DATELINE company profile
-
Upload
sola-onifade -
Category
Documents
-
view
184 -
download
0
Transcript of DATELINE company profile
DATELINE ENERGY SERVICES LTD P r o v i d in g T o p Q u a l i t y S e r v ic e s T o T h e O i l & G a s I n d u s t r y
CORPORATE OFFICE AND YARD:
PLOT 16, JESSY AND JENNY ROAD
TRANS AMADI INDUSTRIAL LAYOUT
PORT HARCOURT
RIVERS STATE
NIGERIA
Tel:+234 (0) 84 786 193
+234 (0) 803 709 4993
+234 (0) 802 305 4742 E-mail: [email protected]
Website: www.datelineenergy.com
COMPANY PROFILE
DATELINE ENERGY SERVICES LTD is a Nigerian indigenous company set up to provide the following technical support services to the oil and gas, marine and energy industries.
Environmental, Process, and Thermal
engineering services,
Mechanical Engineering Design and Construction,
Fabrication, supply and installation of process equipment and Instrumentation.
Operations and Maintenance Services
Inspection and Corrosion Engineering services.
Marine Services
Dredging Services DATELINE is a fast growing, dynamic organization dedicated to giving the Nigerian Oil & Gas Industry the much needed participation and increased local content. DATELINE is propelled by keen, motivated professionals-each dedicated to providing the best solutions for our client needs. Achievement of Total Customer Service is our vision. From the moment you give us that job to upgrade your facility, rehabilitate or even build a new flow station, you can be sure that we have all resources - expertise, materials, facilities, foreign suppliers, logistics, funds etc to provide you with Total and Quality Service.
Other Services Includes; Turnkey construction of Onshore and Offshore Oil & Gas projects including Jetties, Storage Tanks, Pressure Vessels, Columns, Evaporators, Fire Heaters, Packaged Equipment, Pipe coating, Pipe laying, and related items.
installation + Planned maintenance
and after sales service.
MECHANICAL ENGINEERING WORKS
Petrochemical plants and refineries (gas treatment plants, gathering centers and pumping stations, bulk crude handling and storage facilities, prefabrication of piping spools, pipe supports and structural assemblies), oil loading and off-loading terminals, fabrication of platforms for off-shore facilities Heavy and light industrial plants
PIPELINES
Water, oil and gas MAINTENANCE OF MECHANICAL
INSTALLATION & STRUCTURES Oil refineries, petrochemical plants, offshore
structures
BUILDING & CIVIL ENGINEERING WORKS
Construction of Jetties, Power plants, Housing and high quality buildings including hotels, hospitals and educational institutions. Construction of Roads, highways, drainages, etc
De-sanding / Desludging of 25,000 barrel Crude Oil storage Tank
MECHANICAL SERVICES
Sand-blasting and painting of tanks and steel structures Pipe work (isometric) design and construction
Oil gathering -
EPCI Activities:
Process
Mechanical
Piping
Electrical & Instrumentation
Civil / Structural
Facilities Management
Safety
CCRRUUDDEE OOIILL FFAACCIILLIITTIIEESS
Oil Production Trains (Separators, Heater-Treaters / Dehydrators, Desanders, etc)
Crude Oil Storage Tanks and Export Facilities Crude Oil Pipelines
Gas Compression Systems Flare gas knockout vessels Gas transmission pipelines Flare auto-ignition systems O & M of Gas facilities
GGAASS HHAANNDDLLIINNGG AANNDD TTRREEAATTMMEENNTT FFAACCIILLIITTIIEESS
MECHANICAL ENGINEERING WORKS
Prefabrication of piping spools, pipe supports and structural assemblies), oil loading and off-loading terminals, fabrication of platforms for off-shore facilities Heavy and light industrial plants
PIPELINES Water, oil and gas
Commissioning of line heater Auto Ignition system at flow Station
MARINE SERVICES
Provision/Leasing of Supply/Tug boats Salvaging of marine wrecks Dredging and Reclamation Canalization, Stockpiling and Shore protection Provision/Leasing of Barges Provision/Leasing of Accommodation vessels
DREDGING SERVICES
Reclamation Canalization Stockpiling Shore protection
7
DATELINE MANPOWER STRUCTURE
TOTAL (Inclusive off Non Permanent Staff) 44
4
6
4
10
9
11
1. Dateline Safety & Controls Department monitors and supports all our projects sites.
2. Dateline effectively implements a Standardized Project Safety Program Structure throughout all our Projects.
3. Dateline conforms to certification ISO 14001 Environmental Management Systems.
Safety
Health
Environment Zero Accidents
Dateline is committed to the principle of providing all their Clients with quality services/products, ensuring the achievement of the agreed specifications. Dateline operate a TQM system, backed by accredited ISO 9001/9002 QA/QC systems. By so doing, we intend to remain a market leader by pursuing a program of continuous quality improvement.
MMAATTEERRIIAALLSS CCAAPPAABBIILLIITTYY
STRUCTURAL STEEL The following steel materials can be welded in our shop: ASTM A 36 - ASTM A 283 GRADE C - ASTM A 516 GRADE 65 - ASTM A 572 GRADE 50/42 - ASTM A 285 GRADE C
Our Welding Engineering and Quality Control Department is capable of developing welding procedures to deal with any weldable material in the construction industry, including (TIG/MIG welding, SMAW welding, etc).
PIPE The following pipe materials can be welded in our shop:
ASTM A 106 GRADE B Carbon Steel
ASTM A 335 GRADE P5 Chrome Molybdenum Steel ASTM A 335 GRADE P11 Chrome Molybdenum Steel
ASTM A 333 GRADE 6 Carbon Steel Low Temperature ASMT SB 165 Model
API 5L X 52 Carbon Steel API 5L X 60 Carbon Steel
ASTM A 527 GRADE 50/42 Carbon Steel ASTM A 53 Carbon Steel
API 5L GRADE B Carbon Steel ASTM A 312 GRADES 316L, 304L, 321Austenitic Stainless Steel
EQUIPMENT LIST
S/N Items Qty
1 Welding Machine (Self Excited) 4
2 Stress Relieving Equipment 2 Sets
3 Sand/Grit Blasting Set 7
4 Portable Grinding Machine 8
6 Oxy Acetylene Set. 4
7 Haib Self Loader 10 Ton 1
8 Chain Block 5 Ton 5
9 Well Head Cyclone De-sander 2
10 Spray Painting Machine 3
11 Tube Bending Machine 1
12 Air Compressor 3
13 Scaffold Lot
14 Power Generators 45 KVA 1
15 Concetere Mixer 1
16 30 Ton Low Bed 1
17 25 Ton Crane 1
18 Cutter Suction Dredges 3
19 Flat top Barge 1
TTEECCHHNNIICCAALL PPAARRTTNNEERRSS
CCMMII GGRROOUUPP FFRRAANNCCEE DDiirreecctt NN--PPaakktt LLLLCC-- UUSSAA PPRROOTTOOTTYYPPEE IINNTTEEGGRRAATTEEDD SSOOLLUUTTIIOONNSS..IINNCC CCAANNAADDAA
SSEELLIIGG SSEERRVVIICCEESS--GGHHAANNAA RROOVVIINN EENNEERRGGYY--UUKK VVAALLEERRUUSS CCOOMMPPRREESSSSIIOONN SSEERRVVIICCEESS--HHOOUUSSTTOONN