Fire Statistics

Visibility: 47% of survivors caught in a firecould not see more than 12 feet (3.6 m).

Why must we contain Smoke, Toxic Gases and Fire?

3/4 of all fire deaths are caused bysmoke inhalation.

Approximately 57% of people killed infires are not in the room of the fire’s origin.

Source: Hall, Jr. John R. NFPA Fire Analysis & Research, Quincy, MA. “Burns, Toxic Gases, and other Hazards”.

Source: NFPA Fire Protection Handbook, 18th Ed. Table 1-1P. Pg.1-15.

Source: NFPA Fire Protection Handbook, 18th Ed. Table 8-1P. Pg. 8-17.

Safety Design in Buildings – Forum – Dubai 2012 3www.hilti.com

What is the leading killer in fires?

Smoke & Toxic Gases

Safety Design in Buildings – Forum – Dubai 2012 4www.hilti.com

Consider this:

• A square room 20 ft x 20 ft x 20 ft has a pencil hole betweencompartments.

• How long will it take for the smoke to fill the room to a thickness suchthat you cannot see your hands 18 inches in front of you?

How Fast Does Smoke Travel?

Safety Design in Buildings – Forum – Dubai 2012 5www.hilti.com

Pencil Hole

3 minutes40 seconds

20 ft x 20 ft x 20 ft room

Smoke travels 120-420 feet per minute (36 – 128 m/min), under fire conditionsSource: Estimate based upon ceiling jet velocity calculations for typical ceiling heights and heat release rates.

Safety Design in Buildings – Forum – Dubai 2012 6www.hilti.com

The Balanced Approach to Fire Protection

We can’t rely on any single action or safeguardto keep people safe

Safety Design in Buildings – Forum – Dubai 2012 7www.hilti.com

2nd Floor

1st Floor

GroundFloor

CurtainWall

Floor Slab

Chimney Effect –Internal Spread

Main Risks in Perimeter Joints:

Safety Design in Buildings – Forum – Dubai 2012 8www.hilti.com

1st Floor

2nd Floor

3rd FloorVision glass

Spandrel panel(glass, stone, metal...)

Mullions

Transoms

External Spread – “Leap Frog”

Main Risks in Perimeter Joints:

Safety Design in Buildings – Forum – Dubai 2012 9www.hilti.com

Main Risk in Perimeter Joints:

External Spread – “Leap Frog”

Al Tayer Tower – Sharjah 2012 Al Nasser Tower – Doha 2006

Safety Design in Buildings – Forum – Dubai 2012 10www.hilti.com

Critical Parts:1. CW Insulation

3. Safing Rockwool2. Firestop Spray

Safety Design in Buildings – Forum – Dubai 2012 11www.hilti.com

Critical Parts:

1. CW Insulation(Leap Frog Effect)

2. Safing Rockwool(Chimney Effect)

3. Firestop Spray(Chimney Effect)

Safety Design in Buildings – Forum – Dubai 2012 12www.hilti.com

• 3 Main Testing Standards:

1. ASTM E2307: “Standard Test Method for Determining Fire Resistanceof Perimeter Fire Barriers Using Intermediate-Scale, Multi-Story TestApparatus”

2. EN 1364 – Part 3: “Fire resistance of curtain walling systems – fullConfiguration” – Fire Resistant Glazing

3. EN 1364 – Part 4: “Fire resistance of parts of curtain walling” – Non-Fire Resistant Glazing

Testing Of Curtain Wall Systems:

Safety Design in Buildings – Forum – Dubai 2012 13www.hilti.com

ASTM E2307

Standard Test Method forDetermining Fire Resistanceof Perimeter Fire BarriersUsing Intermediate-Scale,Multi-Story Test Apparatus

Safety Design in Buildings – Forum – Dubai 2012 14www.hilti.com

ASTM E2307 – Test Assembly

Cross-section view

backface

View from front face

Safety Design in Buildings – Forum – Dubai 2012 15www.hilti.com

Curtain Wall TestAssembly

Pre-Burn

Transom above floor

Transom below floor

Mechanical attachmentssupporting insulation

Mineral wool insulation atspandrel area

Mullions

Vision Glass

ASTM E2307 – Test Assembly

Safety Design in Buildings – Forum – Dubai 2012 16www.hilti.com

AssemblyInterior View

Pre-Burn

Thermocouplesmeasuring temperaturerise

ASTM E2307 – Test Assembly

Safety Design in Buildings – Forum – Dubai 2012 17www.hilti.com

Video

LSSCWBURN.wmv

ASTM E2307 – Test Assembly

Safety Design in Buildings – Forum – Dubai 2012 18www.hilti.com

Interior Burner Lit - Time: 0:00ASTM E2307 – Test Assembly

Safety Design in Buildings – Forum – Dubai 2012 19www.hilti.com

Exterior Burner Lit - Time: 0:05ASTM E2307 – Test Assembly

Safety Design in Buildings – Forum – Dubai 2012 20www.hilti.com

Flames ClimbingExterior

Time: 0:15

ASTM E2307 – Test Assembly

Safety Design in Buildings – Forum – Dubai 2012 21www.hilti.com

Melting of Mullions&Transoms

Time: 0:45

ASTM E2307 – Test Assembly

Safety Design in Buildings – Forum – Dubai 2012 22www.hilti.com

Vision GlassBreaks

Time: 2:00

ASTM E2307 – Test Assembly

Safety Design in Buildings – Forum – Dubai 2012 23www.hilti.com

Burner Off at 2 hours

Safety Design in Buildings – Forum – Dubai 2012 24www.hilti.com

Post Test:

Close up Detail of Mullionand Transom Damage

ASTM E2307 – Test Assembly

Safety Design in Buildings – Forum – Dubai 2012 25www.hilti.com

Post Test – Interior ViewASTM E2307 – Test Assembly

Safety Design in Buildings – Forum – Dubai 2012 26www.hilti.com

Only two labs presently perform testing in accordance withnewly developed ASTM test methods:

ASTM E2307 – Testing Labs

Northbrook, IL Elmendorf, Texas

Safety Design in Buildings – Forum – Dubai 2012 27www.hilti.com

Test result: Laboratory listing with very preciseconstruction details

Safety Design in Buildings – Forum – Dubai 2012 28www.hilti.com

Perimeter Fire Containment - Basic Design Criteria1. Provide Backing/Reinforcement Member at

Safing Line

Safety Design in Buildings – Forum – Dubai 2012 29www.hilti.com

ReinforcementMember

1

Safety Design in Buildings – Forum – Dubai 2012 30www.hilti.com

Perimeter Fire Containment - Basic Design Criteria

1. Provide Backing/Reinforcement Member atSafing Line

2. Mechanically Attached Curtain Wall Insulation

Safety Design in Buildings – Forum – Dubai 2012 31www.hilti.com

ReinforcementMember

1

2MechanicallyAttachedInsulation(hangers, clips, impalingpins, weld pins,…)

Safety Design in Buildings – Forum – Dubai 2012 32www.hilti.com

Perimeter Fire Containment - Basic Design Criteria1. Provide Backing/Reinforcement Member at

Safing Line

2. Mechanically Attached Curtain Wall Insulation

3. Compression-fit Safing Insulation - as required per tested assembly

Install Safing Impaling Clips - as required per tested assembly

Horizontal fiberorientationVertical fiber

orientation

Safety Design in Buildings – Forum – Dubai 2012 33www.hilti.com

2ReinforcementMember

1

MechanicallyAttached Insulation

3

Compression FitSafing (Direction ofSafing as required pertested assembly)& Safing Clips(as required per testedassembly)

Safety Design in Buildings – Forum – Dubai 2012 34www.hilti.com

Compression Fit Safing (Direction of Safingas required per tested assembly)

Safing Clips (as required per tested assembly)

Safety Design in Buildings – Forum – Dubai 2012 35www.hilti.com

Perimeter Fire Containment - Basic Design Criteria

1. Provide Backing/Reinforcement Member atSafing Line

2. Mechanically Attached Curtain Wall Insulation

4. Protect Aluminum Mullions

3. Compression-fit Safing Insulation - as required per tested assembly

Install Safing Impaling Clips - as required per tested assembly

Safety Design in Buildings – Forum – Dubai 2012 36www.hilti.com

2

ReinforcementMember

ProtectMullions

4

1

MechanicallyAttached Insulation

3

Compression Fit Safing(Direction of Safing asrequired per tested assembly)& Safing Clips(as required per testedassembly)

Safety Design in Buildings – Forum – Dubai 2012 37www.hilti.com

1. Provide Backing/Reinforcement Member atSafing Line

2. Mechanically Attached Curtain Wall Insulation

4. Protect Aluminum Mullions

3. Compression-fit Safing Insulation - as required per tested assembly

Install Safing Impaling Clips - as required per tested assembly

5. For “Smoke Containment” - Add Firestop Coating

Perimeter Fire Containment - Basic Design Criteria

Safety Design in Buildings – Forum – Dubai 2012 38www.hilti.com

5 FirestopCoating

2ReinforcementMember

3ProtectMullions

1

MechanicallyAttached Insulation

4

Compression Fit Safing(Direction of Safing asrequired per tested assembly)& Safing Clips(as required per testedassembly)

Safety Design in Buildings – Forum – Dubai 2012 39www.hilti.com

5FirestopCoating

Safety Design in Buildings – Forum – Dubai 2012 40www.hilti.com

Traditional Method – 6mm sheet metal top and bottom, filled with mineral wool:

Incorrect Installations:

General Value Proposition

• All voids closed with Fire andAcoustic sealant

Can be valid when

• No movement capabilities

• High Load

• Slow to install

• Not tested

Key Weaknesses

Safety Design in Buildings – Forum – Dubai 2012 41www.hilti.com

. Incorrect installation of foil boards leaves space for smoke and flames to passthrough and may fall out

. Foil may be damaged very easily

Incorrect Installations:

Safety Design in Buildings – Forum – Dubai 2012 42www.hilti.com

Coated boards are ridged and do notallow movement

Incorrect Installations:

Floorslab

Fire Stop

Fire StopDrops

Safety Design in Buildings – Forum – Dubai 2012 43www.hilti.com

Mastic spray

Firestop expands

Floor Slab

Cur

tain

Wal

l

Wall bulges outHeat and Flames

Overlapping:

Safety Design in Buildings – Forum – Dubai 2012 44www.hilti.com

Incorrect Installations:

Façade

Safety Design in Buildings – Forum – Dubai 2012 45www.hilti.com

UAE Fire & Life Safety Code ofPractice

2011 Edition

Safety Design in Buildings – Forum – Dubai 2012 46www.hilti.com

UAE Fire Code requirmeent:

Classification of Firestop Systems(21.5)

• “ 21.5.4.3. Perimeter Fire BarrierSystem……shall be….in accordance toASTM E 2307 as the test method(please refer to section 21.16 foracceptable alternative test standards)”

• “21.5.4.4. the firestop system refers toall the necessary components in theapproved firestop design, which caninclude but is not limited to the gap size,backing material depth, sealant depth,and other parameters in the listings”

Safety Design in Buildings – Forum – Dubai 2012 47www.hilti.com

UAE Fire Code requirmeent:

Installation (21.10)

• “21.10.3.4. (joints & CW) …shall becapable of withstanding anticipatedmovements for the installed fieldconditions… …”

• “21.10.4.3. (CW ) Perimeter fire barriersystem accessories i.e. metal framing,curtain wall insulation, mechanicalattachments, safing materials andFirestop…shall be installed asapplicable within the design listedsystem ”

Safety Design in Buildings – Forum – Dubai 2012 48www.hilti.com

Fire with successfulcompartmentation

People with complete trustin the compartmentation

Safety Design in Buildings – Forum – Dubai 2012 49www.hilti.com

Questions….?

Safety Design in Buildings – Forum – Dubai 2012 50www.hilti.com

THANK YOU

(Protect Yourself & Others)

Safety Design in Buildings – Forum – Dubai 2012 51www.hilti.com

ASTM 2307 EN 1364-3 EN 1364-4 BS 8414-1 BS 8414-2

Curtain WallAssembly

Full Full Part Part Part

Glazing Non-FireRated

Fire-Rated Fire Rated &Non-FireRated

N/A Non-FireRated

Internalexposure

Curtain Wall,Insulation &Gap Seal

Curtain Wall& Gap Seal

Curtain Wall& Gap seal(partially)

NotEvaluated asa full system

NotEvaluated asa full system

ExternalExposure

Curtain Wall,Glazing,insulation orCompositePanel

Curtain Wall EvaluatedPartially

curtain Wall,Over-cladding &insulation

Curtain Wall,Glazing,CompositePanel

Movement Cyclingrequirements

N/A N/A N/A N/A

Equipments Internal &ExternalBurners

Internal ORExternalBurner

Internal ORExternalBurner

Internal ORExternalBurner

InternalBurner