New Barlby Schools 3 8 2 7 1 6 4 9 5 Grand Union Centre - a new development further up Ladbroke Grove Ark Brunel Primary Academy - school with speech and language unit Oxford Gardens conservation area Existing retail Kensal House - a Grade II* Listed residential building from the 1930s Area set aside for future residential development Existing school Wormington Green development (under construction) St Charles Hospital 1 4 7 2 5 8 3 6 9 In order to better understand the existing site conditions, we have undertaken a series of analysis to establish what works, what doesn’t and what opportunities there are to better knit Barlby New Schools with the new masterplan for the area and into the borough. The diagrams here examine the site in terms of movement, fronts and backs, and open space and height and how they do or do not relate to the surrounding neighbourhood. It is clear that the post-war development has broken with the tradition of streets and squares, and this is reflected in the analysis here. Understanding both the shortfalls of the current site conditions and how the streets and squares of the wider neighbourhood operate, forms the basis of how we can successfully integrate the new Barlby schools into the local context and into the borough. Site analysis Site analysis in context of proposed masterplan Barlby Road Treverton Street Exmoor Street Ladbroke Grove Sunlight Barlby Road Treverton Street Ladbroke Grove Access Exmoor Street Barlby Road Treverton Street Exmoor Street Ladbroke Grove Existing trees Cat. A Tree +21.9 m Barlby Road Treverton Street Exmoor Street Ladbroke Grove Noise Learning Suites Barlby Road New Treverton Street Exmoor Street Common Catering Services and Adjoined Halls Classroom access to outdoor play area Main Entrance Special School Drop-off and Life Skills Area Access and layout N Two schools with separate identities and entrances. • Both schools constructed in a single phase, with a second phase for the landscape after the demolition of existing school. • Barlby school remains operational on a reduced site: safe, secure and with care taken to mitigate the impact of the construction process. Respect the existing site levels and the significant plane tree, designing the new building to take advantage of the change in levels across the site and to minimize the required earth works. Retain as many existing trees as possible on the site, especially identified grade A category trees. • Barlby school main entrance relocated to quieter Treverton Street, separating entrances playground and school entrance from vehicle and delivery entrances. • Barlby and SEN schools’ playgrounds separated by building, providing clear distinction and good acoustic separation. Maximise the ground level play areas for both schools. 2

Transcript of e arly Scools - Royal Borough of Kensington and Chelsea analysis.pdf · A 09.02.2016FR/MM Issued...

Page 1: e arly Scools - Royal Borough of Kensington and Chelsea analysis.pdf · A 09.02.2016FR/MM Issued for desig cno toeradmination B 12.02.2016FR/MM Special school note added C 24.02.2016FR/MM

New Barlby Schools

3

8

2

7

1

6

4

9

5

Grand Union Centre - a new development further up Ladbroke Grove

Ark Brunel Primary Academy - school with speech and language unit

Oxford Gardens conservation area

Existing retail

Kensal House - a Grade II* Listed residential building from the 1930s

Area set aside for future residential development

Existing school

Wormington Green development (under construction)St Charles Hospital

1

4

7

2

5

8

3

6

9

In order to better understand the existing site conditions, we have undertaken a series of analysis to establish what works, what doesn’t and what opportunities there are to better knit Barlby New Schools with the new masterplan for the area and into the borough.

The diagrams here examine the site in terms of movement, fronts and backs, and open space and height and how they do or do not relate to the surrounding neighbourhood.

It is clear that the post-war development has broken with the tradition of streets and squares, and this is reflected in the analysis here.

Understanding both the shortfalls of the current site conditions and how the streets and squares of the wider neighbourhood operate, forms the basis of how we can successfully integrate the new Barlby schools into the local context and into the borough.

Site analysis

Site analysis in context of proposed masterplan

Barlby Road

Treverton Street

Exmoor Street

Ladbroke Grove

Sunlight

Barlby Road

Treverton Street Ladbroke Grove

Access

Exmoor Street

Barlby Road

Treverton StreetExmoor Street

Ladbroke Grove

Existing trees

Cat. A Tree+21.9 m

Barlby Road

Treverton Street

Exmoor Street

Ladbroke Grove

Noise

Learning Suites

Barlby Road

New Treverton Street

Exm

oor S

treet

Common Catering Services and Adjoined Halls

Classroom access to outdoor play area Main Entrance

Special School Drop-off and Life Skills Area

Access and layout

020 7250 3477penoyreprasad.com

28-42 Banner StreetLondon EC1Y 8QE

Rev Date Prep/Check Description

Royal Borough of Kensington andChelsea

Client

Project

Drawing Title

Status

Date Scale

Drawing Number

Barlby and Treverton Schools

Revision

© Penoyre & Prasad LLP

Do not scale from this drawing.Dimensions are to be verified on site prior to construction

Ordnance Survey Data reproduced by permission of Ordnance Survey®, onbehalf of Her Majesty's Stationery Office. © Crown Copyright. All rights reserved.

Lower Ground Floor Plan

1:200 @ A1

G-201654-

Purpose of Issue

N01

Lower Ground Floor Plan

1:2000 2 10 20m

28 October 2016

For Information

Stage 2A VE H

For InformationF 14.10.2016 FR/SDo

Movement Overlay

For Information18.10.2016 MA/SDoG

Key:

Special School

Circulation

Special school rooms

Special school wet rooms

Primary School

Circulation

Barlby school rooms

Plant/Bins

External areas

Existing school footprint

Site boundary

Respite access

09.02.2016A FR/MM Issued for design team coordination

B 12.02.2016 FR/MM Special school note added

FR/MMC 24.02.2016 Special school layouts revised in accordancewith client comments from 22.02.16 meeting

Issued for Work Stage 2 design freeze.FR/MM07.03.2016D

Issued for Work Stage 2 ReportFR/MM06.04.2016E

Issued for Work Stage 2A -VE28.10.2016 MA/SDoH

• Two schools with separate identities and entrances.

• Both schools constructed in a single phase, with a second phase for the landscape after the demolition of existing school.

• Barlby school remains operational on a reduced site: safe, secure and with care taken to mitigate the impact of the construction process.

• Respect the existing site levels and the significant plane tree, designing the new building to take advantage of the change in levels across the site and to minimize the required earth works.

• Retain as many existing trees as possible on the site, especially identified grade A category trees.

• Barlby school main entrance relocated to quieter Treverton Street, separating entrances playground and school entrance from vehicle and delivery entrances.

• Barlby and SEN schools’ playgrounds separated by building, providing clear distinction and good acoustic separation.

• Maximise the ground level play areas for both schools.

2