CPCB Questioner

download CPCB Questioner

of 50

description

Industrial Inventory Management Maharashtra

Transcript of CPCB Questioner

  • CENTRAL POLLUTION CONTROL BOARD

    [Questionnaire for Baseline surveyfor Pilot ETS]

    Commentsp1:IndustryID: Page1

    ContentsSection 1: General Section Section A: Survey Background Section B: Certificates Section C: Industry Description .......................................................................................... 5Section D: Industry Fuel Consumption .................................................................................. 8Section E: Product Outputs ............................................................................................. 15Section F: Ambient Air Monitoring ..................................................................................... 17Section G: DG Sets or Gas Based Alternate Energy Sources ....................................................... 18 Section I : Technical Details ............................................................................................ 21Section J: Stack Details ................................................................................................. 23 Section K: Stack Attachments (for each Parallel Chain) ......................................................... 26

    Section L1: Boilers ..................................................................................................... 28Section L2: Furnaces .................................................................................................. 30Section L3: Thermopacks/Thermic Fluid Heaters ................................................................ 32Section M1: Gravity Settling Chamber ............................................................................. 33Section M2: Single Cyclone ........................................................................................... 34Section M3: Multi Cyclone ............................................................................................ 35Section M4: Bag filter ................................................................................................. 36Section M5: ESP ........................................................................................................ 39Section M6: Scrubber ................................................................................................. 41 **Section O1: Monitoring Data from sampling at Inlet ........................................................... 44**Section O2: Monitoring Data from sampling at intermediate sampling port ............................... 45**Section O3: Monitoring Data from sampling at Outlet ......................................................... 46

    Section P: Stack Continuous Emissions Monitoring System ........................................................ 47**Section Q: Ringelmanns Measurement ............................................................................. 49

  • CENTRAL POLLUTION CONTROL BOARD

    [Questionnaire for Baseline surveyfor Pilot ETS]

    Commentsp2:IndustryID: Page2

    EmissionsTradingSchemeBaselineSurvey:I.GeneralSection

    Tobefilledbytheenvironmentallaboratory.

    ForOfficeUSEONLY

    IndustryID |___|___|___|___|___|___| Reviewer'sname Dateofquestionnairereviewing(DD/MM/YY) |__|__|/|__|__|/|__|__|

    Numberofmistakesfound |___|___|___|

    Isfollowupneeded? Yes/No

    GeneralinstructionsTheGeneralSectionshouldbefilledENTIRELYbytheSurveyorswithoutanyunjustifiedmissingvalues.ItshouldbenextreviewedbytheMonitor,BEFORELEAVINGTHEINDUSTRY.

    EverythinginthequestionnaireshouldbewritteninUPPERCASEandNEATLY.Useblueinkpen.

    Donotleaveblankswithoutjustification.AlwayswriteNotApplicable,etcifthequestionsdoesnotapplytothisindustryInthequestionnaire:Last12monthsreferstoTHEMOSTRECENT12monthperiodthattheindustrycanprovidegooddatafor.Themonthsshouldbeclearlyspecified.Donotwriteoutsidetheboxesgiven.Comments,exceptionscanbewrittenintheCommentsfieldoneachpageorintheadditionalpageattheendofthegeneralsection.

    Leavetwodigitsbehindthedecimalpoint.Forexample,21.56302shouldbewrittenas21.56

    WritedowntheIndustryIDonthefootofEVERYpage.

    Thumbrulesshouldbeavoided.Ifmustuseit,writedowntheruleusedincommentsclearly

    Alwayswritedowntheunitofmeasurement.

    Allquestionsthatmustbeobservedormeasuredbythesurveyorstartwith**.Allotherquestionsrequireresponsesfromtheindustry.Ifanentiresectionismarked**,everyquestionrequiresmeasurement/observation.

  • CENTRAL POLLUTION CONTROL BOARD

    [Questionnaire for Baseline surveyfor Pilot ETS]

    Commentsp3:IndustryID: Page3

    SectionA:Surveybackground

    **Time(24hr)Enter:|___|___|hrs|___|___|mins

    Leave:|___|___|hrs|___|___|mins

    **Date |___|___|/|___|___|/20|___|___|

    **SurveyInstitution

    IndustrynameandaddressOnrecord

    District State Pincode

    Telephonenumber EmailAddress

    **GPSCoordinatesMarkGPSwaypointandrecorddetailsatfactorygate.

    2.Latitude:N|___||___||___||___|.|___||___||___|

    3.Longitude:E|___||___||___||___|.|___||___||___|

    4.Elevation(ifavailable):_________________________

  • CENTRAL POLLUTION CONTROL BOARD

    [Questionnaire for Baseline surveyfor Pilot ETS]

    Commentsp4:IndustryID: Page4

    **SectionB:Certifications

    Surveyteammembers

    Name Designation1. 2. 3. 4. 5. 6.

    SurveyorCertification

    Asrepresentativeof______________________(surveyinstitution/lab),Icertifythattheinformationcollectedisreportedaccurately.Nameofsignatory Designationofsignatory Signature

    FieldMonitorAsafieldmonitor,Icertifythattheinformationcollectedisreportedaccurately.Name:Signature:Date:|___|___|/|___|___|/2012

    TheSurveyor/EnvironmentalLabpresentisconductingthissurveyonbehalfoftheCentralPollutionControlBoard.Thepurposeofthesurveyistostudyindustrialpollutionemissionsandmeasurestakentoabatetheseemissions. The survey informationwill be used by the Central Pollution Control Board to design futureprogrammesandwillbekeptconfidential.IndustryrespondentsPersonswhoansweredquestions

    Name Designation ContactNumber

    IndustryCertification

    Asrepresentativeof______________________(industryname),Icertifythattheinformationprovidedhereinistrueandcorrect.Nameofsignatory Signatureofsignatory

    Companystamp

  • CENTRAL POLLUTION CONTROL BOARD

    [Questionnaire for Baseline surveyfor Pilot ETS]

    Commentsp5:IndustryID: Page5

    Section C: Industry Description Wheneverpossible,pleasecheckdocumentstoverifyresponses.Notethatpast12monthsreferstothemost

    recent12monthsforwhichthereisgooddata.C1.

    Industryname

    C2.

    Industryaddress(fromindustryrecords/businesscard)Attachabusinesscardtothegeneralsection

    Address:

    Phone:

    |__|__|__|__|__|__|__|__|__|__|__|__|

    C3.

    Isindustryoperating&innormalproductionatthetimeofsurveyvisit?ONLYconductsurveyandtakesamplesifinproductionthatwouldproducethelevelofemissionexpectedoftheindustryunderordinaryoperatingconditions

    1. YesskiptoC5andcontinuesurvey2. No,poweroutage/powercycling3. No,seasonalclosure/monsoon4. No,industrypermanentlyclosed5. No,SPCBClosure6. No,notinnormalproductiondueto

    7. No,notinproductiondueto

    8. No,other(specify):

    AnswerC4onlyandENDSURVEYwithouttakingsamples

    C4.

    Iftheindustryisnotinoperation,accordingtothemanager,onwhatdateistheindustryexpectedtobeoperating?

    1. Daterange: 2. Industryclosedpermanently.

    C5.Arethereotherindustrialunitsinthestateownedbythesameowner/parentgroupasthisindustry?

    1. Yes,whoisthecommonowner/parentgroup

    CommonOwnerORParentGroup

    2. No99. Don'tknow

    C6.CompanyIdentificationNumber(CIN#):[Example:U27200MH1973P]

  • CENTRAL POLLUTION CONTROL BOARD

    [Questionnaire for Baseline surveyfor Pilot ETS]

    Commentsp6:IndustryID: Page6

    C7.Isthisindustrypublicorprivatesector?

    1. Publicsector(governmentowned)2. Privatesector(privatelyowned)

    C8.

    SectoroftheIndustry(Textiles,Cement,etc.)PleasefillintheNICcodeANDcheckonebox.Fillintheprimarysector,asrecordedontheenvironmentalconsent.

    NICcode(ifavailable):|___|___|___|___|___|

    1. Cement2. Chemicals3. Distilleries4. Dyemanufacturing5. Engineering6. FoodandBreweries7. Foundries8. IronandSteel9. MineralProcessing10. Paper11. Petrochemicals12. Pharmaceuticals13. Power14. Refinery15. RollingMill16. Textiles(dyeingand/orprinting)17. Other(specify)____________

    C9.CategoryoftheIndustry(Pollutioncategory)

    1. Red2. UltraRed3. Orange4. Green

    C10.Size[basedontotalamountofcapitalinvestment]Asrecordedontheenvironmentalconsent.

    1. Smallscale 2. Mediumscale 3. Large-scale

    C11.NumberofShiftsinthePlant(Pleasefillinthetimingofeachshift,in24hrtime)

    Noofshifts:|__|__|Timing:

    1. [ ][ ] : [ ] [ ] to [ ] [ ] : [ ] [ ] 2. [ ][ ] : [ ] [ ] to [ ] [ ] : [ ] [ ] 3. [ ][ ] : [ ] [ ] to [ ] [ ] : [ ] [ ] 4. [ ][ ] : [ ] [ ] to [ ] [ ] : [ ] [ ] 5. [ ][ ] : [ ] [ ] to [ ] [ ] : [ ] [ ]

    C12. NumberofWorkdaysperyear |___|___|___|

  • CENTRAL POLLUTION CONTROL BOARD

    [Questionnaire for Baseline surveyfor Pilot ETS]

    Commentsp7:IndustryID: Page7

    C13.

    Werethereanymonthswhentheunitwasnotinproductioninthelasttwelvemonths?Ifso,notedownthemonthsthatwereclosed.

    1. No,notclosedforanymonth2. Yes,closedfor|___|___|monthsoutofthelast

    12months.Monthsclosedare:(ex.Jul2011;Jan2012)

    C14.

    Howmanystaffdidtheindustryemploydirectlyorcontract,onaverage,overthelast12months?(Fillinaverageemploymentbycategory.Iffiguresforlast12monthsnotknown,fillfiguresapplicabletolastfiscalyear.)

    Stafftype Numberofstaff

    ManagementstaffIncludeallactiveownersasmanagement.

    Nonmanagementworkers&contractlabours

    C15.

    Whatisthetotalindustryinvestmentinplant&machinery&building,excludingland?(Fillindatafromthemostrecentdatepossible.Fillallfieldsforwhichdataisavailable)

    BookValueoffixedassets(excludingland):Asofdate:|___|___|/|___|___|/||___||___||___||___|BEFOREtotaldepreciation(GROSSBLOCK):

    Rs.:Lakh/Crore

    AFTERtotaldepreciation(NETBLOCK):

    Rs.:Lakh/CroreEstimatedMarketValue:Asofdate:|___|___|/|___|___|/|___||___||___||___|

    Rs.:Lakh/Crore

    C16.

    Whatwasthegrosssalesrevenue(i.e.turnover)inthelastthreefinancialyears?(DraftfiguresacceptableforFY1112)

    1. Financialyear0910:Rs.:Lakh/Crore

    2. Financialyear1011:Rs.:Lakh/Crore

    3. Financialyear1112:Rs.:Lakh/Crore

    C17.TotalNumberofStacks(NOTincludingDGsetstacks)

    C18.AgeofthePlant:WhatwasthefirstyearofIndustryOperation?

    |___|___|___|___|

    C19. IsindustryISO9001certified? 1. Yes 2. No

    C20. IsindustryISO14001certified? 1. Yes 2. No

    C21. Areaoftheindustry(insquareyards)

  • CENTRAL POLLUTION CONTROL BOARD

    [Questionnaire for Baseline surveyfor Pilot ETS]

    Commentsp8:IndustryID: Page8

    Section D: Industry Fuel Consumption

    D1.Pleaselistallfuelsburntinthisindustryinthelast12months.Pleasecheckallthatapply.

    1. Coal (Indian) 2. Coal (Imported) 3. Coke 4. Lignite 5. Pet Coke 6. Wood 7. Bagasse 8. Rice Husk 9. Biomass (Other) Specify ________________ 10. Other Solid Fuel (specify) ________ 11. Crude Oil 12. LDO (Light Diesel Oil) 13. Fuel Oil (Residual Fuel Oil) 14. Furnace Oil 15. Diesel (Diesel/High Speed Diesel) 16. LSHS (Low Sulphur Heavy Stock) 17. Other Liquid Fuel (specify) _________ 18. Gaseous Fuels (specify) ___________

  • CENTRAL POLLUTION CONTROL BOARD

    [Questionnaire for Baseline surveyfor Pilot ETS]

    Commentsp9:IndustryID: Page9

    D2.1InformationonFuel_____(1,2,3,4,etc)outof_______(totalnumberoffuels)

    a. Whichfueliscoveredinthistable?(Tickonethatapplies.Iffuelisbiomassotherthanwood,filltypeofbiomass.)

    1. No fuelSkip section D2.1 and proceed to Section E 2. Coal (Indian) 3. Coal (Imported) 4. Coke 5. Lignite 6. Pet Coke 7. Wood 8. Bagasse 9. Rice Husk 10. Biomass (Other) Specify ________________ 11. Other Solid Fuel (specify) ________ 12. Crude Oil 13. LDO (Light Diesel Oil) 14. Fuel Oil (Residual Fuel Oil) 15. Furnace Oil 16. Diesel (Diesel/High Speed Diesel) 17. LSHS (Low Sulphur Heavy Stock) 18. Other Liquid Fuel (specify) _________ 19. Gaseous Fuels (specify) ___________

    b. Whichsuppliersdoyoupurchasethisfuelfrom?Pleaselistthethreemainsuppliersonly.

    Name Address1.

    2.

    3. c. Ifyouhaveafuelanalysisreportfor

    thisfuel,pleaseattachittothesurvey.

    Attached(Circleone):Yes/No

  • CENTRAL POLLUTION CONTROL BOARD

    [Questionnaire for Baseline surveyfor Pilot ETS]

    Commentsp10:IndustryID: Page10

    d. Ifthefuelconsumptiondataisonlyavailableforamixtureoffuel,indicatewhatthedatabelowrepresents.Getseparatedataforeachfuelwheneverpossible

    1. data below is for the fuel indicated above only (most of the time)

    2. data below is for the above indicated fuel and another fuel

    3. data below not filled because separate data for this fuel not available

    e. Whatisthemonthwiseconsumptionofthisfuelforthelast12months?(Pleasewriteincommentswhetherthedataisofactualfuelconsumptionorfuelpurchase)UnitsofMeasurement Month/Year Consumption(Units)(Onlynumericvalues)

    (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) f. WhatistheANNUALconsumptionofthisfuelforthelastfouryears?

    (Noteincommentsanyunusualeventsthatmightaccountforfluctuation,suchasmonthsclosed)

    FormatoftheYear1. Calendar Year 2. Financial Year

    Year

    Consumption(Units)

    UnitofMeasurement

    TotalCost(Rs)

    2012 2011 2010 2009

  • CENTRAL POLLUTION CONTROL BOARD

    [Questionnaire for Baseline surveyfor Pilot ETS]

    Commentsp11:IndustryID: Page11

    D2.2InformationonFuel_____(1,2,3,4,etc)outof_______(totalnumberoffuels)

    a. Whichfueliscoveredinthistable?(Tickonethatapplies.Iffuelisbiomassotherthanwood,filltypeofbiomass.)

    1. No fuelSkip section D2.2 and proceed to Section E 2. Coal (Indian) 3. Coal (Imported) 4. Coke 5. Lignite 6. Pet Coke 7. Wood 8. Bagasse 9. Rice Husk 10. Biomass (Other) Specify ________________ 11. Other Solid Fuel (specify) ________ 12. Crude Oil 13. LDO (Light Diesel Oil) 14. Fuel Oil (Residual Fuel Oil) 15. Furnace Oil 16. Diesel (Diesel/High Speed Diesel) 17. LSHS (Low Sulphur Heavy Stock) 18. Other Liquid Fuel (specify) _________ 19. Gaseous Fuels (specify) ___________

    b. Whichsuppliersdoyoupurchasethisfuelfrom?Pleaselistthethreemainsuppliersonly.

    Name Address1.

    2.

    3.

    c. Ifyouhaveafuelanalysisreportforthisfuel,pleaseattachittothesurvey.

    Attached(Circleone):Yes/No

  • CENTRAL POLLUTION CONTROL BOARD

    [Questionnaire for Baseline surveyfor Pilot ETS]

    Commentsp12:IndustryID: Page12

    d. Ifthefuelconsumptiondataisonlyavailableforamixtureoffuel,indicatewhatthedatabelowrepresents.Getseparatedataforeachfuelwheneverpossible

    1. data below is for the fuel indicated above only (most of the time)

    2. data below is for the above indicated fuel and another fuel

    3. data below not filled because separate data for this fuel not available

    e. Whatisthemonthwiseconsumptionofthisfuelforthelast12months?(Pleasewriteincommentswhetherthedataisofactualfuelconsumptionorfuelpurchase)UnitofMeasurement

    Month/Year Consumption(Units)(OnlyNumericValues)

    (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) f.

    WhatistheANNUALconsumptionofthisfuelforthelastfourCALENDARyears?

    FormatoftheYear

    1. Calendar Year 2. Financial Year

    Year Consumption(U it )

    UnitofMeasurement TotalCost(Rs)

    2012

    2011

    2010

    2009

  • CENTRAL POLLUTION CONTROL BOARD

    [Questionnaire for Baseline surveyfor Pilot ETS]

    Commentsp13:IndustryID: Page13

    D2.3InformationonFuel_____(1,2,3,4,etc)outof_______(totalnumberoffuels)

    a. Whichfueliscoveredinthistable?(Tickonethatapplies.Iffuelisbiomassotherthanwood,filltypeofbiomass.)

    1. No fuelSkip section D2.3 and proceed to Section E 2. Coal (Indian) 3. Coal (Imported) 4. Coke 5. Lignite 6. Pet Coke 7. Wood 8. Bagasse 9. Rice Husk 10. Biomass (Other) Specify ________________ 11. Other Solid Fuel (specify) ________ 12. Crude Oil 13. LDO (Light Diesel Oil) 14. Fuel Oil (Residual Fuel Oil) 15. Furnace Oil 16. Diesel (Diesel/High Speed Diesel) 17. LSHS (Low Sulphur Heavy Stock) 18. Other Liquid Fuel (specify) _________ 19. Gaseous Fuels (specify) ___________

    b. Whichsuppliersdoyoupurchasethisfuelfrom?Pleaselistthethreemainsuppliersonly.

    Name Address

    1.

    2.

    3.

    c. Ifyouhaveafuelanalysisreportforthisfuel,pleaseattachittothe

    Attached(Circleone):Yes/No

  • CENTRAL POLLUTION CONTROL BOARD

    [Questionnaire for Baseline surveyfor Pilot ETS]

    Commentsp14:IndustryID: Page14

    d Ifthefuelconsumptiondataisonlyavailableforamixtureoffuel,indicatewhatthedatabelowrepresents.Getseparatedataforeachfuelwheneverpossible

    1. data below is for the fuel indicated above only (most of the time)

    2. data below is for the above indicated fuel and another fuel

    3. data below not filled because separate data for this fuel not available

    e. Whatisthemonthwiseconsumptionofthisfuelforthelast12months?(Pleasewriteincommentswhetherthedataisofactualfuelconsumptionorfuelpurchase)UnitofMeasurement Month Consumption(Units)(OnlyNumericValues)

    (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) (|___|___|/|1|___|) f. WhatistheANNUALconsumptionofthisfuelforthelastfourCALENDARyears?

    (Noteincommentsanyunusualeventsthatmightaccountforfluctuation,suchasmonthsclosed)FormatoftheYear 1. Calendar Year

    2. Financial Year Year Consumption(Units) UnitofMeasurement TotalCost(Rs)2012 2011 2010 2009

    Iftherearemorethanthreefuels,pleasefilloutandattachcopiesoftheSectionDExtension,availableintheGeneralSectionExtension.

  • CENTRAL POLLUTION CONTROL BOARD

    [Questionnaire for Baseline surveyfor Pilot ETS]

    Commentsp15:IndustryID: Page15

    Section E: Product Outputs E0. TotalNumberofProducts:|____|____|

    Whatproductshastheindustryproducedinthelast12months,inwhatquantity?PleasefillouttheentiretableIftherearemorethan5products,ONLYLISTthetopthreeproductsintermsofannualsalesvalue.Fillfiguresforthemostrecent12months

    E1.0 Latest12monthperiod: From:|___|___|/|2|0|_1_|___|to|___|___|/|2|0|1|___| Product1 Product2 Product3

    E1.1. ProductName

    E1.2. UnitsofQuantityforMeasuringthisProduct

    E1.3. ProductioninMonth1(|___|___|/|1|___|) E1.4. ProductioninMonth2(|___|___|/|1|___|) E1.5. ProductioninMonth3(|___|___|/|1|___|) E1.6. ProductioninMonth4(|___|___|/|1|___|) E1.7. ProductioninMonth5(|___|___|/|1|___|) E1.8. ProductioninMonth6(|___|___|/|1|___|) E1.9. ProductioninMonth7(|___|___|/|1|___|) E1.10.ProductioninMonth8(|___|___|/|1|___|) E1.11.ProductioninMonth9(|___|___|/|1|___|) E1.12.ProductioninMonth10(|___|___|/|1|___|) E1.13.ProductioninMonth11(|___|___|/|1|___|) E1.14.ProductioninMonth12(|___|___|/|1|___|)

  • CENTRAL POLLUTION CONTROL BOARD

    [Questionnaire for Baseline surveyfor Pilot ETS]

    Commentsp16:IndustryID: Page16

    E2.0 WhatistheQuantityofAnnualProductioninlast4yearsE2.1 FormatoftheYear 1. Calendar Year 2. Financial Year Year/Product Product1 Product2 Product3

    E2.2UnitsofQuantityforMeasuringthisProduct

    E2.32012(NumericValueonly)

    E2.42011(NumericValueonly)

    E2.52010(NumericValueonly)

    E2.62009(NumericValueonly)

  • Emissions Trading Scheme Baseline Survey (Technical Section)

    Commentsp17:IndustryID:StackID: Page17

    Section F: Ambient Air Monitoring Notevaluesasrecordedbytheindustryinmostrecentambientairmonitoring.Ifanindustryhasnotrecordeda

    particularvariable,writeNotApplicable/NA

    F0.NumberofAmbientMonitoringLocations(onetimereadingsANDpermanentstations)

    1. Zero Skip to the Section G 2. Other (specify) ____________ Fill in Section F

    PleasefillinthemostrecentambientairdataforeveryAmbientAirMonitoringlocationintheindustry.Iftherearemorethan5locations,fillinandattachtheSectionFExtensionAdditionalPages.

    No. Parameter Location1 Location2 Location3 Location4Location5

    F1.

    AmbientAirLocationIdentifier(ifany):

    F1b.Permanentmonitoringstation?

    Yes/No Yes/No Yes/No Yes/No Yes/No

    F2.Dateofmonitoring

    |___|___|/|___|___|/20___

    |___|___|/|___|___|/20___

    |___|___|/|___|___|/20___

    |___|___|/|___|___|/20___

    |___|___|/|___|___|/20___

    F3.Timeofmonitoring

    |___|___|hrs|__||___|mins

    |___|___|hrs|___||___|mins

    |___|___|hrs|__||___|mins

    |___|___|hrs|__||___|mins

    |___|___|hrs|___||___|mins

    F4.TotalSPMconcentration(ifavailable)

    F5. PM10conc. F6. PM2.5conc. F7. SO2conc. F8. NOXconc. F9. NO2conc. F10. COconc. F11. CO2conc.

  • Emissions Trading Scheme Baseline Survey (Technical Section)

    Commentsp18:IndustryID:StackID: Page18

    Section G: DG Sets or Gas Based Alternate Energy Sources FillinthefollowingquestionsforallDGsetsintheindustry.

    G0.NumberofDGsets

    1. Zero Skip to the end of the General Section 2. One or more (specify) |__|__|Fill in Section G

    PleasefillinthemostdataforeveryDGsetintheindustry.Iftherearemorethan4DGsets,fillinandattachtheSectionGExtensionintheAdditionalPages.

    No. Parameter DGset1 DGset2 DGset3 DGset4 Units Preferred Unit G1. DGsetstackheight m

    G2.DGsetstackdiameter

    mm

    G3. DGSetCapacity KVA or KW rating G4. DGSetFuel FuelName Fuel Name G5. DGSetfuelfeedrate kg/hr G6. Sulphur%infuel |__|__|% |__|__|% |__|__|% |__|__|% % %

    G7.Hours/monthonavg.thisDGsetoperates

    Hours/month

    G8.YearthisDGSetwasinstalled

    Year Year

    G9.WhatistheBharatratingofthisDGSet?

    N/ABharat Rating (ex. Bharat I, Bharat IV)

    G10.Diesel/Fuelconsumptioninlast12months

    Kg/year

    G11.DGenergyproductioninlast12months

    KW-h/year

    G12.Last12monthsperiodinG10andG11

    |__|__|/|1|__|to

    |__|__|/|1|__|

    |__|__|/|1|__|to

    |__|__|/|1|__|

    |__|__|/|1|__|to

    |__|__|/|1|__|

    |__|__|/|1|__|to

    |__|__|/|1|__|

    MM/YYtoMM/YY

    MM/YY to MM/YY

  • Emissions Trading Scheme Baseline Survey (Technical Section)

    Commentsp19:IndustryID:StackID: Page19

  • Emissions Trading Scheme Baseline Survey (Technical Section)

    Commentsp20:IndustryID:StackID: Page20

    EmissionsTradingSchemeBaselineSurvey:II.Technical/StackSection

    Tobefilledbytheenvironmentallaboratory.ForOfficeUSEONLY

    IndustryID |__|__|__|__|__|__| Reviewer'sname Dateofquestionnairereviewing(DD/MM) |__|__|/|__|__|/2013

    Numberofmistakesfound |__|__|

    GeneralinstructionsTheGeneralSectionshouldbefilledENTIRELYbytheSurveyorswithoutanyunjustifiedmissingvalues.ItshouldbenextreviewedbytheMonitor,BEFORELEAVINGTHEINDUSTRY.

    EverythinginthequestionnaireshouldbewritteninUPPERCASEandNEATLY.Useblueinkpen.

    Donotleaveblankswithoutjustification.AlwayswriteNotApplicable,etcifthequestionsdoesnotapplytothisindustryDonotwriteoutsidetheboxesgiven.Comments,exceptionscanbewrittenintheCommentsfieldoneachpageorintheadditionalpageattheendofthegeneralsection.

    WritedowntheIndustryIDonthefootofEVERYpage.

    Thumbrulesshouldbeavoided.Ifmustuseit,writedowntheruleusedincommentsclearly

    Alwayswritedowntheunitofmeasurement.

    Allquestionsthatmustbeobservedormeasuredbythesurveyorstartwith**.Allotherquestionsrequireresponsesfromtheindustry.Ifanentiresectionismarked**,everyquestionrequiresmeasurement/observation.

  • Emissions Trading Scheme Baseline Survey (Technical Section)

    Commentsp21:IndustryID:StackID: Page21

    SectionH:SurveybackgroundSurveyAttempt:Sampling&Questionnaire

    Time(24hr)Enter:|__|__|hrs|__|__|mins

    Leave:|__|__|hrs|__|__|minsDate(mm/dd/yyyy) |__|__|/|__|__|/2013SurveyInstitution Industryname Telephonenumber EmailAddress

    Section I :Technical Details I.1. NumberofStacksintheIndustrywithPMconsent |____|____|

    I.2NumberofStacksintheIndustryforwhichPMconsentnotrequired

    |____|____|

    I.3. ForeachstackintheindustrycountedinI1(NOTincludingDGsetstacksornonPMprocessstacks),pleaselistthefollowing:

    JPALStackID Howdoestheindustrydescribethisstack?Processstack/Combustionstack(circleone)

    IfCombustionStack,mentionthetypeoffuel

    a. S|0|1| Process/Combustion(Flue)1. Solid Fuel 2. Liquid Fuel 3. GaseousFuel

    b. S|0|2| Process/Combustion(Flue)1. Solid Fuel 2. Liquid Fuel 3. Gaseous Fuel

    c. S|0|3| Process/Combustion(Flue)1. Solid Fuel 2. Liquid Fuel 3. Gaseous Fuel

    d. S|0|4| Process/Combustion(Flue)1. Solid Fuel 2. Liquid Fuel 3. Gaseous Fuel

    e. S|0|5| Process/Combustion(Flue)1. Solid Fuel 2. Liquid Fuel 3. Gaseous Fuel

    f. S|0|6| Process/Combustion(Flue)

    1. Solid Fuel 2. Liquid Fuel 3. Gaseous Fuel

    g. S|0|7| Process/Combustion(Flue)1. Solid Fuel 2. Liquid Fuel 3. Gaseous Fuel

  • Emissions Trading Scheme Baseline Survey (Technical Section)

    Commentsp22:IndustryID:StackID: Page22

    h. S|0|8| Process/Combustion(Flue)1. Solid Fuel 2. Liquid Fuel 3. Gaseous Fuel

    i. S|0|9| Process/Combustion(Flue)1. Solid Fuel 2. Liquid Fuel 3. Gaseous Fuel

    j. S|1|0| Process/Combustion(Flue)1. Solid Fuel 2. Liquid Fuel 3. Gaseous Fuel

  • Emissions Trading Scheme Baseline Survey (Technical Section)

    Commentsp23:IndustryID:StackID: Page23

    Section J: Stack Details StackdetailsshouldonlybefilledinforstacksburningSOLIDorLIQUIDfuels

    J.1ThisSectionisbeingfilledoutforthestackwiththefollowingStackID:

    S|____|____|

    Unit(Specify) PreferredUnit

    J.2 StackHeight(fromthegroundlevel) m

    J.3 Numberofsamplingportsatthestackoutlet |____|____|samplingportsatstackoutlet

    J.4 NumberofAPCDParallelChains |_____|____|APCDParallelChains

  • Emissions Trading Scheme Baseline Survey (Technical Section)

    Commentsp24:IndustryID:StackID: Page24

    J.9

    OverallStackDiagram(Pleaselabelallsamplingpointsclearly)

    a.

    ParallelChain1

    b.ParallelChain2

    S

    T

    A

    C

    K

  • Emissions Trading Scheme Baseline Survey (Ringelmanns Section)

    Commentsp1:IndustryID:StackID: Page1

    Atthispoint,attachthenumberofstackattachmentsheets(SectionK)correspondingtothenumberofparallelchainslistedinJ.4.AfterfillingoutsectionKforeachparallelchainonthisstack,attachthenumberofequipmentsheetscorrespondingtothenumberandtypeofeachlistedinSectionK.Forexample,ifthisstackhas2parallelchainswith2APCDsand1IDfanoneach,thereshouldbetwostackattachmentsheets,twoIDfansheets,and4APCDsheets.Lastly,accordingtotheaboveprocedure,attachthenumberofrelevantsamplingportsheets

  • Emissions Trading Scheme Baseline Survey (Stack Attachment Section)

    Commentsp26:IndustryID:StackID: Page26

    EmissionsTradingSchemeBaselineSurvey:IV.StackAttachmentSection

    Tobefilledbytheenvironmentallaboratory.

    SectionK:StackAttachments(foreachParallelChain)K1.

    ThisSectionisbeingfilledoutforthestackwiththefollowingStackID:

    S|_____|_____|

    K2.ParallelChainNumber

    |_____|

    K3. EmissionSources

    a.EmissionSource1

    1. Boiler 2. Thermic Fluid Heater/Thermopack 3. Furnace/Bhatti 4. Process emissions 5. Incinerator 6. DG Set 7. Gas Engine 8. Other(specify)___________

    b.EmissionSource2

    1. Boiler 2. Thermic Fluid Heater/Thermopack 3. Furnace/Bhatti 4. Process emissions 5. Incinerator 6. DG Set 7. Gas Engine 8. Other(specify)___________ 9. N/A (only 1 Emission Source)

    c.EmissionSource3

    1. Boiler 2. Thermic Fluid Heater/Thermopack 3. Furnace/Bhatti 4. Process emissions 5. Incinerator 6. DG Set 7. Gas Engine 8. Other(specify)___________ 9. N/A (less than 3 emission sources)

  • Emissions Trading Scheme Baseline Survey (Stack Attachment Section)

    Commentsp27:IndustryID:StackID: Page27

    K4. AirPollutionControlDevices

    a.

    ForeachAPCDinthisparallelchain,tickthecorrespondingAPCDnamefromthecheckboxesbelow.

    1. Gravity Settling Chamber

    2. Single-Cyclone 3. Multi-cyclone 4. Bag Filter 5. ESP 6. Scrubber 7. Other (Specify)

    ____________

    1. Gravity Settling Chamber

    2. Single-Cyclone 3. Multi-cyclone 4. Bag Filter 5. ESP 6. Scrubber 7. Other (Specify)

    ____________

    8. N/A (only1APCD)

    1. Gravity Settling Chamber

    2. Single-Cyclone 3. Multi-cyclone 4. Bag Filter 5. ESP 6. Scrubber 7. Other (Specify)

    ____________

    8. N/A (lessthan3APCDs)

    1. Gravity Settling Chamber

    2. Single-Cyclone 3. Multi-cyclone 4. Bag Filter 5. ESP 6. Scrubber 7. Other (Specify)

    ____________

    8. N/A (lessthan4APCDs)

    K5.AnnualOperatingandMaintenanceCostsforalltheAPCDsofthisParallelChain(incl.electricitycosts,maintenancecosts,andmaterialcosts).

    K6. NumberofIDfans

    1. ZeroSkiptoSectionL2. One3. Two4. Other(specify):_______________

    APCD1 APCD2 APCD3 APCD4

  • Emissions Trading Scheme Baseline Survey (Boiler Section)

    Commentsp28:

    IndustryID:StackID: Page28

    EmissionsTradingSchemeBaselineSurvey:L1BoilerSection

    Tobefilledbytheenvironmentallaboratory.

    Section L1: Boilers L1.1 StackID S|___||___|

    L1.2 ParallelChain

    numbertowhichboilerisattached

    |___|copycorrespondingentryfromK2forthestackIDlistedinL1.1

    L1.3 EmissionsSourcenumber

    |___|copycorrespondingentryfromK3forthestackIDlistedinL1.1

    UnitofMeasurement

    PreferredUnit

    L1.4 ManualorAutomaticcontrol?

    1. Manual Control 2. Automatic Control

    Manual/Automatic

    Manual/Automatic

    L1.5 BoilerSteamGeneratingCapacity

    Tons/hr

    L1.6 FeedWaterConsumption

    m3/hr

    L1.7 OperatingSteamPressure

    kg/cm2

    L1.8 Nameallfuelsinuse

    1. Coal(Indian)2. Coal(imported)3. Lignite4. Biomass/Husk5. Other (Specify ______________)

    N/A NameofFuel(Coal/Biomass/etc)

    L1.9 TypeofFuelFiring 1. Manual 2. Fluidized 3. Burner 4. Other (Specify) ____________

    N/A Type(Manual/Fluidized/Burner/others)

    L1.10 Fuelfeedrate |____||____||____| kg/hr

    L1.11 **LoadontheboileratthetimeofMonitoring.Thisshouldbeobservednotasked

    1. |____|____|%2. Notapplicable

    % %

    L1.12 Isthereaneconomizerinstalled?

    1. Yes 2. No

    N/A N/A

  • Emissions Trading Scheme Baseline Survey (Boiler Section)

    Commentsp29:

    IndustryID:StackID: Page29

    L1.13 Isthereanairpreheaterinstalled?

    1. Yes 2. No

    N/A N/A

    L1.14 Yearthisboilerwasinstalled

    |____|____|____|____|

    Year Year

    L1.15 Numberofhoursadaythisboileroperates

    |____||____|

    Hours/day Hours/day

    L1.16 Numberofdaysperyeartheboileroperates

    |____||____||____|

    Days/year Days/year

    L1.17 Ratedefficiencyofboiler

    |____|____|

    % %

    L1.18 Ifthereisanefficiencydisplay,whatisthereading?

    1. |____|____|

    2. No Efficiency Display Available

    % %

    L1.19 Ifthereisoxygenmonitoring,whatisthereading?

    1. |____|____|

    2. No Oxygen Reading Available

    % %

    L1.20 Totalpowerconsumptionofthisboiler

    |____|____|

    Kw

    L1.21 GrossCalorificValueofFuelused(GCV)

    Kcal/Kg Kcal/Kg

    L1.22 NetCalorificValueoffuelused(NCV)

    Kcal/Kg Kcal/Kg

    L1.23 Whetherblendedfuelused?

    1. Yes2. No

    L1.24 Ifyes,whatisthepercentageofblend?

    % %

  • Emissions Trading Scheme Baseline Survey (Furnace Section)

    Commentsp30:

    IndustryID:StackID: Page30

    EmissionsTradingSchemeBaselineSurvey:L2FurnaceSection

    Tobefilledbytheenvironmentallaboratory.

    Section L2: Furnaces L2.1 StackID S|___||___|

    L2.2 ParallelChainNumbertowhichFurnaceisattached |___|copycorrespondingentryfromSectionK2forthestackIDlistedinL2.1

    L2.3 EmissionSourceNumber

    |___|copycorrespondingentryfromSectionK3forthestackIDlistedinL2.1

    UnitofMeasurement

    PreferredUnits

    L2.4 TypeofFurnace N/A NameofType

    L2.5 FurnaceProduction T/day

    L2.6 AnnualProduction T/year

    L2.7 FurnaceDiameter(D)/Dimensions mm

    L2.8 CapacityofFurnace Tons/melt

    L2.9 FurnaceCycleTime |____||____| hour/melt

    L2.10 Nameallfuelsinuse

    1. Electricity2. FuelOil3. LPG 4. Other(Specify) ________________

    N/A

    NameoftheFuel(Electricity/Oil/Coaletc)

    L2.11 BurningLosses |____|____|% % %

    L2.12 HoodDiameter mm

    L2.13 HeightofHoodfromFurnace mm

    L2.14 DiameterofPipeConnectedtoHood mm

    L2.15

    **CanYouseeSubstantiveFugitiveEmissionsfromthefurnace?Thisshouldbeobservedbythesurveyor

    1. Yes 2. No

    N/A N/A

    L2.16

    **Areanysharpbendsvisibleinthefurnaceducting?Thisshouldbeobservedbythesurveyor

    1. Yes 2. No

    N/A N/A

  • Emissions Trading Scheme Baseline Survey (Furnace Section)

    Commentsp31:

    IndustryID:StackID: Page31

    L2.17

    **Areanyofthehoodsconnectedtotheductingfromthesidesofthehoods?Thisshouldbeobservedbythesurveyor

    1. Yes 2. No

    N/A N/A

    L2.18

    **Canthehoodbeeasilyplacedandremovedfromthefurnaceduringoperation?Thisshouldbeobservedbythesurveyor

    1. Yes 2. No

    N/A N/A

    L2.19 Numberofhoursadaythisfurnaceoperates |____||____| Hours/day Hours/day

    L2.20 Numberofdaysperyearthisfurnaceoperates |____||____||____| Days/Year Days/Year

  • Emissions Trading Scheme Baseline Survey (Thermopack Section)

    Commentsp32:

    IndustryID:StackID: Page32

    EmissionsTradingSchemeBaselineSurvey:L3ThermopackSection

    Tobefilledbytheenvironmentallaboratory.

    Section L3: Thermopacks/Thermic Fluid Heaters L3.1 StackID S|___||___|

    L3.2 ParallelChainnumbertowhichThermopack/ThermicFluidHeaterattached

    |___|copycorrespondingentryfromSectionK2forthestackIDlisteninL3.1

    L3.3 EmissionSourceNumber |___|copycorrespondingentryfromSectionK3forthestackIDlisteninL3.1

    Unit(Specify) PreferredUnitL3.4 ManualorAutomatic

    control?1. Manual Control 2. Automatic Control

    Manual/Automatic

    Manual/Automatic

    L3.5 Whatisthethermopackcapacity?

    mKcal

    L3.6 NameallFuelsinuse 1. Coal(Indian)2. Coal(imported)3. Lignite4. Other (Specify): _______________

    N/A NameofFuel(Coal/Biomass/etc)

    L3.7 Fuelfeedrate kg/hr

    L3.8 Numberofhoursadaythisthermopackoperates

    |____||____| Hours/day Hours/day

    L3.9 Numberofdaysperyearthisthermopackoperates

    |____||____||____| Days/year Days/year

    L3.10 Isthereaneconomizerinstalled?

    1. Yes 2. N0

    N/A N/A

    L3.11 Isthereanairpreheaterinstalled?

    1. Yes 2. No

    N/A N/A

    L3.12 Yearthisthermopackwasinstalled

    |____|____|____|____|

    Year Year

  • Emissions Trading Scheme Baseline Survey (Gravity Settling Chamber Section)

    Commentsp33:

    IndustryID:StackID: Page33

    EmissionsTradingSchemeBaselineSurvey:

    M1GravitySettlingChamberSectionTobefilledbytheenvironmentallaboratory.

    Section M1: Gravity Settling Chamber M1.1 StackID S|___||___|M1.2 ParallelChainNumbertowhich

    GravitySettlingChamberattached

    |___|copycorrespondingentryfromSectionK2forstackIDlistedinM1.1

    M1.3 APCDIDnumber |____|copycorrespondingentryfromSectionK4forstackIDlistedinM1.1

    M1.4 Whatistheannualoperatingandmaintenancecostofthisgravitysettlingchamber(s)?

    1. Rupees 2. LakhsRupees3. CroresRupees

    M1.5 Whichyearwasthisequipmentpurchased?

    |____|____|____|____|

    M1.6 WhatwasthecostofInstallationandCommissioning

    1. Rupees 2. LakhsRupees3. CroresRupees

    M1.7 Hasthisequipmenteverundergonemajormodifications?

    1. Yes 2. No Skip to Question M1.10

    M1.8 Ifyes,whichyeardidthemodificationstakeplace?

    |____|____|____|____|

    M1.9 Ifyes,howmuchdidthemodificationscost?

    1. Rupees 2. LakhsRupees3. CroresRupees

    M1.10 Manufacturer&ModelName M1.11 RatedEfficiencyoftheAPCD

    accordingtomodel/manufacturer

    |____|____|%

    M1.12 SizeoftheGravitySettlingChamber

    ParameterMeasurement

    UnitofMeasurement

    PreferredUnit

    Length mmBreadth mmHeight mm

  • Emissions Trading Scheme Baseline Survey (Single Cyclone Section)

    Commentsp34:

    IndustryID:StackID: Page34

    EmissionsTradingSchemeBaselineSurvey:

    M2SingleCycloneSectionTobefilledbytheenvironmentallaboratory

    Section M2: Single Cyclone M2.1 StackID S|___||___|

    M2.2 Parallelchainnumbertowhichsinglecycloneisattached |___|copycorrespondingentryfromK2forstackIDlistedinM2.1

    M2.3 APCDIDnumber |___|copycorrespondingentryfromK4forstackIDlistedinM2.1

    M2.4Whatistheannualoperatingandmaintenancecostofthissinglecyclone(s)?

    1. Rupees 2. LakhsRupees3. CroresRupees

    M2.5 Whichyearwasthisequipmentpurchased? |____|____|____|____|

    M2.6 WhatwasthecostofInstallationandCommissioning 1. Rupees 2. Lakhs Rupees 3. Crores Rupees

    M2.7 Hasthisequipmenteverundergonemajormodifications?1. Yes 2. NoSkiptoQuestionM2.10.

    M2.8 Ifyes,whichyeardidthemodificationstakeplace? |___|___|___|___|

    M2.9 Ifyes,howmuchdidthemodificationscost? 1. Rupees 2. LakhsRupees 3. CroresRupees

    M2.10 Manufacturer&ModelName

    M2.11 RatedEfficiencyoftheAPCDaccordingtomodel/manufacturer |____|____|%

    UnitofMeasurement PreferredUnit

    M2.12 CylindricalBodyDimensions:(Height) mmM2.13 CylindricalBodyDimensions:(Diameter ) mm

    M2.14 CycloneConeDimensions:(verticalheight) mm

    M2.15 CycloneConeDimensions:(bottomopeningdiameter) mm

    M2.16 GroundClearance(Cyclonebottomtogroundlevel) mm

    M2.17 AverageQuantityofDustCollectedperday kg/day

    M2.18 FrequencyofDustCollection Nooftimes/month

    M2.19 Doesthiscyclonehaveavalveoraflangeatthebottom? 1. Valve 2. Flange

    M2.20 Ifthereisavalve,whattypeisit?

    1. RotaryAirlock2. Butterflydamper3. Slidingdamper 4. Other(specify)

    ________

    N/A

    Typeofvalve(rotaryairlock/butterflydamper/slidingdamper/etc)

  • Emissions Trading Scheme Baseline Survey (Multi Cyclone Section)

    Commentsp35:

    IndustryID:StackID: Page35

    EmissionsTradingSchemeBaselineSurvey:M3MultiCycloneSection

    Tobefilledbytheenvironmentallaboratory.

    Section M3: Multi Cyclone M3.1 StackID S|___||___|M3.2 ParallelChainnumbertowhich

    MultiCycloneisattached|___|copycorrespondingentryfromSectionK2forthestackIDlistedinM3.1

    M3.3 APCDIDnumber |___|copycorrespondingentryfromSectionK4forthestackIDlistedinM3.1M3.4 Whatistheannualoperatingand

    maintenancecostofthismulticyclone?1. Rupees2. LakhsRupees3. CroresRupees

    M3.5 Whichyearwasthisequipmentpurchased?

    |____|____|____|____|

    M3.6 WhatwasthecostofInstallationandCommissioning

    1. Rupees2. LakhsRupees3. CroresRupees

    M3.7 Hasthisequipmenteverundergonemajormodifications?

    1. Yes 2. No Skip to Question M3.10.

    M3.8 Ifyes,whichyeardidthemodificationstakeplace?

    |____|____|____|____|

    M3.9 Ifyes,howmuchdidthemodificationscost?

    4. Rupees5. LakhsRupees6. CroresRupees

    M3.10 Manufacturer&ModelName

    M3.11 RatedEfficiencyoftheAPCDaccordingtomodel/manufacturer

    |____|____|%

    MeasurementUnit PreferredUnitM3.12 OuterCasingDimension(Length) mmM3.13 OuterCasingDimension(Breadth) mmM3.14 CylindricalBodyDimension(Diameter)of

    cells/cyclonesmm

    M3.15 No.ofcells(cyclones) Nos. Nos.M3.16 GroundClearance(MultiCyclonebottomto

    GroundLevel)mm

    M3.17 AverageQuantityofDustCollectedperday kg/dayM3.18 FrequencyofDustCollection Noof

    times/monthM3.19 Doesthiscyclonehaveavalveoraflangeat

    thebottom?1. Valve 2. Flange

    M3.20 Ifthereisavalve,whattypeisit? 1. RotaryAirlock 2. Butterflydamper 3. Slidingdamper 4. Other(specify) _________

    N/A

  • Emissions Trading Scheme Baseline Survey (Bag Filter Section)

    Commentsp36:

    IndustryID:StackID: Page36

    EmissionsTradingSchemeBaselineSurvey:M4BagFilterSection

    Tobefilledbytheenvironmentallaboratory.

    Section M4: Bag filter M4.1 StackID S|___||___|

    M4.2 ParallelChainnumbertowhichBagFilterisattached |___|copycorrespondingentryfromSectionK2forthestackIDlistedinM4.1

    M4.3 APCDIDnumber |___|copycorrespondingentryfromSectionK4forthestackIDlistedinM4.1

    M4.4Whatistheannualoperatingandmaintenancecostofthisbagfilter?

    1. Rupees2. LakhsRupees3. CroresRupees

    M4.5 Whichyearwasthisequipmentpurchased? |____|____|____|____|

    M4.6 WhatwasthecostofInstallationandCommissioning 1. Rupees2. LakhsRupees3. CroresRupees

    M4.7 Hasthisequipmenteverundergonemajormodifications?1. Yes2. NoSkiptoQuestionM4.10.

    M4.8 Ifyes,whichyeardidthemodificationstakeplace? |____|____|____|____|

    M4.9 Ifyes,howmuchdidthemodificationscost? 1. Rupees2. LakhsRupees3. CroresRupees

    M4.10 Manufacturer&ModelName

    M4.11Inspection/MaintenanceSchedule:Refertothemaintenanceregisterifavailable

    |____|____|____|timesperyear

    M4.12 RatedEfficiencyoftheAPCDaccordingtomodel/manufacturer |____|____|%

    M4.13LastInspection/MaintenanceDate:Refertothemaintenanceregisterifavailable

    1. [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] 2. Month : |__|__| Year : |__|__|__|__| 3. Year|__|__|__|__|4. DoesntNeedMaintenance5. Donotremember

    M4.27. OperationofValve

    1. Motorized2. Manual3. Other(Specify)

    __________

    Type(Motorized/Manual/Others)

    M4.28. MethodofDustRemovalfromHopper

    1. Manual2. Connuous3. Other(Specify)

    __________

    Type(Manual/Continuous/Other)

    M4.29. ModeofDustCollection1. EmptyCementBags2. Trolley

    Type(InEmptyCementBags/Trolley/

  • Emissions Trading Scheme Baseline Survey (Bag Filter Section)

    Commentsp37:

    IndustryID:StackID: Page37

    3. ScrewConveyor4. OnGround5. Other(Specify)

    __________

    ScrewConveyer/OnGround/Others)

    M4.30.Ifdustisremovedmanually,whatisthefrequencyofdustremoval? Nosoftimes/day

    M4.31.Ifdustisremovedmanually,quantity/removal

    kg/removal

    M4.32.Ifdustisremovedmanually,quantity/day

    kg/day

    M4.33. No,ofbagsofdustcollected/day Noofbags/day Noofbags/day

    M4.34.No.oftrolleysofdustcollected/day Nooftrolleys/day Nooftrolleys/day

    M4.35. QuantityofDustCollection kg/hour

    M4.36.Totalno.ofFilterBagsfittedinsidebaghouse Nos. Nos.

    M4.37. DiameteroffilterBag mmM4.38. Lengthoffilterbag mm

    M4.39.No.ofRowsinBagFixingArrangement Nos. Nos.

    M4.40.No.ofColumnsinBagFixingArrangement Nos. Nos.

    M4.41. No.ofCells Nos. Nos.M4.42. No.ofRows/Cell Nos. Nos.M4.43. No.ofColumns/Cell Nos. Nos.M4.44. DesignedTotalFiltrationArea m2

    M4.45.DesignedInletGasFlowQuantity? m3/hr

    M4.46. DesignedInletDustLoading kg/hr

    M4.47.DesignedInsideAngle/SlopeofHopper degree

    M4.48. DesignedaircompressorHP? HP

    M4.49.Istheaircompressordedicatedtothebagfilter?

    1. Yes2. No

    N/A N/A

    M4.50.Designedaircompressorflowrate?

    CubicFeetperMinute(cfm)

    M4.51.Designedaircompressorpressure? kg/cm2

    M4.52.Ifthisisapulsejetfilter,howmanypulsesperminute?

    1. ________pulses/min2. N/A(notpulsejet) No.pulses/min Noofpulses/minute

    M4.53.Howmanyreplacementbagsdidyoupurchaselastyear? Nos. Noofbags

  • Emissions Trading Scheme Baseline Survey (Bag Filter Section)

    Commentsp38:

    IndustryID:StackID: Page38

    SURVEYOROBSERVATIONOFBAGFILTERM4.54.

    **Arethereairleakagesatthebottomofthehopper?Pleasefeelforairleakageswithyourhand

    1. Yes 2. No

    N/A N/A

    M4.55.

    **Ifthedustisremovedmanually,isdustpuffing(dustleakage)seen?

    1. Yes 2. No

    N/A N/A

    M4.56.

    **Foramotorizedvalve,isdustfallingcontinuously?

    1. Yes 2. No

    N/A N/A

    M4.57.

    **Whatisthepowerconsumptionofthecompressorofthebagfilter?Thisshouldbemeasuredwithaportablepoweranalyser.

    KW

  • Emissions Trading Scheme Baseline Survey (ESP Section)

    Commentsp39:

    IndustryID:StackID: Page39

    EmissionsTradingSchemeBaselineSurvey:M5ESPSection

    Tobefilledbytheenvironmentallaboratory.

    Section M5: ESP M5.1 StackID S|___||___|M5.2 Parallelchainnumberto

    whichESPisattached|___|copycorrespondingentryfromsectionK2forthestackIDlistedinM5.1

    M5.3. APCDIDnumber |___|copycorrespondingentryfromsectionK2forthestackIDlistedinM5.1M5.4. Whatistheoperating

    andmaintenancecostperannumofthisequipment,notincludingIDfancosts?Includethepowerconsumptioncosts.

    1. Rupees 2. LakhsRupees3. Crores Rupees

    M5.5. Whichyearwasthisequipmentpurchased?

    |____|____|____|____|

    M5.6. WhatwasthecostofInstallationandCommissioning

    1. Rupees 2. LakhsRupees3. CroresRupees

    M5.7. Hasthisequipmenteverundergonemajormodifications?

    1. Yes 2. No Skip to Question M5.10.

    M5.8. Ifyes,whichyeardidthemodificationstakeplace?

    |____|____|____|____|

    M5.9. Ifyes,howmuchdidthemodificationscost?

    1. Rupees 2. LakhsRupees3. CroresRupees

    M5.10. Manufacturer&ModelName

    M5.11 RatedEfficiencyoftheAPCDaccordingtomodel/manufacturer

    |____|____|%

    M5.12. Inspection/MaintenanceScheduleRefertothemaintenanceregisterifitisavailable

    |____|____|____|timesinayear

    M5.13. LastInspection/MaintenanceDateRefertothemaintenanceregisterifitisavailable

    1. [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] 2. Month : |__|__| Year : |__|__|__|__| 3. Year|__|__|__|__|4. DoesntNeedMaintenance5. Donotremember

    UnitofMeasurement PreferredUnitM5.14. TypeofESP Type(Parallelplate/Wire

  • Emissions Trading Scheme Baseline Survey (ESP Section)

    Commentsp40:

    IndustryID:StackID: Page40

    1. Plate & Wire Type 2. Tabular ESP 3. WetESP4. TwoStagePrecipitator5. HotStagePrecipitator6. ColdStagePrecipitator

    andplate/others)

    M5.15. OverallESPDimensions:Width

    mm

    M5.16. OverallESPDimensions:Breadth

    mm

    M5.17. OverallESPDimensions:Height(AboveHopper)

    mm

    M5.18. No.offields Nos. Nos.M5.19. Nooffieldsinoperation Nos. Nos.M5.20. PlateCollectionArea m2M5.21. QuantityofDust

    Collected/day kg/day

    M5.22. Hours/dayESPisinoperation hrs/day hrs/dayM5.23. Days/yearESPisinoperation days/year days/yearM5.24. **Whatisthepower

    consumptionoftheESP?Thisshouldbemeasuredwithaportablepoweranalyser.

    KW

  • Emissions Trading Scheme Baseline Survey (Scrubber Section)

    Commentsp41:

    IndustryID:StackID: Page41

    EmissionsTradingSchemeBaselineSurvey:M6ScrubberSection

    Tobefilledbytheenvironmentallaboratory.

    Section M6: Scrubber M6.1 StackID S|___||___|M6.2 Parallelchainnumberto

    whichScrubberisattached

    |___|copycorrespondingentryfromsectionK2forthestackIDlistedinM6.1

    M6.3. APCDIDnumber |___|copycorrespondingentryfromsectionK4forthestackIDlistedinM6.1M6.4. Whatistheoperatingand

    maintenancecostperannumofthisequipment,excludingIDfancosts?Includetheoperatingcostsofthepump

    1. Rupees 2. LakhsRupees3. CroresRupees

    M6.5. Whichyearwasthisscrubberpurchased?

    |____|____|____|____|

    M6.6. WhatwasthecostofInstallationandCommissioning

    1. Rupees 2. LakhsRupees3. CroresRupees

    M6.7. Hasthisscrubbereverundergonemajormodifications?

    1. Yes 2. NoSkip to Question M6.10.

    M6.8. Ifyes,whichyeardidthemodificationstakeplace?

    |____|____|____|____|

    M6.9. Ifyes,howmuchdidthemodificationscost?

    1. Rupees 2. LakhsRupees3. CroresRupees

    M6.10. Manufacturer&ModelName

    M6.11 RatedEfficiencyoftheAPCDaccordingtomodel/manufacturer

    |____|____|%

    M6.12. Inspection/MaintenanceScheduleRefertothemaintenanceregisterifitisavailable

    |____|____|timesinayear

    M6.13. LastInspection/MaintenanceDateRefertothemaintenanceregisterifitisavailable

    1. [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] 2. Month:|__|__|Year:|__|__|__|__| 3. Year|__|__|__|__| 4. DoesntNeedMaintenance 5. Donotremember

    UnitofMeasurement

    PreferredUnit

  • Emissions Trading Scheme Baseline Survey (Scrubber Section)

    Commentsp42:

    IndustryID:StackID: Page42

    M6.14. TypeofScrubber 1. Simple

    2. Spray3. PackedBed4. Impingement5. Venturi6. Dry7. Other(Specify):_________

    Type(Simple/Spray/PackedBed/Impingement/Venturi/Dry/Other)

    M6.15. Isthescrubberroundorrectangular? 1. Round2.Rectangular

    M6.16. Ifthescrubberisround,whatisthediameter?

    1. ________mm2.NA(rectangular)

    M6.17. Ifthescrubberisrectangular,whatisthelength?

    1. _________mm2.NA(round)

    M6.18. Ifthescrubberisrectangular,whatisthebreadth?

    1. _________mm2.NA(round)

    M6.19. ScrubberTotalHeight MM6.20. Waterrequirement(Freshwateror

    causticsolution) m3/hr

    M6.21. PumpSize HPM6.22. PumpPressure kg/cm2M6.23. QuantityofWastewaterdischarged

    fromScrubberm3/day

    M6.24. QuantityofDustCollectedperday(intheformofcake)

    kg/day

    M6.25. Sludgesettlingarrangementprovided(ifany)

    M6.26. Typeoftreatmentgiventoslurry/wastewater(ifany)

    M6.27. Hours/daythescrubberisinoperation

    Hrs/day Hrs/day

    M6.27a. Days/yearthescrubberisinoperation

    Days/year Days/year

    M6.28. **Whatisthepowerconsumptionofthescrubberpump?Thisshouldbemeasuredwithaportablepoweranalyser.

    Kw

    M6.29. DesignedDeltapressureforthisscrubber?

    Changeinmmwc

    M6.30. DesignedPumpFlow

  • Emissions Trading Scheme Baseline Survey (Scrubber Section)

    Commentsp43:

    IndustryID:StackID: Page43

    EmissionsTradingSchemeBaselineSurvey:NIDFanSection

    Tobefilledbytheenvironmentallaboratory.

    SectionN:IDFans(FillthissectionforeachIDFan)N1 StackID S|___||___|N2. ParallelchainnumbertowhichIDFanis

    attached |____|

    N3.

    WhereistheIDfanlocated? 1. BeforethefirstAPCD

    2. BetweenfirstandsecondAPCDs

    3. BetweensecondandthirdAPCDs

    4. BetweenthirdandfourthAPCDs

    5. AfterallAPCDs

    6. Other(specify)_________________

    UnitofMeasurement PreferredUnitN4. WhatistheratedHPoftheIDfan?

    HP

    N5. **WhatisthestaticpressureattheINLEToftheIDfan?Measurethestaticpressureattheinlet.Thisquestioncanbefilledinafterthesamplingiscomplete.

    mmwc

    N6. **WhatisthestaticpressureattheOUTLEToftheIDfan?Measurethestaticpressureattheoutlet.Thisquestioncanbefilledinafterthesamplingiscomplete.

    mmwc

    N7. WhataretheannualoperatingcostsoftheIDfan?

    Rs.

    N8. **WhatisthepowerconsumptionofthisIDfan?Useaportablepoweranalysertomeasurethepowerconsumption.

    KW

    N9. DesignedRPM(rotationsperminute)oftheIDfan?(UsuallytheRPMatmaxpoweroutput)

    RPM

    N10.

    IsthereaVariableFrequencyDriveinstalledforthisIDfan?

    1. Yesthecurrentfrequencyis|____|____|%ofthedesignedRPMinquestionN8.

    2. No

  • Emissions Trading Scheme Baseline Survey (Scrubber Section)

    Commentsp44:

    IndustryID:StackID: Page44

    EmissionsTradingSchemeBaselineSurvey:SectionO1InletSampling

    Tobefilledbytheenvironmentallaboratory.

    **Section O1: Monitoring Data from sampling at Inlet StacksamplingwilloccuratonlyONEstack.Foreachparallelchainatthatstack,fillTableO1,basedonthecompletestackmonitoringatinletsampling

    location.Alsoattachthecompletesamplingreport,whichshouldbeclearlylabeledSectionS:P1BeforeAllAPCDsandIDFan.

    O1.1 StackIDwherestacksamplingtakingplace

    S|___||___|

    O1.2. Parallelchainnumberonwhichinletsamplingportislocated

    |____|

    O1.3. Isthereasamplingportatthislocation?(circleone)

    1. Yes complete Section O1 2. Noskip to Section O2

    O1.4. Isthecompletesamplingreportattached?

    1. Yes 2. No (Specify Why) ______________________________

    O1.5. DateofSampling |__|__|/|__|__|/2013

    O1.6. TimeofSampling(24hour) |__|__|hrs|__|__|mins

    UnitofMeasurement PreferredUnitO1.7. Istheductcrosssectionroundor

    rectangular?1. Round 2. Rectangular

    O1.8. Iftheductcrosssectionisround,whatistheinternaldiameter?

    1. ________ 2. NA (rectangular)

    mm

    O1.9. Iftheductcrosssectionisrectangular,whatisthelength(internal)?

    1. _________ 2. NA (round)

    mm

    O1.10. Iftheductcrosssectionisrectangular,whatisthebreadth(internal)?

    1. _________ 2. NA (round)

    mm

    O1.11. Distanceofsamplingportfromthenearestbendinupstream

    mm

    O1.12. Distanceofsamplingportfromthenearestbendindownstream

    mm

    O1.13. Diameteroftheport mm

    O1.14. Collarlengthattheport mmO1.15. AverageCO2% %O1.16. AverageO2% %O1.17. AverageCO% PPMO1.18. AverageMoisture% %O1.19. AverageFlueGasTemperature DegCelsiusO1.20. GasMolecularWeight MgO1.21. StaticPressure mmwcO1.22. AverageVelocityMeasurement m/secO1.23. AveragePMConcentration mg/Nm3O1.24. AverageGasFlow Nm3/hrO1.25 DustLoading kg/hr

  • Emissions Trading Scheme Baseline Survey (Intermediate Sampling Port Section)

    Commentsp45:

    IndustryID:StackID: Page45

    EmissionsTradingSchemeBaselineSurvey:SectionO2IntermediateSamplingPort

    Tobefilledbytheenvironmentallaboratory.

    **Section O2: Monitoring Data from sampling at intermediate sampling port

    StacksamplingwilltakeplaceononlyONEstack.Foreachsamplingportoneachparallelchainonthatstack,fillTableO2withgasflowandstaticpressurereadingsfromsamplinglocation(Refertothesurveyormanualforlocationofsamplingpoints,oriftherearemore

    than4intermediatepoints.)Alsoattachthecompletegasflowandstaticpressuremonitoringreport

    O2.1. StackIDwherestacksamplingtakingplace

    |___|

    O2.2 ParallelChainnumber |___|

    O2.3 SamplingportSequencenumber(e.g.1forfirstportfrominlet,2forsecondport,etc.)

    |___|

    O2.4. Isthereasamplingpinholeatthislocation?

    1. Yes complete Section O2 2. No, there are less than two APCDs & ID fans skip to Section O3

    3. No, there are two or more APCDs & ID fans but no port hereskip to Section O3

    UnitofMeasurement

    PreferredUnit

    O2.5. Istheductcrosssectionroundorrectangular?

    1. Round 2. Rectangular

    O2.6. Iftheductcrosssectionisround,whatisthediameter?

    1. ________ 2. NA (rectangular)

    mm

    O2.7. Iftheductcrosssectionisrectangular,whatisthelength?

    1. _________ 2. NA (round)

    mm

    O2.8. Iftheductcrosssectionisrectangular,whatisthebreadth?

    1. _________ 2. NA (round)

    mm

    O2.9. AverageFlueGasTemperature

    DegCelsius

    O2.10. StaticPressure Mmwc

    O2.11 AverageVelocityMeasurement

    m/sec

    O2.12. AverageGasFlow Nm3/hr

  • Emissions Trading Scheme Baseline Survey (Stack Attachment Section)

    Commentsp46:IndustryID:StackID: Page46

    EmissionsTradingSchemeBaselineSurvey:SectionO3OutletSamplingPort

    Tobefilledbytheenvironmentallaboratory.

    **Section O3: Monitoring Data from sampling at Outlet StacksamplingwilltakeplaceatonlyONEstack.FillTableO3forthatstack,basedonthecompletestackmonitoringatoutletsampling

    location,afterallAPCDsandaftertheIDfan.Alsoattachthecompletesamplingreport,whichshouldbeclearlylabeledSectionT:P2AfterAllAPCDs.

    O3.1 StackIDwherestacksamplingtakingplace

    S|___||___|

    O3.2. Isthereasamplingportatthislocation?(circleone)

    1. Yes complete Section O3 2. Noskip to Section P

    O3.3. Isthecompletesamplingreportattached?

    1. Yes 2. No (Specify Why) ______________________________

    O3.4. DateofSampling |__|__|/|__|__|/2013

    O3.5. TimeofSampling(24hour) |__|__|hrs|__|__|mins

    UnitofMeasurement PreferredUnitO3.6. Isthestackcrosssectionround

    orrectangular?1. Round 2. Rectangular

    O3.7. Ifthestackcrosssectionisround,whatisthediameter?

    1. ________ 2. NA (rectangular)

    mm

    O3.8. Ifthestackcrosssectionisrectangular,whatisthelength?

    1. _________ 2. NA (round)

    mm

    O3.9. Ifthestackcrosssectionisrectangular,whatisthebreadth?

    1. _________ 2. NA (round)

    mm

    O3.10. Distanceofsamplingportfromthenearestbendinupstream

    mm

    O3.11. Distanceofsamplingportfromthenearestbendindownstream

    mm

    O3.12. Diameteroftheport mmO3.13. Collarlengthattheport mmO3.14. AverageCO2% %O3.15. AverageO2% %O3.16. AverageCO% PPMO3.17. AverageMoisture% %O3.18. AverageFlueGasTemperature DegCelsiusO3.19. GasMolecularWeight mgO3.20. StaticPressure mmwcO3.21. Avg.VelocityMeasurement m/secO3.22. Avg.PMConcentration mg/Nm3O3.23. AverageGasFlow Nm3/hrO3.24. DustLoading kg/hr

  • Emissions Trading Scheme Baseline Survey (Stack Attachment Section)

    Commentsp47:IndustryID:StackID: Page47

    Section P: Stack Continuous Emissions Monitoring System P.1 StackID: S|____||____|

    P.2Whatexistingcontinuousemissionsmonitoringsystemisinplace?(CheckAllthatApplies)

    1. NoneskiptoSectionU2. CEMSforPM3. CEMSforNOX4. CEMSforNo25. CEMSforSox6. CEMSforSO27. CEMSforCO8. CEMSforCO29. CEMSforVOC10. CEMSforOtherGases

    (Specifypollutantsmonitored___________________

    P.3 IsthereaCEMSforPM?1. YesGoto P.2 2. NoGoto Part III, Ringlemann Section

    P.4 WhatwastheinstallationcostforthisSPMCEMS? 1. Rupees 2. Lakhs3. Crores

    P.5 WhichyearwasthisSPMCEMSinstalled? |____|____|____|____|

    P.6 Whatistheoperatingcostperannum? 1. Rupees 2. Lakhs3. Crores

    P.7 ManufacturerNameoftheSPMCEMS P.8 ModelNumber/NamefortheSPMCEMS P.9 AnnualMaintenanceContractSigned 1. Yes / 2. No P.10 MaintenanceSchedule |____|____|____|peryear

    P.11 Whenwastheinstrumentcalibratedlast?

    1. [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] 2. Month:|__|__|Year:|__|__|__|__| 3. Year|__|__|__|__|4. DoesntNeedCalibration5. Donotremember

    P.12 Whenwastheinstrumentinspectedlast?Refertothemaintenanceregisterifitisavailable

    1. [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] 2. Month: |__|__|Year:|__|__|__|__| 3. Year|__|__|__|__|4. DoesntNeedMaintenance5. Donotremember

  • Emissions Trading Scheme Baseline Survey (Stack Attachment Section)

    Commentsp48:IndustryID:StackID: Page48

    EmissionsTradingSchemeBaselineSurvey:III.RingelmannsSection

    TobefilledbytheFieldMonitor.

    ONECOPYOFSECTIONIIIMUSTBEFILLEDINFOREACHSTACK

    ForOfficeUSEONLY

    SurveyID|______|____|______|____|______|

    Reviewer'sname

    IndustryID Dateofquestionnairereviewing(DD/MM)

    |______|____|/|______|____|/2013

    Numberofmistakesfound |______|____|

  • Emissions Trading Scheme Baseline Survey (Stack Attachment Section)

    Commentsp49:IndustryID:StackID: Page49

    **Section Q: RingelmannsMeasurement ThepurposeoftheRingelmannsProcedureistocomparethecolourofsmokefromastacktoanestablishedscaleofgreyness.Steps:

    1) Stand in the line between the stack and the sun. The sun should be behind you and the stack directly ahead.

    2) Hold the Ringelmann Chart on a level with your eye, and in line with the top of the chimney. Get assistance if needed.

    3) Look at the smoke and identify which slice of the chart is the closest shade of grey. 4) Each slice has a number from 0-6, note the number of the matching slice down in Table G 5) Take TEN observations every THREE minutes over a period of 30 minutes. 6) Complete Table G

    Q1. StackID S|___||___|Q2. Date |______|____|/|______|____|/2013

    Q3.Isthesunbehindyouandthestackinfrontofyou?

    1.Yes2.NoIndicatewherethesunisrelativetoyouandstack,ifyouareatthecenterofaclockdialandthestackisatpositionofhour12.Positionofthesunisat:|______|____|

    Q4.MeasurementNumber:

    Time(24hr): ObservedRingelmannNumber:

    1 |____|____|hrs|____|____|mins 2 |____|____|hrs|____|____|mins 3 |____|____|hrs|____|____|mins 4 |____|____|hrs|____|____|mins 5 |____|____|hrs|____|____|mins 6 |____|____|hrs|____|____|mins 7 |____|____|hrs|____|____|mins 8 |____|____|hrs|____|____|mins 9 |____|____|hrs|____|____|mins 10 |____|____|hrs|____|____|mins

    Q5.SumofObservedRingelmannNumbers:

    |____|____|____|

    Q6. AverageNumber(Sum/10) |____|____|

    Q7.AverageSmokeDensity(%)(AverageNumber*20)

    |____|____|%

    Q8.Whatistheweatherliketoday

    1. Sunny 2. Cloudy 3. Raining

  • Emissions Trading Scheme Baseline Survey (Backcheck Sheet)

    Commentsp50:IndustryID:StackID: Page50

    EmissionsTradingSchemeBaselineSurveyBackcheckSheet:Tobefilledbytheenvironmentallaboratory

    StackID S|___||___|ParallelChain1 Parallelchain2 Parallelchain3

    Equipment Count Attachmentsection

    Equipment Count Attachmentsection

    Equipment Count AttachmentsectionStackAttachmentSheet 1 K StackAttachmentSheet 1 K StackAttachmentSheet 1 KEmissionSource EmissionSource EmissionSourceBoiler L1 Boiler L1 Boiler L1ThermicFluidHeater/Thermopack

    L2 ThermicFluidHeater/Thermopack

    L2 ThermicFluidHeater/Thermopack

    L2

    Furnace/Bhatti L3 Furnace/Bhatti L3 Furnace/Bhatti L3TotalESattachmentsheets TotalESattachmentsheets Total ESattachmentsheets APCD/IDfan APCD/IDfan APCD/IDfanGravitySettlingChamber M1 GravitySettlingChamber M1 GravitySettlingChamber M1SingleCyclone M2 SingleCyclone M2 SingleCyclone M2Multicyclone M3 Multicyclone M3 Multicyclone M3BagFilter M4 BagFilter M4 BagFilter M4ESP M5 ESP M5 ESP M5Scrubber M6 Scrubber M6 Scrubber M6IDfan N IDfan N IDfan NTotalAPCD/IDfanattachmentsheets

    TotalAPCD/IDfanattachmentsheets

    TotalAPCD/IDfanattachmentsheets

    SamplingPorts SamplingPorts SamplingPortsInlet 1 O1 Inlet 1 O1 Inlet 1 O1Intermediate O2 Intermediate O2 Intermediate O2Totalsamplingattachmentsheets

    Totalsamplingattachmentsheets

    Totalsamplingattachmentsheets

    TotalAttachmentSheetsforParallelChain1

    TotalAttachmentSheetsforParallelChain2

    TotalAttachmentSheetsforParallelChain3

    Section C: Industry DescriptionSection D: Industry Fuel ConsumptionSection E: Product OutputsSection F: Ambient Air MonitoringSection G: DG Sets or Gas Based Alternate Energy SourcesSection I :Technical DetailsSection J: Stack DetailsSection L1: BoilersSection L2: FurnacesSection L3: Thermopacks/Thermic Fluid HeatersSection M1: Gravity Settling ChamberSection M2: Single CycloneSection M3: Multi CycloneSection M4: Bag filterSection M5: ESPSection M6: Scrubber**Section O1: Monitoring Data from sampling at Inlet**Section O2: Monitoring Data from sampling at intermediate sampling port**Section O3: Monitoring Data from sampling at Outlet

    Section P: Stack Continuous Emissions Monitoring System**Section Q: RingelmannsMeasurement