Click to edit Master text styles Second level Slide Title 1 Planning for a Repipe What you need to know before you get started

Transcript of Click to edit Master text styles Planning for a Second ... · • Click to edit Master text styles...

Page 1: Click to edit Master text styles Planning for a Second ... · • Click to edit Master text styles – Second level Slide Title 5 Getting Ready to Issue the RFP During this stage:

•  Click to edit Master text styles –  Second level

Slide Title

1

Planning for a Repipe

What you need to know before you get started

Page 2: Click to edit Master text styles Planning for a Second ... · • Click to edit Master text styles – Second level Slide Title 5 Getting Ready to Issue the RFP During this stage:

•  Click to edit Master text styles –  Second level

Slide Title

2

Did you know? From the time you decide to repipe, it usually takes 20-30 weeks for construction to actually begin!

Page 3: Click to edit Master text styles Planning for a Second ... · • Click to edit Master text styles – Second level Slide Title 5 Getting Ready to Issue the RFP During this stage:

•  Click to edit Master text styles –  Second level

Slide Title

3 3

What takes so long?

Owner Makes Decision to

Repipe

Select an Engineer / Architect

Plans and Specs are Bid Ready /

RFP Out To Contractors

Bids Received from

Contractors / Engineer Analysis

Engineer Presents

Clarified Pricing

Select Contractor /

Begin Contract Negotiations

Submit for Permit

Contract Signed Issue General Notice

Issue 30 Day Notice

Permit Approved / Begin Work

1-2 weeks 6-8 weeks 3-4 weeks 1-2 weeks

1 week

2-4 weeks

1 week (Domestic) - 8 weeks (DWV & Hydronic)

2 weeks

1 week 3 weeks 4 weeks

Page 4: Click to edit Master text styles Planning for a Second ... · • Click to edit Master text styles – Second level Slide Title 5 Getting Ready to Issue the RFP During this stage:

•  Click to edit Master text styles –  Second level

Slide Title

4 4

Selecting an Engineer/Architect

During this stage: •  The owner will need to make decisions on scope (is anything

getting upgraded, what’s included, etc?) •  Owner gets bids from 2-3 Engineers/Architects •  Owner selects Engineer/Architect

Owner Makes Decision to

Repipe

Select an Engineer / Architect

1-2 weeks

Page 5: Click to edit Master text styles Planning for a Second ... · • Click to edit Master text styles – Second level Slide Title 5 Getting Ready to Issue the RFP During this stage:

•  Click to edit Master text styles –  Second level

Slide Title

5 5

Getting Ready to Issue the RFP

During this stage: •  The engineer/architect will need to draw

a permit set of plans •  Engineer will create specification

documents (“specs”) clarifying scope for bidders

•  Final Request For Proposal (RFP) is assembled

•  Bidders list of potential contractors is assembled and vetted

•  RFP is issued to bidders

Select an Engineer / Architect

Plans and Specs are Bid Ready /

RFP Out To Contractors

6-8 weeks

Page 6: Click to edit Master text styles Planning for a Second ... · • Click to edit Master text styles – Second level Slide Title 5 Getting Ready to Issue the RFP During this stage:

•  Click to edit Master text styles –  Second level

Slide Title

6 6

Contractors Submit Proposals

During this stage: •  Contractors perform bid walks •  Requests for Information (RFIs) are

issued and answered •  Contractors develop and submit

proposals

Plans and Specs are Bid Ready /

RFP Out To Contractors

Bids Received from

Contractors / Engineer Analysis

3-4 weeks

Page 7: Click to edit Master text styles Planning for a Second ... · • Click to edit Master text styles – Second level Slide Title 5 Getting Ready to Issue the RFP During this stage:

•  Click to edit Master text styles –  Second level

Slide Title

7 7

Engineer Evaluates Contractors Bids

During this stage: •  Engineer reviews bids and asks clarifying

questions of contractors •  Engineer performs price breakdown and

Statement of Work (SOW) comparison •  Engineer reformats bids into comparable

template for Owner review •  Engineer presents bids and makes a

recommendation to Owner

Bids Received from

Contractors / Engineer Analysis

Engineer Presents

Clarified Pricing

1-2 weeks

Page 8: Click to edit Master text styles Planning for a Second ... · • Click to edit Master text styles – Second level Slide Title 5 Getting Ready to Issue the RFP During this stage:

•  Click to edit Master text styles –  Second level

Slide Title

8 8

Contractor Is Selected

During this stage: •  Reference checks are completed •  Contractor is selected

Engineer Presents

Clarified Pricing

Select Contractor /

Begin Contract Negotiations

1 week

Page 9: Click to edit Master text styles Planning for a Second ... · • Click to edit Master text styles – Second level Slide Title 5 Getting Ready to Issue the RFP During this stage:

•  Click to edit Master text styles –  Second level

Slide Title

9 9

Contract Negotiations

During this stage: •  Contractor provides value

engineering (if required) •  Scope is finalized •  Allowances are finalized •  Engineer edits plans (as needed) •  Start date is finalized •  Contract terms are negotiated

Select Contractor /

Begin Contract Negotiations

Submit for Permit

Contract Signed

2-4 weeks

4 weeks

Page 10: Click to edit Master text styles Planning for a Second ... · • Click to edit Master text styles – Second level Slide Title 5 Getting Ready to Issue the RFP During this stage:

•  Click to edit Master text styles –  Second level

Slide Title

10 10

Communications Begin

During this stage: •  Contractor works with Owner to

develop and issue building wide general notice about the upcoming project

•  Town Hall Meetings are scheduled

Contract Signed Issue General Notice

1 week

Page 11: Click to edit Master text styles Planning for a Second ... · • Click to edit Master text styles – Second level Slide Title 5 Getting Ready to Issue the RFP During this stage:

•  Click to edit Master text styles –  Second level

Slide Title

11 11

Scheduling Begins

During this stage: •  Pre-construction meeting occurs with

–  Owner –  Property Manager –  Contractor

•  Schedule is finalized and 30-day notices are issued to residents in the first stack

Issue General Notice

Issue 30 Day Notice

3 weeks

Page 12: Click to edit Master text styles Planning for a Second ... · • Click to edit Master text styles – Second level Slide Title 5 Getting Ready to Issue the RFP During this stage:

•  Click to edit Master text styles –  Second level

Slide Title

12 12

Construction Begins

During this stage: •  Town Hall Meeting is conducted •  Mobilization occurs

–  Storage/build-outs are staged –  Materials arrive onsite –  Dumpsters are placed onsite

•  First units are pre-walked by the project manager

Issue 30 Day Notice

Begin Work 4 weeks