    Diaphragm Wall Work forDiaphragm Wall Work for

    the Proposed Residential Developmentthe Proposed Residential Development

  • 7/14/2019 Diaphragm Wall Construction Work

    2/41

    Project DescriptionProject Description

    Approximate Value: HK$214M

    Contract Duration: 390 days

    Commencement Date : 03 May 2010

    Completion Date: 27 May 2011

    Client: Sino Group / Hopewell Holdings

    Ltd. / URA

    Consultant: CM Wong

    Main Contractor: Gammon Construction Ltd

  • 7/14/2019 Diaphragm Wall Construction Work

    3/41

    IntroductionIntroduction

    Diaphragm Wall is generally reinforced concrete

    wall constructed in the ground using under slurry

    technique which was developed in Europe. e tec nique invo ves excavating a narrow trenc

    that is kept full of an engineered fluid (Bentonite) of

    slurry.

    Walls of thickness between 300 and 1200 mm can

    be formed in this way up to a depth of 45 meters.

  • 7/14/2019 Diaphragm Wall Construction Work

    4/41

    Advantage of Diaphragm WallAdvantage of Diaphragm Wall

    Diaphragm walls are underground structural

    elements commonly used as retention systems and

    permanent foundation walls. They can also be used

    as groundwater barriers. The primary advantage of

    a diaphragm wall over a secant wall is the reduced

    number of joints in the wall which ultimately

    improves the walls water tightness. Diaphragm walls

    tend to be used for retaining very deep excavations

    as they can be designed to take very high structural

    loads.

  • 7/14/2019 Diaphragm Wall Construction Work

    5/41

    Conceptual sketch showing the RCC Diaphragm WallConceptual sketch showing the RCC Diaphragm Wall

    Excavation of

    Panel

    Installation of

    Rebar Cage

    Concreting

    of Panel

  • 7/14/2019 Diaphragm Wall Construction Work

    6/41

    &RQFHSWXDOVNHWFKVKRZLQJWKH5&&'LDSKUDJP&RQFHSWXDOVNHWFKVKRZLQJWKH5&&'LDSKUDJP

    :DOO:DOO

  • 7/14/2019 Diaphragm Wall Construction Work

    7/41

    Project DescriptionProject Description

    Scope of Work:Scope of Work:

    Bored Piles WorkBored Piles Work

    Diaphragm Wall WorkDiaphragm Wall Work

    Utilities DiversionUtilities Diversion

    Hoarding ModificationHoarding Modification

  • 7/14/2019 Diaphragm Wall Construction Work

    8/41

    Project Description (Diaphragm Wall Work)Project Description (Diaphragm Wall Work)

    Total LengthTotal Length : 420m (approximate): 420m (approximate)

    ThicknessThickness : 800mm, 1000mm and 1200mm: 800mm, 1000mm and 1200mm

  • 7/14/2019 Diaphragm Wall Construction Work

    9/41

    Construction SequenceConstruction Sequence

    Grout Curtain WallGrout Curtain Wall

    Near Historical BuildingNear Historical Building

    Diaphragm Wall ConstructionDiaphragm Wall Construction

    Contact Grout (for Load Bearing Panels only)Contact Grout (for Load Bearing Panels only)

    Shear Pin InstallationShear Pin Installation

  • 7/14/2019 Diaphragm Wall Construction Work

    10/41

    Grout Curtain WallGrout Curtain Wall

    Near Historical BuildingNear Historical Building

    TubeTube--AA--Manchettes (TAM) Grouting MethodManchettes (TAM) Grouting Method

    Spacing @ 1.5 c / c down to rockhead /Spacing @ 1.5 c / c down to rockhead / --40mPD40mPD

  • 7/14/2019 Diaphragm Wall Construction Work

    11/41

    Grout Curtain WallGrout Curtain Wall

    Carry out in Rises from the bottom upCarry out in Rises from the bottom up

    to Exiting Ground Levelto Exiting Ground Level

    Grout in 2 stagesGrout in 2 stages

    BentoniteBentonite -- Cement GroutCement Grout

    Chemical GroutChemical Grout

    (Solution A + Solution B)(Solution A + Solution B)

  • 7/14/2019 Diaphragm Wall Construction Work

    12/41

    Diaphragm Wall ConstructionDiaphragm Wall Construction

    Total LengthTotal Length :: 420m (approximate)420m (approximate)

    ThicknessThickness :: 800mm, 1000mm and 1200mm800mm, 1000mm and 1200mm

    Total PanelTotal Panel : 83no.s: 83no.s

    Normally construction period :Normally construction period :

    around 7 ~ 10 days for eacharound 7 ~ 10 days for each

  • 7/14/2019 Diaphragm Wall Construction Work

    13/41

    Diaphragm Wall ConstructionDiaphragm Wall Construction

    Wall ThicknessWall Thickness 800mm, 1000mm and 1200mm800mm, 1000mm and 1200mm

    Type of DType of D--Wall PanelWall Panel Load Bearing Panel /Load Bearing Panel /

    NonNon--Loading Bearing PanelLoading Bearing Panel

    Panel DepthPanel Depth Type 1:Type 1: --1212 mPDmPD

    Type 2:Type 2: --2020 mPDmPD

    Type 3:Type 3: --2727 mPDmPD

    Type 4:Type 4:-- 2525 mPDmPD

    500mm key500mm key--in into Bedrockin into Bedrock

    (Grade III/IV)(Grade III/IV)

    non-loadbearing

    load /non-loadbearing

  • 7/14/2019 Diaphragm Wall Construction Work

    14/41

    Elevation View AElevation View A

    VIEW AVIEW A

    +5.0+5.0

    +0.0+0.0

    --5.05.0

    --10.010.0

    --15.015.0

    --20.020.0

    --25.025.0

    --30.030.0

    Grade III / IVGrade III / IV

  • 7/14/2019 Diaphragm Wall Construction Work

    15/41

    Elevation View BElevation View BVIEW BVIEW B

    +5.0+5.0

    +0.0+0.0

    --5.05.0

    --10.010.0

    --15.015.0

    --20.020.0

    --25.025.0

    --30.030.0

    --35.035.0

    --40.040.0

    --45.045.0

    --50.050.0

    --55.055.0

    Grade III / IVGrade III / IV

    SoilSoil

  • 7/14/2019 Diaphragm Wall Construction Work

    16/41

    Elevation View CElevation View C

    VIEW CVIEW C

    +5.0+5.0

    +0.0+0.0

    --5.05.0

    --10.010.0

    --15.015.0

    --20.020.0

    --25.025.0

    --30.030.0

    --35.035.0

    --40.040.0

    --45.045.0

    --50.050.0

    --55.055.0 Grade III / IVGrade III / IV

    SoilSoil

  • 7/14/2019 Diaphragm Wall Construction Work

    17/41

    Guide Wall ConstructionGuide Wall Construction

    EnsureEnsure TrenchTrench ExcavationExcavation RemainsRemains withinwithin AllowableAllowable ToleranceTolerance

    SupportSupport ReinforcementReinforcement Cages,Cages, TremieTremie PipesPipes andand OtherOther EquipmentEquipment

    MaintainMaintain BentoniteBentonite MudMud LevelLevel

  • 7/14/2019 Diaphragm Wall Construction Work

    18/41

    Diaphragm Wall ExcavationDiaphragm Wall Excavation

    UsingUsing ClamshellClamshell toto ExcavateExcavate SoilSoil

    DifferentDifferent ThicknessThickness toto SuitSuit DD--WallWall ThicknessThickness

  • 7/14/2019 Diaphragm Wall Construction Work

    19/41

    Diaphragm Wall ExcavationDiaphragm Wall Excavation

    HydromillHydromill

    UsingUsing CutterCutter forfor ExcavationExcavation

    AdjustableAdjustable CutterCutter ThicknessThickness toto

    SuitSuit DD--WallWall ThicknessThickness

  • 7/14/2019 Diaphragm Wall Construction Work

    20/41

    Diaphragm Wall ExcavationDiaphragm Wall Excavation

    ControlledControlled ChiselingChiseling forfor RockRock SocketSocket

    andand RemovalRemoval ofof ObstructionsObstructions

  • 7/14/2019 Diaphragm Wall Construction Work

    21/41

    Joint CleanerJoint Cleaner

  • 7/14/2019 Diaphragm Wall Construction Work

    22/41

    Stopend and Waterstop InstallationStopend and Waterstop Installation

  • 7/14/2019 Diaphragm Wall Construction Work

    23/41

    RemoveRemove SoilSoil DebrisDebris ininthethe returnedreturned BentoniteBentonite

    DesandingDesanding

  • 7/14/2019 Diaphragm Wall Construction Work

    24/41

    LapLap Length,Length, StartersStarters //CouplersCouplers LocationLocation AreAreClearlyClearly MarkedMarked onon SteelSteelCagesCages

    StartersStarters // CouplersCouplers AreAre

    Steel Cage InstallationSteel Cage Installation

    ConnectionConnection ofof SteelSteel

    CagesCages byby UU--boltsbolts

  • 7/14/2019 Diaphragm Wall Construction Work

    25/41

    PouringPouring ConcreteConcrete toto CompleteCompletethethe PanelPanel byby TremieTremie MethodMethod

    Concreting of PanelConcreting of Panel

  • 7/14/2019 Diaphragm Wall Construction Work

    26/41

    Typical Panel ArrangementTypical Panel Arrangement

    WATER

    STOP

    STOP

    END

  • 7/14/2019 Diaphragm Wall Construction Work

    27/41

    Construction SequenceConstruction Sequence

  • 7/14/2019 Diaphragm Wall Construction Work

    28/41

    Construction SequenceConstruction Sequence

  • 7/14/2019 Diaphragm Wall Construction Work

    29/41

    Contact GroutContact Grout

    CarriedCarried outout forfor LoadingLoading PanelPanel OnlyOnly

    DrillDrill ThroughThrough ReservationReservation TubeTube toto aa

    DepthDepth 11mm belowbelow ToeToe ofof DD--WallWall

    CarryCarry outout ContactContact GroutGrout toto ProvideProvide

    GoodGood ContactContact betweenbetween DD--WallWall //

    BedrockBedrock

  • 7/14/2019 Diaphragm Wall Construction Work

    30/41

    Shear Pin InstallationShear Pin Installation

  • 7/14/2019 Diaphragm Wall Construction Work

    31/41

    Provision of Shear PinProvision of Shear Pin

    RockheadRockhead wouldwould bebe encounteredencountered atatmuchmuch shallowershallower depths,depths, AsAs such,such, duedue totothethe difficultiesdifficulties forfor excavationexcavation intointo rockrockforfor thethe constructionconstruction ofof diaphragmdiaphragm wall,wall,

    shearshear pinpin isis adoptedadopted asas anan extensionextension ofofap ragmap ragm wawa n on o e roce roc en anceen ance

    thethe toetoe stabilitystability ofof thethe DD--wallwall..

  • 7/14/2019 Diaphragm Wall Construction Work

    32/41

    Inspection and TestInspection and Test

    Tests and Inspections Acceptance Criteria Frequency Method of Inspection

    Setting Out D-Wall thickness +/-50mm Every Panel Surveying

    D-Wall Rockhead Level As stated in drawing Every Panel Visual Inspection

    D-Wall Toe Level As stated in drawing Every Panel Measuring tap

    Fabrication of Steel Cage As stated in drawing Every Cage Measurement

    Verticality Test 1:80 Every Panel Lowering of Chisel

    Bentonite Testing Stated in drawing - Stated in drawing

  • 7/14/2019 Diaphragm Wall Construction Work

    33/41

    Verticality ControlVerticality Control

    LoweringLowering ChiselChisel

    inin DD--WallWall TrenchTrench

    forfor CheckingChecking

  • 7/14/2019 Diaphragm Wall Construction Work

    34/41

    Testing of BentoniteTesting of Bentonite

    Property to be Measure Test Method & Apparatus Fresh Bentonite Prior to Concreting Re-use

    Density (g/ml) Mud Balance 1.01 to 1.03

  • 7/14/2019 Diaphragm Wall Construction Work

    35/41

    Monitoring (Bentonite Slurry Level)Monitoring (Bentonite Slurry Level)

    ImmediateImmediate LossLoss ofof BentoniteBentonite SlurrySlurry duringduring ExcavationExcavation

    PossiblePossible ResultResult inin TrenchTrench StabilityStability

    TrenchTrench toto bebe ImmediatelyImmediately BackfilledBackfilled withwith ExcavatedExcavated SoilSoil

  • 7/14/2019 Diaphragm Wall Construction Work

    36/41

    Monitoring (Alert / Alarm / Action Level)Monitoring (Alert / Alarm / Action Level)

    Alert Level Alarm Level Action Level

    Ground Settlement Check Point (Sensitive) 5mm 8mm 12mm

    Ground Settlement Check Point (General) 15mm 20mm 25mm

    Buildin Settlement Check Point Sensitive 5mm 7mm 10mm

    Building Settlement Check Point (General) 8mm 10mm 15

    Vibration Check Point 3mm/s 5mm/s 7.5mm/s

    Piezometer - 0.4m drop 0.5m drop

    Tilting 1:1000 1:750 1:500

    Water Main Check Point 10mm 15mm 20mm

  • 7/14/2019 Diaphragm Wall Construction Work

    37/41

    Sonic Logging TestSonic Logging Test

    TheThe SonicSonic LoggingLogging TestTest cancan bebe thethe mostmost suitablesuitable methodmethod toto detectdetect thetheconcreteconcrete defectsdefects ofof thethe diaphragmdiaphragm wall,wall, suchsuch asas honeycombinghoneycombing duedue totoinadequateinadequate vibration,vibration, segregationsegregation duedue toto overover vibrationvibration andand improperimproperconcreteconcrete placementplacement method,method, washwash outout ofof cement,cement, crackscracks inin thethe wallwall..Therefore,Therefore, efforteffort mustmust bebe takentaken toto ensureensure eacheach wallwall buildbuild upup onon sitesite toto bebefreefree fromfrom anyany kindkind ofof defectsdefects duringduring thethe constructionconstruction..

  • 7/14/2019 Diaphragm Wall Construction Work

    38/41

    Interface Coring TestInterface Coring Test

    TheThe purposepurpose ofof thethe testtest isis toto verifyverify thetheinterfaceinterface conditioncondition ofof thethe concreteconcrete andandbedrockbedrock..

  • 7/14/2019 Diaphragm Wall Construction Work

    39/41

    Daily Progress Report for Monitoring ofDaily Progress Report for Monitoring of

    Diaphragm wallDiaphragm wall

  • 7/14/2019 Diaphragm Wall Construction Work

    40/41

    Daily Progress Report for Monitoring ofDaily Progress Report for Monitoring of

    Diaphragm wallDiaphragm wall

  • 7/14/2019 Diaphragm Wall Construction Work

    41/41

    Thank YouThank You