ELECTRICITY OF VIETNAM POWER COMPANY No 1 E1712 VOL. 18 RURAL DISTRIBUTION PROJECT COMPONENT PROJECT RURAL MEDIUM VOLTAGE POWER GRID BAC GIANG PROVINCE VOLUME 3 ENVIRONMENTAL MANAGEMENT PLAN HANOI, 2007 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Transcript of ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural...

Page 1: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

ELECTRICITY OF VIETNAMPOWER COMPANY No 1

E1712VOL. 18

RURAL DISTRIBUTION PROJECT

COMPONENT PROJECT

RURAL MEDIUM VOLTAGE POWER GRID

BAC GIANG PROVINCE

VOLUME 3 ENVIRONMENTAL MANAGEMENT PLAN

HANOI, 2007

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

I I I I

Page 3: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

ELECTRICITY OF VIETNAMPOWER COMPANY No 1

RURAL DISTRIBUTION PROJECT

COMPONENT PROJECT

RURAL MEDIUM VOLTAGE POWER GRIDBAC GIANG PROVINCE

VOLUME 3 ENVIRONMENTAL MANAGEMENT PLAN

HANOI, 2007

Page 4: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

ELECTRICITY OF VIETNAMPOWER COMPANY No 1

RURAL DISTRIBUTION PROJECT

COMPONENT PROJECT

RURAL MEDIUM VOLTAGE POWER GRID

BAC GIANG PROVINCE

VOLUME 3 ENVIRONMENTAL MANAGEMENT PLAN

Writen by: Pham Trong Hung

Hanoi, October 2007CONSTRUCTION INVESTMENT

& TECHNOLOGY TRANSFER J.s.c.,

AGER

/ +CObTG RY4s

HANOI, 2007

Page 5: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnamn - Ruiral Distribution Project Environmenital Nianagement PlanBac Giang Province

Table of content i-ii

Part I Project Description 1

I Project Information2 Rural distribution project - Bac Giang province 3

Part II Legal Framework 6

Part III Environmental Screening 7

Part IV Mitigation Measures 16

Part V Emergency Situation & Solution Measures 22

Part VI Public Consultation 24

Part VII Monitoring Plan 27

Part VIII Responsible to implement the environmental management plan 36

Part IX Reporting procedures 38

Part X Plan for improving the Environmental management ability 39

Part XI Estimated costs for implementation EMP 40

Annex

Abbreviations

DP(s) Displaced Person(s)EMP Environmental Management PlanEVN Electricity of VietnamGOV Government of VietnamGDP General Domestic ProductionHH(s) Household(s)NGO(s) Non Govemmental Organisation(s)MV Medium VoltagePCI Power Company 1PPC Provincial People's CommitteeROW Right of WaySIMC Safegard Independent Monitoring ConsultantT/L Transmision lineUSD US Dollar

Construiction Inlvestmenit & Techiniology Transfer J.s.c.. j-

Page 6: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietinamil - Rur al Distribution Project Enivironimenital Nlanagemenl Plan

Bac Giang Province

VND Vietnam DongVAT Value Added TaxWB World Bank

Constr-uctioni Investment & Technology Transfer J.s.c., jj

Page 7: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

V'ietnam - Rtiral Distribution Project Environimilental Management Plan

Bac Giang Province

PART I: PROJECT DESCRIPTION

1 Project information

1. Project name Rural Distribution Project-Bac Giang province

2. Program name Rural medium voltage power grid project-Bac

Giang Province.

3. New- construction or rehabilitation New:W Rehabilitation:

proj ectDistrict Commune

Yen The district Huong Vi, Dong Ky,

Dong Lac, An Thuong

Yen Dung district Xuan Phu, Noi Hoang,

Huong Gian, Tan My,

Tan Tien.

Hiep Hoa district Hoang Van, Chau

Minh, Hop Thinh,

Project location Danh Thang.

i. Commune(s) Tan Yen district Phuc Hoa, Lan Gioi,

ii. District, town (s) Viet Lap, Que Nham

iii. Province Lang Giang district Tan Hung, Tan Thanh,

Tan Dinh, Xuong

Lam, Tan Thinh

Luc Nam district Dan Hoi, Bao Son,

Cam Ly, Dong Phu

Luc Ngan district Phuong Son, Tru Huu,

Quy Son

Son Dong district An ChaLu, Yen Dinh

1. Length and voltage of medium voltage New installation: In which:

(MV) line 34.006km 35kV line: 12.048km

22kV line: 19.826km

6kV line: 2.132km

2. Width of Right of Way (ROW) - Width of MV line: from 6m to 8m

3. Estimated number and height of the - Quantity: 540 Type of pole:

power pole IOm;12m; 14m;16m

4. Number of substation (s) - New installation: 55 Type of substation:

subs - Capacity: 100 kVA,

160 kVA, 200 kVA,

250 kVA, 400 kVA

Constriction Investment & Technology Transfer J.s.c.,

Page 8: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

*'ietnam - Rural Distribution Project Environmental Malagenament PlanBaC Giang Province

- Voltage: 35/0.4

kV;10(22)/0.4 kV;

6(22)/0.4kV

5. Total capacity of the substations - Capacity: 10,100 kVA

6. Have or have not got the substations Yes No: /

or ROW closed to the natural

preservation area or natural forest?

7. Have or have not got the substations Yes No: /

or ROW closed to the historical place,

pogoda or other cultural structures'?

8. Time of implementation the project 24 months

9. Implement construction in rainy Yes: E No: Fseason

10. Number of project affected 1,464HHs

households

11. Total land required for project Temporary:250,175m' Permanent: 2,665 m2

12. Total productive land required for Temporary: Pernanent: 2,665 m2

2proj ect 250,1 75 M

13. Total forest land Temporary: 0 m

14. Total fruit tree land Temporary: 0 m'

15. Total residentialial land Temporary: 0 m2

16. Total others Temporary: 0 m2

17. Total project cost (VND&USD) Cost: Cost: 2,173,255USD

exchange rate: 16,000VND/USD 34,772,084,71 2VND

* In Bac Giang province, there is one preservation area where the Birdlifeinternational organisation locolises to preserve. This area belongs to Yen Thedistrict and the distance from the closest place of the project line to the margin ofthe preservation area is 3.3km (Pls see the detail on the map)

* The activities before or in construction period.Before constructing, the investor shall implement the site clearance, hand over theroute alignment to the construction unit. After receiving the route alignment theconstruction unit shall arrange the camps suitably with the proposed requirementsin RP, EMDP and EMP and with the sphere of construction of each biddingpackage that the contractor won. The contractor shall mobilise its human resources,materials, and equipments to the project site. After having received the equipmentsand materials from the investor, the contractor shall implement the construction.The contractor shall excavate the foundation, erase poles, install the transformersubstation and transmision line as desig,n as well as the warning sign. After

finishing each phase of construction, the contractor has to collect clearly the

Constr-uction Investment & Technology Transfer J.s.c.,

Page 9: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Management Plan

Bac Giang Province

residual equipments and materials. The sections which need open the temporary

roads then have to recover as the original state after finishing the work.

. The main equipments and machines shall be used for constructing the project

include: crane (5 tones), lorry (5-15 tones), cart, and others supported means of

transportation.* Measures to transport equipments and materials to the project site: The materials

and equipments supplied by the investor or by the contractor itseft shall be

transfered to the collection site by lorry. From there, the contractor can use its lorry

to transport to the construction site for the line alignment section closed to the road

permitted to go into. For the section is far from the road, or the village road is too

small for the lorry to go or not permitted to go into, the equipments and materials

then shall be transported by simple means of transportation as the chart to the

project site.* The estimate construction time shall be 2 months, the maximum estimate workers

are about 20 persons for each construction place.

2 Rural distribution project - Bac Giang province

The Rural distribution Project - Bac Giang province is developed in 31 communes

of 8 districts of Bac Giang province. There are 8 districts as Yen The, Yen Dung,

Tan Yen, Lang Giang, Luc Nam, Luc Ngan, Son Dong and Hiep Hoa.

So as, the sphere of the project is very large and expands from the midland to the

mountainouse areas. During the process of transportation, installation and

construction of transmision line and substation, the difficulty is not avoidable.

The project area locates on the monsoon tropical area. The summer is hot and

rainny (representing 90% of the volume of the annual rainfall). The winter is dry.

The average annual temperature is about 22-230C. The humidity fluctuates from

73% to 74%. The average annual rainfall is from 1500mm to 1900mm, concentrates

on April and November. The average annual sunny time is from 1500 hours to 1700

hours. With such volume and time of rainfall, the construction shall meet some

difficulties as: the worker can not work in the rainy weather, the protection of

materials shall meet more difficult.

In this project, there are not any sections of line alignment traverse over river and

stream. T he l ine a lignment mainly t raverses o ver t he f ield 1 and a nd a long t o t he

inter-village roads.

The transportation system of project communes: The road from Bac Giang city to

district is the asphalted road, from district to commune is the broken stone road.

The road which connects villlages in one commune is the concrete road or pathway.

Construction Investment & Technology Transfer J.s.c., 3

Page 10: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

V ietnamn - Rtural Distributiion Project Environmental Nlanageiient Plan

Bac Giang Province

Besides, there are some exploiting places at some districts as Yen The district, so as

the infrustructure is good, fercilitate for construction and transportation activities.

Constrtuction Investmenit & Technology Transfer J.s.c., 4

Page 11: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnami - Rural Distribution Project Environinierital Nlanagenient Plan

Bac Giang Province

FIGURE 1: MAP OF PROJECT AREA

Construction Investment & Techniology Transfer J.s.c., 5

Page 12: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

107' 00

V R -BAC 06 TRONO uKHn Ij V1$T 0IAMTINK

THAI

21*

',I I -X9&0a- g ; - 2- I 00-i

5H A~50 4020 953

I~~ 444474 003, '51535-

-- B

110 -, , .Mh. - m ,,,.

DION8T ICHD -VI' !

T t ~ -^1-- l 321 22

9 PH .0904904 03 1291 995M

40 ~ ~ 0 YIn 746340 13

- sI8 '44/49'0k4

*>wN I.58..,4.

H64#u N 44 ",Sa, Oce 9044 0442 02 1: 5.s' LEGENDS,,44ai. 04~.~

4,. 0-2 22-1X - v

9 H 4 O 210 27 .2m .......... .. -'S

409-N uc -t. Ju 7- i.44 4., 8

.85 8.o , 5n

3-S 5. -93

I

56T 6.4 P G 6 a61 61 22 D0 0 02 6 H 10 a-"H g 20107 20X

Page 13: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Existing and proposed protected areas in Bac Giang provinceCac khu bao ve hien c6 vA de xua't a tinh Bac Giang

6ng H~ AiA C 'L8nYn ThE

n$ HUi Lung HuyOntPhOI Enh 'Yen -he

5 TAn Y§n 8> Y >L,uc Ng,ant -r 4Lang Gianrg qA

OHip Hoa &R" / KheRD 'TX.McGian -, -7g -. -.

e 42 ~~~~Y6n Duing< -1s-,.7-TX.fBScr inh LTun

s .0 Qu6 5 *o Sor -h AP Ti6n ScTn Ch Linr 6ng Tri6u

TP H,i RKhg i Un ITtiC~gyniChz G2 Luung Gn ?:t

Iag -- L -I6An ,}Kirtb> '-Thanh HN %

(o I .1~ uAnI ng%E11Aba

unTin TifMn.#*A Th9L LT (Y K9c7 Qun

V mgetation type), Kieu rng Legend /Chu giai* Evergreen foresi I Ritng 1hUtdng xanh Prolecied area I Khu bao ve* Coniferous foreslt (Ring la kim Provincial border I Ranh gidi linh

Daciduous foresi I Ring rung Ia (k hop) - U- siricl border I Ranh gidi huyen* Semi-deciduous foresl I Ri ng nia rung la* Limeslone foresl I Ring nui da

Bamboo I Ring Ire n&a* Plantalion foreslt I Rng lrong N

Grassland and scrub I Eal trongAgricultural land I Oil nong nghiep W 4 E

U Waler bodies I Mat nidc p* Mangrove I Ri ng ngap man S

lublaleuca t Ring iram

Page 14: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Management PlanBac Giang Province

PART II: LEGAL FRAMEWORK.

This EMP is setting based on the following legal framework:

Requirements from Vietnam:* Environmental protection law dt. 29 November 2005;* GOV Decree No 80/2006/ND-CP dt. 09 August 2006 on detail regulations and

guidance to implement some clauses of the Environmental protection law.;* GOV Decree No 81/2006/ND-CP dt. 09 August 2006 on fining for administrative

violation in the field of environmental protection.* GOV Decree No 52/1999/ND-CP: Regulation on management of construction and

investment with amendment to environmental issues on construction management;* Circular No 08/2006/TT-BTNMT dt. 08 September 2006 guiding on strategic

environmental assessment, environmental impact assessment, and environmentalprotection commitment;

* Vietnam environmental standard and other current standards for land, water and airenvironment.

Requirements from WB:* OP 4.01: Environmental assessment;* OP 4. 11: Cultural heritage;* PB 17.50: Information disclosure.

Detail guidance on assessment method and general impact in the transmision lineprojects:

* World Bank, 1999. Environmental Assessment Sourcebook, thirdth reprint; and* IFC, 2007. Environmental, Health, and Safety Guidelines on Electric Power

Transmission and Distribution.* Framework Regulation on applying the Environmental Protection Law for the Rural

Distribution Project.

Construction Investnsent & Technology Transfer J.s.c., 6

Page 15: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Management PlanBac Giang Province

PART III: ENVIRONMENTAL SCREENING

Impact Potential Commentimpact (about rate and level of impact)

Yes No

Construction phase

The flora is lost by land x - The flora at the area in the ROW, poleacquisition for substation erection, and material transportation shallconstruction or big tree is be affected. Most of the impacts caused bycut off to clear ROW. land acquisition for ROW and pole

foundations. Total estimated impacts

(permanent/ temporary impacts) areM2 ~ 2,2,665m2/250,175m ,in which the detail

numbers are (permanent/ temporary

impacts).

- Rice: 2,665m2 / 250,175m2

- Crops: 0m2 /0m2

The main quantity of affected flora is the

rice. Therefore, this impact does not cause

much adverse impact on the flora of Bac

Giang province.

The whole project does not have any

affected line alignment sections or

substations traversed over the planted ornatural forests in the provincial area.

Lose place of residence or x - Due to the project only affects on the ricefrighten to the bird. so as it does not cause the loss of residential

place of the bird.

- Due to the designed line alignment is

close to the residential area so as there are

no impacts on the earning area of the bird

because they do not earn for their living at

the place of human presence.

- The nearest distance from the margin of

the preservation area to the construction

site is 3.3km.

Soil erosion, sediment x - Soil erosion: It's considered that the

generation and surface impact causing soil erosion of the whole

Construction Investment & Technology Transfer J.s.c., 7

Page 16: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

V'ietnain - Rural Distributiont Project Environmental Mianagement PlanBac Giang Province

water turbidity caused by project is small due to the following

earthwork. reasons:

* The most important of the construction

works is the pole foundation. With the

area of about 3m2 for the MV pole, the

ability of causing soil erosion is

considered very small.

* On the same line alignment, the high

between the terminal and the end points

is not big (the biggest distance is 7m).

The positions of the pole and substation

are selected at the flat areas.

* The ROW needed for installing the MV

lines is only from 6m to 8m.

Water pollution x - The excavation of foundation need to

have plan in order to avoid long time of

rainy days. In case of rain, the volume of

flowed-over water shall sweep away the

land from the construction site to the drain

system or the nearby rice fields. However,

this is not the serious impact because the

time of excavation and installation only

lasts from 3 to 7 days at each place. And

the volume of land residue at each position

of excavated pole is 1.5m3 (average, each

hole of foundation need to excavate 7m3 of

land. After having concreted, the volume of

reuse land for covering is about 5.5 mi3 ).

This volume of land residue need to be

processed in the right way to avoid

spreading to the surrounding areas in rainy

days.

- The project does not require to mix so

much concrete due to the area of foundation

is only 3m2 and the dirty water discharged

from the construction activities is not

significant, of course.

- The construction activities shall not affect

on the underground water source because

the depth of foundation of electric poles is

Construction Investment & Technology Transfer J.s.c., 8

Page 17: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmiental Management PlanBac Giang Province

only 1-2m.

- At the project construction sites, there

aren't any line alignments intersect with the

rivers and locate far from the rivers. So as,

the soil erosion and cement water to this

water source do not happen.

Affects on air quality from x - During construction process, the vehicles

vehicle and equipment and machinery used for the project mainly

exhausts and dust use for transportation

generated by construction material on the national or provincial roads,

activities. so as the perfume discharged from them has

been checked and permitted by the register

department. The number of vehicles and

activity frequency at each commune is

small (one 5 tone-crane, I time of 15 tone-

lorry to carry poles, 1 time of 10 tone-lorry

to carry material and equipments, 10 times

of 5 tone-lorry to carry sand, stone and

cement). The areas far from the main roads,

the transportation is mainly by manual

labour, so as it does not affect on the

environment.

- The activies in the construction period

generate dust mainly from two sources:

* The first source is to transport

material.The material of the project

(land/sand, construction waste,

equipments...) shall be transported by big

15 tone-lorry. During the process of

material transportation, the following

problems shall happen:

I. The load or unload from the lorries

shall generate land and sand under

the type of speck of dust in the air.

2. During the process of transportation,

the lorry's tyres shall scroll dust into

the air when they go on the

temporary or permanent roads.

* The second source is the dust dispersed

from the piles of land/sand.

Construction Investment & Technology Transfer J.s.c., 9

Page 18: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnami - Rural Distribution Project Environmental Nlanagement PlanBac Giang Province

The impacts generate dust shall be serious

in the dry season, when the content of dust

is over the national standard and there is no

rain to mitigate naturally the generation of

dust. However, due to the project affected

communes mainly concentrate on the rural

areas where the population density is

relatively low, so the impact of dust shall

not cause significant affect on the

community. The volume of work at each

project commune is not big. One commune

constructs about 10 to 12 positions of pole

with the distance from 70 to 90m and each

commune has about 12 poles. The

construction time at each position of pole is

about 3 to 7 days, and about 2 months for

each commune.

Noise generates by using x - Many project activities can generate

vehicle and equipment noise: the movement of vehicles,

during construction time. construction machinery (drill, crane,

hammer...), generator.... However, the

frequency of these activities are small as

The volume of work at each project

commune is not big. One commune

constructs about 10 to 12 positions of pole

with the distance from 70 to 90m and each

commune has about 12 poles. The

construction time at each position of pole is

about 3 to 7 days, and about 2 months for

each commune.

- Due to the project is implemented at the

rural area, the distance from house to house

is relatively far, so as the noise impacts

directly to the households, business places

or pagodas.... is minor.

- There are many construction activities can

be implemented by manuall method, so the

noise impact is not serious and can bemitigated.

- The objective of mitigation is to ensure

Construction lnvestment & Technology Transfer J.s.c., 10

Page 19: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Nlanagement PlanBac Giang Province

that the households, business places and

pagodas.... can not be bothered by

excessive noise in the constniction time.

Affects on cultural vestiges x - According to the resettlement plan, this

through direct physical project does not affect on cultural vestiges

disturbance or on the or surrounding areas. There are two reasons

surrounding areas. as hereunder:

1. One of the criteria when designs the line

alignment is to avoid the sensitive areas as

the cultural vestiges and historical places.

2. The design of the line alignment has the

participation of the local authorities and

commune's people in order to mitigate the

adverse impacts on the living and belief of

the people. The direction of the line

alignment of each commune must be

approved by the local people's committee.

Contamination of soil, air x - PCBs have been forbidden to use for

or water from using of electric material and equipment for a long

hazardous materials time. The project does not replace the old

including PCBs. transformers and electrical equipments.

- The substances affect on the environment

as disposal oil or chemical discharged from

the means of transportation and

construction machinery are very small due

to the number of means of transportation is

not so many and they all meet the

requirement on technical safety. So they do

not affect on the environment.

Obstruct the traffic due to x - The whole project need tens of lorries and

construction activities these vehicles concentrate mainly on the

nearby public roads. rural transportation of Bac Giang province

during the construction time.But the vehicle

at each commune is small. With the

average construction volume is 12 positions

of pole for one commune, one commune

only need 1 time of 15-tone lorry to carry

poles, 1 time of 10-tone lorry to cary

equipments and materials and 10 times of

5-tone lorry to carry sand, stone and

Construction Investment & Technology Transfer J.s.c., 11

Page 20: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental NManagement PlanBac Giang Province

cement, and I 5-tone crane.

- The number of means of transportation

and current loading capacity at each

conumnune are small. The traffic jam rarely

happens at the rural area, so as the presence

of lorries and other vehicles during the

construction period shall obviously make

the transportation density increase.

Furthermore, the width of the commune's

road is relatively narrow (about 3m) so as

the ability of traffic jam is not avoidable. In

fact, the lorry is not permitted to go into

commune's roads or inter-village pathways

and must park outside to unload

construction materials before having person

to carry to the construction site. This

activity help to avoid traffic jam on the

commune's main roads, however, the

traffic jam may also happen because the

construction activities are conducted at the

small lanes. Therefore, it's neccessary to

take care and cautiously implement the

mitigation measures during the construction

period.

Environmental impacts x - There are about 25-30 persons shall

caused by construction participate into the construction ofworker in the camping substation. Most of them (about 50%) are

sites. the local people hired for doing the manuall

work and come back home after working

hours. The others live in camping site and

the discharged water shall arise every day.

However, the discharged water is not so

much because the workers are only about

10-15 persons. Each person need to use and

discharge about 30 litres of water per day

and in about 2 months.So as, the mitigation

measuresd are needed to avoid polluting the

source of surface water caused by the

discharged water from the construction

camping sites.

Construction Investment & Technology Transfer J.s.c., 12

Page 21: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Management PlanBac Giang Province

Affect on bridges and x - Most of the intercommune roads,

roads at rural area intervillage roads are the concrete broken

stone roads, the others are the land roads.

The transportation activities (equipments,

poles, cement, sand, stone,...) with high

frequency shall cause a lot of damage to

these roads.

- Despite that the volume of means of

transportation is big in the whole project,

but in each project commune this frequency

is small (1 time of 15-tone lorry to carry

poles, 1 time of 10-tone lorry to cary

equipments and materials and 10 times of

5-tone lorry to carry sand, stone and

cement, and 1 5-tone crane). Furthermore,

the vehicles are not permitted to go into the

intercommune roads. The permissible

vehicles as "cong nong" or the manuall

vehicle as the chart or "xe bo" shall be used

to transport materials to the construction

site. So as the impacts on bridges and roads

are minor.

Should or should not open x Some line alignments are designed to go

the temporary roads? over the fields, not closed to any roads so

as the temporary roads should open to

transport materials and equipments to the

construction sites. These temporary roads

shall cause temporary land acquisition

during the construction time and affect on

the quality of productive land (the land of

the temporary road is pressed more tightly

than the surrounding land and is sunk due

to the load capacity of the means of

transportation). So as, it's necessary to have

the mitigation measures to mitigate these

adverse impacts after constructing.

Conflict between the x The social impacts caused by the

workers and local people construction workers at the surrounding

residential areas are considered as the

potential adverse impacts. These impacts

Construction Investment & Technology Transfer J.s.c., 13

Page 22: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Mlanagement PlanBac Giang Province

happen due to the long time to implementconstruction activities, in about 2 months.Besides the social impacts, the project stillhas the cultural impacts. These impactsaffect on tradition and living style of theareas where the lines traverse through.Howerver, these impacts can be mitigated ifthe suitable mitigation measures areapplied.

Safety issue for labour and The safety for worker and communitycommunity during during construction time shall be put in top

cnt i tpriority. Durino the construction time, theconstrucition timeconcrete poles may be felt down due to thewrong technique of erection and tention. Orwhile installing the cross-arms or conductoron the pole, the workers may let the cross-arms or conductor fall down to the personworking on the ground. This risk is rarelyhappen due to the professional workers.However, the mitigation measures areneeded to minimize at least the accidents.

Does or does not the solid The solid waste arised by foundationwaste arise? excavation. . Each hole of foundation need

to excavate average 7m3 of land. Afterhaving been concreted the foundation, thereare about 5.5m3 of land shall be reused tocover over. The left land have to be

- processed suitably.

Operation phase

Exposure to EMF levels x - There are no impacts because the designexceeding GOV standards. stage is compliance with the regulations

and process of technical designAffects on flora and fauna x - There are some small impacts during thefrom vegetation process of vegetation maintenance. Anymaintenance activities. tree is higher than 2m on the ROW should

be cut off. It is also considered to cut offthe trees on the ROW in the constructionstage. Crop trees are not forbiden to plantaround the foundation and must be far fromthe margin of foundation at least 0.5m.

Interference with radio, TV x - The impacts are minor because the design

Construction Investment & Technology Transfer J.s.c., 14

Page 23: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

V'ietnam - Rural Distribution Project Environmental M'lanagement PlanBac Giang Province

or other communications. is in compliance with the line standard.Affects on public health, x - No impacts because the residential house

safety and security for is forbiden to build in the area of electricpeople magnetic field. Anywhere has the T/L

traversed, the people will be trained and

pre-wamed in an electrical security

program. The operation and design

measures are strictly obeyed on the

required standard in order to keep safety for

people.

Impacts on water quality x - Nil.Because this is the transmision linebecause of discharge of project.There are no worker's new

employee sewage (at the accommodation.

project's substation only)

Contamination of soil. air x - Nil.Because this project does not use the

or water from use of hazardous materials.

hazardous materials

including PCBs (at thesubstation area)

Noise generates from sub- x Nil. As the capacity of the substation in the

station operation project site is small, the noise is not enough

big for causing bad impacts to the

surrounding environment.

Others x Nil

Construction Investment & Technology Transfer J.s.c., 15

Page 24: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Management PlanBac Ciang Province

PART IV: MITIGATION MIEASURES

No Impact Mitigation measures Cost ResponsibilityConstruction period

I The flora is lost by * The construction shall be Include The contractorland acquisition for implemented after the farmers in thesubstation have havested their crops. contractconstruction or big * Forbid to fire branches of trees, ortree is cut off to leaves or straw at the clearance biddingclear ROW. site. Concentrate them at the price

regulated place or stimulate thepeople to reuse them for theuseful purpose as to compostthe green manure for theirfields or gardens.

* The temporary roads must berecovered as the original stateafter finishing the construction.Avoid affecting on the currentenvironment and the living ofthe people.

2 Soil erosion, Technical requirements for the Include The contractorsediment generation contractor shall be as followings: in theand surface water * The land excavation activities constractturbidity. Erosion at at the places where the erosion orthe position of pole may happen seriously shall be biddingwhere the slope is implemented in the dry season

reat and/or after having havested. pricegreat. * Try to keep the impacts on land

at minimum and these impactsonly arise just before the worksbegin at that place.

* Design the drainage to avoidaffecting on the surroundingareas.

* The land residue shall bedischarged at the placespermitted by the authoritybodies.

3 Water pollution To avoid polluting the surface Include The contractorwater, the contractor must appply in thethe following measures: contract

* When mixing concrete for orfoundation, the water must be biddingused enough as regulation rate.

Construction Investment & Technology Transfer J.s.c., 16

Page 25: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environimiental Mnanagement PlanBac Giang Province

No Impact Mitioation measures Cost Responsibility

Prevent the mixing water from pricespreading to the sourroundingareas.

* After finishing the constructionat each position, the residuematerials must be cleared off.So as, when raining, thesurface water of thesurrounding areas shall not be

-_ polluted

Construction Investment & Technology Transfer J.s.c., 17

Page 26: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Management PlanBac Ciang Province

No Impact Mitigation measures Cost Responsibility

Air pollution In order to avoid dust generation, Include The contractor,the contractor shall implement the in the transportation

following measures: contract unit.

* Use the canvas to cover piles of orsand. bidding

* Arrange bricks bounding the price offoot of the piles of sand. the

* Install the anti-wind plates ifthe wind is too strong to contractgenerate dust.

* The material that generatesdust shall be covered carefully.

* The vehicles used for carryingmaterials as sand, stone, orland must be covered carefully.

Noise The contractor shall be required: Include The contractor

* The works that generate noise in the(big machinery....) shall be contractforbidden from 22h to 7h. or

* All means of transportation .d.and machinery of the project biddigthat generate noise must be pricemet the related standards.Themeans of transportation mustmeet the TCVN 5948:1999noise standard.

* Remind the driver not tooveruse the the corn.

- Obstruct the The technical details of the No cost Contractor

traffic due to contractor include:

construction * All means of transportation

activities and means (include the means ofof transportation. transportation of the sub-

contractor) must hang the flag- Affect on people onsafety due to theconstructon ut.

* The limitted speed is 1Okm/hmovement of means in the construction area. Theof transportation. speed limitation plate shall be

sticked on the constructionvehicles.

* Notice to the local peopleabout the place and time ofconstruction.

* Divide the road into many

Construction Investment & Technology Transfer J.s.c., 18

Page 27: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Nlanagement PlanBac Gilag Province

NO Impact Mitigation measures Cost Responsibility

lanes if it is close to theconstruction site: 1) car/lorryand 2) motobike/bicycle.If evening construction isrequired, pre-notification andapproval by local affectedgroups required. Thecontractor must maintain thelighting system so that thedrivers and pedestrians canobserve clearly theconstruction area.

* The traffic direction is requiredto help the movement facilitateand ensure safety whenloading/unloading material andequipment nearby the road orwhen string and pull conductorover the road.

Construction Investment & Technology Transfer J.s.c., 19

Page 28: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Maniagement PlanBac Giang Province

No Impact Mitigation measures Cost Responsibility

Affect on the * Improve construction team's included Contractorenvironment due to awareness of environmental Inthe protection. contract

or's cost.workers construct * Point out the detail plan onthe camps waste water treatment such as:

drainage trench, sanitarylandfill.. .Build isolatedlatrines and dispose solidwaste in proper places.

* Give out the measures ofexplosive and fire protectionwhen using fire.

Open the temporary * After having finished theroad to serve works, the construction unitsconstruction must to recover the roads asactivities the original state.

* To carry clearly all the land ofthe temporary road and pourat the right place that the localauthorities permit.

* To redig the surface of thefield at the area of temporaryroad in order to make it soft asthe original state.

* To bank the edge of the fieldThe conflic * Manage strickly the time of included Contractorbetween the the construction inworkers and local workers.Disseminate the local contractpeople regulations to the workers. or's cost.

Safety for the * During the construction time, included Contractorlabour community the head of construction team induring the must require his workers contractconstruction time absolutely to obey the or's cost.

technical requirements onerecting and installing the linealignment. The works must bedone step by step according tothe technique.

* The workers who work on thepole must always obey to thesafety measures as carryingthe insurance and safety belts.

-_ This belts must meet the

Construction Investment & Technology Transfer J.s.c., 20

Page 29: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Nlanagement PlanBac Giang Province

No Impact Mitigation measures Cost Responsibility

required standard and theymust be replaced promptlyjust before discovering thatthey are overage.

* To check the firm level of thestructures before working.

* To use the technical bag tomove up or down the tools forthe workers.

* To install the notice boards atthe construction site, thepersons who not belong to theconstruction team shall notallow to go into.

Solid waste during * The quantity of solid wastethe construction arised during the constructiontime time is mainly the residue of

land from digging foundation.

* To reuse this land to lift upthe floor of HHs, if needed, orfill up the hollow in thegarden or on the road. The leftresidue shall be carried to theplace where permitted by thelocal authorities.

Operation period

Cutting trees * Only cut the trees that violate Include Bac Giangthe ROW of line and in the Powersubstation. operatio Services.

n cost ofthe line

Construction Investment & Technology Transfer J.s.c., 21

Page 30: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Nlaniagement PlanBac Giang Province

PART V: EMERGENCY SITUATION & SOLUTION MEASURES

No Potential risk Solution measures Responsibility

I Discover the cultural * The contractor must protect the The contractor andobjects during status at the construction site and Monitoringexcavation. reports to the Construction Consultant co-

monitoring/Bac Giang Power operate to

Services, local museum and local implement.

Department of culture and

information.

* To present the object to themuseum/cultural managementbodies.

* To consider in order to make Department ofdecision that the excavation is culture andcontinued or ceased to do more infomationinvestigation.

* The manager of local department ofculture and information isresponsible for managing theobjects according to the Clause 21of Decree No 92/2002 on Guidanceto implement the Law of culturalheritage.

2 Finding the remains * To protect the status and inform to The contractor andduring the process of local authorities. functional bodies.excavation * To determine the power man/

methods and time to implement thecollection and suggest the followingsteps.

* To implement the collection work.3 The community * To process the problems promptly if The contractor

complain about the possible.

environmental issue * Note in the construction diary. The contractor, Bac

due to the * To discuss with the Investor or local Giang Powerconstruction authorities about solving methods. Services and localactivities. authorities.

4 Accident related to * First aid and carry the victims to the The worker andthe construction or closest hospital or medical station cornmunity at theoperation (if necessary). accident area.

Construction Investment & Technology Transfer J.s.c.. 22

Page 31: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

V'ietiam - Rural Distribution Project Environmental Mvlanagement PlanBac Giang Province

No Potential risk Solution measures Responsibility

* To put the dangerous warning The contractor, Bacboard. Giang Power

* To record in writting the accident. Services and localauthorities.

5 Discover the * To protect the status and put the The contractor co-explosion material warning board. operate with the

* To inform to the functional bodies. local authorities.* To make contact with the closest

army unit to get the necessarysupport.

Constriction Investment & Technology Transfer J.s.c., 23

Page 32: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distributioni Project Environimental Nanagement PlanBac Giang Province

PART VI: PUBLIC CONSULTATION

No Commune Place of Time of Number of Representative people Commentsparticipation participation participants

I An Thuong Commune's August 24, 25 1. Nguyen Hong Ha - Chairman of - The local people take carePeople 2007 commune. for the impact of the magneticCommittee 2. Lac Thanh Duc - Representative field to the people's living.

of Ethnic minority. - The impact of the project to3.Nguyen Van Huy - Chairman of the area of land.Fatherland Front4. Hoang Thi Thao - Chairman ofWomen's Union5. 5 HHs of Etlmic minorities

2 Tan My Commune's August 24, 20 1. Hoang Van Dung - Chairman of - The local people take carePeople 2007 commune for the impact of the magneticCommittee 2. Hoang Thi Tuyet - Chairman of field to the people's living.

Women's Union. - The impact of the project to3. Dao Van Tap - Chairman of the area of land.Farmer Union. - The monitoring of the local4. Pham Thi Thu - Chairman of people to the mitigationFatherland Front. measures on environment.5. 16 HHs - Electrical safety to the local

people.3 Dong Ky Commune's August 25, 28 1.Pham Duy Kiem - Chairman of - The local people take care

People 2007 commune for the impact of the magneticCommittee 2. Ly Xuan Tinh - Representative of field to the people's living.

Ethnic minority - The impact of the project to3. Nguyen Hoai Nam - Chaiman of the area of land.Fatherland Front - Time of implementation the4. Nguyen Thi Tiep - Chairman of project.

Coistruction linvestment & Technology Transfer J.s.c., 24

Page 33: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietinam - Rural Distribution Project Environmental NManagemiienit PlanBac Giang Province

No Commune Place of Time of Number of Representative people Commentsparticipation participation participants

Women's Union.5. 6 EM HHs

4 Dong Lac Commune's August 25, 26 1. Nguyen Van Thinh - Chairman of - The local people take carePeople 2007 commune for the impact of the magneticCoirmmittee 2. Trieu Van Cau - Representative field to the people's living.

of Ethnic minority. - The impact of noise, dust on3. Trieu Nam Son - Chairman of the people' living.Fatherland Front. - The rehabilitation measures4. Lang Thi Dong - Chairman of after using the field to makeWomen's Union. temporary road.5. 5 EM HHs - Construction and electrical

safety of the project duringthe rain and storm.

Constr uction Investment & 'I'echinology Transfer J.s.c., 25

Page 34: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Nlanagemenit PlanBac Giang Province

Information Announcement

All the remarks collected from the meetings shall be reviewed in the next periods of

the implementation process of the project as mentioned in EMP. In order to meet

the requirements on information announcement of the WB, the project management

unit will perform the following issues:

- Provides Vietnamese version of EMP, RP, Construction investment plan, and

summary report to Bac Giang Provincial People's Committee.

- Informs on the local newspapers and mass media many times within 2 months.This

announcement talks about EMP RP, Construction investment plan, and summary

report during administration working at the following places:

1. Bac Giang People's Committee.

2. Bac Giang Power Services.

- Vietnamese and English versions of EMP will be submitted to Vietnam information

development Centre at 63 Ly Thai To-Ha Noi for reviewal by NGOs and public.

- Vietnamese and English versions of EMP will be sent to the WB to publish and put

at the Information Centre of the WB.

Construction Investment & Technology Transfer J.s.c., 26

Page 35: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Management PlanBac Giang Province

PART VII: MONITORING PLAN

No Parties Alain responsibility Contentt atidformat forreport

I Contractor - Apply proposed environmental mitigation - Refer to samplemeasures in the construction phase V. I- Report to Bac Giang Power Services theapplication of the environmental mitigationmeasures.

2 Bac Giang Power - Monitor (by observation) and assess of - Refer to sampleServices the environmental parameters suggested by V.2

EMP report;3 Safeguard Independent - Monitor (by observation) and assess - Refer to sample

Monitoring Consultant environmental quality based on parameters V.2(SIMC) suggested by EMP report.

- Conduct public consultation on relatedissues of environmental management of theProject.

4 Commune's - Monitor (by observation) and assess - Refer to sampleadministration environmental quality based on parameters V.3

suggested by EMP report.- Take part in public participation

5 Construction supervisor - Monitor and urge the contractor to - Combine withimplement the mitigation measures the report on

constructionschedule andrefer to sample

-_ V.2

V.I: EXAMPLE ENVIRONMENTAL TERMS OF REFERENCE FOR SIMC

The Safeguard Independent Monitoring Consultant will:

1. Visually look at the construction sites and make notes to the related environmental issuesas:

* General clean up after construction works,* Issues on tree cutting at the project site (area, quantity, the cleaning up after treecutting),* Status of roads* Status of re-vegetation in the ROWs and tower foundation. Impacts due to construction works (level of noise, dust, and damage to roads due to

earthworks and transportation of building materials)* Status of construction worker camps and sanitation facilities for them* Proper distance between the houses and T/L,* Status of implementation of safety measures (signboards, restricted zone, fences, isolation etc.)

2. Conduct public consultation to:

Construction Investment & Technology Transfer J.s.c., 27

Page 36: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental NMlanagement PlanBac Giang Province

* Assess the level of involvement by the- local authorities in dealing with environmental issues(dust, noise, and damage to roads due to the transport of construction materials, tree cutting onpublic lands and protected areas).

* Identify any other environmental issues and record environmental complaints from the DPs.* Report on responses (if any) from appropriate local authorities on environmental complaints or

non-compliance.

3. Schedule* The consultant is responsible to submit the reports within 2 weeks from the time of

implementing the monitoring and just after the test of electric closing.

Construction Investment & Technology Transfer J.s.c., 28

Page 37: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Managenment PlanBac Ciang Province

V.11 ENVIRONMENTAL MONITORING CRITERIA OF THE PROJECT

Phase/ Monitoring object Monitoring place Monitoring Monitoring Cost MonitoriEnvironmental method Time/frequency ng unitIssueRight of Way Clearing technique Along the ROW Visual observation In the clearance(ROW) processClearance -The way to access the flora.

- How much impacts on the flora whendo clearance?

Runoff, Level of soil erosion and sedimentation The Construction Visual observation Once/monthSedimentation caused by project activities Site and ROW are in - In heavy rainand Soil Erosion or along to any conditions or just

neibouring line, after theauxiliary subs, constnictionneibouring areas, process and at thesurface of water near first year ofrunoff waterflow. implementation.

Water Pollution The water during the construction time At construciton site(s) Visual observation During construlctiontime

Air Pollution - Check the covers of the vehicles. At construction site(s) Visual observation Monthly- Check the dry level of the surfaceroad when supposed that the transport In diy seasons andwill cause dusty. windy conditions

Constructioni Investmenit & Technology Transfer J.s.c., 29

Page 38: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietinam - Ru-al Distribution Project Environmental Management PlanBac Ciang Province

Phase/ Monitoring object Monitoring place Monitoring Monitoring Cost MonitoriEnvironmental method Time/frequencv nog unitIssueNoise Noise level generates from the vehicles, One meter from Supervising by If there are

constrmction machinery and equipment sensible measures complaintspreparation/construction activities. at the construction

At the edge of the site.construction site

At the nearestpopulation center

Rural traffic Current status of the surface of roads, Along the line Visual observation Weeklytraffic density. alignment When the

machinery andQuantity, loading capacity, frequency material areand construction machinery going on transported tothe road. locality.

Check the division of lane; put thetraffic guidance boards.

Impacts caused All camps in the project site and At the campsites Visual observation From the beginningby construction campsites'sanitary and safety to the end of theworker's management camping time.campsites

Place of sanitation and place ofcontaining discharged water

Temporary Check the width of the temporary road Along the construction Visual observation Once/monthroads The capacity of the trees affected due to roads

the temporary road At the constructionposition of thetemporary roads

Construction Investment & Technology Transfer J.s.c., 30

Page 39: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Management PlanBac Giang Proviiice

Phase/ Monitoring object Monitoring place Monitoring Monitoring Cost MonitoriEnvironmental method Time/frequency ng unitIssueSolid waste Check the transportation of the solid Along the construction Visual observation During theduring the waste to the regulation places. roads excavation timeconstruction Clear off the solid waste Place to fill the solidtime wasteTree cutting Technique and sphere of clearance Along the line Visual observation Monthly Bac Giang

The way to process the clearance flora alignment PowerPlaces where Selvicesconcentrate clearanceflora

Constructioni Investment & Technology Transfer J.s.c., 31

Page 40: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Management PlanBac Giang Province

Level of Monitoring Table

No Monitoring unit Responsibility Level of monitoring

1 Contractor During the construction time, the contractor must implement Always

the mitigation measures mentioned in this report and submit

the monthly report to Bac Giang Power Services

2 Bac Giang Power Services Monitor and check the implementation of mitigation measures 1 month/i times

of the contractor

3 Independent Monitoring All the issues related to environment of the project during 2 times durinlg the

construction process construction time

4 Commune's administration All the issues related to environment of the project during 1 week/ 1 times

construction and operation process. Participate to monitor the

contractor to implement the mitigation measures.

5 Construction techinical supervisor Combine to monitor the implemention of mitigation measures Always

of the contractor

Coistruction Investment & Technology Transfer J.s.c., 32

Page 41: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

V'ietnam - Rural Distribution Project Environmental Management PlanBac Giang Province

REPORT ON APPLYING ENVIRONMENTAL IMPACT MITIGATION MEASURES( For contractor - Sample V.1)

Project name: Project location:Name of Contractor:Commencement of Project report or monthly report:Date of report:

No Impacts Mitigation measures implemented Comment

Conistrurctioni phase

1 Affects on the flora caused by land acquisition

2 Soil erosion

3 Water pollution

4 Air pollution caused by vehicle and machinery exhausts

5 Noise cause by vehicle and machineries

6 Traffic disturbance and road degradation

7 Adverse impacts due to the constructon worker's camps.

8 Mitigation measures due to the temporary roads.

9 Confliction between the workers and the local people

10 Labour safety for workers and community

11 The solid waste collection during the construction process

Name of person prepared this Report:Title:Address: Telephone:

Coistriuction Investment & Techinology Transfer J.s.c., 33

Page 42: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Management Plan

Bac Giang Province

ENVIRONMENTAL PERFORMANCE MONITORING REPORT(This Report can be used for Bac Giang Power Services's staff and independent monitoring consultant - Sample V.2)

Project name: Project location:

Type of Report: Monthly report (Yes/No): Report to EVN (Yes/No): Report to the WB(Yes/No):

Date of report:

No Parameter Assessment of Contsiultant! commnunity complaints Coinenieits/Recommn endatiolis

During Construction

1 Tree cutting

2 Soil erosion

3 Noise level

4 Turbid level of water

5 Dust level

6 Manage the temporary roads

7 Solid waste generates in the construction time and sitecleaning up after the construction

8 Living conditions of the cosntruction workers andenvironmental safety issues

9 Transportation disturbance in the project area causedby the project

10 Status of application of safety measures

11 Constniction material management

- Recommendation of the local people ..............Report prepared by: Position:

Project management staff: Imonth/timesSMIC: 2 times in the construction time

Construction Investment & Technology Transfer J.s.c., 34

Page 43: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietinam - Rural Distribution Project Environmental Management PlanBac Giang Province

TABLE OF ENVIRONMENTAL MONITORING REPORT(For Local authorities - Sample V.3)

Name of Project: Location:Reporting Period:

Environmental Impacts:

No Impact/Mitigation Measure Commune Representative Comments Community CommentsI Project vehicles or activities increased ambient dust levels2 Project vehicles or activities increased ambient noise levels3 Project activities polluted local rivers and lakes4 Project activities created impacts on agricultural and/or

residential land5 Project activities impact on cultural property6 Project construction caused traffic impacts7 Project caused solid waste of liquid waste impacts8 Project caused social and health impacts of workers9 Accidents10 Dust suppression measures11 Erosion and sediment controls12 Sitting of materials etc. to avoid exacerbation of flood

effects, chemical pollution, etc.13 Waste management practices14 Project vehicles damaged the roads15 Other

Recoiniienidationis (if have)

Signature of Commune Representative:

Title of Commune Representative:

......... ,date .. month ..... ,200

Construction Investment & Technology Transfer J.s.c., 35

Page 44: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Management Plan

Bac Giang Proviiice

PART VIII: RESPONSIBLE TO IMPLEMENT THE ENVIRONMENTAL MANAGEMENT PLAN

ROLE RESPONSIBILITIES ORGANIZATION

Project Owner . Ultimately responsible for overall project management including EVN

environmental management.

Environmental Consultant . Support the Project owner to prepare the EMP documentation. Bac Giang Power Services

Project management consultant . Responsible for coordination and management of overall project PCI

implementation. including guiding and supervising implementation of

the EMP.

Environmental Officer . Specific responsibility and point of contact for environmental issues and Environmental Officer of Bac

EMP Giang Power Services

Project Implementation Agency . Responsible for day-to-day project implementation. Activities include: Bac Giang Power Services

i. Planning and implementation of environmental management

activities during construction

ii. Coordinating with other parties in relation to environmental

management activities.

iii. Carrying out internal monitoring and supervising independent

monitoringiv. Supervising and providing budget for monitoring activities.

v. Reporting on environmental information to concerned parties

Civil Works Contractor . Responsible for construction works and following contractor Contractor

specifications outlined in the EMP. This includes:

Constructioni Investimienit & Technology Transfer J.s.c., 36

Page 45: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

V'ietnam - Rural Distribution Project Environmental NManagement PlanBac Ciang Province

ROLE RESPONSIBILITIES ORGANIZATION

i. Applying construction-phase mitigation measures.

ii. Ensuring safety of construction workers and local peopleduring construction.

iii. Following Vietnam and World Bank policies on environmentalprotection during construction.

Contractor Technical Supervision . Responsible for supervision of civil works contractors during Bac Giang Power Servicesconstruction, including implementation of environmental managementactivities under the EMP

Project Operator . Responsible for operation of the project including operation stage Bac Giang Power Servicesenvironmental management and monitoring activities.

Safeguard Independent Monitor . Responsible for independent monitoring of EMP implementation PCI(SIMC)

Construction Investment & Technology Transfer J.s.c., 37

Page 46: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

V7ietnam - Rural Distribution Project Environmental Management PlanBac Giang Province

PART IX: REPORTING PROCEDURES

SECONDARY TERTIARY REPORTINGREPORT TYPE PRIMARY REPORTING LEVEL REPORTING LEVEL LEVEL'

BY TO FREQUENCY BY TO FREQUENCY BY TO FREQUENCY

SITE ENVIRONMENTAL Contractor Bac Once beforeMANAGEMENT Giang construction

Power commences &Services monthly thereafter

ENVIRONMENTAL Teclnical Bac Monthly PCI EVN Quarterly EVN World QuarterlyPERFORMANCE supervisors of Giang BankMONITORING: Bac Giang Power PowerCONSTRUCTION Services Services

and PCI

Local supervisors Bac Wheneverand local people Giang

PowerServices

SIMC World 2 times in theBank construction time

ENVIRONMENTAL Bac Giang Power PC 1 Half-year PCI EVN Annually EVN World AnnuallyPERFORMANCE Services BankMONITORING:

OPERATION

Coisstructioii Investment & Technolog) Transfer J.s.c., 38

Page 47: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietniam - Rural Distribution Project Environmental Managenment PlanBac Giang Province

PART X: PLAN FOR IMPROVING THE ENVIRONMENTAL MANAGEMENT ABILITY

Traininig/Study course

Nutmber Institute orContent of Person to be of Duration of Organization to CostTraininlg trained person Training Provide

TrainingEnvironmental

Environmental managementmanagement officer of Bac 4 May, 2008 PCI * Cost:training course Giang Power 1,000,000 VND/person x 4 persons = 4,000,000 VND

servicesEnvironmental Officer of 8 8 June, 2008 Bac Giangmitigation and districts Power Services - Documentary cost: 500,000 VNDmonitor training Officer of 31 31course. communes - Living cost: 70.000 VND /day x 39persons x Idays = VND

2,730,000

- Movement cost for learners:39 persons x 20.000 VND x 2 times = VND 1,560,000

- Cost for trainers: 1,000,000 VND x lperson VND1,000,000

Grand total VND 9,790,000

Construction Investment & Technology Transfer J.s.c., 39

Page 48: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

V'ietnam - Rural Distribution Project Environmental Management PlanBac Giang Province

PART XI: ESTIMATED COSTS FOR IMPLEMENTATION EMP

No Item Conistruction Operationi

(20 years of life cycle)

1 Mitigation measures The costs are covered in Contract with ConstruLction The cost is covered in productionContractors cost of the Bac Giang power

service

2 Monitoring costs for substations, lines. The cost is covered in running cost of Bac Giang The cost is covered in runling(By technical supervisor consultant of Bac Power Services cost of Project investerGiang Power Services)

3 SIMC's project monitoring cost 3 persons/period x 10,000,OOOVND/times x 2 times

(2 times in construction time) 60,000,000VND4 Training/study cost for improving the 9,790,000VND

Environmental management ability

TOTAL 69,790,000 VND

GRAND TOTAL 69,790,000 VND

Construction Investment & Techinology Transfer J.s.c., 40

Page 49: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Management PlanBac Ciang Province

THE COPY OF ENVIRONMENTAL PROTECTIONCOMMITMENT CERTIFICATE

Constrtiction Investment & Technology Transfer J.s.c., 41

Page 50: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

UY BAN NHAN DAN CONU JHoA XA H(I CHO NGHIA VItT NAMHUYPN TAN YRN fJ6c hMp - Tii do- Hanh phiic

S6: I.4 fUBND- TNMT -dn Y 1n, ngay .4g... tIling 10 uzndm 2007

GIXY XAC NHA IN DANG Kt CAM K ET BAO V; MOI TrRU0NGDtr th6n tinlil Bac (' iang (RD Project)Can ci Ludt Bao ve rnOi tru'bng 2005;can cir Nghi dinlh 80/2006/NjD-cp ng=Z7y 09/8/2006 cua Chfnh pha qcjy dinh chitiet va hu6ng ddr] thi hanh m6t so dicu cua LuatL B1o v} mcl tru&ng;Cadn cE Th6ng tu su 08/2 0OOM6'1B7TMT ngay 08/9/2006 cua B3 Tai nguydn vsM(i truang hudng d?in ve danh gid mOi trtrryng chijn ltrc, danh gia tac cong moi

trr&ng va cam k&.t bau vd mri trLrdn- ca.ia chul dyr gn;Can ec Quy6t dinh s 6'22/2006/QD- BTNMT ngAy 18/12/2006 cuia B6 tru'&ng BTd nguyen va Moi tnrng V/v b1il buOc ap dung 'ril chudi Vier Narn ve rnbi truang;Ckn ci quy dinh vd danh gi` tAc 'cOng moi titr&ng dai v6i cac dir Ail d'u tLr va caccc SCJ sAn xuSt, kisnh doanh, dich vu trCn cia lan tinh 3ac Giang1 ban1hAnh k1m theoQuy6t dinh so 50/2007/Q£J7UBND ngiy I 1/5/2(0a 07c JaUBNi Cl ang aa rig,

CHiU TICH WB3ND HUYEN TAN YE1NXAC NHAN:

Die't 1. DiOr bLre Bak Giang dZi c6 van bAni d.ing k9, cam k6t bao ve m6i th-J n_doI v6i d dy n hl rc diCn phlan phlOi n6ng th6n Bic Giang (RD Project) qua dia ban 31xd rhucc cac huy6n Ydn Tbe, Yen Dung, Hiep Hoa, Lanig Giang, Luc Naln, LucNgan, Scmn Wnm vYA huyen Tilr Yen, tirih Bdc Gianig.Dieu 2. Oien Lrc Bac Giasn- c6 tr-ach rhkicrn tiLrc hiiOn d6ng vta dly cIi nhbng n5i dungdZi dang ky trong Baii camn k6t bAo ve mOi tnxiUg (dmc O t6in -at va h6 scs km theo).Weu 3. Bali cam kt't ba'o Ye mnoi trru&ng cuia dur an 1 cor sa d cle cac ca quan quin 1Ynha nsudc ve bao ve mOi lru1ing hirm sai, kimni tra, thanii tra viec thtrc hin bao vmitwrZing cua DIr aln.Dieu 4. CGiy xac nhan iity c6 giai Lri ke tIr n-ay ky.l.

Noi 'ihdn; KT. CHf TI'CI-- Chu tich U81N huyn,

PH6 CIIU '1iICH^ UBND cac huyen Lang aJiang, Iiiep Hoa, - ,-Yen Dung, Luc Ngan, Svn D6 ng, Luc Nrwn.Yet, T1h1- Phnbg TN vm- MT (Theo ddi);.- Diea bic Bac (Jiang (T/lh);- LLru: va, 1N vl Mr. Nguyen Thl' To.rn

Page 51: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

/ T6M TAT N6I DUNG BAN CAM KIT BAO Yt MO6 TRLr6NG

Ten dir Ain: Dir an thdi didn phan ph6i n6ng thOn tiubh Bac Giang (RD Project)Noi dun, hoat dtng: Dgu tu ca;i Lao va bo sung lu6i didn trung ap cho cAc cOngtrlnh: C.i tao thay day dIr7ng 35Kv PhLrng Son - Svmn Dong 16 374 E7.8; cac congtrinh b6 sung dusng cday trung a'p va cic tram bien th- phu tAi cho 31 xa (Htwng, Vy,D6nog Ky, DunT, Lac huy.n YCn The; Hoarig Van, Chau Minh, Daili Tbal.ni, Hgp/ Thjhi huyen Hitp Hoi; Tan Hung,Tan Thanth, Tan Dminh, Xurt LAm, Thn Thinh-ihuyen Lang, Giang; Phdc Hoa, Lan Gi6i, Vict LAp, Qu6 Nharn huyan Tan Yen; TanMT, N6i Hoang, HLrctng Gian, Taxi TiLn, Xuan 1'hli huyEn Yen Dung; Dan 1Oi, BaoSon, Cdm L9, Do6n Phu' huyen Luc Nam, Phtrong Son, Qu9 San, Tru Hyu huy8n LucN-an, An Chau, Yen Dinh huyen Son D(rng) cua tinh B-ac GiangQui m6.

Xay dtrnrig 55 tram bi6n zip va 34Km dLrZng day trung ap 22KV va 35KV trenpham vi 31 xa thuQc 8 huyen (Yen ThM, Yen Dung, Hiep Hoa, Lang Giang, Luc Namn,Luc Ngan, Son Dong, huyen Tom Yen) trong tinh Baic GianiChat tllai.

27T Chil Jdi ! ?vgzwtn gdy 6 Ith2i2n B3iin phdp gzadin thiiu o nhiremn1 Chda thdzi Khi thai, btui do hoat i Phun twr6i gm khu vtrc duZfzia van chvye't&da1tg klf, dOng cua e) t6, xc dE gizm thidu bui; Xe may thi cOng c6 hAbu4 mWid may, bui, i)iUi do th6ng giamn thanh theo tieu chuan; xe vanhoat dong cua may chydn vat lieu c6 bat chc thung; KMt^ongm6c bdc xSp vat litu, tlhi cOng qua 21 giR v' gi& nghi trira. DiXrmkhi thi cong. Nnm, bAo xir 1v dat cac tiCu chudii hiEn hanhdo cac chllS u nh.ie~mse quan tra4c khi c6yOu CAu ciua co quanchtrc nang _

2 Ch6t thi Nr6c thbai khi riTa vat Han cht5 cao nhat viac thai dAu do rnaydazng ldng lie&u, sinh hoat, nuac m6c, bo trif h th6ng thu ddu thai cho cacdung phu tirdi din snaly rn6c v'a thu gom xir 19 theo qui dinh,khu vuc, diu thiu cuia ntrdc thai do rZra vat lieu, sinh hoat chodmay m6c vYo 1h,t thOi ̀ Iang t'V tzuvc khi thAi ra hathp6ng tieu chung. Cam k6t ntr6c thai datTCMT, khlOng anh iiihng d'e'n san xust,_sinn huat ca ngii dan xung quarh.3 Chld thdai Vat liu dur thura khi Cho t}lu goin tai khu vgc thi c6ng, v4t 54i1dang ran thi cOng, canh cay du thra tan dung dd san lap. Canh _cAykhi phat quang hAnh chuy6n den noi xur 1 thco qui dinh. Da;mlang bao vc, ric thai bao tlhu goni kip tUri khO6g cd vurcng vaitrong sinh hoat ra klhu viuc xung quanh.4 Cac ye'u ClhAy, chAp dien. IlLre hien caic quy dinh v' phung ch6o'ngt6' khazc Ti Clg 6c (lu may chaiy noi, giam thitu tieng U`n truon, thifrano mjn , di6c, 1n (t-LrL&nlg khli COlIg va klli dir .in di vao hoaL dKThnc. TAuc

Page 52: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

i / -hoat d'3ngi dir zdti di vwIO hI l'IiCii cii: hihjC;1 Phlap) ailn iot1n G(, ;hen C6 i; 1cua dct dc0iig, sat 1& (1at, Aililh siLr C6 CO lii x-iy ra. Tthanl iico) i'Xu cllmand an, PCC'C hu&ng t6i vi khf hau, azi Io;Un lao dO, n° cu. Vift Nam. HMuig

da dlang sirili hoc, intliy kiei tira an toain troni- thi conlg.cAiin. quani klhU vtrc, -Di6n lrrr&lg SA Xly thco ticu chuinan toan cua can bo ngunih. To chCrc ki&Ln tra phat hicn va phoi jc Ong nhan, sur c6 khi lql.p xir 1Y cz;c hanh vI gay mat an Luandir an di v-ao hoat lu6i di-n, cac sir co c6 the' xAy ra. TinhId'ny todn thi&t k- dcu6i-g dti trAnn qua ca-c viung

cIiy ram rap, cac khu vLrc quan sur, ca'cc'na trinih vin hoei. Daim b?ao canh quantheo qui dinil ve hkinh lang 1uLni dien. Camk6t xir iv, bhi thu6ng khi c6 sur cd xay raILrong .!ii cOg cung rilir khi dLr aIn di vao

_ _ _ _ _ _ _ __ ho ta d6rni!

ChrnDng trmnili girni slit m6i triLrrng.- Vi irf'gi2rm sat: Tai cac tramn bi6n Lip va doc theo d(rL'ng day (08 didm).Chi ti8u giam sd.: Di-ii trubng, Bui kh6i, Nu6c thai, raic thlii, tiTng `n, arn toanlao d6ng vY dan cir, cai: yeu t6 phat sinh trong thi cOno va khi dir an di va.o hoat don;,.- Tin sugt giam sat: 0O lan/ ilam (bao ctio bang vail bin v6i UBND huyen Tan

Ydn va bUBND cdc huyen Ycn Thm, Yen Dung, Hicp Iloa, Lang Giane, Luc Nam, LucNgan, Son DOno vao ihang 12 hang nain).

Canl; kit.- NLrc thL: Dat 1TCVN 5945- 2005, loai B.- Kh1' thai: Dat TCVN 5937- 2005, 5938- 2005, 5939- 2005, 5940- 2005.- Tieng 6n: Dat TCVN 5949- 1998, 5985- 1999.- Chat thai rln: Thu gom xt1r I 100% dcaim bito khOn g gav 6 nhi6m m6i trur6ng.-D})t, canh quan, su co moi ltrung: Khong gay o nhie'm z1gurn nu6c ngarn. dnhkm d•t, ngap ung, sat la dat, mar cainn quan mii rribrng, AL'h hlinitig den vi khi hau,san xuSt va sirih lioat c~ia llhan dan.- Cam ket sur dungc mc m;iy m6c phii h110P khi tii cong va klii dir an di vao hoatdo ng, dZu-n bao kho6i,g gay anh hLr&ng d6n mcni trirtno.- Dam bao an toan cho ngv6i lao dong va ddin cir xung quanh khu vqc dLr an- Dien tLr tLran ,: D)at tieU chlumn1 gorthilh.- B6i thu&ng thict hai klhi d1W xay ra czic sir co anh hurung LIn dan sinh, c4c cOng

trilil, caih quani quanii khlu vurc dur P4.n.

Page 53: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmental Management PlanBac Giang Province

SOME PHOTOS OF LINE ALIGNMENT AND SUBSTATION

Construetion Investment & Technology Transfer J.s.c., 42

Page 54: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Hi. Position putting the substationAn Thuong commune - Yen The District

112. The existent substation is being builtat Tan My commune -Yen Dung district

Page 55: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

H3. The existent transmision lineTan My commune - Yen Dung district

H4. The residential area is supplied electricity from the projectTan My commune - Yen Dung district

Page 56: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmienital Management PlanBac Giang Province

ANNEX A: LIST OF ESTABLISHING EMP

1. PHAM TRONG HUNG - CONSULTING STAFF

Construction Investment & Technology Transfer J.s.c., 43

Page 57: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Vietnam - Rural Distribution Project Environmiental Mtanagemenit PlanBac Giang Province

ANNEX B MINUTES OF PUBLIC CONSULTATION

Construction Investment & Technology Transfer J.s.c., 44

Page 58: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Dur ,n lroi dien Dhan oh6i nona th6n (RD)

CONG HOA XA HOI CHli NGHIA VIET NAiMlD6c lap - Tl do - Hanh phuc

BIEN BAN THAMl9 VAN CONG DONGDA.NH GIA T.iC DONG MOI TRUONG

I - Thanh phan'tham dur:

1. Daai dien chu diu tuChC.r...... . v : .... ..... .On,,/ A ,A13... ctl- (1 c_ ............ Chucvue Qt S.r,,

. D)ai dien dun vi ttr van:

O nu/ha: .. . ../................ Chuc vu: ......... n , .....................

3. Dai dien UBND xa . r)zL C ....... Huyen: , ........... Tinh Bac Gian,OnL/ba: *.ffi .............. Chrc vu: .. ,.... '...

4. Dai didn/ng,u&i dCnm, ddu cdic nh6m4z!n toc thieu s6 (ne-u c6):

D..................Dan toc .....On/:.. . ... . . . Dan toe:.........................

5. Daai dien cac hoi, doan the dia phurong:

ai) Ong/ba: U.JyJ.y ... & I..*.2L .......... Chuc vu:.C3%Zie 2~ ... ..........././..b) V ne9 I..; ......... ¢.C- ..... ChI4.-9.. Chuc vu: .a . 44.......... ..2.C) bngj1/i4 -tz B A hucv:( .W ...... GAAG.d) .n... .. . ........................ ..........

_ .

f) Ong/ ba: . . ....... Cc vu: .c) On/ba: ...... ChCrc vu:

d) eng/Eba: ...... Churc vu:..i) Ong/ba: j.v ~.7 .. ?Z. , Chute vui: .. ~I ) 0n g/ba : .......................................... Chrc vu:..............................................

1) bn,/bai: .......................................... Chrc vu:..............................................

6. Dai' dien cec ho gia dinh ... ..... ngtLri, trong d6 s6 n,ruai dan toc thieu so: ...............

II - Ni dung tham van:1. Don vi ti van th6ng bdio ve:

- Noi dung du an ( Iy do dau ti, quy mo cong trenh, vi tri hr&n"g tun... )- Chfnh sacl DOen bu, Tai dinh cu, chfnh such M6i truan;,, chinh sakhd6i v&i Nguoi Dan

Toc thicu so cua WB va c'ua chlinh phu Viet Nam- Muc tieu cua Danh gia tc docng moi truang (vdi y ki6n tu va'n cua nguchi dan va cdn,

dong) lIa de xuat cac giai phap giam thieu cac tac d6ng tieu cuc tiem tang ve Moi truKn,(bao gom m6i tru&ng tu nhien va xa hoi)

2. Y ki;n tham v6a cua c6n dn ng:

Page 59: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

2. 1. NgLr&i dan trong vitng c6 dong y tham gia thurc hien dur an khong ? C6: . Khon: .o 1 . .....

Ncu kl.ng thl vi sao ? : ....................................................................................................................................................................... ............................................................................... . ............. .............................. ........... ............

..........................................................................................................................................................

2.2. Il,am van cUa cong dong ve nhfnm taic dbng tfch cuc ve iM i trzt&ng ( bao go0m ca m6itruon7 LUr nhien va xa h6i, m6i trur&ng sinh thii, m&i trlru&ng vat Iy, truye-n thong van hoa va sinhhoa. cdrg ddng....):

TruLc khi xay dung:

+Y.9 .. ,... .ca . . ..........

-............. ....... . ... t ... .... x .....................................................................................

+ Trong khi xay durng:

......... ~ ffk?.w .... ..... ................** (v ,.c

....................................................................................................... ...................................................

+ Sau khi xay dung xong:

trza3ong v~i caic giai phaip giaim thieu:

+ Trauic khli .rav dLmng:

/V

+ Trong khli xg2y duhng:

........................... ....................

2.4. Doi vi nhung hoc c6n lnh vOng trinh trong hanh lang an toin dien, ncu ky thuat cho phep,co donn y sur dung nhung bien phaip ho tr phong chdng cay no thay the cho c,.c giai phap didi/di chuy en hay khdn?: ........................... ; Khong:.. ......... kh.ng thi vi sao?:

..................................................................................................................

............................ ....................................................................................................................

.. . . .. . . .. . ... . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. ..2. . .-Tron khixJ du7lt

Page 60: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

.5 N-ir6i dan va cong dong trongr vung dur an c6 dong y tham gia c6ng tae giAm thieu tac d6ngmoi trubrng nhuir:) Lam sach nori xay dung c6ng trinh, thu gom rac thai, chat ban vc dung nciquy d!nh ii) Cam ke't thuc hien dung cdc cquy d,inh ve hanh lang an toan Iu6i dien ( n/nu kh6zngLU((Xc t O'tlg cdy 1lu zamd lav haxy dlang c6ng trrinhl ... ); iii) Thcrc hie ng tac ph6ng ch6ng chavno, cac tai nan do dien cgiMt gay ra ?

C6o ...... ; Klihn ; Ne'u k,hong thi vi sao ?

',6 N;',u&i dan va c6ng dong trong vuxng dLr in c6 the thue hien cong tac gidrn sat mnii trw6ngd6i v&i chu thau trong toan bo qud trinh trrdc khi xay du.mng, trong khi xay ding va sau khi xavdLung; k't thuc k-hong ?

C6. ... ; Kh6ng ; Nu kh6n thi vi sao.

..........................................................................................................................................................

2.7. Cac y kien tham van khdc cca ngLuai dan va c6ng dong:

,&d4. c! ..- ...... . .. cw tz , .4 . ....... i 2'S. >9

... ... £ ' ...........................................................................................................................................

III - Y ki6n binh luan (nhan xet, danh gia) va de xuat cua Tu van (ve cac k6t qua tham va'nnru tren, dac biet la giai phap piam thieu cac tac dong tieu cuc tiem tang ve M6i trUCng.)

.OP.. z{(2 ,. a , ;T A ...... /Zta4k. I4

Bac Giang, ngay.< thing n:am 2007

DAI DIEN CHU DAU TUJ DAI DIEN DON VI TIf VAN. ;

DAI DIEN CHINH QUYitN DIA PHUONG: ... ,*,A~~~~ IN, 1,v~;

DAI DIEN CiC CO QUAN DOAN THE DIA PHfNG .G ............. .Q. .....>....... .

DAI DIEN NGUdI D(NiG DAU CAC NHOM DAN TOC THIEU SO (DTTS)

... . ......................

Page 61: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

DL an ludi dien phAn Ph6i ndnq th6n (RD)CONG H6A XA HOI CHUJ NGHIA VIET NAM

DOc lap - Ttr do - Hanh phuc

BIEN BAN THAM VAN CONG D ONGDANH GIA TAC DONG MOI TRUONG

I - Tha'nh phan tham dur:

1. Dal dien chu clau tur

Onib.: . ............................. Chc vu. ..............................

2. Dai in cldn vi tLr van:OnQ/ba: ... A. ./ y Sy .h . Chuv: . ...Ong/b................ Chdc vu: A(.. ;1 'v...........................

3. Dai dien UBND x a .. Laz..............Huydn ........ ... . ............ Tinh Bac GiangOn /bi: ..E1G?-EW .... rChf.. ...............:

4. Dai dien/ng&u6i dCrng dau cac nh6m dan toc thieu so6(ne6u c6):On/ba: . . .. ............ Dan t6c............ ......... .........On/b.. .............................. Dan toc: .............................

5. Dai dien cac hoi, doan the dia phuang:a) Ong/ba: A.O° ...... 9!n .............. Churc vu: .. . .. . .z............:

b)Ony....J At?:t4 ....b) Oa n -/bat Z, iS ..... t........ 4]'...a .... ChCrc vu:CU Q 4

c) On,/bVt: ./... .......... 1 ....... Chuc vu:.. ".a.

d) Oni/ba/ J . .........i Chuc vu ..A ..rv . n. c .c) Ong/b: .......... ChCic vu .......... ...f) O II JDAIbfl .J.h.... ........... ..... ChCrc vu C.iIa2 . . z.'.

g)Ong/bi ...... ................. .... Chuc vu ..............................h) Oig/bi ........................... Chiicvu. .............................i) On/b: ... . ....................... Chuc vu..............................

6. Dai didn cac ho gia dinh ..... I.........J nguci, trong d6 so ngu6i dan toc thieu s6: ..

I1 - N6i dung tham van:1. Dot vi tit van th6ng bao ve:

- Noi dung dur an (15l do dau tut, quy mo c6ng trinh, vi tri huang tu n ... )- Chfnh s5ch De-n bu, Tai dinh cur, chifnh sach Moi tr tbng, chillh siachdoi vai Ngtr6i Dan

Toc thieu so cua W1B va cua chifnl phu Viet Nam- luc tieu cua D0nh giA tac d6ng mn6i trurang (v6i y kien t va' n cua nguoi dan va cong

dong) la dc xuat cAc giai phlip gi'ini thieu cac tac d6ng tieu cuIc tiem tang ve M6i trornig(bao gom m6i trut6ng tur nhien va xai hoi)

2. Y ki6i thaizn v6ii ctia c6ng dng:

1

Page 62: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

2 1. NgILri d.Ln trong vung c6 d'ing y tham gia tIlLuC hien dur zin khong ? C6 7... Kh6ng:NCLu klhong thli vi sao ? .

................. I..........I........................I......................................................................................................

............................................ ............ .................................................................................................

2.2 Thlami va'n eia cong d6ong v6 nhf1ng ti'IC dOnlg tfch CLrc v6 M6i trt(olig ( bao grnm ca mCoitruLing tlr nhie, vi xai hoi, 1ioi IruLyng sinil thiii i. oi tru&nog vzit Iy, truyv6 n thong v5n hdl va sinhhoat cong 6 ng d )

+ Tru6dc khi x.y dtrng

..................................... ....................................................................................... ................... ........................... ...... .... ................ ..................................

+ Trong kili x.ly duLig

.... .............. ....... .......... ....... ....... ... .................................................... I.................................

+ Sau khi xay dung xonig

2.3 Thain va'n eia cOng dong v6 nh[ing tac dong tieu cue tien taing (c6 the xAy ra) v- MoiIrmiol1g vii cc giii phap gilAm thieu

+ Tr c6c khi xdv cinlg:

............ .G... . . . .. . . .. . . . . .. . .. .. . . .. . .. .. . . . . . .. . . . .. . . .. . .. . . . . .. .. . . .. . .

+ Trong klii x y dionig

w ~ ~ ~ ~~( JCoA ifyo i f4-2.>c Jsfx...... _ha, .. c.4p,f..-. Aw.......C . .... o z * a L.. t .v. a.t...........c .. a yr4. -... .... ..... .... ...

+ Sau; klicn xty diing xonig

.f ...d ..... A .) . ... ... .. . . . . . . . . . . . . . . . . . . . . . . . . .

2.4. DOi voi nhurng hd c6 nhai o, c6ng trin h trong hanh lang an tozin dien, neu kl thuat cho phep,c6 dong y' su dung nhung bien pha,Ji0 trg ph6ng ch6ng clihy no thay the cho cac gi.;i phap didoi/di chnLyenl hay khOng ? C6 ...... Khng............. ; Neu kh6nicg thli vi sao ?

c ~0 -...................................................................................................................................................

I.......

................................................................................................................. .......................................................... :

Page 63: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

2.5. Ntr&i dan vai cncg d6ng trong vung du zin c6 d`ng y tham gia c6ng tic giam thic-u taic clongmnoi tru6';ig nhur: i) Lam sach ncri xay dLirn Cong trinh, tlhu gom r.ic thai, cha't bzin v6 ddlnf nciquy dinlill: i) Cain k6c thuLC hiin dung ctic quv dinh ve hanh lan,, an toan lrc6i dien ( nzl(r khz3ngidu-iec troiig cc;y ldu nj hnay hyxy dinlig c6ng tr:inh ... ); iii) TllLhc hien c6ng tac ph6ng cho`ng chaiyno, cic tai nan do dien giat gay ra ?

C i ...J .Kh6nbg: ............. ; Nc'u khiong thi vi sao ?..........................................................................................................................................................

..........................................................................................................................................................

2.6. Ng_1i dan va concg d-ng trong v6lng dLr .inl c6 th' thLrc hi,n cOng t-ic giaizn sat mn6i trw6ngd6i v6i ch6L thAilu trong toan bb quzL trinh trr6c kihi xay di.mg, tronr khill xay durng va saLi khii xaydung k&I thuc kh6n ?

C6 . .... Kh6n-g. ........ ; u Ik-h6ng thi vi sao ?

2.7. Cic kIic'n thiam v6an khaic cua nguoi dan va c6n- dong:

01 .... w641 .. fk . ca i .>.^. .A . w. ..,Ur4.;.

...... e C ... .................. ................... .................

III - Y li6n binh luatn (nhan xet, daiiln gia) vai de xua't cua Tu van (ve c c ke't qu-a thamn va'nneu trCn. d.-c biet la giAi phap giam thieu cac t.ic d,ng tieu c,uc tiem'n tang v6 M6i tru&ng )

........... ...............................................................................................................................................

..........................................................................................................................................................

BWc Giang, ngay 1th5n(,g nami 2007

D Id DIlCN CHU DAU TUJ DAI D IRN DON VIl TUfVAN

* ; P................................................................. ................. .................... ..... ... ... ... ... ... ...

DAI DIl N CHINH QUYEN DIA PiUONG: ........................... .......L , .- ...... . . ....... ..

DAJ DfIfN CAC CO QUAN DOAN THE DIA PH NG< . ........

AWA

DAI DII'N NGUWI DUNG DAXU CAC NH61IANOC TmEU S) (DTTS)

. ... .. ....... ....

3 fe CI

Page 64: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Dir rn !Lrai dien ohAn oh6i nona then (RD)CONG HOA XA HOI CHU NGHIA VILT NAM

DOc lap - Tur do - Hannh phuc

BIEN BAN THANI VAN CONG DONGDANH Gli T.-C DO' NG N1OI TRUONG

I - Tlanh phan thamn diLr:

1 D1i dlien chIII d;'iI tLr

a : .............. .... .... Cl rc vu :

D' Dai dien don vi tu v.in

On-/b2i ........ Chcv. A.AA.................

3. DLIi dien UBND xa . ,/y .. .................. H_y... ..... Tinh B.tic Giani.nz/K...: .... ......r..s. .... ch Crc vu: CL,WKx .........................

4. D;pi di, i/n,,tr&ii dCrng diu cac nhom dani toc thieu so (ne'u co):

On,7/bi........... .......... ... D.il1 ...... .. ............ I ....................n./.. ................................................... Dan toc: ...... ........................

5. Dai die n ccc hoi, doan the dia phuronc,a) O / .. ............... ChCrc vu ... tCT .... / .. . .b) Ong/bai: \/a;s t t Churc vu: C IY /:z <c)ol On9z/b . .Sw ,LIt . ...... Cvhii' c vii (.1 CC . ...X..

d) Ons/bci: .... Chuc vu: .b) Onii/bil .a .... ... ........... Chrc vu:......................C') .........gC/bva.....C C htc-V I:

U) C)ng/b.i:.....................h...................................c) Oiig/bca.......................................... Ch iic vLi ..................................................

h) OT/ba ............... ............................. Chuc vu: ...................................

i) Ong/ba ........................... Churc vu . .

6. Eai dien cLic ho -ia dinh Jg ng'.fei trong d6 s6 ngu&il,dan toc thieu so'..:

II - Noi dung tham van:1. Dofn vi tit vda th6ng blio v:

- Noi dung dur an ( ly do d.'iu tur, quy mo cong trlnh, vi tri hua6ng tuyvn )- Chinh sach Den buL, Tai dinh cLr, chiinh sach \4ioi tru&ng, chinh sachdo6i vai Nrgui Dan

TOc thiiu so ̀ca WB vii Cia; chinh phl Viet Narn- Nl'ic tieu cua DOnh gii ttic dong moi tr.ring (vai y ki'n tur vhi cua ngu&i dan va cong

dting) la de xuLcf ctic giai phJip gi-im thi&iu cec t.ic dong tieu cLrc ti6m tang ve Ndi6 tr.rxnlg(bao gomn moi trrllng tur nhien v,' x i hoi)

2. Y ki-z tharn varZ ciia cong d4ng:

Page 65: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

2.1 I.i nr&i dan trong viing c6 dng- y tham gia thLrc hien dur an kh6ng ? C6 V. Khon: ....

N, C LE kh) i vi sao ? ........................... ........... .................................. ......................... ................................................................ ..........................................................

22. h;Vil;! vani c6a cont: dong ve' nhCrng tJic d65m tich cLrc ve Mmi trrtlo,- ( bao g6fl ca nu)itruortg fit iii va xa hoi, mbi tw.rng siil thAi, moi tr.rJnc vat 1N., crutvcn thW n- van h6a vLi sinhhoatr cOii' C nc.. ):

TrimCc klhi xav dUmng

. . . . . . . . . . . . . . . .. . . . . .. . . . . . . . . .. . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . .

+4 Ti mug khii x.ay dLrn,

+ SatLikhi xavy dirng xong:

........................... .............

2 3 T'hiarm van cua cOng dong vc nhurn= t;ic dong tieu curc ticrm trng (c6 thc xay ra) vc M6itri,Oig -a cac gi ai phzip gizim thicu:

+ Trir0c k/Iuxcivy durg:

............. a ^..... .. .. ..

................................................................................................................................................... .......

............................ ...................................................... .....................................................................

4+ Tr ol,> k-li .eSL;v cIt(iicg:

..... ....A. ....S..X. .g. ...X.. . . . . ...... . ............ . . . ........... ..... ... . . ....... .. . . . . . . . ......... . ................ .

................................................................................................................ .............. ..........................................................................................................

.......................................................................................... ................................................ .: ............................................

+ Satit k/Lxlyv clng xonig

......... ... /s.<' .7 ........ ...... a.... t.,... ........ . ..... g.'.'fi.' .. . .. C.49.4M

..........................................................................................................................................................

.......................... ................................................................................................................... I.............

..........................................................................................................................................................

2.4. D :i vOi nhimg ho c6 nha 6, cong trinh tron- hainh lang an toan clin, neu ky thuat cho phep,c6 don, s su dung nhfrnc bicn phapb trcr ph6ng ch6ng ch.iy nb rhay th6 cho cac giai phap didbi/di citIyC'n hay khon7 ' Co: .Kh1lc: ..... ; NeU khong trhi vi sao ?

..............................................................................................................................................

..... ...............................................................................................................................................

2

Page 66: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

2.5. 5N-r&i dan va cong d6ng trong v6n- dLu an c6 dbna y tham -ia cong tac giam thieu tic dongmn3i trur('ing niLu i) Lzim sach nai xay dLmz ' cong trinih, thu gorn rac thai, chz.t b:'in ve diin: nlUiCiIV Jinhl ii) CaM1 k6"t tilurC 1i1n d6ng cic cjuy din i t. hvnC hmlnfi anz toimr ILui dibn ( uhati !,'

JliCoc Cicv Icnh ,lubn hav xdv dmlo,g cm,r trinh ... ) iii) inirc hien cns tic phon,- ch(ong7 chnvno6, ct.c tai nan do dien cii' civ ra ?

CKh. ./ . ...hn ........ u ; N kh6n- thi vi sao ''..........................................................................................................................................................

.......................... :..............................................................................................I............................... .

2 .6. ¢ crfi dan va con, do'n,g tron, vi ngC dLr zin c6 the thLrc hien cons.g tic gkia;n sat m6i trwtngdo6 v'i chu thziu tron, toan bM qui trinh trurec k-lhi xiv dlUng, trong khi xiv dung vi sau khii xavduLn kd't thuc khbnc' '?

Co ........ Khn ......... ; Nu hn i vi saLo

...................... .............. I.................................I...................I.................... ..................................... ..

.................... ................................ I..................................................................................................

2.7. Cdc ~ K-i-en tharn vThi k-hicca g dhin va con-gdo6ng

................................................................................................ ..........................................................

III -Yki-en binli lu;In (nilan x6t, dJinh gii) vi de' xu'a't c6a TLr vian (v6 cic k-et quAL tharn v-atinn~Ll [r-Cn, dic bi(~t a-ILtgi plidp gii.M thidt. cdc tLic d6ng t&It CL.rC tic'M t"Ing M6NTi taru&ng.)

Bac Giang,, ngiy O,S0hang, nam 2007

DA!I DIftN CHU DAU TU DAI DlE.N DON' VI TIJ VANS

DAI l)IEN CHINH QUYfY DIA PHUONG: ................................................................................. ..

D DDI DIN cAc CO QUAN DOAN THfD DI PHUDG .... = -= .............. ............... ............... -==....................

.... . . . . .

DIkf D)IPN NGUI DO`t4G D2'U CA~C NH6/ DAN TOC ,,HIEU S (DTTS)

...............

Page 67: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

Du! Sn luOi diAn ohan ch6i nOnq th?n (RD)CONG HOA XA 1101 Cl-IU NGHIA VItT NANI

M}c lap - 'tir do - Hanh pliic

BJll'N BAN T1AIM VAN CONG DONGD.iNIH GIA TAiC DONG A10OI TRUONG

I - Thanh phylln tham' du:

1. D3al din chu dziu tur

Ong/ba: ............. C c v . .... f.I 1/ ......... P .. ).7,

2. Dai dicln dcyn vi tu valn

O5.g/b..:........................C. cvu (....i...

3. D)ai dliCn UBND x a /... ............ IILIYCn . ........ Tinil Bac Giarc(^llglbi: . tFz ....... !zy. 11. '17 c Vl; ...2,z iflcvil acr If.......

4. DOi diciie/ng1(rLi Urmn ¢lIu calc nh6in d0in tc ilcSt so ( n6lC`u c6 ):0nib D... . ............................. Dn toc: ................

olnlo/bal: Dain toc:

5. Dai diiin cAc liOi, cloan th6 dia phtrcilg:

a) .n..... lg: .g.. lY/. i ......... (TIhrc vLl: ... ,. . 2 .. a. Pi .......b) O. .b. /.t2... .... i. Z.Chrc viU: ...... , 2.0;0l. 1; (l4o.... .

c) Ong/UU: . .. . ...... Chi[rc vCi : .(4f../i. /.

d)01,ht:... 11. .. / .i. .. ...... ,.. C'IiCrc vt:i,, :2 a /li-/ -/ z ;Z ..Y /t.iZ::Ad) One/bh ...... i. 1 .... t L'; ..... - .. .. ChiCrc Vll: (j/l i I/2 ./1 2//.t2--O n )lgrl: l~ ... 7/D{ -g... . .. . . .. . . .. . . .. . .. . . .. . . .. . . C hl;[cVl v >':Wi ... .. .. .. . .. .. .. . .................................. g./)2r.

g).Ongbal ,.I Chuec vui(~c6i / ./ 'f) Ong/ba - - ChC'rc vui:./.4k

.......................................... Chrc vu:..............................................h) Onig/ba:........................................... Chfrc vu ..............................................i) Ong/b9 :...............1:.,.C'hcre vu................

6. Dai clicn cae ho gia dinh ..... ngumi , trong d6 s6 ngur&i dlan toc thic'u sc:. .

II - Noi dung tham vain1. Do- r' v*ir th6ng btao ve:

- NO-i dung duir aln ( Iy do dL!u tu, quy mn6 c(crlg trinh, vi trf Il hu tuy&n . )- Clfnhl sach Dc`n bi, Tai dinh cu, chlnilh sticlh Moi tar6xng, chinh sach doCi vCi NgcLri Dan

T'C thliiu so' cua WV vaX cua chifnh phu Vitt Narm- Mi'Tc tieu cua DAOnh gia talc d6ng moi ti½rng (vCJi y ki6n tt va'n cua nguacri dan va cong

Cldwg) la de xuit cac gi.li phaip gia-n thie'll calc tac dong tie-u cuc tiern tang v-e( M9i tiru&ng(ba.o g6 m moi tnr'lng tLr nhien vai xal h6i)

2. Y ki tl I(hta van cua cong d6fng

Page 68: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

2.1. Ngu(i Jian trong vu6ng c6 dong y tham gia thitrc hien dtLr' n khllong ? C6: J KhOng

Nu khonlg ii vi sao ?........................................................

..................................................................................................................

............................................................................... .............................................................................

2.2. Thami v'n cua cOng d6ng ve nhuTng tAic dicug tfch ctrc ve A1Ii tr6r&ng ( bao g6m cai moitltriJl- g tu ni!iin va xa h0i, mOi trirLing sinh thJi, nibi tro&ng vat 1y, truycn tho6ng van h6a vai sinhhoat cCon.g dong )

+ Tri trc klhi xly dLung:

.. ......... .................................................. ........ /.C.%.6.... ' f.w Z

.................................................................. I.....................................................................................+ Trong khi xSy dunig:

................................. .......................................................................................... I...................

.................................... .................................................. ............... I........................................................

+ kan Ihi xay dung xong:

..........................................................................................................................................................

..........................................................................................................................................................

2.3. Thlar va'n cuia conng dong ve nhung t.'c dong tieu curc tiem tang (c6 the xAy ra) vc Moitrmeazng va *ac giai phap giam thieu:

+ Triaijc k/ti x(iy dc1tig

..... .. ...................................................... ..

........................................................................................................... I.....................................................................................................................................................................................................

.......... ....... ........................................................................................................ ................................................................... ..................-f Ti orng ktli xcly diang:

~ ~~Y ~ . . ........ ;.. .t....c f ... 2.............. ........... ................................ ; ....... .S -<?27.. vty.... a7 27 . jZy.u,

..........................................................................................................................................................

..........................................................................................................................................................

+ Sczu1 k/li xciy diPig xong:

......................................

. . . . . . .I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .................... ........................... ,,,,,,, ,,,....... ,,...,

..........................................................................................................................................................

.............. . .... ... ........ .. . .... .... ... .... ,,,. . , ,,,,,,.,.... .... .... ... .,.. , .. , .. ,,,..,,.. , .. ,,,. .... ... .... .... ...

2.4. D6Oi ii nhCng ho c6 nh,i ci, cong trinh trong hanh lang an toan dien, nc'u kt thuat cho phep,c6 dcdig i sur dung nhiOrng bicn phAp tio tra phong chong chay no thay the clio cac ;iAi phap didcAi/di chiiven hay khong ? Co: khV ;.Kh6ng ... ; MNu khiOncg tlli vi salo ?

..........................................................................................................................................................

2

Page 69: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province

2.5. Ng-r'ii dan v: cong d6ng trong vuing dir arn c6 d6ng y tham gia cbng tzic giArm thidu t.ic dcngmn()i tnriyng nhu: i) Uirn sach ncri xay clung c6ng trinh, thul goin r6ic th.ii, chift b'in vc d6ng naiquy dinhl ii) Cam k6t thuc hicn dung c.ic Cuy dinh vc hanh lang an toan lrdi dicn ( ua 1110k1ngdLGC trl&Ilg cciy lilladin alay xcy di.cng c5ng tI-inhli ... ); iii) Thirc hicn cong tic phong chong chiyno, caic tai na -n do diin giat gay ra ?

Co: ...... Khong ....... ; Nu h6ng thi vi sao ?

2.6. Ng&ri dAn va cong dong trong viing dLr an c6 th thurc 1lien cong tac gidin sdt ,nii trrrongd6i voi chu thAu trong toin bo qmli trirnh truic k-hi xay dMng, trongi klhi xay dung v.' sau khi xaydunig kct thuc khong ?

C6o . ; Khong ; NAui khong thi vi sao ?

2.7. Ciic k kiTc tham van klic& cua nguLri dan vli cong dong:............. t ,X@'a. .c,,, Sed,B,,,,,,,,,,,,,,,.,

~~~~~~~~~~~~~.................. .'=4*;@, ..........................

.................. .. ..... ... L'. ... c ;.

................... .. .. .....

III - 'y kien binh lu.ftn (nhan x6t, dainh gi6) va dc xuat cua Tu v.in (ve cac ket qua tlham vhnincu tren, clic biet IA giai pliap giam t}liCu cac tic dong tieu cLrc ti6ml tang vxe 1oi trudng )..........................................................................................................

........................................... ..

I ...............................................I.....................................................................................

I......i ............................................... I................................. ........................................................................

Bac Giang, ngiay -2 tUng 3' narn 2007

DAI DIEN CHT-U DAU TU DAI DIESN DON VI TU VAN

................................................................ ................... ....................... ....... . .''...:

DA! DlfiEN ClIINH QUY1PN DIA PHIJONG: . ............

OAI DIftN CAC CO QUAN DOAN THID ixA PHUONG: ........ 4..

DAI DIlf N NGU6I DQJNG DAU CAC NHOM DAN TOC THIEU SO (DTTS)

3...............................................3

Page 70: ELECTRICITY OF VIETNAM POWER COMPANY No 1 · electricity of vietnam power company no 1 rural distribution project component project rural medium voltage power grid bac giang province