facades wall frames bathroom pods kitchen pods
Transcript of facades wall frames bathroom pods kitchen pods
Authorise Installer
© Copyright 2018- | All Rights Reserved | HERM Group
hermbuilt.com
Project Management
Construction Management
Contract Management
hermtechlogic.com
Smart Home/Office Eco-Systems
Project Management
Integration/Installation
hermlogic.com
Project Procurement
Project Management
Outsourcing & Logistics
GAP & BPO Managed Ser-
[email protected] [email protected] [email protected]
a beautiful build start with a beautiful frame…
the more we build, the more it build us!
smartdesign led off-site manufacturing/fabrication
roof trusses + purlins
facades
wall frames
bathroom pods
kitchen pods
floor joists
... delivered to scope, to site in-full-on-time!
WE WILL BEAT IT BY 10%
- PRICE GUARANTEE -
Residential | Townhouse/Triplex | Multilevel Residential & Commercial | Age-care | Student Accommodation | Low-rise Commercial
China Steel Suppliers
Unrivalled CAD Intelligence (FRAMECAD proprietary software)
Global Code Compliance and BIM integrated
AS/NZS Standards Compliance (built-in codes + standards)
4600/2005 : Cold Formed Steel Structure
4100 : Steel Structure
3623 : Domestic Metal Framing
1397/2001 : Steel Sheet & Strip-Hot-Dip Zinc Coating
○ G550 Grade Steel with guaranteed minimum yield strength ≥550MPa
○ AZ150 Aluminium Zinc Coating @ 150/m2
○ Manufactured/Fabricated to Builder approved CAD engineered plans
We use 0.95mm sheet steel [Industry Stranded: 0.75mm] to produce Wall,
Joists, Trusses and Battens
○ ‘C’ & ‘Z’ Profiles: 89mm x 41mm
○ Battens/Purlins: 35mm.
Weighing >60% less than timber, our steel sections can span greater
distances offering larger open spaces and increased design flexibility
without requiring intermediate columns or load bearing walls.
The finished frames/sections include documentation supporting material
verification, frame/section erection guide + instructions for builder; and
an independent engineering sign-off.
Fast and Highly Accurate production and assembly procedures
DIFOT - deliver in-full-on-time … and much more!
China fabrication within HERM Logic TQM framework
NEW ZEALND knowhow + technology + IP brings design led
construction manufacturing to mitigate on-site risk:
- human errors
- delivery delays
- material waste
- labour force cost
- take-off cost blowouts
- project delays due to adverse weather conditions
smart-framing
WITH smartframing we solve the challengers of todays’ construction
industry with bespoke leading-edge CAD integrated framing technology; and
an overarching TQM sourcing, manufacturing and delivery framework…
resulting in smarter turnarounds at the least cost to business/build (LCB).
WHY we do it! To deliver a competitive advantage to your business.
HOW we do it! By taking a whole-of-business/build approach to Project + Procurement and Supply Chain (P+P&SC) Management.
WHAT we do! We deliver negotiated savings and realised value benefits that you can trace to the P&L statement of a project, or to a business unit; and to your bottom-line!
Our Managed Services, Comparable Competitive Pricing
and turnkey solutions completely replaces the need to
tender for structural framing. This is my next generation
GAP & BPO managed service guarantee to you!
lower business
risk
faster
construction
precision
manufacturing
higher productivity
+ profitability
total design
flexibility
100% green
construction
John C Musster [MBT, UNSW]
Managing Director
HERM Logic | HERM Built
[GAP] Group Aggregated Procurement [BPO] Business Process Outsourcing
Our 24/7 Project
Management App will
notify project staff via
email and/or text
message at each critical
point within the supply
chain…
giving your team and you
complete peace of mind.
Step 5
On-site Installation /Erection; and Engineering Certification
Step 3
frame/section fabrication
and assembly
Step 4
Logistics
Step 1
3D CAD Engineering
Step 2
Client approval of CAD framing plans