11
Workbook 6
Authored by: Alexander Doré August 14, 2010
Workbook 5
Architecture Services Mobilization Operational Model - Deployment & Execution
Business Architecture Program Business Enterprise Architecture Governance (BEAG)
Confidential
C-MAD Group Inc Computer Science & Engineering Architecture Consulting Services
22
Chief Architect Role • Chief Architect implementation of the Business Enterprise Architecture
Governance (BEAG) will enable ALU to achieve greater precision in implementing oversight, controlling planning and estimating, and prioritizing at an US Enterprise level, and immediately improving the linkage of tactical execution to strategy
• Chief Architect plays a critical role in supporting pre-execution gate activities in addition to providing design support for projects – Translates business capabilities into IT strategy as part of business architecture – Delivers high level solutions as part of solution shaping – Ensures technology solutions align to the guiding IT strategy through execution
• Chief Architect will requisition well estimated and reasonable % of Capital as needed to fund ALU Business Enterprise Architecture, Solution Shaping, and Governance activities for 2010/2011 – Funding is crucial to support sufficient architects within the organization to maintain the
ability to grow and deliver to support 2010 discovery activities – Architecture resources must be in place to support solution shaping as discovery pilots
occur – Large critical programs like Platform Consolidation risk failure if there is no governance
ensuring alignment to IT strategy
33
ALU Delivery Planning & Architecture
Management
Chief Architect Delivers Key Services Across ALU Enterprise Operating Model
Strategy
• ALU Business Architecture strategy defined & maintained as a reflection of business strategy
• Solutions defined in greater detail as solution shaping takes place in discovery
• ALU capabilities delivered over time
Strategic Planning
Business Architecture
& Blueprinting
Strategy Planning & Discovery
Portfolio Management
Initiative Planning
Project Discovery &
Planning
Detailed Req’s
Detailed Design Dev. Testing Implemen-
tation
Refinement & Execution
IT Strategy
Governance
Chief Architect will be required to provide architectural
governance during solution shaping and detailed design
Business Architecture • A team of “X” will deliver IT
strategy and blueprinting in collaboration with Corporate Strategy
Enterprise Architects • A mix of internal and external
resources will provide the equivalent of “X” architects over 2010
Application Architects • Governance activities should represent 20% of architect workload.
Architect headcount needs to be stable
• Project funding will continue to fund application architect involvement in project design
• IT PMO (PPM) • Business PMO (PPE) • Benefit Realization
• Performance and Capacity Management • IT Vendor Management • Change Management • Service Level Management ALU
Resources Needed
ALU BEAG Operating
Model
Chief Architect deliver Solution Shaping coordinated by BRM’s
Business Architects required to provide ongoing updates to the ALU vision as business strategy
and capabilities evolves
44
Funding Discovery Resource Model
Strategy
! Team of “X” needed to collaborate with Business Strategy as defined by Business Architecture effort currently underway within Strategy and Planning
! Cost: $Y.0M
! Resources: X
! Cost: $Z.0M
! Resources: W
Architecture Significance < $500K $500K – 1M $1M – 3M $3 – 5M >$5M
Avg Project (mil) $0.250 $0.750 $1.500 $4.000 $6.000
Low $ 0.000 $ 0.001 $ 0.005 $ 0.013 $ 0.040
Medium $ 0.000 $ 0.002 $ 0.010 $ 0.027 $ 0.080
High $ 0.001 $ 0.005 $ 0.010 $ 0.053 $ 0.080
Architecture Significance < $500K $500K – 1M $1M – 3M $3 – 5M >$5M
Low 2% 6% 2% 0% 0%
Medium 4% 7% 15% 10% 0%
High 5% 12% 15% 12% 10%
PRE-PROJECT PLANNING ARCHITECTURE DOLLARS PER PROJECT
PERCENTAGE OF 2010 PROJECTS FALLING WITHIN EACH TYPE
Planning & Architecture
! ~X Projects projected for 2010/2011
! ~Y of the X projects will go through discovery
! Assume a normal spread of projects in terms of complexity and cost and estimate architecture funding needed (see Example)
! Assume a mix of internal and external resources. External resources will be used to help ramp up headcount and then transition to a steady state internal headcount
Resource CalculationsDiscovery Full-time Equivalents (FTEs)
2010 Start 2010 End Average CostInternal: 0.0 8.40 4.20 840,000.00$
External: 14.0 5.60 9.80 4,410,000.00$ Total: 14.0 14.00 14.00 5,250,000.00$
Control Examples
55
Governance will focus on 11 key decision points
Governance Key Decision Points and Owners
! Capabilities (Strategic Planning Group)
! ALU vision (CIO/CTO)
! SP/BI owner assigned (Strategic Planning Group)
! Prioritization (SP/BI owner)
! Business case (BRM)
! High level requirements (Enterprise Architects)
! Solution shaping (BRM’s)
! Documented POR (EPMO)
! Detailed requirements (Enterprise Architects)
! Detailed design (BRM’s)
! Testing (AD Architects)
Establish ALU business and IT strategy
ALU Business and IT planning of IT investments
Development of approved IT solutions
3
4
9 10 11 2
Strategic Planning
Business Architecture
& Blueprinting
Strategy Planning & Discovery
Portfolio Management
Initiative Planning
Project Discovery &
Planning
Detailed Req’s
Detailed Design Dev. Testing Implemen-
tation
Refinement & Execution
IT Strategy 2
3
4
9 10 11 Operating Model
Decision Points and
Governance Owner
Exception Process
1
1
5
6
5 6
7
7
8
8
66
Details of Proposed Business-centric Operating Model
Legend [Designate]: R: Responsible A: Approving Authority C: Consulted I: Informed
Legend [Roles]: EMPO = Executive Management Program Office ELT = Executive Leadership Team BRM = Business Resource Management SP/BI = Strategic Planning/Business Intelligence PPM = IT PMO PPE = Business PMO
77
Operating Model: Strategy
Business Strategic Planning Operational Business
Architecture Blueprinting / IT Design Delivery & Deployment
IT Strategy
Goals
Org Platform Skills ALU Vision
Capabilities SP/BI Mapping/Creation
Goals Capabilities
Feasibility
Process
Business
• Strategic goals and objectives defined
• Business Architecture identifies the business capabilities required to deliver on strategic goals and objectives
• Business Capabilities and the ALU Vision are mapped to SP/BI’s as appropriate
IT
• Strategic IT Org, Platform, and Skill decisions are made based on needs identified in the business strategy
• IT capabilities and investments are identified that deliver on business capabilities and mapped into a roadmap that delivers those capabilities over time
1 2
StrategicPlanning
OperationalBusiness & ITArchitectureBlueprinting
PortfolioManagement
Operations Support
Strategy
DetailedRequirements
DetailedDesign Development Testing
Implemen -tation
Refinement & Execution
DetailedRequirements
DetailedDesign Development Testing
Implemen -tation
Refinement & Execution
Project Discovery and
Planning
Planning & Discovery
Initiative Planning
IT Strategy
Operations
Feasibility
Responsible: Corporate Strategy
Responsible: Strategic Planning Group
Responsible: CTO
1
2
3
4
3
4
1a 1a
StrategicPlanning
OperationalBusiness & ITArchitectureBlueprinting
PortfolioManagement
Operations Support
Strategy
DetailedRequirements
DetailedDesign Development Testing
Implemen -tation
Refinement & Execution
DetailedRequirements
DetailedDesign Development Testing
Implemen -tation
Refinement & Execution
Project Discovery and
Planning
Planning & Discovery
Initiative Planning
IT Strategy
Operations
Strategy
88
Operating Model: Strategy Business Strategic Planning Operational Business & IT
Architecture Blueprinting IT Strategy
Goals Org Platform Skills
StrategicPlanning
OperationalBusiness & ITArchitectureBlueprinting
PortfolioManagement
Operations Support
Strategy
DetailedRequirements
DetailedDesign Development Testing
Implemen -tation
Refinement & Execution
DetailedRequirements
DetailedDesign Development Testing
Implemen -tation
Refinement & Execution
Project Discovery and
Planning
Planning & Discovery
Initiative Planning
IT Strategy
Operations
Capabilities SP/BI Mapping/Creation
• Goals: defining the strategic goals of the company
• Capabilities: Strategic goals translated into actionable business capabilities and metrics
• SP/BI Mapping/Creation: Business capabilities mapped to SP/BI’s
R A C I
Corporate Strategy X
ELT X
Business Architects X
Strategic Planning X
• Inputs: N/A • Outputs: Goals
R A C I
Strategic Planning X
Corporate Strategy X
Business Architects X
SP/BI Owners X
BRM X
R A C I
Strategic Planning X
Corporate Strategy X
SP/BI Owners X
BRM X
EMPO X
ALU Vision
• Inputs: Goals • Outputs: Capabilities
• Inputs: Goals • Outputs: SP/BI Mapping/Creation
• Org / Platform / Skills: Organizational structure, strategic platforms and key skills based on strategic goals and IT objectives
• ALU Vision: High level IT Solutions
R A C I
CTO X
CIO X
Strategic Planning X
BRM X
R A C I
CTO X
ELT X
Strategic Planning X
BRM X
• Inputs: Goals • Outputs: Org / Platform / Skills
• Inputs: Goals / Capabilities • Outputs: SP/BI Mapping/Creation
1 2
3
1a
99
Operating Model: Planning & Discovery
Priorities
Cost, benefit and time estimates
Process
Portfolio Management
Project Discovery & Planning
Initiative Planning
Prioritization Documented ROI
Solution Shaping
Business Case
Business
• SP/BI owner assigned if new SP/BI had been created (Approving Authority: Strategic Planning Group)
• SP/BI owners commit to an aggregate cost/benefit for their total portfolio and prioritize based on funding and resources (Approving Authority: SP/BI Owners)
• SP/BI Owners review business cases coming out of discovery as an input to portfolio prioritization (Approving Authority: SP/BI Owner)
• SP/BI portfolio submitted for approval is reviewed to ensure agreed upon cost/benefit is being met (Approving Authority: SP/BI Owner)
IT
• Architecture being developed in solution shaping is reviewed for alignment to ALU vision (Approving Authority: CTO)
• Architecture submitted to Council is reviewed for alignment to ALU vision (Approving Authority: Ops Council)
StrategicPlanning
OperationalBusiness & ITArchitectureBlueprinting
PortfolioManagement
Operations Support
Strategy
DetailedRequirements
DetailedDesign Development Testing
Implemen -tation
Refinement & Execution
DetailedRequirements
DetailedDesign Development Testing
Implemen -tation
Refinement & Execution
Project Discovery and
Planning
Planning & Discovery
Initiative Planning
IT Strategy
Operations
SP/BI Owner Assigned
Projects for
approval
2
3
5
4
Initiative Charter
Requirements Definition
1
Handoff from Strategy
SP/BI Mapping/Creation
Capabilities
ALU Vision
Responsible: SP/BI Owner BRM
Responsible: EPMO
Responsible: BRM
2
1
3
4
5
6
6
Governance Point #
Output
StrategicPlanning
OperationalBusiness & ITArchitectureBlueprinting
PortfolioManagement
Operations Support
Strategy
DetailedRequirements
DetailedDesign Development Testing
Implemen -tation
Refinement & Execution
DetailedRequirements
DetailedDesign Development Testing
Implemen -tation
Refinement & Execution
Project Discovery and
Planning
Planning & Discovery
Initiative Planning
IT Strategy
Operations
Planning and Discovery
1010
Portfolio Management Project Discovery & Planning Initiative Planning
Prioritization Documented ROI Solution Shaping Business Case
StrategicPlanning
OperationalBusiness & ITArchitectureBlueprinting
PortfolioManagement
Operations Support
Strategy
DetailedRequirements
DetailedDesign Development Testing
Implemen -tation
Refinement & Execution
DetailedRequirements
DetailedDesign Development Testing
Implemen -tation
Refinement & Execution
Project Discovery and
Planning
Planning & Discovery
Initiative Planning
IT Strategy
Operations
Initiative Charter
• Prioritization: Identification and prioritization of initiative ideas against available funding and resources
• Business Case: Cost/benefit estimations defined
• Solution Shaping: Solution shaping and architecture design document
R A C I
SP/BI Owner X X
Strategic Planning X
BRM X
Enterprise Architects X
• Inputs: Capabilities / SP/BI Mapping / ALU Vision
• Outputs: Priorities
R A C I
BRM X
SP/BI Owner X
Enterprise Architects X
Finance X
PPE X
EMPO X
R A C I
BRM X
CTO X
SP/BI Owner X
EMPO X
• Inputs: Priorities • Outputs: Business Case
• Inputs: Requirements Definition • Outputs: Solution Shaping
• Documented: The EPMO brings a defined project with an approved business case to the project to Council for approval
R A C I
EPMO X
Council X
BRM X
SP/BI Owner X
Enterprise Architects X
• Inputs: Business Case / Solution Shaping • Outputs: Documented ROI
• Initiative Charter: Completed charter with documented initiative design
R A C I
BRM X
SP/BI Owner X
Enterprise Architects X
Initiative Sponsor X
• Inputs: Capabilities / ALU Vision • Outputs: Initiative Charter (discovery
documents)
• Requirements Definition: High level definition of requirements
R A C I
BRM X
CTO X
SP/BI Owner X
EMPO X
• Inputs: Priorities / Initiative Charter • Outputs: Requirements Definition
2
5
4 6
2 4 6 5
Operating Model: Planning & Discovery
3
Requirements Definition 3
1111
Operating Model: Delivery
StrategicPlanning
OperationalBusiness & ITArchitectureBlueprinting
PortfolioManagement
Operations Support
Strategy
DetailedRequirements
DetailedDesign Development Testing
Implemen -tation
Refinement & Execution
DetailedRequirements
DetailedDesign Development Testing
Implemen -tation
Refinement & Execution
Project Discovery and
Planning
Planning & Discovery
Initiative Planning
IT Strategy
Operations
Governance
Business
• Business oversight of costs and benefits throughout the refinement and execution process.
IT
• CTO oversight of architecture throughout the refinement and execution process.
• Testing oversight at each step of the testing process
Detailed Requirements
Detailed Design
Development Testing Implementa
tion 1-5
1-5
2 3 5 4 1
Handoff from Planning & Discovery
Documented ROI
Solution Shaping
Requirements Definition
Responsible: AD / IM
4
Governance Point #
Output
StrategicPlanning
OperationalBusiness & ITArchitectureBlueprinting
PortfolioManagement
Operations Support
Strategy
DetailedRequirements
DetailedDesign Development Testing
Implemen -tation
Refinement & Execution
DetailedRequirements
DetailedDesign Development Testing
Implemen -tation
Refinement & Execution
Project Discovery and
Planning
Planning & Discovery
Initiative Planning
IT Strategy
Operations
Refinement and Execution
1212
Detailed Requirements Detailed Design Development Testing
• Detailed Requirements: Detailed functional and technical requirements
• Detailed Design: Detailed end-to-end solution design and effort, timing and cost estimates
R A C I
AD / IM X
PPM X
CTO X
BRM X
SP/BI Owner X
• Inputs: Requirements Definition / Solution Shaping
• Outputs: Detailed Requirements
R A C I
AD / IM X
PPM X
CTO X
BRM X
SP/BI Owner X
• Inputs: Detailed Requirements
• Outputs: Detailed Design
• Development: Solution construction
R A C I
AD / IM X
PPM X
CTO X
BRM X
SP/BI Owner X
• Inputs: Detailed Design • Outputs: Development
• Approved Test Results : Test architectures are created and used to approve projects for release
R A C I
QA X
PPM X
AD / IM X
CTO X
BRM X
SP/BI Owner X
• Inputs: Detailed Design / Development
• Outputs: Approved test results
StrategicPlanning
OperationalBusiness & ITArchitectureBlueprinting
PortfolioManagement
Operations Support
Strategy
DetailedRequirements
DetailedDesign Development Testing
Implemen -tation
Refinement & Execution
DetailedRequirements
DetailedDesign Development Testing
Implemen -tation
Refinement & Execution
Project Discovery and
Planning
Planning & Discovery
Initiative Planning
IT Strategy
Operations
Operating Model: Delivery
1313
Key governance points throughout the operating model will ensure projects flow through successfully
Governing Body
Title Title Title
ELT High level IT solutions reviewed
for alignment to strategy and capabilities
Corporate Strategy Capabilities reviewed for alignment
against strategic goals
Strategic Planning Group If an SP/BI has been created,
an owner is assigned Review if any conflict
Ops Council Final decision on any remaining conflicts
CTO
SP/BI Owner Prioritization of projects
against available funding and resources
BRM
EPMO
PPM (IT PMO)
PPE (Business PMO)
Governance Point Responsibilities
Operational Business & IT Architecture Blueprinting
Capabilities
IT Strategy
ALU Vision
Portfolio Management
SP/BI Owner Assigned
Portfolio Management
Prioritization
First escalation point Second escalation point
1414
Key governance points throughout the operating model will ensure projects flow through successfully
Governing Body
Title Title
ELT Final decision if conflict
Corporate Strategy
Strategic Planning Group
Final decision if conflict
Ops Council Final decision if conflict Approval of projects
CTO Review for alignment with ALU vision
SP/BI Owner Approve business case based on pre-
determined metrics BRM
EPMO
PPM (IT PMO) IT oversight throughout
process
Check test results
throughout testing
PPE (Business PMO) Business oversight
throughout process
Governance Point Responsibilities First escalation point Second escalation point
Project Discovery & Planning
Business Case
Project Discovery & Planning
Solution Shaping
Initiative Planning
Documented ROI Refinement & Execution Testing
1515
Tying Together: 1). Chief Architect Governance Model 2). Business Operating Model 3). Future Roles and Responsibilities Model
1616
3 Models - 3 Levels of Detail
Building a Better Alcatel-Lucent End-to-end Business Operating model, inclusive of Business and IT, and focused on Discovery
Chief Architect Governance Model Oriented towards Implementing Business Drivers into IT Organization; focused on Discovery through Execution and Enablement
Future State Roles and Responsibilities Definition
• How do these three models map together? • How is ALU Business strategy maintained and executed through this cycle? • What feedback loops need to exist? • What are the processes needed to allow for this operating model to work (e.g., governance)? • What are the roles and responsibilities? • What capabilities and resources are needed to support these efforts?
Key Questions
1717
If not large project
If large project
IT-centric Operating Model [typical]
Business Strategy and Goals
Business Needs Definition PP3. Initial
Viability Assessment
RQ1. High-level Business
Requirements
SS1. Create Conceptual Architecture
SS2. Analyze Conceptual Architecture
SS3. Create Draft Solution
Recommendation
SS4. Validate Solutions with
Enterprise Architecture
SS5. Validate Solutions with Business SMEs
RQ2. High –level Effort Estimation
RQ2. High-level Benefit Estimation
RQ2. Project Charter and
Business Case Development
PP4. Pre-approve and Prioritize Projects Based on Business Case, Cost, and Preliminary Release Timing
PP5. Validate Delivery
Feasibility
PP6. Update Project Charter and Business
Case
PP7. Operations Council Approval (where required)
PP8. Approve Projects
(Scheduling Stage Gate )
RQ3. Create Detailed Business
Functional Requirements
RQ4. Create Detailed
Technical / Non-Functional
Requirements
TS1. Create Test Strategy
TS2. Create Test Architecture
SDLC. Detailed End-to-end
Solution Design
SDLC. Create Detailed Effort,
Timing, and Cost Estimate
SDLC. Solution Construction
TS3. Define Test Scenarios
TS4. Validate Test Scenarios
TS5. Create Test Cases and Test
Scripts
TS6. Prep Test Environment
TS7. Execute Tests
TS8. Performance Tuning
TS10. Install Test Builds
TS11. Verify / Approve Test
Results
START
END
Service Deployed and Value Realized
Business Ideas, Requests, and Aspirations
TS14. Execute Testing (selected steps from full
testing cycle)
PP1. Project Requests
PP2. Business Needs Definition
Corporate Strategic Planning
Rolling Annual Planning
TS12. Risk Evaluation
TS13. Determine Scope and Approach of Testing
TS9. Defect Management
RM4. Finalize Enterprise
Release Calendar and Scope
RM5. Validate contingency/back-
out plan
RM6. Validate Release
(including final code &
configuration versions)
RM7. Go-No Go recommendation
RM8. Deploy Release
RM3 Align to End-to-End Enterprise Release Calendar
RM2. Identify Preliminary
Release Categorization /
Timing
RM1. Identify Program Release
Dependencies
SS6. Refine and Finalize High-level Solution
Testing
SDLC
Release Manage-
ment
Solution Shaping
Require-ments
Planning
Business Planning
1818
If not large project
If large project
Missing Elements: (1) Business Architecture Strategy, (2) Architecture Blueprinting, and (3) Portfolio Management
Business Strategy and Goals
Business Needs Definition PP3. Initial
Viability Assessment
RQ1. High-level Business
Requirements
SS1. Create Conceptual Architecture
SS2. Analyze Conceptual Architecture
SS3. Create Draft Solution
Recommendation
SS4. Validate Solutions with
Enterprise Architecture
SS5. Validate Solutions with Business SMEs
RQ2. High –level Effort Estimation
RQ2. High-level Benefit Estimation
RQ2. Project Charter and
Business Case Development
PP4. Pre-approve and Prioritize Projects Based on Business Case, Cost, and Preliminary Release Timing
PP5. Validate Delivery
Feasibility
PP6. Update Project Charter and Business
Case
PP7. Operations Council Approval (where required)
PP8. Approve Projects
(Scheduling Stage Gate )
RQ3. Create Detailed Business
Functional Requirements
RQ4. Create Detailed
Technical / Non-Functional
Requirements
TS1. Create Test Strategy
TS2. Create Test Architecture
SDLC. Detailed End-to-end
Solution Design
SDLC. Create Detailed Effort,
Timing, and Cost Estimate
SDLC. Solution Construction
TS3. Define Test Scenarios
TS4. Validate Test Scenarios
TS5. Create Test Cases and Test
Scripts
TS6. Prep Test Environment
TS7. Execute Tests
TS8. Performance Tuning
TS10. Install Test Builds
TS11. Verify / Approve Test
Results
START
END
TS14. Execute Testing (selected steps from full
testing cycle)
PP1. Project Requests
PP2. Business Needs Definition
Corporate Strategic Planning
Rolling Annual Planning
TS12. Risk Evaluation
TS13. Determine Scope and Approach of Testing
TS9. Defect Management
RM4. Finalize Enterprise
Release Calendar and Scope
RM5. Validate contingency/back-
out plan
RM6. Validate Release
(including final code &
configuration versions)
RM7. Go-No Go recommendation
RM8. Deploy Release
RM3 Align to End-to-End Enterprise Release Calendar
RM2. Identify Preliminary
Release Categorization /
Timing
RM1. Identify Program Release
Dependencies
SS6. Refine and Finalize High-level Solution
Testing
SDLC
Release Manage-
ment
Solution Shaping
Require-ments
Planning
Business Planning
Initiative Planning Bus. Strategy
Project Discovery and Planning Detailed Requirements
Detailed Design/Development
Testing
StrategicPlanning
OperationalBusiness & ITArchitectureBlueprinting
PortfolioManagement
DetailedRequirements
DetailedDesign Development Testing Implemen-
tationOperations
Support
Strategy Refinement & Execution
Project Discovery and
Planning
Planning & Discovery
Initiative Planning
IT Strategy
Operations
StrategicPlanning
OperationalBusiness & ITArchitectureBlueprinting
PortfolioManagement
DetailedRequirements
DetailedDesign Development Testing Implemen-
tationOperations
Support
Strategy Refinement & Execution
Project Discovery and
Planning
Planning & Discovery
Initiative Planning
IT Strategy
OperationsHandoff point
1919
Initiative Planning
Business Strategy
Suggested Operating Model “Lined-up” with IT-centric Model
START
Business Ideas, Requests, and Aspirations
Corporate Strategic Planning Business
Strategy and Goals
Business Needs Definition
Rolling Annual Planning Planning
IT Strategy
PP3. Initial Viability
Assessment
PP4. Pre-approve and Prioritize Projects Based on Business Case, Cost, and Preliminary Release Timing
Portfolio Management
StrategicPlanning
OperationalBusiness & ITArchitectureBlueprinting
PortfolioManagement
DetailedRequirements
DetailedDesign Development Testing Implemen-
tationOperations
Support
Strategy Refinement & Execution
Project Discovery and
Planning
Planning & Discovery
Initiative Planning
IT Strategy
Operations
StrategicPlanning
OperationalBusiness & ITArchitectureBlueprinting
PortfolioManagement
DetailedRequirements
DetailedDesign Development Testing Implemen-
tationOperations
Support
Strategy Refinement & Execution
Project Discovery and
Planning
Planning & Discovery
Initiative Planning
IT Strategy
Operations
PP1. Project Requests
PP2. Business Needs Definition
RQ1 RM2 IT Strategy and
Portfolio Management are gaps in this model
2020
Project Discovery and Planning
Planning & Discovery Model “Lined-up” with IT-centric Model
Planning
Require-ments
Solution Shaping
SS2. Analyze Conceptual Architecture
SS3. Create Draft Solution Recommend
ation
SS4. Validate Solutions
with Enterprise Architecture
SS5. Validate Solutions
with Business SMEs
RQ2. High –level Effort Estimation
RQ2. High-level Benefit Estimation
RQ2. Project Charter and
Business Case
Development
SS6. Refine and Finalize
High-level Solution
PP5. Validate Delivery
Feasibility
PP6. Update Project
Charter and Business
Case
PP7. Operations
Council Approval (where
required)
PP8. Approve Projects
(scheduling stage gate)
RQ1. High-level
Business Requirement
s
StrategicPlanning
OperationalBusiness & ITArchitectureBlueprinting
PortfolioManagement
DetailedRequirements
DetailedDesign Development Testing Implemen-
tationOperations
Support
Strategy Refinement & Execution
Project Discovery and
Planning
Planning & Discovery
Initiative Planning
IT Strategy
Operations
StrategicPlanning
OperationalBusiness & ITArchitectureBlueprinting
PortfolioManagement
DetailedRequirements
DetailedDesign Development Testing Implemen-
tationOperations
Support
Strategy Refinement & Execution
Project Discovery and
Planning
Planning & Discovery
Initiative Planning
IT Strategy
Operations
RQ3
RM3 RQ1
SS1. Create Conceptual Architecture
2121
Development
Testing
Detailed Designs
Detailed Requirements
Refinement & Execution Model “Lined-up” with IT-centric Model
Require-ments
Solution Shaping
Release Manage-
ment
SDLC
Testing
RQ4. Create Detailed
Technical / Non-Functional
Requirements
TS1. Create Test
Strategy
TS2. Create Test
Architecture
SDLC. Detailed
End-to-end Solution Design
SDLC. Create
Detailed Effort,
Timing, and Cost
Estimate
SDLC. Solution
Construction
TS3. Define Test
Scenarios
TS4. Validate Test
Scenarios
TS5. Create Test Cases
and Test Scripts
TS6. Prep Test
Environment
TS7. Execute
Tests
TS8. Performance
Tuning
TS10. Install Test Builds
TS11. Verify /
Approve Test Results
TS14. Execute Testing (selected steps from full
testing cycle)
TS13. Determine Scope and Approach of Testing
TS9. Defect Management
RM4. Finalize
Enterprise Release Calendar and Scope
RM5. Validate
contingency/back-out
plan
RM6. Validate Release
(including final code & configuration versions)
RM7. Go-No Go
recommendation
RM8. Deploy Release
RM3 Align to End-to-End Enterprise
Release Calendar
RM2. Identify
Preliminary Release
Categorization / Timing
RM1. Identify
Program Release
Dependencies
RQ3. Create Detailed
Business Functional
Requirements
TS12. Risk Evaluation
StrategicPlanning
OperationalBusiness & ITArchitectureBlueprinting
PortfolioManagement
DetailedRequirements
DetailedDesign Development Testing Implemen-
tationOperations
Support
Strategy Refinement & Execution
Project Discovery and
Planning
Planning & Discovery
Initiative Planning
IT Strategy
Operations
StrategicPlanning
OperationalBusiness & ITArchitectureBlueprinting
PortfolioManagement
DetailedRequirements
DetailedDesign Development Testing Implemen-
tationOperations
Support
Strategy Refinement & Execution
Project Discovery and
Planning
Planning & Discovery
Initiative Planning
IT Strategy
Operations
PP8
PP8
2222
Business Architecture & IT Governance Strategy
! Business Needs ! High-level Business Requirements ! Coordinate High-level Solution Shaping
and Effort Estimation ! Business Case and Project Charter ! Business Demand Management
BRM
! Architecture (including Business Architecture)
! IT Strategy, Innovation, Lifecycle ! Business Blueprints ! Execution of High-level Solution
Shaping and Effort Estimation
Chief Architect
! Detailed Business, Functional, and Non-functional Requirements
! Solution Construction (non-IM)
! Technical Content ! Build Management
AD
! Detailed Business, Functional, and Non-functional Requirements
! Solution Construction (BI/DW)
! Technical Content ! Build Management
IM
! Resource Capacity Management
! End-to-End Project Management of
• Timing • Budget • Scope
PMO
! Testing ! Release Management and Configuration Management
QA
Discovery & Execution Roadmap
Project Portfolio Prioritization Execution
Discovery
Discovery & Execution
• Priority setting and project approval (EPMO)
• IT Strategy (CTO)
• Project Discovery (BRM, Chief Architect)
• Project Execution (PMO, AD, QA, IM)