Food Standards Agencybeefandlamb.ahdb.org.uk/wp-content/uploads/2016/03/Tulip-project-… · The...

16
Food Standards Agency The Tulip Project Jose Ruiz

Transcript of Food Standards Agencybeefandlamb.ahdb.org.uk/wp-content/uploads/2016/03/Tulip-project-… · The...

Page 1: Food Standards Agencybeefandlamb.ahdb.org.uk/wp-content/uploads/2016/03/Tulip-project-… · The Tulip Project Jose Ruiz •Scope: Project started in partnership with Tulip and BEPEX

Food Standards Agency

The Tulip Project

Jose Ruiz

Page 2: Food Standards Agencybeefandlamb.ahdb.org.uk/wp-content/uploads/2016/03/Tulip-project-… · The Tulip Project Jose Ruiz •Scope: Project started in partnership with Tulip and BEPEX

• Scope: Project started in partnership with

Tulip and BEPEX seeking to improve CCIR

quality

• Desired outcome: CCIR results to be

consistent so they are reliable information for

the producer to act upon.

• Timeframe: To be completed within this

calendar year

CCIR Research: The project

Page 3: Food Standards Agencybeefandlamb.ahdb.org.uk/wp-content/uploads/2016/03/Tulip-project-… · The Tulip Project Jose Ruiz •Scope: Project started in partnership with Tulip and BEPEX

• Technical issues (operative systems)

• Logistic (layout, number of screens, etc)

• Consistency (individual criteria, plant

specific matters)

• Policy and training related

CCIR Research: Hurdles

Page 4: Food Standards Agencybeefandlamb.ahdb.org.uk/wp-content/uploads/2016/03/Tulip-project-… · The Tulip Project Jose Ruiz •Scope: Project started in partnership with Tulip and BEPEX

Areas for improvement Actions taken

Missing data Improved interface (on-going)

“time outs” Temporary measures for INNOVA.

K2 covers these

Mapping issues Minimised. Work in progress

Overall Scheduled audits to verify data

consistency

CCIR Research: Technical issues

Page 5: Food Standards Agencybeefandlamb.ahdb.org.uk/wp-content/uploads/2016/03/Tulip-project-… · The Tulip Project Jose Ruiz •Scope: Project started in partnership with Tulip and BEPEX

CCIR Research: Technical issues

Page 6: Food Standards Agencybeefandlamb.ahdb.org.uk/wp-content/uploads/2016/03/Tulip-project-… · The Tulip Project Jose Ruiz •Scope: Project started in partnership with Tulip and BEPEX

Areas for improvement Actions taken

Insufficient Number of screens and

positioning of those screens

Work in progress

Line speed: Time allocation for on

line recording

Looking at different screen layouts.

FBO assistance with data input.

Linked with point above

Buffer rails and other operational

matters: Ways around these

operational issues

Carcase ID. Internal systems.

Mixed batches As above

CCIR Research: Logistics

Page 7: Food Standards Agencybeefandlamb.ahdb.org.uk/wp-content/uploads/2016/03/Tulip-project-… · The Tulip Project Jose Ruiz •Scope: Project started in partnership with Tulip and BEPEX

Areas for improvement Actions taken

Individual criteria 1. Training.

2. One to one.

3. Delivery of condition cards

Plant own specs 1. Review.

2. Training.

3. Manual Update (WIP)

On screen conditions 1. Pilots

2. Reduced number of conditions

CCIR Research: Consistency

Page 8: Food Standards Agencybeefandlamb.ahdb.org.uk/wp-content/uploads/2016/03/Tulip-project-… · The Tulip Project Jose Ruiz •Scope: Project started in partnership with Tulip and BEPEX

Heart

EXISTING PROPOSED

Page 9: Food Standards Agencybeefandlamb.ahdb.org.uk/wp-content/uploads/2016/03/Tulip-project-… · The Tulip Project Jose Ruiz •Scope: Project started in partnership with Tulip and BEPEX

Pneumonia

with

Abscess

PericarditisPneumoniaMilkspot

(focal)

ContaminationAbscess

(liver)

Kidney

lesion

Milkspot

(generalised)

PleurisyBlood

splashCondition

11

Condition

12

CCIR Research: Proposed Screen

Page 10: Food Standards Agencybeefandlamb.ahdb.org.uk/wp-content/uploads/2016/03/Tulip-project-… · The Tulip Project Jose Ruiz •Scope: Project started in partnership with Tulip and BEPEX

CCIR Research: Policy and training Related

Areas for improvement Actions taken

Records on rejections vs Records

on Pathological conditions

1. MOC instructions under review.

2. Implications on interface.

Detail on MOC instructions 1. Condition cards developed,

2. implemented as pilot on CCF

and Tulip sites.

3. MOC instructions under review

Different levels of training 1. Training delivered on pilot sites.

2. Consistency checks tested.

Instructions on how to operate

screens

1. Developed on one site.

2. To be cascaded

Page 11: Food Standards Agencybeefandlamb.ahdb.org.uk/wp-content/uploads/2016/03/Tulip-project-… · The Tulip Project Jose Ruiz •Scope: Project started in partnership with Tulip and BEPEX

CCIR Research: Things into perspective

Page 12: Food Standards Agencybeefandlamb.ahdb.org.uk/wp-content/uploads/2016/03/Tulip-project-… · The Tulip Project Jose Ruiz •Scope: Project started in partnership with Tulip and BEPEX

CCIR Research: Things into perspective

Page 13: Food Standards Agencybeefandlamb.ahdb.org.uk/wp-content/uploads/2016/03/Tulip-project-… · The Tulip Project Jose Ruiz •Scope: Project started in partnership with Tulip and BEPEX

CCIR Research: Things into perspective

0

5

10

15

20

25

30

35

40

Pneumonia Pleurisy Pericarditis Peritonitis Milk spot Abscess Pyaemia

NumberRecorded

Conditions

EA

Hellenic

INNOVA

Page 14: Food Standards Agencybeefandlamb.ahdb.org.uk/wp-content/uploads/2016/03/Tulip-project-… · The Tulip Project Jose Ruiz •Scope: Project started in partnership with Tulip and BEPEX

We are Here Target

Interface issues being alleviated in

partnership with

K2 Implementation.

Pilot sites Inspection staff trained Cascaded Nationally. MOC

instructions amended in line with

desired outcome

Facilities under review on Tulip pilot

sites

Adequate number of touch screens

adequately located. Paper based

system or alternatives developed for

medium and small sites

Staff trained on CC pilot sites.

Review their systems in place

National implementation

CCIR Research: Progress Made

Page 15: Food Standards Agencybeefandlamb.ahdb.org.uk/wp-content/uploads/2016/03/Tulip-project-… · The Tulip Project Jose Ruiz •Scope: Project started in partnership with Tulip and BEPEX

• CCIR programme completed by the end

of the calendar year

• Explore similar initiatives on other

species

• Implement review systems: Continuous

improvement

• Use of technology

• Useful information for all in all species

CCIR Research: Steps Forward

Page 16: Food Standards Agencybeefandlamb.ahdb.org.uk/wp-content/uploads/2016/03/Tulip-project-… · The Tulip Project Jose Ruiz •Scope: Project started in partnership with Tulip and BEPEX

Farm To Fork