CGI Group Inc. 2014
Connecting to the DCC Chris Beard
2
Connecting to the DCC
DCC
DC
C U
ser G
atew
ay E
quip
men
t
Back Office
Systems Technical
Orchestration Business
Orchestration
DUGIS Proprietary Interface
Challenge is mapping proprietary back office interfaces to 101
DUGIS Service Requests (and growing )
3
Technical Orchestration
DCC
DC
C U
ser G
atew
ay E
quip
men
t
Business Orchestration Layer (BOL)
Back Office
Systems Technical
Orchestration
Update Security Credentials (6.15)
Critical, Non Sensitive (SME.C.C.1) 16 individual steps 3 calls to P&C 4 HSM steps
4
Business Orchestration
DCC
DC
C U
ser G
atew
ay E
quip
men
t
Business Orchestration
Back Office
Systems Technical
Orchestration
Business Service CoT
Service Requests Set to credit (1.6) Update tariff (1.1) Retrieve Billing Data Log (4.4.3) Set the Billing Calendar (6.8) Delete/create schedules (5.1, 5.2, 5.3) Restrict access for CoT (3.2) Reset Customer PIN (3.5) Display message (3.1)
5
CGI integration components
DCC
DC
C U
ser G
atew
ay E
quip
men
t
Back Office
Systems
DCC Adapter Business
Orchestration Layer (BOL)
6
DCC Adapter
DCC Adapter
Core DCC Adapter
DCC Adapter Optional Components
UTRN Generation Firmware Management Service Request GUI Anomaly Detection Reporting Single Sign-On Oracle
DUGIS DCC Adapter
Internal Interface (DUGIS-like)
9
DCC Adapter Pricing
Item One-off licence Annual support
One-off implement
ation
Core DCC Adapter Technical orchestration of Service Requests
500,000 100,000 145,000
All prices are exclusive of VAT.
Item Description One-off licence Annual support
One-off implement
ation
GUI Manual entry of Service Requests 75,000 15,000 3,500
UTRN Generation Generation of UTRNs for top-ups 20,000 4,000 N/A
Firmware Management Receipt, validation and storage of F/W 40,000 8,000 1,500
Reporting Reporting environment for Audit Logs 65,000 13,000 4,000
Oracle Replaces MySQL with Oracle 110,000 22,000 N/A
Anomaly Detection Mirrors DSP AD functionality 75,000 15,000 3,500
Single Sign-On Accepts SAML assertions 50,000 10,000 2,200
DNO/GNO options Currently being specified TBD TBD TBD
10
Business Orchestration Layer (BOL)
BOL
Business Services
Business Functions Activity Monitoring Auditing Bulk Notification Extraction GUI Reporting Scheduling
Business Services
DCC Adapter Internal Interface
(DUGIS-like)
12
CGI BOL Pricing Model
Business Services
Business Service Characteristics
13
DCC Adapter Test Pack Optional Component
Source: SMIP UEPT DUGIS CTS Matrix 0.1 Draft, 12/06/2014
Key benefits Rapid automated completion of mandatory,
optional and negative UEPT tests. De-couples UEPT from market readiness. Allows rapid progression to E2E testing with
back office systems and chosen Devices. Key features
Based on DCC Adapter Test Harness. Scripts editable to point at DCC-allocated
Devices. Fully automated testing. Flexible choice of test coverage (e.g. mandatory,
optional, negative). CTS test scripts designed to:
o Provide maximum coverage; o Use minimum number of Device sets; o Complete in minimum execution time.
14
CTS Test Pack
A test harness and set of automated test scripts that provide full UEPT coverage.
http://www.google.co.uk/url?sa=i&rct=j&q=testing+sign&source=images&cd=&cad=rja&docid=2BYSCkaegmcP5M&tbnid=mqv88PYrtJ8l7M:&ved=0CAUQjRw&url=http://www.mysafetysign.com/caution-testing-in-progress-do-not-disturb-sign/sku-s-8894&ei=B0USUrv9LLCT0AX8jIDQDg&bvm=bv.50768961,d.ZG4&psig=AFQjCNE0du9D5coiySBIHN6WhLWZBfX-KQ&ust=1377015383876202
Thank you
Connecting to the DCCChris BeardConnecting to the DCCTechnical OrchestrationBusiness OrchestrationCGI integration componentsDCC AdapterDCC Adapter PricingBusiness Orchestration Layer (BOL)CGI BOL Pricing ModelDCC Adapter Test Pack Optional ComponentCTS Test PackThank you