FINAL DESIGN FOR YORKTOWN HIGH SCHOOL INTERNAL MODIFICATIONS School Board Consent Item March 8, 2018 QUINN EVANS ARCHITECTS

Transcript of FINAL DESIGN FOR YORKTOWN HIGH SCHOOL INTERNAL …file/C-4...final design 1st floor –overall plan...

Page 1: FINAL DESIGN FOR YORKTOWN HIGH SCHOOL INTERNAL …file/C-4...final design 1st floor –overall plan 10. convert copy room & workroom into teacher collaboration space (plc) 11. convert

FINAL DESIGN FOR

YORKTOWN HIGH SCHOOLINTERNAL MODIFICATIONSSchool Board Consent ItemMarch 8, 2018

Q U I N N E V A N S A R C H I T E C T S

Page 2: FINAL DESIGN FOR YORKTOWN HIGH SCHOOL INTERNAL …file/C-4...final design 1st floor –overall plan 10. convert copy room & workroom into teacher collaboration space (plc) 11. convert

2QUINN EVANS ARCHITECTS|Washington, DC

PROJECT SCHEDULE

EXHIBIT A

Page 3: FINAL DESIGN FOR YORKTOWN HIGH SCHOOL INTERNAL …file/C-4...final design 1st floor –overall plan 10. convert copy room & workroom into teacher collaboration space (plc) 11. convert

FINAL DESIGN1ST FLOOR – OVERALL PLAN

10. CONVERT COPY ROOM & WORKROOM INTO TEACHER COLLABORATION SPACE (PLC)

11. CONVERT COMPUTER ALCOVE INTO CLASSROOM

12. PROVIDING ACCESSIBLE BATHROOM IN MULTI-USE CLASSROOM

13. CONVERT STORAGE INTO BIKE STORAGE

14. ADD CHARGING STATIONS AND WALK-UP COUNTERS IN CAFETERIA

15. ADD CHARGING STATIONS AND WALK-UP COUNTERS IN ATRIUM

16. ADD FOLD-UP DIVIDER CURTAINS IN MAIN GYM

17. ADD FOLD-UP DIVIDER CURTAIN IN AUX. GYM

18. REPLACE EXISTING GYM LOCKERS

3QUINN EVANS ARCHITECTS|Washington, DC

EXHIBIT B

Page 4: FINAL DESIGN FOR YORKTOWN HIGH SCHOOL INTERNAL …file/C-4...final design 1st floor –overall plan 10. convert copy room & workroom into teacher collaboration space (plc) 11. convert

FINAL DESIGN2nd FLOOR – OVERALL PLAN

20. PROVIDE TEACHER WORKROOM AND DROP-IN AT NEIGHBORHOOD COMMONS

21. CONVERT OFFICES & CONFERENCE ROOM INTO MULTI-USE SMALL GROUP ROOM

22. ADD CHARGING STATIONS & WALK-UP COUNTERS IN NORTH CORRIDOR

23. RE-PURPOSE OFFICES & CREATE ADDITIONAL OFFICE

24. ADD CHARGING STATIONS AND WALK-UP COUNTER IN EAST CORRIDOR

25. CONVERT TEACHER WORKROOM & CLASSROOM INTO SCIENCE CLASSROOM

26. PROVIDE LOUNGE SEATING IN SCIENCE COMMONS

4QUINN EVANS ARCHITECTS|Washington, DC

EXHIBIT C

Page 5: FINAL DESIGN FOR YORKTOWN HIGH SCHOOL INTERNAL …file/C-4...final design 1st floor –overall plan 10. convert copy room & workroom into teacher collaboration space (plc) 11. convert

FINAL DESIGN3rd FLOOR – OVERALL PLAN

30. CONVERT TEACHER WORKROOM AND OFFICES INTO CLASSROOM

31. CONVERT TEACHER WORKROOM INTO CLASSROOM

32. CREATE MEETING ROOM & DROP-IN AT COMMONS

33. CONVERT EXISTING COMPUTER LAB & CLASSROOM INTO TWO CLASSROOMS

34. ADD CHARGING STATIONS & WALK-UP COUNTER IN EAST CORRIDOR

35. PROVIDE LOUNGE SEATING IN SCIENCE COMMONS

36. ADD OFFICE & LARGE MEETING ROOM IN TEACHER LOUNGE

37. CONVERT WORKROOM & OFFICE INTO PROFESSIONAL LEARNING CENTER & DROP-IN

5QUINN EVANS ARCHITECTS|Washington, DC

EXHIBIT D

Page 6: FINAL DESIGN FOR YORKTOWN HIGH SCHOOL INTERNAL …file/C-4...final design 1st floor –overall plan 10. convert copy room & workroom into teacher collaboration space (plc) 11. convert

PROJECT ESTIMATE & FUNDING

PROJECT ESTIMATE CONSTRUCTION COSTS $2,175,000 OWNER (SOFT) COSTS $1,500,000 CONTINGENCY $ 325,000 TOTAL PROJECT COST $4,000,000

PROJECT FUNDING CAPITAL RESERVE $4,000,000

6QUINN EVANS ARCHITECTS|Washington, DC

EXHIBIT E

Page 7: FINAL DESIGN FOR YORKTOWN HIGH SCHOOL INTERNAL …file/C-4...final design 1st floor –overall plan 10. convert copy room & workroom into teacher collaboration space (plc) 11. convert

RECOMMENDATIONS

APPROVE GENERAL LOCATION AND EXTENT OF INTERNAL MODIFICATIONS

APPROVE NEW BUILDING CAPACITY OF 2,189 SEATS

REAFFIRM $4 MILLION IN TOTAL FUNDING AVAILABLE FROM THE CAPITAL RESERVE

DIRECT STAFF TO SOLICIT BIDS FOR THE CONSTRUCTION WORK

7QUINN EVANS ARCHITECTS|Washington, DC

EXHIBIT F