DuPage Water Gomm ission - dpwc.org · DuPage Water Gomm ission 600 E. Butterfield Road, Elmhurst,...

129
DuPage Water Gomm ission 600 E. Butterfield Road, Elmhurst, lL 601264642 (630) 834-0100 Fax: (630) 834-0120 AGENDA DUPAGE WATER COMMI$SION THURSDAY, JUNE 15,2017 6:30 P.M. 600 EAST BUTTERFIELD ROAD ELMHURST, IL 60126 L Call to Order and Pledge of Allegiance ll. Roll Call (Majority of the Commissioners then in Office-rninimum 7) lll. Public Comments (limited to 3 minutes per person) lV. Approval of Minutes (Concurrence of a Majority of those Commissioners Present, provided there is a quorum-minimum 4) RECOMMENDED MOTION: To approve the Minutes of the April 20,2017 Regular Meeting of the DuPage Water Commission (Voice Vote). V. Treasurer's Report - April and May 2017 (Concurrence of a Majority of those Commissioners Present, provided there is a quorum-minimum 4) RECOMMENDED MOTION: To accept the April and May 2017 Treasurer's Report (Voice Vote). Vl. Committee Repofts A. Finance Committee 1 . Report of 6/15/17 Finance Committee 2. Request For Board Action: Authorizing the Transfer of Funds form the General Account to the Capital Reserve Fund ($21.3 million). (TO APPROVE: Concurrence of a Majority of the Appointed Commissioners-7) RECOMMENDED MOTION: To Authorize the Transfer of Funds from the General Account to the Capital Reserve Fund Account (Roll Call) 3. Actions on Other ltems Listed on 6/15/17 Finance Committee Agenda All visitors must present a valid driver's license or other government-issued photo identification, sign in at the reception area and wear a visitor badge while at the DuPage Pumping $tation.

Transcript of DuPage Water Gomm ission - dpwc.org · DuPage Water Gomm ission 600 E. Butterfield Road, Elmhurst,...

DuPage Water Gomm ission600 E. Butterfield Road, Elmhurst, lL 601264642

(630) 834-0100 Fax: (630) 834-0120

AGENDA

DUPAGE WATER COMMI$SION

THURSDAY, JUNE 15,20176:30 P.M.

600 EAST BUTTERFIELD ROADELMHURST, IL 60126

L Call to Order and Pledge of Allegiance

ll. Roll Call(Majority of the Commissioners then in Office-rninimum 7)

lll. Public Comments (limited to 3 minutes per person)

lV. Approval of Minutes(Concurrence of a Majority of those Commissioners Present, provided there is a quorum-minimum 4)

RECOMMENDED MOTION: To approve the Minutes of the April 20,2017 RegularMeeting of the DuPage Water Commission (Voice Vote).

V. Treasurer's Report - April and May 2017(Concurrence of a Majority of those Commissioners Present, provided there is a quorum-minimum 4)

RECOMMENDED MOTION: To accept the April and May 2017 Treasurer's Report(Voice Vote).

Vl. Committee Repofts

A. Finance Committee

1 . Report of 6/15/17 Finance Committee

2. Request For Board Action: Authorizing the Transfer of Funds form the GeneralAccount to the Capital Reserve Fund ($21.3 million).(TO APPROVE: Concurrence of a Majority of the Appointed Commissioners-7)

RECOMMENDED MOTION: To Authorize the Transfer of Funds from the GeneralAccount to the Capital Reserve Fund Account (Roll Call)

3. Actions on Other ltems Listed on 6/15/17 Finance Committee Agenda

All visitors must present a valid driver's license or other government-issued photo identification, sign in at

the reception area and wear a visitor badge while at the DuPage Pumping $tation.

Commission Agenda 2

B. Administration Committee

June 15,2017

1. Report of 6/15/17 Administration Committee

Z. Resolution No. R-17-17. A Resolution Authorizing and Ratifying the Disposal

of Certain Personal Property Owned by the DuPage Water Commission

RECOMMENDED MOTION: To adopt Resolution No. R-{7-17: A ResolutionAuthorizing and Ratifying the Disposal of Certain Personal Property Owned by theDuPage Water Gommission (Roll Gall)

3. Actions on Other ltems Listed on 6/15/17 Administration Committee Agenda

C. Engineering & Construction Committee

1 . Report of 6/15/17 Engineering & Construction Committee

Z. Ordinance No. O-7-17: An Ordinance Determining the Prevailing Rate ofWages in DuPage County and Cook County (No Cost)'

(TO APPROVE: Concurrence of a Majority of the Appointed Commissioners-7)

3. Resolution No. R-13-17: A Resolution Approving and Ratifying Certain WorkAuthorization Orders Under Quick Response Electrical Contract QRE-7/15 at

the June 15, 2017, DuPage Water Commission Meeting (McWilliams ElectricCo. Inc., estimated cost of $10,860.00)

(Concurrence of a Majority of the Appointed Commissioners - 7)

4. Resolution No. R-14-17: A Resolution Approving and Ratifying CertainContract Change Orders at the June 15, 2017, DuPage Water CommissionMeeting (Mertes Contracting Gorporation - decrease of $8.|,205.00)

(Concurrence of a Majority of the Appointed Commissioners - 7)

5. Resolution No. R-15-17: A Resolution Awarding Quick Response Contract(Contract QR-1 1117) (John Neri Construction Co. Inc., and RossiContractors Inc. - No Cost)

(Concurrence of a Majority of the Appointed Commissioners - 7)

RECOMMENDED MOTION: To adopt item numbers 2 through 5 under theEngineering & Construction Report section of the Agenda in a single grouppursuant to the Omnibus Vote Procedures (Roll Call).

O. Actions on Other ltems Listed on 6115117 Engineering & ConstructionCommittee Agenda

Commission Agenda

Vll. Accounts Payable

June 15.2017

(Affirmative Majority of the Appointed Commissioners, containing the vote$ of at least 1/3 of the County AppointedCommissioners and 40% of the Municipal Appointed Commissioners-3 County + 3 Muni+1=7)

RECOMMENDED MOTION: To approve the Accounts Payable in the amount of$7,639,201.18 (April2017, disbursements made with concurrence of Commission'sChairman) and $8,567,785.73 (May 20171subject to submission of all contractuallyrequired documentation, for invoices that have been received (Roll Gall).

RECOMMENDED MOTION: To approve the Accounts Payable in the amount of$798,625.00 (April 2017, disbursements made with concurrence of Commission'sChairman) and ${,267,3{5.00 (May 20171subject to submission of all contractuallyrequired documentation, for invoices that have not yet been received but have beenestimated (Roll Gall).

Vlll" Chairman'sReport

lX. Omnibus Vote Requiring Majority Vote

X. Omnibus Vote Requiring Super-Majority or Special Majority Vote

Xl. Old Business

Xll. New Business

Xlll. Executive Session(Concurrence of a Majority of those Commissioners Pre$ent, provided there i$ a quorum-rninimum 4)

RECOMMENDED MOTION: To go into Executive $ession to discuss securityprocedures pursuant to 5 ILCS 120/2(c)(8), to discuss matters related to personnelpursuantto 5 ILG$ .|20/2(c)(1) and (2), to discuss acquisition of real estate pursuantto 5 ILC$ 120/2(c)(5), to discuss pending, probable, or imminent litigation pursuantto 5 ILCS 12012(cl(11), and/or to discuss minutes of closed meetings pursuant to 5ILCS 12012(cl(21) (Roll call).

RECOMMENDED MOTION: To come out of Executive Session (Voice Vote).

XlV. CollectiveBargainingAgreement(Affirmative Majority of the Appointed Commissioners, containing the votes of at least 1/3 of the County AppointedCommissioners and 40% of the Municipal Appointed Commissioners (3 County + 3 Muni+1=7)

RECOMMENDED MOTION; Resolution No. R-l6-17: A Resolution Approving andAuthorizing the Execution of Collective Bargaining Agreement with theInternational Union of Operating Engineen$ Local 399 (AFL-CIO) (Roll Call).

XV. Adjournment(Concunence of a Majority of those Commissioners Present, provided there is a quorum-rninimum 4)

Board/Agendas/Commission/20 1 7/Rcm 1 706.docx

MINUTE$ OF A MEETING OF THEDUPAGE WATER COMMISSION

HELD ON THURSDAY, APRIL 20,2017600 E. BUTTERFIELD ROAD

ELMHURST, ILLINOIS

The meeting was called to order by ChairmanZay at 6:30 P.M.

Commissioners in attendance: J. Broda, R. Gans, J. Healy, D. Loftus, D. NOvotny, R.

Obarski, J. Pruyn, M. Scheck, P. Suess, and J. Zay

Commissioners Absent: J. Fennell, D. Russo, and F. Saverino

Also in attendance: TreasurerW. Fates, J. Spatz, C. Johnson, J. Rodriguez, C. Peterson,F. Frelka, J. Schori, M. Weed, R.C. Bostick, E. Kazmierczak, and P. Luetkehansrepresenting Gorski & Good

PUBLIC COMMENT

None

APPROVAL OF MINUTES

Commissioner Broda moved to approve the Minutes of the March 16, 2017 ReqularMeetinq and the Minutes of the March 16. 2017 Executive Session Meetinq of the DuPaoeWater Commission. Seconded by Commissioner Healy and unanimously approved by aVoice Vote.

All voted aye. Motion carried.

CHARTER CUSTOMER HEARING

Commissioner Loftus moved to open the Charter Customer Hearing regardinq theManaqement Budget Ordinance for the Fiscal Year Commencing Mav 1,2017 andEndins April 30. 2018. Seconded by Commissioner Broda and unanimously approved bya Voice Vote.

All voted aye. Motion carried.

There being no comments, Commissioner BrHearino reqardinq the Management Budqet Ordinance for the Fiscal Year CommencinoMav 1,2017 and Endinq April 30.2018. Seconded by Commissioner Loftus and

unanimously approved by a Voice Vote.

Allvoted aye. Motion carried.

-1-

carolyn
Draft

Minutes of the 4120117 Commission Meeting

PUBLIC HEARING

Commissioner Healv moved to open the Public Hearinq reoardinq the Annual Budqet andAppropriation Ordinance for the Fiscal Year Commencino Mav 1 . 2017 and Endins April30. 2018. Seconded by Commissioner Gans and unanimously approved by a Voice Vote.

All voted aye. Motion carried.

There being no comments, Comreqardinq the Annual Budqet and Appropriation Ordinance for the Fiscal YearCommencinq Mav 1 . 2017 and Endinq April 30, 2018. Seconded by Commissioner Brodaand unanimously approved by a Voice Vote.

All voted aye. Motion carried.

TREASURER'S REPORT

Treasurer Fates presented the March 2Q17 Treasurer's Report consisting ol 12 pages,noting that pages 1, 2 and 3 contained a brief summary of the report.

Treasurer Fates pointed out the $162.0 million of cash and investments on page 4, whichreflected an increase of about $3.1 million from the previous month. Treasurer Fates alsopointed out the schedule of investments on pages 5 through 10 totaling $144.1 millionand the market yield on the total portfolio showed 1.21o/o basis points which reflected anincrease from the prior month. On page 11, the statement of cash flows showed anincrease in cash and investments by about $25.7 million and operating activitiesincreased cash by approximately $28.8 million, and roughly $12.S million of sales tax wasreceived. On page 12, the monthly cash/operating report showed that the Commissionhad met or exceeded all of its reserve requirements.

Commissioner Suess moved to accept the March 2017 Treasurer's Report. Secondedby Commissioner Broda and unanimously approved by a Voice Vote.

All voted aye. Motion carried.

GOMMITTEE REPORTS

Finance Committee - Reported by Commissioner $uess

Commissioner Suess reported that the Finance Committee reviewed and recommendedfor approval all action items listed on the Finance Committee Agenda. After providing a

brief summary, Commissioner Suess moved tothe Finance Report section of the Aqenda in a sinqle qroup pursuant to the Omnibus VoteProcedures. Seconded by Commissioner Healy and unanimously approved by a RollCall Vote.

-2-

Minutes of the 4l21l17 Commission Meeting

Ayes. J. Broda, R. Gans, J. Healy, D" Loftus, D. Novotny, R. Obarski, J. Pruyn, M.

Scheck, P. Suess, and J. Zay

Nays: None

Absent: J. Fennell, D. Russo, and F. Saverino

Item 2: Ordinance No. 0-4-17: An Ordinance Approving and Adopting an AnnualManagement Budget for the Fiscal Year Commencing May 1, 2017 andEnding April 30, 2018

Item 3: Ordinance No. 0-5-17: An Ordinance Establishing Fixed Costs to bePayable by Each Contract Customer for the Fiscal Year Commencing May 1,

2017 and Ending April 30, 2018 - ($0.00)

Item 4: Ordinance No. 0-6-17: An Ordinance Approving and Adopting the AnnualBudget and Appropriation Ordinance for the Fiscal Year Commencing May 1,

2Q17 and Hnding April 30, 2018

Item 5: Request For Board Action: To approve the Renewal of Financial ServicesContract between the DuPage Water Commission and Baker Tilly VirchowKrause, LLP for one year (in an amount up to $66,000.00 for a one year period).

Administration Committee * Reported by Commissioner Healy

Commissioner Healy reported that the Administration Committee reviewed andrecommended for approval all action items listed on the Administration CommitteeAgenda. After providing a brief summary, Commissioner Healv moved to adoptResolution No. R-12-17: A Resolution Approvinq Travel Requests and ExpenseReimbursement Policv, as amended. Seconded by Commissioner Gans andunanimously approved by a Roll CallVote.

Ayes: J. Broda, R. Gans, J. Healy, D. Loftus, D. Novotny, R. Obarski, J. Pruyn, M.Scheck, P. Suess, and J. Zay

Nays: None

Absent J. Fennell, D. Russo, and F. Saverino

Engineering & Gonstruction Committee - Reported by Commissioner Loftus

Commissioner Loftus reported that the Engineering & Construction Committee reviewedand recommended for approval all action items listed on the Engineering & ConstructionCommittee Agenda. After providing a brief summary, Commissioner Loftus moved toadopt item numbers 2 through 4 under the Enqineering & Construction Reoort section ofthe Aqenda in a sinqle group pursuant to the Omnibus Vote Procedures. Seconded byCommissioner Scheck and unanimously approved by a Roll Call Vote.

-3-

Minutes of the 4l2Al17 Commission Meeting

Ayes: J. Broda, R. Gans, J. Healy, D. Loftus, D. Novotny, R. Obarski, J. Pruyn, M.

Scheck, P. Suess, and J. Zay

Nays: None

Absent: J. Fennell, D. Russo, and F. Saverino

ltem 2: Resolution No. R-10-17. A Resolution Approving and Ratifying Certain WorkAuthorization Orders Under Quick Response Electrical Contract QRE-7/15 atthe April 20,2017, DuPage Water Commission Meeting (Windy City ElectricCompany - Estimated Cost of $2,500.00)

Item 3: Resolution No. R-11-17: A Resolution Approving and Ratifying Certain TaskOrders Under a Master Contract with AECOM Technical Services, Inc., at theApril 20, 2017, DuPage Water Commission Meeting (Task Order No. 5 -Electrical Safety Studies - $67,900.00)

Item 4: Request For Board Action - To Authorize the General Manager to execute atwo (2) year Work Wear Supply unit price contract with Villa Park ElectricalSupply Co., Inc. for employee uniforms at the DuPage Water Commission forthe estimated two-year amount of $27,156.95.

ACCOUNTS PAYABLE

Commissioner Healv moved to approve the Accounts Pavable in the amount of$7.608,669.06 subiect to submission of all contractuallv required documentation, forinvoices that have been received and the Accounts Pavable in the amount of $792,330.00subiect to submission of all contractuallv required documentation. for invoices that havenot vet been received but have been estimated. Seconded by Commissioner Broda andunanimously approved by a Roll CallVote.

Ayes: J. Broda, R. Gans, J. Healy, D. Loftus, D. Novotny, R. Obarski, J. Pruyn, M.Scheck, P. Suess, and J. Zay

Nays: None

Absent: J. Fennell, D. Russo, and F. Saverino

CHAIRMAN'S REPORT

Chairman Zay began his report by reminding Board members to file their Statement ofEconomic Interest before May 1st. He then gave a brief status update on the Village ofBaftlett's supply line project noting that construction had been scheduled to begin Marchof 2018.

OMNIBUS VOTE REQUIRING MAJORITY VOTE

None

Minutes of the 4120117 Commission Meeting

OMNIBUS VOTE REQUIRING SUPER.MAJORITY OR SPECIAL MAJORITY VOTE

None

OLD BUSINESS

General Manager $patz informed Board members that the Commission had received aCertificate of Unit Clarification from the State of lllinois Labor Relations Board stating thatunion employees represented by Local 150 have been reclassified into Local 399 andthat contract negotiations should begin within the next couple of months.

NE\ru BUSINESS

General Manager Spatz shared that Commission employee Michael Schweizer would beretiring at the end of April with 27 years of service and that a luncheon would be held tocelebrate and wish him well.

Commissioner Loftus also shared that the Commission had received a Water SaverAward from the 2017 lllinois Section WaterWorks Association WaterCon Conference lastmonth. General Manager Spatz congratulated both Terry McGhee and JenessaRodriguez noting that they were both recognized for their work on water conservation.

EXECUTIVE SESSION

None

Commissioner Gans moved to adiourn the meetinq at 6:50 P.M. $econded byCommissioner Broda and unanimously approved by a Voice Vote.

All voted aye. Motion carried.

Board/Minutes/Commission/2O1 7/Rcm 1 70420docx

-5-

DUPAGE WATER COMMISSIONINTEROFFICE MEMORAN DUM

TO: Chairman and Commissioners

FROM: Bill Fates, Treasurer

DATE: May 10,2017

SUBJEGT: TREASURER'S REPORT - April 30,2017

I am pleased to report that I have reviewed and approved all journal entries and bank reconciliations forthe month of April. I have also reviewed the monthly financial statements and budget status reports, andfound them to be in order.

Summarv of Cash & Investments (Paqe 4)1. Cash and investments totaled $161 .9 million at April 30th, a decrease of $0.1 million compared to

the previous month.

2. The balance in the BMO Harris checking account was $17.7 million at April 30'n, a decrease ofapproximately $0.2 million compared to the $17.9 million reported last month.

3. The BMO Harris money market accounts had $15.0 million at month-end, unchanged from thepreceding month.

4. During the month of April, the lllT money market accounts increased by approximately $1 7million from the prior month.

5. ln April, our holdings of U.S. Agency increased by $1.2 million, and commercial paper and U.S.Treasury investments decreased by approximately $1.5 million and $1.1 million, respectively.

6. The current holdings of cash and investments are in compliance with the approved investmentpolicy.

7 . For the year ended April 30, 2Q17 , the Commission's cash and investments increased a total of$25.6 million.

. The Operating & Maintenance Account increased by $10.6 million, for an ending balance of$32.7 million.

r The General Account increased by $3.7 million, for an ending balance of $'19.7 million.

r The Sales Tax Account decreased by $Z.t million due to the Board approved transfer fromthe Sales Tax Account to the Long-Term Water Capital Reserve in January.

. The Capital Reserve Fund increased $311,644 for a balance of $29.9 million.

r The Operating Reserve Account increased $10.8 million for a balance of $67.2 million.

. The Long-Term Capital Reserve Account increased by $Z.g million for a balance of $12.4million.

The following table presents a summary of the changes in cash position by account.

Cash and Investments by Account

AccountBalance

4t30t2016Balance

4t3012017lncrease

( Decrease)Operations & Maintenance $22,137,284 $32,727.195 $10,589,911General Account 14 077 4AQ 19,715,309 3,738,140Sales Tax 2,131.597 275 (2,131,322\

Operatinq Reserve 56,389,449 o I ,zzJ,vzo 10,834,479

Capital Reserve 29,541 ,577 29,853,221 311,644Lonq-Term Cap. Reserve 1 0,1 1 3,085 12,415,641 2,302,556

Total Cash & Investments $136,290,161 s161,935,569 $25,645,408

Schedule of Investments (Paqes 5-10)1. The average yield to maturity on the Commission's investments was '1 .23%, an increase from the

prior month average yield to maturity o'f 1.210/0.

2. The portfolio is showing estimated unrealized losses of $537,000 at April 30, 2017 , compared to

$537,500 in unrealized gains at April 30, 2016.

3. The amortized cost of our investments was $144.2 million at April 30th, relatively unchanged fromthe orevious month.

Statement of Cash Flows (Paqe 11)'1 . The statement of cash flows shows a breakdown of the $25.6 million increase in cash and

investments for the fiscal year.

2. Operating activities increased cash by $28.5 million. The increase was due to the receipt ofslightly over $13 million in deferred revenue related to Bartlett's cost recovery charges. Thisincrease was offset by a $13 million cash outflow related to the loan to Bartlett to help finance thecost recovery charges.

3. $12.5 million of sales tax revenue was received.

4. Capital Assets purchased totaled $3.9 million year-to-date.

5. Cash flow from investment activity generated $'1 .6 million.

Reserve Analvsis (Pase 12)'l . The reserve analysis report shows the commission has met or exceeded all recommended

reserve balances at April 301n.

2. The Operating and Maintenance Account was $32.7 mlllion which is a balance currently sufficientenough to cover an estimated 120 days of normal operation and maintenance costs.

3. The Operating Reserve account was $67.2 million which is approximately 204 days, this amountmeets the minimum balance per the reserve policy.

Respectfully submitted,

Bill Fates, CPATreasurer

DU PAGE WATER COMMISSIONTREASURER'S REPORTSUMIVIARY OF CASH AND INVESTMENTSApril 30, 2017

FUNDS CONSIST OF: April 30, 2017 March 31 , 2017 rNcR - (DECR.)

PETTY CASHCASH AT HARRIS BANK

TOTAL CASn

IIIT MONEY MARKET FUNDSBMO HARRIS MONEY MARKET FUNDSU. S. TREASURY INVESTMENTSU. S, AGENCY INVESTMENTSMUNICIPAL BONDSCOI\4MERCIAL PAPERASSET BACKEO SEC/COLLATEMLIZED MORTGAGE OBLIG

CERTIFICATES OF DEPOSIT

TOTAL INVESTMENTS

TOTAL CASH AND INVESTMENTS

IIIT MONEY MARKET FUNDSBMO HARRIS MONEY MARKET FUNDSU, S, TREASURY INVESTIVIENTSU. S, AGENCY INVESTMENTSMUNICIPAL BONDSCOMMERCIAL PAPERASSET BACKED SEC/COLLATERALIZED MORTGAGE OBLIGCERTIFICATES OF DEPOSIT

TOTAL INVESTMENTS

Note 1 - lnvestments are carried at amortized cost.

1,200.00'17,688,568.97

1,200.0017 ,921 ,054.79

0.00

1232,485.82)

17,689,768.97 17,922,254.79 1232,485 82\

7 ,700,413.7815,037,425.9233,134,976.8256,186,444.236,402,156.59

15,745,048.986,567,334.173,472,000.00

6,033,542.481 5 ,0?6 ,798 .4734,283,460.1655,023,81 6.10

6,402,526.6617,228,542.756,645,009.023,472,000.00

1,666,871.3010,627 .45

(1,148,483.34)1,162,628.13

(370.07)(1,483,493,77)

177,674.85)0.00

144,245,800.49 '144,1 1 5,695.64 1 30,104.85

161,935,569.46 162,037,950.43 (102,380.97)

April 30, 2017 March 31, 2017 o/o CHANGE

C. J-lo

10/%23.00k39.07o4.4Yo10.9%4.6Yo2A%

4.2o/o

10.4o/o

23.80/,38.?%4.4%12.]Yo4.6Yo2.4Yo

27 .6Yo

0.|Yo-3.3%2.1Yo

0.0%-8.6%-1 .2To

0.0%

100,0% 100.0% 0.'lYo

zEEO,ER6I

qn6.E=

.!s=:r

cisa6=d3

s: -B

r,33q 5 g *t.98

t A

cc!::6 E,s-=

is!.*F=

B: :

r l9siiE ?:€?e{E

{:$E s;{

?i ??ti=

: ,fleE$?:E

$ct6f+E

E

s FfsiiE

s€$58;EF

gfEgfE

t

= H

iSE

EF

sBB

ssdseesssde E

;cdo)o' ddolF

-oN.6

!1-

;;;

E

3 8P3E

33 88888888888883o

^i oN

o@N

ts ooodctoooodoooo

$ 8 355P

efr 88888888888888N

N

()o@

Noo

co cct .o .o @ o @

co € .o .o co @ c(i

o-ry

3 8333R3 88888888888888

s 333P

ES

88888888888888i

o @

NN

N(o

oo co 6 !o .o d oi ot .o co od oo' (o (D(,

vqoooo svv\ivss9!*ssvv

{ ;,"i;;;

6i ooocioo

ct o o o ci o o o o o o o o oo

oooooo oo

N

dodoo'o o

.o co o @

.o co co .o @ o (o co co

N

; c'i..i;;

a ssaa*s assssasssssass

- F

,(o(,@O

O

rJ' (o O O

O N

O rr

{ ()

O $

O L'

o F

F-;--

d ci

o o

ci o o

o o

o ci d

ci o

f-\oooco '.)!1 F

Q

QQ

QQ

s=

=S

EQ

QQ

QE

QE

QA

AA

N

@@

@@

@@

@

@@

@(o@

@(o(o(o(o(o(o@

+

N-N

--- ::---dd6-d-dd-

s ssssss ssassssss*sssso

oooooo oooooooooooooo

d oooooo

oo

888EP

q

rias

a;-v6;!t=

<=

A

6-

.:E=3

tr(,N?T

E?E

3

urt>!=

:troEFoo!F=

o9QFao*Fr

fzOu

c.Ff<od

zPd-ot2

.D

EE

->6

lXi =

-:*E

EN

-

6=3t

NS

(l)o-()c)(r,$d o

<'c)-

(,F-F

Cr

rNlr(t

do$6().i.'(..-o

rt qj C.i

o'(D(o.tro(oqN

o

(", oi

-ai; c.i !_

;; ;-

E eqsE

eqKs\eE

E6qqE

Era E

88EB

E8E

E ;E

qi3v

o6i oi .i o {

o o o ci ai o N d

(., ..i .o+

; o!)or)d-ocio

('oNN

-N

t ,, o o () F

- () o € € .{ .' o (Y

) - @

\t \

(i)@

('i..l{{-

- cjd

;;N-6i

'j

E 8888888888388888 888 888888888

rEnR

S:

gEE

gggEE

ggEE

EB

EE

Egg E

EE

EE

EE

EE

gNH

$$v

doL,)()ooo{)da;oooo()o oJ)l')

ciL'ol)Lr)dooo ;(")at@

o;

; c.i^

;---c.i -

S

S S

;€ A A

S S

S re A

$ S $ A

S ;e

s*S

:eS$S

*SS

S;e

SS

;FS

so'

oo() orqrcoc\N

or@

FF

N

t\Doo-N

@lo6

NN

@.).'

oo, o)onl).{F

nNN

rN

o)Fc)

-;;;-;-------- -

*-i ('o+

++

sor-(.c)rNco

OO

O

OO

OO

OO

O.oO

|fl-@

F(\

(o () o c N

o o (D

ro c) s, co - o .o () .o

oNo

ooooo@oN

o c\(l)@

lr)()-

ctdGo-d!)-

.rov oqN

oooooa)oroo

oN(ort()

v 6oo<

F

co ai ci 6i ; N

o si (o ..i ..i |jrd

oL,)oJ)d;dod ?-otqq

(o N

d, o) (o () t () -

- <

o O N

N rJt N

o) .oO

c{ rar@

O(Y

).{rr6o o(oor.)F

-;

; c.j(\

--ci;.j ;

I I S 3 3 3 5 3 ; E

E I 3 S

b 3 S86

3 I f,33R

3$ 3 E

p 3 p 3 b 3 P e 6 S

q 3 P 3?E

3 P

S

SN

BX

oororoooe (oN

ooo

Q

!2 Q Q

Q S

3 S Q

Q C

! Q Q

Q Q

Q Q

Q

{AQ

Q

QS

=E

SQ

QQ

Q

QE

QQ

N

.O |r) LO

Ll) @ (O

@ (o @

@ f.. (o @

@ f.' F

- @

@(o

rO(]|.)r}(o@

()()rO

@(o(f)(o(o

s s s s f a s s s s s s s s s s s sss ssssass*s

sssssoN

OO

OO

c'lt- O

r(o v(od)orc/)(oN

'n

=9IEEcl.Ed5i

3spc(5

d, rP

+

3 r4E

d6

ha,5 E

.(t ::

6A2

XE

=2>

e

og ::

i;fl t;p&9spE

EP

:9 E 3 o 3 * i 3 3 i '

* sss$s€ssseEsiss€ E

H6 qE

Hi€qq;; iF

$ggi

zzzzzzzzzzz zzzzz

E!,9

;99-<*i)1

<<

<+

<>

>>

lqr4

fi;*<r)#a!!

+:n:tt;n

g ; ; i ; ; ; ; ; ; ; ; ; ; ; ; ; 6 .q !

,ii r H

3 E * ; r :

E E

E &

ES

EP

EE

EE

EP

EO

OE

UE

EE

5;E ;':P

:E=

EE

dO

-0./\O-

, F

FF

FF

FF

FF

FF

FF

FF

F

xd@

w,o @

..rr@vlF

e C

CC

=g

- a a

@ ct .n .n a

@ a 6 6 a

U, a a a

yE=

Q

>r2LtQ

>t

==

=iZ

=

r=rrt>

f !>

-f f

f rf

- !<

.E

>z<

)>a.o=

zZ

rLat!L

zoI=

6or?H

S6!JQ?=

3

!r<9.

>'= l!2.

Brg

tr,6 =:*trFo!JtrEo

;tL:<?o=S

P

,J

IrQ

zOul

!<od

=9

YI

t2 u)

50=4

o*UJ

17 -F

,!{E

gd.

N6sq

oco(o('0F.\

(o!odttsr-s6i

N6i dvc,)o(D

o

N.iu,)o-{

o)o.oo('ao,o,coFr

!D *-,0F

-.J) h9

::9+S

R

R g I

R 3 X

3 3 R E

i I R 3 E

3 $ 3 S R

t b 5 E 6 :

b{b-;;

;- N

-d-;---

- --

F;

--

338;8p 88888888888888888888888888 88

sg8*8s 88888888888888888888888888 88

^i^i66nn octooo

::9+$R

33P

R3*3e3b.-..

--- --

(\ -j6j;-;**

; --;--

^iG

*s*"qss s s s s s s S

s S S

S ;e:Q

S ;l S

S ;<

;e;< S

S S

:e S S

;eS

oooooo o o o o o o o o o o o o o o o o o o o o o

oo-o-eF

c{ ocioooocjcj

!) v { or O

N @

@ N

F

LO <

N O

t N

o' O \t (o .O

(.o F

rON

---.'j-.

SS

SS

SA

s S

S s S

s a " S

S ie S

I S

S S

;e :e " S f S

SS

S;€

A"

!r ()

r, o

o rfj o

Lr.) |l, fr lr) |l] o

o lr) lr) |l) ()

oo(o!)@

@-

co(D@

@@

r@c)oo

t o

o cj o

o ct o

o -

- -

- -

- -

- o

o cj e

- -

- -

- -

oo

3EE

Sf;&

8888€888888898888883R838€R

$g

(o-o(t,).'id ol)oi

s o o s r.' (o o o) o N co @

c) \ (.) o

@ -

ooro(oNo

q <t r) c) o f)

co co N s

co i r'-

oooNqc

@ N

N o G

+ co o d o 3 N

o @

F- o

(o rr co o .! v - (o !r v

.io::9*83

R98R

3&3E

RS

N8R

383SS

3P55bE

6: E

E;--;-

^ -.i;;---_

; -,j

-; ,-j-

o) s -O

3 O

.oclO..1O

(\

NN

rON

@

otD.)

a\ c.t.)

rfi3t9fr $ : R

5 3 X I fi 5 R

r I R E

R R

P 3 6 6 S

ts g 3 E S

53;;;;.id

;-- -

-rr -;

N

.-: ;

- dt,)

- (o @

@ @

.O @

@ @

co @ o, q' ot

r-N

NF

QE

Q?E

E

T Q

(! \ Q

Q Q

S S

!! Q T

! =

\ I

=Q

Q

E \

I Q

= =

Q

Q=

(o (o l.o (o (o to (o 10 !i \t (o (o @ @

(o (o (o @ @

@ I

N N

@ (D

ts N

f..

AaQ

Psll!

Q !!

C! Q

s Q C

! s a e e A a e e a $ (! Q

s Q !

= Q

{ Q

ss

l* bb

^,23 gg

3fl8H

l; ti

<3

44U41,

*E

. -;

-"Ip*€1 gE

g eeP

eee .P

s g {E

++

+R

R? zii

222222 22

2 E

;oour{oo

966 oe,6,,!:?

ooro I

".? j;

? ? 3 { * ? , g E

i . .. € $ € € E E

E : - ; f E

; - ; * a ; i i s ;

}E}$$5 ${iiggH

{$EE

EE

*eH{E

fsEriH

HE

*€ssc::s s=

$$!sd=r:sssrssE

sescc;E-qE

B

;rrr-[_rr i*-gJrr;;=

i1==

.ilrrr;;l lrrri 3s

:=.q-

zuIIEexREI

()';eEEo!:Ig

IoN?H

559JQ?23

o{pt=

- 0a-l-

fiEt

N5?

to=For,rJ

!!Fo

to=6ktzO!J

zE;Bau,;o=<

B =

=x

*58N.

so o'o@

roN- - o : : s : s R

3 3 E g s 3 5 6 3 I 3 N

S S

R ts 3 303 3E

S*3P

3 rES

S:

c\.i G

.-:

r c.j

__o .i

-_; ;

oNt5(oN

N

c) F- d) (D

.\ (o c.,l o, \O

|l) a\ f) O

OJ,

OO

O.tO

OO

oF

Fl.)<

l

S H

RP

$$g:Hh$gP

EF

BR

EX

€EF

B3frE

g F

R* gC

gHgE

E F

H:H

$N

ctod{di

ci Ai -

N .i 6i !o N

.o o o ; cj s <

t - o co q r, (')

o,o)o) ()ooF

,ooo .'+

sJ)@

F-oF

9'o(oo(oGn

o orcoti@

6i o ci c) o c.j s !o -

- o

co {, o F- N

r ('

{o .o !'-{o m

co I -

(o 6 n

s o Q N

o{orarcocoo)-N

('coc! v)oco(of)orF

tt(oo N

oo6oo

.oo-.!r,q9cl 9 r

o. (o N @

N n F

F

? e- \- e- I -

o g > I

-

!D N

'i) v (! o ao rr, @

@ @

F (')\\O

c\o,Ar(ooo(o

()F-lO

oo

., (r) o q !r F

F- o o) o '.r r

F (o -

N ts ;

o o o cj o .) o $ - -N

o ooa(oooo

@o!1o.

F -

(a @ r

o F- n_ N

( o

@ .,.1 o@

!to)

oob' 3R

EfrR

$86RS

RE

3gEp6gE

E;8bS

tN 3g? 3A

?PR

38 38s3f;

5 88888888888888888888888888 888 8888888 E

R+

b8^pcjooocjooooao

eee rleaeegi

i:niiN

EE

EE

EE

EE

EE

EE

ES

SE

EE

EE

ggEE

Eg E

EE

ee6666E +

6-in'N

d cj o o

q,) cj '.t o J) o d cj J: o cj ,.j o o () () d o o o () f)

ooo rioctdcioo

ooonio\1 (oN

F,(o\()f-O

No|O

N'ou1

u) Nf.-O

O(oO

-

E dE

E€5566d55dd5566d6d8€85d8

€55 585€6€5 8d556o

ci o--;;;-N---c.

-o(o ('N

<tF

-oFN

rc\o€if)

; -

- -;;-

-;G

N 6i6i6i(\

N N

oi6iN

G N

c) ..) --

-;-; F

i- !-q!-

NN

NC

T(')

(o(,Si$

(oF-O

OO

=

= =

(! A A

Q (! A

! e! A

e e a a A A

e C A

e !! A a A

5! sA

! =

s=$t!A

C:

eAeA

Q

o O

OO

o

o O

r c) O

c) O -

r r

r o

O O

O r

F

ooo roroO

oO

rooo-

L.) 'l) In @ N

o i.- @

@ @

() @

(ots @

@ (o @

(o @

@

ro @ n) Lo()

s) r0 @

(o |') @ @

s 3e a s s s a s s * a s s s s a a $ s s a s a * s s s

sss sssas$s

ssssao

oo--oi -N

-;-;-- N

...|NN

^ oo-F

jo

zc'6.9EEX.=EI

?sE

.EE

E9

ta63;!e

6bbS

*3

! d

ed=

E

6 ('

>

t >

P,

.d29 .*o &

Ee

{ 6i:

EE

-E.^?.

=

Ea!

r F

pE i;6!E

t;a'

;bdi qu626i2

tr>io

6. tts E

B u B

B 6 B

B 6 d u B

B 3 B

B B

E B

B B

B s

iEF

"c')-^t-

ts*sxt'k

6 6 6 6 0 6 6 6 -o 6 5 6 E 6 6 6 6 6 6 6 6 5 6 6 b 6

'r b E

*5?=q3:

EF

;35<

z z z z z z z z z z z z z z z z z z z z z z z z z z

c o ir (!<

:\lg \

<<

<+

<--

l a. n a a b e' e - b b - - - b - e a - - a b b e - z. .E

=*

ffEt

E*z

E

i!r*$ 6ne ;;;;;;;;aaezl;;;;;;;;;;;;;

E!H

:Eri;:i?i E

€Er€

5 O

!u !D o o o e o q q !l) a o o q

g) q p o o I !) q o o o

.'F"

z-FF

Lv!t ---9-

I ;

F F

F ;

F F

i ;

F F

F :

; F

': F F

F ;

F F

F :

|: ; *$;

Lj6?tr<h>

: =

==

-==

33333339333333333333333393 EE

{ i;3453> 7t1.L3.

dz33F;

fr==

to=otro

?o=-klzOul

-<

zP66ah u)

=o

=z

3 6 sEu=

e:

Eqa

;g=

3zEsEOgI

No('@

@N

O

rOo,

o)o)<)O

\.ooco@

+*

N-oF

o-v)('o

+;..,---;e

o voo.o'od

(!*cio ooooN

- r,N

ts.o;o d;o

+

lf)dooo

@c.{N

N\co

sos q)

N

FN

o)-(o(' O

clrol

- ol(,F

-coNo

o)-oi{ J)r)ooo

F

oro)f-ri() roN

9N

r (o@

('

ooooooooooo

.j do!)ood

ooo() $J)ooo

@N

9N

s*ss sssss

ci;;; d -;

(\l ;

N

cooo)ooo @

@(o(o

(r)(J@(o@

s ssssss ssss ssassO

-rF

--- C

i --- O

r-cle

?€^q8339"6d

E

E +

s f!

c :€,gs E

Er

t izzz

t :F

; 6E

gi 6€d3€

i E

SnaS

!"[:,sE

s :e::ie eEiE

ixE€;

e aaaaai_ 98 EA

Y_a;fiJ

s ggpgpp EE

IF 9;i;;

= 333933 E

iti 39p,r6

s asss*s?

..,t<)!J(\N

od

;-r;;.:

- e3Y

8gE;;.j

8c't

sE:E

O:J

9t3i1

B.n<

+

o F

o99 I

9+

tl5ab

€ €6

,:fI\9

I :E

i

Yr63a

E

P5e

en 9

oE:\!

F

-CO

O

-!,9,9?

- -*z

zt e

y|-'-'4"^":;,;-oE

ftEc

SE

SE

i9i39 3

3=2d

=9=

z;Z;=

Z

cz

<99<

9;99;<

;9<

E

=E

E=

H=

FK

;=;F

=

FLLrLrrrr

L! L! L! t! r!

r! r!

r! L!

I

-doc,t N

oi;oc!Nd.,(o

; (.i;-

ci

3S93 E

e3SS

5b3hL. o (.io

i+;qi+

.i6 N

corc)N

oN.)$oo('l

LDN

Lo; co!-olco6ooco

u:o(!o c) {

..t N {'

c.t od i oo'

c'i

8EE

3 8E888E

EE

8!i.o

'r ot u1 rtdo

!,] !) ddd

s*ss sfasssass

o@@

- oN

co'/){\toNe

;;;; -

ci;; -;;;

nl

;; ;;ri

o!1 (o()

3

ssss $ss*s$>

es*;-N

ni od;;;---N

-tEBI3

d(4Npr5?E

3ulad

tri=!5:tro=l-oNtro

dX.{

uJ t (.)

:<:*!!

zQH

oIr

zP6-aau'

=?

3 = =

E*E

EN

.

d z3f

F.

E+xac!

s

ox

_ F

:6sss->

! i

!!->>

>E

i 3 r

a?Anafi

i^ =

i P

ES

igEi

: 5 i,6eeq3

- =

:

>J:-:--H

e ) 2

';Fssg

g E n seiiis

5

t"'illI[ aItsfi il€l slilgl-l !

qou' n r)@

(ooio F

.ooorF()

\

EgE

8SF

88e S

i 3 3 5 ? fi ; 3 $ R :

R 3 R

I 3;.i;

- N

sc.i Y

--^i -

R38N

8S;e5 S

:RS

3n83833{b3P83 83R

3x€R

EE

bES

: E

S 5 I S

3 p 3 6 X € S

3 b b € ; ;3R

?F

$ oro!rc\ N

No

-ooo \

@orfr@

r'-ooo;N

Nooi

o c't d co o c) o {

N (D

r. d o 6i ol o) qr €.o$q

.j--.-.

$r38833e5 88888888888888888 8888

N$d.jaN

ci .r-

o a o o o a e e e e a i i F

p 9 R

ER

pibci.666N

l,.:o - o o o - o 5 d ts 6 - 6 6 6 6 6 25 6b56

-..i..ictooo.)o) o o o o o ,r' o rt !l l) r) o o !) ci o o

oooo

---...

ssss.€ssas s a s s s s s a s s s s a s s s f

.*s*sooooooooo

o o o o o o o o o o o o o o o o o oooo

RR

fR33:33

3 g I E ; P

R C

I 3 S E

3 I E $ I

SX

RS

------dcr^ ooooa-----odo----

N(o@

F..oN

OtO

OS

(o o'n(o\

.---

(, o o o o o o o o N o o o o o o

oocooooooo

Fosol)0q'0()9000()0

-6ooo@N

('co -ctci!,(D

oGi

-g,- o6

oo|J)oR

3;RR

9;36 : I +

3 t 6 h S 6 R

3 q [ 3 R D

g 85S

P-nN

-Nov.tN

octco.:to

No

d'jrJJ).o.o^io o o

sroNN

NoN

(rr.rNco(o-

91@t@

9\<

t(oNloF

(ON

(ot--

.j; ;

; -

6eelEqB

ES

38RE

33333*s+bB

R88 83$3

oN6iciF

-dcito3E

3RP

e69B e33|l*

SS

tS?8h.^"

ftR5:

ri .j

.j ;*N

{,":c.i..i

o)oootooo N

F\\

QA

QQ

QQ

QC

!Q

! C

! A A

A =

S !! Q

S N

\ Q

!! I E

!! =

Q\=

$u)@|r'@

Lr)\o(r)() (o(o@

(oro (o(o(o@

(oNN

(oN

NN

)i

^ 4 dd

3

=s3$

s?!!!*t?r !i--;€-E€;;l€,;,9

?nTP

!ssssEE

s3 II;Es*E

ssEggs;E

3! F

;E=

zzzzz d !zz

- ii = r r =

==

=: I I =

-; r I

853,*

ssssss

sssssssss s s s s f s s s $ s s s s s s s *

ssssn () () !o n o o o o o a (' rri !t o o f)

oooo

-*N---{oe

o o o o o - -

; -

- -

o o o - -

- ooocl

=E9IEE9RoII

aE

6(/)N?H

Eo!JA?E

3

;<a

*Ee

0=E

N=

:tro2E

**FouJtrco

Ff<-zOu

=E

YI

t2 u)

=2

v3; -:!*>

9'-

DUPAGE WATER COMMISSION

ELMHURST, ILLINOIS

TREASURER'S REPORT

STATEMENT OF CASH FLOWS

For the Period from May 1,, 2Ot6 to April 30, 2017

CASH FLOWS FROM OPERATING ACTIVITIES

Cash received from customers

Cash payments to su ppliers

Cash payments to employees

Net cash from operating activities

CASH FLOWS FROM NONCAPITAL

FINANCING ACTIVITIES

Cash received from sales taxes

Cash received/paid from long term loans

Cash payments for net pension activityNet cash from noncapital financing activities

CASH FLOWS FROM CAPITAL AND

RELATED FINANCING ACTIVITIES

Irt"*rt p"'dPrincipa I Paid

Construction and purchase of capital assets

Net cash from capital and related financing activities

CASH FLOWS FROM INVESTING ACTIVITIES

lnvestment income

Net cash from investins activities

Net Increase {Decrease) in cash and investments

CASH AND INVESTMENTS, MAY 1, 2016

CASH AND INVESTMENTS, APRIL 30, 2017

s 140,3s8,s13(108,93s,887)

12,906,371)28,5!6,255

L2,546,754(12,981,s89)

(206,891)

1641,,726)

(43)

(3,240)

(3,874,383)

(3,877,666)

L,648,545I,648,545

25,645,408

136,290,16r

s 161,93s,s69

11

to

3gF

v-tr

OR

oro

!?l

F.O

oz

N

o

IJ E

F'|!

Z 'l-

O6IF

F!dr3{rt

r0 a9

6ticidi(tF

c)€@

_ t a-

€-t.

N

rYt

NN

e e

6 a

o

2P9rq.o

o

.o \t !r

F

rl|) ct

NG

)(\ {

C,

O)

d, (\ \t

(o F

l.-

ct+dF

:od(\(Y

)FN

^{ !o-

-- F

-t-O

tN({

(gN-(t

g e

.&

&

to

N(\|

ofL! r!hoo6r€E

Eg

o=t

fi:Et ieE

ooo o

00 an

toNot

o <

. att

{t-4.- ()

Or

F.{.:dd.do(oN

{€-

(r- or-

.o-orotoro

tteG6g)

F._

F.

qJJ

atxaluF

?;RE

EO

ae!9ioE'

c)S

€e.)L>|t=

^E

U'E

;es(r:=,9gxcq:

F F

ls E e

E,

-gbb 3

E

Ii

Eak

c I

64

9e&

E

X

(J.;

.= a:

_o 6

; 6.H

Eq

0*E

E' =

t

fr o'i8 -9 6 3

uJ.e<

rdl(J6r1r

ooazutvqJouJ+Itt{x,=Eo5

IUJ

u.ozEEIJJo-

ta9{iiofi>*#iF

p6-. 1=

;s;<

Fc)

-2()!JFollJd)F

DUPAGE WATER COMMIS$IONINTEROFFICE MEMORANDUM

TO: Chairman and Commissioners

FROM: Bill Fates, Treasurer

DATE: June 6,2017

SUBJEGT: TREASURER'S REPORT - May 31,2017

I am pleased to report that I have reviewed and approved alljournal entries and bank reconciliations forthe month of May. I have also reviewed the monthly financial statements and budget status reports, and

found them to be in order.

Summarv of Gash & Investments (Paqe 4)1 , Cash and investments totaled $163.1 million at May 31st, an increase of $1 .2 million compared to

the previous month.

2. The balance in the BMO Harris checking account was $16.6 million at May 31st, a decrease ofapproximately $1 ,1 million compared to the $17 .7 million repofted last month,

3, The BMO Harris money market accounts had $12,0 million at month-end, a decrease of $3,0million from the previous month due to a transfer of funds from the BMO accounts to the GeneralFund of $5,0 million during the month,

4. During the month of May, the lllT money market accounts increased by approximately $8.6million from the prior month. The Commission transferred $5.0 million form the BMO accountsand received proceeds from the maturity of $3,2 million in Cedificates of Deposits.

5. ln May, our holdings of U.S, Treasury increased by $1,0 million, and Certificates of Deposit andU.S. Agency investments decreased by approximately $3.2 million and $0,8 million, respectively.

6, The current holdings of cash and investments are in compliance with the approved investmentpolicy.

7. For the one month ended May 31 ,2017, the Commission's cash and investments increased a

total of $1.2 million.

. The Operating & Maintenance Account decreased by $a.1 million, for an ending balance of$28'6 million.

r The General Account increased by $5.0 million, for an ending balance ol $24.7 million.

r The Sales Tax Account remained unchanged at $275,

. The Capital Reserve Fund increased $32,250 for a balance of $29.9 million,

r The Operating Reserve Account increased $158,595 for a balance of $67.4 million.

1

r The Long-Term Capital Reserve Account increased by $44,557 for a balance of $12.5 million.

The following table presents a summary of the changes in cash position by account.

Cash and Investments by Account

AccountBalance

4t30t2017Balance

5t31t2017lncrease

(Decrease)

Ooerations & Maintenance $32,727,195 $28,611,021 $r4.1 16.1 74)

GeneralAccount 19,715,309 24,747,753 5,032,443Sales Tax 275 275Operatinq Reserve 67.223.928 67.382.523 158,595

Canital Reserve 29.853.221 29.885.471 32,250Lonq-Term Cap. Reserve 12.415.641 12,460,198 44,557

Total Cash & lnvestments $161,935,569 $163,087,24{ $1,151,671

Schedule of Investments (Paqes 5-10)1. The average yield to maturity on the Commission's investments was 1.24o/o, a slight increase

from the prior month average yield to maturity of 1.234/0.

?. The portfolio is showing estimated unrealized losses of $389,566 at May 31 , 2017, compared to

$541 ,?39 in unrealized losses at April 30, 2017,

3. The amortized cost of our investments was $146,5 million at May 31*t, en increase of $2,3 millionfrom the previous month.

Statement of Cash Flows (Paqe 11)1. The statement of cash flows shows a breakdown of the $1,2 million increase in cash and

investments for the fiscal year,

2. Operating activities increased cash by $0.9 million.

3. Approximately $29,000 of sales tax revenue was received'

4. Capital Assets purchased were immaterial year-to-date,

5, Cash flow from investment activity generated $237,455,

Reserve Analvsis (Paqe 12)1. The reserve analysis report shows the commission has met or exceeded all recommended

reserve balances at May 315t, except for the Capital Reserve. The Capital Reserve is expected tobe fully funded within a couple of months. Upon approval from the Board, funds will be

transferred from the General Account to meet the current year target. The significant increase in

the target is related to the Village of Baftlett project.

2. The Operating and Maintenance Account was $?8.6 million which is a balance currently sufficientenough to cover an estimated 80 days of normal operation and maintenance costs,

3, The Operating Reserve account was $67.4 million which is approximately 189 days, this amountmeets the minimum balance per the reserve policy,

Respectfully submitted,

3

Bill Fates, CPTreasurer

DU PAGE WATER COMMISSIONTREASURER'S REPORTSUMMARY OF CASH AND INVESTMENTSMay 31, 2017

FUNDS CONSIST OF:

PETTY CASHCASH AT HARRIS BANK

TOTAL CASH

IIIT MONEY MARKET FUNDSBMO HARRIS MONEY MARKET FUNDSU S. TREASURY INVFSTMENTSU. S. AGENCY INVESTMENTSMUNICIPAL BONDSCOMMERCIAL PAPERASS ET BACKED S EC/COLTATERALIZED MORTGAG E OB LIG

CERTIFICATES OF DEPOSIT

May 31 , 201 7 April 30, 2017 rNcR. - (DECR.)

1,200.0016,561,385.82

1,?00 0017,688,568.97

000(1,1?7,183.15)

16,562.585.8? 17.689.768.97 (1,127,183.15)

16,292,S87.8012,048,435.1 I34,1 82,066.9355,388,251.246,226,786.52

15,761 ,976.30

248,000.00

7,700,413.7815,037,4?5,9233,1 34,976.8256,1 86,444.23

6,402,1 56.5915,745,048.986,567,334.1 7

3,472,000.00

8,592,1 74.02(2,988,9e0.74)

1 ,047,090.1 1

(798,192.99)(175,370.07)

16,927.32(190,783.44)

(3,2?4,000.00)

TOTAL INVESTMENTS 146.524.654.70 144,245,800.49 2,278,854.21

TOTAL CASH AND INVESTMENTS 163,087,240.52== = = = = = = = = = = = = = -- = =

May 31, 2017

161,935,569.46

April30,2017

1,151 ,671.06

% CHANGE

IIIT MONEY MARKET FUNDSBMO HARRIS MONEY MARKET FUNDSU. S. TREASURY INVESTMENTSU. S. AGENCY INVESTMENTSMUNICIPAL BONDSCOMMERCIAL PAPERASSET BACKED SEC/COLLATERALIZED MORTGAGE OBLIGCERTIFICATES OF DEPOSIT

TOTAL INVESTMENTS

Note 1 - lnvestments are carried at amortized cost.

11.1o/o

8.2%23.3o/o

37.B%4.2o/o

10.8%4.4%0.28/o

5.3%1Q.4o/o

zJ-v-to39.0%4.4o/o

10,9%4.6%2.4o/o

111 6%.1S.9%

3.2o/o

-1 .4"/-2.70/o

0.1o/o

-2.9b/o

-92.9o/o

100.0% 100.0olo 1.6%

oar6rsIq

nNcrNrflsIoo

EoNE@qoh$-qNtsFNrFBflsniJ

onoooe e

o+o@

@o

oci6ici@

tsts o

6Fr0F

@

O6O

tFoO

O

n m

dts o

@

€gq@

@o@

q

FN

OO

I{ N

FO

tsOO

@rfl@

NO

@R

ts€SS

EN

TF

O@

F+

d*sie@

F E

EE

EE

q E

o ooooQ

o o

o ooooQ

Q

or

oooooo o

H pfiE

EH

f; fr

N

I_NN

-F

s ssssss s

o oooooQ

a

o ts@

n@Q

a q

o rrtsN

oN

@o

;;;;;; o

tsNEo

E@osi@4€sisnoi o ts

tsEeN

(f d

c)r

N

!_OO

F@

F

Ori

o dooosio

oO

O

tsO

NO

O-

O$_

F_

€_@_@

_s_o_\. o"

$ I

*gs88h s

o o

FN

oog{ N

N

rt -;***

NE{eeI,9oB

ts ts

tsrFrrr

r@

@tsoots

oO

O

O

OO

OT

T

NE

B

BE

EtstsE

Ets

ts @

@Q

d6d d

60F@

OO

o o

oroorr fl

O

O

NN

flNN

N

Qoo]g

)g IR

:€)RIR

*)R

!RH

H

X

XX

XX

X

Xtsi

Ei E

EIsE

EE

E

ci o

cicioooo o

raft R

doLvv: o

ffHE

},F =

F

FF

Z;;Y

d

rE

bEd55E

4

sE

>

>orpE

=

q

E Z

Z*E

+? 5

.E+

ooaooS

q

H €E

E,E

'TE

i T

s $i!{tsts;

F

FT

itE+

+-€ {

s|

=zE

EF

d o

ti=

E

OO

m@

F

Q

@

F

66-dPF

R

Fz4EooocoEFtro@aryNcEIRo4!!>tl{

6FE

-o{

s3iri -o

o16E

EoEocE

r

#EFX

tstT

EqtrtroE

,qi

'ic+t!

Ef

oN-1Ea{.ENEdoGEcoNE

ftE*

PH

5F

HH

E4ed0dqO

tr5E4

fi+a

tr5pE

OE

E*tr

d*+FooUNFirE{u

{!oso

otsoE

Q-dE

EF

EtP<

E6

EU{pJo{lzO

ufqo

U-OACE

-o66€n5ENJO

*

UFqs E

^:1:U

EO

!?EgN

tbE;

i9Ee

623=

9N@

OO

OO

ON

Nf

@O

AeN

q er@

+

sod(4N4Q

Q

eV4fld

adtoooNoroooN

@or@

ogr

orNF

ulrvoo rn@

gqojcjdr@

cjodjFd;dqoo-ts

ooo @

mao@

Errd

ci-rjci+O

dddN-O

N-rtsO

9@N

tsO

ON

N

@nQ

NO

-@O

e O

nON

tst

FO

FO

TtsO

@

-9@O

0

Ort

mS

N-O

tsEtts

ON

€ON

N

tsrt-c'a tsooi

@o

; ;s

jj 6cn

o .-

.;

s 38R

RE

8E3S

EE

p86fiBfi 8R

8 8888888R8 S

EE

FS

E E

ER

HF

EE

EH

FE

EH

HH

ilH

fi$H H

EE

EE

fiEH

E

PF

fiHH

S F

:M'H

.HF

HgH

gdH"B

ilEil'H

E F

HS

gHggS

igHF

HS

HS

SN

N

rrN-N

r-

o m

oom

f Q

ol , f!

, fllq\c'!cl

@

O

@O

-@@

O

r O

tsNrq

o o

o-Not

g, =

ioi-tiqol

O

OtN

td@9O

OF

O-O

@rq0

ON

€ O

OO

OO

OQ

NO

€N

Orn

s 6soesooootsfl@

oosNr

Noo

oooootsooo *om

@o

$ FH

FE

HH

EH

HE

HH

il[$EH

$H

H E

EE

gEE

E$E

frEH

fr$@

oN

@ciotN

se@@

oidd+oi.j

@+

.j cinon{t-c;do

-Eo@

-R

ES

83EE

888F88E

PS

eE F

8S P

S3P

Sf,E

S8 ggR

+S

; ;

sisi -

-jsi- c.i

- -

s egB

EE

8Eq88E

88E888 888 888888888 E

ssEE

N

RF

PQ

dFS

dEE

PR

FF

PR

R

EE

R

RR

RE

RE

RR

Q

gRE

RE

+

tststs68tststs6tstststsE888

EE

E

EE

E666E

EE

&

iFE

fidls

6ooociocidooooooooo ooo

oEonE

oood oo@

o@S

O

Orr9O

OtsF

@O

4tsQO

O0

OO

N

F@

Om

Nr-E

O

@N

r*eN

r@

OO

TtO

tsFN

OO

N-€O

O

tsnO

-rm-O

rOO

@

mf

N{q

* *

siN

-;-;N

;;

s S

SS

AS

SS

SS

SS

SS

SS

SS

;eS

S

SS

SS

S;€;eF

S

SsS

SS

o ooooooooooooooooo

aoa oQ

oQeaaaQ

ooQ

QQ

d @

t@{4-m

@N

otsN-o-@

@

a@m

F

qEe@

mqee

tsrqqq6

OO

6EO

Nm

NO

O@

NN

OF

@@

F

Fr

t@O

OF

N@

@sl

NN

@O

n6

; ;

; ;

; ;

; J

o o

; ;

- -

nj - -r

; ;

- .r

- ;

si sj - -

- -

o sj si oi oj

- ooF

@o$oooO

rroo{qo N

N@

€eQ

qr(Sq@

F

Or4O

SO

-0@q@

ts-@O

@@

44*SO

F

qE

QqqF

@A

qf q

IQQ

IQ@

o--NN

NO

O{qq4F

@@

r ts@

m

Eq@

rFqq0v

qnnap;;i;;;-;i----'-j;

'j .j

oo++

+

:e S

SS

SS

SS

SbeS

SS

SS

SS

S

SS

S

SS

SS

SS

SS

S

SS

SS

So

60060600000000000 000

No{oooooo

oooooo

NoodoN

otso40000noo oN

N

FoF

o@otsF

o ooooo

O

@O

O-ts@

OO

ON

OO

OO

NT

ts O

-@

f @

OO

-m@

rn O

FF

On

a ;;doi;dddN

;cisitrid;;; F

;; F

F;G

jGj;;cj;

ocjcjoo

Sefr-99t'E

tt$fr SfrS

ses Rsffi

sEsE

p.H$H

f;.8eHft E

*Hs H

$Eo+

@c'io+

eor'm-od

r oooooooor-F

rrrrrN

oo- @

@oooooo-

@tsooo

NN

NN

NN

NN

NN

NN

NN

N

--fl ---N

N

NN

rrfl

=

EE

FF

=fi8:B

FF

FF

+F

EE

tsts6

}='}'}=

'}==

=

==

==

=6

omS

OS

FO

ON

SO

oOO

ooO

-NO

oor-o-oO

o ooooO

E 3:E

BP

::E33333tP

EE

383 F

P83E

EP

83 FE

E85

ts @

enFd@

@@

@dr6d6rrr

66O

6666666SO

O

O466

- soqooof

r@tse-eQ

mef

N{E

@

Fnqeq@

qq rr@

rtsg

E+

e{eqq{SqS

qqSE

e{ E

EE

iqL{ryE

qEqE

qE

EE

E6

FdN

ddOdO

ts@rO

ON

Of

S

qOO

N

OO

OO

ON

f ts

N@

tsON

O

FO

FF

OO

OO

OO

OoF

TQ

oo O

oO

oOO

oooooO

OoO

oO

eozEoo0dt.9!FEoIo6oFIo.Ef{!!g{l{

?EccooddE

}E

Og

t fl€

+ $

sE

SE

dcE

Eg

ildE

Ez

E;.

ddE

EE

sEsE

,H*eF

E€ugE

EE

E*fE

EE

! o=oE

*

E gs#E

gs$s$$sss$ggg ?EE

Er?eE

E?E

E F

H*$i

; br.bbtsbbhbtsblbbbF

F us:

E,id*fE

T$*T

EiE

EE

€ *frfrfrdddER

dddddfrdd H4: E

f-^FF

!! eaR

.1+T

EE

eeeP#eE

SE

.E,E

,E,E

.E.E

+6E

n-.6i;;;SE

*ggE*

= bE

Ess+

ssssssggggg g#E E

ErsdE

sEE

rfrrr

RNoqEaoocEoeEc,iotit

trhrB

Ho

HE

8uf{'

vts+o=

ylutoF

=- Uo{UOF

gil

fi+s

F5=

troEE

Htr

{--FaooU

JNtrtrE

tsFE

Eo

EU6<U

IFO{

fzOu

f4ocrO

H

=H

n=6d@6

EE

6Jo-UEE

-:!H

FgN

EE

Er

LHF

;B

EiS

No€q_6

$mgF

No

ooots@00@

40@b4doodts6$!'fl6re

ootogo oF

otsoNotstsots@

rmQ

qr@avavN

aa

EH

HfrtrE

$E$H

+$$E

EF

HH

$HE

HH

EE

:EH

FfrH

;; -+

+-ci(l

o -N

eo,itseq{jr +

;{@N

gEB

PP

E E

EE

gEE

SP

9RE

SS

E:S

sSF

hEgH

gg 88

oicisi-d@

NsoooN

@oo@

Foq@

oF€F

eooeQqr

Qo

rroooo tsN

mtsts@

Fo@

ooofoe@g@

@@

@Q

ala @

9S

O@

fS@

ts@

-StsN

@O

tOt€N

NtsF

OF

@qm

VtsO

F

rO

FP

EH

Ffl flB

RF

RE

SR

HflH

flHggF

HH

FE

HE

HH

g fiH

;--j --

si -c,i----.

- .*

.- *;

R38386 8888888888888888888888888 88

S.iiqqA

!S

AA

AA

qAR

RR

RR

EC

ER

RE

ER

RC

FR

ER

R

RN

@O

rOO

O

OO

OO

OO

O ts ts ts ts ts ts ts E

E E

E E

E 15 E

E E

15 15 E E

r@ft$ted

cioooooooooosoooooooEo4ooo

ooo@

oodts ooooosoootso@

oQ00000tststsoN

N

ooF

FT

dON

6T

NO

NO

tOO

NT

NE

OO

@O

OT

tOO

OD

T

OO

FF

;;; fl

;N--;;;-;;"j;.j-

cjoj

:fl*s*** :F

*s:eFF

SS

SF

SS

SS

SS

SS

SS

SS

FS

S

SS

fiEE

EE

E E

ftftFR

CH

FfiE

Ef;E

HE

f;fiH$E

fiEE

EH

fifi

N@

NO

OO

@

O@

@@

O;ci;;;si

ci ci o cio o o -r;;;

ci; ci -

cio o;;;

- -

-; ;;

ssssss sssssssssssfsssssssssssss ss

HS

ES

HE

f;EE

8HF

ER

Rf88H

8RE

[[fl38fRR

E 88

@O

66FO

r@

@@

@@

@-@

OO

O-F

-6€@O

tsOO

--O

OO

--;;cir ood6ooo;;;;;;;;doo;;;;;;;

oo

6s@Fo@F@_

@flosNo_ioeNboEEs

cEE

fffls 888S8888888P

8888888F838S

R +

3rj dj a;r

doj d o

@ cirj

ajo qd

of + rj

@ o o o d qj @

e d d e @

* +

rjO

tStO

@

O9O

-tstsNtsO

NO

Ots-O

Vrq@

@*N

@N

E

@E

s { o 6 N

o $ o o

@ o

@ @

_N_r_F

_f_ts_F_\.q.q.e?.q

Lq.c?.q.1\o" e1c!

gES

sSb E

BT

S$E

EE

gEB

.EB

FgS

hEE

Fflf,E

g: S

B+

TF

SO

N

tON

@N

@O

NO

NO

N@

OO

SnO

ts{OO

OS

- O

O---

** fl

;d;-----; ;

;; J--

--;

=F

6-6-fi'6- r

ro 6'or F

qo qt o q 6rpF

- or

lpo^eE

wqoq

e@@

rqrer@tsts@

oe-T--o$6S

HE

R

Eb

frH:H

HH

HH

EE

H+

SE

ilPE

H$F

EF

FH

flHh$frH

F

HH

- ==

=dg

-J- c'f

cid- --

ro- . -,

- E

ts

Ho

bB'

^?8 sB

tE

++

+E

H+

$+t ssgs$s s# #

EF

TH

H$E

E $88

*T

*T,B

s* HiE

=H

EgE

EE

$ EH

E€ *

ssn $H

$$gHE

$ $f$#F$g$F

E$E

$*$$$$*FE

$#FE

gf;

pfooflooEo&tfro!J;oI

HH

fiffHF

HH

$$$H+

HH

HH

H$F

FE

F$$$H

HH

HF

E

E

o'gxEEaEE.9@E

@@

OO

F-

@@

@O

OF

@F

€OO

OO

OO

OO

OO

OO

AF

FN

tsts

-rrFdN

N

NN

NN

--

F:=

:=}

bEbF

FF

hbFbbbB

ts=bF

bbtsEts+

+B

tsE

OO

OO

OO

O

NqO

oOr-N

NN

N-N

N-oO

-NN

N--O

N

-B

E.tE

EE

E E

BB

BB

FF

F=

EE

BE

tstsEE

B=

iEB

EE

E

F=

s6s$6o 6o@

oo66oqooo@oo0@

66$tsts@ots

rr

HF

HgR

R R

RR

iEE

FE

RE

RE

FH

EF

RE

EE

RF

EF

E E

FE

3:PE

b E

EE

Et388=

58388t8E3:E

83tEE

88

rz4EtrEtr.9.!E9TN-o,gEE{NEtdf{

donP

HS

FH

fid=

vU@dU

HF

5*

f;+=

H=

:troEY

OE

ltL

6uHFtrE{q

E=

rs

nts;qF#trx;$=FdEpkE

oEU@S

Po{dof,IzO

uf{crtrq

zH^=6d60E^

E=

NJ

trul-6$ E **

ilHE

RH

hEE

i9E*

dEE

E

FO

@m

@r@

NqedqN

dtsON

@-S

qtsmO

gO

O--

O@

OO

OT

O

OF

O@

tO

@{{tN

Nm

e@F

-ON

OqN

4OfiO

t@N

-n O

N@

N

6OA

OO

O

OrF

OO

hBfrH

**EP

HF

HE

BH

HH

eFE

$H$$F

Eg F

HH

RH

:Hfi8F

EffiE

EH

O

rFF

rFO

qdr@F

eEqrrgF

F@

mS

oomN

O

oo Q

oOnoO

o N

oo@F

@

Qq@

OrQ

@rN

qFqrN

flrm@

N@

NO

@S

NO

O

On

OO

ON

OO

O

O--N

N

E H

FE

fr$HE

HH

fiHF

HF

HftF

HF

HF

Hf;M

;E

HfrH

EE

EH

gEE

HfifiR

FE

E

PE

S T

HS

E fl+

flEE

S B

P68E

EE

-8ET

9R g+

9 EB

?IIRB

8 6EF

i'3H

o oooooooooooooooQ

oooooooooo ooo

ooooooo N

NoF

r@

eooQ

oooaaooooooooooooooooo ooo

ooooooo oN

rNd

@

oo o o o o oo

o o cj c; ci o o o o o ci ci cidcj o dd

i i;

a; a;;;

@

ooooooooooooeoooooooooooHH

H

FiH

H

HF

lF1F

1F1R

flrtlH

tso

ooooooooooooooooooooooootsts tststs

5tstsAtsE

A

H;H

H:

B 888838P

4fl8s8R88s88sP

P88889

?BE

sAedR

sC hR

SE

RF

!_F}N

NF

)qN

OT

NV

ON

N

FF

N

ON

FF

ssssass sssss8888888 flE

R8B

@F

@@

NN

O

NN

OdS

;d;-sisi- sisisisisi

E6f;eP

8E 96S

P8

{ts@ooo9

$o660*.j-

o rt++

+

ssssoooo-@

No

{vrl)OO

Ottt!O

$NS

OO

SS

OO

OdF

FS

@oo

NF

neq@

ErrE

qQQ

Qgm

ts@F

O4E

qqqOO

OO

-ts@

emQ

Nflfl@

@rF

ooFF

NN

omm

m{E

@ooo

tsom-j

- -

- -

.j .j

,j -

.j oj d

ci 6i Gi 6i sj oi oj o,i N

si s o

; ;

)R IR

)F :€ rR

)F )R

r€ rR :e }3 lP

lg )g )R :g :e lg lS

:g IR lg

o o

o b

o o

b b

e' b er -) -l

o el L) o

c, b -r -r

Er

NN

QS

@O

N€9rN

m-O

tts@N

-4@n

@@

ooos@ro@

@oN

EN

tNE

ooqto

o -

- ;

; -

- 6i;

; ;6i

.6i ;6i

; ;

;; d

osonm

frHfr$f;

888e888 E3fiE

SddsF

O60

Nm

{@4

aoa€ooo @

{N@

NO

OO

OO

OO

O

-EO

NE

83ES

88 63EE

g

ts@O

tsNF

mO

NO

O$-@

@O

$OF

qOO

tsN@

S

-fl@,

qqqqlqqqqqc!q:q\qqqqq:q:qcqoo sso

' d@

f$FF

ts@m

Nntm

NttsN

osmo-oooim

si€ts

N@

O@

N@

NS

*NT

OO

OO

tsNO

@@

@N

mO

€f n@

N@

O O

N @

O q

q n

O @

ts m O

@ -

- @

m @

e vr

n ts ts

F

q r-q

o F

ts-gsNN

oo--No-ts@

o-sN@

oNtsN

o -N

@o

NN

EO

NtO

ON

OO

6000ttTO

OtE

OE

EO

6t6

E 58S

3FE

E99E

E8B

$fiHfiE

E83gB

S8S

S

E:

O

d@O

O@

toFN

NdO

@O

OS

TdO

vFO

OO

ON

rE

Oo

+o€eoc.io-oqo@

Food-ooid-ots9sisi

oooO

O

tsOE

rN@

@rqtsO

OF

€ts@O

@O

€OO

S-N

O

qg--N

NN

ON

N

Orrf

O-N

--N

O

N-F

oo@8tsts

eoo

ooo

sFs

RR

*E

iri il;

@O

OO

OO

- @

tsOQ

Or--N

NN

N

NN

OO

oqggQ

{qq A

eqQQ

FE

P8888

P3E

3:o@

oo6o6 66s@

@rq@

mF

qt tsr@

tsts

333833b 38833

ts m

6ooOoF

FN

NqN

dddSS

dddtqqSqq

NN

NN

NN

NN

NN

NN

NN

NdN

NN

NN

NN

NE

E

E E

: E

E =

E:

= B

6 F B

E F

6'n 6 h b6E

668@

999O

--OrrrF

-On@

€----N4@

4r -

o Q

oo*Fr**ooo-aooo----oooo-F

r dds66666666erer@

@@

r@@

ts@@

@@

r m

ntOF

f @

NO

O@

t-f O

-n@O

@S

@@

O@

rfl

r-flON

-N-P

ON

AA

NO

AO

NO

No-N

OoN

.N

.N.} +

N A

= B

:fr d N

d N +

F S

ft B E

fiE fi B

fiF

6o

ooooo-oo-oo-oooo-o-orooooo

sssooo-F

@

sssssoooooooooo

s

sssssssom

ootooF

@tsF

OS

O@

r@tsN

Nn

;6i;dsitri;

s s s s a s s s s s s s s s s $ s s s s s s s s s s s

o n@

ooosoooooooo@ooooooo6doo

o N

NN

OO

NO

tsOO

NN

OO

Fts400400tsN

S6

o @

O-tsoO

o@so@

0oFdorF

FfrS

SF

NN

o o o;;

d; d -;;;

*; * *;

ci sisisi tri si oi oiru

ru

E=EcotrCo6.gFFa6qoIp535s!oz{fE

#EH

sEtrEsE

&"o

cFop!

E

*-E E

E of;

r. dE

.d

i E

>^o

fr :t.H

c( fitr

$ E

{; EE

sEr$F

E

TsS

;f8=S

8' o

E sg$gs$$g#g$sgssg$gsg$g$s$g

E$H

+E

HE

EeE

$Hfr$H

; F

FF

tsbbFbbbbbebbblbbbbbbbbb

U=

* .6pt,F

f;E,F

llT

Et

- f

f J

f f

f I

f f

J i

J I5I

-L 6

i F

d

tr xua

Q

Q

o u

o

E frfrfrfrfrfrfrfrnfrfttrs8ffsnrs8G

rsrH6

g;A isf efrg 4445q

E

E E

P E

E E

E E

E E

E E

P E

P P

E E

E E

E E

8 EI

FF

FF

FF

FF

FF

FF

FF

FF

FF

FT

TT

TT

FF

]dJ=

,;IiiNI:6>

ts +

+E

EE

= 333333333333E

88E8833333333

€=g E

JE=

;3= F

fEE

F

ooNH4EEqNoEt5EcJr"sFB

ilianP

H:

5pPH

=Eu6dr

Od

5L

fi+c

P5J

troEE

Htr

{*-FooIJJNFtrE{r

a=il{

YF

-E

qEF

E*

lE6

EU@SH

O{

do:IzIFfq

q

zH6=aa@@

Ea

;7.F

f

rl6{FBfr=

x9]E

.EN

HE

esliE

*6z?-E

OO

OO

Sts

OtO

- O

OO

tsO

tstsOS

n O

@O

{ eO

O-

$flRs+

5 SU

eE 3883

fl @

NF

O

@N

O

NqN

_j o_

_ _d_

qNoN

qqflE flP

E88E

EsE

rroN

oF4eF

@A

F€

FO

-O

OO

@N

TO

EN

Dro

rr :q.o_q.olqN

FO

rr

OF

NO

O

OO

OO

OO

OO

oood N

toooonomom

@N

@

@qqN

rrs)r60t0

0rof to@

@o

$_e_ts_o_ m

_-_q q.q

q \.l:.fl?

sv@o

rsFs$N

mts@

Fdtsotsofoo

F

S N

t {

O r_N

t

N

F@

NN

O

@O

@O

@O

SO

oNm

t 66F

rtoo6.rdi+

Gi

ditri;oicisi;oo6$S

6 S

eO9O

O-@

@N

osv ddots

sNqt

Nfl

oFoF

o$oso40de

oErt

-oNf

oof @

oridciG

i r;o+

6i+odci

OF

Fd

$F$O

OO

ts-NF

ON

v o$O

-@rO

mO

n{@oi

oqmN

qflaHa

tEE

r N

OE

OF

OqO

Or

f N

s{mf-N

{NN

8883 888888888;^i

^; ;;;;;;;;

!i t] !i Pt

H lc !t !d H

rd !d H F

tsHH

U

E5E

5tsEE

ET

5E15

oortoi dosoooooo

StsF

r N

OF

OtsO

nO-

r qN

tf O

rNS

frN

SS

SS

F

FF

SF

FF

SF

oooo oooooooQ

oO

d@F

Q

N@

o$$ots-N

O@

ts O

OtsO

rON

ON

;;;; ;d;;F

FF

Ffl

Om

Nts

OO

nO-O

SO

O@

N{S

Q

O{N

S-O

FE

n€o_€_ m

tn@ts€s_ts-fl

FF

d

O

tsSO

NO

- O

OO

O

OO

OO

o E

t@E

o@

oooo ooo@

4 00@

@or

@$oo

oooNfi

EE

RS

ES

S6[S

888tr

i F

ts€-o+

F-m

+

ooooO

N

ts{OO

O

OO

-O

OO

OO

{ O

\.-t4O

nNtN

@

@m

o94FO

O

qrmE

O

, v.o1\g\u?

u?e?q': ,

, ,

c€qooo@

oe€ts

EO

fO@

O-

NtsnF

tst-@ts-

nSf

fl-

tso,sNFdoFo@ciqtrNso@

E E

qEqE

q qqqE eqeq

n -O

{@F

@

-O@

F

OO

Ots

@

oNotststs

@qoo

QooN

o E

ooNoo

toro oooo

b sF

+ s8E

' EsP

S 3 888

! O

rFv6O

6N

tN

__6i6c5-j-

o oooooo

oooo oooo

o oooooo

oooo oooo

.; ;iiii;

ii;i iai;

H

XE

XX

XX

X

XX

X

XX

EX

fi 6E

EE

E6

EE

EE

E

EE

5Ets

44000a oao4

0aoo&

rE

6000 00N

o oooo

t ots"-ql.@

q @

NfN

@

@m

s ssssss sFss ssss

o oooooo

oooo oooo

o @

0Ntsoo

nNo@

oo@

oO

O

t6OE

E

O---

ON

-No

;; -;;;

ci;;; ;;6i

F

s sF

ssss sless

sss$Q

oF

Q666

S6eq

Oem

OS

EE

FF

SH

EE

EP

ER

PE

o ;;;;;;

d;;; ;;si

-

{ON

N

Oe-@

f @

tst N

ooo{{rF

-O

ts@

F

oooqn@ofram

o;;;

F

OO

OqO

O

6OO

O

r4OO

ON

NN

- oororr

oNoo

-f -o

E $F

FH

Hfi F

EE

H E

HF

;O

O

FO

OO

O

OF

OO

F

OO

O

ts o@

FF

FF

O

O@

6 O

@O

Ot

i==

{==

i{=

[ =

r[=E

iEH

EiS

TE

qi EF

E€

n -N

-NO

0 qO

qO

NqO

Oo

rroooo oroo

oooo

@s_EtEEopoF,9ots

?4H

EE

Esr

PE

rE

e r

€EE

€gS

.H E

#S

tszE

z *F

F

9HH

E €q{f

c F

9gE 8:tg

E H

fif;EE

E H

HE

H sF

EE

E zz22z2

Je*sp* #E<

+F

FF

FF

SF

;fiHi $E

E$

E E

ii u$Eu E

?E? iE

:T* 4A

AE

AE

E#c# U

E?E

8flx5?

H

-E

E+

. .E

E

EH

H. g $E

$

9srF

E E

Eq srl

Eo

g trrr

E

F

g o

oET

.F.E

il 6 3AZ

^ZE

. H

HiiH

sei$sg$$g $

#EE

H E

9EE

.;;dEZ

*

sEH

s EqH

EesqE

g E

=E

'F=

EE

$5EE

E$E

s"

OO

FN

666O

oOF

c,llD

=[ts

Er{{{=

$ss-tstsO

-€fS{

OA

oO

NoN

-NN

-ON

:6ftE

fiAIN

AA

E+

+O

OO

O

OO

FO

OO

OO

O

nnoo q@

oq@€@

tso=

=[=

E

E=

Ei=

=iE

EE

SS

EE

EE

SE

iEE

-O-O

S

@N

n@O

ts$f--oo

oo-oo-ooo

;€:F:P

:e l€l?}e:e:F

:€:t:F:e

6riotuh 6n16a)a)e6nrtrJ

EE

P6

EflS

ES

ES

ES

;; si si

o d;;; .;;

dEofEEoooNcqeeodqssBt;J!J.gg

oo16Eoodo4EInI@oqtsH,g5$oaE

ilinrP

,t* F6F

PH

?8Ua=[{

iqE-uac}E

U6{UT(.)

(JFgE

ft;aF

5=H

OE

96UE

FL

6ooUNtrE{

Ftr|!F

/{

Eo

Eu@gpH

Ef,czO

uB

#U-(JE

CE

3q@90E

461o*EUE

!E

r*EH

EE

NV

EE

iiH

Eh

623ts

Eoo@_

oN

I€q_r

bRIqqsqE

q qFffiE

rER

sHE

E+

h8F*F

NO

-nN@

tsO-

NO

$FN

OF

SN

OS

OO

q$dOooooD

qtsoo @

o@floo@

ooNN

d@oorts

F9N

NoN

ots @

O$ts@

ON

@@

d@O

FN

O66

-si-- -oom

-ositri+;6i;

msNqoo€tr,

eTro_

oq_EoNNoErIoNsooqE

oooooNnN

@-

s

-mN

OqO

@O

ts O

OO

OO

OO

OO

ON

OO

OO

OO

O

O@

mr-qO

m-O

On

O-O

qOO

OO

OnS

OO

OO

OO

O

Ord

@oooof

r6@

-d-BR

eEE

PS

EhS

EH

R*

aosoR

ffi$RlE

+E

h :P

$*..oNoN

-o*---S

EE

SS

E H

N'F

'FS

trSH

SF

PH

g$.Hfi.$.F

E.B

F$.P

PE

fl H

$ fl

@9O

@F

AqN

- m

@€tsO

Otsm

OO

NtsO

S4O

N

eON

roqooq@

@@

f N

m@

ootso-oe$m$roF

O

OO

dd8H

8gS8F

RE

flPE

frSE

Of;frE

ES

$3fr9S E

PE

S@

o@F

eNtsF

o +

o@N

Fo

d$4Fts6

f 6{oo

f e#

m

F

o $dN

d

SO

eSA

eFF

d r-etsoor@

oootsoo4oN

OO

OO

rqOO

OnO

@r

rF@

tsON

nOO

@O

@S

TO

FO

O

OO

O

H$H

$H$E

HE

EE

gEF

HH

$EffE

HE

EH

EE

HflH

Fd--qooF

see o+

o€otooiscicfGi€oooo@

d@

ss@

QN

Orqts@

O

4@{@

$tsOntsN

Oq9ts$S

O

OO

OO

FN

FF

N

mF

qrreS

f_@N

_q_Or_Q

tse_tsFr_

OS

Fr

;Eh8b+

RE

e 88888888888888888 8B8B

=s98S

8RE

+

8888SS

g888883RR

go oooo

eNrov-aeo

eeotttttttttEE

EE

E

88884--N

eogmeq

oFoooQ

ooo4000dooo oooo

@aN

q@qF

@o

F@

4tsFro0tsN

NnoF

4so oooo

FN

FF

N

oF

{rEF

*:*::..:_*ts;@_tsts:_

o6€6

aEaaaaaaa F

FE

€E€sF

Fsss*ssssss ssss

888888Re8

EE

goooeooaooooooo oooo

NN

FN

oor6o 6o*E

EF

R338U

3335SS

S

HR

g.;;;

-; ci c; si

o o

o d

cj;;;;; o

cj cj;;;; ;;

* j

({)14OQ

r$4Qq

$!la?o)4(}r$EO

qf ooom

on @

o4@H

Efi3f$S

E$

SB

SS

SB

gES

EH

FR

ES

EE

O6:P

--€@

6OoO

99r 66dddS

OooS

ooooooo rtsrr

rTN

Nfr

FF

T

.F---N

NE

i==

==

=6=

dB

FF

=bdbtsblbhE

bbb E

NE

E999O

9OO

NO

N

NO

OO

--NN

-NF

ON

NN

^'E

EE

EE

EE

SS

EE

EE

PP

E=

EE

BE

EH

HH

H

EE

FF

@e@

4@oE

oo ooooo666oo666d@

rts @

tsFts

bblEbtsF

ts: :b

FF

trFc'rD

;FN

;6dE

EE

HE

ftEF

gflES

Sg

NS

ggE

EE

=B

FB

EE

BB

EB

BE

FE

BE

BE

EE

FE

E F

BilE

Ftt

\tlo!!sii@

iiF

ii-iieii

\liEil

q!!e.

llip iiqiiF

ii#ii

[email protected]

qltJ+

.^ uF

xxx0

.b E

E

E:::E

r s ? ;iflflflft

# =

* frH

$$$E+

:

5 iE

qqe3s

E

x rf,i::h

g :

i ra

tu 6 6 oiE

F ;

EE

##s:#

g [j

oE?T

q->

F

J

OO

O--.

l.ll

IEil g

IfiII S

lrll el*ll

.9ssssss@

OO

FF

do@

NN

{soa;--:;

sssssssss ssssssssssssFssss

ssssffigftB

gsg+g

gf o444o4oss66qodo

ooooqqr?oq\qqq"l

oqoqqqEE

*HiF

H:S

BE

E88H

8888-;6i;;;qcj{

ooood**;-;-cicici;;- O

ooo

nz=atrE.s,gEoEo6+oIItr{!!f5(.'

E

raE

F>

;

88 4*

-99 qri

FF

s

ss .9e

;Efi'

?? E

EE

€E ,

SE

fi#E

E f;r **.q*$*

;; €E

EE

EE

EE

E g =

E{E

f+s$sE

sEE

#ssE$g$g

+E

'EE

**:+=

EE

E$E

F=

+E

Eg=

E

EF

f;

qo

--AH

a=tr-

frE;$E

HS

EP

==

+no

o Xlno

HH

--r A

,Frr

o -

hoo@

@N

NN

A

;NN

uu o

o avt-.1

6 6

Hfr H

H $$E

H H

@@

@Q

A:64@

ggEE

EE

'H#S

zzzz z

d Yzz

oftrcONoEoouEoO

trine?H

FoP

{H

EEw{uYg

ft;sF

5ftroEE

Htr

4-*

artrFe.E{uE

=[{

nEq

HE

EF

EF;xUa$PO{

trolczQ

U;$r

zPadb6*n*FOJ

al-b4FE

Z *-

!HE

PN

YI;E

-JiH

Pr

ofSE

DUPAG E WATER COM M ISSION

ELMHURST, ILLINOIS

TREASURER'5 REPORT

STATEMENT OF CASH FLOWS

For the Period from May I,2OI7 to May 31., Z0I7

CASH FLOWS FROM OPERATING ACTIVITIES

Cash received from customers

Cash payments to suppliers

Cash payments to employees

Net cash from operating activities

CASH FLOWS FROM NONCAPITAL

FINANCING ACTIVITIES

Cash received from sales taxes

Cash received/paid from long term loans

Cash payments for net pension activityNet cash from noncapitalfinancing activities

CASH FLOWS FROM CAPITAL AND

RETATED FTNANCTNG AgTTVTTIES

Interest paid

Principal Paid

Construction and purchase of capital assets

Net cash from capital and related financing activities

CASH FLOWS FROM INVESTING ACTIVITIES

Investment income

Net cash from investing activities

Net Increase (Decrease) in cash and investments

CASH AND INVESTMENTS, MAY t,ZOT7

CASH AND INVESTMENTS, MAY 3I,2OI7

9,056,750(7,9r3,7r5)

(229,041)

913,994

29,198(28,861)

0

337

0n

(114)

(114)

237,455237,455

r,r5r,67z

161,935,569

$ 163,087,24r

11

o

2 LF

@F

OtaO

i- ro

!D

(t6titcto(oaotFrcooa\t

(\

6.4@4

NN

ado

(Yro)r

@

F

O)

NIS

F

O'

N

C)

ra)F(o

F

o F

N(00F

@@

(OtgF

tt6t(0t'-

Ot

C\|

€(oc{F

at

egtt@9

Nr;

otqJoiootH

>9

0a-!ts 5:o=

t=

biS

EE

F.<

50 0

F

dtL)(\ro,

o !t

old.jd'.iod(to(\.(\lnidcici

|'|,rt{^g}

N

UJ

Jd

tIYoqJE

h;iici'orO:o*lt!VC

no:C

oG:.Ed9.Y\A

Eh

d .!i'

,9gxco:

? >

! r

^ E

g gd9 i s

!t

.gbb =

E

I

i E

qll c

? 6

A

gtyt&

E

ii (J

"i :*:

e ,9 |

>

F !,:.:

tr @

:a E

' E

!

u) O

+o

i o

ox.<

d)(JouJ

oulJz;L]J

nUJ

trrEEt))s

3E5N

-9Ug

troE: a)

!:>6o

ooE-6

XE

<-E

F!

Ft!TJJ

v.ztruJ

c6->91 -F

E=

5 -rrJ f,

15=!,fi;E

C3

ItIIJIFu,l

.o

DATE: June 5,2017

REQUEST FOR BOARD ACTION

AGENDA Finance CommitteeSECTION

ORIGINATING FinanceDEPARTMENT

ITEM Authorizing the Transfer of Fundsfrom the GeneralAccount to theCapital Reserve Fund

APPROVAL

wCNAccount Numbers: 01-121700 and 01-122000

The request is to transfer $21.3 million in funds into the Capital Reserve Fund from theGeneral Account. As of May 1 , 2017, the targeted amount in the Capital Reserve Fundincreased by approximately $21.3 million based upon the 5 Year Capital lmprovement Planapproved in April 2017. The new targeted amount is $50,701,790. The significant increase is

primarily related to the construction of the Bartlett connection facilities ($21 million).

Funds deposited in this Fund shall be used to provide a ready source of funds for repair,refurbishment or acquisition of buildings, leaseholds, furniture, fixtures, and equipmentnecessary for the effective operation of the Commission and its programs.

The Capital Reserve Fund will accumulate and maintain a minimum amount equal to theplanned amounts required in the annually approved 5 Year Capital lmprovement Plan.

MOTION: Authorizing the Transfer of Funds from the General Account to the CapitalReserve Fund

DATE: June 05,2017

REQUEST FOR BOARD ACTION

AGENDA Administration CommitteeSECTION

ORIGINATING OperationsDEPARTMENT

ITEM A Resolution Authorizing andRatifying the Disposal of CertainPersonal Property Owned by theDuPage Water Commission

Resolution No. R-17-17

APPROVAL

N/w

Account Number: N/A

Resof ution No. R-17-17 is a Resolution Authorizing and Ratifying the Disposal of CertainPersonal Property Owned by the DuPage Water Commission. This Resolution authorizesthe General Manager to dispose of the assets listed on Exhibit A to the Resolution or, ifalready disposed of, ratifies and confirms their disposal because these assets are or wereno longer useful to the Commission.

The equipment and vehicle listed in Exhibit A will be listed up for auction at Obenauf AuctionService, Inc., an open to the public Government and Municipal Auction house serving theMidwest, Northern lllinois and Southern Wisconsin.

Obenauf Auction Service, Inc.810 Magna Drive

Round Late. lL.60073847-546-2095

MOTION: To adopt Resolution No. R-17-17

DUPAGE WATER COMMISSION

RESOLUTION NO. R.17.17

A RESOLUTION AUTHORIZING AND RATIFYINGTHE DISPOSAL OF CERTAIN PHRSONAL PROPERTY

OWNED BY THE DUPAGE WATER COMMISSION

WHEREAS, the DuPage Water Commission is authorized to sell or otherwise

dispose of personal property pursuant to 65 ILCS 5/11-135-6; and

WHEREAS, in the opinion of the Board of Commissioners of the DuPage Water

Commission, the personal property described in Exhibit A attached hereto and by this

reference incorporated herein and made a part hereof (the "Property") is no longer

necessary or useful to or for the best interests of the DuPage Water Commission to retain

or, if already disposed of, was not necessary or useful to or for the best interests of the

DuPage Water Commission to retain;

NOW, THEREFORE, BE lT RESOLVED by the Board of Commissioners of the

DuPage Water Commission as follows:

SECTION ONE: The Board of Commissioners of the DuPage Water Commission

hereby finds and determines that the Property is no longer necessary or useful to the

DuPage Water Commission and the best interests of the DuPage Water Commission will

be served by its disposal or, if already disposed of, was not necessary or useful to the

DuPage Water Commission and the best interests of the DuPage Water Commission

were served by its disposal.

SECTION TWO: The General Manager is hereby authorized to dispose of the

Property in such manner as the General Manager shall determine or, if already disposed

-1-

carolyn
Draft

Resolution No. R-17-17

of, the Board of Commissioners of the DuPage Water Commission hereby ratifies and

confirms its disposal.

SECTION THREE: This Resolution shall be in full force and effect from and after

its adoption.

AYES:

NAYS:

ABSENT:

ADOPTED this day of 2017.

Chairman

ATTEST:

Clerk

Board/Resolutions/201 7/R-1 7-1 7.docx

-2-

Resolution No. R-17-17

EXHIBIT A

Resolution No. R-17-17

OBSOLETE / DEFECTIVE ITEMS

DLP-3O-SP / 15-89-3063 S Genie DPL3OSP Scissor Lift1GCGG25R9XI 111440 1999 G250Q 3/t Ton Commercial Van $18,287.00DCT12D1-06 / 89750CC Da-Lite 97" Projection Screen

Da-Lite 120" Projection Screen $1,350.00Crestron lMedia Transmitter

DATE: June 8,2017

REQUEST FOR BOARD ACTION

AGENDA Engineering & ConstructionSECTION Committee

ORIGINATING General Manager'sDEPARTMENT Office

ITEM An Ordinance Determiningthe Prevailing Rate ofWages in DuPage Countyand Cook County

Ordinance No. O-7-17

APPROVAL

Attached is "An Ordinance Determining the Prevailing Rate of Wages in DuPage County andCook County." This Ordinance is adopted annually by the Commission. This Ordinanceestablishes the prevailing rate of wages for various construction trades working onCommission public works construction projects. The prevailing rate of wages included in thisOrdinance have been obtained from the lllinois Department of Labor. The Commissionincludes a copy of its then current prevailing wage ordinance in all of its public worksconstruction specifications.

Once adopted by the Commission, a certified copy of this Ordinance will be filed with theDepartment of Labor of the State of lllinois as required by law. The Commission will alsopublish a notice of the adoption of the Ordinance in a newspaper of general circulation withinthe area, within thirty (30) days following its filing with the Secretary of State and theDepartment of Labor.

MOTION: To adoot Ordinance No, O-7-17,

DUPAGE WATER COMM ISSION

ORDINANCE NO. 0-7-17

AN ORDINANCE DETERMINING THEPREVAILING RATE OF WAGES IN

DuPAGE COUNTY AND COOK COUNTY

WHEREAS, the State of lllinois has enacted "An Act Regulating Wages of

Laborers, Mechanics and Other Workers Employed in Any Public Works by the State,

County, City or Any Public Body or Any Political Subdivision or By Anyone Under Contract

for Public Works," approved June 26, 1941 , as amended, being Act 130 (Prevailing Wage

Act), of Chapter 820 (Employment), of the lllinois Compiled Statutes, 8?0 ILCS 130/0,01

et seq. (the "Act"); and

WHEREAS, the Act requires that the DuPage Water Commission investigate and

ascertain the prevailing rate of wages as defined in the Act for laborers, mechanics and

other workers in the localities of DuPage County and Cook County employed in the

construction of public works for the DuPage Water Commission; and

WHEREAS, "locality" is defined in the Act as the County where the physical work

upon public works is performed and the public works of the DuPage Water Commission

will be pefformed in both DuPage and Cook County;

NOW, THEREFORE, BE lT ORDAINED by the Board of Commissioners of the

DuPage Water Commission as follows:

SECTION ONE: To the extent and as required by the Act, the general prevailing

rate of wages in DuPage County for laborers, mechanics and other workers engaged in

the construction of public works coming under the jurisdiction of the DuPage Water

Commission, which physical work is being performed on public works in DuPage County,

is hereby ascertained to be the same as the prevailing rate of wages for construction work

-1-

carolyn
Draft

Ordinance No. O-7-17

in the DuPage County area as determined by the Department of Labor of the State of

lllinois as of June 2Q17 A copy of that determination is attached hereto, and by this

reference incorporated herein, as Exhibit A. As required by the Act, any and all revisions

of the prevailing rate of wages in DuPage County by the Department of Labor of the State

of lllinois shall supersede the Department's June determination and shall apply to any

and all public works construction in DuPage County undertaken by the Commission.

SECTION TWO: To the extent and as required by the Act, the general prevailing

rate of wages in Cook County for laborers, mechanics and other workers engaged in the

construction of public works coming under the jurisdiction of the DuPage Water

Commission, which physical work is being performed on public works in Cook County, is

hereby ascertained to be the same as the prevailing rate of wages for construction work

in the Cook County area as determined by the Department of Labor of the State of lllinois

as of June 2017. A copy of that determination is attached hereto, and by this reference

incorporated herein, as Exhibit B, As required by the Act, any and all revisions of the

prevailing rate of wages in Cook County by the Department of Labor of the State of lllinois

shall supersede the Department's June determination and shall apply to any and all public

works construction in cook county undertaken by the commission.

SECTION THREE: The definition of any terms appearing in this Ordinance that

are also used in the Act shall be the same as in the Act. Nothing herein contained shall

be construed to apply the general prevailing rate of wages for DuPage County and for

Cook County as herein ascertained to any work or employment except public works

construction of the DuPage Water Commission conducted in DuPage County and Cook

County, respectively, to the extent required by the Act.

-2-

Ordinance No. O-7-17

SECTION FOUR: The Clerk of the DuPage Water Commission shall publicly post

or keep available for inspection by any interested party in the main office of the DuPage

Water Commission this determination of the prevailing rate of wages for DuPage County

and for Cook County.

(a)

(b)

(c)

promptly file, no later than July 15, 2017, a certified copy of thisOrdinance with the Department of Labor of the State of lllinois;

cause to be published in a newspaper of general circulation withinthe area a notice of the adoption of this Ordinance, within thirty (30)

days of its filing with the Secretary of State and the Department ofLabor of the State of lllinois, and such publication shall constitutenotice that the determination is effective and that this is thedetermination of this public body;

mail a copy of this determination to any employer, to any associationof employers and to any person or association of employees whohave filed their names and addresses, requesting copies of anydetermination stating the particular rates and the particular class ofworkers whose wages will be affected by such rate; and

attach a copy of this determination or of the revised determination ofprevailing rate of wages then in effect to all public works constructioncontract specifications.

(d)

-3-

Ordinance No. O-7-17

SECTION SIX: This Ordinance shall be in full force and effect from and after its

AYES:

NAYS:

ABSENT:

ADOPTED this ,2Q17.

Chairman

ATTEST:

Board/Ordinances/O-7- 1 7.docx

EXHIBIT A

This schedule contalns the prevailing wage fates required to be paid for work performed on or after Monday, June 5, 2017 on public works

projects In thls County. Pursuant to 820 ILCS 130/4, public bodies ln thls County that have active puhlic works projects are responsible for

notifylng all contractors and subcontractors working on those publlc works projects of the change (if any) to rates that were previously in

effect, ThefallureofapublicbodytoprovidesuchnoticedoesnotrellevecontractorsorsubcontractorsofthelrobligationsunderthePrevailing Wage Act, Including the duty to pay the relevant prevailing wage in effect at the tlme work subject to the Act is performed'

cooK couNwPREVAILING WAGE

RATES EFFECTIVE

JUNE 5, 2017

TradeTitle Region

ASBESTOSABT-GEN AII

ASBESTOS ABT-MEC AII

BOILERMAKER AI

BRICK MASON AI

CARPENTER AI

CEMENT MASON At,

CERAMIC TILE FNSHER AII

COMM. ELECT, AII

ELECTRIC PWR EQMT

OP AII

ELECTRIC PWR

GRNDMAN AII

ELESIRIC PWR

LINEMAN AII

ELECTRICIAN AII

ELEVATOR

CONSTRUCTOR AII

FENCE ERECTOR AII

GLAZIER AII

HTlFRosT rNsULAToR All

Type Class

Atl

BLD

BLD

BLD

Atl

Atl

BLD

BLD

All

All

Atl

All

BLD

Atl

BLD

BLD

Foreman M-F

Wage oT40.95 l.s39.96 1.5

s1.30 2.0

48.84 l.s47.35 1.5

46.2s 2,0

r.5

44.82. 1.5

53.90 l.s

53,90 1,5

53,90 1,5

49.10 1.5

58.43

40.34

43.20

52.45

2.0

f.f

1.5

H/W Pension

14.23 Lt,5711,62 11.06

6,97 18.13

10.2s 15,30

LL.79 17.60

13.65 1s.sl10.55 10.12

8.88 L2.78

11.41 16.39

8.90 17.78

11.41 15.39

14.33 L5,52

74.43 14.95

13.15 13.10

13.94 18.99

11.52 L7.76

Vacation Training

0.00 0.50

0.00 0.72

o.00 0.40

0.00 0.8s

0,00 0.63

0.00 0.65

0.00 0.65

0.59 0.75

0.00 3.10

0.00 2.75

0.00 3.10

0.70 1.00

4.L6 0,90

o.00 0,40

0.00 0.94

0.00 0.72

Base

Wage

40.40

37.46

47.O7

44.88

45.35

44.25

37.8L

42.02

48.90

38.14

48.90

46.10

51.94

38.34

4L.70

49.9s

osA osH

1.5 2.0

1.5 2.0

2.0 2.0

1.5 2.0

1.5 2.0

1.5 2.0

l.s 2.0

1.5 2.0

l.s 2.0

1.5 2.O

1.5 2.O

1.5 2.0

2.0 2.O

1.5 2.O

2.0 2.Q

1.5 2.0

IRON WORKER

LABORER

LATHER

MACHINIST

MARBLE FINISHERS

MARBLE MASON

MATERIAL TESTER I

MATERIAIJ TESTER II

MILLWRIGHT

OPERATING

ENG INEER

OPERATING

ENGINEER

OPERATING

ENGINEER

OPERATING

ENGINEER

OPERATING

ENGINEER

OPERATING

ENGINEER

OPERATING

ENG INEER

OPERATING

ENGINEER

OPERATING

ENGINEER

OPERATING

ENGINEER

OPERATING

ENGINEER

OPERATING

ENGINEER

Atl

All

Atl

Atl

Atl

Atl

All

All

Arl

Atl

All

Atl

All

All

Atl

Atl

Arl

All

All

All

Atl

Atl

All

Atl

BLD

Atl

BLD

Atl

Atl

All

BLD

BLD

BLD

BLD

BLD

BLD

BtD

FLT

FLT

FLT

FLT

FLT

48.20

40.95

46.35

47.85

33.45

48,54

30.20

35.20

47.3s

53.10

53.10

s3.10

53,10

53.10

53.10

53.10

54.75

54.75

54.75

54.75

54.75

2L.52

11.57

16.39

8.95

t4.4414.97

LL.57

IL.5717.60

13.60

13.60

13.60

13.50

13.50

13.60

13,60

12.6s

12.65

12.65

12.65

12.65

0.00

0,00

0.00

1.85

0.00

0.00

0.00

0.00

0.00

1.90

1.90

1.90

1.90

1.90

1.90

1.90

1.90

1.90

1,90

1.90

1.90

0.35

0.50

0.63

1.30

0.45

0.59

0.s0

0.50

0,63

1.30

1,30

1.30

1,30

1.30

1.30

1.30

1.35

1.35

1,35

I.J)

1.35

1

2

3

4

J

6

7

1

2

5

4

5

46.20

40.20

44.35

45.35

33.45

44.13

30.20

35,20

45,3s

49.10

47.80

45.25

43.50

52.85

s0.10

s2.10

54.75

s3.25

47.40

39.40

s6.?s

7.O 2.O

1.5 1.5

1,5 1,5

1.5 1.5

1,5 1,5

1.5 1.5

1.5 1,5

1,5 1.5

1.5 1.5

2.0 2.0

2.O 2.0

2.0 2.0

2,0 2.O

2.0 ?,0

2.0 2.0

2.0 2.O

1.5 1.5

1,5 1.5

1,5 1.s

1.5 1.5

1.5 1.5

2,0 13.65

2.0 14.23

2.0 13.29

7.O 1.25

2,0 10.2s

2.0 10.25

2,0 14.23

2.0 L4.73

2.0 1L.79

2,0 18.0s

2.0 18,05

2.0 18.05

2.0 18.0s

2,0 18.0s

2,0 18.05

2.0 18.05

2.0 17.65

2.0 L7.65

2.0 17.5s

2.0 17.65

2.0 L7.65

OPERATING

ENGINEER

OPERATING

ENGINEER

OPERATING

ENGINEER

OPERATING

ENGINEER

OPERATING

ENGINEER

OPERATING

ENGINEER

OPERATING

ENGINEER

OPERATING

ENGINEER

ORNAMNTL IRON

WORKER

PAINTER

PAINTER SIGNS

PILEDRIVER

PIPEFITTER

PIXSTERER

PLUMBER

ROOFER

SHEETMETAL

WORKER

SIGN HANGER

SPRINKLER FITTER

STEEL ERECTOR

STONE MASON

TERRAZZO FINISHER

TERRAZZO MASON

1,5

1.5

1,5

1.5

1,5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1,5

1q

All

All

HWYAll

All

HWYAll

Alt

HWYAll

Atl

FLT

HWY

HWY

Atl

All

Atl

Atl

Ail

All

Atl

All

HWY

37.00

47.30

46.75

44.70

43.30

42,10

s0.30

48,30

45.75

44.55

33.92

45.3s

47.50

42.25

48.25

4L.70

43.03

31.31

47.2Q

42.07

44.88

39.s4

43.38

54.75

51,30

51.30

51.30

(1 ?n

s1.30

51.30

s1.30

48.2s

49.30

38.09

47.35

50.50

44.79

s0.25

44.10

46.47

33,81

49.20

44.O7

49.37

39.54

43.38

HWY

All

All

BLD

All

BLD

SLD

BLD

BLD

BLD

BLD

BLD

All

BLD

BLD

BLD

2.0 L7.6s 12,65

2,0 18.Os 13.60

2.0 18.0s 13,60

2.0 18.0s 13,60

2.0 18.0s 13.60

2.0 18.05 13.60

2,0 18.0s 13.60

2.0 18.05 13.60

2.0 13,65 18.99

1.5 11.50 11.10

L,5 2.60 2.7L

2.0 11.79 17.60

2.0 g.ss 17.85

2,0 13.65 9.s0

2.0 14,09 1.2.65

2.0 8.28 11,59

2,0 10.73 2r.872.0 4,85 3.28

2.0 12.25 11.55

2.0 13.45 19.59

2.0 10,25 15.30

2.0 10.55 11,79

2.0 10.ss 13.13

1.90 1,35

1.90 1.30

1.90 1.30

1.90 1.30

1.90 1.30

1.90 1,30

1.90 1.30

1.90 1,30

0.00 0,75

0.00 L.27

0,00 0.00

0.00 0,63

0,00 z.o7

5.00 0.65

0.00 1.18

0.00 0.s3

0.00 0,75

o.00 0.00

0.00 0.ss

0,00 0.3s

0.00 0,85

0.00 0.67

0,00 0.79

All

Atl

All

All

Atl

Atl

Atl

2.O 2.0

1.5 1.5

1.5 1.5

1.5 1.5

l.s 1,5

1.5 1.5

1C 1q

1.5 1.5

1.5 1.5

1.5 1.5

1,5 1.5

2.0 2.0

1.5 1.5

f.f r.J

1.5 1,5

TILE MASON

TRAFFIC SAFETY

WRKR

TRUCK DRIVER

TRUCK DRIVER

TRUCK DRIVER

TRUCK DRIVER

TRUCK DRIVER

TRUCK DRIVER

TRUCK DRIVER

TRUCK DRIVER

TUCKPOINTER

Explanations

COOK COUNTY

BLD

HWY

Atl

Ail

All

Atl

All

All

All

Atl

BLD

1

2

3

4

1

3

4

The following list is considered as those days for which holiday rates

of wages for work performed apply: New Years Day, Memorial Day,

Fourth ofJuly, Labor Day, Thanksgiving Day, Christmas Day and

Veterans Day in some classifications/counties. Generally, any of

these holidays which fall on a Sunday is celebrated on the following

Monday. This then makes work performed on that Monday payable at the

appropriate overtime rate for holiday pay. Common practice in a given

local may alter certain days of celebration. lf in doubt, please

check with IDOL.

All 43.84

33.50

3s.60

3s.8s

36.05

36.25

35,98

36.13

35.33

36.53

44.90

47.84

39.s0

36.25

36,25

35.25

36.25

35.53

36,53

36.53

36.53

45.90

1.5

1.5

1.5

1.5

1,5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

r.51.5

1.5

1.5

T.J

1.5

1.5

r.f,

1.5

1.5

2.0

2,0

2.0

L.V

2,0

2.0

L.V

2,0

2.0

6.00

8.56

8,56

8.s6

8,56

8.25

8,25

8.2s

8.25

8.30

7.25

11.50

11.50

11.50

11.50

10.14

10.14

10,14

10.14

L4.29

0.00

0,00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.99

0.s0

0.15

0,1"5

0.1s

0.15

0.15

0,15

0.1s

0,15

0.48

2,0 10.55 11.40

Atl

E

E

E

E

W

W

W

wAll

TRUCK DRIVERS (WEST) - That part of the county West of Barrington

Road.

EXPLANATION OF CLASSES

ASBESTOS - GENERAL - removal of asbestos material/mold and hazardous

materials from any place in a building, including mechanical systems

where those mechanical systems are to be removed. This includes the

removal of asbestos materials/mold and hazardous materials from

ductwork or pipes in a building when the building is to be demolished

at the time or at some close future date.

ASBESTOS - MECHANICAL - removal of asbestos material from mechanical

systems, such as pipes, ducts, and boilers, where the mechanical

systems are to remain.

CERAMIC TILE FINISHER

The grouting, cleaning, and polishing ofall classes oftile, whether

for interior or exterior purposes, all burned, glazed or unglazed

products; all composition materials, granite tiles, warning detectable

tiles, cement tiles, epoxy composite materials, pavers, glass,

mosaics, fiberglass, and all substitute materials, for tile made in

tile-like units; all mixtures in tile like form of cement, metals, and

other materials that are for and intended for use as a finished floor

surface, stair treads, promenade roofs, walks, walls, ceilings,

swimming pools, and all other places where tile is to form a finished

interior or exterior. The mixing of all setting mortars including but

not limited to thin-set mortars, epoxies, wall mud, and any other

sand and cement mixtures or adhesives when used in the preparation,

installation, repair, or maintenance of tile and/or similar materials.

The handling and unloading of all sand, cement, lime, tile,

fixtures, equipment, adhesives, or any other materials to be used in

the preparation, installation, repair, or maintenance oftile and/or

similar materials. Ceramic Tile Finishers shall fill all joints and

voids regardless of method on all tile work, panicularly and

especially after installation of said tile work. Application of any

and all protective coverings to all types of tile installations

including, but not be limited to, all soap compounds, paper products,

tapes, and all polyethylene coverings, plywood, masonite, cardboard,

and any new type of products that may be used to protect tile

installations, Blastrac equipment, and all floor scarifying equipment

used in preparing floors to receive tile' The clean up and removal of

all waste and materials. All demolition of existingtile floors and

walls to be re-tiled.

COMMUNICATIONS ELECTRICIAN

Installation, operation, inspection, maintenance, repair and service

of radio, television, recording, voice sound vision production and

reproduction, telephone and telephone interconnect, facsimile, data

apparatus, coaxial, fibre optic and wireless equipment, appliances and

systems used for the transmission and reception of signals of any

nature, business, domestic, commercial, education, entertainment, and

residential purposes, including but not limited to, communication and

telephone, electronic and sound equipment, fibre optic and data

communication systems, and the performance of any task directly

related to such installation or service whether at new or existing

sites, such tasks to include the placing of wire and cable and

electrical power conduit or other raceway work within the equipment

room and pulling wire and/or cable through conduit and the

installation of any incidental conduit, such that the employees

covered hereby can complete any job in full.

MARBLE FINISHER

Loading and unloading trucks, distribution of all materials (all

stone, sand, etc.), stocking of floors with material, performing all

rigging for heavy work, the handling of all material that may be

needed for the installation of such materials, building of

scaffolding, polishing if needed, patching, waxing of material if

damaged, pointing up, caulking, grouting and cleaning of marble,

holding water on diamond or Carborundum blade or saw for setters

cutting, use oftub saw or any other saw needed for preparation of

material, drilling of holes for wires that anchor material set by

setters, mixing up of molding plaster for installation of material,

mixing up thin set for the installation of material, mixing up of sand

to cement for the installation of material and such other work as may

be required in helping a Marble Setter in the handling of all

material in the erection or installation of interior marble, slate,

travertine, art marble, serpentine, alberene stone, blue stone,

granite and other stones (meaning as to stone any foreign or domestic

materials as are specified and used in building interiors and

exteriors and customarilv known as stone in the trade), carrara,

sanionyx, vitrolite and similar opaque glass and the laying of all

marble tile, terrazzo tile, slate tile and precast tile, steps, risers

treads, base, or any other materials that may be used as substitutes

for anv of the aforementioned materials and which are used on interior

and exterior which are installed in a similar manner.

MATERIAL TESTER l: Hand coring and drilling for testing of materials;

field inspection of uncured concrete and asphalt.

MATERIALTESTER ll: Field inspection of welds, structural steel,

fireproofing, masonry, soil, facade, reinforcing steel, formwork,

cured concrete, and concrete and asphalt batch plants; adjusting

proportions of bituminous mixtures.

OPERATING ENGINEER - BUILDING

Class 1. Asphalt Plant; Asphalt Spreader; Autograde; Backhoes with

Caisson Attachment; Batch Plant; Benoto (requires Two Engineers);

Boiler and Throttle Valve; Caisson Rigs; Central Redi-Mix Plant;

Combination Back Hoe Front End-loader Machine; Compressor and Throttle

Valve; Concrete Breaker (Truck Mounted); concrete Conveyor; Concrete

Conveyor (Truck Mounted); Concrete Paver Over 27E cu. ft; Concrete

Paver 27E cu. ft, and Under: Concrete Placer; Concrete Placing Boom;

Concrete Pump (Truck Mounted); Concrete Tower; Cranes, All; Cranes,

Hammerhead; Cranes, (GCl and similar Type); Creter Crane; Spider

Crane; Crusher, Stone, etc.; Derricks, All; Derricks, Traveling;

Formless Curb and Gutter Machine; Grader, Elevating; Grouting

Machines; Heavy Duty Self-Propelled Transporter or Prime Mover;

Highlift Shovels or Front Endloader L-I/ayd. and over; Hoists,

Elevators, outside type rack and pinion and similar machines; Hoists,

One, Two and Three Drum; Hoists, Two Tugger One Floor; Hydraulic

Backhoes; Hydraulic Boom Trucks; Hydro Vac (and similar equipment);

Locomotives, All; Motor Patrol; Lubrication Technician; Manipulators;

Pile Drivers and Skid Rig; Post Hole Digger; Pre-Stress Machine; Pump

Cretes Dual Ram; Pump Cretes: Squeeze Cretes-Screw Type Pumps; Gypsum

Bulker and Pump; Raised and Blind Hole Drill; Roto Mill Grinder;

Scoops - Tractor Drawn; Slip-Form Paver; Straddle Buggies; Operation

of Tie Back Machine; Tournapull; Tractorwith Boom and Side Boom;

Trenching Machines,

Class 2, Boilers; Broom, All Power Propelled; Bulldozers; Concrete

Mixer (Two Bag and Over); Conveyor, Portable; Forklift Trucks;

Highlift Shovels or Front Endloaders under 2-1l4 yd.; Hoists,

Automatic; Hoists, Inside Elevators; Hoists, Sewer Dragging Machine;

Hoists, Tugger Single Drum; Laser Screed; Rock Drill (Self-Propelled);

Rock Drill (Truck Mounted); Rollers, All; Steam Generators; Tractors,

All; Tractor Drawn Vibratory Roller; Winch Trucks with "A" Frame.

Class 3. Air Compressor; Combination Small Equipment Operator;

Generators; Heaters, Mechanical; Hoists, Inside Elevators (remodeling

or renovation work); Hydraulic Power Units (Pile Driving, Extracting,

and Drilling); Pumps, over 3" (1 to 3 not to exceed a total of300

ft.); Low Boys; Pumps, Well Points; Welding Machines (2 through 5);

Winches, 4 Small Electric Drill Winches.

Class 4. Bobcats and/or other Skid Steer Loaders; Oilers; and Brick

Forklift.

Class 5. Assistant Craft Foreman.

Class 6. Gradall.

Class 7. Mechanics; Welders.

OPERATING ENGINEERS - HIGHWAY CONSTRUCTION

Class 1. Asphalt Plant; Asphalt Heater and Planer Combination; Asphalt

Heater Scarfire; Asphalt Spreader; Autograder/GOMACO or other similar

type machines: ABG Paver; Backhoes with Caisson Attachment; Ballast

Regulator; Belt Loader; Caisson Rigs; Car Dumper; Central Redi'Mix

Plant; Combination Backhoe Front Endloader Machine, (1 cu. yd, Backhoe

Bucket or over or with attachments); Concrete Breaker (Truck

Mounted); Concrete Conveyor; Concrete Paver over 27E cu. ft.; Concrete

Placer; Concrete Tube Float; Cranes, all attachments; Cranes, Tower

Cranes of all types: Creter Crane: Spider Crane; Crusher, Stone, etc,;

Derricks, All; Derrick Boats; Derricks, Traveling; Dredges;

Elevators, Outside type Rack & Pinion and Similar Machines; Formless

Curb and cutter Machine; Grader, Elevating; Grader, Motor Grader,

Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard

Rail Post Driver Truck Mounted; Hoists, One, Two and Three Drum; Heavy

Duty Self-Propelled Transponer or Prime Mover; Hydraulic Backhoes;

Backhoes with shear attachments up to 40'of boom reach; Lubrication

Technician; Manipulators; Mucking Machine; Pile Drivers and Skid Rig;

Pre-Stress Machine; Pump Cretes Dual Ram; Rock Drill - Crawler or Skid

Rig; Rock Drill - Truck Mounted; Rock/Track Tamper; Roto Mill

Grinder; Slip-Form Paver; Snow Melters; SoilTest Drill Rig (Truck

Mounted); Straddle Buggies; Hydraulic Telescoping Form (Tunnel);

Operation of Tieback Machine; Tractor Drawn Belt Loader; Tractor

Drawn Belt Loader (with attached pusher - two engineers); Tractor with

Boom; Tractaire with Attachments; Traffic Barrier Transfer Machine;

Trenching; Truck Mounted Concrete Pump with Boom; Raised or Blind Hole

Drills (Tunnel Shaft); Underground Boring and/or Mining Machines 5

ft. in diameter and over tunnel, etc; Underground Boring and/or Mining

Machines under 5 ft. in diameter; Wheel Excavator; Widener (APSCO).

Class 2, Batch Plant; Bituminous Mixer; Boiler and Throttle Valve;

Bulldozers; Car Loader Trailing Conveyors; Combination Backhoe Front

Endloader Machine (Less than 1 cu. yd. Backhoe Bucket or over or with

attachments); Compressor and Throttle Valve; Compressor, Common

Receiver (3); Concrete Breaker or Hydro Hammer; Concrete Grinding

Machine; Concrete Mixer or Paver 75 Series to and including 27 cu,

ft,; Concrete Spreader.; Concrete Curing Machine, Burlap Machine,

Belting Machine and Sealing Machine; Concrete Wheel Saw; Conveyor Muck

Cars (Haglund or Similar Type); Drills, All; Finishing Machine -

Concrete; Highlift $hovels or Front Endloader; Hoist - Sewer Dragging

Machine; Hydraulic Boom Trucks (All Attachments); Hydro-Blaster; Hydro

Excavating (excluding hose work); Laser Screed; All Locomotives,

Dinky; Off-Road Hauling Units (including articulating) Nor

Self-Loading Ejection Dump; Pump Cretes; Squeeze Cretes - Screw Type

Pumps, Gypsum Bulker and Pump; Roller, Asphalt; Rotary Snow plows;

Rototiller, Seaman, etc., self-propelled; Self-Propelled Compactor;

Spreader - Chip - Stone, etc,; Scraper - Single/Twin Engine/push and

Pull; Scraper - Prime Mover in Tandem (Regardless of Size); Tractors

pulling attachments, Sheeps Foot, Disc, Compactor, etc.; Tug Boats.

Class 3, Boilers; Brooms, All Power Propelled; Cement Supply Tender;

Compressor, Common Receiver (2); Concrete Mixer {Two Bag and Over);

Conveyor, Portable; Farm-Type Tractors Used for Mowing, Seeding, etc.;

Forklift Trucks; Grouting Machine; Hoists, Automatic; Hoists, All

Elevators; Hoists, Tugger Single Drum; Jeep Diggers; Low Boys; pipe

Jacking Machines; Post-Hole Digger; Power Saw, Concrete power Driven;

Pug Mills; Rollers, other than Asphalt; Seed and Straw Blower; Steam

Generators; Stump Machine; Winch Trucks with "A" Frame; Work Boats;

Tamper-Form-Motor Driven.

Class 4. Air Compressor; Combination - Small Equipment Operator;

Directional Boring Machine; Generators; Heaters, Mechanical; Hydraulic

Power Unit (Pile Driving, Extracting, or Drilling); Light Plants, All

(1 through 5); Pumps, over 3" (1 to 3 not to exceed a total of300

ft,); Pumps, Well Points; Vacuum Trucks (excluding hose work); Welding

Machines (2 through 5); Winches, 4 Small Electric Drill Winches.

Class 5. SkidSteer Loader (all); Brick Forklifts; Oilers.

Class 6. Field Mechanics and Field Welders

Class 7. Dowell Machine with Air Compressor; Gradall and machines of

like nature.

OPERATING ENGINEER. FLOATING

Class 1, Craft Foreman; Master Mechanic; Diver/Wet Tender; Engineer;

Engineer (Hydraulic Dredge).

Class 2. Crane/Backhoe Operator; Boat Operator with towing

endorsement; Mechanic/Welder; Assistant Engineer (Hydraulic Dredge);

Leverman (Hydraulic Dredge); Diver Tender.

Class 3. Deck Equipment Operator, Machineryman, Maintenance of Crane

(over 50 ton capacity) or Backhoe (115,000 lbs. or more); Tug/Launch

Operator; Loader/Dozer and like equipment on Barge, Breakwater Wall,

Slip/Dock, or Scow, Deck Machinery, etc.

Class 4. Deck Equipment Operator, Machineryman/Fireman (4 Equipment

Units or More); Off Road Trucks; Deck Hand, Tug Engineer, Crane

Maintenance (50 Ton Capacity and Under) or Backhoe Weighing (115,000

pounds or less); Assistant Tug Operator.

Class 5. Friction or Lattice Boom Cranes.

Class 5. ROV Pilot, ROV Tender

SURVEY WORKER - Operated survey equipment including data collectors,

G.P.S, and robotic instruments, as well as conventional levels and

transits.

TERRAZO FINISHER

The handling of sand, cement, marble chips, and all other materials

that may be used by the Mosaic Terrazzo Mechanic, and the mixing,

grinding, grouting; cleaning and sealing of all Marble, Mosaic, and

Terrazzo work, floors, base, stairs, and wainscoting by hand or

machine, and in addition, assisting and aiding Marble, Masonic, and

Terrazzo Mechanics.

TRAFFIC SAFETY

Work associated with barricades, horses and drums used to reduce lane

usage on highway work, the installation and removal of temporary lane

markings, and the installation and removal of temporary road signs.

TRUCK DRIVER - BUILDING, HEAVY AND HIGHWAY CONSTRUCTION 'EAST & WEST

Class 1. Two or three Axle Trucks. A-frame Truck when used for

transportation purposes; Air Compressors and Welding Machines,

including those pulled by cars, pick-up trucks and tractors;

Ambulances; Batch Gate Lockers; Batch Hopperman; Car and Truck

Washers; Carry-alls; Fork Lifts and Hoisters; Helpers; Mechanics

Helpers and Greasers; oil Distributors 2-man operation; Pavement

Breakers; Pole Trailer, up to 40 feet; Power Mower Tractors;

Self-propelled Chip Spreader; Skipman; Slurry Trucks, 2-man operation;

Slurry Truck Conveyor Operation, 2 or 3 man; Teamsters; Unskilled

Dumpman; and Truck Drivers hauling warning lights, barricades, and

poftable toilets on the job site.

Class 2. Four axle trucks; Dump Crets and Adgetors under 7 yards;

Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or

Turnatrailers when pulling other than self-loading equipment or

similar equipment under 15 cubic yards; MixerTrucks under 7 yards;

Ready-mix Plant Hopper Operator, and Winch Trucks, 2 Axles'

Class 3, Five axle trucks; Dump Crets and Adgetors 7 yards and over;

Dumpsters, TrackTrucks, Euclids, Hug Bottom Dump Turnatrailers or

turnapulls when pulling other than self-loading equipment or similar

equipment over 16 cubic yards; Explosives and/or Fission Material

Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit;

Oil Distributors, 1-man operation; Pole Trailer, over 40 feet; Pole

and Expandable Trailers hauling material over 50 feet long; Slurry

trucks, l-man operation; Winch trucks, 3 axles or more;

Mechanic-Truck Welder and Truck Painter.

Class 4. Six axle trucks; Dual-purpose vehicles, such as mounted

crane trucks with hoist and accessories; Foreman; Master Mechanic;

Self-loading equipment like P.B. and trucks with scoops on the front'

Other Classifications of Work:

For definitions of classifications not otherwise set out, the

Department generally has on file such definitions which are

available. lf atask to be performed is not subjectto one ofthe

classifications of pay set out, the Departrnent will upon being

contacted state which neighboring county has such a classification and

provide such rate, such rate being deemed to exist by reference in

this document. lf no neighboring county rate applies to the task,

the Department shall undertake a special determination, such special

determination beingthen deemed to have existed underthis

determination. lf a project requires these, or any classification not

f isted, pfease contact IDOL at 2L7-182-lTIOfor wage rates or

clarifications,

LANDSCAPING

Landscaping work falls under the existing classifications for laborer,

operating engineer and truck driver. The work performed by

landscape plantsman and landscape laborer is covered by the existing

classification of laborer. The work performed by landscape operators

(regardless ofequipment used or its size) is covered by the

classifications of operating engineer. The work performed by

landscape truck drivers (regardless of size of truck driven) is

covered by the classifications of truck driver.

MATERIAL TESTER & MATERIAL TESTER/INSPECTOR I AND II

Notwithstanding the difference in the classification title, the

classification entitled "Material Tester l" involves the same job

duties as the classification entitled "Material Tester/lnspector 1".

Likewise. the classification entitled "MaterialTester ll" invotves

the same job duties as the classification entitled "Materia

Tester/lnspector |1".

EXHIBIT B

Thls schedule contains the prwailing wage rates requlfed to be paid for work performed on or after Monday, June 5, 2017 on public works

projects in thls county. pursuant to g20 trcs fo/a, public bodies In this county that have active public works proJects are responslble for

notifying all contractors and subcontractors working on those public works projects of the change (if anyl to rates that were previously ln

effect. The fallure of a publlc body to provide such notlce does not relleve contractors or subcontractors of theil obllgatlons under the

prevalllng wege Act, including the duty to pay the relevant prevailing wage ln effect et the tlme work subject to the Act is performed.

DUPAGE COUNTY

PREVAILING WAGE

RATES EFFESTIVE JUNE

5,2017

TradeTitle

ASBESTOS ABT-GEN

ASBESTOS ABT.MEC

BOILERMAKER

BRICK MASON

CARPENTER

CEMENT MASON

CERAMIC TILE FNSHER

COMMUNICATIONTECH

ELECTRIC PWR EQMT

OP

ELECTRIC PWR EQMT

OP

ELECTRIC PWR

GRNDMAN

ELECTRIC PWR

GRNDMANELECTRIC PWR

LINEMAN

ELECTRIC PWR

LINEMAN

Region Type Class

All All

AII BLD

AII BLD

AII BLD

All All

All All

AII BLD

Base Foreman

Wage Wage

40.40 40.95

31 ,46 39.96

47.07 s1.30

44.88 49.37

45.35 47.35

44.25 46.25

37.81 37.81

M-F

or osA osH

1.5 1.5 2.0

1.5 l.s 2.0

2.0 2.0 2.0

l.s 1,5 2.0

l.s l.s 2,0

2.0 l.s 2,0

1.5 1..5 2.0

H/W Pension

14,23 rr.s711.52 11.06

6.97 18.13

10.25 L5,30

11.79 17.60

13.55 15.51

10.55 10.12

10,10 17.19

5.00 Lr.75

5.25 12.s9

s.00 9.09

s.25 10.09

5,00 14.06

5,25 15.07

Vacation Training

0.00 0.s0

0.o0 0.72

0.00 0.40

0.00 0.85

0.00 0,63

0.00 0.65

0,00 0.5s

2.01 0.61

0.00 0.38

0.00 0.7t

0.00 0.29

0,00 0.s8

0.00 0.4s

HWY

All

All

All

All

All

All

HWYAll

BLD

All

33,00

37.89

40.59

29.30

32.s0

45.36

48,59

35.40

s1.48

55.15

51.48

55.15

51.48

55.15 0.85

2,0

2,0

2.0

2.0

2.0

2.0

2.0

1.5

1.5

1.5

1,5

I.J

1.5

1.5

1.5

1.5

1,5

1.5

1,5

1.5

1.5

All

HWY

Atl

0,00

ELECTRIC PWR TRK

DRV

ELECTRIC PWR TRK

DRV

ELECTRICIAN

ELEVATOR

CONSTRUCTOR

FENCE ERECIOR

FENCE ERECTOR

GLAZIER

HT/FROST INSULATOR

IRON WORKER

IRON WORKER

LABORER

LATHER

MACHINIST

MARBLE FINISHERS

MARBLE MASON

MATERIAL TESTER I

MATERIALS TESTER II

MILLWRIGHT

OPERATING ENGINEER

OPERATING ENGINEER

OPERATING ENGINEER

OPERATING ENGINEER

OPERATING ENGINEER

OPERATING ENGINEER

OPERATING ENGINEER

OPERATING ENGINEER

OPERATING ENGINEER

OPERATING ENGINEER

All All

HWY

BLD

BLD

All

ALL

BLD

BLD

All

All

All

All

BLD

All

BLD

All

Atl

All

BLD

BLD

BLD

BLD

BLD

BLD

BLD

FLT

HWY

HWY

30,34

31.40

38.14

51.94

38.34

45.06

4I.7Q

48.45

46.20

45.56

40.20

44.35

45.35

33.45

44.13

30.20

35.20

45,35

49.10

47.80

45.25

43.50

s2.8s

50.10

52.10

37.00

47.30

46.75

51.48

s3.29

42.74

58.43

40.34

48.66

43.20

50.95

48.20

49.20

40.95

46.35

47.85

33.45

48.54

30.20

35.20

47.35

34,50

53.10

53.10

53.10

53.10

s3.10

53.10

54.75

s1.30

s1.30

1.5 1.5

L.5 1,5

1.5 1.5

2.0 5.00 9.40

2.Q s.OO 9.73

2,0 12.10 20.81

0.00 0.30

Atl

Atl

0,00 0.31

4.43 0.68

4.16 0,90

0.00 0.40

0.00 0,70

0,00 0.94

0.00 0.72

0.00 0.35

0,00 0.70

0.00 0.50

0.00 0.63

1.85 0.O0

0.00 0,46

0.00 0.s9

0.00 0.50

0,00 0.50

0.00 0.63

1,90 1.30

1.90 1.30

1.90 1.30

1.90 1.30

1,90 1.30

1.90 1,30

1.90 1.30

1.90 1.3s

1.90 1,30

1.90 1,30

Atl

NE

wAll

Atl

E

All

Atl

All

All

All

All

All

Atl

All

All

All

All

Atl

All

All

Atl

All

All

1

2

3

4

5

.,

1

I

2.0 2.0 2.0 L4.43 14.95

1,5 1.5 2.O 13.1s 13.10

2.0 2.0 2.0 10,52 20.76

1.5 2.0 2.0 13.94 18.99

l.s l.s 2,0 LL.47 12.15

2.0 2.0 2.0 13.65 2L.52

2.0 2.0 2.0 11.02 21.s1

1.5 1.5 2.0 14.23 Lr.s7l.s l.s 2,0 13.29 16.39

1.5 1.5 2.O 7.26 8.95

L.5 1.5 2,0 10.25 14.44

l.s l.s 2.0 10.25 14.97

1.5 1.5 2.O L4.23 rr.571.5 1.5 2.0 L4.23 11.57

l.s l.s 2.0 LL.79 17.60

2.0 2.0 2.0 18.0s 13.60

2,0 2,0 2.0 18.05 13.50

2.0 2.0 2,0 18.05 13.60

2.O 2.0 2.0 18.05 13.60

2.0 2.0 2.0 18.0s 13.60

2,0 2,0 2.O 18.05 13.50

2.0 2.0 2.0 18,05 13.60

l.s l.s 2.0 17.65 12.65

1.5 1.5 2.0 18.05 13.60

1.5 1.5 2.0 18.0s 13.60

OPERATING ENGINEER

OPERATING ENGINEER

OPERATING ENGINEER

OPERATING ENGINEER

OPERATINC ENGINEER

ORNAMNTL IRON

WORKER

ORNAMNTL IRON

WORKER

PAINTER

PAINTER SIGNS

PILEDRIVER

PIPEFITTER

PLASTERER

PLUMBER

ROOFER

SHEETMETAL WORKER

SPRINKLER FITTER

STEEL ERESTOR

STEEL ERECIOR

STONE MASON

TERRAZZO FINISHER

TERRAZZO MASON

TILE MASON

TRAFFIC SAFETY WRKR

TRUCK DRIVER

TRUCK DRIVER

TRUCK DRIVER

TRUCK DRIVER

TUCKPOINTER

AII HWY 3

AII HWY 4

AII HWY 5

AII HWY 6

AII HWY 7

All

All

All

BLD

All

BLD

BLD

BLD

BLD

BLD

BLD

All

All

BLD

BLD

BLD

BLD

HWY

All

All

All

All

BLD

44.70

43.30

42, t0s0.30

48.30

4s,00

45.06

42.93

33.92

44.3s

4t.5044.63

48.25

4L,7Q

45.77

47.20

42.07

4s.06

44.88

39.54

43.38

43,84

33.s0

36.30

36.45

36,65

36.8s

43.62

51,30

51.30

51.30

s1.30

51,30

47.50

48.55

44,93

38.09

46,35

50.s0

47.3r

50.2s

44.70

41.77

49.20

44.O7

48.55

49.37

39.54

43.38

47.84

36,85

36.8s

36.85

35.85

44.62

1.5 1.5

1.5 l.sl.s 1.5

1.5 1.5

1.s 1..5

2.0 2.O

2.0 2.0

1.5 1,5

1.5 1.5

1.5 1,5

1,5 l.sl.s 1.5

1,5 1.5

l.s 1.5

1.5 1.5

1.5 1.5

2.0 2.0

2.0 2.O

l.s 1,5

L.5 r,J

l.s 1.5

1.5 1.5

1,5 l.sl.s 1.5

1,5 1.5

1.5 1.5

1.5 1.5

l.s 1,5

1.90 1,30

1.90 1.30

1,90 1.30

1.90 1.30

1,90 1.30

0.00 0.65

0.00 0.70

0.00 1.3s

0.00 0.00

0.00 0.63

0.00 2.07

0.00 0.8s

0.00 1.18

0.00 0.s3

0.00 0.82

0.00 0.ss

0.00 0.35

0.00 0.70

0.00 0.8s

0.00 0.67

0.00 0.79

0.00 0,99

0,00 0.2s

0.00 0.15

0,00 0.1s

0.00 0,15

0,00 0.1s

0.00 0.48

2.0 18.05 13.50

2.0 18.05 13.60

2.0 18.05 13.50

2,0 18.0s 13.60

2.0 18.05 13.50

2,0 13.ss L7.94

2.0 10,52 70.76

1.5 10.30 8.20

1,5 2.60 2.7L

2.0 13.29 16.39

2.0 9,55 17.85

2.0 10.25 15.03

2.0 14,09 12.6s

2.0 8.28 L1,59

2,0 10.5s 14.10

2.0 L2.25 11.55

2.O 13.45 19.59

2.0 10,52 20.76

2.0 10.2s 15.30

2.0 10.s5 11.79

2.0 10.ss 13.13

2,0 10.5s 11,40

2.0 8.10 7.62

?.0 8.10 9.76

2.0 8.10 9.76

2,0 8.10 9.76

2.0 8.10 9.76

2.0 10.25 14,11

W

Atl

All

All

All

All

Atl

All

All

All

E

W

All

All

Atl

All

All

Atl

Atl

All

All

All

1

2

3

4

Explanations

DUPAGE COUNTY

IRON WORKERS AND FENCE ERECTOR (WEST) - West of Route 53.

The following list is considered as those days for which holiday rates

of wages for work performed apply: New Years Day, Memorial Day,

Fourth ofJuly, Labor Day, Thanksgiving Day, Christmas Day and

Veterans Day in some classifications/counties. Generally, any of

these holidays which fall on a Sunday is celebrated on the following

Monday. This then makes work performed on that Monday payable at the

appropriate overtime rate for holiday pay. Common practice in a given

local may alter certain days of celebration, lf in doubt, please

check with IDOL.

EXPI-ANATION OF CLASSES

ASSESTOS - GENERAL - removal of asbestos material/mold and hazardous

materials from any place in a building, including mechanical systems

where those mechanical systems are to be removed. This includes the

removal of asbestos materials/mold and hazardous materials from

ductwork or pipes in a building when the building is to be demolished

at the time or at some close future date.

ASBESTOS - MECHANICAL - removal of asbestos material from mechanical

systems, such as pipes, ducts, and boilers, where the mechanical

systems are to remain.

TRAFFIC SAFETY - work associated with barricades, horses and drums

used to reduce lane usage on highway work, the installation and

removal of temporary lane markings, and the installation and removal

of temporary road signs.

CERAMIC TILE FINISHER

The grouting, cleaninE, and polishing of all classes of tile, whether

for interior or exterior purposes, all burned, glazed or unglazed

products; all composition fiaterials, granite tiles, warning detectable

tiles, cement tiles, epoxy composite materials, pavers, glass,

mosaics, fiberglass, and all substitute materials, for tile made in

tile-like units; all mixtures in tile like form of cement, metals, and

other materials that are for and intended for use as a finished floor

surface, stair treads, promenade roofs, walks, walls, ceilings,

swimming pools, and all other places where tile is to form a finished

interior or exterior. The mixing of all setting mortars including but

not limited to thin-set mortars, epoxies, wall mud, and any other

sand and cement mixtures or adhesives when used in the preparation,

installation, repair, or maintenance of tile and/or similar materials.

The handling and unloading of all sand, cement, lime, tile,

fixtures, equipment, adhesives, or any other materials to be used in

the preparation, installation, repair, or maintenance of tile and/or

similar materials. Ceramic Tile Finishers shall fill all joints and

voids regardless of method on all tile work, particularly and

especially after installation of said tile work. Application of any

and all protective coverings to all types oftile installations

including, but not be limited to, all soap compounds, paper products,

tapes, and all polyethylene coverings, plywood, masonite, cardboard,

and any new type of products that may be used to protect tile

installations, Blastrac equipment, and all floor scarifying equipment

used in preparing floors to receive tile. The clean up and removal of

all waste and materials. All demolition of existing tile floors and

walls to be re-tiled.

COMMUNICATIONS TECHNICIAN

Low voltage installation, maintenance and removal of telecommunication

facilities (voice, sound, data and video) including telephone and

data inside wire, interconnect, terminal equipment, central offices,

PABX, fiber optic cable and equipment, micro waves, V-SAT, bypass,

CATV, WAN (wide area networks), LAN (local area networks), and ISDN

(integrated system digital network), pulling of wire in raceways, but

not the installation of racewavs.

MARBLE FINISHER

Loading and unloading trucks, distribution of all materials (all

stone, sand, etc.), stocking of floors with material, performing all

rigging for heavy work, the handling of all material that may be

needed for the installation of such materials, building of

scaffolding, polishing if needed, patching, waxing of material if

damaged, pointing up, caulking, grouting and cleaning of marble,

holding water on diamond or Carborundum blade or saw for setters

cutting, use of tub saw or any other saw needed for preparation of

material, drilling of holes for wires that anchor material set by

setters, mixing up of molding plaster for installation of material,

mixing up thin set for the installation of material, mixing up of sand

to cement for the installation of material and such other work as may

be required in helping a Marble Setter in the handling of all

material in the erection or installation of interior marble, slate,

travertine, art marble, serpentine, alberene stone, blue stone,

granite and other stones (meaning as to stone any foreign or domestic

materials as are specified and used in building interiors and

exteriors and customarily known as stone in the trade), carrara,

sanionyx, vitrolite and similar opaque glass and the laying of all

marble tile, terrazzo tile, slate tile and precast tile, steps, risers

treads, base, or any other materials that may be used as substitutes

for any of the aforementioned materials and which are used on interior

and exterior which are installed in a similar manner.

MATERIAL TESTER l: Hand coring and drilling for testing of materials;

field inspection of uncured concrete and asphalt.

MATERIALTESTER ll: Field inspection of welds, structural steel,

fireproofing, masonry, soil, facade, reinforcing steel, formwork,

cured concrete, and concrete and asphalt batch plants; adjusting

proportions of bituminous mixtures.

OPERATING ENGINEER . BUILDING

Class 1. Asphalt Plant; Asphalt Spreader; Autograde; Backhoes with

Caisson Attachmenu Batch Plant; Benoto (requires Two Engineers);

Boiler and Throttle Valve; Caisson Rigs; Central Redi-Mix Plant;

Combination Back Hoe Front End-loader Machine; Compressor and Throttle

Valve; Concrete Breaker (Truck Mounted); Concrete Conveyor; Concrete

Conveyor (Truck Mounted); Concrete Paver Over 27E cu. ft; Concretq

Paver 27E cu, ft. and Under: Concrete Placer; Concrete Placing Boom;

Concrete Pump (Truck Mounted); Concrete Tower; Cranes, All; Cranes,

Hammorhead; Cranes, (GCl and similar Type); Creter Crane; Spider

Crane; Crusher, Stone, etc.; Derricks, All; Derricks, Traveling;

Formless Curb and Gutter Machine; Grader, Elevating; Grouting

Machines; Heavy Duty Self-Propelled Transporter or Prime Mover;

Highlift Shovels or Front Endloader 2-U4Vd, and over; Hoists,

Elevators, outside type rack and pinion and similar machines; Hoists,

One, Two and Three Drum; Hoists, Two Tugger One Floor; Hydraulic

Backhoes; Hydraulic Boom Trucks; Hydro Vac (and similar equipment);

Locomotives, All; Motor Patrql; Lubrication Technician; Manipulators;

Pile Drivers and Skid Rig; Post Hole Digger; Pre'Stress Machine; Pump

Cretes Dual Ram; Pump Cretes: Squeeze Cretes-Screw Type Pumps; Gypsum

Bulker and Pump; Raised and Blind Hole Drill; Roto Mill Grinder;

Scoops - Tractor Drawn; Slip-Form Paver; Straddle Buggies; Operation

of Tie Back Machine; Tournapull; Tractor with Boom and Side Boom;

Trenching Machines.

Class 2, Boilers; Broom, All Power Propelled; Bulldozers; Concrete

Mixer (Two Bag and Over); Conveyor, Portable; Forklift Trucks;

Highlift Shovels or Front Endloaders under 2-114 yd,; Hoists,

Automatic; Hoists, Inside Elevators; Hoists, Sewer Dragging Machine;

Hoists, Tugger Single Drum; Laser Screed; Rock Drill (5elf-Propelled);

Rock Drill (Truck Mounted); Rollers, All;Steam Generators; Tractors,

All; Tractor Drawn Vibratory Roller; Winch Trucks with "A" Frame.

Class 3. Air Compressor; Combination Small Equipment Operator;

Generators; Heaters, Mechanical; Hoists, Inside Elevators (remodeling

or renovation work); Hydraulic Power Units (Pile Driving, Extracting,

and Drilling); Pumps, over 3" (1 to 3 not to exceed a total of300

ft.); Low Boys; Pumps, Well Points; Welding Machines (2 through 5);

Winches, 4 Small Electric Drill Winches.

Class 4. Bobcats and/or other Skid Stoer Loaders; Oilers; and Brick

Forklift.

Class 5, Assistant Craft Foreman.

Class 6. Gradall.

Class 7, Mechanics; Welders.

OPERATING ENGINEERS . HIGHWAY CONSTRUC-IION

Class 1. Asphalt Plant; Asphalt Heater and Planer Combination; Asphalt

Heater Scarfire; Asphalt Spreader; Autograder/GOMACO or other similar

type machinesl ABG Paver; Backhoes with Caisson Attachment; Ballast

Regulator; Belt Loader; Caisson Rigs; Car Dumper; Central Redi-Mix

Plant; Combination Backhoe Front Endloader Machine, (1 cu. yd. Backhoe

Bucket or over or with attachments); Concrete Breaker (Truck

Mounted); Concrete Conveyor; Concrete Paver over 27E cu. ft.; Concrete

Placer; Concrete Tube Float; Cranes, all attachments; Cranes, Tower

Cranes ofall types: Creter Crane: Spider Crane; Crusher, Stone, etc.;

Derricks, All; Derrick Boats; Derricks, Traveling; Dredges;

Elevators, Outside type Rack & Pinion and Similar Machines; Formless

Curb and Gutter Machine; Grader, Elevating; Grader, Motor Grader,

Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard

Rail Post Driver Truck Mounted; Hoists, One, Two and Three Drum; Heavy

Duty Self-Propelled Transporter or Prime Mover; Hydraulic Backhoes;

Backhoes with shear attachments up to 40' of boom reach; Lubrication

Technician; Manipulators; Mucking Machine; Pile Drivers and Skid Rig;

Pre-Stress Machine; Pump Cretes Dual Ram; Rock Drill - Crawler or Skid

Rig; Rock Drill - Truck Mounted; Rock/Track Tamper; Roto Mill

Grinder; Slip-Form Paver; Snow Melters; SoilTest Drill Rig (Truck

Mounted); Straddle Buggies; Hydraulic Telescoping Form (Tunnel);

Operation of Tieback Machine; Tractor Drawn Belt Loader; Tractor

Drawn Belt Loader (with attached pusher - two engineers); Tractor with

Boom; Tractaire with Attachments; Traffic Barrier Transfer Machinet

Trenching; Truck Mounted Concrete Pump with Boom; Raised or Blind Hole

Drills (Tunnel Shaft); Underground Boring and/or Mining Machines 5

ft, in diameter and over tunnel, etc; Underground Boring and/or Mining

Machines under 5 ft. in diameter; Wheel Excavator; Widener (APSCO),

Class 2. Batch Plant; Bituminous Mixer; Boiler and Throttle Valve;

Bulldozers; Car Loader Trailing Conveyors; Combination Backhoe Front

Endloader Machine (Less than 1 cu. yd. Backhoe Bucket or over or with

attachments); Compressor and Throttle V6lve; Compressor, Common

Receiver (3); Concrete Breaker or Hydro Hammer; Concrete Grinding

Machine; Concrete Mixer or Paver 75 Series to and including 27 cu.

ft.; Concrete Spreader; Concrete Curing Machine, Burlap Machine,

Belting Machine and Sealing Machine; Concrete Wheel Saw; Conveyor Muck

Cars (Haglund or Similar Type); Drills, All; Finishing Machine -

Concrete; Highlift Shovels or Front Endloader; Hoist - Sewer Dragging

Machine; Hydraulic Boom Trucks (All Attachments); Hydro-Blaster; Hydro

Excavating (excluding hose work); Laser Screed; All Locomotives,

Dinky; Off-Road Hauling Units (including articulating) Non

Self-Loading Ejection Dump; Pump Cretes: Squeeze Cretes - Screw Type

Pumps, Gypsum Bulker and Pump; Roller, Asphalt; Rotary Snow Plows;

Rototiller, Seaman, etc., self-propelled; Self-Propelled Compactor;

Spreader - Chip - Stone, etc,; Scraper - Single/Twin Engine/push and

Pull; Scraper - Prime Mover in Tandem (Regardless ofSize); Tractors

pulling attachments, Sheeps Foot, Disc, Compactor, etc.; Tug Boats.

Class 3. Boilers; Brooms, All Power Propelled; Cement Supplv Tender;

Compressor, Common Receiver (2); Concrete Mixer (Two Bag and over);

Conveyor, Portable; Farm-Type Tractors Used for Mowing, Seeding, etc';

Forklift Trucks; Grouting Machine; Hoists, Automatic; Hoists, All

Elevators; Hoists, Tugger Single Drum; Jeep Diggers; Low Boys; Pipe

jacking Machines; Post-Hole Digger; Power Saw, Concrete Power Driven;

Pug Mills; Rollers, other than Asphalt; Seed and Straw Blower; Steam

Generators; Stump Machine; Winch Trucks with "A" Frame; Work Boats;

Tamper-Form-Motor Driven,

Class 4. Air Compressor; Combination - Small Equipment Operator;

Directional Boring Machine; Generators; Heaters, Mechanical; Hydraulic

Power Unit (Pile Driving, Extracting, or Drilling); Light Plants, All

(1 through 5); Pumps, over 3" (1 to 3 not to exceed a total of300

ft,); Pumps, Well Points; Vacuum Trucks (excluding hose work); Welding

Machines (2 through 5); Winches, 4 Small Electric Drill Winches.

Class 5. SkidSteer Loader (all); Brick Forklifts; oilers.

Class 6. Field Mechanics and Field Welders

Class 7. Dowell Machine with Air Compressor; Gradall and machines of

like nature.

OPERATING ENGINEER . FLOATING

Diver. Diver Wet Tender, Diver Tender, ROV Pilot, ROV Tender

SURVEY WORKER - Operated survey equipment including data collectors,

G,P,S, and robotic instruments. as well as conventional levels and

transits.

TRUCK DRIVER. BUILDING. HEAVY AND HIGHWAY CONSTRUCTION

Class 1. Two or three Axle Trucks, A-frame Truck when used for

transportation purposes; Air Compressors and Welding Machines,

including those pulled by cars, pick-up trucks and tractors;

Ambulances; Batch Gate Lockers; Batch Hopperman; Car and Truck

Washers; Carry-alls; Fork Lifts and Hoisters; Helpers; Mechanics

Helpers and Greasers; Oil Distributors 2-man operation; Pavement

Breakers; Pole Trailer, up to 40 feet; Power Mower Tractors;

Self-propelled Chip Spreader; Skipman; Slurry Trucks, 2-man

operation; Slurry Truck Conveyor Operation, 2 or 3 man; Teamsters;

Unskilled Dumpman; and Truck Drivers hauling warning lights,

barricades, and portable toilets on the job site.

Class 2. Four axle trucks; Dump Crets and Adgetors under 7 yards;

Dumpsters, Track Trucks, Euclids, Hug Bottorn Dump Turnapulls or

Turnatrailers when pulling other than self-loading equipment or

similar equipment under 15 cubic yards; Mixer Trucks under 7 yeards;

Ready-mix Plant Hopper Operator, and Winch Trucks, 2 Axles.

Class 3. Five axle trucks; Dump Crets and Adgetors 7 yards and over;

Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnatrailers or

turnapulls when pulling other than self-loading equipment or similar

equipment over 15 cubic yards; Explosives and/or Fission Material

Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transiq

Oil Distributors, t-man operation; Fole Trailer, over 40 feeu Pole

and Expandable Trailers hauling material over 50 feet long; Slurry

trucks, l-man operation; Winch trucks, 3 axles or more;

Mechanic-Truck Welder and Truck Painter.

Class 4. Six axle trucks;

crane trucks with hoist

Dual-purpose vehicles, such as mounted

and accessories; Foreman; Master Mechanic;

Self-loading equipment like P.B. and trucks with scoops on the front,

TERRAZZO FINISHER

The handling ofsand, cement, marble chips, and all other firaterials

that may be used by the Mosaic Terrauzo Mechanic, and the mixing,

grindinB, grouting, cleaning and sealing of all Marble, Mosaic, and

Terrazzo work, floors, base, stairs, and wainscoting by hand or

machine, and in addition, assisting and aiding Marble, Masonic, and

Terrazzo Mechanics.

Other Classifications of Work:

For definitions of classifications not otherwise set out, the

Department generally has on file such definitions which are available.

lf a task to be performed is not subject to one of the

classifications of payset out, the Department will upon being

contacted state which neighboring county has such a classification and

provide such rate, such rate being deemed to exist by reference in

this document. lf no neighboring county rate applies to the task,

the Department shall undertake a special determination, such special

determination being then deemed to have existed under this

determination. lfa project requires these, or any classification not

listed, please contact IDOL at 2L7-782-L7L0 for wage rates or

clarifications.

LANDSCAPING

Landscaping work falls under the existing classifications for laborer,

operating engineer and truck driver. The work performed by landscape

plantsman and landscape laborer is covered by the existing

classification of laborer. The work performed by landscape operators

(regardless of equipment used or its size) is covered bythe

classifications of operating engineer. The work performed by

landscape truck drivers (regardless of size of truck driven) is

covered by the classifications of truck driver.

MATERIAL TESTER & MATERIAL TESTER/INSPECIOR I AND II

Notwith$tandinE the difference in the classification title, the

classification entitled "Material Tester l" involves the same job

duties as the classification entitled "Material Tester/lnspector 1,,.

Likewise, the classification entitled "Material Tester ll" involves

the same job duties as the classification entitled "Material

Tester/lnspector |1".

DATE: June 7,2017

REQUE$T FOR BOARD ACTION

AGENDA Engineering & ConstructionSECTION Committee

ORIGINATING Instrumentation/DEPARTMENT Remote Facilities

ITEM A Resolution Approving andRatifying Certain WorkAuthorization Orders Under QuickResponse Electrical ContractQRE-7/15 at the June 15,2017,Du Page Water CommissionMeeting (WAO 7 .014, 7.01 5)

Resolution No. R-13-17

APPROVAL

flN

Account Numbers. 01-60-663300 (Total Maximum Cost $10,860.00)

The Commission entered into certain agreements dated December29,2015, with McWilliams ElectricCo, lnc. and with Windy City Electric Co. for quick response electrical work as needed through theissuance of Work Authorization Orders" Resolution No. R-13-17 would approve the following WorkAuthorization Order under the Quick Response Electrical Contracts:

Work Authorization Order No. 014: This work authorization is to McWilliams Electric Co.lnc., to test approximately 175' of buried 7/8" antenna cable between Meter $tation 22A andWillowbrooks standpipe. lf cable is good install new antenna at an approximately elevation of 40' onside of standpipe, if cable is bad replace and then install antenna. Work with Commission staff to aimantenna. Remove temporary entenna, cable, and mast and retum to Commission. Last yearWillowbrook had their standpipe painted and the antenna was removed and a temporary antennasystem installed to maintain communications between the Commission and the meter station.McWilliams installed the temporary antenna system and from past jobs McWilliams owns equipmentfor testing the cable whereas Windy City hires it out at a much higher cost.

The total cost for this work if the antenna cable does not need to be replaced is estimatedat $3,900.00. lf the antenna cable needs to be replaced the totalestimated cost is $5,800.00

Work Authorization Order No. 015: This work authorization is to McWilliams Electric Co.lnc., to provide and replace two internally damaged electric supply disconnect$, and a corroded J-Boxenclosure with appropriate NEMA 4 enclosures at Tank Site 4. Moisture and ants found insidedisconnects causing corrosion of the disconnect linkage and apparatus, J-Box is not an outdoor NEMA4 enclosure.

Contractor Descrintion of Work Estimated CostMcWilliams Electric Renlace Disconnects & J-Box at Tank Site 4 $5,060.00Windv Citv Electric Replace Disconnects & J-Box at Tank Site 4 $8,900.00

The total cost for this work is not known but is estimated at $5,060.00.

MOTION: To adopt Resolution No" R-13-17.

DUPAGE WATER COMMISSION

RESOLUTION NO. R-13-17

A RESOLUTION APPROVING AND RATIFYINGCERTAIN WORK AUTHORIZATION ORDERS

UNDER QUICK RESPONSE ELECTRICAL CONTRACT QRE.7/15AT THE JUNE 15, 2017. DUPAGE WATER COMMISSION MEETING

WHEREAS, the DuPage Water Commission (the "Commission") entered into ceftain

agreements dated December 29,2015, with McWilliams Electric Co. Inc. and with Windy

City Electric Co., for quick response electrical work related to the Commission's Waterworks

System (said agreements being hereinafter collectively referred to as "Contract QRE-7115");

and

WHEREAS, Contract QRE-7/15 is designed to allow the Commission to direct one

or more or all of the quick response electrical contractors to pedorm emergency electrical

work, including without limitation electricalwork that the Commission is unable to perform

through its own personnel and with its own equipment, as needed through the issuance of

Work Authorization Orders; and

WHEREAS, the need for such emergency electrical work could not have been

reasonably foreseen at the time the contracts were signed;

NOW, THEREFORE, BE lT RESOLVED by the Board of Commissioners of the

DuPage Water Commission as follows:

SECTION ONE: The foregoing recitals are by this reference incorporated herein and

made a part hereof as findings of the Board of Commissioners of the DuPage Water

Commission.

$_ECTION TWO: The Work Authorization Orders attached hereto and by this

reference incorporated herein and made a part hereof as Exhibit 1 shall be and hereby are

-1-

carolyn
Draft

Resolution No. R-13-17

approved and, if already issued, ratified because the Board of Commissioners of the

DuPage Water Commission has determined, based upon the representations of staff, that

the circumstances said to necessitate the Work Authorization Orders were not reasonably

foreseeable at the time the contracts were signed, the Work Authorization Orders are

germane to the original contracts as signed, and/or the Work Authorization Orders are in the

best interest of the DuPage Water Commission and authorized by law.

SECTION THREH: This Resolution shall constitute the written determination

required by Section 33E-9 of the Criminal Code of 1961 and shall be in fullforce and effect

from and after its adoption.

AYES:

NAYS.

ABSENT:

ADOPTED this day of 2017

ChairmanATTEST:

Clerk

-?-

Board/Resolutions/201 7/R-1 3- 1 7.docx

Exhibit 1

WORK AUTHORIZATION ORDER

SHEET

CONTRACT QRE-7/15: QUIGK RESPONSE ELECTRICAL CONTRAGT

PROJECT: QRE-7.014

10F2

LOGATION:Meter Station 22A, 75th Street about half a mile East of Rte 83, Willowbrook PublicWorks

CONTRACTOR.McWilliams Electric Co.. Inc"

DESCRIPTION OF WORK.lnstall antenna mast with new Yagi antenna (provided by DWC) on side of standpipe.Test buriedTlS" Heliax antenna cable between meter station building and standpipe toodetermine condition. lf usable add necessary connectors, %" Heliax cable jumper,grounding kits, and connect to new antenna on side of standpipe. lf the buried 7/8"Heliax cable not usable replace with same type of cable, test cable, add propergrounding cables, Tz" Heliax cable jumper and connect to antenna. Work withCommission staff to aim antenna. Remove temporary antenna, cable, and mast. Coil upTz" Heliax cable carefully and return with antenna and mast to DWC.

REASON FOR WORK.The antenna for SCADA communication from the Willowbrook meter station has beenmounted on the side of Willowbrooks standpipe at an elevation of approximately 40'.Willowbrook had standpipe painted and the painting contractor removed the antenna forpainting. A temporary antenna system was installed to maintain communications. Thepainting of the standpipe is now complete and the 15' of antenna mast and antenna hasbeen reinstalled on the side of the standpipe. Unfortunately, the contractor cut the cablewhen removing the upper 15' of antenna mast with antenna. Willowbrook would like thetemporary antenna system removed and the original antenna system put back.

MINIMUM RESPONSE TIME:

None

COMMISSION.SUPPLIED MATERIALS, EQUIPMENTAND SUPPLIES TO BE INCORPORATED INTO THE WORK:

1 - Yagi AntennaRequired Heliax cable connectors, %" cable, and ground kits.

v-1

SHEET 2 OF 2

THE WORK ORDERED PURSUANT TO THIS WORK AUTHORIZATION ORDER

f-l rs |xl ts ruor pRtoRtry EMERcENcy woRK

SUBMITTALS REQUH$TED:

None

SUPPLEMENTARY NOTIFICATION OF POTENTIALLY HAZARDOUS CONDITIONS:

None

SUPPLEMENTARY CONTRACT SPECIFICATIONS AND DRAWING$:

None

DuPAGE WATER COMMISSION

Signature of AuthorizedRepresentative

DATE:

CONTRACTOR RECEIPT ACKNOWLEDGED AND DESIGNATION OF SAFETYREPRE$ENTATIVE:

Safety Rep:

By:

By.Signature of AuthorizedRepresentative

Name and 24-Hr Phone No.

DATE:

v-2

WORK AUTHORIZATION ORDER

SHEET

GONTRACT QRE-7/15: QUICK RE$PONSE ELEGTRICAL CONTRAGT

PROJECT: QRE-7.015

LOCATION.Tank Site 4, located on 75th Street in Naperville, about Tzmile West of Rt. 53

CONTRACTOR:McWilliams Electric Co., lnc.

DE$CRIPTION OF WORK:Provide and replace two internally damaged electric supply fused disconnects and J-Box with appropriate NEMA 4 enclosures.

REASON FOR WORK:Moisture and ants found inside of disconnects causing corrosion of the disconnectlinkage and apparatus, J-Box is not an outdoor NEMA 4 enclosure.

MINIMUM RESPONSE TIME.

None

COMMISSION.SUPPLIED MATERIALS, EQUIPMENTAND SUPPLIES TO BE INGORPORATED INTO THE WORK:

None

THE WORK ORDERED PURSUANT TO THIS WORK AUTHORIZATION ORDER

10F2

[-l rs [x I rs ruor pRroRrry EMERcENcy woRK

SUBMITTALS REQUESTED:

None

v-1

SHEET 2 OF 2

SUPPLEMENTARY NOTIFICATION OF POTENTIALLY HAZARDOU$ CONDITIONS:

None

SUPPLEMENTARY CONTRACT SPEGIFICATIONS AND DRAWING$:

None

DuPAGE WATER COMMISSION

$ig nature of AuthorizedRepresentative

DATE:

CONTRACTOR RECEIPTREPRESENTATIVE:

ACKNOWLEDGED AND DESIGNATION OF SAFETY

By: Safety Rep:

By:

Signature of AuthorizedRepresentative

Name and 24-Hr Phone No,

v-2

DATE: June 8,2017

REQUEST FOR BOARD ACTION

AGENDA Omnibus Vote Requiring Super-SECTION Majority or Special Majority Vote

ORIGINATING Facilities Construction/SafetyDEPARTMENT Coordinator

ITEM A Resolution Approving andRatifying Certain ContractChange Orders for MasonryRehabilitation and WindowReplacement Work for theDuPage Water Commission atthe June 15,2017, DuPageWater Commission Meeting

Resolution No. R-14-17

APPROVAL

cfoP.f(Account Numbers: 01-60-771600

Resolution No. R-14-17 would approve the following Change Orders:

Ghange Order No. 2 for Masonry Rehabilitation and Window Replacement Work at the DuPagePumping Station. There are several estimated quantities included in the Contract. The exactnumber of units was to be determined by Staff and the final Contract Price determined accordingly.The modified quantities and Contract Price modification is as listed in the table below. All otherquantities remain unchanged.

Approval of this Change Order would decrease the net Contract Price by $9t,205.00 making theFinal Contract Price $239,710.00"

Approval of this Change Order does not authorize or necessitate a decrease in the Contract Pricethat is 50o/o or more of the original Contract Price nor, based upon the Contractor's sworncertification, authorize or necessitate an increase in the price of any subcontract under the Contractthat is 50o/o or more of the original subcontract price.

Item Description UnitContractOuantiiv

Price PerUnit

AdiustedQuantitv

FinalQuantitv Extension

3 Concrete Wall Patchinq So.Ft. 100 $210.00 (100) 0 ($21.000.00)

4 Concrete Crack Fillino L.Ft. 500 $16.90 (320) 180 ($5,408.00)

5 Remove/Replace Face Brick So.Ft. 2,000 $54.20 (794) 1 206 ($43,050.00)

5a Tuckoointino of Mortar Joints Sq.Ft. 1,000 $13.86 (449) 551 ($6.220.00)

6a Remove/Replace Caulked Joints L.Ft. 300 $10.40 150 450 $1.560.007 Saw Cuttins of Control Joints L.Ft. 200 $49.45 100 300 $4.945.008 Cleaninq of Brick Surfaces Sq.Ft. 4,000 $s.+o (3.539) 461 ($12,032.00)

Net Decrease ($81,205,00)

Resolution No. R-x-17

AGENDA Omnibus Vote Requiring Super-SECTION Majority or Special Majority Vote

ORIGINATING Facilities Construction/SafetyDEPARTMENT Coordinator

ITEM A Resolution Approving andRatifying Certain ContractChange Orders for MasonryRehabilitation and WindowReplacement Work for theDuPage Water Commission atthe June 15,2017, DuPageWater Commission Meeting

Resolution No. R-14-17

APPROVAL

This Change Order would also grant Final Acceptance of the Work and Allow theto make Final Payment, including the release of all monies held in Retainage,receipt of all contractually required documentation.

General Managerconditioned upon

MOTION: To approve Resolution No. R-14-17.

DUPAGE WATER COMMISSION

RESOLUTION NO. R-14.17

A RESOLUTION APPROVING AND RATIFYINGCERTAIN CONTRACT CHANGE ORDERS AT THE

JUNE 15. 2017 DuPAGE WATER COMMISSION MEETING

BE lT RESOLVED by the Board of Commissioners of the DuPage Water Commission as

follows:

SECTION ONE: The Change Orders set forth on Exhibit 1, attached hereto and by this

reference incorporated herein and made a part hereof, shall be and hereby are approved and, if

already issued, ratified because the Board of Commissioners of the DuPage Water Commission has

determined, based upon the representations of staff and the Contractors, that the circumstances said

to necessitate the changes were not reasonably foreseeable at the time the contracts were signed,

the Change Orders are germane to the original contracts as signed and/or the Change Orders are in

the best interest of the DuPage Water Commission and authorized by law.

SECTION TWO: This Resolution shall constitute the written determination required by Section

33E-9of Article33Eof theCriminal Codeof 1961 andshall beinfull forceandeffectfromandafter

its adoption.

AYES:

NAYS:

ABSENT:

ADOPTED this _ day of 2017.

ATTEST:

Clerk

Board\Resolutions\R- 1 4- 1 7,doc

Chairman

carolyn
Draft

Exhibit 1

Resolution No. R-14-17

1. Change Order No. 2 for Masonry Rehabilitation and Window Replacement Workat the DuPage Pumping Station, for a reduction in Contract Price in the amountof $81,205.00 due to the balancing of final quantities of unit price items and alsoto Grant Final Acceptance of the Work.

DuPAGE WATER COMMISSIONCHANGE ORDER

LOCATION:

PROJECT NAME: DPPS Masonry RehabilitationAnd Window Replacements

Elmhurst, lllinois

SHEET 1 OF 3

CHANGE ORDER NO. 2

CONTRACT NO. N/A

Adiusted FinalQuantitv Quantitv

(100) 0

(320) 180

(794) 1206(44e) 551

150 450

100 300(3,539) 461

Net Decrease

CONTRACTOR: Mertes Contracting Corporation

I. A. DESCRIPTION OF CHANGES INVOLVED:

DATE: June 15.2017

Balancing of final quantities of unit price items and grant FinalAcceptance.

1"

B. REASON FOR CHANGE:

1. Close out of indeterminate items.

C. REVISION IN CONTRACT PRICE:

1. Net Decrease of $81,205.00 as detailed below.

Contract Price PerUnit Quantity UnitItem

3

4

5

5a

6a

7

I

Description

Concrete Wall Patching

Concrete Crack Filling

Remove/Replace Face Brick

Tuckpointing of Mortar JointsRemove/Replace Caulked Joints

Saw Cutting of ControlJointsCleaning of Brick Surfaces

Sq.Ft,

L.Ft.

Sq.Ft.

Sq.Ft.

L.Ft.

L.Ft,

Sq.Ft.

100

500

2,000

1,000

300

200

4,000

$210.00

$16.90

$54.20

$13.86

$10.40

$4s.45$3.40

Extension

($21,ooo.oo)

($5,408.00)

($43,050.00)

($6,220.00)

$1,560,00

$4,s45.00($12,032.00)

($81,205.00)

il.

SHEET 2 OF 3

CHANGE ORDER CONDITIONS:

1. The Completion Date established in the Contract, as signed or as modifiedby previous Change Orders, is hereby extended by 0 days, keeping thefinal Completion Date N/A.

2. Any Work to be performed under this Change Order shall be provided,performed, and completed in full compliance with, and as required by orpursuant to, the Contract, including any Specifications and ContractDrawings for the Work to be performed under this Change Order and forWork of the same type as the Work to be performed under this ChangeOrder, and as specified in the preceding "Description of Changes Involved."

3. Unless othenryise provided herein, all Work included in this Change Ordershall be guarantied and warranted as set forth in, and Contractor shall not berelieved from strict compliance with, the guaranty and warranty provisions ofthe Contract.

4. All Work included in this Change Order shall be covered under the Bondsand the insurance coverages specified in the Contract. lf the Contract Price,including this Change Order, exceeds the Contract Price set forth in theContract, as signed, by twenty percent (20o/o), Contractor shall submit toOwner satisfactory evidence of such increased coverage under the Bonds ifrequested by Owner.

ilt. ADJUSTMENTS IN CONTRACT PRICE:

1. Original Contract Price

2. Net (addition){+edsdkd dueto all previous Change OrdersNos. 1 to 1

Contract Price, not includingthis Change Order

$Eg+ien) Reduction to ContractPrice due to this Change Order

Contract Price including thisChange Order

SHEET 3 OF 3

286.445.00

$ 34.470.00

320.915.00

81.205.00

239.710.00

$

3.

4.$

5.

RECOMMENDED FOR ACCEPTANCE:

ACCEPTED: By my authorized signature below, being first duly sworn on oath, I certify onbehalf of Contractor that this Change Order does not authorize or necessitate an increasein the price of any subcontract under the Contract that is 50% or more of the originalsubcontract price.

CONTRACTOR: Mertes Contracting Corporation

By:Signature of AuthorizedRepresentative

Date

DUPAGE VVATER COMMISSION:

By:Signature of AuthorizedRepresentative

Date

DATE: June 8,2017

REQUEST FOR BOARD ACTION

ORIGINATING PiPelineDEPARTMENT

AGENDA Engineering & ConstructionSECTION Committee

WN#A Resolution Awarding QuickITEM A Resolution Awardlng (JUlcK

ResPonse Contract (Contract QR-11t17)

Resolution No. R-15-17

Account Number: 01-60-663100

The Commission entered into certain agreements beginning July 1, 2013 with John Neri

Construction Co. Inc" and Rossi ContraCtors, lnc. for quick response construction work as

needed through the issuance of Work Authorization Orders (Contract QR-10/13)' These

agreements are scheduled to end on June 30,2017. Since these contracts are critical, it is

"tatr= desire to enter into 2 new two-year contracts that would run through June 30, 2019,

with the option of extending the contracts through June 30, 2021. These stand-by contractors

perform construction work that the Commission is unable to perform through its own

personnel and with its own equipment.

At the March 16th,2017 Commission meeting, the Board approved Resolution R-8-17,

Directing Advertisement for Bids For Quick Response Contract QR-11/17. Pursuant to this

action and in accordance with Article Vlll, Section 5 of the Commission's By-Laws, and as

required by state statute, the Commission advertised for bids on two separate occasions in

the Chha go Tribune and The Daily Herald. ln addition, the Commission posted the

advertisement on its website and solicited bids by direct invitation. Sealed bids were

received until 1:00 p.m., local time, June sth, 2017, at which time all bids were publicly

opened and read aloud.

Of the Six contractors who examined the bidding documents prior to the bid opening,

Three submitted proposals. All proposals complied with the bidding documents and

contained no errors or omissions. The bid tabulation is as follows:

Bidder A B c D E

John Neri Construction Co. lnc. 354/o 104/o 8.54/o 10% $5000.00

Rossi Contractors Inc. 30o/o BYo 8% 10% $6,000.00

Benchmark Construction 550/ 15o/o 00/ 20o/o $12,000.00

Due to the indeterminate need for, and uncertain scope of, work under the contract,

bidders bid the work based upon the following pricing:

A. For Labor, prevailing wage rate/union contract wage rate plus

-o/oB. For lncorporated Material and supplies, actual cost plus

-%

AGENDA Engineering & ConstructionSECTION Committee

ORIGINATING PipelineDEPARTMENT

ITEM A Resolution Awarding QuickResponse Contract (Contract QR-11117)

Resolution No. R-15-17

APPROVAL

C. For Owned and Rented Equipment Used, modified Bluebook rate plus _'/oD. For Priority Work (3-hours or less response time), an additional _o/o on the sum of

items A, B and C

E. For Insurance and Bonds, $_ per year

Staff is recommending that a contract be awarded to John Neri Construction Co. lnc. andto Rossi Contractors, Inc. as the Commission reserved the right in the bidding documentsto award a contract to one or more bidders to, among other things, motivate a contractorto prosecute efficiently any work ordered in order to obtain future work orders.

Motion: To Adopt Resolution R-15-17

DUPAGE WATER COMMISSION

RESOLUTION NO. R.15.17

A RESOLUTION AWARDINGQUICK RESPONSE CONTRACT

(Contract QR-11117)

WHEREAS, pursuant to Article Vlll, Section 5 of the Commission's By-Laws, the

DuPage Water Commission (the "Commission") invited proposals for quick response

construction work related to the Commission's Watenrorks System; and

WHEREAS, said bid proposals were required to be in compliance with the

Commission's "Contract Documents" comprising Quick Response Contract QR-11/17;

and

WHEREAS, the Commission received two conforming bids and reserved the

right to award a contract for the Commission's Quick Response Contract QR-11117 to

one or more bidders; and

WHEREAS, the Commission has reviewed the proposals received and

determined that the proposal of John Neri Construction Co. Inc. and the proposal of

Rossi Contractors, Inc. comply with all applicable requirements of Article Vlll of the

Commission's By-Laws, are fully in compliance with requirements of the Commission's

request for proposals and are deemed to be the most favorable to the interests of the

Commission:

NOW, THEREFORE, BE lT RESOLVED by the Board of Commissioners of the

DuPage Water Commission as follows:

SECTION ONE: The foregoing recitals are hereby incorporated herein as

findings of the DuPage Water Commission.

-1-

carolyn
Draft

Resolution No, R-15-17

SECTION TWO: The DuPage Water Commission hereby awards a contract for

the DuPage Water Commission Quick Response Contract QR-11/17 to John Neri

Construction Co. Inc. and Rossi Contractors, Inc. conditioned upon the receipt of all

contractually required documentation.

SECTION THREE: This Resolution shall be in full force and effect from and after

its adoption.

AYES:

NAYS:

ABSENT:

ADOPTED TH|S _ DAY OF ,2017.

ChairmanATTEST:

Clerk

Board/Resolutions/R- 1 5- 1 7.docx

I

I

-2-

TO:

FROM:

DATE:

DuPage Water GommissionMEMORANDUM

John Spatz, General Managero -t'Y

CherylPeterson,FinancialAdministrator 0( !-!

May 9, 2017

SUBJECT: Accounts Payable Listings

Following is a summary of the Accounts Payable to be considered at the May 18,2017Commission meeting:

Apdl 12, 2017 to May 9, 2017 NP Report

Accrued and estimated payments requiredbefore June 2017 Commission meeting

$7,639,201 .18

Total $8,437,826.18

cc: Chairman and Commissioners

798.625.00

Payable Number

Payable Account:

Vendor: lgLZ17096P-7

vendor: lXLo8471467

vendor: 18028T1099988

Vendor: lOlZ288-364242

Vendor: 1980

s23s652357

vendor: 2912

535

Vendor 2!!2747723

vendori !!3!tNV0001800

Vendor: !!!5tNV0001838

vendor: 182-1

160639

vendor: 2@36L70

Vendor: 123300040616-00

00043271-N

vendor: 10924t3494t'367

vendor: 21Q5

tNV0001840

Vendor: 1892rNV0001841

vendor: 18559428335898

9428744962

Vendon 106810416785

10431966

ro4372L3

Vendor; 13!E

DuPage Water Commission

Description

01-211000. ACCOUNTS PAYABLE

ACTION AUTOMATION

ReDlacement motor and valve actuator

ARAMARK REFRESHMENTS

SuoDlies

BAKER TILLY VIRCHOW KRAUSE, TIP

PROFESSIONAL S ERVtCESt 3 /281 77 -4 / 78 I L7

BATTERIES PLUS

Batteries

BEARY IANDSCAPE MANAGEMENT

tAWN MAINTENANCE: Aoril 2017

TANK SITE LANDSCAPING: April 2017

BEDROCK EARTHSCAPES, tICSERVICE VISIT - April 2017

CITY OF AURORA

Microbial Analysis - April 2017

CITY OF CHICAGO DEPARTMENT OF WATER

LEX PUMP STATION IABOR: March 20u

WATER BILLING: April 2017

COTTEY ETEVATOR COMPANY

Flevator service for fire alarm testing

ECO CTEAN MAINTENANCC, INC.

JANITORIAL SERVICET April 2017

Elmhurst Occupational Health

Employee Physicals

Annual Physical and Respiratory Testing 2017

CI.MHURST PTAZA STANDARD INC.

Vehicle Maint: M153835

Vehicle Maint: M78556

FRANK TEANOS

Employee Reimbursement: NFPA Training

GORSKI & GOOD, ttPATTORNEY FEE: April 2017

GRAINGER

Maintenance Suppiles

Meter Station Supplies

HACH COMPANY

Monthly Chemicals

Chemicals

Monthly chemicals

HECTOR VIITEGAS

CITY OF CHICAGO SUPERINTENDENT OF WATER COTTECTION

Post Date

04/3012oL7

osl09/2or7

04/30/2OL7

04/30/20L7

04l30l2oL704l30l2or7

04/30l2OL7

04l30l2oL7

04/27l2OL7

04/30/2Or7

04/30/2017

04l30l2or7

o4127 /201704l3ol2or7

04127/2Or7

04127 /2077

04/30/2077

04/30l2Or7

04/30/2OL7

04/30/2017

04/3Ol2Or7

04/3Ol2Or7

04/30/2017

Board Open Payable ReportAs Of 05/09 /2oL7

Summarized by Payable Account

PayableAmount

2,L27.6

58.68

2,623.50

33.90

5,644.50

775.25

r,965.00

50.00

33,402.t7

7,563,732.t6

189.00

1 <<t oa

230.00

4,6s0.00

304.86

50.15

36.38

2,646.72

655.60

4,764.72

309.89

4L8.67

388.94

Payable Count; (1)

Payable Count; (1)

Payable Count: (1)

Payabl€ Count: (1)

Payable Count: (2)

Payable Count: (1)

Payable Count; (1)

Payable Count: (1)

Payable Count: (1)

Payable Count! (1)

Payable Count: (1)

Payable Count: (2)

Payable Count: (2)

Payable Count: (1)

Payable @unt: (1)

Payabl€ Counu (21

Payable Count: (31

NetAmount

2,127.OO

2,127.OO

s8.68

s8.68

2,62?.5O

2,623.50

33.90

33.90

6,4L9.75

5,644.50

775.25

1,965.00

1,965.00

50.00

s0.00

3t,4O2.t733,402.77

7,563,732.16

7 ,563 ,732.16

14n,00

189.00

r,552.981,552.98

4,880.00

230.00

4,6s0.00

355.01

304.86

50.15

36.38

36.38

2,586.72

2,686.72

4,420.32

655.60

4,764.72

L,Lt7.SO

309.89

474.67

388.94

27.93

5/9/2017 4:52tAS PM

Payable Count (1)

Page 1 of 4

Board Open Payable Report As Ot 05lo9l2or7

Payable Number

tNV0001842

vendor: 1803200029061

Vendor: 1196327486

Vendor: ?!54osv000001063794

Vendor: 139592402996s001

9 2,r030110001

924030LL2007

vendor: 2826

384s6

Vendor: !L!3PM600263661

PM600263662

PM600263663

PM600263664

PM600263655

Vendor: XQ59

000000039-c04s

00000041-c04s

Vendor: 195Q

2564

vendott UJ7668933

vendor: Il!2

Vendor: 1Q43

284678

24547L

Vendor: 1E!0466447

867513

868s73

869664

Vendor: ![ZLtNV0001828

vendor: 17233338028612

Vendor: 298472374

vendor: 11080

02s-186850

13369

Vendor: 2096rNV0001836

Description

Employee reimbursement: NFPA Training

ItuNots sEcfloN AwwAconference: Ladegaard

KARA COMPANY, INC.

Paint

Networkfleet, Inc.

Monthly Diagnostics - April 2017

OFFICE DEPOT

Office supplies

Office supplies

Office supplies

ONYX

office supplies

PATTEN INDUSTRIES, INC,

Emergency generator maintenance

Emergency generator maintenance

Emergency generator maintenance

Emergency generator maintenance

Emergency generator maintenance

RED WING SHOE STORE

Uniforms: Driscoll

Uniforms: Foushi

RORY GROUP, IIC.

CONSULTING FEE: May 2017

SCHNEIDER ETECIRIC BUITDINGS AMERICA, INC

BAS system suPport

SIR SPEEDY PRINTING AND MARKETING SERVICES

Reprints of QR contract

SOOPER LUBE

Vehicle Maint: M63637

Vehicle Maintenance: M198872

SPECIALTY MAT SERVICE

MAT SERVICE: 4/6/17MAT SERVICE: 4/13lUMAT SERVICE: 4/20/17MAT SERVICE: 4/27lU

SPI ENERGY GROUP

Electrical consulting services D-oO1-009

STAPT€S ADVANTAGE

Office supplies

STORINO RAMEI.LO & DURTIN

Professionalservices

TYIER TECHNOI"()6IES, INC

lncode Maintenancet 6h/ f7 -5/37 / 18

Credit for voided invoice O25-L42997

william A. Fates

Service as Treasureri May 2Ot7

Post Date

04/30l2Or7

04127 /2Or7

04l30l2o!7

u/3o12077

os/o9l2o!705lo9l2or7os/o9l2o!7

os/o9l2or7

04/3O/2Ot7

04l3o/207704l3o/207704l3o/207704l3ol2077

04l3o/2077o4/3O/2077

os/09/2or7

04/L8/2017

04/30/2017

04/18/2OL7

05l09/2077

04l30/201704/30/207704l3ol2or104l3ol2ot7

04/3O/2O77

05/0912077

04/30/20!7

M/301207704l3ol2077

os/o9l2o!7

PayableAmount

27.93

6s.00

629.80

26s.30

461.08

15.46

27 .L7

27L.59

698.50

469.2s

469.25

469.25

504.50

215.90

I73.40

1s00.00

916.99

293.46

36.95

45.70

156.24

156.24

156.24

L56.24

1,430.00

623.60

1,598.87

-672.74

r,666.67

NetAmount

z7.93

65,00

65.00

629.80

629.80

265.30

265.30

503.71

461.08

27.r7

27r.59

27l.59

2,6tO.75

698.50

469.25

469.25

469.25

504.50

389.30

215.90

173.40

1,500.(n1,500.00

915.99

916.99

293.46

293.46

82.65

36.95

45.70

624.96

756.24

756.24

rs6.24L56.24

1,430.00

1,430.00

323.27

323.27

623.50

523.60

926.13

1,598.87

-672.74

L,665.67

L,666.67

Payable Count: (1)

Payable Count: (ll

Payable Coune (l)

Payable Count (3)

Payable Count: (11

Payable Count (5)

Payable Count (2)

Payable Count: (l)

Payable Count: (1)

Payable Count; (1)

Payable Countr (2)

Payable Count: (4)

Payable Count: (1)

Payable Count: l1)

Payable Coune (ll

Payable Count (21

Payable Count (11

5/912017 4t52tA5 PM Page 2 of 4

Board Open Payable Report

PayableNumber Deicription

As Ot O5lo9l2oL7

NetAmount

Payable Account 0l-2U000 Payable Count: (531 Total: 7,619,20r.r8

Paya bleAmount

5/9/2017 4t52tj5 PM Page 3 of 4

Board Open Payable Report As ot 05lo9l2ot7Summary

Payable Account SummaryAccount Count

01.211@O . ACCOUNTS PAYABLE

Report Total:

Payable Fund SummaryFund

01 , WATER FUND

Reoort Total:

Amount7,639,20L.L8

7 ,6t9,20r.L4

Amount7,639,20r.r87,639,2OLL4

5191201t 4t52ij5 PM Page 4 of 4

DUPAGE WATER COMMISSIONITEMS TO BE PAID BY 6-,15.17

Board M€eting Datet May 1E,2017

Estimate Amounl Description Check Number Payment Date Paymenl Amount

52,000.00 Blue Cross Blue Shield - Health InsuEnce

6,000.00 Euclid Manag€rs - Dental Insurance

10,000.00 lllinois Public Risk Fund - Workers Comp.

200.00 Envision Health Care - Administration Fees

300.00 Healthiest You

20,000.00 ComEd - Utility Charges

300,000.00 Constellation (Exelon Energy) - Utility Charges

180,000.00 City of Chicago - Lexinglon. Eleclric

21,000.00 City of Chicago - Repairs & Maintenance

2,000.00 City of Naperville -Meter Station Electric Bills

15,000.00 Nicor - Gas

250.00 Comcast - Intemet Service

2,000.00 AT&T - Telephone Charges

2,600.00 AT & T - Scada Backhaul Network

1,000.00 Fed - Ex - Postage/Delivery

5,000.00 Procurement Card Charges

200.00 Anderson - Pest Control

400.00 Republic Services - Disposal services

200.00 Elecsys - Cell Data Services

1 ,500.00 Konica Minolta - Copy and Lease Charges

525.00 Pitney Bowes - Postage

8,000.00 Grainger - Suppljes for Operations

2,500.00 Verizon - Wireless Service

1,250.00 William Fates - Treasurer

5,000.00 Baker Tilly

2,000.00 Gorski & Good

1,500.00 Rory Group

6,000.00 John J. Millner & Assoc

7,000.00 lT Sawy - Network Support

200.00 Edward Coughlin/Ken Lafin - Security

250.00 Storino Ramello & ourkin

500.00 Local 399 Training courses

17,000.00 Sikich

1,000.00 Accurate Tank - Tank Testing

2,000.00 Beary - lnigation Repairs

100.00 Beary - Meter Station Services

4,000.00 Blackwood Associates - E-mail Services

400.00 Cintas - Safety Supplies

H:\Accounting\2017-2018\05-llcommission R€ports\EST ACCOUNTS PAYABLE LIST - May 2017

DUPAGE WATER COMMISSIONITEMS TO BE PAID BY 6-15-I7

Board M€eting Daler May 18,2017

500.00 EH Wachs - Pipeline Supplies

1,500.00 Gas Depot - Gasoline

80,000.00 Gas Deoot - Diesel Fuel

500.00 Green - April Window Cleaning

300.00 Hatfield & Company - Maintenance Supplies

2,000.00

400.00

1,500.00

1,200.00

3,000.00

200.00

400.00

500.00

7,000.00

6,000.00

7s0.00

3,000.00

7,500.00

3,500.00

HD Supply - Pipeline Supplies

IFMA - Membership Dues

lT Sawy - Configure Relay Server

McMaster Carr - Meter Station Supplies

Metro Valve - Actuator Motors

MK Baltery - Batteries

Orr Safety - Pressure Testing

Patten - Generator Service

Power Process - Parts for Actuators

RA Adams - Truck Safety Lights

Red Wing - Safety Shoes

Schneider - BAS system supporl

Neri - G10

Neri - Supplies for Valve Replacement

798,625.00

H:\Accounling\2017-m18{0slncommission R€ports\EsT ACCOUNTS PAYABLE L|ST - fiay 2017

DuPage Water Gomm issionMEMORANDUM

TO:

FROM:

DATE:

John $patz, General Manager

Cheryl Peterson, Financial Administra ro, M(t

June 6.2017

SUBJECT: Accounts Payable Listings

Following is a summary of the Accounts Payable to be considered at the June 15,2017Commission meeting:

May 10, 2017 to June 6, 2017 AIP RePod

Accrued and estimated payments requiredbefore July 2017 Commission meeting

$8,567,785,73

1 ,267,315.00

Total $9,835,100,73

cc: Chairman and Commissioners

Payable Number

Payable AEcount:

Vendon 15*q.Z

2672t

Vendorr 1663

37910887

Vendor: 2147

3l3J

vendon L2l1sls 10051517

Vendor: 1886

4?85609

{?85611

vendon 15fG8349608

vendon -L80?

8T1124125

Vendon 1017

288-108517-01

Vendon L437

uzzaq

Vendon 1692?824s28347

Vendor: 1134tNV0001890

vendon *1J*35

1NV0001895

Vendor; 1883

10540

Vendor: 1981

3_t2lz

Vendon 1283

5!08*1"5,1

Vendon 2003

ffil_

Vendor: LO97

4t444

Vendor: 1159

168348

vendor: Lq59

!_NV0S01.861

DuPage Water Commission

Descrlptlon

01-21100_Q": Acco u NTS PAYAB_IE

ACCURATE TANK TECHNOLO6IES, INC.

Underground fuel and diesel tank testing

AECOM

Transmission Main to serve Bartlett

AJ's lawnmower, Inc.

Snowblower parts

ATEXANDER CHEMICAT CORPORATION

Sodium hypochlorite

ANDERSON PEST SOTUTIONS

EXTERMINATOR SERVICE

EXTERMINATOR SERVICE

ARAMARK REFRESHMENTS

Supplies

BAKER TIttY VIRCHOW KRAUSE, ttPPROFESSIoNAL SERVICES 4/27 / L7 -5/23 | L7

BATTERIES PLUS

Batteries

BERKELEY AUTO $UPPIY INC.

Filters for air compressors

BRIDGEPOINT TECHNOTOGIES

Hosting Servie: May 2017

Hosting Services: June 2017

CIW OF CHICAGO DEPARTMENT OF WATER

LEX PUMP STATION LABOR: April 2017

WATER BILLING: Mav 2017

cooK couNw cottEcToREasement Fee 7 | tl t7 -6/30 / I8

DAWSONS TREE SERVICE INC.

Tree removal

E.H. WACHS

Handheld valve operator data collectors

ECO CTEAN MAINTENANCE, INC.

JANITORIAL SERVICE: May 2017

ETMHUR$T PI.AZA STANDARD INC,

Vehicle Maintenance; M149226

ENVISION HEAITHcARE, lNC.

ADMIN FEES: June 2017

FRED PRYOR SEMINARS

Training

CITY OF CHICA6O SUPERINTENDENT OF WATER COLTECTION

Post Date

0s/3L/2oL7

0s/23/2017

os/L6l?oLl

0s/3L/2OL7

06/ou2oL706/o2/20t7

os/3L/2OL7

os/3L/2Ot7

osl23/2OL7

os/3o/?ot7

os/23/2OL7

06102120L7

0s/30/2or7

05/3r/20r7

06/02/2Or7

osl3ll?otT

05/30lZOr7

05/3r/2or7

os/23/2OL7

06/02/2OL7

os/2f/20L7

Board Open Payable RePortAs Of 06/o6/20L7

Summarized by Payable Account

PayableAmount

s80.00

61,635,08

36.00

1,849,90

75.00

9s.00

58.58

3,762.00

117.50

154.56

45.00

45.00

30,491.90

8,413,200.36

2,99s,00

390,00

5,988.03

1,552.98

89,39

36.00

149.00

Payable Count; (rl

Payable Countr (1)

Payable Count: (1)

Payable Count: (1)

Payable Count: (2)

Payable Count: (1)

Payable Count: (1)

Payable Counti (1)

Payable Count; (l)

Payable Countr (2)

Payable Countr (1)

Payable Countr (1)

Payable Count: (1)

Payable Count; (1)

Payable Count: (r)

Payable Count: (1)

Payable Countr (1)

Payable Count: (1)

Payable Countr (1)

NetAmount

s80.00

580.00

6r,63s.0861,535.08

35.00

36.00

1,849.90

1,849.90

r70.00

75.00

95.00

s8.68

58,68

3,762.00

3,762.00

117.50

117.50

154.55

154.56

90.00

45.00

45.00

30,491.90

30,491.90

8,413,?00.35

8,413,200.35

2,99s.00

2,995.00

390.00

390.00

5,988.03

5,988.03

1,ss2.98

1,552.98

89.39

89.39

35.00

35.00

149.00

149.00

6/6/2017 B:42:40 AIY Page I of 3

Board Open Payable Report

Payable Number

Vendor: 2100

?0_1z54AE?_1_r

Vendor: 1904

-0*5-se00za

Vendor: 1111

!NV"0.-8,q18e6

Vendor; 1059

@00ppp19-1445

Vendor: 1813

FOCS106?40

Vendon 1777

611?\0

Vendor: 1EL3_

286L77

286290

Vendor: 1121

tNV0001897

V€ndor; 2029

a000e19sj7-

Vendor: 1080

025-189858

Vendor: L427

-10c_sJz-0q

Vendori 2096

rNV0001898

Vendor: UJ18482

Descrlption

HealthiestYou

Healthiest You

IT SAWY LLC

lT Network Support

NICOR GAs

DPPS GAS SVC: 4/21h1-5/26/I7

RED WING SHOE STORE

Safety Boots; castaneda, villegas and Slattery

ROESCH FORD

Vehicle Repairs: M17195

SCHNEIDER EtEgfRIC BUILDING$ AMERICA, INC

Service call on Camera Security System

SOOPER TUBE

Vehicle Repairs: M66159

Vehicle Mainu M78556

SPI ENERGY 6ROUP

Electrical Consulting Services D-001-009

TREE TOWN$ IMAGING & COTOR GRAPHICS

Print of Meter Station Drawings

TYLER TECHNOLOGIES, INC

lncode Maintena nce|, 7 / LlL7 -6/30/ rB

VITTA PARK EIECTRICAI SUPPIY CO., INC.

SurgE Protective Devices

William A. Fates

Service as Treasuruer: June 2017

windy city Electric co,

QRE 7.012

Post Date

06/0212011

06/0?/?ot7

oslsLl2OL7

oslsL/zoL7

os/3t/2oL7

os/23/20rl

os/3L/7Or7os/3L/2O17

osl3Ll2OrT

0s/3L/2Or7

os/3o/2077

0s/3L/2ot7

06/02/2Qr?

0s/3r12017

PayableAmount

288.00

6,70L.OO

1,151.58

535.47

844.00

881.28

36,95

54.94

1,560.00

118,00

2,664.90

445,50

L,666.67

27,49r.06

As of 06106lz017

NetAmount

Payable Count: (1) ?88,00

288.00

Fayable Countr (1) 5,701.00

6,701.00

Payable Countr (1) 1,151,58

1,151.58

Fayabfe Count: (1) 535.47

535.47

Payable Count: (1) 844,00

844.00

Payable Count: (1) 881,28

881.28

Payeble Countr (2) 91.89

36.9s

54.94

Payable Count: (1) 1,560.00

1,550.00

Payable Count: (1) 118,00

118,00

Payable Count: (1) 2,554.90

2,664.90

Payable count: (1) 445.50

445.50

Payable Count: (1) 1,666,67

L,666.67

Payabfe Count: (1) 27,49L,O8

27,49L.06

PayabfeAccount0l-211000 PayableCount: (35) Total: 8,567,785,73

6/6/2077 8:42:40 AM Page 2 of 3

Board Open Payable Report Asof o6lo6l2oL7

Summary

Payable Account SummaryAccount Count

O1-211OOO - ACCOUNTS PAYABLE

Report Total:

Payable Fund SummaryFund

01. WATER FUND

Report Totel:

Amount

8,s67,78s.13

8,567,745.73

Amount

8.567.785.73

8,567,74s.t3

6/6/2017 8:42:40 AM

DUPAGE WATER COMMISSIONITEMS TO BE PAID BY 7-20.17

Board Meeting Date: June 15, 2017

Estimate Amount Description

52,000.00 Blue Cross Blue Shield - Health Insurance

6,000.00 Euclid Managers - Dental lnsurance

10,000.00 lllinois Public Risk Fund - Workers Comp.

200.00 Envision Health Care - Administration Fees

300.00 Healthiest You

20,000,00 ComEd - Utility Charges

300,000.00 Constellation (Exelon Energy) - Utility Charges

180,000.00 City of Chicago - Lexington. Electric

21,000,00 City of Chicago - Repairs & Maintenance

2,000.00 City of Naperville -Meter Station Electric Bills

15,000.00 Nicor - Gas

250.00 Comcast - lnternet $ervice

2,000 00 AT & T - Telephone Charges

2,600,00 AT & T - Scada Backhaul Network

1,000.00 Fed - Ex - Postage/Delivery

5,000,00 Procurement Card Charges

200,00 Anderson - Pest Control

400,00 Republic Services - Disposal $ervic6s

200.00 Elecsys - Cell Data Services

1,500.00 Konica Minolta - Copy and Lease Charges

$25 00 Pitney Bowes - Postage

8,000.00 Grainger - $upplies for Operations

2,500,00 Verizon - Wireless $ervice

1,700.00 William Fates, Treasurer

5,000.00 Baker Tilly

5,000.00 Gorski & Good

1,500.00 Rory Group

6,000.00 John J. Millner & Assoc

7,000.00 lT Sawy - Network Suppoft

200.00 Edward Coughlin/Ken Lafin - Security

1,000,00 Storino Ramello & Durkin

500.00 Local 399 Training courses

18,000.00 Sikich

15,100.00 AECOM - Bartlett

1,500.00 Atomotic Mochanical - HVAC Services

1,140.00 Bedrock Earthscapes - Netive Prairie Maint.

4,000,00 Blackwood Associates - E-mail Threat Prev.

50.00 City of Aurora - Water testing

\\AGUA\Volz\Accounting\2017-2018\06-17\Commi$sidn R6pdrt$\EST ACCOUNTS PAYABLE LtST - Jun€ 20i7

Check Number PaymentDate Pqymqn!Amount

500 00

500,000.00

450 00

8,000 00

900 00

8,700 00

700.00

300 00

2,150,00

900.00

800,00

400.00

150,00

45,000 00

DUPAGE WATER COMMISSIONITEMS TO BE PAID BY 7.20"17

Board Meeting Date: June 15,2017

Comprehensive Communications - Antennas

Era-Valdivia - Standpipe Painting

Five Star - Gas Monitor Sensors

GexPro - Generator System PLC Pafis

IFMA - Conference expenses

lT $avvy - ASG Engineering Services

Nafisco - Temporary Traffic Control

Networkfleet - Vehicle GP$

Nugent Consulting - Insurance Consulting

Otfice Depot - Office Supplies

Specialty Mat - Mat Cleaning

Staples - Office Supplies

Villa Park Electric - Main Breaker

Mertes - Masonry Rehab and Window Repl,

1 .267,315 00

\!AGUA\Vol2\AccountingU0 l 7-?01 8\06.1 7\Coftmi$$ion R€ports\EST ACCOUNT$ PAYABLE LIST - June ?01 7

DATE: June 8,2017

REQUEST FOR BOARD ACTION

AGENDA Commission BoardSEGTION

ORIGINATING General Manager's OfficeDEPARTMENT

ITEM A Resolution Approving andAuthorizing the Execution of aCollective Bargaining Agreement witl'the International Union of OperatingEngineers Local 399 (AFL-ClO)

Resolution No. R-16-17

APPROVAL

+/ NAccount Number: 01 -60-61 1 200

In March of 2017, the Commission received a Certificate of Unit Clarification from the Stateof lllinois Labor Relations Board stating that union employees represented by Local 150 havebeen reclassified into Local 399.

After receiving notification from International Union of Operating Engineers Local 399 (AFL-CIO), the DuPage Water Commission's Chairman, General Manager, and others on behalf ofthe Commission reopened the collective bargaining negotiations between the Commissionand Local Union 399. The new proposed Agreement for Local 399 will be discussed in

Executive Session.

Note: A three year contract between the Commission and Local Union 399 was negotiatedand agreed upon by both parties.

Resolution R-16-17 would approve and authorize the execution of the proposed Agreement.

MOTION: To approve Resolution No. R-16-17.

Resolution No. R-16-17

DUPAGE WATER COMMISSION

RE$OLUTION NO. R-16-17

A RESOLUTION APPROVING AND AUTHORIZING THE EXECUTION OFA COLLECTIVE BARGAINING AGREEMENT WITH

THE INTERNATIONAL UNION OF OPERATING ENGINEERS LOCAL 399 (AFL-CIO)

WHEREAS, one group of employees of the DuPage Water Commission represented

by International Union of Operating Engineers Local 399 (AFL-CIO) ('Local 399'), the

Chairman, General Manager and others have engaged in collective bargaining with Local

399 on behalf of the Commission; and

WHEREAS, Local 399 has approved the Collective Bargaining Agreement Between

Local 399 and the Commission forthe period of May 1, 2017 through April 30,2020, as

presented to the Board of Commissioners of the DuPage Water Commission; and

WHEREA$, the Board of Commissioners of the DuPage Water Commission has

determined that it is reasonable and in the best interest of the Commission to approve the

Collective Bargaining Agreement as presented to the Commission;

NOW, THEREFORE, BE lT RESOLVED by the Board of Commissioners of the

DuPage Water Commission as follows:

SECTION ONE: Recitals. The foregoing recitals are hereby incorporated herein

and made a part hereof as findings of the Board of Commissioners of the DuPage Water

Commission.

SECTION TWO: Approval of Aqreement. The Commission does hereby approve:

A. The Collective Bargaining Agreement Between Local 399 and the Commission

for the period of May 1 ,2017 through April 30, 2020 in substantially the form attached hereto

and by this reference incorporated herein and made a part hereof as Exhibit 1.

carolyn
Draft

Resolution No. R-16-17

SECTION THRHE: Execution. The General Manager shall be and hereby is

authorized and directed to execute the Collective Bargaining Agreement in substantially the

form attached hereto as Exhibit 1; provided, however, that the document described in

Section 2.A above shall not be so executed on behalf of the Commission unless and until

the General Manager shall have been presented with copies of the document executed by

Local 399.

$ECTION FOUR: Effective Date. This Resolution shall be in full force and effect from

and after its adoption by a majority affirmative vote of all of the Commissioners including

the affirmative votes of at least 1/3 of the Commissioners appointed by the County Board

Chairman and 40% of the Commissioners appointed by the Mayors.

AYES:

NAYS:

ABSENT:

ADPOTED THIS DAY OF ,2017.

Chairman

ATTEST:

Clerk

Board/Resolutions/R-1 6-1 7

EXHIBIT 1

Please see Executive Session Packet for Document

TO:

FROM:

DATE:

DuPage Water Gomm issionMEMORANDUM

Chairman Zay and Commissioners

John F. SpatzGeneral Manager

May 1 1,2Q17

SUBJECT: April 2017 Invoice

I reviewed the Gorski & Good, LLP (Schirott, Luetkehans & Garner) April 2017invoice for services rendered during the period April 1 ,2017 - April 30, 2017 andrecommend it for approval. This invoice should be placed on the June 15, 2017Commission meeting accounts payable.

Ep

:abE

o+

E.g

fit

EE

dtgsEoEE

#o(E,E

-*E

tso(u(Jodi'E

l

EF

oq, ;i

.=

EE

Eo 4tri pEF

g8qe.6c#er#ags!JE

D^tr'iOE

9otrE

f€)FgE

FE

sg(5 O

S

IIIIIIII

,luJIF

l>

lF

lol4ltrlol-l{l=

lI

nlqlo-lE

I

Hul

><

lH

HI

(rJIP

trIF

{l{Ll

fiEul

I

pfitfJlE

EI

I

ml

*l

o llo

qilqo[ooiloc\t

[(\l@

il{A

tl

s ll;

ril-ooc;!o(o-C

{r/+

totr(s(,06U

'

rS

+O

o#8g h

r-(9J F

EgE

U

F

I#E

H

P

ii

"a,BE

s E

#

TO:

FROM:

DATE:

DuPage Water CommissionMEMORANDUM

Chairman Zay and Commissioners

John F. SpatzGeneral Manager

June 9.2017

SUBJECT: May 2017 lnvoice

I reviewed the Gorski & Good, LLP ($chirott, Luetkehans & Garner) May 2017 invoicefor services rendered during the period May 1 ,2017 - May 31 , 2017 and recommendit for approval. This invoice should be placed on the June 15, 2017 Commissionmeeting accounts payable.

c

EE

>dJ

OJ

U)

q(suf 0)

EEPF

H-R

Eot

UB

6E9o)-=

()o

;ii

*EE

EE

M(E

Oot

>(J(g

fr-'THE

EE

E€)F

Jc!tstttRE

H6

[f .f; c;:ce*ts

o,rtc-;O

O

gBE

€ e)f

llollciloiloll*lltrl[,ll"

oqoof{6,qC{

uJ=o{troEEot!0-E.uJ-av))>

{H

HItsJP

trF

<{(L

lHts

|

Edr'l

t+l{l

Hoel

I

pfit)Jl

loto

ml H

*l sI

oE(E

06Ul

crU-c

\oo#RE

;ii n

r*"1 t

E3E

6

Ec{ r

.=

ttJ ;i

..bgfi

b E

B

gEd

S E

E

TO:

FROM:

DATE:

SUBJECT:

DuPage Water Comm issionMEMORANDUM

Chairman Zay and Commissioners

John F. SpatzGeneral Manager

June 8,2017

April 2017 lnvoice

I reviewed the Storino Ramello & Durkin April 2017 invoice for services renderedduring the period April 1 ,2017 - April 30,2017 and recommend it for approval. Thisinvoice should be placed on the June 15, 2017, Commission meeting accountspayable.

o,o)(f)

Eg_$E

8(Jr9o8FO

-r9r$E

E9*;5.EP

;:Ed$s8

fiHf

PB

s??sH

;EE

<E

ooollqqciloootl$r o olle{ c{ (\r lltf(#€iltl

ro o ollro\qqil\o o ollotl

.Eftoode(t)tr

-6 tr

=tr

O

.E.s

Q o

O

*+=

=F

H E

Ef

o_E

<\

:4-1fJ

O

E<

E

atuFEFO{E.

o'{EoIUo(LE.. uJ

.:Q>

{uJ (gE

-|JlE

.Jo{F

trF

{{tL

+F

il

dpfilF

fJIooJlF

rol

I ooollo

I aoollo

9,1 'd cj ollrifrl

P * *llP

|"|.l e

lltfrttl

TO:

FROM:

DuPage Water Gomm issionMEMORANDUM

Chairman Zay and Commissioners

John F. Spatz C11|General Manager tp

DATE: June 8,2017

SUBJECT: March 2017 Invoice

I reviewed the Storino Ramello & Durkin March 2017 invoice for services renderedduring the period March 1 , 2017 - March 31, 2017 and recommend it for approval.This invoice should be placed on the June 1 5,2Q17 , Commission meeting accountspayable.

o)o)(eE_$<

o'.=

r{)ctr9oF

EL,' .FO

-rgEE

_9o*oi.0P;:EB

SF

s

fiHfi

BB

eP

?AH

;EE

dts

@tuFEOtro-{Eoluo(LE.UJ

_-_ @

uro4, ul(tsJ(-)<F

trF

{{(L

ooolloootld d cillc\| o otl$l

$t C

\illc+

(+ r#lltl

co o olloa? u? qiloq* o oll*tl

o o elleq q qilsq(r) o oll({)c{ o

6+ll(\l

lf) F

ll(O

n@ ll*tl

fiHi

{rdpfilF

f,JIQ

OJI

*_El

I

frlIJJ

I*l

,Et=ood_goLtr16

tr9d

O

.E.q

le !? E

EE

+c

uJ _f =

e'E

E

o6ts(u .Y

<

1, _.:

E@

LJ

E<

E