  • Page 1 of 4

    GENERAL INFORMATION The BIT GROUP consist of two companies: BIT S.p.A. and EUROTRAVI Srl. 1 - Name of Company : BIT SPA Address : Via Trieste,33 - 31016 CORDIGNANO (TV) Telephone : +39 0438 998811 Telefax : +39 0438 995410 P. IVA : 02048840264 E-mail : [email protected] Internet address : www.bitcostruzioni.com

    Because of its geographical position, our company is easy to reach both from the Venice Airport – MARCO POLO (away about 40 minutes driving) or the train stations of Sacile or Conegliano (away only few minutes driving). Also the A27 Highway, which connect Venice to Conegliano and Vittorio Veneto (TV) is only 15 km away from BIT S.P.A.

    2 - Turnover (gross sales 2011) € 36.973.751,00.- Revenue € 29.886.410,00.- (gross sales 2012) € 33.114.178,00.- € 28.716.602,00.- (gross sales 2013) € 36.504.352,00.- € 46.171.837,00.- Registration SOA nr. 12621/04/00 dated 23.05.2012 OG3 classification VI° OS18-A classification VIII° (unlimited) Registration at Chamber of Commerce of Treviso: nr. 02048840264 – R.E.A. 185060 3 - Share capital : € 1,200,000.00- 4 - Year of establishment : 1968 Activity begin of steel working : 1950 5 - Number of employees : 104 staff Professional staff - Total Workers 64 - Total Employees 40 (Manager 1) (Cadres 4) (Employees 35)

    Date: 23.04.2014 Rev. 05

  • Page 2 of 4

    Employers - 1 Managing Director

    - 9 Technical Department - 4 Production

    - 2 Quality System - 5 Administration - 6 Purchasing and Shipments Department - 8 Sales Department - 5 Others 6 - Main products

    a) Steel structures for civil, industrial and agriculture buildings, power plants; b) Steel structures for any type for industrial plants, as petrochemical, as thermal plants,...; c) pipe racks d) bridges, overpasses, underpasses, viaducts, pedestrian walkways and steel bridges for

    roads, highways and railways; e) lattice steel towers for over-head transmission lines, for antennas, for telecomunication and

    supports for light signals; f) beams and special welded profiles; g) bridge cranes and quay cranes, and special steel components.

    All above listed products can be produced by ourselves. For some other peculiar products connected with our main production we can also sub-contract them to some other companies under our control.

    7 - Areas of production BIT S.P.A. has one production centre:

    it is about 60,000 square meters, 24,000 of which are covered and served by nr. 24 overhead travelling cranes up to 20 tons.

    8- Production capacity: 24,000 tons per year. Engineering We can provide design, calculation and workshop drawings for all our products as listed above. We can provide engineering directly through our office or through some other independent design offices which are specialized in design of different products and are usually collaborating with our Company.

    An IBM AS400 which include the ERP for the management of our Company, one FUJITSU BLADE server which include 12 VM servers (Windows server 2008 R2 + 2 LINUX MACHINES), 42 PC, and 14 printers (Laser, inc jet, and needles) and 9 multi function primer are connected to central computer and to blade server. Excel, Word, Project and Access programs are usually used for the routine works in the technical and commercial departments. We can provide non cost engineering for bids of steel structures for workshop buildings. We can provide pre-order engineering consultation for all our activities at costs to be defined. can provide detail drawings from specifications and sketches. We usually work with ITALIAN CODE (UNI),BRITISH CODE (B.S.), GERMAN CODE (DIN), FRENCH CODES, AMERICAN CODES. We can work with ASME CODE section IX, and U.B.C.

    Date: 23.04.2014 Rev. 05

  • Page 3 of 4

    Inspection and test Our Quality Control Manager is qualified as 2nd level, according to ASNT-ASME, for the following n.d.t.: - U.S. test - penetrant test - magnetic particle examination. He refers directly to the General Manager of the Company. We can perform all these tests with our own equipments. We subcontract the execution of x-ray test to an authorized Company. We can provide destructive testing using our: a) machinery "GALDABINI" for bending, resistance for tensile and compression stress b) impact test equipment c) two hardometers d) apparatus to make test on galvanized areas All the equipments are officially tested every 12 months by Italian Authorities and certificates are released. Quality System and other certifications Bit S.p.A. has been certified UNI EN ISO 9001:2008 by DNV (DET NORSKE VERITAS ITALIA S.r.l.). We use the quality system in each stage of production in workshop and in site. Bit S.p.A. has got a technologic laboratory with suitable equipments for destructive, nondestructive, impact and hardness tests. The instruments are controlled periodically and calibrated by external specialized agencies which issue the relative certificates. Moreover we supply the ironworks certificates of the used materials and if it is necessary we are able to confirm the same ones using our spectrometer. Our technicians can make the following controlls as they have got the ASNT Licence of 2° level: A) Penetrant liquid B) Ultrasoud C) Magnaflux We entrust radiographicals checks to external specialized agencies. Our welding processes, like arc welding, submerged arc welding and MAG welding, are approved by Registro Navale Italiano, Loyd’s Register of Shipping and Istituto Italiano della Saldatura. We usually work with the following standards and international rules: - UNI - DIN - B.S. - EN - ASME - Standards and specifications of FF.SS. and ENEL .

    Date: 23.04.2014 Rev. 05

  • Page 4 of 4

    BIT Spa has also been qualified for EN 1090-1 and UNI EN 3834-2. BIT Spa is also a qualified supplier for Italian Railway RFI and Italian Energy Power Companies TERNA and ENEL. Scheduled Certifications Concerning the HSE Certifications UNI EN ISO 14001 and OHSAS 18001, the company has already completed the development of the written procedures and instructions and it is now waiting for the final audit and the consequent certifications release.

    Date: 09.05.2013 Rev. 04

  • OurCertificates

  • Some of our most important jobs carried out in the last few years

    Section: Bridges

    Year 2011

    Job’s Description

    Road Axis Marche – Umbria

    Completion works SS77 “Val di Chienti”

    Viaduct S. Lorenzo

    Place of execution Route Civitanova Marche - Foligno

    Total weight 2.000 ton

  • Year 2010

    Job’s Description Construction 3rd way on Highway A14 BO-BA-TA

    Viaducts

    Place of execution Civitanova Marche (AN) Italy

    Total weight 2500 ton

  • Year 2011

    Job’s Description Foot bridge over Dora Riparia

    Place of execution Turin- Italy

    Total weight 240 ton

  • Year 2008

    Job’s Description

    Construction of new heavy traffic road between V.le

    De Gasperi and V. Gattamelata in Milan

    Arc Bridge “De Gasperi”

    Place of execution Milan - Italy

    Total weight 740 ton

  • Year 2010

    Job’s Description PEOPLE MOVER – Monorail train

    Place of execution Venice (Italy)

    Total weight 1.700 ton

  • Section: Buildings

    Year 2012

    Job’s Description Tower Building “Bank Intesa-San Paolo”

    Place of execution Turin (Italy)

    Total weight 6.000 ton ( BIT) – Peso totale 15.000 ton

  • Year 2011

    Job’s Description New Parliament House

    Place of execution La Valletta (Malta)

    Total weight 1.500 ton

  • Year 2012

    Job’s Description Opera House – Malta

    Place of execution La Valletta (Malta)

    Total weight 250 ton

  • Year 2011

    Job’s Description New Arrival Hall in Florence Airport

    Place of execution Florence (Italy)

    Total weight 1.000 ton

  • Year 2010

    Job’s Description New High Speed Train Station ” Torino Porta Susa”

    Place of execution Turin (Italy)

    Total weight 3.000 ton

    AW

    AR

    D E

    CC

    S 2

    013

    EU

    RO

    PE

    EA

    N D

    ES

    IGN

    AW

    AR

    D 2

    013

  • Year 2004

    Job’s Description Nr. 2 Pavilions/ New Trade Center in Milan - Rho Pero

    Place of execution Rho-Pero (Milan) - Italy

    Total weight 7.200 ton

    Year 2006

    Job’s Description Pavilions / New Trade Center in Rome

    Place of execution Rome (Italy)

    Total weight 2.200 ton

    Year 2008

    Job’s Description Pavilions nr. 14-15 / New Trade Center in Bologna

    Place of execution Bologna (Italy)

    Total weight 2.500 ton

  • Section: Buildings for Power Plants Year 2010

    Job’s Description Pipe Racks and building for Power Plant

    Place of execution Aprilia-LT (Italy)

    Total weight 3.400 ton

    Year 2010

    Job’s Description New Plant for Waste Processing in Lucchini Spa

    Place of execution Piombino - LI (Italy)

    Total weight 830 ton

  • Year 2010

    Job’s Description Building and Pipe Rack for energy power plant

    Place of execution Turano-LO (Italy)

    Total weight 2.867 ton

    Year 2008

    Job’s Description Building and pipe racks for thermal power plant

    Place of execution Turbigo (MI) - Italy

    Total weight 1.250 ton

    Year 2008

    Job’s Description Buildings for Thermal Power Plant

    Place of execution Rizziconi (CS) - Italy

    Total weight 3.100 ton

  • Section: Special Components Year 2013

    Job’s Description MOSE Project

    Place of execution Venice - Italy

    Total weight 34 ton

  • Year 2013

    Job’s Description MOSE Project – rail -rack for structu res ’ movement, inspection ’s towers and sealing entrances Place of execution Venice - Italy

    Total weight 850 ton

  • Section: Lattice Steel Towers Year 2012

    Job’s Description Lattice steel tower for cableway

    Place of execution France

    Total weight 100 ton

  • Year 2010

    Job’s Description Lattice steel towers for electricity ’s transportation - line 380 kV Sudburgenlan

    Place of execution Austria

    Total weight 1800 ton

  • Year 2011

    Job’s Description Lattice steel towers for electricity ’s transportation - line s 110/220/380 kV Limberg - Schaufelberg Place of execution Austria

    Total weight 2100 ton