COVER: Men of the 1st Battalion, 9th Ma- at Da Nang ...

117

Transcript of COVER: Men of the 1st Battalion, 9th Ma- at Da Nang ...

COVER : Men of the 1st Battalion, 9th Ma-rines wait to board the amphibious transportPaul Revere at Da Nang, during the firstphase of the withdrawal of American force sfrom Vietnam .Department of Defense Photo (USMC) A800469

HQMC20 JUN 2002

ERRATUMto

USMC MARINES IN VIETNAM

HIGH MOBILITY AND STANDDOWN 1969 (SFT)

1 . Change the distribution PCN read 19000310300 "vice "19000310200 .

DISTRIBUTION: PCN 19000310380

PCN 19000310380

U.S. MARINES IN VIETNAMHIGH MOBILITY AND STANDDOWN

196 9

by

Charles R. Smith

HISTORY AND MUSEUMS DIVISIO NHEADQUARTERS, U .S. MARINE CORP S

WASHINGTON, D.C .

1988

Volumes in the Marine Corps

Vietnam Series

Operational Histories Series

U.S. Marines in Vietnam, 1954-1964, The Advisory and Comba tAssistance Era, 197 7

US. Marines in Vietnam, 1965, The Landing and the Buildup, 197 8

US. Marines in Vietnam, 1966, An Expanding War, 198 2

US. Marines in Vietnam, 1967, Fighting the North Vietnamese, 198 4

U.S. Marines in Vietnam, 1970-1971, Vietnamization and Redeployment, 198 6

In Preparation

U.S. Marines in Vietnam, 1968

U.S. Marines in Vietnam, 1971-1973

U.S. Marines in Vietnam, 1973-1975

Functional Histories Serie s

Chaplains with Marines in Vietnam, 1962-1971, 198 5

Marines and Military Law in Vietnam: Trial By Fire, in preparatio n

Anthology and Bibliography

The Marines in Vietnam, 1954-1973, An Anthology and Annotated Bibliography ,1974, reprinted 1983 ; revised second edition, 198 5

Library of Congress Card No . 77-604776

PCN 19000310300

Foreword

This is the sixth volume in a planned nine-volume operational and chronological ser-ies covering the Marine Corps ' participation in the Vietnam War . A separate functionalseries will complement the operational histories . This volume details the change in Unit-ed States policy for the Vietnam War. After a thorough review, President Richard M . Nixonadopted a policy of seeking to end United States military involvement in Vietnam eithe rthrough negotiations or, failing that, turning the combat role over to the South Viet-namese . It was this decision that began the Vietnamization of the war in the summe rof 1969 and which would soon greatly reduce and then end the Marine Corps' comba trole in the war.

The Marines of III Marine Amphibious Force continued the full range of military an dpacification activities within I Corps Tactical Zone during this period of transition . Unti lwithdrawn, the 3d Marine Division, employing highly mobile tactics, successfully blunt-ed North Vietnamese Army efforts to reintroduce troops and supplies into Quang Tr iProvince . The 1st Marine Division, concentrated in Quang Nam Province, continued bot hmobile offensive and pacification operations to protect the city of Da Nang and surround-ing population centers . The 1st Marine Aircraft Wing provided air support to both divi-sions, as well as other allied units in I Corps, while Force Logistic Command served al lmajor Marine commands .

Although written from the perspective of III MAF and the Marine ground war in ICorps, an attempt has been made to place the Marine role in relation to the overall Ameri -can effort . The volume also treats the Marine Corps' participation in the advisory effort ,the operations of the Seventh Fleet Special Landing Force, and, to a lesser extent, th eactivities of the 101st Airborne Division (Airmobile), 23d Infantry (Americal) Division ,and 1st Brigade, 5th Infantry Division (Mechanized) . There are separate chapters on Ma-rine air, artillery, surveillance, and logistics .

The nature of the war facing III MAF during 1969 forced the author to concentrat eon major operations . This focus in no way slights those Marines whose combat servic einvolved innumerable patrols, wearying hours of perimeter defense, and long days o fproviding logistical and administrative support for those in the field . III MAF's combatsuccesses in 1969 came from the combined efforts of all Americans in I Corps .

The author, Charles R . Smith, has been with the History and Museums Division sinc eJuly 1971. He has published several articles on military history, and is the author of Ma-riner in the Revolution: A History of the Continental Marines in the American Revolu-tion, 1775-1783 (Washington : Hist&MusDiv, HQMC, 1975) . He is a graduate of theUniversity of California, Santa Barbara, and received his master 's degree in history fro mSan Diego State University. He served in Vietnam with the 101st Airborne Division (Air -mobile) in 1968 and 1969, first as an artilleryman and then as a historian .

*4Vft!nE. H. SIMMON S

Brigadier General, U.S . Marine Corps (Ret . )Director of Marine Corps History and Museums

iii

Preface

US. Marines in Vietnam : High Mobility and Standdown, 1969, like its predecessors ,is largely based on the holdings of the Marine Corps Historical Center . These holdingsinclude the official unit monthly command chronologies, combat after-action reports ,daily message and journal files, files and studies of HQMC staff agencies and those ofthe Office of the Commandant, and the Oral History, Personal Papers, and Referenc eCollections of the Center.

The author supplemented these above sources with research in the records of the othe rServices and pertinent published primary and secondary sources . Although none of theinformation in this history is classified, some of the documentation on which it is base dstill carries a restricted or classified designation . More than 200 reviewers, most of whomwere participants in the events covered in this volume, read a comment edition of th emanuscript . Their comments, where applicable, have been incorporated into the text .A list of those who made substantial comments is included in the appendices . All ranksused in the body of the text are those held by individuals in 1969 .

Like the previous volumes in the series, the production of this volume has been a cooper -ative effort . Members of the Histories Section, History and Museums Division, past andpresent, have reviewed the draft manuscript . Mrs . Joyce Bonnett, head archivist, and he r

assistants; aided the author's access to the records of the division and Headquarters Ma-rine Corps staff agencies . Miss Evelyn A . Englander, head librarian, and her assistant ,Mrs . Patricia E . Morgan, were very helpful in obtaining needed reference materials, aswere members of the Reference Section, headed by Mr. Danny J . Crawford . Mrs . Regin aStrother, formerly with the Defense Audio Visual Agency and now with the History an dMuseums Division, graciously assisted in the photographic research . Mr. Benis M. Frank ,head of the Oral History Section, was equally helpful in not only making his tapes an dtranscripts available, but also in interviewing a number of key participants and reviewin ga copy of the draft manuscript .

Mr. Robert E . Struder, head of the Publications Production Section, adeptly guidedthe manuscript through the various production phases and assisted the author in partial-ly mastering the intricacies of computer publication . The typesetting of the manuscriptwas done by Corporal James W. Rodriguez II and Lance Corporal Javier Castro . Mrs . Cather -ine A. Kerns contributed significantly to the typesetting effort, developed the charts ac-companying the text, and cheerfully and professionally provided considerable technica lexpertise on typesetting procedures . Mr. William S . Hill, the division 's graphics specialist,expertly produced the maps and completed the design and layout of the volume . Theindex was prepared by the author and Mrs . Meredith P. Hartley with the guidance an dassistance of Mr. Frank .

The author gives special thanks to Brigadier General Edwin H . Simmons, Director o fMarine Corps History and Museums, whose policies guide the Vietnam series ; to Deput yDirectors for History, Colonel Oliver M. Whipple, Jr., Colonel John G . Miller, and thei rsuccessor, Colonel James R . Williams, who provided continuing support and guidance ;to Mr. Henry I . Shaw, Jr., Chief Historian, who aided the author by giving him the benefi tof his considerable experience in writing Marine Corps history, encouragement, advice,

v

vi

prodding when needed, and general editorial direction ; and to Mr. Jack Shulimson, Head ,Histories Section and Senior Vietnam Historian, for providing advice and guidance, an d

for editing the final manuscript .

The author is also indebted to his colleagues in the historical offices of the Army, Navy,Air Force, and Joint Chiefs of Staff, who freely exchanged information and made perti-nent documents available for examination . The author must express his gratitude als oto all those who reviewed the comment edition and provided corrections, personal pho-tographs, and the insights available only to those who took part in the events . To all theseindividuals and all others connected with this project, the author is indebted and trul y

grateful . In the end, however, it is the author alone who is responsible for the conten tof the text, including opinions expressed and any errors in fact .

CHARLES R. SMITH

Table of Contents

Foreword ii i

Preface vTable of Contents vi i

Maps, Charts, and Tables x i

PART I THE CONTINUING WAR 1

Chapter 1 Planning the Campaign 2I Corps Order of Battle 2

Strategy: A Reevaluation of Priorities 8I Corps Planning 1 2

Chapter 2 Mountain Warfare 1 5Northern I Corps 1 5Off Balance 1 6

From the Cua Viet, South 2 4Chapter 3 The Spring Offensive Preempted 2 7

Strike into the Da Krong 2 7A Phased Operation 2 8Phase I 3 1Backyard Cleanup 3 3

Chapter 4 The Raid into Laos 3 8Across the Da Krong 3 8The NVA Retaliates : 3 9Ambush Along 922 3 9Heavy Fighting 4 5Back Into Laos 47Persistent Problems 47Phased Retraction 48Laos : Repercussions 5 1

Chapter 5 The Quang Tri Border Areas 5 2No Change in Tactics 5 2

The DMZ Front 5 2Brigade Mauls 27th 5 8The 9th Battles the 36th 6 1The Vietnam Salient 6 2Apache Snow 6 7Central DMZ Battles : 7 2Eastern Quang Tri and Thua Thien 7 6

PART II SOUTHERN I CORPS BATTLEGROUND 7 9

Chapter 6 Destruction of Base Area 112 8 0Defense of Da Nang 8 0Attack into 112 82

vii

"A Little Urban Renewal" 9 5Americal's TAOI 10 1

Chapter 7 The Battle for Quang Nam Continues 10 3Rockets Equal Operations 10 3Operation Oklahoma Hills 10 35th Marines and the Arizona 11 6Securing the Southern and Northern Approaches 12 1Americal Battleground 12 5

PART III THE THIRD'S FINAL MONTHS 12 7

Chapter 8 Redeployment : The First Phase 12 8Keystone Eagle 12 8"A Turning Point " 13 3

Chapter 9 "A Strange War Indeed" 13 8Company Patrol Operations 13 8Idaho Canyon 13 8"A Significant Step" 14 9Specter of Anarchy 15 4

Chapter 10 "A Difficult Phase " 15 9Maintaining a Protective Barrier 15 9"You Shouldered Us" 16 5The Brigade Takes Over 17 0

PART IV QUANG NAM: THE YEAR'S FINAL BATTLES 17 3

Chapter 11 Go Noi and the Arizona 17 4Vital Area Security 17 4Pipestone Canyon : The Destruction of Go Noi Island 17 41st Marines : Protecting the Southern Flank 18 7The Arizona 19 0

Chapter 12 Da Nang and the Que Son Valley 20 1The 7th Marines 20 126th Marines : Protecting the Northern Flank 21 2Quang Tin and Quang Ngai Battleground 21 5Results 21 6

PART V SUPPORTING THE TROOPS 219

Chapter 13 Marine Air Operations 22 01st MAW Organization and Deployment 22 0Single Management : Relations with the Seventh Air Force 22 3Upgrading of Aviation Assets 22 6I Corps Fixed Wing Support 22 9The Interdiction Campaign 23 1Air Control 234Helicopter Operations 23 6Improving Helicopter Support 23 9Air Defense 24 1Accomplishments and Costs 24 1

Chapter 14 Artillery and Surveillance 243

ix

Artillery Operations 24 3Surveillance and Reconnaissance Activities 25 1

Chapter 15 Supplying III MAF 26 0Force Logistic Command 26 0Naval Support Activity, Da Nang 26 4Engineer Support 26 7Motor Transport 27 0Medical Support 27 2Communications 27 4Logistics of Keystone Eagle and Keystone Cardinal 27 5

PART VI UNIQUE CONTRIBUTIONS 279

Chapter 16 Pacification 280The National Perspective 280

Pacification Planning In I Corps 28 3Line Unit Pacification 28 5Civic Action 28 7

The Grass Roots Campaign 288

Results 294Chapter 17 Special Landing Force Operations 29 7

The Strategic Reserve 29 7Organization and Operations 29 8The Fleet's Contingency Force 310

Chapter 18 The Advisory Effort and Other Activities 31 1

Marine Advisors and the Vietnamese Marine Corps 31 11st Air and Naval Gunfire Liaison Company (ANGLICO) 31 6

U.S . Marines on the MACV Staff 31 7

Embassy Guard Marines 31 8

Chapter 19 1969 : An Overview 31 9

NOTES 32 3

APPENDICESA. Marine Command and Staff List, January-December 1969 336

B. Glossary of Terms and Abbreviations 349

C. Chronology of Significant Events, January-December 1969 354

D. Medal of Honor Citations, 1969 358

E. List of Reviewers 374

F. Distribution of Personnel, Fleet Marine Force Pacific (31 January 1969) 376

G. Distribution of Personnel, Fleet Marine Force Pacific (8 December 1969) 38 1

INDEX 386

Maps, Charts, and Table s

Map, Reference Map, I Corps Tactical Zone xi iMap, Allied Commands in I Corps, January 1969 4

Chart, III MAF Command Relationships 6Map, Enemy Order of Battle, Northern ICTZ, January 1969 1 6Map, 3d Marine Division Outposts and Operational Areas, January 1969 2 1

Map, Assault into the Da Krong Valley, 22-25 January 1969 3 2Map, 9th Marines Movement into Base Area 611 40Map, Movements and Objectives of the 3d and 4th Marines, March July 1969 5 8

Map, Operation Maine Crag, 15 March-2 May 1969 6 5Map, Operations of the 9th Marines, May-August 1969 7 3

Map, Enemy Order of Battle, Southern ICTZ, January 1969 8 2Map, Assault on Base Area 112 90Map, Enemy Ground and Rocket Attacks Against Da Nang, February 1969 9 8Map, 7th Marines' Operation Oklahoma Hills, 31 March-29 May 1969 10 9

Table, The MACV List : Composition of Keystone Eagle 13 5

Map, Denial Operations of the 3d Marines, July-August 1969 14 0Map, 3d Marine Division Operations, July-September 1969 14 4

Table, The MACV List : Composition of Keystone Cardinal 16 7

Map, Operation Pipestone Canyon : Attack on Go Noi 18 0

Map, Cordon of Tay Bang An, 15-17 July 1969 184

Map, Scheme of Maneuver, 5th and 7th Marines, July-December 1969 19 2

Map, Hiep Duc Valley Counterattack, 21-26 August 1969 20 8

Map, Hiep Duc Valley Counterattack, 26-29 August 1969 208

Map, 1st Marine Aircraft Wing Locations, 1969 22 2Chart, III MAF Logistic Command Relationships and Facilities, 31 March 1969 26 1

Chart, Special Landing Force Command Relationships 298Chart, Strength, Arms, and Equipment of a Typical Special Landing Force 29 9

Map, Special Landing Force Operations, 1969 304

Chart, Marine Advisory Unit, 1969 312

xi

X11

Reference Ma p

I Corps Tactical Zone

0

2 5kilometers

DaNang

South

China

Sea

Thailand

SouthChinoSea

Quang Tri

Thua Thien

Quang Nam

Quang Tin

Quang Ngai

PART I

THE CONTINUING WAR

CHAPTER 1

Planning the CampaignI Corps Order of Battle — Strategy : A Reevaluation of Priorities—I Corps Plannin g

I Corps Order of Battle

Responsibility for the defense of the Republic ofVietnam ' s five northernmost provinces of Quang Tri ,Thua Thien, Quang Nam, Quang Tin, and Quan gNgai in January 1969 rested with III Marine Amphibi-ous Force (III MAF) . Commanded by Lieutenan tGeneral Robert E . Cushman, Jr., III MAF consistedof approximately 81,000 Marines situated at position sthroughout the provinces which constituted I Corp sTactical Zone (ICTZ) . Major General Charles J .Quilter 's 15,500-man 1st Marine Aircraft Wing (1s tMAW) controlled more than 500 fixed-wing and ro-tary aircraft from fields at Chu Lai, Da Nang, Phu Bai ,and Quang Tri . Headquartered on Hill 327 southwes tof Da Nang, Major General Ormond R . Simpson's 1stMarine Division, 24,000 strong, operated throughoutQuang Nam Province . The 21,000-man 3d Marine Di -vision, commanded by Major General Raymond G .Davis and controlled from Dong Ha Combat Base ,was responsible for Quang Tri Province . At Da Nang ,the 9,500 officers and men of Brigadier General Jame sA . Feeley, Jr .'s Force Logistic Command (FLC) provid -ed the wing and two Marine divisions with combatmateriel and maintenance support . Scattered through-out the hundreds of villages and hamlets of the fiv eprovinces were the 1,900 officers and men of the Com -bined Action Program (CAP), under Colonel EdwardF. Danowitz, who continued the Marines' ambitiou sexperiment in local security, still hampered somewha tby the residual effects of the enemy ' s 1968 Te tOffensive .

In addition to Marines, III MAF controlled approx-imately 50,000 United States Army troops . Located i nQuang Tri Province, 5,000 officers and men of the 1s tBrigade, 5th Infantry Division (Mechanized), com-manded by Colonel James M. Gibson, USA, aided i npreventing enemy infiltration of the coastal plains . Tothe south, in Thua Thien Province, the 101st Airborn eDivision (Airmobile), under Major General Melvi nZais, USA, deployed three brigades totalling 20,000men in an arc protecting the ancient imperial capitalof Hue . These two Army units, which had been shift-ed to I Corps in 1968, together with the 3d Marine

Division, constituted XXIV Corps, commanded byArmy Lieutenant General Richard G . Stilwell .* Locatedat Phu Bai, Stilwell's organization was under the oper-ational control of III MAE Based at Chu Lai insouthern I Corps, the 23,800 Army troops of MajorGeneral Charles M . Gettys' 23d Infantry (Americal )Division operated in Quang Tin and Quang Nga iProvinces under the direct control of III MAE Als ounder the direct control of General Cushman, in hiscapacity as Senior U .S . Advisor in I Corps, were the400 officers and men from all services of the Unite dStates Army Advisory Group (USAAG), who provid-ed professional and technical assistance to South Viet-namese military units operating in I Corps Tactica lZone .

As a member of the III MAF staff, Mr. Charles T.Cross, the civilian deputy for Civil Operations andRevolutionary Development Support (CORDS), coor-dinated the pacification effort in I Corps through hi sU .S . civilian and military representatives at theprovince and district level . Directly controlled b yMACV, CORDS was created to integrate and direc tthe country-wide pacification program .

Other U .S . and allied contingents that were neithe rattached to nor controlled by III MAF also operate dwithin the boundaries of I Corps . Assigned to the U.S .Army Support Command, U.S . Naval Support Activi-ty, 3d Naval Construction Brigade, 45th Army En-gineer Group, Task Force Clearwater, and the AirForce' s 366th Tactical Fighter Wing were approximatel y31,000 U.S . Army, Navy, and Air Force personnel .While controlled by their respective services, these sup -port units cooperated closely with III MAE Like th eother five major allied organizations, the 7,800-ma n2d Republic of Korea Marine Brigade, commanded byBrigadier General Dong Ho Lee, which protected a nenclave south of Da Nang centered on Hoi An ,received operational guidance from III MAF, but wa sunder the direct authority of the commanding genera l

*In order to provide operational direction for the expanded Unite dStates military effort in northern I Corps during Tet, MACV For-ward was established at Phu Bai in early February 1968 . On 10 March ,the command unit was redesignated Provisional Corps, Vietnam ,and on 15 August again redesignated as XXIV Corps .

2

PLANNING THE CAMPAIGN

3

Department of Defense Photo (USMC) A19282 8

LtGen Robert E. Cushman, Jr., right, is congratulated by Gen Creighton Abrams, Com-mander, U. S. Military Assistance Command, Vietnam, after being presented a Gold Sta rin lieu of a second Distinguished Service Medal. As Commanding General, III MarineAmphibious Force since June 1967, Cushman oversaw a doubling of III MAF's strength .

of Korean Forces in Vietnam, whose headquarters wa sin Saigon .

The Army of the Republic of Vietnam (ARVN) andits paramilitary forces gradually were assuming a muc hgreater share of the fighting in I Corps by 1969 . Lieu -tenant General Hoang Xuan Lam, commandin gICTZ, controlled a force of 34,000 ARVN regulars .Headquartered at Hue, the 17 battalions of Majo rGeneral Ngo Quang Truong ' s 1st ARVN Infantry Di -vision pursued enemy forces in Quang Tri and ThuaThien Provinces . In southern I Corps the 2d Division's12 infantry battalions, commanded by Brigadier

General Nguyen Van Toan, fought both enemy regu-lars and guerrillas throughout Quang Tin and Quan gNgai Provinces . Between the two ARVN infantry di -visions, the 51st Infantry and Armored Cavalry Regi-ments operated in Quang Nam Province . The 1s tRanger Group, normally stationed at Da Nang, actedas corps reserve, while the Vietnamese Air Force's 41s tTactical Wing, also located at Da Nang, provided over-all air support .

Reinforcing ARVN regulars were 49,800 troops ofthe Regional and Popular Forces (RF and PF), an d8,500 trained members of the part-time People's Self-

4

HIGH MOBILITY AND STANDDOWN

Cam Lo•i,Ctg;

Dong Ha

Quan gT (i SVantlegrIftSharon

Tr i

• Khe'Sanh x

y1 t►~1~ $,Camp Evans'

Allied Command sin I Corps ,

January 196 9

XXIVkilometers

0 25

50

7 5

Da Nang (ARV NX X

SouthChinaSea

I 1{►~~~

1II

ARVN

USMC

Martac. Mountai nAIr ra[IiIty c\

ARVN

X

ROKMC1 ~RGR

Quang Nam G P

An HoaARVN-

~

r-~-1_~ •

Tam

zX

1

Hiep Du c

Quang Tin

USA

Quang Ngai ARV N

Camp Ea gX X

Thua Thie n

Cambodia

PLANNING THE CAMPAIGN

5

Defense Force (PSDF)—a paramilitary organizationrecruited, trained, and stationed in local areas . Amon gother Vietnamese units available to combat smal lgroups of guerrilla infiltrators and root out membersof the local Viet Cong Infrastructure (VCI), were th e9,000-man National Police, and the National Polic eField Force with a strength of 2,500 . In addition, therewere 6,200 men of the Civilian Irregular Defens eGroup (CIDG), composed of Montagnard and Nungtribesmen, Cambodians, and Vietnamese, recruite dand trained by the South Vietnamese Special Force sand advised by the U .S . Army's 5th Special Force sGroup (Airborne), which occupied nine mountai ncamps rimming the lowlands . Their task was to col-lect intelligence on enemy activities and attempt t oblock enemy infiltration routes into the heavily popu-lated coastal plains . ,

From a modern complex of air-conditioned build-ings on the banks of the Song Han at Da Nang ,General Cushman coordinated the activities of thi sdiverse group of forces . Like his predecessor, Lieu -tenant General Lewis W . Walt, he functioned withina complex chain of command . III Marine AmphibiousForce was under the operational control of the Com-mander, U .S . Military Assistance Command, Viet-nam, General Creighton W. Abrams ; but with respectto administrative matters affecting his Marines, Gener -al Cushman reported directly to Lieutenant General

Henry W . Buse, Jr ., Commanding General, Fleet Ma-rine Force, Pacific (FMFPac), in Hawaii . As command -ing general of III MAF, General Cushman not onlydirected the operations of all United States combatunits in I Corps, but also provided guidance to thecommander of the Korean Marine Brigade and othersas I Corps Coordinator for United States and Fre eWorld Military Assistance Forces and, as Senior U .S .Advisor for I Corps, coordinated the activities of Lieu -tenant General Lam's ARVN units with those of hisown .

General Cushman was well prepared when he as-sumed the post of top Leatherneck in Vietnam . Agraduate of the Naval Academy (Class of 1935) an drecipient of the Navy Cross as a battalion commanderduring the recapture of Guam, Cushman served fou ryears on Vice President Richard M . Nixon ' s staff asAssistant for National Security Affairs . In addition hecommanded the 3d Marine Division in 1961, and late rwhile serving as Commanding General, Marine Corp sBase, Camp Pendleton, headed both the 4th Marin eDivision Headquarters nucleus, and the newly or-ganized 5th Marine Division . In April 1967, he wasappointed Deputy Commander, III Marine Am-phibious Force . Three months later he assumed th eduty of Commanding General, III MAF, replacingLieutenant General Walt .

During his tenure, General Cushman managed II I

LtGen Hoang Xuan Lam, left, Commanding General, 1 Corps ; LtGen Richard G. Stilwell,USA, Commanding General, XXIV Corps; and MajGen Ngo Quang Truong, right, Com-manding General, 1st AR VN Divirion, pose with Gen Cao Van mien, center left, Chair -man of the South Vietnamese Joint General Staff during the latter's visit to Phu Bai .

Department of Defense Photo (USA) SC649680

6

HIGH MOBILITY AND STANDDOWN

III MAFCOMMAND RELATIONSHIP S

CINCPA C

FMFPAC

M ACV

I CORPS

III MAF -----

-------------- - USARV

2D ROKM CBDE

1ST MAR DIV

XXIV CORPS

23D INF DI V

1ST MAW

3D MAR DI V

d

— — — — OP Control

'h

$ Admin Control• • • • • • Command Less OP Contro l

Coordination

101 ABN DI V

1ST BDE5TH INF DIV

• • •

• • • • • • • • • • •

MAF's growth from a force of 97,000 Marine, Navy ,and Army personnel to 172,000 by the beginning of1969. His responsibilities, however, changed little .Like General Walt, Cushman was charged with thedefense of I Corps Tactical Zone . Although thesmallest in area and population, ICTZ was the mos tstrategically located of the four South Vietnames emilitary regions due to its proximity to major enemyinfiltration and supply routes, and base areas in Laos ,the Demilitarized Zone (DMZ), and North Vietnam .Cushman would be replaced in March 1969 by Lieu -tenant General Herman Nickerson, Jr ., a highly deco -rated veteran of World War II and Korea, and forme rcommanding general of the 1st Marine Division inVietnam from October 1966 to May 1967 .

Opposing American, South Vietnamese, andKorean forces within the boundaries of I Corps, the

Demilitarized Zone, and contiguous North Viet-namese and Laotian border regions, were 123 NorthVietnamese Army (NVA) and 18 Viet Cong (VC) com -bat and support battalions composed of close to 89,00 0enemy troops . According to allied intelligence esti-mates of early 1969, 42,700 were North VietnameseArmy regulars while 6,500 were Viet Cong main an dlocal force unit members . In addition, there were ap-proximately 23,500 guerrillas and 16,000 political andquasi-military cadre . Added to these known Nort hVietnamese and Viet Cong units were additional in-fantry and support battalions with an estimatedstrength of 30,000 troops located within striking dis-tance of the corps tactical zone .

Five different headquarters directed enemy opera-tions within the corps tactical zone to varying degrees :the B-5 Front which controlled troops along the DMZ ;

PLANNING THE CAMPAIGN

7

Marine Corps Historical Collectio n

LtGen Herman Nickerson, Jr., right, relieves GenCushman as Commanding General, III Marine Am-phibious Force in formal ceremonies at Da Nang o n26 March 1969. LtGen Nickerson previously served inVietnam as Commanding General, 1st Marine Divi-sion and Deputy Commanding General, III MA E

7th Front which directed units within Quang Tr iProvince ; Tri-Thien-Hue Military Region which hadcharge of units in Quang Tri and Thua Thie nProvinces ; troops attached to the 4th Front whichoperated in Quang Nam and Quang Tin Provinces ,and the city of Da Nang ; and units subordinate toMilitary Region 5 which operated in Quang Nga iProvince . The five political and military headquarterswere thought to receive orders from the Central Officefor South Vietnam (COSVN), which in turn was sub-ject to the directives of the Reunification Departmen tof the North Vietnamese Lao Dong Party . *

The dramatic and massive corps-wide attack, con-centrated in the northern two provinces, and resul-tant severe losses during the Tet and post-Te tOffensives of 1968, forced the enemy to reevaluat ehis military position as the new year began . As a result ,Viet Cong and North Vietnamese Army strategy an dtactics shifted from an attempt to win an immediat e

*COSVN, the North Vietnamese forward control headquarters ,consisted of a few senior commanders and key staff officers organizedas an extremely mobile command post . Thought to be located inTay Ninh Province, III Corps, near the Cambodian border, COSVN ,although targeted by numerous American and South Vietnames eoperations, eluded capture throughout the war .

victory to an attempt to win by prolonging the con-flict . Large unit assaults were to be undertaken onl yif favorable opportunities presented themselves ; smallunit operations, particularly highly organized hit-and -run or sapper attacks, attacks by fire, harassment, ter-rorism, and sabotage would be used more extensive-ly . The Communists hoped to inflict troop losses b ycutting allied lines of communication, attacking base ,rear service, and storage areas while conserving thei rmilitary strength, defeating the pacification effort, an dstrengthening their negotiating position at Paris .Through such actions the enemy hoped to maintai nan aura of strength and demonstrate to the South Viet-namese populace that its government was incapabl eof providing security for its people .

The differences in terrain and population north an dsouth of Hai Van Pass, which essentially bisected th ecorps tactical zone, resulted in markedly different mili -

tary situations by the end of 1968. In the north, withless than a third of the zone's population, the enem ytended to concentrate regular units in the uninhabit-ed, jungle-covered mountain areas, close to bordersanctuaries . The war in the north, then, was one fough tbetween allied regular units and North Vietnames eArmy regiments and divisions . It was, to draw an anal -

ogy, "like the Army fighting the Japanese in Ne wGuinea—inhospitable jungle, mountainous terrain ;the enemy being not little guys in black pajamas, bu tlittle guys in well-made uniforms and well-equippe dand well-led, and certainly well-motivated ." 2

Faced with a smaller population base and a some -what weaker infrastructure in the northern tw oprovinces, and pursued at every turn by allied forces ,enemy strength by year's end had dwindled to abou t29 battalions from a high of 94 in mid-1968 . The al -lied shift to a more mobile posture and the satura-tion of the remote mountain regions of western Quan gTri and Thua Thien Provinces with numerous patrols ,sweeps, and ambushes resulted in the opening of vas tareas of hitherto uncontested enemy strongholds, ex -posing havens and supply caches . Further, it allowe dallied forces to exploit the advantages of the helicop-ter to the fullest, which permitted the massing ofregimental or multi-regimental-size units anywher ewithin the provinces in a matter of hours . Allied oper-ations north of the Hai Van Pass by the end of 196 8had produced a yearly total of almost 40,000 enem ycasualties, forcing both North Vietnamese and VietCong units to withdraw in an attempt to regroup ,reindoctrinate, refit, and prepare for the winter-spring

8

HIGH MOBILITY AND STANDDOWN

offensive scheduled to begin in the early months o f

1969 .

The three provinces which constituted southern ICorps posed a contrasting problem to that of th enorthern provinces . The large population base an dstronger enemy infrastructure, built up over many yearsin the region south of Da Nang and around QuangNgai, created a continuous threat to the large popu-lation centers and allied military complexes, whic hwere, in spite of the best attempts, the targets of fre-quent enemy ground and rocket attacks . Popula-tion and territorial security was progressing, albei tslowly, and by the end of 1968, 69 percent of th ecivilian population, according to allied statistics, live dwithin secure villages and hamlets . As enemy strengt hin the north diminished and engagements becam eprogressively rarer, the enemy was able not only t omaintain current force levels in the south, but eve nto increase them slightly. The 42 enemy battalions i nsouthern I Corps in mid-1968 were increased to abou t54 by the end of the year .3

Taking advantage of favorable weather and the al -lied out-of-country bombing pause, which went int oeffect on 1 November, the enemy renewed efforts tobuild and repair strategic roads, greatly expandin gresupply capabilities within the corps tactical zone an dsurrounding border areas . With the infusion of menand material from the north, tactical redisposition offorces, and increased determination to carry on th efight, the Communists began the new year as they ha dbegun the previous year—seeking the overthrow o fthe South Vietnamese Government and the reunifi-cation of the two Vietnams under Communist domi-nation . III MAF was ready to ensure that the enem ydid not succeed . '

Strategy: A Reevaluation of Prioritie s

In 1969, the sixth year of direct United States com-bat operations in Southeast Asia, the basic issues ofthe war remained largely unchanged . The Viet Cong ,supported by regular North Vietnamese troops, con-tinued to seek control over South Vietnam by attempt-ing to destroy the existing governmental structure andsubstituting in its place one of Communist domina-tion . On the other hand, the Government of theRepublic of South Vietnam, with allied assistance ,sought to check the VC and NVA assaults by buildin ga viable nation immune to Communist overthrow . Toaccomplish this, the South Vietnamese Governmentasked for and received United States economic and

Courtesy of Maj Charles D . Melson, USM C

Enemy troops assemble in preparation for battle . Th eRussian-designed 7 .62mm automatic rifle each carrieswas the standard rifle of North Vietnamese Army sold-iers and of guerrillas fighting in South Vietnam .

military support, particularly the manpower, mobili-ty, and firepower of the United States Armed Forces .

In the four years prior to 1969, the United State spresence grew rapidly as did its preoccupation withsuccessful military operations. The protection and for-tification of South Vietnam 's political, economic, andsocial institutions had been, to a large extent, left t oits own government, and improvement and moderni-zation of its combat power had received little empha-sis . The advisory effort of the 1950s and early 1960shad become United States direction and prosecutio nof the war. The realization, both in Washington an dSaigon, that the enemy had the capability of launch-ing a major offensive in 1968 led to greater emphasi son meaningful programs, leading to increased popu-lation security, a stable government, and a militarystrategy designed to seize the initiative . These goals ,combat operations to defeat the enemy and promot esecurity, increased effort to improve and moderniz ethe Vietnamese Armed Forces, and emphasis on build-ing a viable state, were to receive equal attention.5 Th etransition, then, was to turn the course away fro m"Americanization of the war" toward "Vietnamizatio nof the peace ."

PLANNING THE CAMPAIGN

9

For the enemy, too, 1969 was a year of transition .From 1965, the main thrust of Viet Cong and NorthVietnamese strategy was to match the United Statestroop buildup and endeavor to defeat the allied force son the battlefield, a strategy that was followed unti lTet of 1968 . The failure of the Tet and post-TetOffensives resulted in the reformulation of strategyand tactics . North and South Vietnamese Communis tleaders set forth a new, pragmatic strategy that dis-missed the possibility of a total victory on the fiel dof battle over United States and South Vietnames eForces, seeking instead to parlay limited military vic-tories into withdrawal of U.S . troops, establishmen tof a coalition government, and ultimate Communis tpolitical victory in South Vietnam . It was a strategydesigned to weaken and exhaust the allies . As a cap-tured enemy document noted : "For each additionalday [U.S . troops] stay, they must sustain more casual -ties . For each additional day they stay, they mus tspend more money and lose more equipment . Eachadditional day they stay, the American people willadopt a stronger anti-war attitude, as there is no hop eto consolidate the puppet administration and Army . "6

Tactics, like overall strategy, were to change . Northand South Vietnamese Communist leaders champi-oned the more frequent use of small unit tactics i nthe form of ground attacks or attacks by fire agains tpopulation centers, economic areas, and allied bases ,while still maintaining the option of large unit actions .They emphasized the importance of the politica laspects of the war and moved to bolster their politi-cal appeal in the South by establishing a forma lgovernmental structure . They prepared for either pro-tracted warfare or a ceasefire, while trying to broade ntheir options in South Vietnam, and enunciating theirmajor demands at the on-going peace negotiations i nParis . The basic enemy campaign plan for South Viet-nam aimed to blunt the allied security program andto foil attempts to Vietnamize the war .

With the first large commitment of United Statestroops to the war in 1965, U .S . strategy focused onassisting the Government of South Vietnam and it sarmed forces in defeating Communist subversion an daggression . This strategy stressed military operations ,and advisory and financial assistance to aid in creatin ga secure environment, necessary for the success of na-tional development programs . Further, efforts wer emade to encourage and assist the South Vietnames ein assuming greater responsibility for the developmen tand maintenance of a free and independent nation .

Various operational concepts to support this strate -

gy were developed by the Joint Chiefs of Staff (JCS )and Commander-in-Chief, Pacific (CinCPac), wit hprimary emphasis on maintaining maximum pressureagainst the enemy' s disruptive and war-making capa-bilities through three interrelated undertakings . Firstwere the destruction of the Viet Cong main and Nort hVietnamese Army forces in South Vietnam, forcing theNVA to withdraw, and the separation of the VC unitsfrom the population by providing a protective shiel dthrough ground, air, and naval offensive operationsagainst the remaining enemy main force units . Thesecond undertaking involved the establishment of amilitarily secure environment within which the govern-mental apparatus of South Vietnam could be extend-ed, consolidated, and sustained. This entailedaccelerating offensive operations against Viet Con gguerrilla and main forces, with priority being give nto the elimination or neutralization of the enemy's po-litical and military infrastructure while simultaneousl ydeveloping and improving the Republic's armed an dsecurity forces . Third was the improvement of the na -tional development effort through a number of in-tegrated security, political, economic, and socialprograms.

Although all three of these undertakings were con-ducted simultaneously well into 1968, priority wasgiven to the first operational goal . Military operationsdesigned to inflict unacceptable casualties on the ene -my and thereby bring about a successful outcome t othe war were stressed . A strategy of attrition, whilenever formally articulated, was adopted . As GeneralWilliam C. Westmoreland, Commander, UnitedStates Military Assistance Command, Vietnam, unti lJuly 1968, stated :

Our strategy in Vietnam is to secure our bases which areessential if we are to fight troops and sustain combat ; t ocontrol populated and productive areas, . . . to neutralizehis [the enemy's] base areas which are in the main situated. . . along international borders, . . . to force the enemyback, particularly his main forces, back to peripheral areasand to contain him there . Next to interdict infiltration . An dfinally to inflict maximum attrition on his ranks . '

In short, until mid-1968, "it was to grind down th eenemy using the combined forces available in SouthVietnam . "8 The other two operational goals receivedrelatively little in terms of effort and resources .

As allied losses declined and territorial security im -proved following the enemy's failed Tet and post-Te t

Offensives, greater emphasis was placed on popula-tion security and improvement of South Vietnam ' sArmed Forces . Out of this change in operational em-

10

HIGH MOBILITY AND STANDDOWN

phasis evolved a balanced approach which was to be -come the guiding principle for all future allie doperations . In September 1968, General Creighton W.Abrams, General Westmoreland's successor at MACV,advanced the "one war" concept which in essenc erecognized no such thing as a separate war of big unit sor of population and territorial security. Under thi sintegrated strategic concept, allied forces were to car-ry the battle to the enemy simultaneously, in all area sof conflict, by strengthening cooperation between U .S.advisors and commanders and their South Vietnames emilitary and civilian counterparts . Major elements ofthe "one war" concept were population security ,modernization and improvement of South Vietnam' sArmed Forces, and combat operations, each to receivethe highest priority, and each to be kept abreast ofthe other and moving forward with the ultimate aimof ensuring a strong and viable nation. No single ele-ment was to be allowed to overshadow the other two .

Under this concept, all allied forces were to be mar-shalled into a single integrated, all-out attack agains tthe enemy's forces, organization, activities, and facil-ities . Working in close coordination with the ArmedForces of the Republic of Vietnam and other govern -mental agencies, each element within the overall ef-fort was to be assigned a mission and related tasks mos tappropriate to its particular capabilities and limita-tions . Emphasis was to be placed on combined oper-ations in which Free World Military Assistance Forcesand Republic of Vietnam Armed Forces would joi nin an effort to increase the latter's experience and con-fidence . In all operations, mobility and flexibility wereto be stressed ; as the enemy situation changed, exist-ing plans were to be rapidly modified to counter o rcapitalize on the changing situation. The strategy o fattrition was dead . As General Abrams pointed ou tto his major field commanders in mid-October :

The enemy's operational pattern is his understanding tha tthis is just one, repeat one, war . He knows there' s no suchthing as a war of big battalions, a war of pacification or awar of territorial security . Friendly forces have got to recog-nize and understand the one war concept and carry the battleto the enemy, simultaneously, in all areas of conflict . In theemployment of forces, all elements are to be brough ttogether in a single plan—all assets brought to bear agains tthe enemy in every area, in accordance with the way th eenemy does his business . . . . All types of operations areto proceed simultaneously, aggressively, persistently andintelligently—plan solidly and execute vigorously, never let-ting the momentum subsides

The "one war" concept embodied Abrams' long-hel dbelief that both the multi-battalion and pacification

wars were mutually supporting aspects of the sam estruggle. *

As a corollary to the "one war " concept, significan temphasis was to be given to the Accelerated Pacifica-tion Campaign (APC), initiated in November 1968 .Recognizing that insurgency would fail if cut off fro mpopular support, allied efforts were to be directe dtoward denying the enemy access to population andrice-growing centers, which in turn would deprive hi mof his mobility and force him to divert combat troop sto logistical duties for which he would otherwise im-press local laborers .

Guided by these principles, the South Vietnames eJoint General Staff (JGS), in coordination with Gener-al Abrams' MACV staff, issued two documents late in1968 which set forth strategy for the conduct of th ewar in the coming year . The 1969 Pacification and De-velopment Plan was the first attempt by the Sout hVietnamese Government to present in a single docu-ment the strategy, concepts, priorities, and objective swhich were to guide the total pacification effort . Is -sued on 15 December by South Vietnamese PremierTran Van Huong and members of the newly forme dCentral Pacification and Development Counci l(CPDC), it was to take effect with the termination o fthe Accelerated Pacification Campaign in February1969 . Although a unilateral plan, it was considere dto be directive in nature for all allied forces . Theprimary objectives of the plan were to provide at leas ta measure of security for 90 percent of the South Viet-namese population by the end of 1969, and extendnational sovereignty throughout the country b yeliminating the Viet Cong Infrastructure, strengthen-ing local government, increasing participation in self -defense forces, encouraging defection among enem yunits and their supporters, assisting refugees, combat-ing terrorism, and promoting rural economic develop-ment and rice production .

*In commenting on the "one war" concept, promulgated b yGeneral Abrams, General Westmoreland stated : "It was not Abramsthat did it, it was the changed situation which he adapted to. Th echange was the situation, it was not the personality because, GeneralAbrams was my deputy for over a year . He and I consulted abou talmost every tactical action . I considered his views in great depthbecause I had admiration for him and I'd known him for many years .And I do not remember a single instance where our views and th ecourses of action we thought were proper, differed in any way." Con-tinuing, "there was no change in strategy . But there was a changein the situation, a profound change after the defeat of the Mt Offen-sive." (Gen William C . Westmoreland intvw, 4Apr83, pp . 7, 19 [Oral -HistColl, MCHC, Washington, D .C.])

PLANNING THE CAMPAIGN

1 1

Department of Defense Photo (USMC) A19254 0

A Marine infantryman scrambles down a steep moun-tain slope during a typical patrol in I Corps' rugged,jungle-covered mountainous terrain in search of Nort hVietnamese Army Forces, base camps, and cache sites .

The four corps and Capital Military District com-manders were given primary responsibility for execut-ing the pacification plan on the basis of province plan sprepared under corps supervision and reviewed in Sai-gon . To focus and ensure success for the effort, inter-mediate goals were established . These goals, to be ac-complished by 30 June 1969, were deliberately set hig hin order to exact maximum effort .

The second document issued was the CombinedCampaign Plan (CCP) for 1969, which provided basi cguidance for all Free World forces in the conduct ofmilitary operations in South Vietnam . The 1969 pla ninaugurated a number of changes in annual campaig nplanning which strengthened the status of the Sout hVietnamese Joint General Staff . Unlike previous cam-paign plans, which were prepared by MACV, the 1969plan was prepared by the JGS with assistance fromMACV. In addition, U.S . forces were for the first tim elisted among Free World forces instead of separately ,and more significantly, the plan, once drawn up, wassigned by each of the national commanders .

The basic assumptions included in the plan re-mained unchanged from those of 1968, except for ac -

knowledging the on-going Paris peace negotiation sand assuring that allied force levels would remain sta-ble throughout the year. Under the plan, United State sand South Vietnamese troops were to continue mobil eoperations against enemy forces and bases, whilescreening population centers against attack and in -filtration. The plan also directed continued extensionof government control by securing major cities, towns ,and military installations, and denying enemy acces sto important economic regions, rail and road links ,and centers of government . Again emphasized werethe need for population security, elimination of enemyinfrastructure, development of local self-defense forces ,and civic action programs, but to a much greate rdegree than similar programs had received in previ-ous campaign plans .

Twelve major objectives and goals were enumerate dfor use in measuring progress . As compared with th e1968 plan, the 1969 campaign plan reduced and sim-plified the list, making it more meaningful and mor ereasonably attainable than were the percentile goal sused in the past. The goals established for Free Worl dforces varied : defeat Viet Cong and North Vietnames earmed forces ; extend South Vietnamese Governmen tcontrol; modernize and raise the level of South Viet-nam combat readiness ; inflict maximum enemycasualties; increase the percentage of territory andpopulation under South Vietnamese control throughan expanded pacification effort ; reduce the enemy'sability to conduct ground and fire attacks against mili-tary and civilian targets ; destroy or neutralize enemybase areas ; enhance the effectiveness of provincial secu -rity forces ; secure vital lines of communication ; neu-tralize the enemy's infrastructure ; increase the numbe rof Viet Cong and North Vietnamese Army deserters ;and, maximize intelligence collection and counter -intelligence activities . In order to make substantialprogress in achieving these goals, allied militaryresources were to be applied to critical areas, with econ -omy of force being practiced in less essential areas .

In ICTZ, allied forces were to be committed primar-ily to offensive operations in order to destroy enem yforces throughout the tactical zone and those whic hmight cross the Demilitarized Zone and Laotian bord-er . Operations were also to be conducted to destro yenemy base areas, and to protect the major populationcenters of Hue, Da Nang, Quang Ngai, and the mai nlines of communications, especially Routes 1 and 9 .Pacification activities would be concentrated on th epopulated coastal areas surrounding the major citie sand extended to other populated areas along Route 1 .

12

HIGH MOBILITY AND STANDDOWN

In essence, the 1969 country-wide Combined Cam-paign Plan abandoned the earlier concept of a pro-tective shield of containment, and both emphasize dand implemented the concept of area security and con-trol, while again stressing the spirit of the offensiveand relentless attack against the enemy. It recognizedboth the enemy's political and military threats and ad-vocated expanded spoiling and preemptive operation sagainst all types of enemy organizations and facilities ,with particular emphasis placed on eliminating th eViet Cong Infrastructure. Further, it recognized thatthere was just one war and the battle was to be car-ried to the enemy, simultaneously, 'in all areas of con-flict . Friendly forces were to be brought together i na single plan against the enemy in accordance wit hthe way he operated . "The key strategic thrust," as stat-ed in the MACV Strategic Objectives Plan approve dby General Abrams early in 1969, was "to provid emeaningful, continuing security for the Vietnames epeople in expanding areas of increasingly effective civi lauthority." As envisioned by MACV and the JGS, th e"one war" concept was to be forcefully implemente don all fronts in 1969. As General Abrams stated toa gathering of his major field commanders early i nJanuary :

Pacification is the "GUT" issue for the Vietnamese . This i swhy I think that we cannot let the momentum die down .I started off by saying that I think we have the cards. I be-lieve that . But the artistry in this situation is going to b eto play the cards at the proper time and in the proper place .We do not have so many extras that we can afford to blunde raround and put forces where the enemy isn't and where th epacification effort doesn 't need it . It is going to require th eutmost in professional work and professional judgment dur-ing the next weeks to ensure that we play our cards in th emost effective way. If we do not and we get sloppy, pacifica-tion is going to really suffer . You can't let the old steam rolle rget going and not feed it fuel and expect it to keep going? 0

I Corps Planning

On 26 December 1968, South Vietnamese, Korean ,and American commanders in I Corps Tactical Zon eissued their Combined Campaign Plan for 1969 .Designed to implement the objectives outlined in th enationwide campaign and pacification plans, thisdocument was to provide basic guidance for the oper-ations of Marines and allied forces in ICTZ through -out the coming year.

The drafters of the plan assumed that the NorthVietnamese and Viet Cong in I Corps would continu eto follow the strategy used during the campaigns o flate 1968— that of concentrating men and materiel in

attacks on population centers in order to inflict adefeat on the ARVN and incite a popular uprising thatwould culminate in either the overthrow of the Sout hVietnamese Government, or its replacement by a coa-lition government which would include representativesof the National Front for the Liberation of Sout hVietnam .

Due to a number of decisive tactical defeats, heav ycasualties, and failure to gain popular support by 1969 ,allied planners noted :

Realizing that he cannot win a military victory, the enem yis apparently resorting to a "fighting while negotiating "strategy. In adopting such a strategy, he now hopes to gai npolitical advantage at the conference table through continue doffensive action in RVN [Republic of Vietnam] . The enem yis expected to expand his efforts to control the rural area sand strengthen his infrastructure as a base for further action .,

In pursuit of this goal, the planners declared, th eNVA and VC in I Corps would endeavor to "wear downand eliminate RVNAF [Republic of Vietnam ArmedForces] and Allied forces to the maximum extent pos-sible and to draw friendly forces away from urban area sand thereby relieving pressure on those enemy forcesattacking the urban areas ." 12 In the attack on the ur-ban population, Communists forces would continu eto rely on such standard tactics as assassination, rock -et and mortar attacks on vital areas and key installa-tions, and direct assaults on isolated units, outposts ,and towns . These actions were aimed, the planner snoted, at demoralizing allied forces, discrediting th eSouth Vietnamese Government, and disrupting it spacification effort .

To meet and eliminate the enemy threat, campaig nplanners divided the opposing force into twocategories, the VC and NVA main force units oftenfound in remote areas and local VC guerrilla units an dtheir supporters, concentrated in and around urba npopulation centers . They assigned a distinct yet over-lapping function to each allied unit : Korean, Ameri-can, and ARVN regulars were to focus on destructio nof the enemy's main forces, neutralization of base andlogistical areas, and prevention of infiltration of popu-lation centers . Regional and Popular, People's Self-Defense, and National Police forces were to weed ou tand eliminate Viet Cong local force units and infra -structure. These auxiliaries were to furnish "securityfor hamlets and villages and will defend the LOCs[lines of communication], political and economi ccenters and government installations . They will als oparticipate in and coordinate with the ARVN regular

PLANNING THE CAMPAIGN

1 3

Abel Papers, Marine Corps Historical Cente r

LtGen Robert K Cushman, left, Commanding General, III Marine Amphibious Force ;

LtGen Hoang Xuan Lam, Commanding General, I Corps ; and BGen Dong Ho Lee, right,Commander, 2d Republic of Korea Marine Brigade, sign the I Corps Combined Cam-paign Plan for 1969, outlining allied coordination and assistance policies for I Corps.

forces in the protection of cities and provincial anddistrict capitals" 1 3

The major task assigned to the regular forces un-der the plan was to locate and "systematically neutral-ize " the enemy ' s base areas scattered throughout thetactical zone, predominantly in the mountains adja-cent to the Laotian border . Allied troops were to con-centrate on those enemy command, control, andlogistical facilities which "directly affect the selectedRD [Revolutionary Development] priority areas, ke ypopulation and economic centers, and vital commu-nications arteries" 14 Priority was given to those enemybase areas within striking distance of Dong Ha andQuang Tri City (Base Area 101), Da Nang (Base Area112), and Quang Ngai City (Base Area 120 .* For themore remote bases where complete neutralization an dpermanent denial was impossible, "repeated air strikeswith random pattern ground operations " were to b e

*Each enemy base was assigned a three-digit number . The firs tdigit represented the country in which it was located (1 for SouthVietnam and 6 for Laos), while the last two digits indicated se-quential position of discovery by allied troops .

used to "create insecurity, disrupt command channels ,and deter stationing and movement of VC/NVA

forces " within those areas 1 5 The drafters of the cam-paign plan were convinced that :

The destruction of the enemy's command, control, and

logistics facilities will contribute to his eventual defeat . Theneutralization of these bases will also require the enemy t oplace greater demands on the people for more manpowe r

and resources . As these demands increase, the people wil lbecome more susceptible to friendly psychological opera-tions . This will support the objective of assisting the GV N

in expanding territorial control 1 6

"Territorial control" or territorial security was stressedby the authors as the primary objective of all allie d

activity in I Corps :

The campaign to provide sustained territorial security i nthe countryside and concurrently to introduce political, eco-nomic and social reforms which will establish condition sfavorable for further growth and stability, is just as impor-tant as anti-aggression operations . Operations to annihilatethe enemy, while clearly essential to pacification, are by them -selves inadequate . The people must be separated and wonover from the enemy."

14

HIGH MOBILITY AND STANDDOWN

Each allied unit was assigned a security function, i naddition to its other allotted duties . American ,Korean, and ARVN regulars, when not engaged inmajor operations against enemy base areas and mai nforce units, were to "prevent enemy infiltration intothe fringes of towns, cities, and areas adjacent to popu-lation" centers by constantly patrolling those areas .1 8They were to reinforce territorial units under attack ,furnish air and artillery support, and assist them i ntheir campaign to eliminate local Viet Cong. Region -al and Popular Force units within the tactical zone wer eto carry out ambushes, cordons, and patrols near in-habited areas, while the National Police and People' sSelf-Defense Forces were to maintain public order andconduct operations aimed at eradicating the enemy' sinfrastructure .

I Corps planners also sought to delineate the ofte nconflicting responsibilities for pacification by requir-ing each locality to be placed into one of five genera lsecurity categories : uninhabited areas, North Viet-namese Army- or Viet Cong-controlled areas, contest-ed areas, areas being secured, and those areasconsidered completely secure. Uninhabited areas en -compassed, that territory just inside the national front-iers which did not contain officially recognizedhamlets . NVA- or VC-controlled areas were regions inwhich the enemy was present and able to exert mili-tary and political influence . In both of these areas, al -lied units were to conduct only transient operations ,with no intention of gaining complete and permanen tcontrol .

Closer to the main population centers were the con -tested areas . Selected as targets for Revolutionary De-velopment activities, these areas were to be cleared

permanently of all organized enemy main force an dguerrilla unit activity by regular forces . In areas in th eprocess of being secured, all "organized resistanc e" wasconsidered to have ceased and the government to b ein the process of destroying what remained of the ene-my's guerrilla network, thereby preventing its re -emergence.

Secure areas, the final category, were densely popu-lated regions where government control was complete ,or where permanent New Life Hamlets (Ap Doi Moi )were being developed . Here the population coul dmove freely without fear of organized enemy attacks ,except for occasional individual acts of terrorism orsabotage, and indirect attacks by fire . In both secureareas and areas being secured, the responsibility fordefense and maintenance of public order rested wit hlocal officials and their principal security forces, th eRF and PF, the PSDF, and the National Police .

The purpose of this regional organization was no tonly to fix responsibility for pacification, but to inte-grate and unify all allied activity. Combat operations ,population and teritorial security, and RVNAF im-provement and modernization were to be equally em-phasized in the "one war" concept as enumerated bythe ICTZ/III MAF Combined Campaign Plan fo r1969 .

Against this background, the battlefields of I CorpsTactical Zone were relatively quiet during the earlydays of 1969 . The Viet Cong's unilateral 72-hour NewYear's truce ended on 2 January, but intermittentfighting took place as allied forces, who had refuse dto recognize the ceasefire, continued both large an dsmall unit operations .

CHAPTER 2

Mountain Warfar eNorthern I Corps— OffBalance—From the Cua Viet, South

Northern I Corps

Arrayed within the provinces of Quang Tri and Thu aThien as 1969 began were the following major Unite dStates headquarters and combat units : HeadquartersXXIV Corps ; 3d Marine Division ; Task Force Hotel ;101st Airborne Division (Airmobile) ; 1st Brigade, 5t hInfantry Division (Mechanized) ; XXIV Corps Artillery ;and U .S . Navy Task Force Clearwater. Generallydeployed along the Demilitarized Zone and Laotia nborder within Quang Tri Province was the 3d MarineDivision, less two battalions of the 3d Marines, wit hthe 1st Brigade, 5th Infantry Division (Mechanized )under its control, operating throughout the easternportion of the province, primarily within the piedmontand coastal lowlands . Located at Vandegrift CombatBase in western Quang Tri was Task Force Hotel, whic hessentially functioned as 3d Marine Division Forwar dHeadquarters . Deployed within Thua Thien Provincewere the three brigades of the 101st Airborne Divi-sion (Airmobile), headquartered at Camp Eagle, southof Hue and northwest of Phu Bai . Collocated withHeadquarters, XXIV Corps, at Phu Bai Combat Basewas XXIV Corps Artillery, while stationed at Don gHa was the subordinate 108th Artillery Group . TheNav y' s Task Force Clearwater, with the mission of rive rand inland waterway security, operated from a basenear the mouth of the Song Cua Viet in Quang Tr iProvince, with river patrol groups securing the Son gCua Viet and Song Huong (Perfume River), and patro lair cushion vehicle (PACV) elements patrolling inlan dwaterways .

Enemy activity throughout northern I Corps wa slight and sporadic during the early days of Januar y1969 . Along the Demilitarized Zone, units of the 3dMarine Division and 1st Brigade, 5th Infantry Divi-sion (Mechanized) faced elements of six North Viet-namese regiments, the 138th, 270th, 84th, 31st, 27th ,and the 126th Naval Sapper, all independent regi-ments of the unlocated B-5 Front Headquarters. Thre eregiments of the veteran 320th NVA Division hadwithdrawn from western and central Quang Tr iProvince for refitting in North Vietnam following theirthird defeat in late 1968.' What enemy activity therewas, was generally limited to infrequent rocket and

mortar attacks on allied positions, ground probes bysquad- and platoon-size units, and attempts at inter-dicting the Song Cau Viet with mines . Artillery firefrom within and north of the Demilitarized Zone ha dall but ceased in December .

Within the central portion of Quang Tri Province ,units subordinate to the 7th Front, including threebattalions of the 812th Regiment, were for the mostpart pulled back into jungle sanctuaries on the Quan gTri Thua Thien provincial border for resupply and in -fusion of replacements . These three units were badl ymauled during the 1968 Tet and post-Tet Offensives ,and their forward base areas and cache sites destroyedby Marine and ARVN search and clear operations dur-ing the late summer and fall campaigns. Enemystrength at the end of January, within the Demilita-rized Zone and Quang Tri Province, was estimated a t36,800, approximately 2,500 more than the Decembertotal . Of these, more than half were confirmed to b ecombat troops .

In Thua Thien Province the enemy situation wa ssimilar . North Vietnamese Army units, with the ex-ception of small forward elements of the 4th and 5thRegiments, had been withdrawn into the A Shau Val -

ley and Laos under constant U.S . and ARVN pressureduring the previous year. These forward elements di dconduct occasional attacks by fire, but were forced toconfine much of their effort to attempts at rice gather-ing and survival in the foothills of the province . VietCong local force units and the Viet Cong Infrastructureremained under steady pressure from Army, ARVN ,and provincial forces, and likewise devoted much o ftheir energy toward survival and avoiding discovery .End-of-January estimates placed enemy strength with -in the province at 15,200, a 25-percent increase overDecember figures .

To the west, in the A Shau Valley and beyond, therewere signs of increasing enemy activity. Roadwork wasbeing conducted on Route 548 in the valley and o nRoute 922 in Laos . Vehicular traffic and troop move-ment was light at the beginning of the month, bu tsoon picked up as January progressed, particularly i nand around Route 922 and enemy Base Area 611 i nLaos .

15

16

HIGH MOBILITY AND STANDDOWN

SouthChinaSpa

Hue

Phu Ba i

x x

1►51 320th =IHQ6~5 Front

II I

1►ml 4 th

In

70138th 1l 86t h

DMZ nu

II I

1►nl 52dIII I

~~•n n31e• 1~~1 h

1►I 64thCon Thiel

27th

Cam Lc) .

* 'Jong H a

xx

Quang Tr i308th

ri1 HQ Front

I q

•Khe Sanh7th

B A114

Enemy Order of Battl eNorthern ICTZJanuary 196 9

kilometers 0

25

50

7 5M 88th

812th J

II I

M102d

C BA101

H QTri-Thlen-Ho eMilitary Regio n

6thLaos

5thIm

9th4,h1 •~~1► I

29thDa NanB A

60 7803 d

I_4III I

MIII I

I

l

In

IC4I

OffBalance

While the enemy generally avoided contact in Janu-ary, American and South Vietnamese forces in north -ern I Corps continued their efforts at keeping him offbalance, striking at his traditional base areas and in -filtration routes, and increasing security within popu-lated areas . Driving deeper into the mountains an dareas bordering the Demilitarized Zone, allied force spushed and probed for evidence of infiltration an dsupply build-up, in order to determine the enemy' sintentions in the months ahead and thwart them be -fore they could be implemented .

Leading the effort in Quang Tri Province was th e3d Marine Division under the command of Majo rGeneral Raymond G. Davis. A veteran of the Guadal-canal, Cape Gloucester, and Peleliu campaigns o fWorld War II and Medal of Honor recipient for ac-tions at the Chosin Reservoir during the Korean War ,Davis assumed command of the division in May 1968 ,following a short tour as Deputy Commanding Gener-al, Provisional Corps, Vietnam .

Under Davis' leadership, the tactical disposition o fthe division would be turned around . No longer con -signed to defensive positions, the 3d Marine Division ,with helicopter support, now would assume a highl ymobile posture, characteristic of Army air cavalry an dairborne operations of 1968 . As General Davis noted :

We had something like two dozen battalions up there alltied down (with little exception) to these fixed positions ,and the situation didn't demand it . So, when the Armymoved into Pegasus to relieve the Khe Sanh operation [i nApril 1968] they applied forces directly responsive to the ene-my's dispositions and forgot about real estate—forgettingabout bases, going after the enemy in key areas—this

See Reference Map, Sections 1-2 7

punished the enemy most . Pegasus demonstrated the deci-siveness of high mobility operations . The way to get it donewas to get out of these fixed positions and get mobility, t ogo and destroy t!ie enemy on our terms—not sit there andabsorb the shot and shell and frequent penetrations thathe was able to mount . So all this led me, as soon as I heardthat I was going, it led me to do something I had never don ebefore or since, and that is to move in prepared in the firs thours to completely turn the command upside down . Theywere committed by battalion in fixed positions in such away that they had very little mobility. The relief of CGs tookplace at eleven o'clock . At one o'clock I assembled the staffand commanders ; before dark, battalion positions had be -come company positions. It happened just that fast .2

In addition to establishing a more mobile posture ,Davis reinstituted unit integrity. For various reasons ,the regiments of the division had slowly evolved int ooperational headquarters which might have any bat-talion of the division assigned . There was constant ro-tation; the 9th Marines, for example, might have abattalion of the 3d Marines, a battalion of 4th Ma-rines, and only one of its own. Thus, as Colonel Rober tH. Barrow, one of Davis' regimental commanders an dlater Commandant of the Marine Corps, noted, th eindividual battalions "felt . . . they were commande dby strangers . Every unit has a kind of personality o fits own, often reflecting the personality of the com-mander, so you never got to know who did what best ,or who would you give this mission to ." 3 Davis changedthat; each regiment, under normal operating circum-stances, would now control its constituent battalions .As General Davis later commented, "it was the keyto our success" 4

As battalions of the division moved from defensiveoperations to more aggressive operations against ele -

MOUNTAIN WARFARE

1 7

ments of the 320th NVA Division during the latterhalf of 1968, the need for helicopters grew. "I was veryfortunate in this," Davis was later to state, " that thelater model of the CH-46 was arriving in-country i nlarge numbers . Whereas it would pick up a platoon ,the old 46 would hardly pick up a squad ."5 In addi-tion, due to his close working relationship with Arm yLieutenant General William B. Rosson, ProvisionalCorps commander, and Lieutenant General Richar d

G. Stilwell, his successor at XXIV Corps, Davis hadthe promise of Army helicopter support if needed.More important, however, was the creation of Provi-sional Marine Aircraft Group 39 and the subsequen tassignment, initially on a temporary basis, of a Ma-rine air commander for northern I Corps who, asGeneral Davis stated, "had enough authority delegat-ed to him from the wing, where he could execut ethings; he could order air units to do things " e* Withhelicopter transport assured, division Marines move dfrom relatively static positions south of the Demilita-rized Zone and along north-south Route 1 and east -west Route 9, the main lines of communication, int othe mountainous regions of Quang Tri Province insearch of the enemy and his supplies .

Davis' concept of mobile operations depended notonly on the helicopter, but on the extensive exploita-tion of intelligence, specifically that gathered by smal lreconnaissance patrols, which he continuously em-ployed throughout the division ' s area of responsibili-ty and which supplemented both electronic andhuman acquired intelligence . Operating within rangeof friendly artillery were the heavily armed "Stingray "

patrols, whose mission was to find, fix, and destro ythe enemy with all available supporting arms, an d

rapid reinforcement, if necessary. In the more remot eareas, beyond artillery range, he used "Key Hole"patrols . Much smaller in size and armed with only es-sential small arms and ammunition, the function o fthese patrols was to observe? The 3d Marine Division ,

Davis noted, "never launched an operation withou tacquiring clear definition of the targets and objective sthrough intelligence confirmed by recon patrols . High

*Assistant Wing Commander, Brigadier General Homer S . Hill ,was temporarily assigned to 3d Marine Division Headquarters fo r"operations requiring more than routine air support and used hisnormal position within the Wing to coordinate air operations o nthe spot? ' The assignment of a Marine air commander to norther nI Corps "did not involve any new command structure ." (Col Edwi nH. Finlayson, Comments on draft ms, 25Nov86 [Vietnam 69 Com-ment File, MCHC, Washington, D.C .])

Department of Defense Photo (USMC) A192746

MajGen Raymond G. Davis led 3d Marine Division .

mobility operations [were] too difficult and comple xto come up empty or in disaster." 8

Armed with information on probable enemy troopand supply locations provided by reconnaissanc epatrols and other intelligence sources, such as radi ointercepts, 3d Division Marines would advance rapidl yinto the proposed area of operations. Forward artillerypositions, or fire support bases (FSBs), defended b ya minimum of infantry personnel, would be estab-lished on key terrain features . These mutually support-ing bases, constructed approximately 8,000 meter sapart with a 3,000-meter overshoot in order to cove renemy mortars, provided ground troops operating un-der the fan with continuous, overlapping artillery sup-port . Once inserted, Marine rifle companies, and eve nentire battalions, would move rapidly, althoughmethodically, and largely on foot, throughout the areato be searched . Additional fire support bases wouldbe constructed, permitting deeper penetration of thearea of operations .

The purpose of the intelligence collection effort an dsubsequent combat operations, if required, was to pre -vent the enemy from sticking his "logistics nose in -

country." "The [enemy's] first order of business," asColonel Barrow later noted, was to "move all the thing sof war ; all of their logistics forward from the sanctu-aries of North Vietnam, just across the DMZ, or fro mLaos." This movement would take weeks, or possibly

18

HIGH MOBILITY AND STANDDOW N

months. At the appointed time, troops would quick-ly move in, marry up with the cached supplies, an dthen do battle . As General Davis believed and Bar-row later stated :

We must do everything we can to find that stuff, where-ver its exists and obviously destroy it . And if we miss anyof it, we must attempt by vigorous patrolling, radio inter-cept, signal intelligence, recon team inserts, and whateverelse, to find out when any troops were moving in . Maybewe hadn't found their logistics, their caches, and we didn' twant to have the surprise of not finding them until afte rthey had married up and were about to engage us som eplace .9

Thoroughly indoctrinated in the mobile concept ofoperations, Marines of the 3d Division at the begin-ning of 1969 could be found from the Laotian borde rto the coastal lowlands . To the west, elements o fColonel Robert H . Barrow's 9th Marines continuedsearching north of the Khe Sanh plateau in operation sbegun the year before. In the center, the 4th Marines ,under Colonel William F. Goggin, patrolled themountainous areas north of Vandegrift Combat Bas eand south of the Demilitarized Zone . Further east, onebattalion of Colonel Michael M . Spark's 3d Marinescontinued to search areas south of the DMZ and north

of Route 9, while the remainder of the regiment as-sisted the 5th Marines in Operation Taylor Commo nin Quang Nam Province .

On 31 December 1968 and 1 January 1969, teamsfrom the 3d Reconnaissance Battalion were insertedwest of Khe Sanh along the Laotian border, initiatin gOperation Dawson River West . The teams immedi-ately secured seven landing zones, eliminating theneed for preassault artillery and air strikes. On themorning of the 2d, elements of Barrow's 9th Marine sand supporting artillery made simultaneous helicop-ter landings into the secured zones north of Route 9 .The initial assaults were made by Lieutenant ColonelGeorge W. Smith's 1st Battalion, Lieutenant Colone lGeorge C . Fox's 2d Battalion, and Company L, 3d Bat -talion under First Lieutenant Raymond C . Benfatti .A battalion of the 2d ARVN Regiment assaulted sout hof Route 9 to the right of the 2d Battalion, 9th Ma-rines on the 4th . Fire Support Bases Geiger and Smith ,occupied by batteries of Lieutenant Colonel Josep hScoppa, Jr.'s 2d Battalion, 12th Marines, supported th e9th, while an ARVN artillery battery at Fire Suppor tBase Snapper supported the South Vietnamese .

Throughout the three-week operation, Barrow's Ma-rines experienced minimal enemy contact during th e

Infantrymen of the 1st Battalion, 9th Marines move through waist-high elephant grassin search of enemy troops and supply areas around Khe Sanh during Dawson River West .

Department of Defense Photo (USMC) A800506

MOUNTAIN WARFARE

19

Department of Defense Photo (USMC) A80050 3

A solitary Marine moves up a small stream near the abandoned Khe Sanh base, carefullychecking out both banks for hidden North Vietnamese Army supplies and harbor sites .

search. They uncovered numerous small weapon scaches, of which a great majority contained U.S . equip -ment, rations, and ammunition lost during and afte rthe sieges of Lang Vei and Khe Sanh in 1968 . TheSouth Vietnamese located more recent hoards o f122mm rockets, mortars, and artillery rounds alongRoute 9 in the vicinity of Lang Vei . The general pat -tern of search during the operation was from the Lao-tian border north of Route 9, in the vicinity of Fir eSupport Base Argonne, south and astride Route 9 ; aprobe into the "Vietnam Salient," that portion o fSouth Vietnam which protrudes into Laos, near FireSupport Base Passport ; and finally back toward Van-degrift Combat Base . At the close of Dawson Rive rWest, the 3d Battalion, 9th Marines resecured Fir eSupport Bases Henderson, Tun Tavern, Cates, an dShiloh near the Ba Long Valley, southwest of Van-degrift .

While the 9th Marines accounted for few enemycasualties and limited equipment captured, Opera-tion Dawson River West proved significant in ascer-taining that no sizeable enemy concentrations orsupplies existed in the Khe Sanh area or Vietna mSalient at the time . "If there was ever a piece of groundin the western part of Quang Tri that was searched ou tthoroughly," Barrow remembered, "that was that oper-ation''10 In addition, the 9th Marines created a num-ber of landing zones and fire support bases, facilitatin gcontinued operations against the NVA in western an dsouthwestern Quang Tri Province, and providing a

springboard for the regiment's turn to the south an dfuture push into the upper Song Da Krong Valley ,southwest of Vandegrift .

East of the Dawson River area of operations, Colone lGoggin' s 4th Marines continued search and clear oper-ations in the Scotland II area, while elements of the3d Marines' Task Force Bravo, in Operation Kentucky,conducted search and cordon operations in the vicinityof the outposts at Cam Lo, Con Thien, and Charlie-2 ,south of the DMZ . Scotland II, a continuation of oper-ations initiated in November 1967 in and around Kh eSanh by the 26th Marines, was begun 15 April 196 8under the control of Task Force Glick, later redesig-nated Task Force Hotel and now under the comman dof Assistant 3d Division Commander, Brigadie rGeneral Frank E . Garretson . Employing various bat-talions of the division, led by the 4th Marines, an delements of the 2d ARVN Regiment in search an dclear operations in an area generally bounded by Route561, Route 9, the Demilitarized Zone, and the Laoti-an border, Marines of Task Force Hotel had, since Apri lthe previous year, accounted for nearly 4,000 enem ykilled and 1,100 weapons captured .

Ground combat was light and scattered through -out January and into early February as Lieutenan tColonel George T. Sargent, Jr.'s 1st Battalion, 4th Ma-rines conducted searches of the area surrounding Nu iTia Pong, west of Elliott Combat Base (Rockpile), an dLieutenant Colonel Joseph E . Hopkins' 2d Battalio ncontinued extensive squad-size reconnaissance patrols

20

HIGH MOBILITY AND STANDDOW N

along the Demilitarized Zone, north and west of Co nThien. The 3d Battalion, under Lieutenant Colone lWilliam A . Donald, in cooperation with the Quan gTri Provisional Rifle Company, maintained patrol sfrom Ca Lu and Vandegrift Combat Base . The searchesand extensive patrolling did uncover several importan tenemy fighting positions and supply caches . On 10January, two companies of Lieutenant Colonel Sar-gent's 1st Battalion discovered a large bunker complexnortheast of Fire Support Base Neville, containing ove r120 mortar rounds, miscellaneous small arms ammu-nition, and explosives . Company L, working in con -junction with the 2d Battalion, 2d ARVN Regiment ,on 23 January uncovered nearly 500 mortar rounds i nmultiple dumps in the vicinity of bases Charlie-1,

Charlie-2, and Alpha-1, northwest of Cam Lo. It ap-peared from the location of the caches that the NVAwere prepositioning ammunition and supplies as farforward as possible along the Demilitarized Zone inorder to support future offensive operations.

As a result of these and other discoveries within theScotland area of operations, Colonel Goggin ordere dLieutenant Colonel Hopkins' 2d Battalion to conduc treconnaissance patrols within the southern half of th eDemilitarized Zone, while maintaining search andclear operations immediately to the south . "Our oper-ations north of the southern boundary of the DMZ,"Hopkins noted, "were not search and destroy opera-tions per se . There were certain political implication sinvolved, obviously. It had to be a carefully controlled

Marines of Company B, 1st Battalion, 4th Marines pick their way among rocks as the ycross one of the many streams which traversed the rugged mountainous terrain whichcharacterized the Scotland II area of operations, south of the Demilitarized Zone .

Department of Defense Photo (USMC) A800539

tg

CMTh

oncs

--0T

h Ngh

iaM

rl}

),_

Tlw

yl3c

:Pn~

f-V

an

deg

rift

~'-

)fC

om

bat

Base

,CC

r_..

= It

HOU

NGLO

N Aep

.

`r ,r

,.

NG

tile

r-

^L

.t,

vo

_ i~

(

/~

~/

cT

~_

►.:•1

~' —

,‘X

r•~

-'rX

fif

c1

t

Z~

r<r

.1'

J~/

~al

wT

han

of~

~/

_.

d ,

t

71r2

e~

! o

He L

aiT?

~ ny

~. `4

."

;f-~~

C~'"

r-e

-"

~ynC

~mSo

n•__

In.n

om

/

a GisM

o,D.

7r^

~t

A"'

AIp

ha-2

/

oM

e Ldi

t \_

wT'

Gxr

..\

1

p„v

c

uang

xys

no

~-

`r

'.

oGi B

inh

Gl2

Lin

h!

oNhi

Tru

ng

H

Then

\eL~

Trun

--R

Q-~

---~

-r°

Gio

Lin

hi

~..

on xu

Alp

ha

NOT N

aJ

4

+ 7

X01•

`.a

~o

a^_—

,A

-4

,

_TM

h ~

~

.TG

bdPO

ro.n

eeB

Khyc

ho

J

U

V7

/9

\i

k~m

Can

Ten

9

C-"

T11

0

-A

lph

a1

~-

haL

~~

/O

._

•-e t

-'-~

°~.

'~ a

2g

!

-A

6AW

OL

OH

O6Y

H0

88rq

jvn

Th

ICon

Th

ien

~.

\.

,

_A

ho

nAn

IIXe

°

a Te

__Ch

oc

Si1N,U

v

oaP

Tu

Ph o

''---

-'-

wry

.Ci.

WIC

WTA

IL,T

f1b

.

•L/

e.

y

t

G

•~

K,L

~

~I

ITI,p

Y YA

R[AT

IOIY

UNf

.i!

Truc

~4.

t t

e i

sR

'"

'n

Sen o

Cha

\o

rlie

Y1

y •fT

°49

,

(,LV

BU.X

111

OU

iy~

}M

4.

-

\~

ini

IV

Kim

gg`1

~1s6

an s

,~

"

rr44

,

d;=

-a !

8 -

--

;,R

ussel

l3

I9.~

:r_

,Argon

ne

. ,--Ne

vil

le

1i-

Ell

iott

-_

'i

~. ,

°

B.

;.

~%

/

AI

w1

a.C

om

ba

Base

--- S

CO

TL

AN

D I

I..

:_6

Lw

J,

' AP

Leng

Ire

3=y

~`~

'c

oLir

yp h

iu D

ona

?_ a

fang

Dpd

See

Ref

eren

ceM

ap,

Sec

tio

ns

1-3,

5-7

22

HIGH MOBILITY AND STANDOWN

reconnaissance of the southern half of the DMZ unde rsome specific rules of engagement which rather limite dthe number of personnel who might be in that are aat any time.""* The reconnaissance effort was to in-volve teams from the division's 3d Reconnaissance Bat -talion and a rifle squad from Companies F, G, an dH; a squad being the largest unit which could be in-troduced into the Demilitarized Zone for any purpose.Specific targets of the reconnaissance effort were enem yforces, fortifications, and supply caches .

Operations within the DMZ began on 1 Februar ywith the insertion of three division reconnaissanc eteams and an equal number of squads from the 2 dBattalion . Generally, the teams covered less area an dwere involved in more fighting than Hopkins' squad sduring the two-week effort . As a result, the divisionreaction force, designated "Sparrow Hawk," was usuallysent in to reinforce the reconnaissance teams . Thistechnique, as Lieutenant Colonel Hopkins later report-ed, "offered an opportunity to put a larger force o fMarines in, an additional platoon, and by walkingthem directly south, offered the opportunity to per -form a good solid reconnaissance by a good-size uni tof a portion of the area"1 2

Under the watchful eyes of North Vietnamese sold-iers, some of whom stood in the open on the north-ern bank of the Ben Hai which bisected the DMZ ,Hopkins' squads covered approximately 50 percent o fthe 36-square-kilometer reconnaissance zone assigned .Contact was sporadic, the actions involving either tran-sients, local guides, cache guards, or screening andreconnaissance units of no more than a squad .Although the enemy's maneuverability was lessenedand a number of his large cache sites discovered an ddestroyed, the reconnaissance effort was unable, ac -cording to the battalion's intelligence officer, Firs tLieutenant Larry L. Eastland, to discern "what theirfuture plans are, what their future plan for a short peri-od of time is to be." Near the end of February, th eenemy struck—first at Fire Support Base Neville an dthen at Russell, north of Vandegrift.

In the early morning hours of the 25th, Fire Sup -port Base Neville, located northeast of the Elliott Com -bat Base, and defended by two platoons of Compan y

*Then current rules of engagement prohibited U .S . ground forcesfrom crossing the southern boundary of the DMZ without specifi corders from COMUSMACV. Every local commander, however, re-tained the right and responsibility for the defense of his forces .(COMUSMACV msg to CGIIIMAF, et al., dtd 20Feb69, MACV Hist-DocColl, Reel 54)

H, 2d Battalion, 4th Marines and Battery G, 3d Bat-talion, 12th Marines, and protected by concertina wire,tanglefoot, listening posts, mines, and sensors, was as-saulted by 200 highly trained and highly motivate dsappers (raiders) from the 246th NUA Regiment. "Thenight of the attack was pretty much of a typical nightat Neville," reported Captain John E . Knight, Jr. ,Company H's commander, "very foggy ; it looked likesomething right out of a horror movie with fog drift-ing through the trees ; visibility almost nil . . . . Thefirst indication we had that anything was out of th eordinary other than just normal movement was whe na trip flare went off and evidently they were infiltrat-ing at that point and one of their people had set of fa trip flare. We H and I'd [harassing and interdictio nfires] the area with the 60 ' s and approximately a halfan hour after that, at 0030 we were taken under at -tack by the sappers . "" After infiltrating the concerti-na wire barrier on the west side of the perimeter, th eattacking force systematically crisscrossed that portio nof the fire base occupied by the 1st platoon and Bat-tery G's number six gun pit, tossing satchel charge swhich forced the defenders into bunkers which th eenemy then destroyed .

In the glow of flares and burning powder, the Ma-rines rallied and with the assistance of 60mm morta rfire, drove the attacking force from the hill . "We beatthese sappers, which are supposed to be the worstthing the North Vietnamese got," noted Gunnery Ser-geant John E. Timmermeyer. "We beat these peoplenot with air, not with arty, not with any supportingarms; we beat them and we beat them bad wit hweapons we had in our own company . . . . M-16s ,or M-79s, or 60s, or frags, everything we had in th erifle company, this is what we used to beat these peo-ple with, we didn' t have to have supporting arms . Wedid it without them." 5 At dawn, Captain Knight ' sMarines, who lost 11 killed and 29 wounded, foun d36 enemy dead and wounded, several of whom stil lhad satchel charges and other explosives strapped t otheir backs and quantities of opium in their pockets .

Ten kilometers east, Fire Support Base Russell ,defended by platoons of Companies E, F, and K, Mor-tar and H Batteries of the 12th Marines, and a detach-ment from the 1st Searchlight Battery, came unde rattack the same evening. A sudden heavy mortar bar-rage followed by a 200-man sapper attack by troop sof the 27th NVA Regiment, swiftly breached the base' snortheast perimeter . "In the first few minutes, th e81mm mortar section and the company CP, both lo-cated on the east and southeast side were decimated"18

MOUNTAIN WARFARE

2 3

Marine Corps Historical Collection

Fire Support Base Russell occupied a mountaintop within range of the Demilitarized Zone ,and because of its location was often subjected to enemy mortar and ground attacks .

Fighting was hand-to-hand as the Marines, with th ehelp of a heavy artillery cordon, coordinated by thebattalion operations officer at Vandegrift Comba tBase, drove the enemy back through the perimeter .At daybreak, Marine air came on station, and consoli-dation began with only two officers and one staff non -commissioned officer left out of the original

complement. The Marines on Russell suffered 26 kille dand 77 wounded, while accounting for 25 enem ytroops, most of whom were cut down inside the wire .Marine patrols pursued the enemy north toward theDMZ at dawn, and reported finding bloody uniformsand bandages, as well as several fresh grave sites alon gtrails the enemy used in their escape .

Both fire bases were reinforced the following day,but continued to report enemy probing activity . FireSupport Base Neville remained surrounded by ene-my units employing mortars from several positions fo rseveral days despite heavy air concentrations, artillery

and counter-mortar fires, and extensive patrols, an d

was eventually relieved of pressure by Company Gwhich moved into the area by forced march ove rrugged terrain ."

The end of February found the 4th Marines engage din base security and reaction force duties, and in

patrolling the areas immediately around Fire SupportBases Neville and Russell in an attempt to severelypunish the 27th and 246th NVA Regiments. On the28th, Operation Scotland II ended with most regimen-tal units remaining in place throughout the operation -

al area .

Further east, two brigade-size operations were be-ing conducted in support of the South Vietnames eGovernment's resettlement and pacification effort a sthe new year began . Centered in the Cam Lo and ConThien areas, and along the Song Cua Viet, Operatio nKentucky consisted of one Marine infantry battalion ,one tank battalion, and elements of the 1st Amphib-

24

HIGH MOBILITY AND STANDDOWN

ian Tractor (Amtrac) Battalion, under the control o fthe 3d Marines' Task Force Bravo. This search, clear,and cordon operation, begun in November 1967, hadat one time included all three battalions of the 3d Ma-rines and the 1st Brigade, 5th Infantry Division(Mechanized), following its arrival in northern I Corpsin July 1968 . In December, the 1st Brigade redeploye dto an area south of the Cua Viet, and the 1st and 3dBattalions, 3d Marines moved to southern I Corp swhere they joined elements of the 1st Marine Divi-sion in Operation Taylor Common .

The new year found Lieutenant Colonel James J .McMonagle's 2d Battalion, 3d Marines conductingpacification operations in the Mai Loc area south ofRoute 9, securing friendly positions along the Co nThien-Cam Lo corridor, and assisting Regional Forcesaround Cam Lo. Lieutenant Colonel George E . Hay-ward's 3d Tank Battalion continued armored combat ,security patrols, and road sweeps between Quang Tr iand Dong Ha Combat Bases, and in the vicinity ofCon Thien, while the 1st Amtrac Battalion, unde rLieutenant Colonel Walter W. Damewood, Jr., con-tinued motorized patrols near the Cua Viet, not fa rfrom Mai Loc . As the month progressed and the ene-my became more furtive, the battalions began a ser-ies of short platoon- and company-size reconnaissance -in-force operations, designed to expose enemy posi-tions, infiltration routes, and supply caches . Result swere disappointing; most of the North Vietnames eand Viet Cong having been driven out by the intens eartillery and air bombardments .

On occasion these small but frequent operations didinitiate short skirmishes, and these skirmishes, com-bined with intelligence from captured enemy troops ,pointed to Leatherneck Square as the only active are awithin the Kentucky area of operations .* As a result ,on 18 January, the 2d ARVN Regiment, assisted byLieutenant Colonel McMonagle's battalion and Lieu -tenant Colonel William A. Donald's 3d Battalion, 4thMarines, with tanks attached, began a cordon an dsearch operation northeast of Cam Lo, the local dis-trict headquarters . The Marines maintained blockingpositions along the square's northern boundary, while

_ the ARVN force swept from Gio Linh to Cam Lo ,hunting for enemy troops and resettling any displacedvillagers in the Cam Vu Valley. As the cordon dissolved

*Leatherneck Square was a four-by-six-kilometer piece of cleared ,flat piedmont about three kilometers east of the Vietnamese coast .Often characterized as a "parking lot" or "golf course," the are awas bordered by Con Thien and Gio Linh on the north, and byDong Ha and Cam Lo on the south .

on the 26th, the 3d Battalion, 4th Marines, less Com-pany M, rejoined its regiment, and a land-clearingoperation, utilizing 20 to 30 tractors of the Army' s59th Engineer Battalion, was begun . The 2d Battal-ion, 3d Marines, assisted by Company M, 4th Marines ;1st Brigade, 5th Infantry's Troop A, 4th Squadron ,12th Cavalry ; and later Troops B and C, 3d Squadron ,5th Cavalry, provided security for the engineers an dconducted reinforced company-size search and destroyoperations in the Con Thien, Cam Lo, and Mai Locareas .

Task Force Bravo's control of the aggressive patroloperations within the Kentucky area continued until18 February, when the remainder of the 3d Marine sreturned from southern I Corps and reassumed con-trol of the task force, which was later deactivated . Fol-lowing the return of the regiment, the 3d Battalion ,3d Marines began operations in the Cam Lo and Nh iHa areas, replacing two companies of the 2d Battal-ion, helilifted west into Fire Support Bases Cunnin-gham and Erskine, overlooking the Song Da Krong ,to support the 9th Marines in Operation DeweyCanyon. With the westward shift of elements of th e2d Battalion and the transfer of control of the 1st Bat-talion to Task Force Hotel at Vandegrift, the 3d Ma-rines ended Operation Kentucky.

From the Cua Viet, South

South of the Cua Viet, elements of the Army's 1s tBrigade, 5th Infantry Division (Mechanized) and the1st ARVN Regiment continued a combined search an dclear and cordon operation (Marshall Mountain), be -gun on 10 December . The area of operation encom-passed the political districts of Trieu Phong, Mai Linh ,and Hai Lang, and Quang Tri City ; and the are astretching from the coastal dunes west of Highway 1to the jungle-canopied eastern portions of enemy Bas eArea 101 in southwestern Quang Tri Province. Approx-imately two-thirds of the province's population live din the area, and consequently it was a key target fo renemy infiltration and harassment efforts .

Friendly forces taking part in Operation Marshal lMountain were to interdict enemy movement by em-ploying small-unit (squad and fire team) patrols andambushes, known as "Hunter Killer" teams, and con -duct detailed cordon and search operations in conjunc-tion with the 1st ARVN Regiment, Regional an dPopular Forces, Provincial Reconnaissance units, andNational Police Field Forces . Capitalizing on the mo-bility of the 1st Brigade along the coastal plains and

MOUNTAIN WARFARE

2 5

Department of Defense Photo (USMC) A80047 0

Men of the 3d Marines on board tanks of the 3d Tank Battalion sweep the Con Thie nCorridor within the Kentucky Area of Operations, north of Cam Lo District Headquarters.

in the piedmont, ready reaction forces were main-tained to close rapidly in the event significant num-bers of enemy troops were encountered .*

During the initial stages of the operation, element sof the 1st Brigade and 1st ARVN Regiment moved int othe western portion of the area of operations to clea rout remaining detachments of enemy main force unit swhich had previously withdrawn to the mountainou sregions of the province. These stay-behind enemytroops attempted to maintain rice collection points ,not only posing a threat to the security of villages an dhamlets throughout the area, but also hampering th egovernment ' s pacification efforts . The forces involve dsimultaneously conducted combined search and cor-don operations within the three districts, and by theend of the operation on 28 February, 37 such searche sand cordons had been carried out . North of the SongCua Viet, the 1st Amtrac Battalion supported th ebrigade with a search and clear operation along thebeach from Ha Loi to the Demilitarized Zone .

Enemy action was generally defensive, with scatteredattacks by fire and widely dispersed mines and othersurprise firing devices . At the termination of the

*The brigade and its subordinate units were configured into thre etask forces : the first, infantry with a tank company attached ; th esecond, armor with an infantry company attached ; and the third ,mechanized infantry with tanks attached .

brigade operation, 568 enemy troops had been killed ,397 captured, and 307 civil defendants rounded up ,many of whom were later identified as local in-frastructure members . Four hundred ninety-six in-dividual and 41 crew-served weapons were captured ,along with miscellaneous arms and nearly 80 tons of

rice .

In northern Thua Thien Province on 31 December ,Operation Todd Forest began within the 101st Air-borne Division' s area of operation . In response to in-telligence indicating a significant enemy presence i nBase Area 101, the 1st Battalion, 501st Infantry andelements of the 1st ARVN Regiment conducted com-bat assaults into the Nam Hoa District highlands . Sub-sequent reconnaissance-in-force operations met lightenemy resistance as NVA and VC troops again chosenot to expose their forces, and Todd Forest ended wi-thin two weeks .

In the central portion of the province, around Hue ,various elements of the 101st Airborne Division con-tinued to conduct a large-scale division-level opera-tion, initiated 17 May 1968, in support of the SouthVietnamese Government ' s Accelerated Pacification

Campaign . The initial goal of Operation Nevada Ea-gle had been to clear the provincial lowlands of NVAunits following the Tet Offensive, and then to seve rthe link between NVA regular units and VC local forces

26

HIGH MOBILITY AND STANDDOWN

in the coastal plains . A series of combat operationswere grouped under Nevada Eagle, all directed at th epacification of Thua Thien Province . During the sum-mer of 1968, combat assaults in and around Base Area114, coupled with rice denial operations, forced th e803d NVA Regiment to withdraw its main elementsfrom Thua Thien . A succession of cordon and sweep swere then carried out within the province to haras sand destroy local-force VC units and the infrastruc-ture, including highly successful Vinh Loc and Ph uVang security operations . This all-out offensive agains tthe VC included night ambushes to intercept ric egathering parties, propaganda and proselytizin gteams, and blocking attempts by the Viet Cong t oregroup. Phu Vang IV, conducted during Decembe rand January, was a combined cordon and search of thePhu Vang, Huong Thuy, and Phu Thu Districts by th e1st Battalion, 501st Infantry ; elements of the 54thARVN Regiment ; Regional Forces ; and patrol units ofTask Force Clearwater, which thwarted attempts by th eVC to reenter the coastal area . Seventy-five of the ene-my were killed and 35 infrastructure members wer ecaptured . Ambush operations in Phu Loc District, par-ticularly in the vicinity of the Song Truoi, during Janu -ary, severely restricted attempts by the 4th and 5thNVA Regiments and VC local forces to gain provisions ,and to propagandize the area .

Just north of the Hai Van Pass, which separatednorthern and southern I Corps, elements of the 2 dBattalion, 502d Infantry, and the 1st and 2d Battal-ions, 327th Infantry, initiated Platte Canyon on 6January, a reconnaissance-in-force operation in the vi-cinity of the Ruong Ruong Valley. This portion ofsouthern Thua Thien had long been considered th etraditional location of the 4th NVA Regiment. Rainand low-hanging clouds, typical of the northeas twinter monsoon season, hampered initial operations ,but the three battalions pushed on against moderateresistance as here too the enemy elected to disengage

and avoid decisive combat . One large staging area waslocated and destroyed by reconnaissance elements ,along with miscellaneous enemy equipment and am -munition .

Certain signs pointed to the likelihood that anoffensive effort was brewing north of the Hai Van Pas sas the Vietnamese Lunar New Year season approached .The evidence was strong that major elements of th e6th and 9th NVA Regiments were attempting to worktheir way eastward through the A Shau Valley. Ene-my activity in Base Area 611, straddling the border be -tween Laos and South Vietnam, had graduall yincreased through the end of 1968, and continued t oprovide evidence that the North Vietnamese wer emoving personnel and supplies toward the Vietnames eborder in large numbers . Then, too, the NVA wereactive along the DMZ, although losing materiel nearl yas fast as it could be positioned forward . Also, manyof the supply and ammunition caches uncovered wer earranged in temporary or makeshift facilities, whic hsuggested ready accessibility for further transport insupport of offensive operations . Finally, several cache swere discovered in areas recently checked and foun d"clean," pointing to an intensification of efforts to pushammunition and supplies forward .

Even though the enemy's forward supply areas ha dbeen disrupted, the 4th and 5th NVA Regimentsforced out of their traditional forward operating areas ,and the VC local force and infrastructure restricte dalong the coastal lowlands, it seemed apparent tha tthe NVA intended an offensive of some kind in thenear future . A victory, even against one or more limit-ed objectives of minor or temporary tactical value ,could have significant impact upon the civilian popu-lation, and a more far-reaching effect upon bargain-ing positions at the ongoing Paris Peace Talks . Theenemy's jungle logistics system therefore would haveto be destroyed before it could be used .18

CHAPTER 3

The Spring Offensive PreemptedStrike into the Da Krong —A Phased Operation —Phase I —Backyard Cleanu p

Strike into the Da Krong

With the beginning of the new year, Vietnames eborder areas again became the focal point of allie dconcern about enemy activity in northern I Corps .From various intelligence sources it was learned tha tNorth Vietnamese Army engineer units, inactive fo rseveral months, had reopened a number of major in -filtration routes, among them Route 922 whichparallels the Laotian border and then enters Vietna msouth of the Song Da Krong Valley, becoming Rout e548. Reports also indicated a dramatic surge in vehic-ular traffic ; the enemy again was attempting to stic khis logistics nose into South Vietnam . The numberof trucks traveling south along 922 and then east on548 doubled in early January—Marine and Air Forc ereconnaissance and attack aircraft at times sightedmore than 1,000 trucks a day. Allied air interdictionefforts successfully closed a number of choke point son both roads, but only for short periods as enemyengineers quickly repaired the damage .

North Vietnamese determination to maintain an ddefend Routes 922 and 548 also was evident as th evolume of antiaircraft fire increased during the sam eperiod . Friendly aircraft on armed reconnaissance, in-terdiction, and d irect support missions reported heavy12 .7mm, 25mm, and 37mm fire with airbursts as hig has 16,000 feet' The only reported loss was an A-6 "In-truder" from Marine All Weather Attack Squadron(VMA[AW]) 242, which was shot down by 37mm an-tiaircraft over the northern A Shau Valley on the nigh tof 17 January. The squadron conducted both visua land electronic searches, but the plane and its pilot an dnavigator were not found .2

Main enemy forces in the area were tentatively iden -tified as elements of the 6th NVA Regiment, 9th NVARegiment, 65th Artillery Regiment, and the 83d En-gineer Regiment—largely support and replacementtroops . Intelligence reports also noted that these units ,which recently had crossed over from Base Area 61 1in Laos, were stockpiling materiel, and then attempt-ing to work their way eastward through the Da Kron gand A Shau Valleys to Base Area 101 southwest ofQuang Tri and Base Area 114, west of Hue?

These recent developments in enemy activity didnot go unnoticed at Dong Ha where Major Genera lRaymond G . Davis and his staff at Headquarters, 3 dMarine Division, closely monitored all pertinent in-telligence information as it became available . Whenit looked as if the potential enemy threat might be -come an eventuality, General Davis requested authori-ty from XXIV Corps to conduct an operation in th eupper Song Da Krong Valley to block the threat . On14 January, General Davis ordered Brigadier Genera lFrank E. Garretson, Commanding General, Task ForceHotel, to prepare plans for a regimental-size searchand clear operation in the Da Krong, scheduled t otake place "as soon as practicable after 22 January, o norder"4 The following day, the 9th and its support-ing 2d Battalion, 12th Marines, then conducting asimilar operation (Dawson River West) near the Lao-tian border west of Khe Sanh and north of Lang Vei ,were put on alert by General Garretson, who requeste dthat the regiment submit a detailed plan of opera-tion for approval prior to D-Day.5

At this time, Colonel Barrow's 9th Marines was th edivision's "swing" regiment ; it could be used at anytime or place as the situation dictated . As such, it oper-ated under the direct orders of General Davis eve nthough the regiment was under the control of Tas kForce Hotel . "It was a strange sort of a relationship,"Barrow remembered, "I was under his [Garretson's ]OpCon [operational control], but most of what th erelationship was, . . . was to support me with whateverTask Force Hotel and Vandegrift Combat Base couldprovide" in terms of supplies . "I got most of my ord-ers, if you will, directly from General Davis ."

Except for information gleaned from agent report sand aerial reconnaissance photographs, little wasknown about the upper Song Da Krong Valley. Sur -rounded by high mountains broken by a number ofsharp protruding ridgelines and bisected by the mean-dering Da Krong, the valley was located in the remot esouthwest corner of Quang Tri Province, 62 kilome-ters west of Hue and 48 kilometers southwest of Quan gTri . Several kilometers further south lay the A Sha uValley. Between the two, and dominating both, weretwo large hill masses : Tam Boi (Hill 1224) and Co A

27

28 HIGH MOBILITY AND STANDDOWN

Marine Corps Historical Collectio nAerial photograph of the Da Krong Valley with the Song Da Krong in the foregroun dparalleling Route 922, one of the enemy's major supply routes from Laos into Vietnam .

Nong (Hill 1228), commonly known as Tiger Moun-tain. Co Ka Leuye, a razorback ridge 1,500 meters highand 3,500 meters long, sitting astride the Laotianborder, formed the valley's western boundary. Vegeta-tion in the area varied, consisting of head-highelephant grass mixed with brushwood west of the river ,and rugged triple-canopied jungle in the eastern halfof the valley. South of the river, which ran east to westand then abruptly turned north, the area was strippe dof much of its natural ground cover by frequent al -lied air and artillery bombardment.

During the final months of the northwest winte rmonsoon, January to March, temperatures in the val-ley were generally chilly compared to the 100-degreetemperatures of the lowlands, rarely rising above 7 1degrees or falling below 51 degrees . Skies were over -cast with light drizzle or occasional thunderstorms, butno significant rainfall was recorded . As a result, th emountains were continually shrouded in clouds whil ethe valleys and numerous ravines were blanketed wit hheavy fog .

A Phased Operatio n

Planning for the Da Krong operation, codenamedDawson River South, began in earnest even before th e9th Marines returned to Vandegrift Combat Base fro mDawson River West . Colonel Barrow made several

visual reconnaissance flights over the objective are awith his battalion commanders, staff, and the direc tsupport artillery battalion commander, Lieutenan tColonel Joseph Scoppa, in order to select appropriat esites for fire support bases? In extensive discussion swhich followed there emerged a number of factor swhich would bear heavily upon the operation's con-cept, execution, and eventual success . Of primary im-portance was intelligence . The 3d Marine Divisionwarning order stated simply : "Intelligence agencies in-dicate considerable enemy activity in the subject area"No concrete information was provided as to exact ene -my strength, location, or composition, other than th eexistence of antiaircraft artillery, which Barrow noted ,"was a tip-off that they were protecting something ." 8The effect was to urge prudence . Instead of simultane-ous heliborne assaults over a wide area, a phased oper -ation requiring strong fire support base defense ,extensive infantry patrols, and a reliable intelligenc esystem designed to locate enemy antiaircraft and ar-tillery positions was decided upon .

A second factor was time . General Davis had ex -pressed a desire to have maximum forces available i ncritical areas of Quang Tri Province during Tet, whichwas to begin 17 February. Since the operation, there -fore, was limited to approximately 24 days, a mini-

THE SPRING OFFENSIVE PREEMPTED

2 9

Marine Corps Historical Collection

Col Robert H. Barrow, Commanding Officer, 9th Ma-rines, led the regiment in the assault into the DaKrong Valley and enemy Base Area 611 beyond

mum force of three infantry battalions and thre e105mm howitzer batteries with 155mm support wouldbe necessary ; anything less would severely restrict th eregiment's ability to conduct the operation and mee tDavis' Tet deadline . Distance and weather were like -wise viewed as limiting factors. Operating 50 kilome-ters from the nearest Marine combat base and logistica lsupply point, requests for resupply, reinforcements ,medical evacuations, and air support would b edelayed, 45 to 60 minutes for helicopters and 30 t o45 minutes for fixed-wing aircraft . Air operationswould be hindered further by weather, at best un-predictable during the final months of the northwestmonsoon .9

What emerged after five days of discussions, brief-ings, and frequent liaison with all participating or sup -porting echelons, including Headquarters, XXI VCorps, was a phased operation involving the step-by-step deployment of three infantry battalions protect-

ed by overlapping artillery fans, all requiring a mini-

mum of helicopter support . The first phase was toconsist of getting the regiment and its direct supportartillery battalion into the area of operations and es-tablishing fire bases within eight kilometers of eachother to support the scheme of maneuver. The secondphase was to include extensive patrolling around th efire support bases and the alignment of forces prio rto launching into the target area . The final phase wasvisualized as a conventional three-battalion attack intothe objective area. During this critical phase the regi-ment would depart from the highly mobile concep tof operations, so successful in the past, and make th efinal move overland, securing ground and permittin ghelicopter resupply and support over an area alread ycleared of enemy forces, calming fears voiced byrepresentatives of the 1st Wing . Aircraft and troo plosses due to expected heavy antiaircraft defenses i nthe target area therefore would be reduced .' The 2dARVN Regiment and the 101st Airborne Division (Air -mobile) were to conduct supporting operations eastand southeast of the Dawson River South area of oper-ations . As in the past, a high degree of flexibility wasbuilt into the plan of operations so as to permit arefocusing of effort should either allied or enemy sit-uations change ."

The entire concept of operations required the clos ecoordination of Marine supporting arms . Fixed-win gaircraft based at Da Nang and Chu Lai were to pro -vide landing zone preparations and close air support .Colonel Walter Sienko's Provisional Marine Aircraf tGroup 39 at Quang Tri, augmented by Marine Air -craft Group 36 at Phu Bai under Colonel Bruce J .Matheson, was to furnish helicopter support . Thedirect air support center (DASC), collocated with th e9th Marines' fire support coordination center (FSCC )at Vandegrift, was to control all aircraft . As the oper-ation progressed, the FSCC and a DASC subunit wer eto move with the regiment into the operational area .The six firing batteries (three 105mm, two provision-al 155mm, and one 4 .2-inch mortar) of the 2d Bat-talion, 12th Marines (Reinforced), were to be deployedat eight kilometer intervals throughout the area o foperations . A battery of Army 175mm guns from th e1st Battalion, 83d Artillery at Fire Support Base Jack,west of Hue, was to provide long-range support.1 2

The operational plan further provided that the

logistic support area (LSA) at Vandegrift be designatedthe primary resupply point for all classes of equip-ment . Quang Tri Combat Base and the 3d Brigade,

30

HIGH MOBILITY AND STANDDOW N

101st Airborne's Camp Evans, north of Hue, were tobe used as alternate or emergency resupply points i ncase of bad weather, and would be stocked with an ad-ditional 6,200 rounds of 105mm, 155mm, and 4 .2 -inch mortar shells .13 Marines themselves were to carr yan extra day 's long-range patrol ration, plus twice th estandard load of dry cell batteries and ammunition."

Phase I

The first stage of the movement into the area ofoperations was to open three previously establishe dfire support bases which stretched southward fro mVandegrift . On 18 January units of Lieutenant ColonelElliott R . Laine, Jr.'s 3d Battalion, 9th Marines rese-cured FSB Henderson, eight kilometers southwest ofCa Lu, in conjunction with a brief operation in th eBa Long Valley. This operation was a natural corollaryto the base security mission picked up by the 9th Ma-rines as it returned to Vandegrift from Dawson RiverWest . On the 20th, Company L, 3d Battalion, 9th Ma-rines reopened FSB Tun Tavern, unoccupied since earl yDecember 1968, after a team from the 3d Reconnais-sance Battalion checked for mines and boobytraps .

Battery D, 2d Battalion, 12th Marines occupied recon-structed artillery positions later the same day, and be-gan shelling FSB Shiloh, another eight kilometer ssouth .

Shortly after Marine air prepped Shiloh on the 21st ,Company A, 1st Battalion, 9th Marines occupied thefire base . Insertion of the artillery was delayed due t oa fuze malfunction on one 750-pound bomb ; thebomb detonated on impact instead of above ground ,wiping out two previously constructed 105mm howit-zer parapets, half of a third, and two ammunitio nberms . To repair the damage required seven hours o fbulldozer work . With the reoccupation of Shiloh b ytwo batteries of the 12th Marines, a forward LSA wa sestablished on the site and stocked with 5,000 roundsof artillery ammunition, and a 10-day supply of ra-tions and batteries for an infantry battalion .

Shiloh turned out to be a "vacation land" for th eMarines of Company A who were assigned the mis-sion of providing security for the two artillery batter-ies . In addition to the normal patrols, as Lieutenan tColonel Wesley L . Fox, then a first lieutenant and corn -

Infantrymen of the 2d Battalion, 9th Marines relax while waiting for helicopter transpor tat Vandegrift Combat Base prior to jumping off on operations in the Da Krong.

Department of Defense Photo (USMC) A192763-B

THE SPRING OFFENSIVE PREEMPTED

3 1

pally commander, later remembered, "a platoon a daywent off of the hill to the small river at the foo t

. . . for swimming and fishing. Swimming and lyin gin the sun on the nice sand bar were great, but th ereal treat was the fish provided by the fishing expedi-tion. The platoons would wind up their day at th eriver by throwing grenades in the deep holes and sim-ply wading out and picking up the fish that floate dto the top" Throughout the remaining days of th eoperation, during which the company would ex-perience a number of heavy firefights, shortages ofboth water and rations, and exhaustive patrols, Fo xcontinued, "Marines were heard to talk about the goo dold days back on Shiloh'"

With Henderson, Tun Tavern, and Shiloh reoc-cupied, the 9th Marines was now poised to launch at -tacks into the new area of operations . On the morningof 22 January, four companies of Lieutenant Colone lGeorge C. Fox's 2d Battalion lifted off from Vandegriftwith a two-fold mission : Companies E and H were toassault a 600-meter hilltop about eight kilometerssouth-southeast of Shiloh, while Companies F and Gwould secure a landing zone, Dallas, five kilometersbeyond to the southwest . Except for scattered smal larms fire the landings of Companies E and H wentunopposed, and work on the fire support base, name dRazor, began immediately.*

Razor was similar to other bases constructed by th e

9th Marines' infantry, artillery, and engineer team dur-ing the previous eight months of mountain warfare ,but technically more difficult . Trees measuring threeto four feet in diameter—the largest encountered —had to be cleared, a job which posed major problems

for the inexperienced Marines of Company H . Accord -ing to Captain David F. Winecoff, commanding officer

of the company :

We went in with . . . enough power saws and axes to dothe job if we had the experienced people to work thes e

things . But, I found out that there are very few people i nHotel Company, and we were the ax swingers, that knewhow to swing an ax properly, and we immediately proceed-ed to bust about 50 to 60 percent of our axes . . . . It wa sonly through the cooperation of the engineers and all handsconcerned in Hotel Company [that] with the power saws and

*The first fire support base established in the area of operation swas named by Colonel Barrow in honor of General Davis . "Razor"was the nickname given Davis by Major General James M . Master ,

Sr., when both served on Okinawa in the early 60s : "the razor cuts

to the root of problems ." (Gen Raymond G . Davis, Comments ondraft ms, Aug86 [Vietnam 69 Comment File, MCHC, Washing -

ton, D .C .])

the limited amount of axes that we got . . . Fire SupportBase Razor opened up in time . . . . It was quite a feat 1 e

Winecoffs Marines cleared the trees, but the gentl eslope on one side coupled with two hummocks on th eflanks proved troublesome, and light bulldozers wer ebrought in by helicopter to widen the landing zon eand build gun pits and ammunition berms .

In the rapid buildup which followed, CH-46 "Se aKnight" helicopters, under the control of the wingDASC and the protective umbrella of gunships an dobservation aircraft, brought 1,544 Marines and 4 6tons of cargo into the landing zone . By the evenin gof 23 January, a battery of 105mm howitzers was in

place . The following day, the regimental comman dgroup displaced to Razor and occupied the gently slop -

ing finger on the fire base 's northwestern edge . The

2d Battalion, 12th Marines' command and fire contro lgroups followed a short time later. Direction of th eFDC and FSCC was then passed from Vandegrift toRazor without loss of continuity or centralized fire con -

trol . Six days after the introduction of Larne's 3d Bat-talion, the regiment was well into the zone of action .

On the morning of the 25th, after heavy air strikes ,Larne's battalion assaulted three landing zones atopCa Ka Va, a 1,100-meter-long razorback ridgeline ,6,000 meters south-southwest of FSB Razor . A shorttime later an artillery advance party and a team of en-gineers helilifted into the landing zones and beganconstruction of what was to become FSB Cunningham ,

named for the first Marine aviator, Lieutenant Alfre d

A. Cunningham . From an artillery standpoint, Cun-ningham was ideal . Being at the center of the plannedoperational area and large enough to accommodat ean integrated battalion position, it represented a sim-ple solution to fire support requirements and coordi-nation . As for the 9th Marines, its 11-kilometer artiller y

fan extended south and southwest almost to the limi tof the area of operations .

Within the next four days the regimental comman dgroup and five artillery batteries moved into positio n

on Cunningham . Mortar and D Batteries, the formerfrom Vandegrift and the latter from Tun Tavern, dis-placed by sunset on the 25th . The 1st and 3d Provi-sional 155mm Howitzer Batteries helilifted in on 2 8January from Ca Lu and Shiloh, respectively. WhenBattery E displaced from Shiloh to Cunningham th efollowing day, the artillery movement into the D a

Krong Valley was complete .Soon after Cunningham opened, a small regimen-

tal forward logistical support area, capable of resup-plying eight rifle companies with rations, water,

32

HIGH MOBILITY AND STANDDOW N

Assault into the Da Krong Valley ,22-25 January 1969

Dkilometers 1

r • _ • • , ti

SAIiM ' ~~

~ .~ ,

g ;Ha`j.

'\ DONG RIAN U

/ .

lN

s8. .Lang Ma —

A111C,lang Da Bao4Khd~1.M''~'

' Ib3~ /BA

1

NUf

''"--(apg Kerie

ag'

9

fang b

ERVE

Razor

See Reference Map, Sections 11, 12, 16, 17

THE SPRING OFFENSIVE PREEMPTED

3 3

Department of Defense Photo (USMC) A19304 4

A CH-53 Sea Stallion lands supplies and ammunition at Fire Support Base Razor shortl yafter the mountaintop was secured by members of the 2d Battalion, 9th Marines .

batteries, and small arms ammunition on a daily ba-sis, was established. A tactical logistical group (TacLog), used primarily in amphibious operations, als owas established, enabling the supply officer to wor kclosely with the regimental commander, the opera-tions officer, and the air liaison officer. As MajorCharles G . Bryan, the regimental S-4, noted : "Theprocedure permitted the establishment of realistic pri-orities to minimize interference with tactical opera-tions and also to ensure maximum utilization ofavailable helicopter assets . And it further provided fora more effective control and coordination of resupplyoperations ." The tactical logistical group was set up"with an administrative Tac Log net from each battal-ion with the logistics requirements being passedthrough the regiment ; the regiment would then passthese logistic requirements to the personnel in the tea rat Vandegrift who would ensure that these supplie swere promptly staged on the LSA and lifted to thefield ." 17 This technique would prove invaluable as theregiment moved into the second phase of the opera-tion, now called Dewey Canyon .*

Backyard Cleanup

Following the rapid movement of the regiment intothe area of operations, companies of the 2d and 3 d

*After a majority of the regiment was deployed, and the area ofoperations expanded, the operational codename was changed fromDawson River South to Dewey Canyon . However, Dawson Rive rSouth remained in effect for those elements of the 9th Marines stillat Fire Support Bases Tun Tavern and Henderson.

Battalions moved out from Razor and Cunninghamon the 24th and 25th, initiating Phase II . Their mis-sion was to clear the area around the two fire supportbases, secure the flanks, and then gradually move intoposition along the Da Krong's east-west axis, desig-nated Phase Line Red, for Phase III . This placed the3d Battalion on the eastern flank and the 2d Battal-ion on the western flank near the Laotian border . The1st Battalion, 9th Marines, under Lieutenant Colone lGeorge W. Smith, would be introduced into the mid-dle once the two battalions were in place . Among th ecritical second phase objectives were : the seizure of theCo Ka Leuye ridgeline, assigned to Company G ; theconstruction of FSB Erskine, four kilometers southwes tof Cunningham, by Company F; and the occupationof Landing Zones Lightning and Tornado, located fou rkilometers northeast of Cunningham, by Company K .

Patrolling 2,000 to 3,000 meters apart, the two bat-talions encountered screening forces of major enem yunits thought to be operating further south . Engage-ments with single NVA soldiers or small bands of sup -port troops were commonplace, and the ensuingfirefights short . On 25 January, one such contact le dto the discovery of ,a sophisticated four-strand com-munications wire by Company M . Running from Laosinto Base Area 101 to the east, the line was strung be-tween tree-mounted porcelain insulators and well con-cealed by overhead cover . A five-man special Marin eand Army intelligence team, which had accompanie dthe Marines, tapped the wire and eventually broke the

34

HIGH MOBILITY AND STANDDOWN

NVA code, but no information was provided the 3dBattalion as it was "presumed to be of strategic rathe rthan tactical value," noted Lieutenant Colonel Laine .1 8

Another significant find during the first stage ofPhase II was the 88th NVA Field Hospital. Discoveredby Company F, 2d Battalion, near the Song Da Krong ,the complex consisted of eight large permanent build-ings capable of accommodating 150 to 160 patients .A detailed search revealed large quantities of Russian -made stainless steel surgical instruments, antibiotics ,foodstuffs, and evidence that the area had been evacu-ated the previous day.' '

Company G, under Captain Daniel A . Hitzelberger ,launched its attack on Co Ka Leuye (Hill 1175) th eafternoon of 31 January from LZ Dallas . After a shortskirmish with a small group of NVA soldiers whosought to draw it into an ambush at sunset, the com-pany crossed a tributary of the Da Krong and advance d500 meters up the mountain before settling in for th enight . The following morning the Marines continue dtheir climb, roping up sheer rock cliffs and traversin gslopes with grades averaging 65 to 75 degrees . As th eday progressed, the weather began to deteriorate, ad -ding yet another obstacle . Heavy rains alternated withdrizzle and dense fog, reducing the hard, red Viet -

namese soil to mud, visibility to 25 meters, and th eceiling to zero . Despite weather and terrain problems ,Company G continued the climb toward the objective .

As Hitzelberge r' s company moved up Co Ka Leuye ,the two other regimental objectives were taken . Com-pany F secured the ground for Erskine on 1 February ,but was prevented from developing the fire suppor tbase by the same bad weather hampering CompanyG's movement . Four kilometers east of Cunningham ,Company K secured a landing zone and began con-struction of FSB Lightning . Within hours of comple-tion, the 1st and 2d Battalions, 2d ARVN Regiment ,plus the 1st Battalion, 62d Artillery Regiment (ARVN )lifted into the fire support base just before inclemen tweather halted all helicopter operations .

Predictably, enemy-initiated attacks increased dur-ing this period of bad weather. On 2 February, FS BCunningham received approximately 30 to 40 round sfrom one or more enemy 122mm field guns locatedon or near the border . Although one of the 1st Provi-sional Battery's 155mm howitzers was temporarily dis -abled by a near hit, and the 3d Provisional Battery 'sfire direction center was put out of action by a direc thit, the batteries maintained uninterrupted counter -battery fire . The 2d Battalion, 12th Marines sustaine d

Two Marine UH-1E (Huey) helicopters touch down at the operation's main fire suppor tand logistic base, Cunningham, bringing in additional supplies and personnel in sup -port of the 9th Marines and artillery batteries of the 2d Battalion, 12th Marines .

Department of Defense Photo (USMC) A192655

THE SPRING OFFENSIVE PREEMPTED

3 5

Department of Defense Photo (USMC) A192844

Despite rugged terrain and heavy jungle growth, in-fantrymen of the 2d Battalion, 9th Marines struggle u pone of the many ridges in the area of operations.

a total of five killed and an equal number of wound -ed . Subsequent crater analysis and aerial sightings in-dicated that the enemy guns were in Laos just beyon dthe maximum range of the battalion's 155mm howit-zers . The Army's 175 guns, located along the coast ,proved inaccurate but were used to harass . Thereforethe only means of delivering effective counterbatter ywas by air. If the guns could be visually located, the ycould be destroyed . However, it soon became appar-ent that if an aerial observer (AO) remained on sta-tion for any length of time, all enemy fire would cease .Therefore, as Barrow later noted, "counterbattery wa sa simple thing of always having an AO up"29 The firesupport base continued to receive enemy incomin gthroughout the operation at sporadic but frequent in-tervals, notably when the observers left the area, eve nfor short periods .

By the 3d, after four days of bad weather, Colone lBarrow had to make a decision . Should present posi -

tions be held? Had the regiment overextended itsel fby placing Company G on Co Ka Leuye? With norelief in sight and helicopter resupply and medicalevacuations halted throughout the area, Barrow in-structed the 2d and 3d Battalions to pull in their com-panies and hold them close to areas from which theycould be easily supported . The decision proved to bea wise one, since Razor and Cunningham were well -stocked with rations and small arms ammunition . Ar-tillery ammunition, however, was in short supply . The2d Battalion, 12th Marines had attempted to stock ex-tra shells, but the scarcity of heavy lift helicopters (Ma -rine CH-53s and Army CH-47s), and the weathermade it impossible to achieve the initial stockage ob-jectives. Without the reserve, artillery missions had tobe reduced . For the first 10 days of February, the bat-talion fired 6,078 rounds, assisting only engaged units .

Except for Company G, 2d Battalion, all rifle com-panies assumed a modified defensive position or wer equickly moving into one by 4 February: Company Lwas on Cunningham, while I, K, and M were clos eby ; Company H was on Razor ; Company F was on Er-skine ; and Company E was at LZ Dallas . On the morn -ing of the 5th, Hitzelberger's company began retracingits steps :

As we came down off of 1175 my point element, whic hwas from the 3d Platoon, observed three NVA off to the right;however, because of the contacts we had the previous da ywe decided to check out the area a little bit further. So Iheld the column in place and allowed the point fire tea mto go out to see if there was any more forces there or tak ethe three NVA if they could. Our point then came unde rfire? '

From what Captain Hitzelberger was able to piecetogether, the company had been drawn into a classi-cal U- or V-shaped enemy ambush .

The point fire team soon found itself pinned dow nin the midst of approximately 30 NVA troops scatteredin low-lying bunkers and well-camouflaged amongrocks and trees . Silhouetted against the sky if it at -tempted to withdraw, the team waited until the res tof the 3d Platoon was brought up . The 2d Platoo nwas then moved to the left, and as it started to sweepthrough the enemy position, came under a hail of au-tomatic weapons and rocket propelled grenade (RPG )fire . With the 2d and 3d Platoons stopped, Hitzel-berger decided to commit the 1st by swinging it fur-ther to the left and through a small ravine, flankingthe enemy. By this maneuver, the 3d Platoon was abl eto break through and force the NVA to withdraw. Thecompany then pushed through the ambush site to a

36

HIGH MOBILITY AND STANDDOWN

communications line where it consolidated its posi-tion . A cursory check of the immediate area revealedtwo enemy bodies and several blood trails . Five Ma-rines were killed and 18 wounded . Among those wh ogave their lives during the battle was fire team leade rLance Corporal Thomas P. Noonan, Jr ., of Brooklyn ,New York, who was posthumously awarded the Me -dal of Honor for his daring rescue of a seriously wound-ed fellow Marine.

With 30 minutes to reorganize for fear of a secon dattack, there was only time enough to destroy excessequipment and rig stretchers . At 1730, after puttingout a strong rear guard and plotting artillery concen-trations along the proposed route, the company move ddown the ridge . The pace was slow and rest breaks fre -quent, as half the company was either assisting thewalking wounded or carrying stretchers . At 0200 thefollowing morning, Hitzelberger decided to stop an dsettle in for the night even though the company wa ssplit because of a treacherous slope .

Early the next day, the company consolidated an dbegan its trek toward a predetermined rendezvous wit ha relief platoon from Company E . The terrain, as be-fore, proved to be an obstacle. "At this time the stretch -er cases were moving up and down slopes in excess o f70 degrees," reported Captain Hitzelberger, "we hadto use six, eight and, at times, ten men to carry astretcher and it would take us over 30 minutes to moveone stretcher case over one bad area" 22 At 1400, th ecompany paused and then began what was to be th emost difficult part of its descent . During the nex tseveral hours, Marines roped the stretchers and wound -ed down the face of a rocky cliff without incident . A tthe bottom the company linked up with the relief pla-toon which had brought out medical supplies and thefirst rations the Marines had had in three days . Forthe next 36 hours, the company wound its way downHill 1175 toward the river . Once on the Da Krong ,Marine aircrews made a heroic effort to extract th emost seriously wounded . In dense fog, two medica levacuation helicopters from HMM-161 flew south u pthe Da Krong, using the river as their guide. Withou tHuey gunships for cover, and after having been fire don from the high ground during their approach, th etwo CH-46 helicopters landed, picked up the casual -ties, and returned to Vandegrift .

On the 8th, Company G returned to LZ Dallas . Theordeal, as Lieutenant Colonel George C . Fox later not-ed, "was a tremendous performance in leadership an dfire discipline . . . . I went out and talked to those

Marine Corps Historical Collection

Capt Daniel A . Hitzelberger, right, and GySgt Charle sA. Baker led the Marines of Company G off Co KaLeuye ridgeline during an extended period of badweather and heavy fighting when it was impossibleto reinforce and resupply the company by helicopter.

young Marines as they came in ; every last one of them .They were smiling and laughing . Their clothes weretorn, and in some cases completely off of them, bu tthey were ready for a fight ."23

The two ARVN battalions on FSB Lightning ex-perienced a somewhat similar problem. As the weathe rclosed in on 1 February the battalions' direct suppor tartillery battery and remaining supplies were in th eprocess of being inserted . By the time all helicopte roperations halted, only one of the six 105mm howit-zers and 400 rounds of ammunition had been deli-vered . The battalions themselves carried only the basi callowance supplied to each infantryman. With con-ventional resupply out of the question, it was decid-ed to attempt a helicopter-parachute drop by directin gtwo CH-46s from HMM-161 over the target with th eassistance of the Vandegrift air support radar team(ASRT).* Both drops landed within 100 meters of th eARVN position, even though the team's radar equip-ment was operating beyond its normal range .

From 5 to 8 February, Marine fixed-wing KC-130 smade additional ASRT-controlled drops adjacent t oMarine positions. Although the "Hercules" could dropgreater quantities of supplies, the drops proved to b eless accurate, and the percentage of loads recovere dfell from 80 to 66. These initial experiences led to a

*The ASRT employed a radar-course-directing central compute rwhich consisted of a precision radar and associated computer equip-ment designed to accurately position aircraft without visual refer-ence to the earth's surface .

THE SPRING OFFENSIVE PREEMPTED

3 7

refinement of the Vandegrift facilities and the instal-lation of a second ASRT team at Cunningham on 2 6February.24 Working together, they provided extend-ed radar coverage, increasing the accuracy of subse-quent resupply drops and the regiment' scounterbattery capability during periods of darknessand inclement weather .

Another innovation that paid high dividends con-cerned the handling of casualties in the field whe npoor weather conditions precluded helicopter medi-cal evacuations . In November 1968, the regimental an dthree battalion surgeons had developed and fabricat-ed a helicopter-transportable aid station, capable o f

providing maximum lifesaving care as field condition s

would allow. One such aid station accompanied th e

9th Marines to Cunningham and was placed into ful loperation soon after the fire support base opened .During the first week of February, when the weather

would not permit helicopter evacuation of casualties ,the Cunningham station proved invaluable in the

number of lives saved .Nine days of bad weather cost the regiment it s

momentum. They also permitted the enemy, who b ythis time had determined the purpose and strengthof the Marine attack, to prepare and fortify hi sdefenses . By 10 February, the weather cleared suffi-ciently for helicopters to move elements of the 1st Bat -

Marine Corps Historical Collection

talion from Vandegrift and Shiloh to FSB Erskine, an d

Using a winch and cable, aircrewmen from Marine

Battery F from Razor to Erskine . With all battalion s

Medium Helicopter Squadron 242 hoist a wounded in place, the stage was now set for the southward drive

Marine through jungle canopy into a hovering CH-46 .

across the Da Krong .

CHAPTER 4

The Raid into Lao s

Across the Da Krong — The NVA Retaliates—Ambush Along 922—Heavy Fightin gBack Into Laos—Persistent Problems—Phased Retraction—Laos : Repercussions

Across the Da Krong

The 3d Battalion, 9th Marines crossed the Song D aKrong early on the morning of 11 February, initiatin gPhase III of Operation Dewey Canyon . The 1st an d2d Battalions followed the next day. According to th econcept of operations, each battalion was given a zon eof action approximately five kilometers wide, and anobjective about eight kilometers south southwest ofthe point of departure . To the east, the 3d Battalionwas to attack along ridgelines 2,000 meters apart, wit hone company securing Hill 1228 (Tiger Mountain) ,and two companies taking Hill 1224 (Tam Boi) . The1st Battalion was to advance over two parallel ridge-lines further west, converging on a single objective as-tride the Laotian border. On the regiment's wester nflank, the 2d Battalion was to attack through a broa dvalley with secondary assaults on the ridges to the east .The battalion's final objective also lay on the SouthVietnamese-Laotian border.

Tactically, Colonel Barrow divided each battalion :two companies attacking along parallel ridgelines wit htwo companies in trace . The lead company was to at-tack and if heavily engaged, the company in trace, o rits platoons, was to act as the maneuver element, as-sisting the attacking company and securing a landingzone for resupply and medical evacuation, if neces-sary. When the situation permitted, the company intrace would assume the lead and the company in th eattack would fall back . The scheme of movement, ac -cording to Barrow, "was masterfully done" "Battalioncommanders went right along with [their troops], n ojeeps obviously, or any of that nonsense .." 1

As each battalion moved across Phase Line Red, i tmade strong contact . Three companies of LieutenantColonel George W. Smith's 1st Battalion immediate-ly encountered a sizeable enemy force which had ap-parently been positioned to mount a ground attac kagainst FSB Erskine . Assisted by well-aimed fire of fiveartillery batteries, the Marines forced the enemy t owithdraw, leaving behind 25 killed in addition tonumerous weapons, packs, and explosives . Meanwhile,further east, Company M threw back a mortar -supported ground attack by an estimated NVA pia -

toon, killing 18 while losing two Marines . After fight-ing a day-long series of minor skirmishes on the 13th ,Company C collided with a mortar- and machine gun -reinforced enemy platoon, deployed on a hilltop ina line defense . The ensuing Marine assault forced th eenemy from the hill, killing 12 NVA . That night, theMarines employed mortars and artillery to break anenemy effort to retake the hill, claiming an addition -al 12 NVA during the battle . Company C losses forthe day were two killed and 21 wounded .

The opposition the Marines found themselves u pagainst was determined and formidable . Enemy forces,unlike those encountered during Phase II, were well -disciplined and remained in their bunkers or fight-ing holes until overrun or destroyed . At night theywould probe or attack Marine company positions us-ing squads or platoons. Snipers frequently were tiedin trees, and would fire at close range or wait unti lMarines were directly beneath and drop grenades .These suicide techniques seemed to be designed foronly one purpose : to prevent or delay the Marines' ad-vance on Route 922, and the important supply are aand artillery positions which encircled it .

The enemy's tough resistance achieved little success .Employing a heavy volume of accurate artillery fire an dair strikes, the three battalions advanced steadilysouthward . Attesting to the performance of Marinefirepower, two 122mm field guns were destroyed on15 February—one by air, the other by artillery. Ma-rine scout-sniper teams also contributed to the suc-cess of the attack by shooting their NVA counterpart sout of trees on several occasions .

Sharp clashes across the entire front marked the ac-tion on 16 and 17 February. On the left flank, Com-pany K, 3d Battalion, moving toward an intermediateobjective, was attacked from the front and rear by a nunknown number of North Vietnamese troops . Us-ing all available supporting arms to silence enemy mor -tar and rocket propelled grenade fire, the compan ykilled 17 and seized a number of weapons in takin gthe position, while sustaining few casualties . On th e17th, while advancing along the right flank, Compa-ny G, 2d Battalion exchanged small arms and support -ing fire with an enemy company in a daylong runnin g

38

THE RAID INTO LAOS

3 9

Department of Defense Photo (USMC) A80056 1

Riflemen of the 2d Battalion, 9th Marines cross the shallow Song Da Krong below FS BCunningham, beginning the long-waited-for penetration of enemy Base Area 611 .

battle . Thirty-nine NVA lost their lives, while the Ma-rines counted five killed and 12 wounded .

The NVA Retaliates

In observance of Tet, the North Vietnamese and VietCong unilaterally declared a weeklong truce . The al -lied countrywide 24-hour truce went into effect at 180 0on 16 February. But as Major Joseph B . Knotts, theregimental operations officer, commented : "out onDewey Canyon you wouldn't know there was any ."2 At0345 the following morning, an enemy sapper platoonsupported by a reinforced company launched an at -tack on FSB Cunningham . Dressed in shorts, skull -caps, and weighted down with explosives, the NVAbroke through the defensive wire and dashed towardthe center of the fire support base, tossing concussio ngrenades and satchel charges into every open hole .Although initially caught by surprise, the Marines ofCompany L, securing the fire support base, quickl yorganized a drive to clear the base in the face of heav yenemy mortar and recoilless rifle fire .

Lieutenant Colonel Scoppa's 2d Battalion, 12th Ma-rines bore the brunt of the attack, suffering majo rdamage within the first minutes ; the battalion's fir edirection center was put out of action, as was on ehowitzer. Within 30 minutes, however, the battalio nreestablished centralized fire control and batteries con-tinued with their missions . Throughout the night theyexpended 3,270 rounds on targets of opportunity, sus-pected assembly areas, and likely escape routes ; in-cluded among the total were 147 "flechette" and

"beehive " rounds of direct fire. In support, the ARVN105mm battery on FSB Lightning unleashed reinforc-ing fires totalling 340 rounds .

A sweep of the base and surrounding hillsides a tfirst light revealed 37 NVA bodies, 13 of which wer e

within the perimeter. A number of individualweapons, grenades, and packs were also located, th elatter containing quantities of marijuana and othe rdrugs . The use of narcotics, Second Lieutenant Mil -

ton J . Teixeira explained, "made them a lot harder to

kill . Not one of the gooks we had inside the perimete rhad less than three or four holes in him . Usually ittook a grenade or something to stop him complete-ly." 3 Four Marines lost their lives and 46 were wound-ed during the three-hour defense . On the 20th ,Companies E, G, and the command group of Lieu -tenant Colonel James J . McMonagle's 2d Battalion, 3 dMarines assumed the mission of providing security forFire Support Bases Cunningham and Erskine, reliev-ing Companies G and L, which joined their respec-tive battalions in the move southward ?

Ambush Along 922

The heaviest fighting of the Da Krong campaig ntook place from 18 to 22 February, the majority oc-curring within the sector assigned to Lieutenant

Colonel Smith's 1st Battalion . On the morning of the18th, Company A encountered stiff opposition froman enemy platoon dug into camouflaged, reinforcedbunkers on a heavily forested ridgeline, five kilome-ters southeast of FSB Erskine . Armed with small arms

40

HIGH MOBILITY AND STANDDOW N

and automatic weapons, the enemy "appeared to wantto hold their position at all cost ." 5 Preceded by air an dartillery strikes, Company A assaulted and overran th eposition, counting more than 30 NVA dead . The fol-lowing morning, Company C moved through Com-pany A's lines and continued the attack against theheavily reinforced hilltop emplacement, killing anequal number of NVA . Friendly casualties resultingfrom the two actions were one killed and 14 wounded .

Pressing the attack through the bunker complex ,Company C again made contact during the late after -noon on the 20th, engaging a large enemy force sup -ported by small arms, grenades, and machine gun fire .Two hours later, the Marine assault, assisted by fixed -wing air strikes with napalm drops within 50 meter sof the point element, carried the position, killing 7 1NVA. Equipment captured included two Russian -

See Reference Map, Sections 16, 1 7

made 122mm field guns, and a five-ton, tracked prim emover.* Employing company rotation tactics, Compa-ny A continued the attack through Company C's for -ward lines and overran yet another enem yemplacement, killing another 17 NVA and seizing atwo-and-one-half-ton truck and assorted artillery an dantiaircraft ammunition . Marine losses sustained i nthe two actions were five killed and 28 wounded i nCompany C, and one killed and two wounded inCompany A .

As the attacking forces neared the Laotian border ,concern over enemy artillery attacks, protection of th eregiment's right flank, and potentially lucrative ene -

*The two 122mm artillery pieces, the largest captured during theVietnam War, subsequently were evacuated . One of the field gun sis on display at the Marine Corps Air-Ground Museum, Quantico ,Virginia .

THE RAID INTO LAOS

4 1

my targets generated plans and requests for the tacti-cal deployment of troops across the internationa lboundary . After discussion at division and with XXI VCorps, Major General Davis forwarded a message toMACV requesting that the Special Operations Grou p(SOG) expand and redirect ground reconnaissance andexploitation operations, codenamed Prairie Fire, be-ing carried out in the Laotian panhandle, toward Bas eArea 611 . 6 * MACV approved and quickly implement-ed the request . ? Reacting to the NVA artillery attackof 2 February on FSB Cunningham, Davis had ini-tially requested that the 9th Marines be permitted t oenter Laos and destroy the threat : "From the presen tposition of the 9th Marines, a raid by a force of twobattalions could be launched quickly and effectivelyto cut road No . 922 and moving rapidly back to theeast, destroy art[iller]y forces and other forces and in-stallations which threaten us . " 8

Davis' request was put aside for a period as curren trules of engagement did not permit the introductio nof a large combat force into Laos for the purpose o fconducting what was in essence a secondary search an ddestroy operation, and which could possibly be viewe das an expansion of the war. The rules did permit Unit-ed States and other Free World World Forces to"maneuver, while actually engaged and in contact withenemy forces, into Laos as necessary for the preserva-tion of the force," and employ artillery and air strike son threatening military targets. The rules in no wayprohibited commanders from taking the "necessarycounteractions against VC/NVA forces in the exercis eof self-defense and to defend their units against arme dattacks with all means at their disposal ." These ex-ceptions provided the 9th Marines with the justifica-tion it needed .

As Barrow ' s troops moved further south, it becam eincreasingly clear that the enemy was making exten-sive use of Route 922, either to reinforce or to with -draw his forces . "In either case, interdiction of the roadwas clearly essential," noted Colonel Barrow. "Effortsby B-52 arc light strikes, fixed-wing attacks, and un-observed artillery had been to no avail ; he was con-tinuing to use it . During the day the AOs werereporting fresh vehicle tracks, including tracked vehi-cle tracks on the road, and as our forces moved fur -

*The mission of the Special Operations Group's Prairie Fire pro -gram provided for crossborder reconnaissance operations into thepanhandle of Laos using combined US/RVN forces to locate, inter-dict, and destroy enemy personnel and equipment on infiltratio nroutes into South Vietnam.

Cher south, we could hear vehicles on the road . Thiswas a pretty unacceptable situation, and it cried ou tfor some sort of action to put a stop to it ."

By 20 February, two companies, E and H, of Lieu -tenant Colonel Fox's 2d Battalion were on the Laoti-an border. At least two additional companies wer eexpected within the next 24 hours . As Company Hsat on the ridgeline overlooking the border and Rout e922 beyond, Marines watched as an enemy convo ycomposed of truck and tracked vehicles moved slowl yin a westerly direction along the road . As Captai nDavid F. Winecoff later reported :

The company, of course, was talking about let's get dow non the road and do some ambushing. I don't think they reall ythought that they were going to let us go over into Laos ,. . . I knew if the military had their way we'd be over ther ein Laos and the company was all up for it . . . . With th eParis Peace Talks going on, I wasn't sure what route was go-ing to be taken? "

Winecoff reported the observations and fire mission scalled, but from "1,700 meters away it is difficult t ozero in on movement ." t z

With the information provided by Winecoffs com-pany, and intelligence gathered by SOG teams and 1stRadio Battalion intercepts, indicating that the enemywas evacuating its heavy artillery westward out of th ereach of the 9th Marines, Lieutenant General Stilwel lrevived Davis ' initial request . In a message to Lieu -tenant General Cushman on the 20th, he recommend-ed a limited raid into the heart of enemy Base Area611 to a maximum depth of five kilometers along a20-kilometer front . If, however, the proposal was "be-yond the realm of political acceptability," he suggest-ed a lesser course of action which would involve th euse of a Marine company as an extraction force if SO Greconnaissance teams encountered trouble . Accordin gto Stilwell, " this would multiply the number of SO GRT teams which could be deployed simultaneously."t a

Cushman, in a message to General Abrams later thesame day, passed on the suggested courses of actio nand noted that "while recognizing the political im-plications of Gen Stilwell's proposals, . . . balance dagainst the military value of this unique opportunity ,I fully endorse both" 14 The matter of an incursion intoLaos was now left up to Abrams .

Events in the field, however, moved more rapidly .Company H, on the night of the 20th, again observe dheavy truck traffic on Route 922 . Winecoff reporte dthe observations, and once again the company direct-ed a number of fire missions on the targets, but with

42

HIGH MOBILITY AND STANDDOWN

unknown results . The following afternoon, Captai nWinecoff received a hand-coded message, the resul tof several days of planning, from Colonel Barrowdirecting him to set up a company ambush alongRoute 922 that evening, with specific instructions tobe back in South Vietnam no later than 0630 the nex tmorning.15 "Hotel Company," reported Barrow, " wa sin the best position; really the only position to do it,

and the job fell to them." 16 Winecoff immediately re -quested a 24-hour postponement because of the limit-ed time available and the condition of his men, mos tof whom had been on patrol since early morning . Bar -row denied his request .

With no time to rehearse and little time to plan,Captain Winecoff decided to use only his 1st and 2 dPlatoons, as the men of the 3d were exhausted after

The advance of the 1st Battalion, 9th Marines is halted temporarily by a group of Nort hVietnamese support troops attempting to protect their supplies and road network .

Department of Defense Photo (USMC) A193159

THE RAID INTO LAOS

4 3

Marine Corps Historical Collectio n

One of the 12 captured North Vietnamese Army122mm field guns. With a range of 14 miles, it wasthe largest enemy artillery piece captured in Vietnam .

several tiring days of continuous patrol . At 1610, thecompany command group and the 1st Platoon, rein -forced by mortar, forward observer, and machine gu nteams, moved out for the 2d Platoon's position at th ebottom of the ridge, leaving the 3d as security . Mak-ing good time over difficult terrain, they joined th e2d Platoon a little over an hour later, and the 1s tpassed through the 2d Platoon' s position to establis hthe planned order of march. At 1800, after a meal an da 30-minute forward reconnaissance, the order arrive dto execute and Winecoff quickly briefed the compa-ny on ambush tactics, signals, and night movement .

Shortly after dark, the company headed toward theroad, 900 meters away. Staying off trails and using acreek bed and then a ridge line to minimize noise ,the point element reached the small river whichparalleled Route 922 at about 2030 . Winecoff haltedthe column and sent his lead platoon commander andthe chief scout, an experienced Marine sergeant, for -ward to find a route across the stream and to selec tan ambush site . As the company waited, it observe dsix trucks pass in front of its position ; each stoppin gfor a short period to "recon by silence ." A tracked

vehicle mounting a spotlight also passed . "It was a veryexciting moment for Hotel Company because the spot -light was scanning up and down the river and on th ebluff, and it was playing over the lead elements of th ecompany, but we were not spotted . Finally it proceed-ed on down the road .'"

The two-man reconnaissance team returned around2215, and after a quick brief, the company moved for -ward, crossing the river in column formation and the nthe road . About 35 meters beyond, Winecoff haltedthe company and set up a hasty linear ambush withthe 1st Platoon on the right, and the 2d on the left ,and the command group in the center . Within min-utes of moving into position, the Marines heard trucksapproaching from the west . They passed the word tolet the vehicles proceed through the ambush site, asthe claymores and flank security were not yet in place .By 0100 in the morning, the ambush was ready .

With the men of Company H about 500 meters in -side Laos, Colonel Barrow informed Task Force Hotel o fthe move, " thinking that even that much of a mino rviolation might in itself provide a little bit of assuranc e

Marines move down one of the numerous enemy sup -ply roads which crisscrossed the enemy base area .

Marine Corps Historical Collection

44

HIGH MOBILITY AND STANDDOW N

of approval ." "There was a little bit of opposition towhat we were doing, and much discussion," noted Bar -row, "and finally approval came through that, yes, w ecould do what we were going to do, but the implica-tion clearly was, you had better make it work ." 1 9

While the 9th Marines ' staff obtained approval ,Winecoffs men waited . The wait was not long . Lessthan ten minutes after setting up the ambush, a sin-gle NVA appeared, aimlessly walking along the roadfiring his AK47 assault rifle into the brush . Not want-ing to "bag one NVA soldier," Winecoff passed th eword to let this "dude" walk through the killing zone .Forty minutes later, flank security detected a singl etruck approaching . Again not wanting to destroy jus tone vehicle, Winecoff passed the order to let itthrough, instructing his forward listening post tovisually check its contents . As it turned out, the truckcarried a load of lumber .

The next half hour was tense for Winecoffs men ;nothing moved, but voices could be heard 800 to 1,00 0meters off to the right . " I felt," Captain Winecoff not-ed, " that sooner or later something was going to b ecoming along into the killing zone ." 20 The compan ycontinued to wait . Meanwhile, a radio request cam ein from the battalion asking for a status report ; the ywere "afraid that we'd blown it," but Winecoff assuredthem otherwise. At 0230, the lights of eight truck ssuddenly appeared off to the east. All positions wer ealerted . As the trucks moved closer, stopping now andthen to "recon by silence," the men of the ambushbraced for action .

Three of the vehicles had already entered the kill-ing zone when the entire column stopped . Fearing thatthe enemy would detect his ambush, Winecoff deto-nated his claymore. With a loud roar and a boilingcloud of thick, black smoke, the mine disabled th esecond truck, killing its three passengers . As the smokecleared, Winecoff could see that the explosion had alsoset the first truck afire and forced the third off th eroad . Small arms and automatic weapons fire pouredinto the vehicles from the flanks; "everybody had beenwaiting a long time and the excitement was keen" 2 1Within seconds the forward observer alerted the ar-tillery and rounds bracketed the company position .

After several minutes of unrestricted fire, Winecoffgave the signal to move forward, making sure every -thing within the ambush site was destroyed . Once o nthe other side of the road, the company was given "leftface," and "we proceeded in column right back in th esame direction we came, crossing the river in the exact

area, up the other side, and went about 5 to 60 0meters up to a rally point where we . . . hung 'till day-light ." 22 Later, the company rejoined the 3d Platoo non the ridgeline where it was resupplied and the me ngiven a rest . In addition to the three trucks destroyed ,H Company counted eight NVA dead . Not a singl eMarine had been killed or wounded by enemy fire .

First reports of the ambush to reach the 3d Marin eDivision were sketchy and based largely on monitore d9th Marines radio traffic . Colonel Martin J . Sexton ,3d Division Chief of Staff, immediately recommend-ed that only XXIV Corps and III MAF be informe dof the incident and that no report would be relayedto MACV until Brigadier General Frank E . Garretson ,commanding Task Force Hotel, had prepared a "spo treport in compliance with directives pertaining to rulesof engagement ."23 On being informed of the ambush ,Brigadier General George E . Dooley, III MAF Chiefof Staff, was elated : "Hit 'm hard! Good news—wh oknows where the border is anyway?"2 4

About mid-afternoon on 22 February, a reply to Stil -well's and Cushman's messages of the 20th arrived a tIII MAF. Responding to their proposals, Genera lAbrams stated emphatically that "all operations i nconnection with Base Area 611 will be with SOGforces," and that close coordination between Marin eunits in South Vietnam and SOG teams in Laos wa sauthorized2 5 Although an apparent conflict existe dbetween the action of Company H, 2d Battalion, 9thMarines, and General Abrams' directive, Garretso nsolved it by making reference to the appropriate rule sof engagement permitting a local commander to ex-ercise the right of self-defense in his report 2 6 However,larger questions remained. With all three battalion son or just north of the border, and substantial enemyinstallations and lines of communication directl yahead, what future direction was Operation DeweyCanyon to take? Was the international boundary t oremain a permanent barrier to the 9th Marines ?

While the ambush itself was dramatic and success-ful, its real value, according to Colonel Barrow, lay i nthe leverage it provided to request a continuation ofsuch operations in Laos . "Therefore, the next day I senta message to higher headquarters stating why we ha ddone what we had done, reiterating the successe sachieved, and then my final paragraph made an urgen trequest for authority to maneuver into Laos as applie dfrom North-South gridline 01 to the North-South[east-west] gridline 02 . This generally was about a2,000 meter extension and included all of Route 922"

THE RAID INTO LAOS

4 5

Again he stated that his request was based upon th e"immediate and constant " enemy threat to his troop sand on intelligence which continued to place enemytroops and equipment concentrations in the area .And, noted Barrow, "I put a final comment on mymessage, which said, quote, ` put another way, myforces should not be here if ground interdiction ofRoute 922 not authorized.' " 2 7

Lieutenant General Stilwell would not give up .Adopting Barrow's recommendations, he requeste dauthority from MACV for "a selected advance southto the east-west 02 gridline—a distance not exceedin gtwo kilometers from the border at any point ."28 Facedwith a fait accompli, General Abrams finally approve dStilwell's request on 24 February, but placed restric-tions on all public discussion of the Laotian incursion ,fearing possible adverse effects on international poli-cy.29 Knowledge of the operation was also to be limit-ed; the American ambassador in Laos, William H .Sullivan, for example, was not informed until the oper -ation was well underway, as was Laotian Prime Ministe rSouvanna Phouma, who when informed, "expresse dunderstanding of the action and said the essential ele-ment was to keep the matter secret," but hoped i twould be short 30

Heavy Fighting

In the regiment's center, Company A, 1st Battal-ion, protecting the battalion's left flank, continued t oreconnoiter the site of the previous day's contact, an dthen headed east off the ridge on the morning of 2 2February. About 1,000 meters from the battalion com-mand post near Lang Ha on the border, the 1st Pla-toon encountered an NVA squad in well-positione dbunkers . Under Second Lieutenant George M . Malone ,Jr ., the platoon quickly overran the position, killin gseven while losing one Marine. "At this point," ob-served First Lieutenant Wesley L . Fox, "it looked likethat was all the resistance we had . Everything wasquiet, so I radioed up to battalion to send the waterdetails [from Headquarters and Service and C Com-panies] down to the creek . We were in bad need ofwater . The helicopters could not get in due to weather ,and the battalion was low."3' A 20-man detail moveddown and as they started to fill canteens, they cameunder enemy 60mm mortar and machine gun fire .Lieutenant Fox immediately ordered the detail back ,reoriented his 1st Platoon toward the south, and movedit forward, beginning the last large engagement o fOperation Dewey Canyon .

Pushing through triple-canopied jungle, banana

Courtesy of LtCol Wesley L . Fox

lstLt Wesley L . Fox rests at Company A's position over -looking the Ho Chi Minh Trail, a week after the actionfor which he would be presented the Medal of Honor.

groves, and dense underbrush, Lieutenant Malone' splatoon ran up against a reinforced NVA company i na well-prepared, well-camouflaged, and heavily forti-fied bunker complex . To the rear, on a high ridgeline ,the enemy had emplaced RPGs, machine guns, an dmortars. Fox moved up the 3d Platoon and placed i ton line with the 1st . When the momentum of the as-sault faltered, the 2d was then committed through th ecenter of the two attacking platoons . Even thoug hcasualties mounted, Lieutenant Fox found he coul dnot use air and artillery support as the company wa sboxed in by a low ceiling, terrain, and vegetation, an dso locked in combat that if he withdrew to use artillery,he would run the risk of incurring additional casual -ties . Momentum nevertheless had to be maintained .

As the three platoons pressed the attack, the com-pany command group took a direct mortar hit, kill-ing or wounding everyone except the executive officer ,First Lieutenant Lee R . Herron, who was given com-mand of the 2d Platoon . Lieutenant Fox, despite hiswounds, continued to control the advance .* Finally,

*First Lieutenant Wesley Lee Fox was awarded the Medal of Hono rfor his actions during this engagement .

46 HIGH MOBILITY AND STANDDOW N

Department of Defense Photo (USMC) A19268 5

Infantrymen of the 3d Battalion, 9th Marines move up an artillery-scarred slope towardthe crest of Tiger Mountain, Hill 1228, one of the regiment's three major objectives .

Company D, which had been ordered to assist, ap-peared, moving through the banana groves in fron tof Company A's position . "They had gotten off on th ewrong trail and came in behind the enemy position,and then walked into our front ." `At this time," not-ed Lieutenant Fox, "I realized that we had alread ypenetrated the enemy position; we had already pushedthrough the entire position, and all Delta Compan yhad to do was walk down and help us carry up ou rwounded ." 32 Results included 105 NVA killed and 2 5automatic weapons captured; the dead, clad in ne wuniforms, included several officers, all of whom wer ehighly decorated veterans of other campaigns . Marinecasualties were heavy: 11 killed and 72 wounded, 54of whom required evacuation .

Because of Company A's daylong battle, the 1st Bat-talion reoriented its direction of search eastward ,towards Hills 1044 and 1224 (Tam Boi) . During th enext four days, it moved along Route 548, just northof the border, encountering small groups of enem ypersonnel and discovering several minor arms caches .On 27 February, while searching the slopes of Hill1044, Company D stumbled onto one of the larges tenemy weapons and munitions caches of the war . " Iwas walking along the side of a road," Gunnery Ser -

geant Russell A . Latona reported, "and there was abomb crater there and sticking out of the bomb crate rI saw the footpod of a mortar bipod ." Alerting th ecompany, he ordered several men to start digging ."They dug down about four or five inches and the yfound boards . They lifted up the boards and they start-ed digging a hole and this is when we found severa lweapons ."33 A further check of nearby bunkers andbomb craters revealed that the company had move dinto the midst of an NVA supply depot, a storehous ewhich would eventually yield 629 rifles, 108 crew -served weapons (60 machine guns, 14 mortars, 1 5recoilless rifles, and 19 antiaircraft guns), and well over100 tons of munitions . The next two days were spentinventorying and then destroying the cache .

Meanwhile, on the left flank of the regiment's are aof operations, although encountering lighter opposi-tion, Lieutenant Colonel Laine's 3d Battalion gaine dsubstantial results . Attacking generally down the trac eof Route 922 within South Vietnam, elements of thebattalion uncovered numerous enemy facilities con-taining tons of supplies and equipment . On the 18th ,Company L located an NVA cemetery containing 18 5bodies, most of whom had been buried in June 1968 .On the 21st, Company M found a well-camouflaged

THE RAID INTO LAOS

4 7

maintenance installation, complete with six repair pits ,a bulldozer, a front-end loader, several disassembledengines, and more than three hundred 50-gallon fueldrums . Pushing southward, the battalion, after secur-ing Hill 1228 (Tiger Mountain), began a detaile dsearch of the Tam Boi mountain complex, discover-ing on the 23d two spiked 122mm field guns, alon gwith a prime mover and assorted artillery, mortar, andsmall arms ammunition . Further penetration of theTam Boi complex revealed a headquarters and ad-ministrative facility composed of 11 immense tunnels .Carved into solid rock, these 150- to 250-meter-long,cross-connected tunnels contained extensive repai rshops, storage facilities, and a "hospital which theyhad abandoned very rapidly and left one patient o nthe operating table to die" 34 All were capable of with -standing direct hits from air and artillery attacks .

With Tiger Mountain secured, Battery E, 2d Bat-talion, 12th Marines displaced to the top on 28 Febru-ary, and established FSB Turnage, named after aformer 3d Marine Division commander, General Al-len H. Turnage . The fire support base, used the yearbefore by the 1st Cavalry Division, was opened primar-ily to provide balanced artillery support for furtheroperations of the 3d Battalion in the northeast corne rof Thua Thien Province .

Back Into Lao s

Within hours of General Abrams' approval, Com-pany H, 2d Battalion, 9th Marines was again instructe dto move "back down onto the bloomin' Route 922 "According to Captain Winecoff, the men's "moral ezoomed way down because the company was extremel ytired, [and] we were afraid that we were going to haveto go off and leave our supplies . . . . This includedhalf a pallet of 60mm mortar ammunition, quite afew C-rations, and of course not the beer ; we con-sumed that ." 3 5 But move out they did .

The plan was for Company H, followed by Compa-nies E and F, to move into Laos, and then drive east -ward along Route 922, forcing enemy troops into th ewaiting sights of the 1st and 3d Battalions . In addi-tion, intelligence indicated that the NVA were desper-ately trying to evacuate their remaining artillery piece sin the face of the other two battalions' push south -ward . In essence, the direction of the operation wa snow toward removing the enemy threat to the regi-ment's right flank .

Once again on the road, Company H, after a six -hour night march, set up another hasty ambush, andat 1100 on the 24th, engaged six unsuspecting NVA

soldiers, killing four . Moving eastward the followin gday, another 10 were engaged, resulting in eight killed ,one 122mm field gun and two 40mm antiaircraft gun scaptured. Marine losses were two dead and seve nwounded . Later the same day, a company patrol wa sambushed by an estimated 15 enemy troops in forti-fied bunkers and fighting holes . Reinforced, the patrolpushed through the enemy position, killing two an dcapturing a second 122mm gun . Marine casualtie swere high : three killed and five wounded . Amongthose who gave their lives was Corporal William D .Morgan, who in a daring dash, directed enemy fireaway from two wounded companions, assisting in thei rrescue. For this action, he was posthumously awarde dthe Medal of Honor .

Company H and the battalion "jump" or field corn:mand group, continued to move eastward, flanked byCompanies E and F. "The thought here," notedColonel Fox, "was to have a force in position to launc ha flank attack quickly were we hit from the rear (west )by major enemy units advancing from deeper i nLaos ." 36 Progress was rapid ; too rapid for some : "I fel tthat if we had been moving slower and had more tim eto check things out, we probably would have foun da heck of a lot more equipment than we did," note dCaptain Winecoff.37 As it was, elements of the 2d Bat-talion did capture over 20 tons of foodstuffs, and thou-sands of rounds of ammunition, while killing 4 8enemy soldiers .

By 1 March, the three companies were within 1,00 0meters of the South Vietnamese border, having co-vered over 5,000 meters in five days against light enemyresistance . Two days later, they helilifted to Vandegrif tCombat Base . The battalion, while in Laos, sustainedeight killed and 33 wounded, 24 of whom require devacuation . All dead were officially reported to hav ebeen killed "near Quang Tri Province, South Viet-nam" ; no reference was made to Laos for politicalreasons .

Persistent Problem s

While the 9th Marines enjoyed a number of suc-cesses it also experienced two critical and persisten tproblems during the month-long push southward ,resupply of units in the field and casualty replacement .Early in the operation it was found that resupplyingrifle companies without halting their forward progres sor pinpointing their positions was impossible . To makematters worse, once a company was ready to continu eits advance after being resupplied, a squad or platoo noften had to remain behind to secure transport nets,

48

HIGH MOBILITY AND STANDDOWN

water containers, and other items until retrieved . Thi snot only reduced company strength, but unnecessari-ly exposed the smaller unit to attack . An effort wa smade to improve this situation through the use of aHelicopter Emergency Lift Pack, designed and fabri-cated by the 3d Shore Party Battalion . C-rations, am -munition, and other items were placed on wood palletsor bundled in discarded canvas, slung on inexpensiv eloop-type wire cables, and lifted into the field . Ma-rines were then able to obtain their supplies, dispos eof the packaging, and continue the advance with lit-tle or no delay.

Initially included among the items of the Emergen-cy Lift Pack were 5-gallon plastic water bottles, whic hdid not supply the need of Marines in the field, an dwere subject to leakage. Instead of increasing the num-ber of containers, 155mm, 175mm, and 8-inch artillerycanisters, each capable of holding approximately 1 3gallons of water were substituted, and proved highlysuccessful3 8

A number of units sustained moderately highcasualties, and, as a result, lost some effectiveness i nthe movement southward . Although anticipated i nearly planning, the 9th Marines, because of transpor-

tation problems, due mostly to weather, was forcedto shift personnel already in the field about . Successwas achieved, but in most cases units had to operatefor several days below the desired strength level be-fore receiving replacements 3 9

Phased Retractio n

By the beginning of March, all the battalions of the9th Marines had obtained their major objectives . Or-ganized enemy resistance had virtually collapsed ; mostenemy troops not killed or captured had withdrawnwestward, deeper into Laotian sanctuaries . There wasscattered activity from small groups of enemy through-out the operational area, but it was apparent that n ofurther significant contacts would occur .

The 9th Marines had successfully interdicted Rout e922 . It had captured or destroyed thousands of ton sof enemy food, medical supplies, and ammunition .The equivalent of two medium artillery batterie s(twelve 122mm field guns) and one light battery (fou r85mm guns) had been seized, along with prim emovers and munition carriers . Enemy undergroundheadquarters, storage facilities, hospitals, and troopbilleting areas, as well as his fortified positions, ha d

Marines inspect and inventory a portion of the tons of captured weapons and ammuni-tion in what would be the largest haul of enemy supplies taken during the war.

Department of Defense Photo (USMC) A800583

THE RAID INTO LAOS

4 9

been overrun and a significant portion of his antiair-craft potential was located and destroyed . In short, by1 March, with the exception of mopping up, the 9t hMarines had accomplished its mission .

The original concept of operations envisioned aleapfrogging retraction from the area of operations ,with each element always under a protective artiller yfan—the reverse of the technique used to get the regi-ment into the area of operations . This movemen twould have required about 10 battery displacement sand, since a reasonable level of artillery ammunitionhad to be maintained during the leapfrog maneuver, i twould have entailed approximately 25 heavy lifts pe rhowitzer battery and five heavy lifts for the mortar bat-tery, not including normal resupply lifts . If goodweather prevailed, and helicopters were abundant, th eleapfrog retraction would be accomplished in seve ndays .

As the operation drew to a close, however, severalfactors dictated a reappraisal of the original retractio n

plan. First, the weather showed no signs of improv-ing . Second, continuation of the operation through -out the retraction phase would require an initial 10 0lifts of artillery ammunition to bring stocks up to ap-propriate 'levels . That this level of lift support wouldnot be forthcoming was evident from the daily short -fall of normal ammunition resupply during the lastweek of February and the first few days of March . Forexample, the 2d Battalion, 12th Marines required 9 3lifts on 1 March to sustain normal artillery operation sof which it received 35 ; the battalion required 94 thefollowing day and only two were received . Part of thediscrepancy was due to marginal weather ; however, alarger part was due to limited helicopter assets . Final-ly, the 9th Marines was scheduled to relieve the 3d Ma-rines in the Vandegrift-Rockpile-Route 9-Cam Lo areaso that the latter could join Operation Maine Crag ,which had already begun .

The retraction plan originally had the 2d Battalio nscheduled to lift to Vandegrift on 3 March, followed bythe 1st Battalion on the 4th . After the 1st Battalionwas out, Battery F and the 1st Provisional Battery ,which had been covering the 1st Battalion's sector o fthe area of operations from FSB Erskine, would dis-place to Vandegrift, and Company G, 2d Battalion ,would close Erskine . On 5 March, the 3d Battalion andBattery E would lift to Vandegrift, leaving one com-pany at FSB Turnage as security for the ARVN 105mmbattery remaining there . On 6 March, the 2d ARVNRegiment would retract from its area of operations un -

der cover of its battery on Turnage, and FSB Cunning -ham would be evacuated with all units going to Vande -grift . Finally, on 7 March, the ARVN battery and th eone company from the 3d Battalion would be extract-ed from Turnage under the cover of fixed-wing air -craft, and the retraction of the regiment would b ecomplete .

The first step in the retraction plan— the retrograd eof the 2d Battalion—went as scheduled . Everythin gthereafter changed . The weather turned from margi-nal to bad . In addition, before clearing the area o foperations, III MAF tasked the 9th Marines with link-ing up with and extracting SOG forces which had beenoperating in Laos . A third development was the dis-covery of additional cache sites in the eastern portionof the operational area which had to be searched .

On 8 March, the 1st Battalion, with its huge cach eexploited, began to move overland to Tam Boi . In ad-dition, FSB Erskine was evacuated, with Battery F go -ing to Ca Lu and the 1st Provisional Battery going t oVandegrift . Two plans were then developed, designatedA and B, for further operations and the extraction ofthe remaining forces, both of which hinged onwhether or not the 1st Battalion linked up with SOGforces by 1300 on 10 March . If it did, Plan B providedfor its extraction that day, followed by the displace-ment of all artillery on FSB Cunningham to Vandegrif tbefore dark . Then on 11 March, Company K, 3d Bat-talion, would be extracted from Turnage and move dto Vandegrift under cover of fixed-wing aircraft. PlanA provided for the displacement of Mortar Battery t oTam Boi on 10 March to cover the extraction of th e1st Battalion ; for the closing of Cunningham by Com-pany K; and, finally, for the employment of MortarBattery to cover the closing of Turnage . Eventually, th e9th Marines implemented a modified version of PlanA, which essentially followed the same scheme as th eoriginal, but which was changed frequently as weathe rand other factors dictated .

The weather finally broke sufficiently on 15 Marchto move Mortar Battery to Tam Boi, and to extract al lthe artillery and most of the 3d Battalion from Fir eSupport Base Cunningham .* Control centers establish -ed helicopter approach and retirement lanes whichpermitted all batteries to fire a continuous smoke andmortar suppression program until the last gun lifted

*During the movement of the 3d Battalion to Cunningham ,Company M came under intense automatic weapons fire . Durin gthe firefight, Private First Class Alfred M . Wilson was killed pro-tecting a fellow Marine from a grenade. For his heroic action, Pri-vate Wilson was posthumously awarded the Medal of Honor .

50

HIGH MOBILITY AND STANDDOWN

out . During their displacement, batteries on Cunning -ham fired over 1,000 rounds, including 547 rounds onactive missions and 389 rounds of smoke . A small rea rechelon left behind was brought out two days later .

Helicopters lifted the 3d Provisional Battery fromCunningham to Dong Ha . Army CH-47 "Chinooks "carried out the move, the first time that heavy-liftArmy CH-54 "Skycranes" had not been used to movethe 155mm Marine howitzers . Following the depar-ture of the 3d Provisional Battery, Battery D displace dto Vandegrift, as did the 3d Battalion (-) . With allbatteries except two out of the area of operations, th e2d Battalion, 12th Marines decentralized tactical con-trol of Battery E on Turnage and Mortar Battery o nTam Boi, and moved to Vandegrift . To provide firesupport for the 1st Battalion and Company I, 3d Bat-talion, Battery E was given the mission of direct sup -port of those units, and tactical fire d irection of MortarBattery ; the 1st Battalion FSCC was given responsi -

Artillerymen of 2d Battalion, 12th Marines load a4.2-inch mortar round while covering the withdrawalof the remaining elements of the 9th Marines .

Marine Corps Historical Collection

bility for all fire support coordination within the oper-ational area .

Marginal weather dominated the execution of thewithdrawal plan to the finish . Company K and the2d Battalion, 12th Marines' rear echelon on Cun-ningham were extracted on the 18th, and the fire sup -port base closed . By this time, the 1st Battalion hadjoined with SOG forces and was also ready to be ex-tracted, but the weather closed in again, effectivel yisolating the battalion and exposing it to enemyground probes and constant mortar fire .

To have followed the planned sequence of eventsmight have required more good weather than it ap-peared prudent to expect. Therefore, when the weatheraround Tam Boi broke on the morning of the 18th ,Lieutenant Colonel George W. Smith, commandingthe 1st Battalion, decided to extract whatever couldbe lifted out, weather permitting . As a result, MortarBattery was extracted first, and thus it did not pro -vide covering fires for the evacuation of FSB Turnageas planned. Instead Battery E, in conjunction withfixed-wing and helicopter gunship strikes, covered th ewithdrawal of the 1st Battalion under heavy enem ymortar and antiaircraft fire, and was in turn covere dby fixed-wing . Operation Dewey Canyon terminatedat 2000, as the last helicopter touched down at Van-degrift Combat Base .

During Dewey Canyon, supporting arms played adecisive yet somewhat muted role due to weather . Ma-rine fixed-wing aircraft flew a total of 461 close air sup -port missions, expending over 2,000 tons of ordnance .At the same time, Provisional Marine Aircraft Grou p39 and Marine Aircraft Group 36 flew nearly 1,20 0helicopter sorties, transporting a total of 9,121 troop sand 1,533,597 pounds of cargo. On the ground, Lieu-tenant Colonel Scoppa ' s artillery fired approximatel y134,000 rounds in support of Marine and South Viet-namese infantrymen .

Both sides suffered heavy casualties . The Marine slost 130 killed and 920 wounded, while reporting ene-my casualties of 1,617 killed and five captured . Ene-my equipment losses were significant : 1,223 individualweapons, 16 artillery pieces, 73 antiaircraft guns, 2 6mortars, 104 machine guns, 92 trucks, over 807,00 0rounds of ammunition, and more than 220,00 0pounds of rice .

The final score, however, reached far beyond mer estatistical results . The Marine strike into the Song D aKrong Valley disrupted the organizational apparatu sof Base Area 611, effectively blocking the enemy's abil-

THE RAID INTO LAOS

5 1

ity to strike out at civilian and military targets to theeast . Attempts to rebuild this base and reorder dis-rupted supply lines would be long and arduous . Inreporting to General Abrams on Dewey Canyon ,General Stilwell stated :

In my possible parochial estimate, this ranks with the mos tsignificant undertakings of the Vietnam conflict in the con-cept and results : striking the enemy unexpectedly in tim eand place, destroying a NVA base area and LOC center an dpre-empting a planned NVA spring offensive somewher ein ICTZ . . . . The enemy took a calculated risk in massinginstallations right at the border, misjudging our reach ; h elost . . . . Above all though, a Marine Regiment of extraor-dinary cohesion, skill in mountain warfare, and plain hear tmade Dewey Canyon a resounding success . As an indepen-dent regimental operation, projected 50KM airline fromnearest base and sustained in heavy combat seven weeks ,it may be unparalleled . Without question, the 9th Marines 'performance represents the very essence of professionals . 4 °

Laos: Repercussions

Knowledge of the Laos incursion, ordered kept un-der wraps by General Abrams, found its way into th epress during the first week of March, causing concer nin Saigon :

We have received word from III MAF that a number o fcorrespondents have considerable knowledge of that part ofDewey Canyon that has extended into Laos . Newsmen ap-parently picked up bits and pieces from troopers while sit-ting around talking and eating . Media involved are AP, UP ,NY Times, Newsweek, AFP, and the New Yorker . We havea rumor that some of the media have photos that they clai mwere taken in Laos ; however, we cannot confirm that an ynewsman or photographer actually entered Laos in theDewey Canyon area .4 1

Although the story was out, the official line was t osay nothing on the subject, diverting press attentio ninstead to the large amounts of enemy suppliescaptured .

On 8 March, however, Drummond Ayres, Jr ., of theNew York Times informed MACV that he was filin ga story on Marine operations in Laos . Attempts weremade to persuade Ayres to ignore the story, but it ap-peared in the Sunday edition of the Times the fol -

lowing day. While noting that Marines ha d"technically violated Laotian neutrality " guarantee dat Geneva in 1954, and again in 1962, the operation swere carried out " to protect the flanks of Marine ele-ments maneuvering nearby along South Vietnam'snorthwestern border." Concluding, Ayres reported that"Operation Dewey Canyon seems to indicate that al-lied commanders operating along borders may di pacross lines to secure their flanks"4 3

The subject was brought up again during the fina lnews conference of Defense Secretary Melvin R . Laird'sfact-finding mission to Vietnam . Asked if Americantroops had been operating in Laos during the lastweek, Mr. Laird said :

I would not confirm that they were there now but I woul dcertainly say that there have been operations in which it ha sbeen necessary in order to protect American fighting force sthat—that border being a very indefinite border—it ma yhave been transgressed by American forces in carrying ou tthis responsibility.43

The Secretary noted that the decision to permit oper-ations inside Laos had been reviewed at the highes tlevel and approved by General Abrams on the basi sof the "safety of our men ." He further explained that"Marines took up positions in Laos to protect thei rflank during a sweep of the area near the border."4 4

Secretary Laird's statements acknowledging th eAmerican incursion into Laos caused embarrassmen tin Vientiane . The Laotian Government immediatel ysought to counter the Secretary 's remarks by issuinga communique "clearly designed to confine the con-troversy to a discussion of a single incident rather tha nto the general implications for Laotian neutrality." Am -bassador William H. Sullivan subsequently apologize dto the Laotian Premier for the incident and assure dhim that the United States would avoid any furthe rextension of hostilities into Laotian territory.45 The con-troversy did not end . In 1970 and again in 1973, th eMarine incursion into Laos during Operation Dewe yCanyon came to the fore, both times in connectionwith Congressional hearings on Vietnam .46

CHAPTER 5

The Quang Tri Border AreasNo Change in Tactics—The DMZ Front—Brigade Mauls 27th—The 9th Battles the 36th

The Vietnam Salient—Apache Snow—Central DMZ Battles—Eastern Quang Tri and Thua Thie n

No Change in Tactics

Reviewing his tour as Commanding General, 3 dMarine Division, shortly before his reassignment ,Major General Raymond G. Davis noted, with pride ,that the forces under his command were "now in aposture where we totally control Quang Tri Province . ""However," he continued, "we cannot lower our guardor decrease our forces one iota so long as the enem yretains his total sanctuary in Laos and in and abov ethe DMZ ."' On 14 April 1969, General Davis was suc-ceeded by Major General William K. Jones, ahardened veteran of Tarawa, where he earned the Sil-ver Star ; of Saipan, where he was awarded the Nav yCross ; and of Korea where he commanded the 1st Ma-rines . Unlike Davis, Jones found .it unnecessary to re -orient the tactical disposition of the division . Hecompletely agreed with General Davis' concept ofoperations and "simply continued the various action sDavis had initiated ." 2

Neither Davis nor Jones lowered their guard, no rthat of the division. Even though the enemy had large-ly been forced to withdraw to nearby North Vietnamand Laos, General Davis and then General Jones con-tinued to maintain a strong, mobile posture charac-terized by essentially company-size operations . AsGeneral Davis described the tactic :

A company will be put into an area two or three kilome-ters on a side, they'll cut an L[anding] Z[one] for resuppl yand medevac, and they'll work day and night activities un-til they've thoroughly searched out this area . By thoroughl ysearching out I mean : on every trail, every hill knob, everydraw, every finger— total search-out of the area . Then they' dbe lifted to another place ?

Relying on this tactic, the division initiated severa loperations in March throughout the border areas ofQuang Tri Province with the aim of preempting ene-my efforts to infiltrate major formations and supplie sfrom cross-border sanctuaries or to use northern ICT Zredoubts and lines of communication to stage andmove those supplies forward . The March campaign inwestern and northwestern Quang Tri did not developheavy contact ; rather, the actions were characterized

by skirmishes with NVA screening forces and by th eseizure of numerous, and often extensive, munitionsand supply caches .

The DMZ Fron t

Combat action along the Demilitarized Zone, fro mthe Laotian border east to coastal Cua Viet, had re-mained intermittent during January and February.Enemy forces engaged by 3d Marine Division, Army,and ARVN units were, by and large, elements of thre eindependent NVA Regiments, the 27th, 138th, and246th, all tasked with screening the DMZ front . Onlyoccasionally encountered or employed in strength ,these units primarily undertook reconnaissance mis-sions, shellings, ambushes, probing and sapper attacks ,and assisted in the movement of arms and supplies tolocal force Viet Cong units and guerrillas . But by theend of February, forward elements of the three regi-ments had gained key terrain south of the DMZ, es-pecially in northwestern Quang Tri Province, wher ethe 246th NVA Regiment continued to push slowl ysouthward .

Under the operational control of Task Force Hote lat Vandegrift Combat Base, commanded by Brigadie rGeneral Garretson until relieved by Brigadier Genera lRobert B. Carney, Jr. at the end of March, the 4th Ma-rines was given the mission of destroying the 246thor driving the enemy regiment back into the sanctu-ary of the Demilitarized Zone . Once the enemy wasforced to withdraw, Colonel William F. Goggin's Ma-rines were to secure key terrain features on the DMZ' ssouthern edge, and then move into the southern por-tion of the zone . The codename assigned to the 4thMarines counterattack was Operation Purple Martin .

The first day of March found the three battalion sof Colonel Goggin's regiment patrolling along a broadfront, 5,000 to 10,000 meters south of the DMZ . The3d Battalion, under Lieutenant Colonel William A .Donald, continued to clear the northern portion o fthe area of operations, north of Fire Support Base Rus -sell ; Lieutenant Colonel Joseph E . Hopkins' 2d Bat-talion conducted search operations north of FireSupport Base Neville ; and the 1st Battalion, under

52

THE QUANG TRI BORDER AREAS

5 3

Lieutenant Colonel George T. Sargent, Jr., cleared thenortheastern portion of the area of operations, nearElliott Combat Base (Rockpile) . First Lieutenant JamesM. Herron's Company C initiated the first significantengagement with the 246th as it attempted to reoc-cupy LZ Mack, north of Elliott, in preparation for th eregiment's move deeper into the area .

The action began at 0430 when the company's nigh tdefensive position received four rounds of 60mm mor-tar fire, resulting in three casualties . Shortly after dawnthe following morning, Lieutenant Herron's companybegan its assault . Supported by over 3,000 rounds ofartillery fired by batteries of Lieutenant Colonel Eu-gene D. Foxworth, Jr.'s 3d Battalion, 12th Marines, twoplatoons first seized a small knoll north of the heavi-ly fortified landing zone and then swept toward thesummit . However, when the Marines reached the hill -top, three enemy mortars opened up, forcing the tw oplatoons to withdraw with heavy casualties . Durin gthe assault, Company L, 3d Battalion moved up t oserve as a reserve force, and overall conduct of the at -tack placed under the control of Lieutenant ColonelDonald, the 3d Battalion's commanding officer .

Hampered by dense fog and misting rain, and con-sequently a lack of air support, the two companies con-solidated their defensive positions and prepared fora second attack. During the next three days, the ene-my subjected Companies C and L to a continuous bar-rage of 60mm and 82mm mortars, sniper fire, an dground attacks, resulting in more than 15 Marin ecasualties . Shortly after midafternoon on the 5th, fol-lowing another extensive artillery preparation, Lieu -tenant Herron' s company again assaulted Mack . Onc emore two platoons were used, one to secure the smal lhill north of the landing zone in order to provid ecovering fire, and the other to move on the summit .The scheme of maneuver proved successful and theassaulting platoon reached the crest of the hill, wher esquad and fire teams fanned out, methodically clear-ing one enemy-infested bunker after another .

The enemy's determined defense of Mack charac-terized the type of engagement experienced by the 4t hMarines throughout the area of operations : elementsof the 246th were prepared to fight . Well-equippedand well-supplied, North Vietnamese troops gave u pterrain only when physically dislodged .

MajGen William K. Jones, left, assumes command of the 3d Marine Division from Maj-Gen Raymond G. Davis at Dong Ha on 14 April. Jones, like his predecessor, would con-tinue to place major emphasis on blocking enemy infiltration and capturing supplies .

Abel Papers, Marine Corps Historical Center

54

HIGH MOBILITY AND STANDDOWN

Department of Defense Photo (USMC) A19253 7

Infantrymen of the 4th Marines cross a jungle streamjust south of the Demilitarized Zone in search ofever-elusive North Vietnamese Army infiltrators .

Sweeping near LZ Catapult on the 9th, CompanyG, 2d Battalion, engaged yet another large and de-termined enemy unit in battle . The landing zone ,abandoned a year before, was significant as it was lo-cated 4,000 meters north of Fire Support Base Nevill eand dominated the extensive enemy trail network ofthe upper Cam Lo Valley. With intelligence informa-tion which confirmed not only North Vietnamese oc-cupation of the general area, but their intention t ohold the landing zone and surrounding terrain, Com-pany G was given the difficult mission of resecuringCatapult.

As Company G, under the command of Captai nJoseph M. Dwyer, moved slowly and cautiously fro mthe south along a ridge toward the landing zone, sup -

ported exclusively by artillery as air was unavailabl edue to weather, resistance became increasingly stub -born. Entrenched enemy troops employed snipers ,claymore mines, and ambushes to halt or delay th ecompany's progress . On 10 March, Dwyer's Marine sbroke through the enemy's outer defenses and engage da number of determined NVA troops in a running fire -fight which lasted throughout the day.

The next morning, as Dwyer's company continue dthe assault toward Catapult, the North Vietnames elaunched a counterattack . Employing small arms ,grenades, and RPG's, the enemy hit Company G o nthree sides . Fighting at close quarters, at times les sthan five meters, Dwyer's Marines suffered four kille dand 13 wounded, including three killed and fou rwounded as a result of a 105mm short round . The vio-lent fight, which lasted most of the day, finally brokethe enemy ' s attempt to hold the landing zone . Whenthe company completely secured Catapult on the 14th ,Dwye r' s Marines discovered 24 enemy bodies, all kille deither by artillery or small arms fire.

While Dwyer's Marines were heavily engaged o nCatapult, another sharp battle took place 12 kilome-ters to the east . On 13 March, Lieutenant Colone lDonald 's battalion continued its push along th elengthy ridgeline from LZ Mack toward LZ Sierra .Abandoned two months earlier, Sierra was now in NVAhands, and had been used by the enemy as a morta rsite in an effort to blunt the Marine assault on L ZMack, 2,000 meters to the southeast . A dense fog ham-pered direct air support, forcing the battalion to relysolely on artillery and a small number of radar -controlled bomb drops . The terrain proved rugged .Punctuated by deep draws and steep hills, the ridge -line offered few avenues of approach, and as a result ,every meter presented a threat of mines.

Lieutenant Colonel Donald assigned Company M ,under the command of First Lieutenant Edwin C . Kel-ley, Jr ., the task of resecuring Sierra, and First Lieu -tenant John P . Kiley's Company I the taking of a hil lnorth of Sierra, commonly known as Sierra North .Companies K and L would be held in reserve . As Kel-ley's Marines began their advance, it soon became ap-parent that the landing zone was defended by adetermined NVA platoon, located in well-constructedbunkers, capable of withstanding a direct hit by a105mm artillery round . Supported by heavy coverin gfire emanating south of the landing zone, two of Kel-ley's platoons assaulted from the east through a hai lof intense enemy small arms and mortar fire . Oncethe advance was underway, Kelley's squads and fire

THE QUANG TRI BORDER AREAS

5 5

teams maneuvered from bunker to bunker, destroy-ing the stubbornly entrenched enemy troops . Com-pany M secured Sierra by late afternoon at a cost o f10 Marines killed and 35 wounded ; 23 enemy troop slay dead in the smoldering ruins .

The following morning, Kiley ' s Marines advance don Sierra North in a well-executed envelopment fro mthe south . "Two hundred meters from the objective,"Lieutenant Kiley recalled, "NVA were spotted on th ehill, and there proved to be 11 in number. We wer emoving in a column ; 2d Platoon had the point, fol-lowed by the CP group, then 1st Platoon, and then3d Platoon . . . . I set up the company CP with oneplatoon as security, moved 2d Platoon up the hill fol-lowed by 1st"4 As Marines of the 2d Platoon emerge dfrom the heavily wooded area surrounding the crestof the hill, they laid down a heavy base of fire in ord-er to permit the 1st Platoon to attack through . Theenemy, apparently expecting an attack from the north ,as 10-inch claymores were found facing only in thatdirection, were surprised inside their bunkers . 5

While Company I was engaged on Sierra North, ele -ments of the 246th attacked Captain Kelley 's compa-ny position, initiating the action by downing a CH-4 6medical evacuation helicopter with an RPG round .Kelley's Marines beat back the assault, and again, tube sof the 3d Battalion, 12th Marines accounted for al lthe supporting fires. "After their counterattack failed,"reported the battalion executive officer, Major Ray-mond D. Walters, "what forces they had withdrew andwe didn't see any more of them in that area . So it be -came apparent that we had cleaned them out ther eand we decided to go on with our primary missio nwhich was to establish our patrol bases in the DM Z. . . . Shortly after we commenced our DMZ patrols ,we got an additional mission of constructing landin gzones along the DMZ" e

On 20 March, the long-anticipated assault on aban-doned Fire Support Base Argonne, to secure the regi-ment's western flank, began . The base, located on Hil l1308, two kilometers east of the border, offered ob-servation into Laos and onto portions of the enemy' sinfamous Ho Chi Minh Trail . Planned for almost amonth, the assault had been postponed due t oweather and lack of helicopter support, then heavil ycommitted to the 9th Marines in the Da Krong Val -ley. By the 19th, the weather cleared and aircraft be -came available . At 2230, Colonel Goggin decided t oconduct the assault the following day.

The proposed scheme of maneuver called for a three

company advance, with one company landing on Ar-gonne and two companies moving into the valley tothe north . A reconnaissance team would be inserte dprior to the assault and would guide the troop-lade nhelicopters into the landing zone . Goggin gave Lieute -nant Colonel Sargen t 's 1st Battalion the task of secur -ing Argonne, and in anticipation Sargent had movedhis companies to FSB Alpine (Lang Hoan Tap), 1 6kilometers to the south-southeast . With the Marine sof the 1st Battalion came tons of supplies for the sup -port of the Argonne assault and planned operation snearby. The establishment of a mini-logistical suppl yarea on Alpine would prove an asset in the comin gdays by lessening the distance required for helicopte rresupply lifts during periods of poor weather .

At 0930 on the 20th, after an extensive artillery an dair preparation, team "Frostburg" from the 3d Recon-naissance Battalion moved toward the upper landin gzone on Argonne by air. As the helicopter carryingthe team approached the zone, an explosion rockedthe area and a volley of small arms fire ripped throug hthe aircraft cockpit, killing the pilot and woundin gthe copilot . Despite his wounds, the copilot brough tthe helicopter in and the team jumped out, immedi-ately forming a hasty 360 degree perimeter around thedowned aircraft. Within minutes of the crash, theNVA struck . After repelling the enemy's initial charge,the team leader surveyed the situation, and request-ed an immediate extraction . Following the team'sdeparture, the first transport helicopter attempted t oland with Lieutenant Colonel Sargent and elementsof Company D on board . The downed UH-l E("Huey") used by the team prevented the CH-46 Dtransport from entering the upper zone ; consequent-ly, Sargent shifted the main assault to the lower zone.

The assault troops of Captain Joe B. Green's Com-pany D received only sporadic sniper fire upon land-ing in the lower zone, but as the lead element sadvanced toward the upper zone, enemy small arm sand automatic weapons fire emanating from a mutu-ally supporting bunker system intensified . Like the ac-tions on Mack, Sierra, and Catapult, the Marine thrus ton Argonne consisted of destroying the enemy by em-ploying small fire teams methodically to clear eac hbunker. The company directed a heavy base of smal larms fire toward bunker entrances, as one or two Ma -rines crawled to within grenade range, and then as-saulted the enemy fortifications . The battle to resecureArgonne continued until dark. Green's companysuffered six killed and 11 wounded in the daylong ad-

56

HIGH MOBILITY AND STANDOWN

vance, while accounting for 15 NVA dead . Due to th eheavy fighting on Argonne, Lieutenant Colonel Sar-gent cancelled the helilift of the remaining two com-panies into the valley north of the landing zone .

At 0815 the following morning, an enemy morta rbarrage of twelve 82mm rounds fell on the battalion' scommand post on Argonne, killing Lieutenan tColonel Sargent ; Second Lieutenant Carl R . Wilson ,Jr., the battalion S-2 ; two enlisted Marines and wound-ing 12 others . Later, as a medical evacuation helicop-ter extracted the casualties of the first attack, 10 mor erounds hit the landing zone, resulting in an additiona lthree killed and 11 wounded . The same day, Compa-nies A and C lifted into an area south of the landingzone and began a sweep to the north . But with Ar-gonne under mortar siege, Colonel Goggin modifie dthe mission of the two companies, ordering Compa-ny A, under Captain Henry W. "Buzz" Buse III, so nof Commanding General, Fleet Marine Force, Pacif-ic, Lieutenant General Henry W. Buse, Jr., to movewest, toward the Laotian border, in search of the sus-pected enemy mortar sites, and Company C to Ar-gonne's relief. On 23 March, while the remainder o fthe battalion conducted search operations near Ar-gonne in an effort to locate additional enemy harbo rand mortar sites, Company B swept six kilometer stoward the high ground to the northeast, where it es -

tablished Fire Support Base Greene, opening th enorthern portion of the area of operation .

With the regiment firmly established within thearea of operations and initial objectives achieved, Lieu -tenant Colonel Donald ' s 3d Battalion began recon-naissance operations within the Demilitarized Zon eon 25 March. Companies I and K, deployed on hilltop ssouth of the DMZ, overlooking major trail networks ,were assigned the task . The size of reconnaissancepatrols introduced within the zone were to be limited ,according to the rules of engagement, to no more thana reinforced squad . Therefore, a typical 3d Battalionpatrol included a squad of 14 Marines reinforced bya forward air controller, forward observer, platoon lead -er, corpsman, and a machine gun team? Should apatrol become involved in a heavy engagement, a"Sparrow Hawk" reaction force would be deployed t oaid in the squad's extraction, and only its extraction .

According to Major Walters, "contact within theDMZ was light . We did find a considerable amountof ammunition, bunkers, complexes, and we blewthem as we went . But they weren't there to defendthose positions and we never really got into a goo dfight in the DMZ at all . A couple of times we hadto call in a Sparrow [reaction force] and extract th esquads, but never did we get into any serious troublein the DMZ."8 Lieutenant Colonel Donald 's battal-

During a lull in fighting, LCdr Frederick E . Whitaker, chaplain for the 3d Battalion, 4thMarines conducts services for Company M on a ridgeline north of Elliott Combat Base .

Department of Defense Photo (USMC) A192846

THE QUANG TRI BORDER AREAS

5 7

Abel Papers, Marine Corps Historical Center

Members of Company D, 1st Battalion, 4th Marines load another 81mm mortar round a sthe team prepares to fire on an enemy mortar threatening the battalion near Argonne .

ion maintained patrols within the DMZ, as well as inthe vicinity of Landing Zones Sierra and Mack, bothdesigned to halt enemy infiltration, until the end o fthe operation .

Near Argonne, Captain Buse 's company continue dto sweep northwest toward the high ground, Hill 1154 ,just east of the Laotian border . After a brief fireligh ton the 25th, Buse's Marines pushed through a bunke rsystem, suffering only two wounded, but an artilleryshort round inflicted an additional three killed an d15 wounded . With mortar fire again directed agains tArgonne, Buse was ordered by Lieutenant Colone lClair E. Willcox, who had taken command of the 1s tBattalion following the death of Lieutenant ColonelSargent, to take Hill 1154 and silence the enemy tubes .On 28 March, after fighting off an NVA platoon, th eMarines of Company A pushed through yet anotherbunker complex and captured the hill . With Hill 115 4in Marine hands, enemy activity around and harass-ment of the regiment's western-most fire support bas erapidly decreased .

First Battalion Marines continued search operations

in the vicinity of Argonne until 3 April when the com-mand group and the remainder of Company B movedby helicopter to Fire Support Base Greene . Compan yA Marines searched west and then northeast of Ar-gonne, moving to Greene on the 7th . Companies Cand D swept north from Argonne, conducting opera-tions along the DMZ northeast of LZ Bell . The twocompanies maintained search operations in the area forthe remainder of Purple Martin . After more than twoweeks of fighting around Argonne, Willcox's battalio naccomplished its mission ; enemy infiltration routeswere disrupted, and forces guarding the Ho Chi MinhTrail pushed back into Laos with considerabl ecasualties .

Throughout April and into the first week of May ,the number of 4th Marines engagements with screen-ing elements of the 246th NVA Regiment remainedrelatively constant . Enemy troops encountered, like th emonth before, were well-equipped, well-supplied, andprepared to defend key terrain . On 10 April, whilesearching a section of the upper Song Cam Lo Valley ,two kilometers south of the DMZ, Marines of Corn-

58

HIGH MOBILITY AND STANDDOWN

--• Leng Cqp

Dxs M'c Bdi

Movements and Objectivesof the 3d and 4th Marines ,

March-July 1969kilometers? s

t o

__P F 4

"—A

. may . , . ,;

. . D Con Thien ,

icbBP°

B Kb h 2 _~

7

J

' G

DOND a ~a_ r a z q' ~nr4FF We- ..

_1

Phu Th~o _

D Comet

TF

h li'~ _ " DMZ `

'~ --• •- ~~L

[y

A%BOOLURAL I

° r~FZgp Alpha-4~~W

rr~

D

Rhun An

phTU°aD n ,

e

Sierra North °de-_f

ronsi•de ,

~

PFu

+

Te Pwge "~

N VA~un~or "P ? i•

}

rc San ;

=la

Ae

ChampM•! :S arrow t

\,, I — 3F

~ .s

p

Charlie 2~ feavery r x .. • .

O3 A•. BiIA tSierra\

Than

EirGreene

+Catapult

1

111apk r

'VN ~

ThOnBe?h°n9

bs

r .~ ..<

'

Russell

' Fullerman. :: .;o Via=c.,; LAPeteNeville

{^°(• Hill 37,

<'9n ~ .

]Guy r

L ...? .nPi

x,

f^ ~5~

K rie Gio Bridg e4Dy/

e~ 31

.'.wiFmrdl i. . 4

,?:nSan'

zso

Elliott Combat Base -

-

D aaa,,, Thong-- ~,Th

I

D'n VeC' ..~

NBhie

'• iFYn

° B

T

Vandegrift Combat Bas eUfa-1

`

pany E, 2d Battalion received fire from a well -camouflaged enemy cave complex . Advancing slowl ytoward the complex, set in towering cliffs borderin gthe river, Captain Albert H . Hill's company capturedtwo wounded enemy soldiers, one of whom proved t obe the commander of the 1st Company, 1st Battal-ion, 246th Regiment. Both were extracted immedi-ately and were of considerable intelligence value .

Captain Hill, in order to clear the cave complex,combined both psychological techniques and accept-ed tactics designed for assaulting a fortified position.A psychological operations team, under the battalion' sintelligence officer, was brought in as was a flame sec -tion . Using a loudspeaker, the team, in the face of ene -my hurled obscenities, endeavored to coax the NorthVietnamese troops into surrendering. Three enemysoldiers yielded to the team's entreaties, but the re-mainder refused, and the company, preceded byflamethrowers, assaulted the complex. After clearingthe caves, Hill's Marines began a thorough search ofthe labyrinth, which yielded a substantial cache of in-dividual weapons and ammunition .

By 25 April, having accomplished their goal ofpushing the NVA back into the Demilitarized Zone ,Hill's company and the remainder of the 2d Battal-ion, were ordered south, beyond the range of enem y82mm mortars emplaced within the DMZ . ColonelGoggin directed the 1st and 3d Battalions to do like -

B Khe Gibs

.

~3o I

14-

- .'Then Thonh Tr8 c

BA LONG .-<t

~~;J ''

See Reference Map, Sections 1, 2, 3

wise, but still maintain their reconnaissance effortswithin the zone . These positions were being held o n8 May when Operation Purple Martin came to an end .

"Our objectives," noted Major George X . McKen-na, the regimental S-3, "were to search and destroythroughout our AO, to push the enemy back, clea rhim away from our fire support bases, and push himas far north as possible, up to the southern limits ofthe DMZ . This was accomplished by late April, whenall of our units were within 500 meters of the DMZ ,strung over 35 to 40,000 meters on an east-west axis"8The battle had been hard fought . Before it yieldedto the 4th Marines and withdrew into the Demilita-rized Zone and westward into Laos, the 246th NVARegiment suffered over 347 casualties, three times thatof Colonel Goggin's regiment .

Brigade Mauls 27th

With the 4th Marines heavily engaged against th e246th to the northwest, elements of the 1st Brigade ,5th Infantry Division (Mechanized) began areconnaissance-in-force operation in the Khe Chu aValley, north of Dong Ha Mountain (FSB Fuller), be-tween Charlie-3 and the Elliott Combat Base. Unit sof the brigade, up to mid-March, had concentrate don weeding out enemy troops in areas south of Land-ing Zone Sharon, and along the coastal lowlands fro mCua Viet to Wunder Beach . But as elements of the

THE QUANG TRI BORDER AREAS

5 9

27th NVA Regiment moved south from the DMZ, wes tof Cam Lo, with the aim of cutting Route 9, Davi sdirected units of the brigade to advance westward t ocounter the enemy threat .

Codenamed Montana Mauler, the counter -infiltration operation called for two tank troops of th e3d Squadron, 5th Armored Cavalry, reinforced withinfantry, to enter the Khe Chua Valley and attemp t

to engage the 27th Regiment. Once the cavalry troop sencountered enemy units, the 1st Battalion, 11th In-fantry would be brought in to reinforce .

Troops A and B, 3d Squadron, 5th Armored Caval-ry, each with a platoon of infantry from Company D ,1st Battalion, 11th Infantry, swept into the valley fro m

the east on 23 March . The two cavalry troops observe dsmall groups of enemy to the north, and raked themwith tank and artillery from fire support bases withi n

range. The troops made few additional sightings asthey worked westward along separate axes, finally link-ing up in mid-valley early in the afternoon .

At 1000 the following morning, lead elements o fthe cavalry troops encountered an unknown numbe rof NVA soldiers entrenched in bunkers, north of th e

valley. After an exchange of small arms, automati cweapons, RPG, and tank fire, the brigade units pulle dback in order to employ artillery against the enem yforce, now estimated to be a battalion in strength . Arequest was made to Task Force Hotel for reinforce-ments, which in turn ordered Company I, 3d Battal-ion, 9th Marines, under Captain Joseph U. Arroyo,immediately airlifted into a makeshift landing zone

south of the engaged Army troops . The brigade als oalerted two companies of the 1st Battalion, 11th In-fantry to prepare for an assault, on order, into an areanorth of the valley.

The enemy proved surprisingly elusive as Marin eand Army units advanced slowly westward along th esouthern portion of the valley the following day. Thetwo companies of the 1st Battalion, 11th Infantry con -ducted their planned air assault north of the valley,completing the movement by mid-afternoon . Due tothe lack of significant engagements throughout theday, the brigade directed the 1st Battalion, with Ar-royo's Marines attached, to sweep northward on the26th in order to regain contact with the enemy bat-talion, suspected to have withdrawn further north .

At 0330, 26 March, before the sweep could be in-itiated, the enemy struck at the night defensive posi-tions of the 1st Battalion, 11th Infantry with smal larms, automatic weapons, mortar, and RPG fire, fro mthe north, west, and east, inflicting few casualties . At

daybreak, the battalion observed enemy movement to

the north . As Army infantry elements probed in thatdirection, contact was reestablished and air strikes andartillery employed periodically throughout the day o nthe suspected enemy positions without much success .Experiencing difficulty not only with entrenched ene-my troops, but also with the oppressive heat, as tem-peratures approached 105 degrees, the two companie sreturned to their positions of the previous night and

prepared to resume the attack on the 27th. Meanwhile,Arroyo's Marines advanced northwest without incident ,while the two armored cavalry troops searched the are a

near their previous day's position, finding document sand weapons indicating the presence of the 1st Bat-

talion, 27th NVA Regiment.The 1st Battalion, 11th Infantry resumed its north -

ward advance on the 27th, with Company B assigne dto secure the high ground on the right flank, support-ed by Company A . Arroyo's Marines received the taskof seizing the high ground on the battalion's left .Shortly after beginning their sweep, Companies A andB fell in with elements of the 27th, occupying bunkers

to the companies ' northeast. Air strikes were called, fol -

lowed by artillery fire on terrain ahead of the line o f

march . Midday found the two Army infantry compa-nies just short of their objective . Meanwhile, CompanyC helilifted into blocking positions near Hill 208, th e

enemy's main position . As Company B moved fowar dtoward the high ground, its objective, the enemy agai n

struck with mortar fire and a ground counter-assaul tfrom the north. Again, the Army commander calle dair strikes and artillery to support the fires of Compa-ny B, which repulsed the enemy assault after an hour.

Shortly thereafter, Company A too came under attack .And again tactical air struck the disruptive blow . Ar-royo's Marines took their objective on the left withou t

incident . The day's heavy fighting accounted for 120enemy soldiers killed, while friendly losses numbere d

13 . Company B lost all of its officers except for a for -

ward observer, who took command of the companyduring the latter stages of the day's fighting .

The three companies of the 1st Battalion, 11th In-fantry, supplemented by Company I, 9th Marines, re-sumed search operations on the 28th, encounterin g

few enemy troops . As added reinforcement, the re-maining elements of Company D, 1st Battalion, 11t hInfantry helilifted into the area from FSB Sharon. Alsoduring the day, elements of the 3d Squadron, 5th Ar-mored Cavalry moved into the eastern portion of th eKhe Chua Valley in support of Company C on th eright flank, which occupied Hill 208 .

60

HIGH MOBILITY AND STANDDOWN

The following day turned out to be one of heav yfighting with considerable losses inflicted on the ene-my. While attempting to secure a position in supportof the planned helicopter assault by Arroyo's Marines ,troops of Company D engaged an NVA force occupy-ing a bunker complex on the right flank . Employingsmall arms, riot control agents (CS gas), and air strikes ,the company accounted for five NVA killed . Movingnorth along a ridge, west of Company D, CompanyA also came under heavy attack, estimated at an NVAcompany. Attacking from the north, the enemy usedsmall arms and RPG fire in an attempt to outflan kand isolate the company's northernmost platoon . Ex-pertly directed small arms and helicopter gunship fire,followed by massive air strikes, met the advance . A selements of Company B reinforced Company A, allunits then came under mortar attacks from the north -west . In heavy fighting, Army and Marine defender sfinally broke the enemy's daylong ground and mor-tar assault, counting more than 30 NVA dead .

During the next four days, the 1st Battalion, 11thInfantry conducted extensive search and clear opera-tions over the battleground, moving in an east -southeast direction, looking for bypassed enemy po -

sitions and personnel . The 1st Battalion, 2d ARVNRegiment, helilifted into the area of operations on th e29th, initially searched along the southern boundary ofthe DMZ west of Con Thien, and then joined the 11t hInfantry in a sweep of the northern half of the battl earea . The combined Army, Marine, and ARVN forc eencountered few enemy troops, and consequently, th eoperation was terminated on 3 April . Elements of th e27th NUA Regiment lost close to 300 troops as a resul tof the short allied strike into the Khe Chua Valley .

With the end of Montana Mauler, Arroyo' s Marine sreturned to the 9th Marines while the 1st Battalion ,11th Infantry split . Company A returned to the coasta llowlands, while Companies B and C, joined by Troo pA, 4th Squadron, 12th Cavalry ; and Battery B, 1st Bat -talion, 40th Artillery ; formed Task Force 1/11 andmoved south . At Ca Lu, east of Vandegrift Comba tBase, the task force was joined by Task Force 3/5, com -posed of Troops A and B, 3d Squadron, 5th Cavalry ;elements of Company D, 1st Battalion, 11th Infantry ;and Battery B, 5th Battalion, 4th Artillery, in a swee pof the Ba Long Valley. Beginning at the western endof the valley, the two task forces swept eastward alongthe Song Quang Tri, clearing Route 556, in a five-da y

Crouched in elephant grass, a Marine witnesses the results of a close air support missio nflown by an F-4 Phantom. From bases at Da Nang and Chu Lai, Marine Phantoms provid-ed air support for allied ground units operating throughout the I Corps Tactical Zone .

Marine Corps Historical Collection

THE QUANG TRI BORDER AREAS

6 1

Marine Corps Historical Collectio n

A veteran of the Combined Action Program, Col Ed-ward F. Danowitz assumed command of the 9th Ma-rines from Col Robert H. Barrow on 9 April 1969.

operation, codenamed Ellis Ravine. The operation ter-minated on 13 April with disappointing results : oneViet Cong killed and his weapon captured .

The 9th Battles the 36th

The central portion of the Demilitarized Zone re-mained the main arena in which heavy fighting tookplace during April, as Marine and ARVN units fough ta series of heated engagements with enemy forces con-centrated in the region between Con Thien and Mut-ter's Ridge, 14 kilometers to the southwest . Elements ofthe 36th NVA Regiment apparently began infiltratin ginto the central DMZ region of Quang Tri Province i n

early April as replacement for the 27th NVA Regiment,which had sustained severe losses during Operatio nMontana Mauler. Although provided guides and liai-son personnel from the departing 27th, infiltratingunits of the 36th clearly were unfamiliar with the ter -rain and the maneuver capabilities and disposition o fallied troops in the area, a factor which ultimately wasto cost the regiment the equivalent of one battalion .

With the end of Operation Dewey Canyon, TaskForce Hotel gave the 9th Marines the mission of secur-ing a number of allied installations within the 3d Di -vision's area of operation, replacing units of the 3d

and 4th Marines, heavily engaged in western Quan g

Tri Province. Although still headquartered at Van-degrift Combat Base, but now under the command

of Colonel Edward F. Danowitz, who replaced Colone lBarrow on 9 April, companies of the regiment werescattered from Oceanview on the coast to Fire Sup -port Base Alpine, north of Lang Vei .

The first of a series of separate contacts with the 36th

Regiment took place about seven kilometers northwes tof Cam Lo on 9 April, when, at 1030, a 1st Battalion ,9th Marines patrol, moving toward a predetermine dhelicopter extraction point, encountered an enem y

unit estimated at 30 to 40 troops . Engaging the ene-my in a day-long running firefight, the patrol kille d19 NVA, before being successfully extracted during th elate evening . Two days later, on the 11th, a secondpatrol from Lieutenant Colonel Thomas J . Culkin' sbattalion detected 20 enemy soldiers, five kilometersnorthwest of the 9 April contact .* Artillery fire andfixed-wing air strikes claimed 16 NVA ; no Marin e

casualties resulted from either action .

Minor skirmishes between the 9th Marines and for -

ward elements of the 36th continued across the cen-tral DMZ front until the 21st . At 1440, a reinforcedNVA company, armed with automatic weapons, RPGs,satchel charges, and supported by mortars, struck a tCompany G, 2d Battalion, 9th Marines, under Firs tLieutenant James M . Horn, eight kilometers north -east of Elliott Combat Base . Horn's company, scattere din three separate, mutually supporting night defen-sive postions, contained the enemy 's initial thrust, thencounterattacked behind supporting air and artiller y

fires, forcing the enemy to flee northward . Results ofthe night-long battle were 42 NVA killed, 3 take nprisoner, and 27 weapons captured ; Company G losteight killed and 23 wounded .

On 23 April, Captain Donald K. Shockey, Jr :s Com -pany E, 2d Battalion, 9th Marines encountered an ene-my force in the open moving south, midway betwee nCam Lo and Elliott, three kilometers north of Route9 . Engaging the force with small arms and artiller yfire, Shockey' s Marines pursued the enemy unit, fi-nally driving it into caves . Launching an assault agains tthe heavily fortified position just before noon, Shock-ey's company seized the site after two hours of fierc ecombat, killing 14 NVA troops and capturing a n82mm mortar, while losing eight killed and 17 wound -

*Lieutenant Colonel Culkin relieved Lieutenant Colonel GeorgeW. Smith as commanding officer of the 1st Battalion, 9th Marine son 31 March .

62

HIGH MOBILITY AND STANDDOW N

ed. As the month closed, the 9th Marines bega npreparing to be relieved by elements of the 3d an d4th Marines .

One day earlier, on the 22d, two battalions of th e2d ARVN Regiment joined the 9th Marines in clear-ing the front ; the 4th Battalion, brought in by Ma-rine helicopters, landed 13 kilometers northwest ofCam Lo and began a sweep to the east, while the 5t hBattalion, supported by Marine tanks of Company B ,3d Tank Battalion, attacked from the east . Thismaneuver, calculated to trap elements of the 36thRegiment between the two battalions, achieved its firstsolid contact on the 27th, when an unknown-size ene-my force mounted a night attack against the 4th Bat-talion, deployed on Hill 208, site of heavy actio nduring Operation Montana Mauler . The ARVN bat-talion held its position, killing 27 enemy troops andcapturing 17 weapons .

Five days of heavy combat followed, the brunt o fwhich was borne by the 2d ARVN Regiment . Employ-

ing the combined firepower of air, artillery, and tank sof Company B and then Company A, the two Viet-namese battalions pressed the attack, killing nearly 25 0enemy troops by 2 May. Action thereafter was limite dlargely to mopping up isolated pockets of resistance .

While there was evidence of increased North Viet-namese Army presence in crossborder areas of theDemilitarized Zone, and attempts to infiltrate troopsinto the central region of Quang Tri Province durin gMarch and April, the enemy launched no massive ef-fort to contest the region . He instead withdrew hisforces into DMZ sanctuaries when pressed by the 4t hMarines and the combined efforts of the 2d ARVNRegiment, 9th Marines, and the Army's 1st Brigade ,5th Infantry Division .

The Vietnam Salien t

During the 1968 siege of Khe Sanh, the North Viet-namese employed armored elements against the Spe-cial Forces camp at Lang Vei, 13 kilometers north o f

Col Paul D. Lafond, Commanding Officer, 3d Marines briefs, from left, MajGen Car lA . Youngdale, Deputy Commanding General, III MAF ; LtGen Henry W. Buse, Jr., Com-manding General, FMFPac; MajGen Raymond G. Davis; and BGen Frank E . Garretson ,Commanding General, Task Force Hotel, on search operations in the Vietnam Salient .

Abel Papers, Marine Corps Historical Center

THE QUANG TRI BORDER AREAS

6 3

Abel Papers, Marine Corps Historical Cente r

LtCol James J. McMonagle's 2d Battalion, 3d Marines, in search of North Vietnames esoldiers, patrols an enemy infiltration route littered with vehicle wreckage near Laos .

Route 926, which enters that portion of Quang TriProvince protruding southeast into Laos, commonl ytermed the "Vietnam Salient ." Intelligence gained dur-ing early March 1969 from reconnaissance team report sand sensors indicated a sizable increase in truck an dtracked vehicle activity in the area, adding credence t othe possibility that again enemy support and mecha-nized units had entered South Vietnam . The enemy' s"logistics nose" needed to be blunted once more .

North Vietnamese use of Route 616, an extensio nof Route 926 from Laos, for the movement and stag-ing of supplies and infiltrating troops, was to be ex-pected . With 9th Marines' Operation Dewey Canyo nin Base Area 611 and 101st Airborne Division's Oper-ation Massachusetts Striker in the A Shau Valley clog-ging the enemy's primary lines of communication t othe south, he was obliged to seek an alternate route .Moreover, the area' s rugged terrain and position, sur-rounded on three sides by Laos, offered a majoradvantage—security.

Terrain within the salient, while providing Nort hVietnamese Army support and logistical units with amargin of security, posed no major obstacle to Ma-rines . The western area, bordering the Song Xe Po nand Laos, generally consisted of a large `U' shaped val-ley, surrounded by high ground with a jungle-covere dhill mass at the center. Terrain in the eastern and

northern portions of the salient, roughly south o fRoute 9, consisted of rugged mountains, punctuatedby valleys covered with elephant grass and scru bgrowth . As in Operation Dewey Canyon, Marine swould use the now-standard mobile concept of oper-ations ; establishing fire support bases on the hig hground and then moving out under an artillery um-brella in company search operations .

Elements of the 3d Marine Division had penetrat-ed the salient twice before. In June of 1968, a multi -regiment campaign virtually destroyed two regiment sof the 308th NVA Division . Three months later, areconnaissance-in-force conducted by the 9th Marinesencountered no significant enemy force . Task Forc eHotel assigned the mission of confirming the enemy' spresence and again clearing the salient to Colonel PaulD. Lafond's 3d Marines, recently returned to QuangTri Province after participating with units of the 1s tMarine Division in Operation Taylor Common, south -west of Da Nang .

The scheme of maneuver for the 3d Marines' thrustinto the Vietnam Salient, codenamed Maine Crag ,called for the 1st and 2d Battalions to conduct helicop-ter assaults from FSB Snapper, four kilometerssoutheast of Lang Vei, to seize and establish fire sup -port bases in the southern portion of the salient, an dthen fan out in company-size search and clear opera-

64

HIGH MOBILITY AND STANDDOWN

tions, blocking the western terminus of Route 616 a tthe Laotian border . Concurrently, a U.S . Army taskforce, under the operational control of the 3d Marines ,would attack westward from the Vandegrift-Ca Lucomplex along Route 9 to Lang Vei, thence southward ,linking up with the Marines . Subsequently, the 3d Ma-rines in coordination with elements of the 2d ARVNRegiment, would attack eastward along Route 616 i na deliberate search to locate and destroy enemy forces ,fortifications, and supply caches . Although as initial-ly planned, the operation was to begin with a two -battalion helicopter advance into the salient, ba dweather made it necessary to launch a single battal-ion by foot from Route 91 0

On 10 March, in preparation, Lieutenant ColonelJames J. McMonagle's 2d Battalion, 3d Marineshelilifted into LZ Hawk, just south of Route 9, an dbegan overland movement to FSB Snapper, seve nkilometers to the southwest, by way of the Khe SanhPlateau. Supported by 155mm howitzers of the 1s tProvisional Howitzer Battery on FSB Cates, the bat-talion reached Snapper after a night's forced march ."It was a moonless night," remembered LieutenantColonel McMonagle, "there were quite a bit of streamsthat we had to cross, a heck of a lot of elephant gras swhich impeded movement, and the matter of main-taining direction by Foxtrot Company, who had thepoint on this, was a real task and it was really amaz-ing how they were able to find this place goingthrough elephant grass at that time of the evening ,but they did ."" The following morning, the battal-ion initiated search operations in the vicinity of th efire support base .

Operation Maine Crag officially began on the 15th ,as Battery A, 1st Battalion, 12th Marines lifted intoSnapper, and three companies of Lieutenant Colone lMcMonagle's battalion pushed overland toward Rout e616, reaching FSB Saigon, overlooking the road, th efollowing day. On the 17th, Companies G and H con-tinued southwest to Route 616, leaving Company Fas security for Battery C, 1st Battalion, 12th Marines ,which had moved from Vandegrift to Saigon .

As elements of McMonagle's battalion probed th esalient they encountered few enemy troops ; those the ydid encounter consisted primarily of solitary snipersand ambushers, who quickly disappeared into th eheavy jungle growth when engaged by the battalion' spoint. But on the 18th, these solitary engagement sproduced tangible results . While in ambush position salong Route 616, Marines of Company G observed two

east-bound enemy trucks approach their position . Al-lowing the first truck, which was empty, to pass, th eambush opened fire on the second, destroying it an dits cargo of 122mm rocket and mortar ammunition .The Marines then attacked the security element of th elead truck, which had halted a short distance dow nthe road . The following morning, the enemy sen tseven soldiers to check out the ambush site, and Com-pany G ambushed them also. 1 2

On the 19th, Colonel Lafond ' s 3d Marines assume doperational control of Task Force Remagen, under thecommand of Army Lieutenant Colonel Carmelo P .Milia, which consisted of Company B, 1st Battalion ,61st Mechanized Infantry ; Company C, 1st Battalion ,77th Armor ; Battery C, 1st Battalion, 40th Artiller y(105mm self-propelled) ; two M42 self-propelled"Dusters" (dual-mounted 40mm cannons) from 1s tBattalion, 44th Artillery (AWSP) ; 4 .2mm mortars (self-propelled) from 1st Battalion, 77th Armor ; and Armyand Marine bulldozers, organized into three teams .The task force, which had advanced along Route 9from Ca Lu to the Khe Sanh Plateau, was to turn southand establish blocking positions at the western endof Route 616 in the vicinity of the Song Xe Pon andinitiate search operations, effectively screening the 3dMarines, operating to the east .

Three companies of Lieutenant Colonel John S .Kyle ' s 1st Battalion helilifted into FSB Saigon on th e19th, and then moved to the southwest, supported b ytwo Ontos disguised as bulldozers, toward the Laoti-an border .* Concurrently, Companies G, H, and late rE, continued moving eastward along Route 616 ,searching the draws and ridgelines and encounterin ga number of squad-size enemy groups in protectivebunker complexes . The ensuing firefights were usuallyof short duration and involved few casualties . On 20March, however, a water patrol from Company H wa sambushed as it approached a stream approximatel y1,000 meters north of the road, resulting in three Ma-rines killed and 15 wounded .

Patrolling near the Phou Nhoi Hill mass, the are aof the previous day's ambush, First Lieutenant Wil-liam C . Helton's Company H on the 21st discovere dwhat appeared to be an extensive staging area for ap-proximately 150 enemy troops and a storage site con-taining rice and other foodstuffs . Between shor tfirefights with security forces, the Marines of Compa-ny H eventually found a rice cache totaling over 35 0

*The Ontos was a lightly armored, tracked antitank vehicle arme dwith six coaxially-mounted 106mm recoilless rifles .

THE QUANG TRI BORDER AREAS

65

66

HIGH MOBILITY AND STANDDOW N

Abel Papers, Marine Corps His orical Center

A camouflaged Russian truck used by the North Viet-namese to transport supplies from Laotian supportbases into South Vietnam that was uncovered by the3d Marines during operations in the Vietnam Salient .

tons . The significant feature of the rice find was thatit was of high quality and contained in bags withChinese markings—evidence that rice denial opera-tions in the coastal lowlands were having the desire deffect on NVA efforts to live off the land . In the samegeneral search area, Lieutenant Helton's Marines foun dsizeable amounts of small arms, mortar, and RPG am -munition, and 7,000 pounds of salt, loaded in aFrench truck with Russian tires and American mark-ings . The captured rice was subsequently extractedfrom the storage site, moved to the coastal lowlands ,and distributed to refugees recently resettled withi nQuang Tri Province.

During the next several days, the three companie sof Lieutenant Colonel McMonagle's 2d Battalion con-tinued to search the area bordering the eastern bound-ary of the salient, finding additional caches ofmunitions and food while encountering few largegroups of enemy troops . "What we had in effect work-ing there," reported Lieutenant Colonel McMonagle ,"was Echo Company on the north, . . . Hotel Com-pany on the west, Gulf Company on the south, and

the enemy was ricocheting off of these three compa-nies . . . . Those that did manage to get through, an dit was very easy for him because the vegetation wasthick and there were a number of trails that couldn ' tbe physically covered, the AO [aerial observer] was abl eto pick them up ." 3 After initial enemy attempts t odefend the storage sites, the Marines met very littl eopposition as search operations progressed . Docu-ments and prisoner interrogation confirmed the as-sumption that the entire area was lightly defended b yservice units and newly infiltrated troops .

In the first two weeks of April, the NVA launche d14 attacks-by-fire against 3d Marines and ARVN po-sitions, employing mortars, 85mm field guns, an d122mm rockets, all fired from sanctuaries in Laos .However, by this point the principal storage sites i nthe area had been uncovered, and allied units begansweeping out of the salient . On 6 April, operationa lcontrol of Task Force Remagen passed from the 3d Ma -rines to Task Force Hotel at Vandegrift Combat Base ,as the Army task force moved out of the salient an dbegan operations near the Khe Sanh Plateau . "Thi sforce," noted Colonel Lafond, "was a tremendous as-sist to the 3d Marines and gave us an anti-tank capa-bility that as it turned out wasn ' t completely necessaryin that we received no tank attack from the enemy,but one can never be sure that its very presence didn' tdeter such an attack ."" Withdrawal operations con-tinued as the 3d Battalion, 2d ARVN Regimen thelilifted to Dong Ha City on the 16th . The ARVNBattalion had made few significant enemy contacts ,except for fending off an NVA attack, during it smonth-long search operation around FSB Torch, nort hof Route 616 . However, "on one occasion which shoul dbe highlighted," reported Colonel Lafond, "at a tim ewhen 2/3 had temporarily moved outside the artiller yfan from Saigon, ARVN artillery from Fire Suppor tBase Torch supported the 2d Battalion, 3d Marine scontacts near the rice caches. This support was superb,it was responsive, and it was fast, and it was accurate .'"

Elements of the 3d Marines, instead of being ex-tracted, moved from the salient in mid-April to an areaof the lower Song Da Krong Valley, bordering on Laos .The next two weeks, as companies rotated to Cua Vie tfor a period of rest and resupply, the regiment sweptthe area encountering few enemy troops . The last daysof April and first two days of May saw the battalion sslowly pulled out of the area and helilifted to the cen-tral portion of Quang Tri Province, south of the DMZ ,where they were positioned for Operation Virgini aRidge .

THE QUANG TRI BORDER AREAS

6 7

The seven-week, combined 3d Marines, Army, andARVN thrust into the Vietnam Salient and lower D aKrong hit the enemy quite literally in the breadbasket, where he did not have the wherewithal to resis teffectively. In addition to losing over 600 tons of rice ,7,000 pounds each of sugar and salt, and 2,000 pound seach of powdered milk, peanut butter, and miscellane-ous canned food, the enemy lost 207 soldiers, over 40 0weapons, and 775,000 rounds of assorted ammunition .

Apache Snow

Despite the success of the 9th Marines in Opera-tion Dewey Canyon and the recent accomplishment sof the 3d Marines in the Vietnam Salient, reports fro mBru tribesmen and North Vietnamese Army defectors(Hoi Chanhs) indicated that several regimental-siz eenemy units remained located in the northern por-tion of Base Area 611, south of the salient . It was be-lieved that elements of the 6th and 9th NVA InfantryRegiments, the 675th Artillery Regiment, and vari-ous support units, operated within the area . In addi-tion, aerial reconnaissance reports confirmed the belie fthat Route 922 was under repair, and that the NVAwere again moving men and materiel into the north-ern A Shau Valley and then eastward into Base Area

101, located astride the Quang Tri-Thua Thien provin-cial boundary.

Under the overall control of Lieutenant GeneralRichard G . Stilwell's XXIV Corps at Phu Bai, element sof the 3d Marine Division and 101st Airborne Division,in coordination with the 1st ARVN Division, were or-dered to conduct operations, codenamed Apach eSnow, in the northern A Shau and southern Da Kron gValleys, cutting enemy supply and infiltration routesat the Laotian border, and destroying enemy forces ,base camps, and supply caches . D-Day was set for 1 5May, but subsequently moved forward to the 10th.

XXIV Corps assigned the 1st and 2d Battalions, 9thMarines the task of occupying the southern Da Kron gand blocking enemy escape routes into Laos alon gRoute 922 . On 3 May, Lieutenant Colonel Thomas J .Culkin's 1st Battalion lifted into FSB McClintock an d12 Tarawa, replacing elements of the 3d Battalion, 3 dMarines . From its Tarawa position, the battalio ndeployed one of its companies, Company D, com-manded by Captain Leonard F. Chapman III, son ofMarine Commandant Leonard F. Chapman, Jr ., over-land to reestablish Fire Support Base Razor. " Travel-ing the tedious and the difficult terrain," reportedColonel Edward F. Danowitz, "Delta Company was

Vietnamese Regional Force soldiers load the tons of rice captured by the 3d Marines i nthe Vietnam Salient onto trucks for distribution to the refugees of Quang Tri Province .The secured rice was enough to feed more than 5,000 enemy soldiers for one month .

Abel Papers, Marine Corps Historical Center

68

HIGH MOBILITY AND STANDOWN

able to uncover FSB Razor, therefore eliminating th enecessity for a heliborne assault, saving the require-ment for supporting arms, maintaining the securit yand secrecy of the operation, and in effect adding t othe feasibility of the landing" of the 2d Battalion, 9thMarines, under Lieutenant Colonel George C . Fox, o nthe 7th .16 Operation Apache Snow began for the 9thMarines on the 10th, when Culkin's battalion leap -frogged south over Fox's battalion and assaulted int oFSB Erskine, overlooking the upper Song Da Kron gand Route 922 . The lift into Erskine was not withou tincident, as enemy fire downed a CH-46 transpor thelicopter, killing seven Marines and wounding five .

During the early stages of the operation, it becameapparent that large-size enemy units had yet to recon-stitute within the Da Krong Valley following theirdefeat in Dewey Canyon two months earlier . Culkin'sbattalion, continuously patrolling in the vicinity ofErskine and Route 922, skirmished with several smal lNVA units with disappointing results, and towards th eend of May swept east, initiating patrol operations nearabandoned FSB Lightning. Lieutenant Colonel Fox' s2d Battalion, patrolling from FSB Razor and LZ Dal-las, eight kilometers north-northeast of Erskine, en -countered numerous small enemy units . On 23 May,for example, a platoon from Company F engaged fiveNVA, occupying a bunker complex along a stream, fivekilometers west-southwest of Razor . As one Marin esquad maneuvered against the concealed enemy po-sition, the remainder of the unit massed small arm sand automatic weapons fire on the bunkers . The en -suing assault accounted for four enemy killed and oneprisoner. The platoon sustained no casualties duringthe brief encounter.

While the Da Krong remained relatively quiet, th esame could not be said for the A Shau where XXI VCorps tasked four battalions of the 101st Airborne Di -vision (Airmobile), in coordination with elements ofthe 1st ARVN Division, with the destruction of enemyconcentrations within the valley. On the morning of10 May, Army and ARVN battalions helilifted into thevalley and began multiple sweeps toward the Laotianborder. While patrolling near the border the follow-ing day, Company B, 3d Battalion, 187th Infantry en -countered an unknown size enemy force, positione din a well-defended hut and bunker complex at the baseof Hill 937 (Dong Ap Bia), three kilometers south -west of A Luoi . Over the next four days, the battalio nendeavored to push through the complex toward thesummit, supported by heavy volumes of artillery, mor -

tar, gunship, and tactical air fire, without much suc-cess . On 15 May, the 1st Battalion, 506th Infantrymoved to assist the mired battalion . Both battalion sthen mounted a counterattack and pursued the enemyup the hill, meeting stubborn resistance as theypushed their way up the jungle-covered slopes . Thetempo of the battle increased as the attacking forc eneared the crest of Hill 937, encountering fresh, well -disciplined NVA forces defending one fortified, mutu-ally supporting bunker complex after another . As aresult, elements of the 2d Battalion, 506th Infantr ywere committed on the 18th, followed by the 2d Bat-talion, 501st Infantry and 2d Battalion, 3d ARV NRegiment on the 19th .

By the morning of the 20th, with all battalions i nposition, they joined in the final assault on the con-tested hill complex . Once taken, the combined Armyand ARVN force then pursued the remaining enemyelements southwest down a ridgeline to the Laotianborder, less than three kilometers from the crest ofthe hill .'' The weeklong battle cost the 9th and 29thNVA Regiments more than 500 killed . Testifying tofierce fighting on the hill, later termed "Hamburge rHill" by the remaining infantrymen of the 3d Battal-ion, 187th Infantry, was the friendly toll—44 soldier skilled and 297 wounded .

Dong Ap Bia secure, the battalions involved re -oriented their search operations in an effort to des -troy remnants of the two NVA regiments . Althoughoperations throughout the A Shau continued until 7June, the NVA avoided all but minor engagements .

With Army and ARVN forces heavily engaged inthe A Shau, a platoon from Company C, 3d Enginee rBattalion completed the first of three cuts of Rout e922 in the Da Krong on 25 May. Two were 12 feet wideand 20 feet deep, and the third, 12 feet wide and 1 0feet deep . The following day, the platoon caused two50-meter landslides and blew a 50-meter, enem yhand-constructed revetment. With the interdiction ofRoute 922 complete, Culkin' s battalion lifted out ofthe area of operations and returned to VandegriftCombat Base on the 27th, followed by Fox's battalion ."Contact with the enemy during the initial phases ofthe [three-week] operation," noted Colonel Danowitz ,"was light and it continued to be light, mainly agains tsmall elements, reconnaissance units or screening forc efor the major North Vietnamese forces, which accord-ing to the progress of the operation, indicated tha tthey had moved into Laos as well as south into th earea of the 1st ARVN, but were not to remain to stan dand fight against the 9th Marines" le

THE QUANG TRI BORDER AREAS

6 9

Department of Defense Photo (USMC) A19375 8

Marine 105mm howitzer crews watch as an Army CH-47 Chinook helicopter hovers afte rlanding ammunition at Fire Support Base Razor. The artillerymen were supporting th ejoint 101st Airborne-9th Marines attack, code-named Apache Snow, into the A Shau Valley .

The 3d Marine Division' s mobile posture, involvin gthe continuous deployment of maneuver battalions inwestern Quang Tri Province, succeeded in reducing th eenemy threat from the west . During June, Colone lDanowitz's 9th Marines continued the effort, par-ticipating in Operations Cameron Falls and Uta hMesa . These two concurrent operations were targete dagainst elements of the 304th NVA Division, attempt-ing to reestablish a presence south of Route 9 .

Evidence from reconnaissance and other intelligenc esources suggested that divisional troops had infiltrat-ed into the lower Da Krong Valley, moved east alon gRoute 616, and then north along the river . In addi-tion, the series of rocket attacks on Vandegrift Com-bat Base in May signaled the start of a period o fplanned pressure on allied positions by the 57th NVARegiment, 304th Division . Task Force Hotel assigne dDanowitz's Marines the mission of conducting searc hand destroy operations in an area bordered on th enorth by the Song Quang Tri, on the south by the D aKrong, on the east by Fire Support Base Shepherd ,and on the west by Fire Support Base Henderson ; anarea considered critical to the security of not only Van-degrift Combat Base, but of the Ba Long Valley, entry -way from the west into the population centers o fQuang Tri and Dong Ha .

Operation Cameron Falls, which began on 29 May,shifted the efforts of the 9th Marines from th esouthern Da Krong to the northern extremities of th emountainous river valley, south of Vandegrift . Move-ment into the objective area went unopposed as Lieu -tenant Colonel Fox's 2d Battalion occupied Fire Sup -port Base Whisman and the 3d Battalion, under Lieu -tenant Colonel Oral R. Swigart, Jr., FSB Shepherd, be -low FSB Cates, on Route 9 . In establishing its positio non Whisman, Marines of the 2d Battalion, accordin gto Colonel Danowitz, "rapidly and wisely selected po-sitions for the defense of the fire support base ; plac-ing wire, fighting holes, obstacles, and of course ,claymores, and tripflares in their protective defens eplan. The defensive fire plan was fired and prepare dprior to last light" This preparation paid off for at 021 5on the 1st, a small enemy force attempting to prob eWhisman hit a listening post, causing the death oftwo Marines and alerting the fire base. As a result,defenders from Company G ably countered the sub-sequent heavy attack against the base, killing 19 o fthe enemy while suffering minor casualties . This at -tack on Whisman, remarked Colonel Danowitz, "wa san unusual aspect of the operation, because never be -fore had the enemy been able to strike within hour sof the initial establishment of the fire support base .

70

HIGH MOBILITY AND STANDDOWN

But in this case it was attempted and very readil y

thwarted"' 9During the attack on Whisman, a prisoner as well as

a defector were taken, both of whom acknowledged theexistence of a command post of the 57th NVA Regi-ment to the southwest of the fire support base. Ex-ploiting this information, Lieutenant Colonel Fox dir-ected Companies F and G toward the area reported t ocontain the enemy headquarters . But before this couldbe accomplished, the battalion received fresh intelli-gence indicating the movement of a large enemy forcenortheast toward Hill 824 (Dong Cho) . Danowit ztherefore redirected the attack toward the hill mass ,with the two companies of the 2d Battalion moving t othe northeast along the Da Krong, and two companie sof the 3d Battalion advancing east from Shepherd ."The terrain," reported Lieutenant Colonel Swigart ,"was very rough, characterized by triple-canopy rai nforest and elephant grass that ran as high as 12 feet. . . . Because of the hot weather, I guess the troop ssuffered more in the elephant grass than they did i nthe triple-canopy because down in the 12-foot-hig helephant grass, there was no breeze at all, in fact ther ewas the feeling that you couldn't breathe properly" 2 0

As elements of the two battalions converged on Hill

824, it became increasingly evident that the enemywas deployed around the hill in strength . Advancin g

to the northeast on 5 June, Company H encountered adug-in enemy battalion on the southern banks of the

Da Krong. During the initial engagement, which last-ed more than 12 hours, 29 enemy troops were killed ;subsequent sweeps of the area revealed additional bod -ies, numerous bunkers, caves, and living quarters, al l

of which were destroyed . As Marines of Swigart's bat-talion continued to move toward the hill, they too en -countered and engaged sizable enemy forces . "Theenemy encountered," noted Lieutenant ColonelSwigart, "were quite effective, they were well-armed ,well-supplied, they had on new uniforms, and indi-cations were that they were an enemy force that ha dbeen newly introduced into the area of operations" 2 1

On 11 June, elements of the 2d Battalion resecure dFire Support Base Henderson in preparation for thepositioning of two batteries of the 2d Battalion, 12thMarines . The remainder of Fox's battalion continue dsearch operations along the Da Krong in the south -western sector of the assigned regimental area, wit hlittle success, until the 15th, when the battalionreturned to Vandegrift Combat Base .

View of Dong Ap Bia, or Hamburger Hill, after it was secured by elements of the 3 dBrigade, 101st Airborne Division, which suffered more than 300 casualties in taking the hill .

Author 's Collection

THE QUANG TRI BORDER AREAS

7 1

Swigart's Marines continued company sweeps in th eDong Cho Mountain complex until the 18th when or-dered to reorient their advance toward the western por-tion of the area of operations, south of Shepherd, inan effort to exploit a number of reconnaissance sight-ings . On the 23d, Task Force Hotel shifted operationa lcontrol of the battalion to Task Force Guadalcanal i nanticipation of the battalion's relief of the 1st Battal-ion, 9th Marines .

Intelligence gained during Operation Camero nFalls, in addition to sensor reports, aerial observation ,and reconnaissance patrol reports, indicated that dur-ing May and early June, elements of a second regi-ment of the 304th NVA Division, the 24th, andattached support units, had infiltrated south and east ,toward the Khe Sanh Plateau. As a result, a joint taskforce, codenamed Guadalcanal, consisting of the 1s tBattalion, 9th Marines and Task Force Mustang fro mthe 1st Brigade, 5th Infantry Division (Mechanized) ,was established, and in coordination with the 2d an d3d Battalions, 2d ARVN Regiment, directed by Tas kForce Hotel to drive the NVA out .

The joint Marine, Army, and ARVN effort in theKhe Sanh Plateau, codenamed Utah Mesa, began o n12 June with the helilift of Lieutenant Colonel Cul-kin's 1st Battalion, 9th Marines into 12 Bison and FS BCates, and the 3d Battalion, 2d ARVN Regiment intoFSB Quantico, northeast of Khe Sanh . Their missio nwas to conduct offensive sweeps west to Khe Sanh ,destroying troops and supplies, securing the division' swestern flank, and spoiling any enemy attempte dbuildup which might threaten allied installations an dlines of communications . ARVN forces, although con-sidered an integral element, operated in a separat earea, generally north of the Marine and Army taskforce, which gradually advanced to the southwest ,along an axis centered on Route 9 .

On 13 June, the 2d Battalion, 2d ARVN Regiment ,lifted into LZ Cokawa, north of FSB Cates, and be-gan searching to the west . Two days later, Culkin'sCompany D moved to LZ Horn in order to secure th eflanks of Task Force Mustang, which consisted of Com -panies B and C, 1st Battalion, 61st Mechanized In-fantry, and Company B, 1st Battalion, 77th Armor ,advancing west along Route 9 .

Reacting to the combined thrust, elements of th e24th Regiment conducted a series of night attacksagainst allied units, the first taking place on 18th . Be-tween 0335 and 0530, an estimated 100 NVA troop sattacked Company B, 61st Infantry's night defensive

postion, east of Lang Vei. Using machine gun and RP Gfire, the enemy broke through the perimeter and en -gaged Army troops in heavy close combat . At dawn ,the enemy withdrew, leaving 11 bodies inside thedefensive wire and 30 outside, in addition to 1 2weapons and 100 satchel charges . Company B lost 1 1killed and 15 wounded as a result of the attack .

Later that morning, a squad-size reconnaissanc epatrol from Company C, 9th Marines, while search-ing an area three kilometers southeast of Khe Sanh ,engaged a well-armed, well-entrenched, and well -camouflaged NVA company. The enemy initiated th eambush with a burst of .50 caliber machine gun fire ,instantly killing three Marines . The squad returne dfire, knocking out the machine gun position, andcalled for reinforcements . The enemy company thenmaneuvered to outflank the squad; however, thesquad, having linked up with a nearby platoon, struc kthe enemy's right flank . The remainder of CompanyC joined the battle and assaulted the enemy position ,driving the NVA company southward, into artilleryblocking fires .

Continuing the push westward, elements of the taskforce were again struck on the 20th . Early that morn-ing, the enemy, in three separate ground attacks, hitthe combined position of Company B, 61st Infantr yand Company D, 9th Marines . With the assistance ofhelicopter gunship fire, fixed-wing air strikes, and ar-tillery, Army and Marine infantrymen repulsed the as-saults, accounting for 27 NVA dead . Two days later,Marines of the 3d Battalion, 9th Marines effected arelief-in-place of Culkin's battalion, which then move dto Vandegrift Combat Base, where it stood down i npreparation for redeployment to Okinawa.

Throughout the remainder of the operation, thenumber of engagements between allied forces and ele-ments of the 24th remained high, as small enem yunits, in an attempt to halt the advance, continue dto attack friendly night defensive positions, bu twithout success . On 24 June, two NVA platoons as -sailed the positions of Company K, 9th Marines, southof Route 9 . "On the morning of the 24th at abou t0130," reported First Lieutenant Patrick P. Oates, com-manding the 1st Platoon, "our ambush, which was ou tabout 75 meters, was hit from three different sides.They were hit mainly by chicoms [grenades] and smallarms fire . This alerted the lines, everybody got onstand-to and the ambush started filtering in one byone . . . . Nobody on the sector of the lines wher ethe ambush was, opened-up until after all of the am-

72

HIGH MOBILITY AND STANDDOWN

Abel Papers, Marine Corps Historical Cente r

Engineers accompanying the 9th Marines clear a land-ing zone for resupply and medical evacuation helicop-ters in heavily wooded terrain south of Vandegrzft.

bush was in with the exception of the one Marine wh owas killed." At about the same time, other sectionsof the company's position came under fire . "After thelast of the ambush came in," continued Lieutenan tOates, "1st Platoon sector started receiving heavy smal larms fire, at which time we called in 60mm morta rmissions which gave us outstanding support, an dknocked out the depth of the attack and broke up themain attack . We had several different occasions wher ethey came very close to the line and then the troopscould hear them crawling through the elephant gras son their retreat . This firefight lasted about four an da half hours . . . . At approximately 7 a .m. we starte da sweep of the area and that is when we started com-ing up with all the bodies and gear. Closest bodie swere about 10 to 15 meters from the lines ; there wefound AKs and Chinese light machine guns "

On the morning of the 26th, Company K move dwestward toward a series of knobs where it set-in forthe night and where it was again struck . "We had areal fine perimeter that night," reported LieutenantOates, "and we were hit . . . by an estimated two com -

panies of NVA . This firefight lasted between two andone half and three hours and we had good suppor tall the way around . . . . On the morning of the 27th ,we did find numerous rifles and automatic weapons ,and this time two flamethrowers showed up . Durin gboth of these fire fights, on the 24th and 26th, thefire discipline that we had was very good "22 As a resul tof both actions, the enemy lost 41 killed . In yet anothe rattack, two enemy companies struck at Company I ,9th Marines, on FSB Tenaru, east of Lang Vei, on th e27th, losing another 22 dead . In all attacks, the enemyfailed to penetrate beyond the defensive wire .

On 2 July, the 2d Battalion, 9th Marines, underMajor Robert L . Modjeski, who had replaced Lieu -tenant Colonel Fox on the 22d, helilifted 14 kilome-ters south of Khe Sanh in order to reactivate FSB Sparkand conduct sweeps of Route 926 in support of Tas kForce Guadalcanal . Shortly after reoccupying the base ,Modjeski noted, "the NVA immediately bega nregistering 82mm mortars on the position . Towardsevening a brisk mortar exchange built up which ou rartillery also entered into. The battalion sustainedabout 40 casaulties, mostly from mortar shrapnel ." Thefollowing morning, Modjeski sent his maneuver com-panies in search of the enemy mortars, which subse-quently displaced out of range 2 3 With the regimen talerted for redeployment to Okinawa, the 2d and 3 dBattalions were pulled out of the Khe Sanh Plateauand returned to Vandegrift Combat Base on the 6th ,thus terminating Operation Utah Mesa .

When it appeared that the enemy was seeking t oreestablish a strong presence in western Quang Tri Pro -vince following the Dewey Canyon defeat, the 3d Ma-rine Division, in conjunction with Army and ARVNforces, fought back . In the four major allied strikes intothe area, the North Vietnamese lost over 600 troop sand a number of important supply depots . As a resul tof the continued pressure, the enemy units were agai nforced to withdraw into their Laotian sanctuaries .

Central DMZ Battles

During May and June, the central and western por-tions of Quang Tri Province, just south of th eDemilitarized Zone and north of Route 9, were agai ntargeted by the 3d Marine Division . The enemy, how-ever, failed to expose his large units, favoring instea dsapper and indirect fire attacks against allied installa-tions, while holding his major forces in sanctuarie snorth of the DMZ .

The 36th NVA Regiment, 308th Division, whichhad replaced the 27th in central Quang Tri following

THE QUANG TRI BORDER AREAS

7 3

Liing

-” .,

.tv. Pb.g1 1

.n9131e 121

Operations of the 9th Marines ,May-August 1969

„roa r

4

ro. :o '1

Utah Mesa12 June-9 Jul

,mo .McClint

toc k

her O .j .ri emro La.ir

l.

the latter regiment's defeat, was itself driven back intothe zone during the successful 9th Marines, ARVN ,and 1st Brigade operations in March and April . Butby the beginning of May, elements of the 27th and36th again began to filter back into the central por-tion of the province. Colonel Lafon d' s 3d Marines, hav-ing successfully cleared the Vietnam Salient i nOperation Maine Crag, was tasked with destroying th eremnants of both regiments, and preventing any ene-my attempts at interdicting Route 9 or interfering wit hthe ongoing rice harvest .

On 2 May, Lafond's regiment began Operation Vir-ginia Ridge, as Lieutenant Colonel John S. Kyle's 1stBattalion assaulted into LZ Sparrow, eight kilometer snorthwest of Cam Lo, immediately engaging smal lgroups of NVA . The 3d Battalion, under LieutenantColonel Richard C . Schulze, secured Fire SupportBases Fuller and Pete, northeast of Elliott CombatBase, and began sweeping north toward the DMZ ,while the Marines of Lieutenant Colonel McMonagle' s2d Battalion provided security for Con Thien ,Charlie-2, Cam ID Bridge, Cam Lo District Headquart-ers, Khe Gio Bridge, and Route 9, and furnished con-tingents for mine sweeps emanating from all fixed in -

See Reference Map, Sections 10-12, 16, 1 7

stallations and roving patrols of the surroundin gterrain ? 4

By 6 May, Kyle's battalion had swept west onto Mut -ter's Ridge, near Landing Zones Ironsides and Junior ,three kilometers from Sparrow . Four days later at 0415 ,Company D, in a night defensive position west of Iron -sides, came under attack by an estimated NVA platoo nemploying RPG, grenades, and small arms fire . Afte r10 minutes the enemy broke contact and withdrew t othe northeast, leaving eight Marines dead and 1 0wounded .

Constant patrolling and company sweeps were th erule as Kyle's battalion continued westward an dSchulze's 3d battalion move north, engaging smal lgroups of enemy troops. On 16 May, a patrol fromCompany M, operating north of LZ Champ, receive dsmall arms and RPG fire from approximately 10 ene-my troops entrenched in bunkers . The platoon-siz epatrol, using air, artillery, mortars, and CS gas, maneu-vered up to and through the bunker complex, killin gfour and capturing one weapon .

During the remainder of May, the 1st Battalion, no wunder Lieutenant Colonel David G . Herron, who had

74

HIGH MOBILITY AND STANDDOW N

replaced Kyle on the 11th, turned and swept eas ttoward LZ Comet and Alpha-4, as did the 3d Battal-ion . Engagements with infiltrating troops of the 27thand 36th remained light except for a number of at -tacks against Marine positions . Twenty NVA, employ-ing grenades, probed the perimeter of Company Co n20 May without breaching the wire . A search at firs tlight revealed 15 enemy bodies and a number o fweapons ; Company C lost three killed and eigh twounded . Two days later, Company B trapped 30 NVAbetween the company ' s night position and a platoonambush. Using 60mm mortars and small arms fire ,the company routed the enemy, killing 19 and cap-turing two prisoners .

While Herron and Schulze's battalions advance deastward, just south of the Demilitarized Zone, thedivision directed both to begin a series of reconnais-sance patrols within the zone. These patrols were tocollect evidence of enemy troop presence and, if pos-sible, capture prisoners . However, the patrols ex-perienced limited success, as it was necessary to pu ta company within mortar range of the zone in orde rto provide patrol support . The supporting companies ,as a result, were subjected to numerous enemy morta r

A CH-46 Sea Knight helicopter lowers a load of sup -plies at a 3d Marine Division fire base. The supplies,flown out from Force Logistic Support Group Bravo atDong Ha, included rations, water, and all types of am -munition to sustain not only the artillery battery, butground forces operating in the surrounding terrain .

Department of Defense Photo (USMC) A193235

attacks, sustaining losses that proved to be unaccept-able. The special patrols were thus discontinued anda two- to three-kilometer patrol zone reestablished be -low the DMZ .

The first of several B-52 raids (Arc Lights) carrie dout during the operation within the 3d Marines' are aof responsibility, just south of the DMZ, occurred o nthe night of 6-7 June. Based on continuous enemy ac-tivity over the previous several weeks, the eastern por -tion of Mutter's Ridge, Foxtrot Ridge, and Helicopte rValley were struck by six separate Arc Lights . Withinan hour of the last bomb drop, Marines of Lieutenan tColonel McMonagle's 2d Battalion conducte dheliborne assaults into a number of landing zones nea rJunior, in an effort to exploit the strikes and conduc tbomb damage assessment (BDA). The Marines foundfew enemy dead, but numerous bunkers destroyed ,and the concealing foliage ripped away from severa lknown and suspected enemy redoubts . The destruc-tion was so devastating, that it was suspected manymore NVA soldiers lost their lives than were found .After exploiting the area, the 2d Battalion move dsouth, conducting search and clear operations nort hof Route 9 .

In mid June, the regiment received a number of in-telligence reports from local informants indicating thata large unknown enemy unit was in the process of in -filtrating from the DMZ into a portion of LeatherneckSquare, southwest of Gio Linh . "It looked to us,"reported Captain William J . Quigley, regimental S-2 ," like an indication that he was either going to attackC-2, which at that time was in our AO, or he was af-ter C-1 in the ARVN AO. But he was definitely com-ing down for something . For this operation we selectedthe 3d Battalion, 3d Marines, and because of bein gin close proximity to the DMZ as it was where the ene -my was building up, we needed to try somethin gunique to see if we could catch the enemy off-balanc eand not tip our hands . "

The battalion loaded on trucks after dark on the16th and then advanced up Route 1 in column ,"brazenly heading right for the DMZ, which had neve rbeen done before, and nobody would ever think o fdoing a thing like this ." The bold plan worked ; "whenthe 3d Battalion was moving up Route 1 toward theDMZ, elements of the 27th Regiment and the 33dSapper Battalion were going the other way southward .""Actually," reported Quigley, "what happened was thatwe passed one another; the 3d Battalion being on th eroad and them people coming down through the flat-

THE QUANG TRI BORDER AREAS

7 5

lands, heading toward Charlie-1 . . . . The timing wasjust one of those things, just once in a hundred thatyou run into, that we hit them on the way down ,caught them coming down from the DMZ ; he wasdecimated by artillery fire ." "In fact," Quigley con-tinued, "he got hurt so bad that his own sappers fro mthe 33d Sapper Battalion, when they did reachCharlie-1, they ran into the Charlie-1 minefields .Which of course is a very unusual thing for a sappe rto do. The ARVNs on their contact at Charlie-1 hun g56 of the people up in the wire . The 3d Battalion i nthe meantime sliced in behind them, separating the mfrom the DMZ." 2 5

The night sweep by Schulze's Marines from Gi oLinh, southwest toward Con Thien proceeded withou tincident . At 0930 the next morning, Company M en -gaged an estimated enemy company occupying hedg-erows, three kilometers west of the former Marin eartillery position. A half hour later, Company L, twokilometers to the south, engaged an unknown-siz eenemy force in fortified positions on a small hill. Bothfirefights raged throughout the morning until the ene-my broke contact and fled southward, leaving 20 dead.

At midday, Schulze's command group, accompa-nied by a platoon from Company K and a section o f106mm recoilless rifles, moved westward in trace ofthe attacking companies . At 1400, while the grou pestablished a forward command post, two kilometerseast of Company L, an estimated NVA companylaunched an intense mortar-supported ground attackagainst the Marines . The command group ' s securityforce, employing the recoilless rifles and small arms ,repulsed the enemy force, killing 37 and capturin gthree . During the height of the action, a platoon fromCompany L, maneuvering from the west to reinforc ethe command group, engaged an NVA platoon in abunker complex. Under the cover of air strikes, th eplatoon assaulted the enemy position, killing eigh tNVA and seizing 14 weapons .

Throughout the afternoon, aerial observers directedair strikes and artillery fires on the withdrawing enemyforce . Fixed-wing strikes accounted for 57 enemy killed ,while another 13 were credited to the artillery . Com-panies F and G, 2d Battalion, the designated divisio nreaction companies, and Companies A and B, 3d Tan kBattalion, were committed to the battle late in th eafternoon, but the enemy force had fled the area, andsignificant contact was not reestablished . The actionon the 17th resulted in 193 enemy killed, 9 prisonerstaken, and 77 weapons seized . Schulze's battalion ,although losing 19 killed and 28 wounded, continued

Abel Papers, Marine Corps Historical Cente r

Carrying an M60, the standard automatic weapon use dby American forces, a machine gunner and his assis-tant from the 1st Battalion, 3d Marines enter a clear-ing during a patrol south of the Demilitarized Zone .

search operations in the area until the 21st, when i tmoved to Cua Viet for a period of rehabilitation .

With the enemy limiting his activity during the re-mainder of Operation Virginia Ridge, which termi-nated on 16 July, Colonel Wilbur F Simlik's regiment *continued search operations throughout the area o foperations : the 1st Battalion centered on Alpha-4 ; the2d Battalion north of Route 9 at FSB Fuller ; and th e3d Battalion, after its return from Cua Viet, operat-ing from Cam Lo.

Also operating within close proximity of th eDemilitarized Zone, but west of Colonel Simlik's 3 dMarines, was the 4th Marines . With the terminationof Operation Purple Martin on 7 May, the 4th Ma-rines remained in place, initiating a two-month oper-ation, codenamed Herkimer Mountain . Continuallypressured by Colonel Goggin's regiment, the bulk o f

*Colonel Simlik replaced Colonel Paul D. Lafond as Command-ing Officer, 3d Marines on 28 June.

76

HIGH MOBILITY AND STANDDOWN

enemy units operating northwest of Elliott Comba tBase had been forced to withdraw northward int oNorth Vietnamese havens, leaving behind rovingbands of sapper, rocket, and reconnaissance unitswhich attempted to disrupt Marine combat an dlogistical operations . As in Purple Martin, the regi-ment's mission remained the same, Major Charles W .Cobb, Jr ., S-3 of the 1st Battalion, 4th Marines, noted :

Our primary mission, of course, was to conduct offensiveoperations north of, and occupy, Fire Support Bases Nevilleand Russell . And we had in the back of our minds that th ereal reason we were out there in this AO was to deny theenemy the use of the avenues of approach from the Laotia nborder through the west, down around the Lang Ho Valleyand the Route that traveled from the northwest to th esoutheast right through the northern part of our AO an djust south of the DMZ, the Cam Lo River Valley. Both ofthese areas had been used, based on the intelligence infor-mation we received, by the enemy over a period of years ,and by occupying the areas that we did and by keeping th ecompanies out on the move constantly, . . . I really thin kwe kept them honest and negated their attempts, if ther ewere any, to use these avenues of approach into the 4th Ma-rines A02 6

The operation began with the 1st Battalion, 4th Ma-rines relieving the 2d Battalion on LZ Catapult an dFSB Neville, which then moved to Cua Viet for a peri-od of rehabilitation . The 3d Battalion, 4th Marinescontinued to operate from FSB Russell and LZ Sierra ,to the northeast, while the 3d Battalion, 9th Marines ,awaiting redeployment, manned installations fromVandegrift Combat Base to Hill 950 (FSB Cates), wes talong Route 9 . Participation of the 9th Marines varie dduring the operation as elements were shifted to othe roperations throughout the divisional area of opera-tions, and then redeployed .

Enemy activity remained at a low level as 4th an d9th Marines fought sporadic engagements with smallgroups of NVA . The first significant fight took plac eat 1610 on 10 May. While moving north from Neville ,Company B, 1st Battalion, 4th Marines took small arm sfire, wounding five Marines . Pressing the attack, th eMarines moved onto the high ground and continuedthe pursuit until the enemy broke contact . Air strikesand artillery were called, but with unknown results .The following day, a local security patrol from Com-pany K, 3d Battalion, 4th Marines, near LZ Dodg eon the DMZ, surprised two well-armed NVA movingtoward the company's night defensive position . Theenemy soldiers were taken under fire ; a sweep th efollowing morning revealed two bodies with TNTstrapped to their waists .

Goggin's Marines conducted extensive and continu-ous patrols throughout the ever-shrinking area of oper-ations during the remainder of May and into June .Engagements with small groups of NVA soldiers wer einfrequent and of a short duration, as the enemyquickly withdrew when pressed . Noteworthy incidents ,however, took place, one of which Major Cob bdescribed :

A recon insert into the DMZ, which was put in some -time around the 7th or 8th of June, ran into some problem sand they had a platoon commander killed and they wer esurrounded during most of the night . And we received anorder from regiment that the "Sparrow Hawk," which is th eready platoon that is maintained at Vandegrift Combat Bas eunder the OP control of the 3d Marine Division and isdeployable on short notice to any trouble spots, would b eflown up to the LZ located in the vicinity of Bravo Compa-ny and join up with them and move into the DMZ and hel pextract these recon people. While the planning of this wa sgoing on, there was another recon team in heavy contac tabout 4,000 meters from them inside the DMZ . Originall ythe plan was to take out the recon inserts as they normall ydo by helicopter, but in the process they had two CH-46sshot down: one of the crews immediately was picked up, th eother crew joined one of the recon teams and set in for th enight . And it was at that point that the decision was mad eto not lose anymore helicopters and that we would send BCompany up in there, reinforced by the "Sparrow Hawk "platoon and also a reaction force from the 3d Recon Battal-ion to go up and bring them out of the DMZ . There weremany complications in this operation that gave us some trou-ble . The tremendous heat for one thing down in the valley sand draws without any breeze ; the high temperatures ; th esteep terrain ; and the jungle canopy and the growth, th ebrier and bramble, that resulted in the troops having to cu ttheir way through and it seemed like an endless task to even-tually get to these people and then extract them . They ha dto get resupplied with water and chow and the whole oper-ation took a little better than two days before it was finall yover with . . . . The operation went off pretty well withou tlosing any more people? 7

Month's end found Goggin's Marines fending off n oenemy attack other than attacks by fire against theregiment's installations 2 8

Eastern Quang Tri and Thua Thien

While a majority of Marine operations were con -ducted in central and western Quang Tri Province ,responsibility for the coastal lowlands and piedmon twas divided between the 2d ARVN Regiment and 1s tBrigade, 5th Infantry Division (Mechanized) . TheARVN Regiment operated mainly in Leathernec kSquare, while the 1st Brigade secured the coast fro mthe DMZ south to the Quang Tri/Thua Thien Provin-cial boundary. Consisting of the 1st Battalion, 11th In-fantry ; 1st Battalion, 61st Infantry (Mechanized) ; 1st

THE QUANG TRI BORDER AREAS

7 7

Abel Papers, Marine Corps Historical Center

Two 3d Division Marines escort a captured North Vietnamese Army soldier to the unit' scommand post where he will be questioned by division intelligence personnel in an ef-fort to obtain information as to his unit's location, strength, morale, and objectives .

Battalion, 77th Armor ; and elements of the 4th Bat-talion, 12th Cavalry ; 3d Squadron, 5th Cavalry ; 1s tBattalion, 40th Artillery; and the Marine 1st Amphib-ian Tractor Battalion, the brigade operated from CampRed Devil (Dong Ha Combat Base), LZ Sharon, LZNancy, and Wunder Beach . In addition to periodicall yproviding task groups to assist Marines, the brigad econducted a number of independent operations i nsouthwestern Quang Tri Province, while securing majo rallied coastal installations .

During March and April, elements of th emechanized brigade conducted search and clear opera-tions in Base Area 101, southwest of Quang Tri Com-bat Base. In May, following Montana Mauler and Elli sRavine in central Quang Tri, the brigade again move dinto Base Area 101, with elements also operating inthe coastal lowlands near Landing Zones Nancy an dSharon . The brigade's mission was to prevent enem yforces from entering or leaving populated areas an dto deny the enemy rice by destroying his rice-gatherin gforces . During Operation Massachusetts Bay, which be -

gan on 7 May and concluded on 18 June, element sof the brigade saw light contact, consisting of ambush -es and probes, and accounted for 61 enemy killed an d50 suspects detained . With the termination of Mas-sachusetts Bay, the brigade began the follow-up oper-ation, Iroquois Grove, in the same area and with a nidentical mission .

In Thua Thien Province to the south, the 101st Air -borne Division prepared to conduct the follow-o ndivision-level operation, Kentucky Jumper, with thetermination of Operation Nevada Eagle on 28 Febru-ary. This operation, begun on 1 March, continued thecombined 101st Airborne and 1st ARVN Division ef-fort in support of the Republic's Accelerated Pacifica-tion Campaign in the coastal lowlands around Hue ,and forays into the mountains of western Thua Thie nProvince in an attempt to halt infiltration from Laos .Operation Kentucky Jumper (1 March - 14 August )included the following sub-operations: Bristol Boots(25 April - 15 May) directed against elements of th e5th NVA Regiment in the Ruong Ruong Valley; Mas-

78

HIGH MOBILITY AND STANDDOWN

sachusetts Striker (1 March - 8 May) in the southernA Shau Valley and northern regions of Quang NamProvince; and Montgomery Rendezvous (7 June - 14August), directed against Viet Cong forces operatin gin Phu Loc and Hien Doc Districts, south of Hue .

Also during this period, the 3d Brigade, 101st Air -borne Division participated in the XXIV Corps oper-ation, Apache Snow (10 May - 7 June), in the norther nA Shau Valley. In addition, the 1st Brigade joined theAmerical Division in southern I Corps, assisting th edivision for three months in Operation Lamar Plain .

Throughout the first six months of 1969, Marine ,Army, and ARVN troops continued the relentless andsuccessful pursuit and destruction of enemy forces innorthern I Corps. From the Da Krong Valley and Viet-nam Salient in the west to Leatherneck Square in theeast, and along the Demilitarized Zone within Quan gTri Province, troops of the 3d, 4th, and 9th Marine saggressively and repeatedly forced the enemy to with -draw into cross-border sanctuaries, thereby spoilin gany attempt at a military victory in far northern ICorps .

PART I I

SOUTHERN I CORPS BATTLEGROUND

CHAPTER 6

Destruction of Base Area 11 2

Defense of Da Nang —Attack into 112— "A Little Urban Renewal"—Americal 's TAOI

Defense of Da Nang

The surge in enemy ground combat activity witnes-sed during the last months of 1968 in the provincesof Quang Nam, Quang Tin, and Quang Ngai, whic hcomposed southern I Corps Tactical Zone, moderat-ed somewhat as 1969 began. The eastern portion ofQuang Nam Province, however, again produced th ehighest level of enemy action as NVA and VC forcessubordinate to the 4th Front Headquarters pursueda limited tactical course of ground, rocket, and mor-tar attacks against friendly installations, in prepara-tion, many allied intelligence analysts thought, for amajor thrust against Da Nang . In addition, the enemypersisted in attempts to control the civilian popula-tion and major rice-producing areas of the provinc eby resorting to terrorism, intimidation, kidnappings ,and the assassination of local government officials .Operating within the boundaries of Quang Nam, an dsubject to the 4th Front, was the 2dNUA Division andits subordinate regiments : the 1st Viet Cong ; 21stNVA ; 31st Independent ; 36th NVA ; 38th NVA ; 141stNVA ; 68B NVA Artillery (Rocket) ; and the 368B NVAArtillery (Rocket) . All were thought to be located i nthe mountains either southwest of Da Nang, or thos eastride the provincial border with Quang Tin .

In the southern two provinces of I Corps, Quang Ti nand Quang Ngai, regiments controlled by Headquart-ers Military Region 5 and the 3dNVA Division — the2d Viet Cong, 3d NVA, 22dNVA, 31st NVA, and the401st VC (Sapper) —continued to confine their activi -ties primarily to scattered attacks by fire, interdictio nof friendly lines of communication, and the harass-ment of villages, hamlets, and refugee camps sur-rounding the cities of Tam Ky and Quang Ngai .

Facing the estimated 37,300 enemy troops in th ethree provinces at the beginning of 1969, were twomajor United States combat units : the Army's 23d In-fantry (Americal) Division under the command o fMajor General Charles M . Gettys, and Major GeneralOrmond R . Simpson ' s 1st Marine Division .

A Texan by birth, Major General Simpson entere dthe Marine Corps in 1936 and served in the Pacifi cduring World War II . When the Government of

Department of Defense Photo (USMC) A37278 2

MajGen Ormond R . Simpson, as Commanding Gen-eral, 1st Marine Division, coordinated the activitiesoffour Marine regiments in the defense of Da Nang .

Thailand requested American troops during the Lao-tian Crisis in 1962, CinCPac ordered then-Brigadie rGeneral Simpson to Southeast Asia as Commandin gGeneral, 3d Marine Expeditionary Brigade, as well a sNaval Component Commander, Joint Task Force 116 .Following a tour as Commanding General, Marin eCorps Recruit Depot, Parris Island, he assumed com-mand of the 1st Marine Division from Major Genera lCarl A . Youngdale on 20 December 1968 .

Under Simpson, the division performed a variety ofmissions . The division's general task, like that of al lother United States combat units, was to locate anddestroy enemy forces, installations, and LOCs [linesof communication] within its assigned area of respon-sibility, in coordination with South Vietnamese andother allied forces . Its primary mission was the defens e

80

DESTRUCTION OF BASE AREA 112

8 1

of Da Nang and the more than one million SouthVietnamese living within the city or nearby. As Gener-al Simpson later commented : "The 1st Marine Divi-sion was, far beyond all else, tied to the defense ofthe Da Nang Vital Area. This was exactly as it shoul dhave been. Da Nang was clearly a textbook exampleof a ` Vital Area .' Here were military headquarters, po-litical headquarters and officials, a great seaport, asplendid airfield, a vast array of logistical support ap-paratus including supplies of every variety, equipment,medical establishments, to say nothing of nearly on emillion Vietnamese . U.S . Forces could not have oper-ated in ICTZ without Da Nang ." Therefore, the divi-sion's infantry units and supporting arms were to b e"disposed to provide maximum security for the D aNang vital area, installations and LOCs of greatest po-litical, economic and military importance ." '

Among the secondary tasks assigned the divisionwere to provide security for the continuing engineereffort to improve National Route 1 and logistics craftoperating in inland waterways, and to assist Viet-namese forces in the pacification effort . In addition ,it was to carry on surveillance, reconnaissance withinits tactical area of responsibility (TAOR), and "suchother places as assigned''* Elements of the divisio nwere also required to furnish support for combine daction platoons, Civilian Irregular Defense Grou pcamps, and government district headquarters . Finally,the division was to provide one reinforced battalio nfor deployment anywhere in South Vietnam o n12-hour notice, and two additional battalions withi n24 hours .2

Stretching from above the strategic Hai Van Pass inthe north to the rugged Que Son Mountains in th esouth, the division's TAOR encompassed approximate-ly 1,100 square miles and included most of Quan gNam and small portions of Thua Thien and Quan gTin Provinces . From the flat sand beaches along th eSouth China Sea and the wide bay of Da Nang, the

*TAOR, as defined at this time, was "the area assigned to th e1st Marine Division in which the responsibility and authority fo rthe development and maintenance of installations, control of move-ment, and the control of tactical operations involving troops unde rdivision control is vested in the Commanding General, 1st Marin eDivision . All fire and maneuver conducted within the TAOR, o rthe effect of which impinge upon the TAOR, must be coordinate dwith the Commanding General, 1st Marine Division." TAOR differedfrom an area of operations (AO), which was "an area where force sconduct operations during specific periods of time," and which coul dbe an area within or outside of an existing TAOR . (Anx C, 1stMarDi vOpO 301-YR, dtd 6Feb69, in 1stMarDiv ComdC, Feb69) .

terrain rose westward into the jungle-covered moun-tains of the Annamite Chain and opened out to th esouth and southwest into the flat, treeline-broken, rice-paddy country of the An Hoa-Song Thu Bon basins ,and Go Noi Island . It was heavily populated terrai nwhich offered the enemy numerous places of defens eand concealment, and the Marines a difficult choreof routing them out .

The type of warfare carried on in southern I Corp sTactical Zone was in marked contrast to that fough tin northern I Corps, where, as Colonel Robert H . Bar-row later noted, "anything that moved you could shootat because he was the enemy ; you did not have toseparate the armed threat from the civilian popula-tion ." Barrow came to appreciate " the most difficult ;the most arduous ; dirty ; psychologically bad situatio nthat confronted those who fought the kind of war thatwas necessary to fight down in the Da Nang" area ."Those Marines who went out day after day conduct-ing, . . . combat patrols, almost knowing that some -where on their route of movement, they were goingto have some sort of surprise visited on them, eithe ran ambush or explosive device . . . . I think that isthe worst kind of warfare, not being able to see th eenemy. You can't shoot back at him . You are kind ofhelpless . It is easy to become fatalistic, as indeed a lo tof our young men did .' 3

Centered on Da Nang, the division deployed its fou rinfantry regiments, the 1st, 5th, 7th, and elements o fthe 26th Marines, in a series of radiating belts . To th enorth, Colonel Clyde W. Hunter ' s 26th Marines se -cured portions of the Hai Van Pass and sections o fRoute 1 . Colonel Herbert L. Beckington's 7th Marine spatrolled the scrub-covered piedmont and moun-tainous jungle that rose to the west . To the southwest ,the 5th Marines, under the command of ColonelJames B. Ord, Jr., scoured the An Hoa and Song ThuBon basins . Included within the regiment's area o fresponsibility was the infamous Arizona Territory, tha trice paddy-dotted, enemy-infested region set betwee nthe Song Thu Bon and Song Vu Gia . South of DaNang and north of the area assigned the Korean Ma-rines was Colonel Robert G. Lauffer's 1st Marines ,whose area of operations included Dodge City, Go No iIsland, and portions of the coastal lowlands . A rein -forced artillery regiment, the 11th Marines, provide dfire support for the four infantry regiments, while th e1st Reconnaissance Battalion and 1st Tank Battalio nsupplemented and reinforced their efforts, as did con-tingents of engineer, transport, and service troops .

Like all allied forces, the 1st Marine Division coor-

82

HIGH MOBILITY AND STANDDOWN

Enemy Order of Battl eSouthern ICT ZJanuary 196 9

kilometers0

25

50

7 5

Thua Thien► I 21s tr

n,

Da31st Na n

I►.11141stQuang Na m

dinated its efforts with South Vietnamese and Korea nMarine forces within Quang Nam Province . The fou rbattalions of the Republic of Korea's 2d MarineBrigade, based at Hoi An, about 27 kilometerssoutheast of Da Nang, defended a small TAOR stretch -ing from the South China Sea inland to the foothillsof the Que Son Mountains . South Vietnamese forceswithin the province were considerable . Regular ARVNforces consisted of the four-battalion 51st Regiment ;the 1st Ranger Group of three battalions ; and sup-porting armor, artillery, and service troops . CivilianIrregular Defense Groups based at Thuong Duc andat Nong Son, deep in the mountains, interdicted im-portant enemy infiltration routes . Protecting thepopulated areas were Regional Force companies, Popu-lar Force platoons, and a large contingent of the Na-tional Police Field Force .

Despite four years of bitter warfare in Quang Na mas the new year began, Marines, together with Sout hVietnamese and Korean units, faced an estimated forceof 24 enemy infantry and support battalions .Although massing from time to time, the enemy

See Reference Map, Sections 18-3 6

generally adhered to a defensive pattern establishe dduring late summer 1968, a posture of consisten trefusal to engage friendly forces in a large-scale con-frontation . Clearly the enemy was attempting to recon -stitute and conserve his troops by holding hi sformations to relatively secure areas . But the enem ywas to be afforded no respite, as 1st Division Marine scarried the war into the areas the Viet Cong and NorthVietnamese considered safe from attack .

Attack into 11 2

Numbered among the goals assigned III MAF b yboth CinCPac and MACV in 1968, was the neutrali-zation of eight enemy base areas within ICTZ .Although not sharply defined, these eight geographicregions were known to harbor training and logistica lsupport facilities of enemy regular and guerrilla forces .Since these areas often covered hundreds of squar ekilometers of mountainous hinterland and piedmont ,and were criss-crossed by thousands of hidden paths ,roads, and waterways, absolute neutralization was im -practical, if not impossible . It was the destruction an ddislocation of the enemy's logistical facilities within

DESTRUCTION OF BASE AREA 112

8 3

Marine Corps Historical Collectio n

An infantryman of the 1st Battalion, 7th Marines examines several captured 140mm ene-my rockets, positioned on earthen firing ramps and ready for launch against Da Nang .

these areas, and the eventual degradation of his corn-

On 25 October 1968, a number of Delta Force recon-bat capabilities, to which CinCPac referred whendefining "neutralization" as a condition when the area swere "no longer able to be used for their intende dpurpose ." 4

During 1968, III MAF conducted 21 operations i nthe eight enemy base areas. As a result of these oper-ations, two base areas were "neutralized" : Base Area100 in Quang Tin Province ; and Base Area 116 inQuang Nam . However, one new base area was estab-lished . Designated Base Area 112, it was located in th emountainous region of Quang Nam Province south -west of An Hoa, directly threatening the heavily popu-lated coastal region between Da Nang and Tam Ky.

Neutralization of Base Areas 100 and 116 in mid -1968 had forced the enemy to shift his training an dlogistical support facilities eastward into the moun-tains between the Song Thu Bon and Song Cai, andbeyond. Early intelligence provided by the U .S . ArmySpecial Forces "Delta Force" confirmed the relocation.*

*Under the Military Assistance Command and the Special Forces ,Project Delta was given a long-range reconnaissance and intelligence -gathering mission . Organized into a reconnaissance element anda reaction force, at full strength Project Delta would comprise abou t600 men, both U.S . and South Vietnamese . The typical reconnais-sance element consisted of eight road patrol teams, and 16 six-ma nreconnaissance teams .

naissance and road teams entered the area in orde rto determine the identity and location of enemy units .The Army intelligence collection effort, codenamedOperation Warbonnet, continued until 14 Novembe rwhen it was terminated prematurely and the Delt aForce teams diverted to other areas within South Viet-nam. Defectors and prisoners rounded up by Marine sduring Operation Meade River in November provide dadditional intelligence regarding unit identification .

Taken together, reconnaissance and prisoner inter -rogation reports provided a somewhat accurate list o fenemy units and probable locations within Base Area112 . Among the units identified were the two maincommand elements which controlled NVA and VC ac -tivities within Quang Nam, Quang Tin, and Quan gNgai Provinces : Front 4 Headquarters and Headquart-ers Military Region 5 . Attached and directly subor-dinate to the two headquarters elements, and als olocated within the base area were the 21st Regiment,2d NVA Division, 220th Transport Regiment, Q81s t(Deux Xuan) and Q83d (Dai Loc) Local Force Battal-ions, and 2d Battalion, 141st NVA Regiment. Rein -forcing the estimated 3,500 enemy troops were anothe r6,000 located just outside the base area in the QueSon Mountains and on Go Noi Island to the east .

84

HIGH MOBILITY AND STANDDOWN

Situation appraisals based on the intelligenc ereports, indicated that the enemy units within Bas eArea 112 would not defend in strength, but woul dwithdraw their headquarters, supplies, and personne lto the west and southwest, while attempting to dela yfriendly forces. In addition, the III MAF appraisals ex-pected the enemy to continue to harass allied line sof communication, make maximum use of surprise fir-ing devices, and mount attacks by fire against allie dinstallations, specifically An Hoa Combat Base .5

Desirous of eliminating the threat to Da Nang,MACV suggested that an operation be conducte dagainst the enemy base area as a follow-up to the high -ly successful operation, Meade Rivere Preliminary dis -cussions and planning began in late November, a sBrigadier General Ross T. Dwyer, Jr., Assistant Divi-sion Commander, 1st Marine Division, noted :

There were some planning sessions between respective 1s tDivision staff and III MAF staff, and then we had some o four own discussions in the 1st Division . It was our view tha tthis was something that a regiment could handle itself . Theaction officer level of III MAF indicated we 'd have to havea task force go out there . . . . We didn't think it was reallywarranted . . . from what they were describing to us . Weargued that a reinforced regiment, beefed up out of the exist-ing command structure that was at An Hoa at the time —then the 5th Marines—could do the job . But subsequently ,it was determined, and I think at the III MAF level, thatone, the task force would be formed and would conduct th eoperation, and that additional forces would be made avail -able to perform the mission ?

III MAF passed word to the 1st Division on 1 De-cember to form the required task force organization ."We started from absolute zero," General Dwye rremembered :

Since no task force staff and its equipment was in exis-tence, the rapid organization of a task force headquarterswas an immediate requirement. Under Major General [CarlA .] Youngdale's guidance (he was then CG, 1st Mar Div) ,I selected Colonel Bob Nichols, then an assistant G-3, a smy Chief of Staff. He supervised and directed the forma-tion of the task force headquarters from officers serving i nthe various division staff sections, from Headquarters Bat-talion and from the Communications Company . It was pur-posely designed as a small headquarters because we felt wecould satellite on existing facilities at An Hoa. We had ourinitial meeting of the hastily assembled staff and commence dplanning for the operation and for briefing General Abrams .Time was of the essence since the deadlines were short '

On 4 December, the 1st Marine Division activate dthe temporary command, codenamed Task Forc eYankee, designating General Dwyer, a World War I Iand Korean War veteran and former commanding of-

ficer of the 1st Marines, as its commander.* Later th esame day, task force staff section heads briefed Genera lCreighton Abrams on details of the operation at II I

MAF Headquarters . With no comment or questio nduring the entire briefing, General Abrams at the con-clusion turned to General Dwyer and said, "It sound sfine . Go!"°

Assigned to the task force were three battalions ofColonel James B . Ord's 5th Marines—Lieutenan tColonel Richard F. Daley ' s 1st Battalion, LieutenantColonel James W. Stemple' s 2d Battalion, and Lieu -tenant Colonel Harry E . Atkinson's 3d Battalion—aswere Battalion Landing Team /7 under LieutenantColonel Neil A . Nelson, and elements of the 1st Forc eReconnaissance Company. A small field artillery grou pwas formed from elements of Force Artillery, the 11th ,and later the 12th Marines, consisting initially of on e8-inch, two 155mm, four 105mm, and two howtar bat -teries .** Operating in coordination with Task Forc eYankee would be the 1st ARVN Ranger Group, consist -ing of the 21st, 37th, and the 39th Ranger Battalions ,and one brigade of the Americal Division .

The plan for the upcoming operation, codenamedTaylor Common, hammered out two days before th eformal activation of Task Force Yankee, called for unit sof the task force to conduct a three-phase operatio nto destroy enemy forces, caches, and installations inBase Area 112 and adjacent areas, and to prepare aseries of fire support bases extending along likel yavenues of approach to the base area from the Laotianborder. During phase one, task force units were to con-duct search and clear operations from Liberty Bridg eto An Hoa in coordination with the 1st ARVN Range rGroup' s Operation Le Loi in the An Hoa-Arizona area ,in order to destroy elements of the 2d NVA Division .A series of fire support bases would then be prepare dalong the approaches to 112 . Penetration of the ene-my base area by four Marine battalions and the es-tablishment of bases required to support the extensivesearch and destroy operations would be carried out i nphase two. During the final phase, task force units wer eto conduct reconnaissance and surveillance operations

*At this time there were two assistant division commanders ofthe 1st Marine Division . General Dwyer was stationed with the di -vision, while Brigadier General Carl W. Hoffman was assigned t oIII MAF as Assistant Chief of Staff for Operations .

**The howtar resulted from the blending of two existing weapons :the tube of a 4 .2-inch mortar mounted on the carriage of a 75mmpack howitzer. The result was a helicopter-transportable, high -trajectory weapon . With the increased evolution toward heavy-lifthelicopters and more mobile artillery, the howtar was deleted fro mthe Marine Corps' artillery inventory.

DESTRUCTION OF BASE AREA 112

8 5

Department of Defense Photo (USMC) A371820

Aerial photograph looks east down the runway at An Hoa Combat Base, the 1st Divi-sion's western-most logistical facility and home of Task Force Yankee, commanded by BGe nRoss T. Dwyer, Jr., and the 5th Marines, under the command of Col James B . Ord, Jr.

deep into the mountains west of the Song Cai, de-velop fire support bases to sustain forces completin gthe neutralization of 112, and interdict the avenue sof approach from the Laotian border. Vital to allphases of the operation would be the maintenance o fa continuous reconnaissance screen to the north, south ,and west of the maneuvering battalions as theyprogressed westward into the enemy base area .

The weather was a major consideration in the plan-ning as the monsoon season was in full swing . SinceMarines would be operating in rugged terrain far fro mtheir bases and thus dependent on helicopters, therewas thought of waiting for better flying weather . AsGeneral Dwyer noted, "we couldn't have picked aworse time weatherwise for helicopter operations inBase Area 112 ; we were going to be weather sensitive ."But, he continued, "we were at the stage where wewere told to run an operation, and the climatic con-ditions were such they said go ahead and run it . "r o

With the activation of Task Force Yankee on 4 De-cember, Nelson 's Marines, four companies and th ecommand group were released from Operation MeadeRiver, and reembarked on board the Tripoli (LPH 10) ,where all personal gear and organizational equipmentwas packed for debarkation . The following day, as

operational control of the landing team passed to the1st Marine Division and then to the 5th Marines, Com-panies E, F, G, H, and the command group movedby helicopter to An Hoa Combat Base . Simultaneous-ly, the team's rear echelon moved ashore to Camp love ,the 7th Engineer Battalion 's command post at DaNang, where the battalion's administrative and logisti-cal facilities were to be established .

Operation Taylor Common began two days later,on the morning of the 7th, with a heliborne assaultby Lieutenant Colonel Nelson's Marines into th esouthwestern corner of the Arizona Territory, thre ekilometers west of the Song Thu Bon, opposite A nHoa.* The first wave of Marines from Company H ex-perienced no contact as they landed at LZ Champagne ,and were followed immediately by the remaining com-panies and the command group. In trace, the fou rcompanies moved northeast across swollen streams, ric epaddies, and through dense treelines, conductin gsearch and clear operations throughout the widely scat-tered Phu Loi village complex . The 1st ARVN Range r

*' Arizona Territory," or simply Arizona, was the name given t othe rice paddy regions of Dai Lx and Duc Duc Districts lying be-tween the Song Vu Gia and Song Thu Bon . Origin of the term i sunknown .

86

HIGH MOBILITY AND STANDDOWN

Group assaulted into the northeast corner of the sam earea on the 10th, and began search and clear opera-tions to the southwest, eventually passing throug hblocking positions established by Nelson's Marines ,who then swept southeastward across the Song Th uBon to My Son, and then to An Hoa. Meanwhile, ele-ments of Colonel Ord's 5th Marines, following theirreturn from Meade River, conducted a thorough searchof their northern area of operations, from Libert yBridge to An Hoa .

These three operations, in conjunction with the196th Infantry Brigade's search of the Que Son Moun-tains to the south, completed the initial phase b ysweeping major enemy units from areas adjacent toAn Hoa, Liberty Bridge, and Liberty Road, the mai nsupply route between the two. But the operations werenot without cost . Although engagements with enem yunits were light and scattered during the first fou rdays, surprise firing devices or boobytraps, usually con -sisting of M26 grenades rigged as antipersonnel mines ,wounded eight . Friendly fire killed five and wounde dan equal number of Marines. Both of these problem swere to plague task force Marines throughout the oper-ation, especially those working in the lowlands .

While search and clear operations were in progressaround An Hoa, task force Marines made preparation sfor the move into Base Area 112 . On 9 December, withno additional combat resources available from the 1s tMarine Division, Task Force Yankee assumed opera-tional control of the 1st and 3d Battalions, 3d Marines ,under Colonel Michael M . Spark, from the 3d Marin eDivision : the 1st would join Operation Taylor Corn -

mon on the 13th, and the 3d the following day. Ac -cording to General Davis, the two battalions wereprovided to assist the 1st Marine Division in its "firs t` high mobility' operation out into the hills .""

Also in preparation for the assault, Task Forc eYankee established a main logistical area with 10-da ysupply levels of rations and ammunition at An Hoa ,in addition to a forward direct air support center(DASC) . Located near the artillery fire support coor-dination center (FSCC), in order to pool "Save-a -Plane" information for the protection of aircraft, th eDASC would not only control Marine fixed-wing andhelicopter support, but also Air Force transport air -craft provided by the 15th Aerial Port Squadron, fire -ship (AC-47) or "Spooky," and AC-119 or "Shadow "assistance furnished by the 14th Special Operation sWing, and special mission aircraft for heavy ordnancedrops by the Seventh Air Force within the area of oper-ation . During this period of preparation, the first fou rfire support base sites were selected and bombarded b yB-52, fixed-wing, and concentrated artillery fire wit hthe heaviest barrages directed against the sites desig-nated Lance and Pike . But due to the distance (eigh tkilometers) between Lance, the main artillery supportsite, and An Hoa, a temporary mobile fire suppor tbase, close to Lance and oriented southward, wa sopened . Its mission was to provide complementary firesupport to the Nong Song Civilian Irregular Defens eGroup and two Mobile Strike Force companies oper-ating along the Song Thu Bon and southern TaylorCommon boundary. Battery K, 4th Battalion, 13thMarines, a self-propelled 155mm Howitzer (M109) bat -

A tank of the 1st Tank Battalion conducts a sweep of Liberty Road, the main thorough -fare between Da Nang and An Hoa, in preparation for the build-up at the combat base .

Marine Corps Historical Collection

DESTRUCTION OF BASE AREA 112

8 7

Marine Corps Historical Collection

Photograph provides an overhead view of An Hoa logistics operations center and the pas-senger and cargo pad beyond. The center coordinated the helicopter movement ofper-sonnel and supplies in support of combat operations in Base Area 112 and the Arizona .

tery, supported by Company L, 5th Marines, move doverland on the 10th to establish Fire Base Marne onthe eastern shore of the Song Thu Bon, five kilome-ters from Lance . 1 2

Phase two of Operation Taylor Common began o n11 December with an assault against Hill 575, the sit eselected for Lance. The location had been visuallyreconnoitered prior to preparatory fires by Zone Inter-pretation, Planning, Preparation, and Overfly (ZIPPO )and Fire Base Interpretation, Reconnaissance, Plan-ning, Preparation and Overfly (FIRPPO) Teams to de-termine its suitability as a landing zone and sub-sequent development as a fire support base .* Althoughthe preparatory fires cleared a large proportion of thevegetation from the landing zone, a few large tre etrunks remained, necessitating the use of rappel tech-niques to land engineers and a small security force ,who cleared an area large enough to accommodate ahelicopter. Within two hours, division engineers creat-ed an adequate zone and the main assault elemen t

*ZIPPO and FIRPPO Teams, composed of air, artillery, engineer ,and infantry representatives, determined the selection and suita-bility of a fire support base, and the subsequent placement of guns ,command bunkers, and storage areas .

of Lieutenant Colonel Atkinson's 3d Battalion, 5thMarines landed and established perimeter security fo rthe engineers, who then began construction of artiller ypositions, ammunition and command bunkers, an dfurther enlarged the base .

Once the security force was in position and the sup -porting artillery batteries in place, rifle companies o fAtkinson's battalion radiated from Lance, initiatingdeliberate search and clear operations . The establishedpatrol pattern resembled a clover leaf, expanding asMarines secured areas near the fire support base . Thi spattern of operation characterized the establishmentof the next three support bases : Pike (Hill 214), openedby the 2d Battalion, 5th Marines on 13 December ;Spear (Hill 558), occupied by the 1st Battalion, 3d Ma-rines on the 15th ; and Mace (Hill 375), taken by th e3d Battalion, 3d Marines on the 19th . In construct-ing Spear and Mace, Spark's Marines encountere dproblems. The initial clearing fires were insufficien tand had to be augmented by 10,000-pound demoli-tion bombs (MK121), known as "Combat Traps,"dropped by Air Force C-130 aircraft manned by per-sonnel of the 434th Air Division from Tan Son Nhu tAirbase, near Saigon. Although partially successful on

88

HIGH MOBILITY AND STANDDOWN

Spear, the explosive force of the bombs was not stron genough to completely clear the required area on theextremely narrow ridgelines selected for Spear an dMace . Standard 500- and 1,000-pound bombs, rockets ,and napalm then were used to clear away the multi -layered, 70- to 80-foot canopy, and thick secondarygrowth which generally covered the terrain in Bas eArea 112 . 1 3

With the establishment of four Marine battalions ,under the operational control of the 3d Marines, inthe eastern zone of Base Area 112, search and destroyoperations against an area of reported enemy activityand concentrated installations began . During the nexttwo weeks, Marines, in their search, found and des-troyed several enemy base camps, fighting positions ,hospitals, and an enemy prison camp: all of which hadbeen vacated before the Marines arrived . Engagementswere few as the enemy withdrew westward, leaving onlya handful of troops to slow the advance . For many Ma-rines, this was their first experience operating in moun-tainous terrain, as Lance Corporal Rick L . Wacklerelated :

This was completely new for me because I had never oper-ated up in the canopied areas . It was a whole new type ofwarfare up there . The density of the woods, vines, jungle ;it' s really thick and it's nagging and tiresome to work in ,and everything is against you up there . . . . Being it wasso thick up there, it was very easy to walk past a ville ; thefoliage and coverage was unbelievable ; you couldn' t detec tanything from what was right or wrong .' "

In conjunction with the search and destroy mission,Task Force Yankee mounted ground operations agains tHills 1050 and 551, subsequently designated Dagge rand Cutlass . Lieutenant Colonel Richard C . Schulze's3d Battalion, 3d Marines secured the former and as-sisted in the establishment of a communicationsretransmission site . Lieutenant Colonel Richard B.Twohey's 1st Battalion, 3d Marines took the latter andbegan to exploit a major trail network identified nearMace. The battalions of the ARVN Ranger Group ,meanwhile, continued search and clear operations i nthe Arizona area, relieving Lieutenant Colonel Nel-son's battalion landing team, which assaulted into th enorthwestern portion of Go Noi Island on 17 Decem-ber. Sweeping south, the battalion displaced to A nHoa Combat Base two days later, having met only ligh tresistance . On the 23d, the 21st and 39th Ranger Bat-talions, operating in the piedmont west of Phu Loi ,encountered and then fought an estimated NVA bat-talion, killing 158 and capturing 18 individual an d10 crew-served weapons .

Abel Papers, Marine Corps Historical Cente r

Fire Support Base Lance was the first of many infan-try and artillery positions constructed in support ofTask Force Yankee operations in the enemy base area .

Near Taylor Common's southern boundary, the twoSpecial Forces Mobile Strike companies and the Non gSong Irregular Company continued reconnaissanceoperations along the upper Song Thu Bon . Althoughthese forces were relatively small, they did providetimely intelligence and proved to be an impedimentto the flow of enemy supplies and troops that previ-ously had used the area as a route into the Que SonMountains and the flatlands beyond . Further south ,the 196th Infantry Brigade continued to maintai nblocking positions, as well as search operations in theQue Sons in order to prevent an enemy escape .

With the new year, Taylor Common moved into th ethird and final phase of operations. Combat actio ncentered on two regions, the An Hoa basin, the scen eof constant enemy activity throughout most of 1968 ,and Base Area 112, the high ground lying to the wes tand southwest .

On 1 January, the 3d Battalion, 5th Marines liftedinto Combat Operations Base (COB) Javelin, signalin gthe initiation of operations in the western zone of Bas eArea 112 ; more specifically, the penetration of the larg ebasin between the Ong Thu slope and the Nui Gaing -Yang Brai ridgelines near the Song Cai .* Following theestablishment of Javelin, the bombardment of Hil l508, future site of FSB Maxwell, began . Although

*A combat operations base was similar in character to a fire sup -port base, but did not include artillery.

DESTRUCTION OF BASE AREA 112

8 9

more than 177 tons of high explosives were used t oclear a landing zone, the number of exposed treetrunks and the continued enemy small arms fire ,prevented Marines from being inserted by air . As aresult, Lieutenant Colonel Twohey ' s 1st Battalion, 3dMarines landed on nearby Hill 728 and attackedtoward Hill 508 over Hill 401, finally securing the ob-jective on the 15th . With the six 105mm howitzers ofBattery C, 12th Marines in position on Maxwell ,Spark's Marines were ready to pursue enemy forceswestward, searching and clearing the remainder of 112 .

Executing heliborne assaults from fire support andcombat bases into selected landing zones, the infantrybattalions fanned out in local search operations, uponthe successful completion of which they moved stil ldeeper into the base area : the 3d Battalion, 3d Ma-rines conducting clearing operations south and wes tof Cutlass through COB Dart to COB Battle-Ax an dFSB Bolo; the 3d Battalion, 5th Marines, under Lieu -tenant Colonel Atkinson, continuing operation sthrough COB Broadsword toward FSB Tomahawk ; andLieutenant Colonel Twohey's 1st Battalion conductingsearch operations with companies advancing on

parallel axis north and west of Maxwell, and then de-veloping COB Scimitar on Mai Guy ridgeline overlook -ing the confluence of the Song Cai and Song Boung .By 5 February, units of Task Force Yankee were oper-ating along the entire length of the Song Caiwithin Base Area 112, while 1st Force Reconnaissanc eCompany teams penetrated deep into the western ap-proaches .

The four Marine battalions, radiating from thewidely dispersed combat and fire support bases, de-veloped numerous contacts with evading enemy unit sno larger than platoons, resulting in an undramatic ,but steady, attrition of enemy troops. Beyond thegenerally light ground combat, they uncovered abun-dant evidence confirming substantial enemy strengthwithin the base area . Patrolling units continued to lo-cate many base camps, supply stores, weapons, andammunition caches . On 5 January, for example, Com-pany E, 5th Marines unearthed an arms cache contain-ing 166 rifles and three crew-served weapons, 11kilometers west of An Hoa near FSB Pike. A logisticscomplex discovered by Companies C and D, 1st Bat-talion, 3d Marines, 10 kilometers southwest of Thuon g

A Marine patrol pauses in the dense jungle undergrowth . Fighting not only the terrainbut also excessive heat and humidity, Marines found the search of Base Area 112 exhausting.

Marine Corps Historical Collection

90

HIGH MOBILITY AND STANDDOWN

Bii h

Jho Son

3 1

~,

'~'~ r r19I

TiGB

Tit ry

i

1~~

pTong Hee

1Ke94,11

'

s," Ph . Bea

` .y-P6c HS\.

Hev P I

Coy

(~

•~cey 5 . n. , - "

11S2en9

Hieu B6c 0 Clm Ne

Phono G+aAA\ -

. I .I 'Da Nang 10Km`

Aii,;c Yah-NB ^. .

i gle ,Son

! Sly ,,em

Bith,BSc +%uen-Diem ~ '~" Nem

1GR ss

De n I men

Co Lou ,

le oa,' Nh-Go

Bier( Ban

Hi~u Nhor5 ,~.

++n 9'

h ~ Khvo l

T

H

ng

the

Kinh ihanh

C;)IoAls

' n\

~~ a oi , Say

.+ _

{

Ban H,]n

\ N + i''

'~\h

vac lobeB°r Bw,

Thanh D§~

eh, son

A 5

.Loa Ph ,

T

adl Son f ,-16p

- Ma Nh '

. CT+aa

Ovc Tay ,

Thvon~J

" d.n5y ,

/ L- P Tr

Hp. Khdch

h'

nano

ern

3 Aar - Scimitar ~ein/FnePa

oa('H ep "

A

_

~l

Maxwell :'`

Di4c

~Y1'V

Duc on the 22d, yielded twenty-two 122mm rockets ,a thousand 82mm mortar rounds, 501 RPG rounds ,25 rifles, 17 cases of small arms ammunition, nearl y12 tons of rice, and a pen containing 65 live pigs .

It was during this period that the 3d Marine ssuffered a profound loss . While on visual reconnais-sance south of FSB Maxwell on the 15th, an Arm yUH-1H helicopter received automatic weapons fir ecausing it to crash and burn . On board were ColonelMichael M. Spark; the regimental sergeant major, TedE. McClintock; the commanding officer of the 1st Bat-talion, 12th Marines, Lieutenant Colonel Ermil L .Whisman; and Colonel Spark's radio operator, Lanc eCorporal Fredrick D. Kansik . All, including th ehelicopter's Army crew, were killed . Colonel Paul D .Lafond assumed command of the 3d Marines, whil eLieutenant Colonel Roddey B . Moss took over the 1s tBattalion, 12th Marines .

Ten My ~ I

Binh K/~esh, Hd r

w s—

+` 11

T.Le, r •,PMrda Bon I I

, ,

Phu N4o+T\'

ratio1~%>o

55 1. . '~

rv4 ~. . 21. br_See Reference Map, Sections 31-33, 37, 3 8

Detailed search operations within Base Area 11 2continued throughout the remaining days of Januaryand into February. On the 6th, Task Force Yankee in-itiated operations west of the Song Cai as the 2d Bat-talion, 5th Marines, following a short rest at An Hoa ,assaulted Hill 435, later named Machete, and begansearching north-northwest along the river toward FireSupport Base Saber .

In the An Hoa basin, the new year was marked byoccasional skirmishes with small enemy units movin gbetween An Hoa and Go Noi Island, 10 kilometer sto the northeast . Assigned to secure the area was Lieu-tenant Colonel Richard F. Daley's 1st Battalion, 5thMarines . Combat patrols were the order of the day ,as described by First Lieutenant Ronald E . Pruiett :

The normal way we operate is to go out and set up a com -pany PPB [platoon patrol base] and operate out of that ,sending out platoons and squad-size patrols . The norma l

Tomahawk

• Dart/;

`' -A -

H° Non •

r-Phu Lof Nghta

PhI

}'PhvieTY eD

Phu Do^g

0 Ph

G,00 ThuY K~ Lain

Thon Tay

XoSnPh .B.r;Marne

~yee+Ss n

\L h ThObr(gT,on - -`

5 il each ih'wn g

(raate

--~Theng 1'e Y .~ Sl S d g,

Theani.dlB The nn

B

a _11TBF0rC.-n-9)

'----'

'Ya :h He y

CFau,S . r1 ,R (Binh~san `

-

IDv'c gn

, Thon

Lo'Ng ,iA'S ~ _

a .

• C7 _A'

' ~4oi "\I

Assault on Base Area

11 2

Base Area

kilometers 0

5

10

1 5

odnds. la

DESTRUCTION OF BASE AREA 112

9 1

patrol covers an area anywhere from 500 meters to a clic kand a half [1,500 meters], depending on terrain and typ eof contact which we expect to make . . . . Normally the onl ycontact we do make is a small unit also . Normally we runinto groups of maybe three, four, or five . The way contac tis normally initiated, they, in most instances, initiate th econtact by firing a few sniper rounds at us and then we wil lgo ahead to commence to maneuver . Again, they are veryslippery, and by the time we maneuver into the area whichthey are at or where we think they are at, they have alreadymade their bird [escape] . , s

The most intense action to occur took place duringthe night of 29 January in the far western sector ofGo Noi Island . At 2200, a squad ambush of CompanyC, 1st Battalion, 7th Marines, not a participant i nOperation Taylor Common, observed approximatel y300 enemy troops cross to the southern bank of th eSong Ky Lam, six kilometers west of Dien Ban . Theenemy unit, apparently forced south by 7th MarinesOperation Linn River and ARVN Operation Hun gQuang 1-03, was taken under artillery fire, while th ecompany launched an attack to block the enemy's ad-vance . Engaging the Marines with automatic weaponsand RPG fire, the enemy attempted to escape west -ward, but was intercepted by Company D, 5th Ma-rines, moving from the southwest through head-highelephant grass . Fierce firefights continued throughou tthe night, with Marines employing 155mm artilleryfire and air strikes in support of the attack . By dawn ,

LtCol Richard B. Twohey, center, CommandingOfficer, 1st Battalion, 3d Marines, and LtCol Ermil L .Whisman, right, Commanding Officer, 1st Battalion ,12th Marines, brief Task Force Yankee commanderBGen Ross T. Dwyer on operations of the battalions .

Abel Papers, Marine Corps Historical Center

the enemy had broken into small groups and scattered.A search of the battle area turned up 72 NVA dead ,while numerous drag marks and blood trails punctu-ated the dense growth of elephant grass . Friendlycasualties resulting from the night's action were seve nwounded .

On 7 February, operational control of BattalionLanding Team 2/26, under Lieutenant Colonel Wil-liam F. Sparks, was shifted from the 7th to the 5t hMarines and the BLT joined Operation Taylor Com-mon. Continuing the cordon and search of Go NoiIsland begun early during Operation Linn River, theteam' s Marines encountered sniper fire and a larg enumber of boobytraps as they moved across their as -signed area, destroying tunnel systems, bunkers, an dother enemy-prepared fighting positions . Completingits short sojourn ashore, the battalion landing tea mreturned to the amphibious assault ship, Okinawa(LPH 3), where after a vigorous training period, it wa splaced in reserve for the expected Tet Offensive .

During this same period, BLT 2/26 was joined i nOperation Taylor Common by her sister landing team .On 10 February, by way of a vertical envelopment ,codenamed Defiant Measure, Lieutenant Colone lJ . W. P. Robertson's BLT 3/26 deployed to the Arizona ,relieving the 1st ARVN Ranger Group. Due to the sizeof the team's area of operation (100 square kilome-ters), Robertson assigned each company a separate are ain which to conduct search and destroy missions . Cons-tant sniping at the moving companies, with five orsix NVA tracking each company, characterized actio nduring the first two weeks . Any halt in movemen twould result in sporadic sniper and incoming M7 9grenade fire. Near the end of February, Company Lmade heavy contact killing 75 enemy soldiers and des-troying two .50-caliber antiaircraft positions . Over th enext several days, Robertson's Marines found approxi-mately 20 rockets, mortars, and recoilless rifles in po-sitions from which they could be fired, line-of-sight ,at An Hoa Combat Base. With the close of the oper-ation, BLT 3/26 remained in the Arizona, concentrat-ing on the southern portion of its assigned area whil ebeing subjected to continuous daylight sniper an dnight mortar, RPG, and suicide-squad attacks .

By mid-February, Task Force Yankee essentially ha dneutralized Base Area 112 and established fire sup -port and combat operations bases on the western ap-proaches from the Laotian border. Upon order of the1st Marine Division, General Dwyer, who was replaced

92

HIGH MOBILITY AND STANDDOWN

on the 14th by Brigadier General Samuel Jaskilka ,reduced the scale of operations by ordering the with-drawal to An Hoa of all forces in 112 with the excep-tion of two companies (L and M) of the 3d Battalion ,5th Marines, each with one battery of direct supportartillery, located on Fire Support Bases Tomahawk an dMaxwell . Due to increased enemy activity in the DMZ ,the 3d Marines command group and its 3d Battalio nwithdrew from Base Area 112 to An Hoa Combat Bas eon 16 February, and redeployed immediately to Don gHa. The 1st Battalion, 3d Marines displaced to Hil l55 the following day, and subsequently airlifted t oDong Ha after participating in a short operation i nthe 5th Marines' northern area of operations .

On 21 February, following three days of rehabilita-tion and refurbishment at An Hoa, Lieutenan tColonel Stemple's 2d Battalion, 5th Marines movedby truck to the Phu Loc (6) Refugee Hamlet, north -east of the combat base on the Song Thu Bon . There ,in coordination with the 1st ARVN Ranger and loca lRegional Force Groups, the battalion initiated block-

Abel Papers, Marine Corps Historical Cente r

ing operations in conjunction with the ARVN attempt

Two Marines enter a bamboo hut in one of the sever -to again find, fix, and destroy enemy forces, fortifica-

al enemy base camps and storage sites discoveredtions, and installations on far western Go Noi Island .

during the thorough search of Base Area 112.

On one of many patrols carried out in the Arizona, Marines of Company D, 1st Battal-ion, 5th Marines search an abandoned hut for hidden enemy troops and supplies .

Marine Corps Historical Collection

DESTRUCTION OF BASE AREA 112

9 3

Department of Defense Photo (USMC) A372866

Marines of Company D, 1st Battalion, 5th Marines rush a fellow Marine, wounded bya boobytrapped grenade, to a waiting helicopter for evacuation to a nearby medical facility.

Limited land-clearing operations, using high explo-sives, medium dozers, and Rome plows, were to beconducted after the sweep of the island, but a predawnenemy attack carried out against An Hoa Combat Baseduring the Mt holidays forced their cancellation . *

Shortly after midnight on the 23d, the northeas tcorner of the combat base, near the ammunitio nstorage area, was hit with enemy 82mm mortar fire .Under cover of the mortar and small arms fire, enemytroops cut and entered the base's defensive wire, an dfrom that position, using bamboo poles, were able tolob satchel charges into one of the ammunitio ndumps, causing a fire which ignited the remainder .Small arms and mortar fire broke the probe, and th eenemy fled to the northeast, continually engaged by"Spooky" and artillery fire . But the enemy force haddone its job . In addition to the extensive loss of am-

*Of the various types of land-clearing equipment tested in Viet-nam, the standard military D7E tractor, equipped with a heavy -duty protective cab and a special tree-cutting blade manufacture dby the Rome Company of Rome, Georgia, proved to be the mos tversatile and effective . The tractor took its name from the impos-ing blade attached to the front, which sheared off most vegetationsix inches above the ground .

munition, base personnel sustained numerous casual -ties from the night-long series of explosions whic hrocked the ammunition dumps . As a direct result ofthe enemy attack on An Hoa, and minor probes a tLiberty Bridge and on other allied installations withi nthe Da Nang Vital Area, Colonel Ord ordered Stem-ple's battalion to Liberty Bridge, where the battalio nassumed a local security mission .

As the number of enemy-initiated ground and in -direct fire attacks around An Hoa rose, so did th enumber experienced by the units which remained i nBase Area 112 . Almost nightly, Companies L and M ,operating near Fire Support Bases Tomahawk an dMaxwell, reported enemy ground and mortar attack sagainst their defensive positions . The companies re -quested reinforcements and General Jaskilka ordere dthe remainder of Atkinson's battalion redeployed tothe base area in late February. But with the attacksagainst An Hoa and other allied units operating near -by on the increase, Jaskilka again ordered the the 3 dBattalion to withdraw in early March .

Planned as a one-day operation, the withdrawal ofLieutenant Colonel Atkinson's battalion became athree-day battle of disengagement . On 3 March, Com-

94

HIGH MOBILITY AND STANDDOWN

pany M, while on a sweep near Maxwell, received smal larms and automatic weapons fire from an estimate dentrenched enemy platoon . Three Marines were killedin the attack, two of whose bodies could not be reco-vered due to heavy enemy fire . Forced to maintain itsposition, the company requested additional air an dartillery support . The following day, the Marines mad eanother attempt to retrieve the bodies, but they wer esuccessful in recovering only one . On the 5th a thir dattempt was made to recover the remaining Marin ebody, but as the company attacked the enemy posi-tion, two more Marines were killed and their bodie sleft on the battlefield .

Meanwhile, operations to close Tomahawk and Max -well began . As originally conceived, helicopters wereto extract the infantry companies and two artillery bat-teries simultaneously from both fire bases, but lowclouds and sporadic enemy mortar fire around Maxwel lforced the airborne helicopter controller to concentrat eall lifts on Tomahawk instead . Four 105mm and two155mm howitzers of the 11th Marines, along with on einfantry company, airlifted to An Hoa ; Company Lremained to provide security for a downed CH-5 3helicopter. The following day, Company L lifted to A nHoa and Tomahawk closed .

On 6 March, the Marines of Company M made on elast attempt to recover the bodies of their comrades .In their final drive, enemy fire proved to be too in -tense to warrant the risk of losing additional men, andthe company withdrew. A force reconnaissance teamsubsequently recovered the bodies of the fallen Ma-rines without loss ." Carrying their wounded, the Ma-rines of Company M advanced through the dens ejungle foliage toward Maxwell, encountering sporadicenemy resistance along the way. In one instance th ecompany's point element was taken under fire by anenemy squad, resulting in the wounding of one Ma-rine, who required immediate evacuation . While thecompany maintained its position, a medical evacua-tion helicopter extracted the wounded Marine by hoist .Poor visibility, additional enemy contact, rugged ter -rain, and the slow movement due to the wounde dresulted in Company M arriving at Maxwell after dark ,too late to be lifted to An Hoa along with the artillery.The following day, the last of Atkinson's tired Marine slifted out through sporadic small arms fire, and th efire support base was closed . With the later extractionof all reconnaissance teams operating within the bas earea, Operation Taylor Common came to an end on8 March .

Results of the three-month-long operation were im -

pressive: the destruction of enemy manpower in ex-cess of a regiment ; the capture of 206 tons of rice ,430,000 rounds of ammunition, and 1,100 weapons ;and the neutralization of Base Area 112 . But as Gener -al Dwyer was later to observe :

We knew when we went in—and we pushed these fir ebases all the way out as far as they'd go, almost to theborder—we knew we couldn't stay . And we had pretty muc hcleaned out the area . . . . But when you have to pull out ,they just filtered back in—that was, of course, the natureof the war. "

Marine casualties were 183 killed and 1,487 wound-ed; boobytraps killed 27 and wounded 386 Marines ,while 26 Marines were killed and 103 wounded b yfriendly fire . The ARVN Ranger Group suffered 100killed and 378 wounded, most occurring during oper-ations in the Arizona and on Go Noi Island .

Despite poor flying weather and rough terrain, Ma-rine airpower played a major role in the neutraliza-tion of Base Area 112, and the repeated security sweep sof the lowlands . The F-4 Phantom, A-4 Skyhawk, an dA-6A Intruder pilots of Major General Charles J .Quilter's 1st Marine Aircraft Wing flew numerous tac-tical support missions in marginal weather . During theoperation the Da Nang and Chu Lai-based fixed-win gaircraft flew 3,702 sorties, striking targets with 7,04 2tons of bombs, killing 155 enemy troops, and destroy-ing 624 installations .

Marine helicopters made an equally important con-tribution to the operation . The 10 helicopter squa-drons of Colonel Warren L. MacQuarrie's Marin eAircraft Group 16 at Marble Mountain, and Colone lBruce J . Matheson's Phu Bai-based MAG-36, flew32,619 sorties, carried 61,995 troops, and transporte d10,489 tons of supplies . Besides providing battlefieldmobility to the infantry and close air support whenfixed-wing aircraft were unable to attack targets du eto poor visibility, the pilots of these squadrons accom-plished medical evacuation, reconnaissance, resupply ,and other operational and administrative missions .Army CH-54 "Crane," CH-47 "Chinook," and UH-1 E"Huey" helicopters, " loaned" to the Marines by theAmerical Division supplied additional support . Ai rsupport for Taylor Common was not withou tproblems . While fixed-wing support was well -coordinated and "very timely," helicopter suppor toftentimes was not . Like Colonel Barrow during Oper-ation Dewey Canyon, General Dwyer was critical : "Thehelicopter support I would have to judge overall mixe din performance . It ranged from outstanding, coura-geous, superb helicopter work, to the other end of the

DESTRUCTION OF BASE AREA 112

9 5

spectrum where it did not arrive on time, left befor eit should have, [or] went to wrong zones .

"It got to a point," he continued, "that we startedrecording the times that they were supposed to be o nhand, the times they actually arrived, by type of air -craft, so that we kept a plotted curve on them—thei rperformance" A frustrating problem for Genera lDwyer and his ground commanders were lunch breaks ."It was remarkable," he commented, "when they fi-nally did arrive, they would disappear around noon-time—at lunchtime—for a variety of reasons . It wasa startling coincidence of bad radios that had to befixed at lunchtime.' 18 A number of Marine pilots, bothfixed-wing and helicopter, took exception to the re -marks of General Dwyer. Among them was ColonelEdwin H. Finlayson, who served as the 1st Wing' soperations officer at the time. "The fact of this mat -ter is," he explained, "the helicopters as a physica lcharacteristic ran short of fuel after about four hours 'operation and had to return to Marble Mountain fo rfuel since the First Division at the time had not provid-ed for any at their forward bases as the Third Divisio nhad. BGen [Henry W.] Hise [Assistant Wing Com-mander] investigated this complaint and arranged tomove refueling facilities into more forward locations

for subsequent operations which greatly reduced th eproblem ." 19 Despite the problems and resultant criti-cism, Marine aviation, specifically helicopter support ,significantly influenced the results on the battlefield .

`A Little Urban Renewal"

"At first light, I told my [lead] platoon to move i nthere and do that village a job; and take a little bitof Tecumseh Sherman into Chau Son (1) ." After al lthe civilians, mostly women and children, were round -ed up, put on amtracs, and sent to the processin gcenter adjacent to Hill 55 before resettlement, the Ma-rines of Company D, 1st Battalion, 7th Marines move dswiftly through Chau Son (1) destroying bunkers ,fighting holes, and tunnels, and burning huts foun dto contain fighting gear . The actions of Company Dat Chau Son (1) characterized the conduct of the othe rcompanies involved in the short cordon and searchoperation, codenamed Linn River .20

While battalions of the 3d and 5th Marines searche dthe lowlands near An Hoa and Base Area 112, the 1s tMarine Division gave elements of Colonel Herbert L .Beckington 's 7th Marines the task of cordoning andsearching an approximately 10-kilometer-square are asouth of Hill 55, between Route 4 and the Song Th u

Elements of Company D, 1st Battalion, 3d Marines inventory a portion of the tons ofenemy food, supplies, and ammunition captured during Operation Taylor Common.

Department of Defense Photo (USMC) A800567

96

HIGH MOBILITY AND STANDDOWN

Bon, in support of the Accelerated Pacification Cam-paign. This task was in addition to the regiment ' s nor-mal missions of patrolling the Da Nang rocket belt ,with emphasis on the Song Vu Gia infiltration cor-ridor, and bridge and installation security . Except fo rscattered treelines and a few small hamlets, fallow ric epaddies dotted the area. Long considered a haven fo rlocal guerrilla forces, the area had witnessed severa lallied operations : Linn River would be no different .

At midday on 27 January, the 1st Battalion, 7th Ma -rines departed Hill 65 and moved east on Route 4 ,accompanied by half a dozen amphibious assault vehi-cles . Once in the objective area, Lieutenant ColonelWilliam F. Bethel's battalion would be joined by th e2d Battalion, 26th Marines, under Lieutenant ColonelWilliam F. Sparks, which was to assault two separat elanding zones the following day, link up with the 1s tBattalion, and establish the initial cordon . Althougheight Sea Knight (CH-46D) helicopters fromHMM-165 did arrive on schedule, their air filters swiftl yclogged with sand, and the lift portion of the opera-tion had to be postponed. Meanwhile, Bethel's bat-talion arrived in the objective area, and not wishin gto disclose the target and mission, moved further eas tand established a temporary blocking position .

The feint to the east "might have fooled some o fthe gooks," noted the acting commanding officer o fCompany B, Second Lieutenant Wyman E . Shuler III ,"but it sure didn't fool all of them," as the assault ele-ments of Lieutenant Colonel Sparks' battalion disco-vered the following morning. The first wave landedat LZ Owl without problem ; the second, however,received heavy small arms fire as it attempted to lan dat LZ Hawk . Four of the six helicopters in the fligh tsustained heavy damage and were forced to return t oHill 55, halting the heliborne assault for three hourswhile Marines awaited replacement aircraft . By late af-ternoon on 29th, with the lifts completed, all unit smoved into position, establishing the initial cordon? '

Supported by three 105mm artillery batteries ,5-inch guns of the heavy cruiser Newport News (CA148), and two platoons of tanks from the 5th Tan kBattalion, the 7th and 26th Marines successively cor-doned and then searched the objective area . Engage-ments during the remainder of the 12-day operatio nwere light, consisting of Marines intercepting enem ytroops attempting to flee the cordon . These smal lgroups of enemy troops were sighted and then engage dby air and artillery ; however, the majority of casual -ties resulted from mortar and sniper fire . Although53 enemy troops were killed, the destruction of for -

Marine Corps Historical Collection

As elements of the 7th Marines look on, a South Viet-namese Air Force "Skyraider" drops its ordnance o nan enemy position during Operation Linn River

tifications and tunnel complexes carried out by the twobattalions and accompanying engineer detachment sovershadowed the loss of enemy personnel .

While multi-battalion operations such as Linn Rive rand Taylor Common gathered a majority of the laurels ,small-unit, counter-guerrilla operations were consis-tent in achieving success . When not participatingin major operations far afield, elements of Becking-ton 's 7th and Colonel Clyde W. Hunter' s 26th Ma-rines joined Colonel Robert G. Lauffer's 1st Marinesin saturating the coastal lowlands and piedmont ,north, west, and south of Da Nang with day and nigh tpatrols, ambushes, and company-size operations ,denying the enemy the freedom of action necessar yfor tactical successes within the Da Nang Vital Area . *

As the new year began, elements of the three regi-ments launched an around-the-clock assortment o f10,600 patrols and ambushes, in coordination with 7 8company-size cordon operations, during the month

*The 26th Marines, task-organized as a regimental landing team ,was under operational and administrative control of the 9th Ma-rine Amphibious Brigade . The regiment's in-country compositio nat the beginning of the year included a command group and th e1st Battalion . The remaining two battalions formed the infantryelement of the Seventh Fleet's Special Landing Force .

DESTRUCTION OF BASE AREA 112

9 7

against suspected enemy harbor sites and areas of in -tense combat and logistical support traffic with meage rresults . But the relative calm observed in January, t oa degree reminiscent of the period preceding the waveof offensive thrusts of Tet 1968, gave way the follow-ing month to the first significant rise in enemy activi-ty since August 1968. Attempting to counter theexpanding South Vietnamese influence and to pro -vide stronger political leverage, the Quang Nam ene-my leadership again struggled to stage its comba tstrength in the populated piedmont and lowlandspreceding the Tet holidays, but were once moretrapped in the maze of 1st Marine Division patrols andambushes .

Acting on locally obtained intelligence, a patro lfrom Company D, 1st Battalion, 26th Marines, on 7February, found an enemy base camp containin gequipment and messing and billeting facilities nea rthe Nam 0 Bridge on the Song Cu De, 13 kilometersnorthwest of Da Nang. Reporting the find, the patro ldeparted, leaving the site untouched . Shortly afte rdark, the full company returned and set up a series

ColRobert G. Lauffer, Commanding Officer, 1st Ma-rines, maps out the movement ofpatrols south of D aNang with his operations officer, MajJames K. Reilly.

Marine Corps Historical Collection

of ambushes in order to catch any enemy troops us-ing the facility. Twenty soldiers attempting to moveinto the base camp activated the first trap shortly be -fore midnight . By 0200 the following morning, Com-pany D had surprised two additional NVA units . Ofa total of 45 enemy observed and engaged, the com-pany killed 18 and captured two prisoners .

Enemy attempts to move rockets within range of D aNang during early February, also fell victim to th enumerous Marine patrols and ambushes . On the 8th ,Company L, 3d Battalion, 7th Marines found seve ncomplete 122mm rockets concealed along the banksof the Song Yen, 14 kilometers southwest of the city.On the same day, and two kilometers west, another3d Battalion patrol discovered thirteen 140mm rockets ,temporarily stored in a waterhole . And shortly beforemidnight on the 18th, a Company F, 2d Battalion ,1st Marines ambush, directing artillery on suspecte denemy movement, five kilometers south of MarbleMountain, reported 21 secondary explosions, presuma-bly enemy rockets being destroyed .

By mid-February, encounters with larger enem yunits around the periphery of the Da Nang Vital Are arose . Company D, 1st Battalion, 7th Marines, whil epatrolling 22 kilometers south-southwest of the city,located an NVA platoon occupying a bunker system .Under cover of artillery, the company assaulted the po-sition, forcing the enemy to withdraw, leaving 16 dead .A squad was left in the area, and at dusk it ambushe danother enemy platoon attempting to reoccupy th ebunker complex, killing 14 more . Earlier in the day,four kilometers to the east, the 2d Battalion, 51s tARVN Regiment engaged an estimated enemy bat-talion moving north from Go Noi Island . Pinnedagainst the Song Suoi Co Ca, the enemy lost 49 killed .

Despite the lack of strength necessary for a full-scal eoffensive, enemy units within range of Da Nang com-mitted themselves to action on the morning of the23d, the first day of Tet. Rocket and mortar teams werethe first to strike. Attacks against the Da Nang Vita lArea began with a 25-round, 122mm rocket missio ndirected at the Deep Water Pier and continued withsporadic attacks throughout the vital area until dawn .Principal allied losses included the destruction of a nARVN ammunition dump near III MAF Headquarter sand a 450,000-gallon fuel tank near the airbase . OneA-6A fixed-wing aircraft and six helicopters sustaine dlight damage during the attacks .

In addition to a rocket and mortar attack on Logis-tic Support Unit-1 supply areas at An Hoa, which des-

98

HIGH MOBILITY AND STANDDOWN

DESTRUCTION OF BASE AREA 112

99

troyed 15,000 rounds of artillery ammunition an d40,000 gallons of aviation fuel, enemy units also tar-geted the Chu Lai complex . The largest rocket mis-sion of the day—fifty 122mm rockets—targeted th eDa Nang Force Logistic Command and Naval Suppor tActivity installations. Over half the rounds, however ,fell into the ocean with the remaining inflicting limit-ed damage on the LST ramp and one empty fuel tank .

As rocket and mortar teams attacked allied com-mand and logistic facilities within the vital area, ene-my sapper units attempted to disrupt major infantrycommand installations, while still other units move dto cut the principal approaches to the city . Like previ-ous attempts against Da Nang, the effort was detect-ed and repulsed, forcing the enemy to withdraw agai nto avoid total destruction .

Ground action south of Da Nang began shortly aftermidnight on the 23d, when Company K, 3d Battalion ,1st Marines and Company D, 1st Military Police Bat-talion detected enemy troops approaching the twoSong Cau Do bridges . Attacking the yet-unassemble denemy units, the two companies killed 47 Viet Congand captured 11, halting any enemy attempt at clos-ing the two critical highway approaches . A short tim elater, an estimated 70 Viet Cong attacked the com-mand post of the 2d Battalion, 1st Marines, six kilom-eters south of Marble Mountain . Repelled and forcedto withdraw, the enemy left 17 dead and 4 wounde din the hands of the 1st Marines .

Shortly after dawn on the 23d, a Viet Cong uni twas detected in a factory complex near the Hoa Van gDistrict Headquarters, site of the heavy fighting dur-ing the abortive attempt to take Da Nang in Augus t1968 . Marine units from the airbase forced the enemyinto an isolated, bamboo-encircled cemetery after kill-ing six and capturing two others . In a two-hour fire -fight the following day, the 21st ARVN Range rBattalion assaulted the enemy force, then in th eprocess of withdrawing southward, killing another 57 .

After less than 12 hours of fighting, enemy unit ssent north to attack Da Nang were in retreat . Theirefforts to escape unscathed were shattered by element sof the 1st Marines and 1st Battalion, 51st ARVN Regi-ment, who found them 11 kilometers south of D aNang and struck hard . Maintaining almost constan tcontact for three days, the ARVN and Marine troop skilled 139 and captured 38 weapons .

West of Da Nang, Lieutenant Colonel Francis X .Quinn's 3d Battalion, 7th Marines intercepted an dthen blunted a major three-pronged thrust into the

vital area by elements of the 141st NVA Regiment. Thecentral and southern thrusts aimed at seizing the vil-lage of Tuy Loan and destroying nearby Cobb Bridgein order to prevent allied reinforcements from movin gnorth along Highway 540 . The northern thrust at -tempted to secure a route through Dai La Pass andthen into the 1st Marine Division Command Post o nHill 327. Shortly after midnight on the 23d, a squa dambush from Captain Paul K. Van Riper's Company Mtrapped an enemy force moving east of Hill 10, kill-ing 10 and capturing numerous weapons . Several hourslater, another of Van Riper ' s patrols spotted 40 NVAtroops in the same area and engaged them with ar-tillery. A company search at first light the followingmorning revealed that the patrol had ambushed anenemy mortar company. In addition to securing twocomplete 82mm mortars, the enemy company's firs tsergeant was captured . He later indicated that a major

NVA offensive was underway .

During the morning of the 23d, as elements of th e141st continued to advance, Colonel Quinn first com-mitted Van Riper's company and then the remainde rof the battalion . The constant pressure applied b yQuinn's Marines, which at times approached hand -to-hand encounters, forced the enemy to separate insmall groups which, by the end of the day, congregate din three pockets along the Song Tuy Loan . The pocke teast of Hill 41 was eliminated on the morning of th e24th by Captain Fred T. Fagan, Jr's Company K, whoseMarines captured the acting regimental commande rduring the engagement .* Van Riper 's Marines, in clos efighting, reduced the second pocket centered aroun dthe village of Tuy Loan the same day. The third pock-et, nestled between the An Tan ridgeline and Son gTuy Loan, proved to be more difficult . Under Cap-tain James K. Hall, Marines of Company L, support-ed by artillery and air strikes, assaulted the positionseveral times but were unable to dislodge the enemyfrom the thick stands of bamboo and dense growthof elephant grass that covered the area . Sufferingnumerous casualties, included among them CaptainHall, the company was forced to withdraw an dregroup? 2

At first light on the 26th, Company M and the twoeffective platoons of Company L prepared to move for -

*Under interrogation, the captured regimental commande rprovided information which eventually led to the destruction o fhis own regiment, and to that of the 31st during Operation Okla-homa Hills . (LtCol Merrill L . Bartlett, Comments on draft ms ,1Sep86 [Vietnam 69 Comment File, MCHC, Washington, D .C.]) .

100 HIGH MOBILITY AND STANDDOWN

Marine Corps Historical Collection

Sgt Howard" Johnson, a member of Detachment A, Marine Air Support Squadron 3 ,displays a North Vietnamese Army flag captured during one of the several enemy attack son Da Nang-area Marine and other allied positions, which began on 23 February .

ward against the enemy position . Following air strikes ,which consisted of 500-pound retarded bombs ("SnakeEyes"), napalm, and artillery fire, the assault bega nunder a blanket of riot control agent (CS gas) . In aseries of coordinated squad assaults, Van Riper's Ma-rines carried a portion of the objective before stallin gin the face of stiffening enemy resistance at nightfall .The following morning, again under cover of CS gas ,Company M renewed the attack. Moving rapidly, Va nRiper's lead platoon reached the Song Tuy Loan, cut-ting the objective in two while the trace platoon sturned east and west, clearing the remainder of th earea and hunting down surviving enemy troops . "Thecommanding officer was a prisoner and nearly 200 o fhis men were dead," noted Captain Van Riper, "rem-nants of the unit struggled desperately to break con -tact and move to the relative safety of the mountain s. . . . With the collapse of resistance at An Tan Ridge,

the 141st NVA Regiment ceased to exist as an effec-tive fighting force ." 2 3

Two other predawn Tet attacks centered on majorallied command complexes west of Da Nang. On thenorthern slope of Hill 327, security elements for Head-quarters, 26th Marines and 1st Marine Divisio nrepulsed a nocturnal assault by satchel charge -equipped NVA sappers . A similar attack targeted the2d Battalion, 7th Marines compound to the northwest .Although the sappers breached the defensive wire, 2 dBattalion Marines drove the attackers back. At least75 enemy troops were killed or captured in the tw ofutile attempts . Reflecting the intensity of the rocket-and mortar-supported suicide raids, Marine defender slost 18 killed and 80 wounded .

Although Marine patrols and ambushes continue dto engage remnants of the enemy force through March ,the attacks on the Da Nang Vital Area during Tet, in

DESTRUCTION OF BASE AREA 112

10 1

essence, were met and broken on 23 February . Strand-ed in the Da Nang-Hoi An-Dai Loc triangle, the ene-my hid, hoping to escape area saturation by Marin esmall units and increased employment of the deadlyscout/sniper teams.* Despite the enemy ' s reluctanceto engage 1st Division Marines, nearly 500 NVA an dVC were taken out of action — a clear gauge of the con -tinued effectiveness of the 1st Marine Division's small -unit campaign in Quang Nam Province .

Americal's TAOI

Headquartered at Chu Lai, about 45 kilometer ssouth of Da Nang, was Major General Charles M . Get-tys ' Americal Division . The division' s Tactical Area ofOperational Interest (TAOI), one of the largest in Viet-nam, encompassed all of Quang Tin and Quang Nga iProvinces and the Que Son District of Quang NamProvince. Spanning the relatively flat coastal lowland sand mountainous central highlands, the division's are acontained approximately 1 .2 million South Viet-namese centered around Tam Ky and Quang Ngai ci-ties . Sharing the TAOI was the 2d ARVN Divisionheadquartered at Quang Ngai and numerous provin-cial forces .

Tactically, the three infantry brigades of the divi-sion were deployed throughout the TAOI in separat eareas of operation . To the north was the Oregon are aof operation; in the center, the Chu Lai ; and, to thesouth was the Duc Pho area of operation . In addition ,there were a number of areas created for specific com-bat operations .

Operations within the Chu Lai TAOI, as the year

began, centered on small unit patrols, ambushes alonginfiltration routes, and security operations along majo rlines of communications, designed to locate an deliminate enemy forces, enhance security of friendl yinstallations, and ensure the safety of the local popu-lation . Employment of patrols in the Chu Lai rocketbelt and detailed searches of Ky Hoa Island success -fully prevented attacks by fire against the airbase an dthe city of An Tan . In addition, a series of preemptiv eoperations was conducted in late January and earlyFebruary north of the Song Tra Khuc to deny the ene-my use of the area as a base from which to launch at -tacks against Quang Ngai City. Encounters remainedlight during the first two months of the year and i n

*Marine two-man scout/sniper teams, observer and rifleman, wer edeployed along heavily traveled enemy infiltration routes . Usingthe standard sniper weapon, a Model 700 Remington rifle with avariable-power telescopic sight, the teams were often credited withfirst-round kills at distances exceeding 1,000 meters .

early March the Chu Lai area of operation was incor-porated into that of Operation Geneva Park .

Americal Division forces conducted combat opera-tions within the Duc Pho area of operation during th efirst two months of the year with emphasis on secur-ing the heavily populated coastal plains, using satu-ration patrols and preemptive assaults in suspecte denemy staging areas . Like those within the Chu Laiarea, engagements remained light until late Februarywhen a series of joint Army-ARVN operations werelaunched along the coastline east of Mo Duc and intothe foothills of the Nui Tam Cap Mountains, all aime dat preventing enemy troops from approaching the cityof Quang Ngai . As with the other areas, in early Marchmilitary actions within the Duc Pho area of operatio nwere terminated and its area incorporated into the Iron

Mountain Operational Zone .

Created in early November 1968, the Oregon are aencompassed the northern portion of the Americal Di -vision TAOI—Quang Tin Province and Que Son Dis-trict of Quang Nam. Engagements were few aselements of two infantry brigades and one cavalrysquadron conducted saturation patrols, reconnais-sance-in-force, and rice-denial operations to locate an ddestroy enemy troop and supply concentrations . On23 February, elements of the 2d NVA Divisionlaunched simultaneous attacks on Tam Ky and agains tthe Civilian Irregular Defense Group camp at Tie n

Phuoc . Americal Division forces were committed tothese two areas and engaged the attacking enem yforces, turning them back before they could achiev eany success . On 18 March, as part of the realignmen tof forces within the Americal Division TAOI, the Ore-gon area of operation was incorporated into the oper-ational zone of Frederick Hill .

In addition to operations conducted within the Ore-gon, Chu Lai, and Duc Pho areas, four separate oper-ations were carried out . As a complement to OperationTaylor Common conducted by Task Force Yankeeagainst Base Area 112, elements of the 196th InfantryBrigade initiated Operation Fayette Canyon on 15 De-cember against the 1st Viet Cong Regiment in An-tenna Valley and the Nui Mat Rang Mountains to th esoutheast . Operation Russell Beach was carried out o nthe Batangan Peninsula, in conjunction with SpecialLanding Force Operation Bold Mariner, to rid the are aof enemy troops and to reintroduce South Vietnames econtrol . In support of the Accelerated Pacificatio nCampaign, Operation Hardin Falls was initiated in th eThang Binh District of Quang Tin Province in De-

102

HIGH MOBILITY AND STANDDOW N

cember and was aimed at destroying local Viet Con gforces, rebuilding war-ravaged hamlets and villages ,and reestablishing South Vietnamese control of th earea . Further south, in Quang Ngai Province, Opera-tion Vernon Lake II continued in the Song Re Valle yagainst elements of the 3d NVA Division, preventing

the enemy force from launching offensive operation sagainst Quang Ngai City and the populated coasta l

lowlands . Due to aggressive Americal operations dur-ing the first two months of 1969, the enemy was un-able to achieve a single military or political objectivewithin the division's TAOI .