Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term...

40
Corporate Flats Strategy MTAC November 7, 2002

Transcript of Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term...

Page 1: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Corporate Flats Strategy

MTAC November 7, 2002

Page 2: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 2

Presentation Overview Background

Near Term Actions (FY 2003 and 2004)

Longer Term Planning (FY 2005 and beyond)

– Delivery Vision

Summary

Page 3: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 3

Importance of Flats

FY 01 Revenue From Flats: $16.1 Billion

Periodicals: Mailbox Anchor ThatGenerates Other Revenue Streams

Standard Mail Revenue isSecond Only to First-Class Mail

Flats Rates Rising Faster Than Inflation

Page 4: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 4

USPS Committed to Flats

Grow Customer’s BusinessIncrease Capital InvestmentMaintain Affordability

Improve Processes

Corporate Flats Strategy

Introduced at the September 2000 Postal Forum

Page 5: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 5

Corporate Flats Strategy

Distributed in July 2001

Introduced the DeliveryVision

Focused on Improvements in the Near Term

Overviewed the Longer Term Plans

Page 6: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 6

Drive Down Costs Through

Automation

Improve Processing Performance

and Service

Create a Win-Win for Customers and the Postal Service

Corporate Flats Strategy

Page 7: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 7

Completed AFSM 100 Deployment

Started FSM 1000 Modifications

Explored Mail Preparation Alternatives

– Logs

– Flats Feeder Assist Device

– Fiberboard Trays

– Pallet Movers

Last Year’s Progress

Page 8: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 8

Manage the Base

Substitute Capital for Labor

Increase Customer Involvement

Near Term Actions

Page 9: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 9

Improve Operational Performance

– Up-the-Distribution-Ladder

– Increase Productivity

Reduce Mail Preparation Costs

– Standardize Opening Units

Standardize Flats Distribution

Capture Savings

Manage the Base

Page 10: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 10

Summary

QTR 1 FY 2001

QTR 4 FY 2002

Page 11: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 11FY 2001 FY 2002end of year FY 2000

piece handlings per workhour

Qtrs. 1 to 4 Qtrs. 1 to 4

Page 12: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 12

Take Advantage of Latest Technology– Automatic Tray Handling System

– Flats Feeder Assist Device

– The AFSM 100 Feeder Modification

– Pallet Movers

– UFSM 1000

– ID Code Sort Move More Mail to Our Processing

Centers to Achieve Greater Depth of Sort (i.e., from the 5-digit level to carrier route)

Substitute Capital for Labor

Page 13: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 13

Structure Rate Incentives to Support Operations Objectives

Match Make-up to Processing Requirements

Increase Barcoded Flat Volumes Improve Address & Barcode

Readability

Increase Customer Involvement

Page 14: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 14

Where We Were

4 Mail Streams:– Automated– Mechanized– FSM 1000– Manual

Significant Piece Handling Costs

Increasing Mail Prep Costs

Increased Rates

Page 15: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 15

From 4 Mail Streams to 2– Automated– Manual

Maximize 11 Digit Barcoded Volume

Minimize (eliminate) Small Bundles

Standardize– Physical Characteristics– Address Placement– Make-up and Presentation

Where We Want To Go

Then to 1: DPP

Page 16: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 16

MTAC & USPS Working TogetherMTAC & USPS Working TogetherOptimizing Readability

Conducting Mail Characteristics Study

Developing Alternative Flats Packaging

Developing Mail Preparation Alternatives

Reducing Bundle Breakage

Developing Irregularity Reporting

How Do We Get There?

Page 17: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 17

Address Block Location

Destination Address Format

Barcode Placement

Adhesive Labels

Extraneous Information

MTAC Workgroups

Optimizing ReadabilityOptimizing Readability

Page 18: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 18

Optimizing Readability

Developed Voluntary Guidelines for Flat Mail

MTAC Workgroups

Page 19: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 19

Mail Characteristics StudyMail Characteristics Study

Determining the Spectrum of Mail the AFSM Can Successfully Process

Basic size dimensions remain the same

Increase the maximum weight to 20 oz

MTAC Workgroups

Page 20: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 20

Identify Cost Effective Bundle Packaging for Mailers and USPS

Balance Cost of Material With Package Integrity

Alternative Flats PackagingAlternative Flats Packaging

MTAC Workgroups

Page 21: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 21

Working with Mailers through MTAC Mutually Acceptable Preparation and Handling Methods

Drive Down Combined Cost

Mail Preparation AlternativesMail Preparation Alternatives

MTAC Workgroups

Page 22: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 22

Flats Feeder Assist Device allows operator to handle heavy loads

MTAC Workgroups

Mail Preparation AlternativesMail Preparation Alternatives

Page 23: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 23

Controlled Testing of Various Packaging Materials

Reducing Bundle BreakageReducing Bundle Breakage

Solution– Shrink wrap– Double band– Palletize– Weight – 20 pound max– Height – 6 inch max

MTAC Workgroups

Page 24: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 24

Long Term Plan: NO SACKS

Page 25: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 25

Develop a Mechanism to Report Preparation Irregularities to Mailers and Mail Owners In a Timely Manner to Prevent Recurrence

Irregularity ReportingIrregularity Reporting

MTAC Workgroups

Page 26: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 26

Evaluate Delivery Point Packaging

Prioritize Key Decision Points

Identify Potential Customer Impacts

Longer Term Plans

Page 27: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 27

Implement the Delivery Vision

Minimize In-Office Costs

Maximize Street Efficiency

Page 28: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 28

OPTION 1: Delivery Point PackagingDevelop a machine that will use a one-pass system to sequence both letters and flats in delivery order.

OPTION 2: Flats Sequencing SystemDevelop a machine that will use a two-pass system to sequence flats in delivery order.

Evaluate Delivery Sequencing Options

Page 29: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 29

OPTION 1: Delivery Point PackagingDevelop a machine that will use a one-pass system to sequence both letters and flats in delivery order.

Evaluate Delivery Sequencing Options

Page 30: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

NEAR TERMFY 2003 & FY 2004

MID TERMFY 2005

to

FY 2006

Sector/Segment Firms

Direct to Street

DPS LettersDirect to Street

Walk Sequence/ Marriage MailingsDirect to Street

Residue Letters & All FlatsCased

Current Operations

This time period will be used for

planning purposes.

The Postal Service’s Delivery Vision

Option 1: Delivery Point Packaging

Start Research & Development for

DPP

Page 31: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

LONG TERMFY 2007

Letters(DPS Not Required)

Flats(5 Digit Presort,

No Carrier Route)

Walk Sequence/ Marriage Mailings(Entered at DPP

Location)

One Bundle100% Letters &

FlatsDirect to Street

Sector/Segment Firms

Direct to Street

DPS LettersDirect to Street

Walk Sequence/ Marriage MailingsDirect to Street

Residue Letters & All FlatsCased

Current Operations

NEAR TERMFY 2003 & FY 2004

MID TERMFY 2005

to

FY 2006

Operational Planning

Start Research & Development for

DPP

The Postal Service’s Delivery Vision

Option 1: Delivery Point Packaging

Page 32: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 32

OPTION 1: Delivery Point PackagingDevelop a machine that will use a one-pass system to sequence both letters and flats in delivery order.

OPTION 2: Flats Sequencing SystemDevelop a machine that will use a two-pass system to sequence flats in delivery order.

Evaluate Delivery Sequencing Options

Page 33: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Sector/Segment Firms

Direct to Street

DPS LettersDirect to Street

Walk Sequence/ Marriage MailingsDirect to Street

Residue Letters & All FlatsCased

Current Operations

NEAR TERMFY 2003 & FY 2004

MID TERMFY 2005

This time period will be used for

planning purposes.

Start Research & Development for

FSS

The Postal Service’s Delivery Vision

Option 2: Flats Sequencing System

Page 34: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Sector/Segment Firms

Direct to Street

DPS LettersDirect to Street

Walk Sequence/ Marriage MailingsDirect to Street

Residue Letters & All FlatsCased

Current Operations

FSS FlatsDirect to Street

Residue Letters & Flats

Walk Sequence/ Marriage Mailings

Cased

DPS LettersDirect to Street

NEAR TERMFY 2003 & FY 2004

LONG TERMFY 2006

Operational Planning

Start Research & Development for

FSS

The Postal Service’s Delivery Vision

Option 2: Flats Sequencing System

MID TERMFY 2005

Page 35: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 35

Fund Research and Development

Examine Competitive Prototypes

Evaluate Impact on Plant & Delivery Operations

Prioritize Key Decision Points

Page 36: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 36

11 Digit Barcode Standardized Piece Design ID Tag Presort (For Automated Zones)

– Carrier Route Sorting Make-up and Presentation Entry Point

Identify Potential Customer Impacts

DPP FSS

REQ REQ

? REQ

YES YES

? ?

CHG CHG

CHG CHG

Page 37: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 37

Implement the Delivery Vision

Minimize In-Office Costs

– Sequencing Letters and Flats

Maximize Street Efficiency

– Sequence Letters and Flats Together

– One Delivery Point Package (DPP)

Page 38: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 38

Summary

Near Term (FYs 2003 & 2004):

Increase Equipment Utilization

Reduce Mail Preparation Costs

Manage the Base

Involve Customers

Page 39: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Slide 39

Summary

Longer Term (FY 2005 & beyond):

Refine the Delivery Vision

Evaluate DPP & FSS Options

Develop DPP & FSS Technologies

Involve Customers

Page 40: Corporate Flats Strategy MTAC November 7, 2002. Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.

Corporate Flats Strategy