EIDPMO Brunei Industry Group Engagement

51
Energy & Industry Department Prime Minister’s Office EIDPMO Brunei Industry Group Engagement SEP 2016 9/7/2016 1

Transcript of EIDPMO Brunei Industry Group Engagement

Page 1: EIDPMO Brunei Industry Group Engagement

Energy & Industry Department Prime Minister’s Office

EIDPMO

Brunei Industry Group

EngagementSEP 2016

9/7/2016 1

Page 2: EIDPMO Brunei Industry Group Engagement

EIDPMO2

Safety Briefing

• No drills planned for today

• The alarm is a continuous ringing of a bell

• In an emergency we evacuate in an orderly fashion

• Follow one of the ushers

• Assembly Point A

Mobile phones on silent mode please

SAFETY BRIEFING

Page 3: EIDPMO Brunei Industry Group Engagement

3

EIDPMO

Recital of Doa Selamat

DOA SELAMAT

Page 4: EIDPMO Brunei Industry Group Engagement

4

EIDPMO

AGENDA

0830 – 0900 hours: Registration

0900 – 0905 hours: Safety Briefing

0905 – 0910 hours: Doa Selamat

0910 – 0920 hours: Opening Remarks

0920 – 0935 hours: Pipeline Regulations Update

0935 – 0950 hours: National Standards Centre

0950 – 1005 hours: COMAH Regulations (Amendments) 2016

1005 – 1015 hours: COMAH ACOP Process

1015 – 1030 hours: Decommissioning & Restoration Guidelines

1030 – 1045 hours: IERP Collaboration Process & Readiness

1045 – 1110 hours: Learning from Experience: BSP

KOTUG

1110 – 1130 hours: Way Forward – Legislative Update

1130 – 1145 hours: AOB

1145 – 1200 hours: Q & A

1145 – 1200 hours: END

Page 5: EIDPMO Brunei Industry Group Engagement

5

EIDPMO

AGENDA

0830 – 0900 hours: Registration

0900 – 0905 hours: Safety Briefing

0905 – 0910 hours: Doa Selamat

0910 – 0920 hours: Opening Remarks

0920 – 0935 hours: Pipeline Regulations Update

0935 – 0950 hours: National Standards Centre

0950 – 1005 hours: COMAH Regulations (Amendments) 2016

1005 – 1015 hours: COMAH ACOP Process

1015 – 1030 hours: Decommissioning & Restoration Guidelines

1030 – 1045 hours: IERP Collaboration Process & Readiness

1045 – 1110 hours: Learning from Experience: BSP

KOTUG

1110 – 1130 hours: Way Forward – Legislative Update

1130 – 1145 hours: AOB

1145 – 1200 hours: Q & A

1145 – 1200 hours: END

Page 6: EIDPMO Brunei Industry Group Engagement

6

EIDPMO

OPENING REMARKS

Page 7: EIDPMO Brunei Industry Group Engagement

7

EIDPMO

AGENDA

0830 – 0900 hours: Registration

0900 – 0905 hours: Safety Briefing

0905 – 0910 hours: Doa Selamat

0910 – 0920 hours: Opening Remarks

0920 – 0935 hours: Pipeline Regulations Update

0935 – 0950 hours: National Standards Centre

0950 – 1005 hours: COMAH Regulations (Amendments) 2016

1005 – 1015 hours: COMAH ACOP Process

1015 – 1030 hours: Decommissioning & Restoration Guidelines

1030 – 1045 hours: IERP Collaboration Process & Readiness

1045 – 1110 hours: Learning from Experience: BSP

KOTUG

1110 – 1130 hours: Way Forward – Legislative Update

1130 – 1145 hours: AOB

1145 – 1200 hours: Q & A

1145 – 1200 hours: END

Page 8: EIDPMO Brunei Industry Group Engagement

8

EIDPMO

PIPELINE REGULATIONS

PIPELINE REGULATIONS

(Draft)

Page 9: EIDPMO Brunei Industry Group Engagement

9

EIDPMO

PIPELINE REGULATIONS

CORE GROUP

Brunei Shell Petroleum Sdn Bhd

TOTAL E&P Borneo

Brunei LNG Terminal

Brunei Methanol Company

Brunei National Petroleum Company

Energy & Industry Department, Prime Minister’s Office

Page 10: EIDPMO Brunei Industry Group Engagement

10

EIDPMO

PIPELINE REGULATIONS

“pipeline” means pipe, tube or conduit that has been used, is in

use or intended to be used for conveying any substances in any

form;

These Regulations shall apply to -

(1) pipelines conveying hazardous substances within the territory of Brunei Darussalam

where

(a) the length of pipeline is from the 500 meter safety zone of an offshore facility to

the boundary fence of an onshore facility; and

(b) the length of pipeline is from an offshore facility to the fence of an onshore

premises; and

(c) the length of pipeline is between the boundary fences of any onshore premises;

and

(d) the length of pipeline is from the territorial boundary of Brunei Darussalam to the

boundary fence of a premises within the territory of Brunei.

(2) where a pipeline is used for the purpose of injecting water into a hydrocarbon

reservoir.

Page 11: EIDPMO Brunei Industry Group Engagement

11

EIDPMO

PIPELINE REGULATIONS

Pipeline Notification

The operator shall submit a notification to the competent authority….as

specified in the First Schedule

Pipeline Warning Signs

The operator of a pipeline shall install clearly identifiable pipeline warning

signs at adequate locations and intervals to indicate the location and hazardous

substance contained within the pipeline

Arrangements for incidents and emergencies

The operator shall ensure that no substance is conveyed in a pipeline unless

adequate arrangements have been made for dealing with -

(a) an accidental loss of substance from;

(b) discovery of a defect in or damage to; or

(c) other emergency affecting,

the pipeline.

Page 12: EIDPMO Brunei Industry Group Engagement

12

EIDPMO

PIPELINE REGULATIONS

Decommissioning and Restoration notification

The operator shall ensure that a hazardous substance pipeline which has ceased to

be used for the conveyance of a hazardous substance shall be decommissioned;

and

(2) The operator shall send a decommissioning and restoration notification to the

competent authority containing the details as specified in the Fourth Schedule.

Offences under this Part.

Any person who contravenes any part of this regulation is guilty of an offence

and liable on conviction to a fine not exceeding $1,000,000 imprisonment for a

term not exceeding 2 years or both.

Fees chargeable under the regulation.

The competent authority may with the approval of the Minister, charge fees in

relation to issuance of hazardous substance pipeline notification certificates and

inspections undertaken by the competent authority on pipelines. These charges

are as specified in the Fifth Schedule.

Page 13: EIDPMO Brunei Industry Group Engagement

13

EIDPMO

Way Forward

Item Description Who When

1 Core Group to be set up to develop the regulations EIDPMO DONE

2 EIDPMO to facilitate development of the

regulations. Kickoff Meeting in April

EIDPMO DONE

3 EIDPMO to engage Hazardous Substance

Industry companies through BIG Forum :

Responses back to EIDPMO

INDUSTRY 15/10/16

4 Drafting of Pipeline Regulations EIDPMO Legal Q4 2016

5 Legal Drafting of Pipeline Regulations AGC Q1 2017

6 Sign off on Pipeline Regulations MINISTER Q2 2017

Page 14: EIDPMO Brunei Industry Group Engagement

14

EIDPMO

AGENDA

0830 – 0900 hours: Registration

0900 – 0905 hours: Safety Briefing

0905 – 0910 hours: Doa Selamat

0910 – 0920 hours: Opening Remarks

0920 – 0935 hours: Pipeline Regulations Update

0935 – 0950 hours: National Standards Centre

0950 – 1005 hours: COMAH Regulations (Amendments) 2016

1005 – 1015 hours: COMAH ACOP Process

1015 – 1030 hours: Decommissioning & Restoration Guidelines

1030 – 1045 hours: IERP Collaboration Process & Readiness

1045 – 1110 hours: Learning from Experience: BSP

KOTUG

1110 – 1130 hours: Way Forward – Legislative Update

1130 – 1145 hours: AOB

1145 – 1200 hours: Q & A

1145 – 1200 hours: END

Page 15: EIDPMO Brunei Industry Group Engagement

15

EIDPMO

NSC BRUNEI

NATIONAL STANDARDS CENTRE

LINK

Page 16: EIDPMO Brunei Industry Group Engagement

16

EIDPMO

AGENDA

0830 – 0900 hours: Registration

0900 – 0905 hours: Safety Briefing

0905 – 0910 hours: Doa Selamat

0910 – 0920 hours: Opening Remarks

0920 – 0935 hours: Pipeline Regulations Update

0935 – 0950 hours: National Standards Centre

0950 – 1005 hours: COMAH Regulations (Amendments) 2016

1005 – 1015 hours: COMAH ACOP Process

1015 – 1030 hours: Decommissioning & Restoration Guidelines

1030 – 1045 hours: IERP Collaboration Process & Readiness

1045 – 1110 hours: Learning from Experience: BSP

KOTUG

1110 – 1130 hours: Way Forward – Legislative Update

1130 – 1145 hours: AOB

1145 – 1200 hours: Q & A

1145 – 1200 hours: END

Page 17: EIDPMO Brunei Industry Group Engagement

17

EIDPMO

COMAH AMENDMENTS

CONTROL OF MAJOR ACCIDENT

HAZARDS REGULATIONS

(AMENDMENTS) 2016

Page 18: EIDPMO Brunei Industry Group Engagement

18

EIDPMO

COMAH AMENDMENTS

Citation and commencement.

1. These Regulations may be cited as the Workplace Safety and Health

(Facilities) (Control of Major Accident Hazards) Regulations, (Amendment)

2016 and shall commence on the 1st January 2017.

“decommissioning” means the process of

(a) taking a facility, well, pipeline or other conveyance system from cessation of

production (or operation) of that facility, well, pipeline or other conveyance

system; to the final declared state of that facility, well, pipeline or other

conveyance system; and

(b) includes the planning and implementing the removal, disposal or re-use of

a structure or item when it is no longer needed for its current purpose;

“restoration” means the actions required to take a location site to its final

declared state;

Page 19: EIDPMO Brunei Industry Group Engagement

19

EIDPMO

COMAH AMENDMENTS

Decommissioning and restoration notification of a facility

Safety Case for decommissioning and restoration of a facility

Emergency shut-down valves

Fees – detailed in a Schedule

SCHEDULE: Decommissioning and restoration notification

SCHEDULE: Safety Case for decommissioning and restoration of a

facility

SCHEDULE: Fees

Page 20: EIDPMO Brunei Industry Group Engagement

20

EIDPMO

COMAH AMENDMENTS

SCHEDULE: Fees

1. The fees as prescribed are chargeable by the competent authority for specific

activities undertaken and authorized by the Competent Authority.

2. Facility Notifications

Type Fees (BND)

Fixed Facility Design 50,000

D&R 20,000

Any Material Change to a notification 10,000

Page 21: EIDPMO Brunei Industry Group Engagement

21

EIDPMO

COMAH AMENDMENTS

3. Facility Safety Cases

Type Annual Fees (BND)

Onshore Fixed Facilities 100,000

Offshore Fixed Facilities (more than 2 premises) 200,000

Offshore Fixed Facilities (less than 2 premises) 100,000

Mobile Facility 100,000

Page 22: EIDPMO Brunei Industry Group Engagement

22

EIDPMO

COMAH AMENDMENTS

3. Facility Safety Cases

Type Annual Fees (BND)

Decommissioning & Restoration 50,000

Combined Operations 25,000 per DH

Any Material Change for Fixed Facility 20,000

Any Material Change for Mobile Facility 10,000

Any Material Change for Combined Operations 10,000

Any Material Change for D&R 10,000

Page 23: EIDPMO Brunei Industry Group Engagement

23

EIDPMO

COMAH AMENDMENTS

4. Well Notifications

Notification Fees (BND)

Well 10,000

5. Regulatory Inspections

Location Fees (BND)

Onshore 5,000

Offshore 10,000

6. Investigations

Regulatory Fees (BND)

Per Inspector 250 per hour

Page 24: EIDPMO Brunei Industry Group Engagement

24

EIDPMO

Way Forward

Item Description Who When

1 EIDPMO to engage Hazardous Substance

Industry companies through BIG Forum

EIDPMO DONE

2 Industry to provide EIDPMO with comments on

COMAH amendments

All members DONE

3 Legal Drafting of COMAH Regulations

(Amendment)

AGC Q3 2016

4 Sign off on COMAH Regulations MOHA Q4 2016

5 Implementation of COMAH Regulations EIDPMO 01.01.2017

Page 25: EIDPMO Brunei Industry Group Engagement

25

EIDPMO

AGENDA

0830 – 0900 hours: Registration

0900 – 0905 hours: Safety Briefing

0905 – 0910 hours: Doa Selamat

0910 – 0920 hours: Opening Remarks

0920 – 0935 hours: Pipeline Regulations Update

0935 – 0950 hours: National Standards Centre

0950 – 1005 hours: COMAH Regulations (Amendments) 2016

1005 – 1015 hours: COMAH ACOP Process

1015 – 1030 hours: Decommissioning & Restoration Guidelines

1030 – 1045 hours: IERP Collaboration Process & Readiness

1045 – 1110 hours: Learning from Experience: BSP

KOTUG

1110 – 1130 hours: Way Forward – Legislative Update

1130 – 1145 hours: AOB

1145 – 1200 hours: Q & A

1145 – 1200 hours: END

Page 26: EIDPMO Brunei Industry Group Engagement

26

EIDPMO

COMAH ACOP

COMAH APPROVED CODE OF

PRACTICE DEVELOPMENT

LINK

Page 27: EIDPMO Brunei Industry Group Engagement

27

EIDPMO

AGENDA

0830 – 0900 hours: Registration

0900 – 0905 hours: Safety Briefing

0905 – 0910 hours: Doa Selamat

0910 – 0920 hours: Opening Remarks

0920 – 0935 hours: Pipeline Regulations Update

0935 – 0950 hours: National Standards Centre

0950 – 1005 hours: COMAH Regulations (Amendments) 2016

1005 – 1015 hours: COMAH ACOP Process

1015 – 1030 hours: Decommissioning & Restoration Guidelines

1030 – 1045 hours: IERP Collaboration Process & Readiness

1045 – 1110 hours: Learning from Experience: BSP

KOTUG

1110 – 1130 hours: Way Forward – Legislative Update

1130 – 1145 hours: AOB

1145 – 1200 hours: Q & A

1145 – 1200 hours: END

Page 28: EIDPMO Brunei Industry Group Engagement

28

EIDPMO

D&R Guidelines

DECOMMISSIONING & RESTORATION

IN BRUNEI

Page 29: EIDPMO Brunei Industry Group Engagement

29

EIDPMO

D&R Guidelines

ASCOPE – ASEAN COUNCIL ON PETROLEUM

ASCOPE DECOMMISSIONING GUIDELINE (ADG) FOR OIL AND

GAS FACILITIES

BRUNEI – signatory since 5th Nov 2012

BRUNEI NATIONAL PETROELUM COMPANY (PB) – Signed on

behalf

EIDPMO has facilitated the development of D&R Guidelines with the

support of Brunei Shell Petroleum, who have provided details on Industry

practices.

EIDPMO wishes to engage Brunei Industry to support the development

of D&R guidance and processes

Page 30: EIDPMO Brunei Industry Group Engagement

30

EIDPMO

D&R Guidelines

D&R

Notifications

COMAH

Regulations

D&R

Guidelines

Duty

Holder

D&R

Safety

Case

D&R

BRUNEI

WSH

Order

2009

Page 31: EIDPMO Brunei Industry Group Engagement

31

EIDPMO

D&R Guidelines

D&R

Notifications

COMAH

Regulations

D&R

Guidelines

Duty

Holder

D&R

Safety

Case

D&R

BRUNEI

WSH

Order

2009

RE

GU

LA

TO

R

STA

KE

HL

DE

RS

& P

UB

LIC

Page 32: EIDPMO Brunei Industry Group Engagement

32

EIDPMO

D&R Guidelines

EIDPMO will cascade 4 D&R documents by end September 2016 for review

and comment:

BRUNEI DARUSSALAM D&R OF COMAH FACILITIES

PHILOSOPHY

BRUNEI DARUSSALAM ONSHORE DR TECHNICAL HANDBOOK

BRUNEI DARUSSALAM OFFSHORE DR TECHNICAL HANDBOOK

BRUNEI DARUSSALAM COMPARATIVE ASSESSMENT

APPROACH FOR D&R TECHNICAL HANDBOOK

FEEDBACK IS REQUESTED BY END OCTOBER 2016

Page 33: EIDPMO Brunei Industry Group Engagement

33

EIDPMO

AGENDA

0830 – 0900 hours: Registration

0900 – 0905 hours: Safety Briefing

0905 – 0910 hours: Doa Selamat

0910 – 0920 hours: Opening Remarks

0920 – 0935 hours: Pipeline Regulations Update

0935 – 0950 hours: National Standards Centre

0950 – 1005 hours: COMAH Regulations (Amendments) 2016

1005 – 1015 hours: COMAH ACOP Process

1015 – 1030 hours: Decommissioning & Restoration Guidelines

1030 – 1045 hours: IERP Collaboration Process & Readiness

1045 – 1110 hours: Learning from Experience: BSP

KOTUG

1110 – 1130 hours: Way Forward – Legislative Update

1130 – 1145 hours: AOB

1145 – 1200 hours: Q & A

1145 – 1200 hours: END

Page 34: EIDPMO Brunei Industry Group Engagement

34

EIDPMO

IERP

INTEGRATED

EMERGENCY RESPONSE PLAN:

Collaboration Process & Readiness

LINK

Page 35: EIDPMO Brunei Industry Group Engagement

35

EIDPMO

AGENDA

0830 – 0900 hours: Registration

0900 – 0905 hours: Safety Briefing

0905 – 0910 hours: Doa Selamat

0910 – 0920 hours: Opening Remarks

0920 – 0935 hours: Pipeline Regulations Update

0935 – 0950 hours: National Standards Centre

0950 – 1005 hours: COMAH Regulations (Amendments) 2016

1005 – 1015 hours: COMAH ACOP Process

1015 – 1030 hours: Decommissioning & Restoration Guidelines

1030 – 1045 hours: IERP Collaboration Process & Readiness

1045 – 1110 hours: Learning from Experience: BSP

KOTUG

1110 – 1130 hours: Way Forward – Legislative Update

1130 – 1145 hours: AOB

1145 – 1200 hours: Q & A

1145 – 1200 hours: END

Page 36: EIDPMO Brunei Industry Group Engagement

36

EIDPMO

LFE

LEARNING FROM EXPERIENCE

Page 37: EIDPMO Brunei Industry Group Engagement

37

EDPMO

LFE

BRUNEI SHELL PETROLEUM

LINK

Page 39: EIDPMO Brunei Industry Group Engagement

39

EIDPMO

AGENDA

0830 – 0900 hours: Registration

0900 – 0905 hours: Safety Briefing

0905 – 0910 hours: Doa Selamat

0910 – 0920 hours: Opening Remarks

0920 – 0935 hours: Pipeline Regulations Update

0935 – 0950 hours: National Standards Centre

0950 – 1005 hours: COMAH Regulations (Amendments) 2016

1005 – 1015 hours: COMAH ACOP Process

1015 – 1030 hours: Decommissioning & Restoration Guidelines

1030 – 1045 hours: IERP Collaboration Process & Readiness

1045 – 1110 hours: Learning from Experience: BSP

KOTUG

1110 – 1130 hours: Way Forward – Legislative Update

1130 – 1145 hours: AOB

1145 – 1200 hours: Q & A

1145 – 1200 hours: END

Page 40: EIDPMO Brunei Industry Group Engagement

40

EIDPMO

WAY FORWARD

HSE DEVELOPMENTS

BRUNEI

Page 41: EIDPMO Brunei Industry Group Engagement

41

EIDPMO

HSE DEVELOPMENTS

• Environmental Protection & Management Order 2016 - status

• Environmental Impact Assessment Regulations – ongoing

• Air Pollution Control Regulations – ongoing

• Electricity Order 2016 (Draft) –drafting

• Electrical Safety Appliance Regulations – to develop

• Electrical Safety Regulations – to develop

• HSE Competency and Capability Framework – IMIST / WSH Officer

• National HSE Authority – Governance & Compliance Authority

Page 42: EIDPMO Brunei Industry Group Engagement

Gov/Ind Advisory Committee

BIG Council

BIG

MAH

BIG

Industry

BIG

Non Industry

GCA INTERFACE WITH INDUSTRY

EIDPMO

Page 43: EIDPMO Brunei Industry Group Engagement

43

EIDPMO

AGENDA

0830 – 0900 hours: Registration

0900 – 0905 hours: Safety Briefing

0905 – 0910 hours: Doa Selamat

0910 – 0920 hours: Opening Remarks

0920 – 0935 hours: Pipeline Regulations Update

0935 – 0950 hours: National Standards Centre

0950 – 1005 hours: COMAH Regulations (Amendments) 2016

1005 – 1015 hours: COMAH ACOP Process

1015 – 1030 hours: Decommissioning & Restoration Guidelines

1030 – 1045 hours: IERP Collaboration Process & Readiness

1045 – 1110 hours: Learning from Experience: BSP

KOTUG

1110 – 1130 hours: Way Forward – Legislative Update

1130 – 1145 hours: AOB

1145 – 1200 hours: Q & A

1145 – 1200 hours: END

Page 44: EIDPMO Brunei Industry Group Engagement

44

EIDPMO

AOB

OTHER BUSINESS

Page 45: EIDPMO Brunei Industry Group Engagement

45

EIDPMO

Scaffolding Code of Safety Practices

BIGCORE

GROUP

Managing Risks

Planning

Controlling the Risk

Types of Scaffold

Inspection and Maintenance

Appendices

Scaffold Training and Competency

Scaffolding Code of Practice will be forwarded to Industry for comment

and review in October 2016. Feedback requested back within 1 MONTH

Page 46: EIDPMO Brunei Industry Group Engagement

46

EIDPMO

SAFETY ALERT

USE OF COMPRESSED OXYGEN CYLINDERS

EIDPMO ARE PRESENTLY INVESTIGATING AN INCIDENT THAT

RESULTED IN SERIOUS BURNS TO TWO PERSONS.

THE INCIDENT INVOLVED THE USE OF A COMPRESSED GAS CYLINDER.

IN PARTICULAR OXYGEN.

THE OXYGEN CYLINDER WAS BEING USED TO PRESSURISE A

HYDRAULIC UNIT ON A CONCRETE BREAKER.

A FLASH FIRE OCCURRED RESULTING IN FACIAL AND UPPER BODY

BURNS TO TWO PERSONS.

ALL COMPANIES INVOLVED IN THE USE OF COMPRESSED GASES AND IN

PARTICULAR THE USE OF COMPRESSED OXYGEN ARE REQUESTED TO

HAVE A TIME OUT FOR SAFETY TO REITERATE THE HAZARDS AND

CONTROLS ASSOCIATED WITH THE USE OF SUCH CYLINDERS.

ANY ONE USING OXYGEN FOR AN ACTIVITY OTHER THAN CUTTING,

WELDING OR FOR MEDICAL REASONS SHOULD IMMEDIATLEY STOP THAT

ACTIVITY AND SEEK FURTHER ADVICE.

Page 47: EIDPMO Brunei Industry Group Engagement

47

EIDPMO

AGENDA

0830 – 0900 hours: Registration

0900 – 0905 hours: Safety Briefing

0905 – 0910 hours: Doa Selamat

0910 – 0920 hours: Opening Remarks

0920 – 0935 hours: Pipeline Regulations Update

0935 – 0950 hours: National Standards Centre

0950 – 1005 hours: COMAH Regulations (Amendments) 2016

1005 – 1015 hours: COMAH ACOP Process

1015 – 1030 hours: Decommissioning & Restoration Guidelines

1030 – 1045 hours: IERP Collaboration Process & Readiness

1045 – 1110 hours: Learning from Experience: BSP

KOTUG

1110 – 1130 hours: Way Forward – Legislative Update

1130 – 1145 hours: AOB

1145 – 1200 hours: Q & A

1145 – 1200 hours: END

Page 48: EIDPMO Brunei Industry Group Engagement

48

THANK YOU

Q & A

EIDPMO

www.ei.gov.bn

Page 49: EIDPMO Brunei Industry Group Engagement

Government Resources

• Labour Department:

http://www.labour.gov.bn

• Attorney General’s Chamber:

http://www.agc.gov.bn/

• Energy Department Prime Minister’s Office:

http://www.ei.gov.bn

41

Page 50: EIDPMO Brunei Industry Group Engagement

EIDPMO Website - HSSE

42

Page 51: EIDPMO Brunei Industry Group Engagement

Energy & Industry Department Prime Minister’s Office

THANK YOU

9/7/2016 51