Discussion of Consultant Hiring Process Master Plan ...
Transcript of Discussion of Consultant Hiring Process Master Plan ...
5/2/2018
1
bureau of engineering
City of Los Angeles
Silver Lake Reservoir Complex
Master Plan
Discussion of Consultant Hiring Process
MAY 1, 2018
COMMUNITY OPEN HOUSE
FRIENDSHIP AUDITORIUM
3201 RIVERSIDE DRIVE
Page 1
Welcome
Council District 4
David E. Ryu (Councilmember)
Rachel Fox
Nikki Ezhari
Council District 13
Mitch O’Farrell (Councilmember)
Christine Peters
Mary Rodriguez
Page 2
5/2/2018
2
Project TeamBureau of Engineering (BOE)
Deborah Weintraub, AIA, LEEDAP
Chief Deputy City Engineer
Cyril Charles, P.E.
Project Manager
Armen Dermenjian
Asst. Project Manager
Mary Nemick
Director of Communications
In coordination with Los Angeles Dept. of Water and Power (LADWP)Page 3
Agenda
Background
Process for Hiring Consultant
for Master Plan
Project Overview
Project Schedule
Page 4
5/2/2018
3
Background
Memorandum of Agreement
(MOA) was approved by LADWP
Board in January 2018
MOA was approved by Board of
Public Works in March 2018
MOA was approved by City
Council on March 27, 2018
Council File (CF No. 08-3420-S1)
Page 5
Project Introduction
Introduction
Objectives
LADWP Facilities
LADWP Scheduled and Planned
Projects
Project Description
Page 6
5/2/2018
4
Introduction
Silver Lake and Ivanhoe Reservoirs
Engineered by William Mulholland
and completed in 1908
Located on an approximately 127
acre site
Both reservoirs are decommissioned
and replaced with a new covered
water storage facility north of
Griffith ParkPage 7
Project Objectives
Update from Year 2000 Master Plan
Guide Future Public Uses and Future
Physical and Operational Changes
Stakeholder and Community Input
Maintain LADWP Access
Page 8
5/2/2018
5
Page 9
LADWP Facilities and Scheduled Projects
LADWP Facilities
Approximately 81 acres of
reservoir surface (64%) and 46
acres of land area (36%)
Approximately 13 acres of the
land space is restricted for LADWP facilities and infrastructure
Page 10
5/2/2018
6
LADWP Facilities and Scheduled Projects
LADWP Scheduled and Planned Projects
Pollock Well #3 Groundwater Supply
Project
Gate Well Modifications
Silver Lake Stormwater Capture Project
Aeration and Recirculation Systems Project
Page 11
LADWP Facilities and Scheduled Projects
LADWP Scheduled and Planned Projects
Modular Offices for LADWP
Reservoir Re-characterization Permit with
the Los Angeles Regional Water Quality
Control Board
Silver Lake Reservoir Walkway
(COMPLETED Spring 2018)
Ivanhoe Reservoir Walkway
Page 12
5/2/2018
7
Project Description
Current Publicly Accessible Areas
Areas to Be Considered for Expanded
Public Access and New Uses
Natural Resources
Water Level in Reservoirs
Page 13
Project Description
Water Sources
Reservoir Edge Condition
Potential Support Facilities
Public Activities on the SLRC Site
Envision Guidelines
Page 14
5/2/2018
8
Project Schedule2018 2019 2020
TaskStart
Date
End
DateJ F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
Memorandum of Agreement
Approved Mar-18 Mar-18
Develop Project Description and
Scope of Work Mar-18 May-18
Select Master Plan Consultant Jun-18 Oct-18
Issue Notice to Proceed to
Selected Consultant Oct-18 Oct-18
Draft Master Plan Oct-18 Oct-19
Prepare and Submit Final Master
Plan Oct-19 May-20
Master Plan Approval May-20 Nov-20
Page 15
Master Plan Consultant Selection Process
Prepare and Issue Request for
Proposals
Interview and Short-List Firms
Short-Listed Firms to Present to
the Community (Fall 2018)
Select Highest Rated Firm
Award Contract
Start Master Plan Design ProcessPage 16
5/2/2018
10
Comment Cards
Page 19
moving forward
Project Description Available for
comments on May 2, 2018
Project Description Available at:
eng.lacity.org/silverlake_reservoirs
Comment Period Closes on May 22,
2018
City Council MOA approval (CF No. 08-3420-S1) available at:
https://cityclerk.lacity.org/lacityclerkconnect/index.cfm
Page 20