approved PD&E concept alternative •Preliminary TSTM •Express lane diagram •GTR deviation form identifies and provides justification

James E. Beverly Jr.Tolls Design Administrator

[email protected]