    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    SITE PREPARATION AND GRADING

    01 Excavation oversite on unclassified ground including all hard and rock 60 M 3

    layers (if any) to reduced levels generally in cutting profiles andforming depressions, falls and the like and clear away toapproved disposal tip.

    02 Fill oversite with approved imported fill material according to site soil 60790 M 3

    report recommendation including compaction in making up levels torequired formations, embankments, contouring and the like as per drawings and spec.

    PAVING AND SURFACING

    03 Supply and install 400x400x30mm thk polished granite paving dark 264 M2

    &light colors w.\ 200x200x30mm granite band dark color including

    100mm thick cast-in-place concrete slab with A193-WWF meshreinforcement, 20mm thick cement mortar setting bed, polyethylenemoisture barrier, compacted subgrade, 3mm water proofingmembrane on R.C. slab as per detail no. C2 on drawing CL06-XL301to suit required locations as shown on drawing CL06-XL101

    04 Supply and install 400x400x60mm thk precast conc. paving beige 5203 M2

    color shotblasted w.\ photocatalytic titanium dioxide coatingincluding 100mm thick cast-in-place concrete slab with A193-WWFmesh reinforcement, 20mm thick cement mortar setting bed,polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. A1 on drawingCL06-XL301 to suit required locations as shown on drawingCL06-XL101

    05 Supply and install 400x400x60mm thk precast conc. paving beige & 141 M2

    brown colors shotblasted w.\ photocatalytic titanium dioxide coatingincluding 100mm thick cast-in-place concrete slab with A193-WWFmesh reinforcement, 20mm thick cement mortar setting bed,polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. A5 on drawingCL06-XL301 to suit required locations as shown on drawingCL06-XL101

    06 Supply and install 400x400x60mm thk precast conc. paving light 1570 M2

    grey & light grey color shotblasted w.\ photocatalytic titanium dioxidecoating including 100mm thick cast-in-place concrete slab with

    A193-WWF mesh reinforcement, 20mm thick cement mortar settingbed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. A6 on drawingCL06-XL301 to suit required locations as shown on drawingCL06-XL101

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    2 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    3/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    SITE DEVELOPMENT

    PAVING AND SURFACING

    01 Supply and install 400x400x60mm thk precast conc. paving beige & 228 M2light beige w.\ photocatalytic titanium dioxide coating w./200x200x30mm grey granite band including 100mm thickcast-in-place concrete slab with A193-WWF mesh reinforcement,20mm thick cement mortar setting bed, polyethylene moisturebarrier, compacted subgrade, 3mm water proofing membrane on R.C.slab as per detail no. B3 on drawing CL06-XL301 to suit requiredlocations as shown on drawing CL06-XL101

    02 Supply and install 400x400x60mm thk precast conc. paving beige & 150 M2

    brown w.\ photocatalytic titanium dioxide coating w./ 200x200x60mmgrey precast band w.\ photocatalytic titanium dioxide coatingincluding 100mm thick cast-in-place concrete slab with A193-WWFmesh reinforcement, 20mm thick cement mortar setting bed,polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. A4 on drawingCL06-XL301 to suit required locations as shown on drawingCL06-XL101

    03 Supply and install 50mm thk rubber pavement color green & blue 795 M2

    including adhesive mixture,100mm thick cast-in-place concrete slabwith A193-WWF mesh reinforcement, 20mm thick cement mortar

    setting bed, polyethylene moisture barrier, compacted subgrade,3mm water proofing membrane on R.C. slab as per detail no. E ondrawing CL06-XL301 to suit required locations as shown on drawingCL06-XL101

    04 Supply and install asphalt paving including 80mm bituminous wearing 10632 M2

    course, bituminous prime coat, granular base course, 3mm water proofing membrane on R.C. slab as per detail no. F on drawingCL06-XL301 to suit required locations as shown on drawingCL06-XL101

    05 Supply and install concrete screed with epoxy coat finish including 5270 M2

    100mm thick cast-in-place concrete slab with A193-WWFreinforcement mesh, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no.D on drawing CL06-XL301 to suit required locations as shown ondrawing CL06-XL101

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    3 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    4/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    SITE DEVELOPMENT

    SUNDRIES

    CURBS AND EDGING

    01 Supply and install precast concrete road curb, size 300X500X150 2755 Mmm with exposed aggregate finish including bedding, haunching,cast in place concrete base and concrete grout behind curb, 20mmthick cement mortar setting bed, on R.C. slab as per detail no.1 ondrawing CL06-XL302 to suit required locations as shown on drawingCL06-XL101

    GALVANIZED CHAIN LINK FENCE AND GATE

    Supply and install galvanized chain link fence and gatecomprising columns, galvanized chain link fabric, 400mm dia.concrete foundation, 42mm dia galvanized steel brace rail,73mm galvanized steel post earthwork, and all required tocompleet and fix the work as per detail 6 on drawingCL06-XL302, manufacturer's recommendations and subject toengineer's approoval Contractor shall submitt shop drawingsfor approval before supply

    02 chain link and gate to suit required locations as shown on drawing 122 MCL06-XL101

    RAISED CONC. PLANTER

    Supply and install raised 1600x1600mm concrete planter withgranite cladding brown color, including soil mix, drainagelayer, filter , membrane, sealant and all required to completeand finish the work as per detail 2 on drawing CL06-XL302

    03 Raised planter, to suit required locations as shown on drawing 13 No.CL06-XL101

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    4 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    5/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    SITE DEVELOPMENT

    SUNDRIES

    EARTH MOUNT

    Supply and formation of 500-1500 mm height earth mountincluding compacted sub base layer, 100 mmm thick layer of sand and gravel mix, and all required to complete and finishthe work as per detail 5 on drawing CL04-XL302 anddetail 4 on drawing CL06-XL401(Softscape and planting soil mix are measured elsewhere)

    01 Earth mount to suit required locations as shown on drawing 180 M2

    CL06-XL101

    WOODEN SHADE STRUCTURE

    Supply and install wooden shade structure comprising50x100mm artificial wooden louvers every 150mm o.c.(typ.)with 60 angle on horizontal beam, 100x200 mm artificialwooden beam(typ.) fixed w/ steel bolts, 200x200mm artificialwooden post including concrete footings, earthworks,insulation, finishing, fixing, and all required to complete thework as per detail 5 on drawing CL06-XL302

    02 Wooden shade structure, approximate area 90 m2 on plan to suit 4 No.

    required locations as shown on drawing CL06-XL101

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    5 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    6/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    SITE DEVELOPMENT

    SITE SIGNAGE

    Manufacturer's standard outdoor sings, letters and plaquesincluding fixings, finishes, accessories complete as per detailson drawing CL06-XC-04, and as per specifications

    WARNING SIGNS

    01 Ref. type W11-1 ( PEDESTRAIN CROSSING ) 9 No.

    REGULATORY SIGNS

    02 Ref. type R2-1 (GIVE WAY ) 15 No.

    03 Ref. type R5-1 ( ENTRY PROHIBTED ) 1 No.

    INFORMATIVE SIGNS

    04 Ref. type I-1 (PARKING) 1 No.

    05 Ref. type I-2 (ENTRY ) 1 No.

    Manufacturer's standard outdoor sings, letters and plaquesincluding fixings, finishes, accessories complete as per details on drawing CL06-XL602, and as per

    specifications

    06 RESIDENTIAL SIGN, as per detail (1) 5 No.

    07 DIRECTIONAL SIGN, as per detail (2) 4 No.

    08 CENTRAL PLAZA SIGN, as per detail (3) 2 No.

    09 CENTRAL PLAZA PARKING SIGN, as per detail (4) 1 No.

    10 SMALL MOSQUE SIGN, as per detail (5) 1 No.

    11 BASKEBALL PLAYGROUND SIGN, as per detail (6) 1 No.

    12 GATE SIGN, as per detail (7) 1 No.

    13 SOUTH GATE SIGN, as per detail (8) 1 No.

    14 ADVERTISING PANEL, as per detail (9) 3 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    6 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    7/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    SITE DEVELOPMENT

    ROAD SIGNAGE & PAVEMENTMARKING

    Manufacturer's standard outdoor sings, letters and plaquesincluding fixings, finishes, accessories complete as per details on drawing CL06-XC-04 and as per specifications

    01 White edge line, ref. detail 2 970 M

    02 Lane marking, ref. detail 3 151 M

    03 Direction separation lines (passing permitted), ref. detail 4 490 M

    04 Direction separation lines (passing prohibited), ref. detail 5 316 M

    05 White stop line, ref. detail 6 1073 M

    06 Pedestrain crossing, ref. detail 8 81 M

    07 Through traffic arrow, ref. detail 9-1 34 No.

    08 Right turn arrow, ref. detail 9-2 6 No.

    09 Left turn arrow, ref. detail 9-3 1 No.

    10 Through & right turn arrow, ref. detail 9-47 No.

    11 Through & left turn arrow, ref. detail 9-5 5 No.

    12 Right & left turn arrow, ref. detail 9-6 6 No.

    13 Speed control hump including cut & removal of existing wearing 18 M(0.05m) course & add a new course, tack coat and 0.10m of bituminous wearing course, ref. 10 detail G

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    7 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    8/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    SITE DEVELOPMENT

    LANDSCAPING

    Trees including pit excavation, stakes and ties, soilplanting mix, mulching, filter membrane and drainagelayer all as details and planting schedule as per detailP2 on drawing CL06-XL-401

    01 T/Af 14 No.

    02 T/Bv 8 No.

    03 T/Fm 35 No.

    Shrubs including planting, site excavationas required, soil planting mix, mulching, filter membrane,screed sloped to drain and drainage layer all as per detailsand planting schedule as per detail P3 , on drawingCL06-XL-401

    04 S/Hs 92 No.

    05 S/Iha 13 No.

    Ground cover including planting, site excavation

    as required, soil planting mix, mulching, filter membrane,screed sloped to drain and drainage layer all as per detailsand planting schedule as per detail P3 , on drawingCL06-XL-401

    06 G/As 79 No.

    07 G/Cgp 147 No.

    08 G/Lm 70 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    8 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    9/74

  • 7/28/2019 CL06 (MAY 2012)

    10/74

  • 7/28/2019 CL06 (MAY 2012)

    11/74

  • 7/28/2019 CL06 (MAY 2012)

    12/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    MANHOLE AND COVERS

    Supply , install, testing and commissioning precastconcrete sewer manholes with standard traffic (heavy duty)type cast iron manhole covers and frames, access ladders,concrete channel at manhole bed, foundation bed, droppipe to manhole where required, all associated earthworks,damp proofing, and all materals, equipments required tocomplete and finish. the work according to specificationssection 02605, 02730, drawings and code of practices

    01 Sewer manhole, ref. (SMH) 13 No.

    02 Sewer manhole, ref. (STMH) 10 No.

    POTABLE WATER INSTALLATION

    Supply, install and testing pipework, UPVC Schedule 80 for potable water the work shall include but not limited tofittings, supports, all associate works and all materials andequipments required to complete and finish the workaccording to drawings, specification and code of practices

    03 50 mm dia. 15 M

    04 100 mm dia. 8 M

    Supply, install and testing pipework, UPVC Schedule 80 for fire water the work shall include but not limited tofittings, supports, all associate works and all materials andequipments required to complete and finish the workaccording to drawings, specification and code of practices

    05 63 mm dia. 7 M

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    12 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    13/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    IRRIGATION WATER INSTALLATION

    Supply, install and testing pipework, UPVC Schedule 80 for Irrigataion water the work shall include but not limited tofittings, supports, all associate works and all materials andequipments required to complete and finish the workaccording to drawings, specification and code of practices

    01 32 mm dia. 625 M

    02 40 mm dia. 340 M

    03 50 mm dia. 495 M

    Accessories

    04 Supply and installation irrigation controller as detailed on drwings 1 No.and as per specifications

    05 Supply and install bubbler for shrubs, ground cover and 168 No.succulents

    06 Supply and installation bubbler for trees 140 No.

    07 Supply and installation spray lawn sprinkler 47 No.

    08 Gate valve W/valve box 32 mm dia., 3 No.

    09 Gate valve W/valve box 40 mm dia., 1 No.

    10 Gate valve W/valve box 50 mm dia., 3 No.

    Supply and installation remote control valve assemblyincluding piping complete with valve box, Y-strainer,accessories and all associated works as detail on drawingand as per specifications section 02810

    11 Ref. RCV 32mm dia. 3 No.

    12 Ref. RCV 40mm dia. 1 No.

    13 Ref. RCV 50mm dia. 5 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    13 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    14/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    SITE DEVELOPMENT

    Collection

    Sheet -1

    Sheet -2

    Sheet -3

    Sheet -4

    Sheet -5

    Sheet -6

    Sheet -7

    Sheet -8

    Sheet -9

    Sheet -10

    Sheet -11

    Sheet -12

    Sheet -13

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    14 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    15/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 2 - SITE WORK

    SITE GRADING

    All additional excavation required for temporary works and spaces,shoring, dewatering, removal of surplus excavated materials,support, temporary spoil heaps and general compaction Note

    EXCAVATION AND EARTHWORK

    Necessary moving or transportation about the site excavation Notematerial including handling to temporary stockpile or ultimatedisposal off site is to be included in the unit rate of excavation

    Excavation in natural land consisting of solid rock formation,cracked rocks, bolders and natural contoured soil, temporaryearthwork supports, dewatering ( if any ) as per specifications sections 02200

    01 Excavation for foundations commencing from existing grade level 30668 M

    Backfilling

    02 Approved selected imported fill material including compaction in 440 Mmaking up levels around and over foundations, beds and the like asper spec. sections 02200

    03 Approved fill material selected from excavated material including M price onlycompaction as per specification section 02200

    Soil treatment application for termite control

    04 To subgrades of slabs and along periphery of building 18227 M

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    15 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    16/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 2 - SITE WORK

    TRAFFIC MARKING DIMENSION

    Thermoplastic paint for traffic marking on parking pavementas detail 11 shown on drawing CL-GA-901 and specification

    01 Straight arrows 81 No.

    02 Turning arrows 62 No.

    03 Parking lane marking 5753 M

    04 Handicapped marking on floor 43 No.

    05ENTRY (text)

    2 No.06 NO ENTRY (text) 4 No.

    07 EXIT (text) 2 No.

    08 Lane numbers 566 No

    To Collection SR

    Collection

    Sheet - 15

    Sheet - 16

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    16 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    17/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 3 - CONCRETE

    CONCRETE WORK

    CONCRETE TYPES

    Include in Unit Rates for concrete of the following types andlocations:

    20 Mpaa) Blinding concreteb) Catch basins and side walks Note

    40 Mpaa) Footingsb) Columns and R.C. wallsc) Floor and roof slabs, beams, girders, stairsd) Concrete topping or structural screede) Slab on gradef) water tanks

    Water stops including junction accessories are not measured Noteseparately. The cost of water stop items are to be included in the unitrates of the related concrete items

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    17 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    18/74

  • 7/28/2019 CL06 (MAY 2012)

    19/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 3 - CONCRETE

    CONCRETE WORK

    Insitu reinforced concrete, 40 Mpa type I cement includingformwork and steel reinforcements conforming to ASTMA615 and A185 as per specifications sections 03100, 03200 &03300

    01 Columns 660 M

    02 Shear wall 732 M

    03 Beams 115 M

    04 Suspended slabs (solid slabs) 247 M

    05 Suspended slabs (flat slabs) 200 mm thk including drop panels 41 M

    06 Suspended slabs (flat slabs) 300 mm thk including drop panels 5962 M

    07 Suspended flat slabs 380 mm thk including drop panels 513 M

    08 Suspended flat slabs 500 mm thk including drop panels 5810 M

    09 Suspended flat slabs 700 mm thk including drop panels 1508 M

    10 Suspended flat slabs 1000 mm thk including drop panels 7722 M

    11 Ramps 33 M

    12 Stairs including landings 154 M

    PRECAST CONCRETE

    Precast concrete wheel stopper including dowels, groutingand accessories for complete installation as per detail 21 ondrawing CL-GA-901 and specification

    13 Precast concrete wheel stopper including fixings 573 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    19 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    20/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 3 - CONCRETE

    CONCRETE WORK

    Sundries

    EQUIPMENT PADS

    01 Allow for reinforced concrete equipment pads including upstand 10 Msurrounds and anti-vibration accessories as required

    02 Allow for reinforced concrete equipment pads including upstand Msurrounds and anti-vibration accessories as required

    03 150mm thick raised slabs, Handicapped`s ramps and curbs to suit 15 Mrequired areas as per detail 10,14, 20 on drawing CL-GA-901

    To Collection SR

    Collection

    Sheet - 17

    Sheet - 18

    Sheet - 19

    Sheet - 20

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    20 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    21/74

  • 7/28/2019 CL06 (MAY 2012)

    22/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 5 - METALS

    Expansion joint

    Supply and install expansion joint cover includingextruded aluminum assembles, fillets, accessories, fixingand sealants as per drawing CL-GA-902 and according tospecifications

    01 Floor to floor cover as per detail no. 1a 2845 M

    02 Wall to wall cover as per detail no. 1b 1595 M

    03 Wall to wall cover as per detail no. 1e 1805 M

    04 Floor to wall cover as per detail no. 1d 840 M

    05 Ceiling to ceiling cover as per detail no. 1j 2845 M

    06 Wall to ceiling cover as per detail no. 1h 840 M

    Steel cover as per details & drawing

    07 To suit PG trench 15 M

    08 To suit cable trench 55 M2

    09 To suit sump pits 16 No

    Supply and install 30mm depth panted galvanized cast irongratings including 40x40mm steel angle, medium gaugegalvanized gutter slope to drain and all required for fixingand finisheng as per detail no.13 on drawing CL-GA-901 andspecificatons

    10 To suit required locations 16 M

    Bollards

    Steel bollard comprising 150mm dia., painted finish steel pipefilled with concrete as detail 19 on draiwng CL-GA-901

    11 Bollards, 600mm high 91 No

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    22 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    23/74

  • 7/28/2019 CL06 (MAY 2012)

    24/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 8 - DOORS AND WINDOWS

    DOOR SETS

    Supply and install all doors to suit masonry openings and approved Notesamples including fixings, decorations, frames, architrave,hardwares and saddles and all required materials and equipmentsto complete and finish the work as detailed on drawing CL-GA-01and according to specifications and code of practice

    44mm thick painted hollow metal insulated door includingframes and decoration as per drawings and specifications

    01 Type B1, single leaf door, size 900x2150mm, 45 min. fire rated 3 No.

    02 Ref B06, double leaves door, door size 950x2150mm, 45 min. fire 6 Norated

    44mm thick fully louvered hollow metal door. Includingmotorized adjustable louvers panel working upon signal fromfire alarm system for generator, frames and as per drawingsand specifications

    03 Type C1, double leaves door, door size 950x2400mm, 45 min. fire 2 No.rated

    04 Type C2, double leaves door, door size 1050x2400mm 1 No.

    Aluminum panels

    Supply and install 24mm thick double tempered clear fixedglazing on powder coated aluminum frame as describedon drawing CL-GA-802 and according to specificationssection 08920

    05 Ref. P10, overall size 3200 x 4150mm 16 No(glazed door measured elsewhere)

    06 Ref. P11, overall size 2900 x 4800mm 4 No

    (glazed door measured elsewhere)

    07 Ref. P07, overall size 2900 x 5900mm 24 No(glazed door measured elsewhere)

    08 Ref. P08, overall size 2900 x5200mm 7 No(glazed door measured elsewhere)

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    24 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    25/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 9 - FINISHES

    INTERNAL FINISHES

    Flooring including respective types of bounding materials,concrete screed sub-floor of required thickness, (if any)accessories for complete installations as per ID drawingand specification

    01 Epoxy paint on cement screed , ref. EC 565 M

    02 Anti carbonation protection epoxy coating for pavement , ref. AEC 4727 M

    03 Multi component epoxy coating on concrete screed for drive way & 16846 M

    turns , ref. MEC

    04 8mm thk. Heavy duty multi component apoxy screed with 195 Mpolyurethane base on concrete screed to suit car ramps,supported with linear mrtal strips for non sliding, ref. HES

    Finishings : walls including metal angle beads and lathing at junctions of differing backgrounds

    05 Cement plaster to suit walls 13740 M

    06 Paint on cement plaster ,ref. W01 13740 M

    07 Non toxic epoxy paint on structure, ref. W07 6515 M2

    Finishings : ceilings

    08 Cement plaster to suit ceiling 25860 M

    09 Paint on cement plaster, ref. CO1 25860 M

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    25 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    26/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 9 - FINISHES

    EXTERNAL FINISHES

    Stone cladding mechanical fixation including fixings ,finishings and all associated work as per detail on drawingsand specification

    01 300x600mm Natural stone cladding, riyadh stone 835 M2

    To Collection SR

    Collection

    Sheet - 25

    Sheet - 26

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    26 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    27/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 10 - SPECIALITIES

    SIGNAGEManufacturer's standard indoor signs, letters and plaquesincluding fixings, finishes, accessories complete as per interior design drawings CL06-i901 to CL06-i916 and allrequired materials and equipments to complete and finishthe works according to specifications, drawings and code of practice

    01 Ref. type S01 86 No

    02 Ref. type S02 122 No

    03 Ref. type S07 16 No

    04 Ref. type S09 7 No

    05 Ref. type S10 158 No

    06 Ref. type S11 38 No

    07 Ref. type S12 9 No

    08 Ref. type S13 2 No

    Aluminum louvers

    09 Ref. L04, overall size 2500 x 3400mm 4 No

    10 Ref. L03, overall size 2500 x 3200mm 1 No

    11 Ref. L07, overall size 450 x 700mm 2 No

    12 Ref. L08, overall size 400 x 700mm 6 No

    13 Ref. L09, overall size 2500 x 5000mm 3 No

    14 Ref. L10, overall size 1500 x 1500mm 1 No

    Corner guards install at 600 high from finish floor heavy dutyrubber guard bumper, including all associated works, as per detail 18 shown on drawing CL-GA-901 and as specification

    15 To suit column location as required 255 No

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    27 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    28/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 14 - CONVEYING SYSTEMS

    AUTOMATED WASTE COLLECTION SYSTEM

    Supply and provide all required to construct, test and operateautomated waste collection system, consisting of thefollowing items:-

    01 Discharge valve room with basement floor including all required 16 No.works as detailed on drawing no. STM - ITCCP2 - TD - 008.Contractor shall perform all required coordination with other trade toensure proper installation and operation of the complete system totransport waste from tower chute to pipe networks as shown ondrawings STM - ITCCP2 - TD - 001 to 007 and 015, 016 andaccording to manufacturer's standards and specifications

    02 Outdoor Load station. including required earthworks, concrete works, 1 No.masonry and electromechanical works for the vacuum room and PAIservice box and all required works as detailed on drawing no. STM -ITCCP2 - TD -013 and 014 Contractor shall perform all requiredcoordination with other trades to ensure proper installation andoperation of the complete system to transport waste from villas andplaygrounds to pipenetworks as shown on drawings STM - ITCCP2 -TD - 001 to 007 and 015, 016 and according to manufacturer'sstandards and specifications

    PIPE WORK

    Supply and installation of Automated waste collection system

    piping. Item shall include the earth works, insulation,,concentric reducer, puddle flanges ,inspection covers and allrequired materials and equipments to complete the transportpipe line from DV rooms , outdoor load stations and fullvacuum load stations to waste plant

    03 508mm under/above ground transport pipe 865 M

    RC MANHOLE

    Supply and install cast insitu or precast reinforced concretemanhole ,the item shall include excavation, backfillinsulation ,inspection cover steel rungs and all required to

    complete the work.

    04 RC manhole to suit required location in sitesas shown on drawings 22 No.STM - ITCCP2 - TD 001 to 016

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    28 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    29/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15A - MECHANICAL

    PLUMBING INSTALLATIONS

    SANITARY FIXTURES

    Supply and install sanitary fixtures, water mixers andaccessories, as selection schedule, the work shall includebut not limited to necessary fittings, trims, valves, traps,spouts and all materials and equipment required tocomplete and finish the work according to specifiactions,drawings and code of practice

    01 Floor mounted water closet with flush tank, ref. (WC) 6 No

    02 Lavatory without pedistal, ref. LAV 6 No

    03 Counter top one bowel sink, ref. 03 6 No

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    29 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    30/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15A - MECHANICAL

    PLUMBING INSTALLATIONS

    WASTE AND DRAINAGE INSTALLATION

    Supply, installation and test drainage pipe work UPVCschedule 40 the work shall include but not limited to fittings,supports hangers, excavation, backfilling, cast iron pipes onroof for vent with caps and all materials and equipmentrequired to complete and finish the work according tospecifiactions, drawings and code of practice

    01 32 mm dia 420 M

    02 40 mm dia 270 M

    03 50 mm dia 585 M

    04 75 mm dia 455 M

    05 100 mm dia 1880 M

    06 150 mm dia 2781 M

    Accessories

    07 Area drain 150mm dia., ref. AD 21 No.

    08 Floor drain, 50 mm dia., ref. (FD) 38 No.

    09 Parking drain, 150mm dia., ref. PD 57 No.

    10 Cleanout, 50 mm dia., ref. (CO) 18 No.

    11 Cleanout, 75 mm dia., ref. (CO) 72 No.

    12 Cleanout, 100 mm dia., ref. (CO) 180 No.

    13 Cleanout, 150 mm dia., ref. (CO) 64 No.

    14 Floor cleanout 50mm dia., ref. (FCO) 21 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    30 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    31/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15A - MECHANICAL

    PLUMBING INSTALLATIONS

    WASTE AND DRAINAGE INSTALLATION

    Accessories

    01 Floor cleanout 100mm dia., ref. (FCO) 10 No.

    02 Floor cleanout 150mm dia., ref. (FCO) 18 No.

    03 Gully trap, ref. GT 11 No.

    04 Trench drain outlet, 100mm dia., ref. TDO 4 No.

    Reinforced concrete sump pit including internal lining,proprietary galvanized steel manhole cover and frame,guide bar, lifting chain and all associated works, valvespipework within sump pit chamber as detailed on drawings(concrete work & earthwork, waterproofing measuredelsewhere)

    05 Sump pit 16 No.

    Submersible pumps (one duty and one stand-by) includingassociated valves, pipework, valves controllers andaccessories within sump pit chamber as described ondrawings (sump pit measured separately)

    06 Ref. SP1 capacity 1.5 HP 15 Set

    07 Ref. SP2 capacity 90 GPM & 38 m TDh 2 HP 1 Set

    Allow for the design, supply and installation of packagedtype waste water treatment plant complete including filter,chemical feeders, air blowers controls, wirings, piping andall as associated works as per specifications section 02736and scheduled on drawing

    08 Packaged water treatment unit. Cap. 35 m3/day 8 No.

    09 Packaged water treatment unit. Cap. 72 m3/day 2 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    31 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    32/74

  • 7/28/2019 CL06 (MAY 2012)

    33/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15A - MECHANICAL

    PLUMBING INSTALLATIONS

    HOT WATER INSTALLATION

    Supply, installation and test pipework, plypropylenefor hot water the work shall include but not limited toinstallation, fittings, insulation for pipework, valves,supports and all materials and equipment required tocomplete and finish the work according to specifications,drawings and code of practice

    01 15 mm dia. 12 M

    02 20 mm dia. 30 M

    Accessories

    03 Water meter assembly 63mm dia., 16 No.

    04 Gate valve 20 mm dia., ref. GV 12 No.

    05 Isolating valve, 25 mm dia, ref. (IV) 15 No.

    06 Isolating valve, 50 mm dia, ref. (IV) 42 No.

    07 Isolating valve, 63 mm dia, ref. (IV) 1 No.

    08 Isolating valve, 75 mm dia, ref. (IV) 22 No.

    09 Isolating valve, 100 mm dia, ref. (IV) 1 No.

    10 IV & CV assembly 50 mm dia., 11 No.

    11 IV & CV assembly 63 mm dia., 21 No.

    12 IV & CV assembly 75 mm dia., 3 No.

    13 IV & CV assembly 100 mm dia., 10 No.

    14 Hand spray with flexible hose and wall hook, ref. (HS) 6 No.

    15 Wall mounted shower head with mixer, ref SH 6 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    33 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    34/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15A - MECHANICAL

    PLUMBING INSTALLATIONS

    Supply, install, testing and commissioning electrical water heaters the work shall include but not limited to shortlength pipework, valves, supports, controls, fixings,accessories and all associate works and all materials andequipments required to complete and finish the workaccording to drawings, specification and code of practices

    01 Ref. EWH- 2 6 No

    Drainage installations

    Reinforced concrete gray water tank with proprietary

    medium duty cast iron manhole cover and frame, includingsump pit, submersible pumps, internal lining, access ladder vent pipework within tank as detailed on drawing (Concretework, earthwork & water proofing measured elsewhere)

    02 Gray water tank CAP. 35 m3 8 No

    Packaged type variable speed discharge pressure systemGray water lift pumps, including piping and valves networkwithin pump chamber, complete with all controllers,accessories for automatic operation as scheduled ondrawing as per spec. section 15453

    03 Gray water lift pumps CAP. 5 KW 8 Set

    04 Gray water lift pumps CAP. 11 KW 2 Set

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    34 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    35/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15A - MECHANICAL

    PLUMBING INSTALLATIONS

    Packaged type duplex unit discharge pressure systempotable water lift pumps, (one duty & one stand by)including piping and valves network within pump chamber,complete with all controllers, accessories for automaticoperation as scheduled on drawing and specificationsection 15453

    01 Potable water pump CAP. 4.78 KW 7 Set

    02 Circulating potable water pump CAP. 0.5 HP 7 Set

    03 Potable water pump CAP. 7.17 KW 3 Set

    04 Circulating potable water pump CAP. 0.5 HP 3 Set

    Reinforced concrete under ground water tank and pumproom with proprietary cast iron manhole covers andframes, including internal lining access ladders, pipeworksubmersible pump, ventilating fans with exhaust and freshair pipework, valves, vent pipes and truck fill pipework asdetailed on drawings (concrete work & earthwork, water proofing measured elsewhere)

    05 Potable Water tank CAP. 18 M 3 1 No.

    06 Potable Water tank CAP. 65 M3

    6 No.

    07 Potable Water tank CAP. 105 M 3 1 No.

    08 Potable Water tank CAP. 140 M 3 2 No.

    09 Fire Water tank 1 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    35 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    36/74

  • 7/28/2019 CL06 (MAY 2012)

    37/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15A - MECHANICAL

    FIRE WATER UTILITIES

    Supply, install, testing and commissioning portablemultipurpose fire extinguisher the work shall include butnot limited to fixing to wall, all associate works and allmaterials and equipments required to complete and finishthe work according to drawings, specification and code of practices

    01 Ref. PFE 6 No

    02 Ref. CO2 16 No

    CO2 system

    Supply, install and test CO2 cylinders including pipe work,black steel seamless for CO2 fittings, supports valves,regulators, sleeves, as shown on drawings and as per specification

    03 CO2 cylinders CAP 45 KG 59 No.

    04 Control panel 27 No.

    05 Remote manual release 27 No.

    06 Abort switch 27 No.

    07 Alarm bell 27 No.

    08 4-port nozzle 27 No.

    09 Ioization detector 27 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    37 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    38/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15A - MECHANICAL

    PLUMBING INSTALLATION

    DIESEL FUEL STORAGE TANK INSTALLATION

    Allow for underground fiberglass diesel fuel storage tankwith required capacity including concrete anti-flotationpad, heavy duty traffic type manhole ring and cover,pipework, valves duplex diesel fuel transfer pumps, steelladder, pea gravel bed, earthworks, fixings and accessoriesall as detailed on drawings

    01 Proprietary tank units CAP. 2800 Lit. 2 No.

    02 Proprietary tank units CAP. 3800 Lit. 1 No.

    To Collection SR

    Collection

    Sheet -29

    Sheet -30

    Sheet -31

    Sheet -32

    Sheet -33

    Sheet -34

    Sheet -35

    Sheet -36

    Sheet -37

    Sheet -38

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    38 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    39/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15B - MECHANICAL

    HVAC INSTALLATIONS

    CHILLED WATER SYSTEM

    Supply, install and test black steel pipework includingfittings thermal insulation, flexible connections andaccessories as per required drawings and spec.sections15050 to 15140 ,15510

    01 15 mm dia. 135 M

    02 20 mm dia. 165 M

    03 25 mm dia. 95 M

    04 32 mm dia. 75 M

    05 50 mm dia. 10 M

    06 65 mm dia. 30 M

    07 80 mm dia. 230 M

    08 100 mm dia. 190 M

    09 150 mm dia. 740 M

    10 200 mm dia. 550 M

    11 250 mm dia. 185 M

    12 400 mm dia. 345 M

    13 450 mm dia. 15 M

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    39 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    40/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15B - MECHANICAL

    HVAC INSTALLATIONS

    CHILLED WATER SYSTEM

    Supply and install valve / BTU meter

    Butterfly valve

    01 Ref. MBFV 400 mm dia., 1 No.

    Isolating valve

    02 65mm dia., 12 No.

    03 32mm dia., 20 No.

    Check valve

    04 65mm dia., 6 No.

    05 32mm dia., 10 No.

    BTU meter

    0665mm dia., 6 No.

    07 32mm dia., 10 No.

    Supply and install heat exchanger including valves andshort length piping as detailed on drawings and as per specifications

    08 Ref. HEX-01 to 05, 1940 KW capacity 5 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    40 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    41/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15B - MECHANICAL

    HVAC INSTALLATIONS

    CHILLED WATER SYSTEM

    Supply, install, test and commission, variable speed chilledwater centrifugal inline pumps unit including valves, flexibleconnections, Y-striners, mounting and fixing to pads(measured separately) as detailed on drawing andspecifications

    01 Ref. CWP-01 to 05, 51.36 L/S capacity 45 m TDH 5 No.

    Supply, install and commission, expansion tank as detailedon drawings and specifications

    02 Ref. ET, 1200 liter capacity 1 No.

    Supply, install and commission, air separator tank asdetailed on drawings and specifications

    03 Ref. AS 1 No.

    Supply, install, test and commission, Fan coil units ductedtype including control valves, pressure & temperature,

    gauge, Y-strainer mounting and fixing as per drawings andspecifications section 15781

    04 Ref. FCU-01, 17.1 KW cooling capacity 2 No.

    05 Ref. FCU-03, 2.4 KW cooling capacity 6 No.

    06 Ref. FCU-04, 3.5 KW cooling capacity 10 No.

    07 Ref. FCU-05, 6.5 KW cooling capacity 5 No.

    08 Ref. FCU-06, 5.0 KW cooling capacity, 16 No.

    09 Ref. FCU-07, 2.9 KW cooling capacity, 16 No.

    Supply, install, test and commission automatic chemicaldosing unit as detailed on drawings and specifications

    10 Ref. ACDU 1 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    41 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    42/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15B - MECHANICAL

    HVAC INSTALLATIONS

    Supply, install, test and commission DX-ducted split unitincluding control, pipes and fixing as per drawing andspecifications

    Ref. RAC-01, 3.51 KW nominal coollling capacity 24 No.

    Supply, install, test and commission, DX-ducted split unitincluding control, pipes and fixing as per drawings andspecifications section 15781

    01 Ref. FCU-02/ACCU-02 , 4 KW capacity 3 No.

    02 Ref. FCU-08/ACCU-08 , 3 KW capacity 10 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    42 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    43/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15B - MECHANICAL

    HVAC INSTALLATIONS

    Supply, install, test and commission, Ventilating fans asdetails on drawings and specifications, section 15860

    01 Ref. PEF- 01, 13500/22500 LPS capacity with exh. Duct and CAP. 8 No.

    02 Ref. EF- 01, 60 LPS capacity 20 No.

    03 Ref. EF- 02, 100 LPS capacity 6 No.

    04 Ref. EF- 03, 1470 LPS capacity 3 No.

    05 Ref. EF- 04, 150 LPS capacity 3 No.

    06 Ref. EF- 05, 60 LPS capacity 3 No.

    07 Ref. EF- 06, 105 LPS capacity 3 No.

    08 Ref. EF- 07, 40 LPS capacity 6 No.

    09 Ref. EF- 08, 35 LPS capacity 6 No.

    10 Ref. EF- 09, 35 LPS capacity 10 No.

    11 Ref. BIF-01, 3600 LPS capacity 30 No.

    Supply, install, test and commission, Supply air squareceiling diffusers with opposed blade volume damper including frame trims & insulated plenum box as detailedon drawing and specification, section 15860

    12 Ref. SD1 A 24 No.

    Supply, install, test and commission, Supply air roundceiling diffusers with opposed blade volume damper including frame trims & insulated plenum box as detailedon drawing and specification, section 15860

    13 Ref. SD1 56 No.

    14 Ref. SD2 20 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    43 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    44/74

  • 7/28/2019 CL06 (MAY 2012)

    45/74

  • 7/28/2019 CL06 (MAY 2012)

    46/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    MEDIUM VOLTAGE INSTALLATION

    MVSWGR (medium voltage switchgear)

    Supply , install , testing and commissioning 13.8 KV, 3 phase,60 Hz,SF6 MVSWGR with 3 cells (1 inputs + 2 outputs)including all associated works to complete installation as per drawings and specifications. The contractor shall preparesketches and details for approval from SEC and shall makearrangement and required coordination with supervisingengineer to complete the work

    01 M.V Switchgear unit ref (MVSWGR/CL-6) 1 No

    RING MAIN UNIT

    Only installation, testing and commissioning for 13.8 KV, 3phase, 60 Hz SF6 ring main unit including all associated worksfor complete installation as per drawings and specifications andrequired coordination (supply will be by client)

    02 Ring main units ( RMU 1,2,3) 3 No

    MEDIUM AND LOW VOLTAGE DISTRIBUTION

    Supply installation, testing and commissioning of thefollowing equipment including all accessories and necessaryworks required for installation as shown on the drawingsE-701,E201 and as described in specifications section16461,16124and and by making arrangiement withsupervising engineer to achieve the work to the bestpossible and specifications

    03 Dry type transformers 2000 KVA, 13.8 KV ,400/230V , 3PH, 60HZ 3 No, ref (TR6-1,2,3)

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    46 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    47/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    MEDIUM VOLTAGE INSTALLATION

    Supply , install and test medium voltage copper Cables 15KV/XLPE/STA/PVC, between medium voltage equipments asshown on drawings and coordination with other disciplinesshall be conducted during work execution as per technicalspecifications, drawings and by making arrangement withsupervising engineer to achieve the work to the best possibleand specifications

    01 Medium voltage cable comprising 3 core 70 mm CU / XLPE /STA/ 15 MPVC, cables route from RMU up to transformers

    02 Medium voltage cable comprising 3 core 300 mm CU / XLPE /STA/ 255 MPVC, cables

    Smart Metering System

    Supply, installation , testing and commissioning of SmartMetering System comprising of M-bus master controller complete with soft ware and bus IP router, including digitalelectrical KWH meters, 1 pair twisted cable # 22 AWG typeto TCP/IP net work and all associated works required asshown on drawing E-501--E520 and as described in

    specifications section 16211

    To suit Building Smart Metering System with multi -electronicmeter (MEM) and main bus master controller and IP router as Noterequired to form a complete and fully operative system to link allproject buildings with the existing data center at phase (1)

    03 Electronic KWH meters 16 No

    04 M-bus master controller complete with software 16 No

    05 M-bus IP router 16 No

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    47 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    48/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    MAIN AND SUB-MAIN POWER

    Supply and install an Emergency Power Generating Setsincluding Generator Control Panel (GCP). In addition to circuitbreakers, pads, supports, controls and daily diesel fuel storagetank, including all necessary equipment, accessories andassociated works, as shown on drawings E-701,E201 asdescribed in specifications section 16231, and by makingarrangiement with supervising engineer to achieve the work tothe best possible and specifications

    01 Ref. (G1) 650 KVA, 3 phase 4 wire ,400/230V , 60 Hz. 1 No.

    02 Ref. (G2) 750 KVA, 3 phase 4 wire ,400/230V , 60 Hz. 1 No.

    03 Ref. (G3) 450 KVA, 3 phase 4 wire ,400/230V , 60 Hz. 1 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    48 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    49/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    MAIN AND SUB-MAIN POWER

    supply , install, testing and commissioning multicore copper cable ( XLPE/PVC -1000/600V) in cable tray or cable trench(measured elsewhere) including junction boxes, connectionfor feeders and various power loads as shown on drawingsE-701 and as per specification section 16126 and by makingarrangement with supervising engineer to achieve the workto the best possible specifications

    01 (4 C-10 mm + 10 mm G/cable tray 440 M

    02 (4 C-16 mm ) + 16 mm G /cable tray 160 M

    03 (4 C-35 mm ) + 16 mm G /cable tray&trench 750 M

    04 4 C-50 mm + 25mm G /cable tray 5 M

    05 4 C-70 mm + 35mm G /cable tray 650 M

    06 4 C-95 mm + 50mmG /cable tray&trench 235 M

    07 4 C-120 mm + 70 mmG /cable tray 1850 M

    08 4 C-150 mm + 95 mmG /cable tray&trench 715 M

    09 4 C-185 mm + 95 mm G /cable tray&trench 705 M

    10 4 C-240 mm + 120 mm G /cable tray 30 M

    11 4 C-300 mm + 150 mm G /cable tray&trench 60 M

    12 2(4C-150mm2) + 150 mm G /cable tray&trench 405 M

    13 2(4C-185mm2) /cable trench 10 M

    14 2(4C-300mm2)G /cable trench 5 M

    15 3(4C-240mm2) + 240mm G /cable trench 10 M

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    49 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    50/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    MAIN AND SUB-MAIN POWER

    supply , install, testing and commissioning multicore copper cable ( XLPE/PVC -1000/600V) in cable tray or cable trench(measured elsewhere) including junction boxes, connectionfor feeders and various power loads as shown on drawingsE-701 and as per specification section 16126 and by makingarrangement with supervising engineer to achieve the workto the best possible specifications

    16 4(4C-240mm2) + 240 mm G /cable trench 10 M

    17 4(4X1C-630mm2)G /cable trench 15 M

    The length of cables including the cluster-6 cables and cables in Notethe first floor for AP01 & AP02 according to No. for eachAP in site

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    50 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    51/74

  • 7/28/2019 CL06 (MAY 2012)

    52/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    MAIN AND SUB-MAIN POWER

    supply and install reinforced concrete Man / Holes connectedvia duct banks, complete with man / hand hole bolted typemetal cover, drain pipe outlet, including trenching andbackfilling for duct banks, conduits for M.V cables in ductbanks, tapes, all as required to suit locations as shown ondrawings drawings E201--E220and as all accessories andcoordination & integration with other systems shall beconducted during work execution as per technicalspecificationssection 16180 and by making arrangement withsupervising engineer to achieve the work to the best

    possible specifications

    01 Power Man Holes (180018001800) Ref. MH including UPVC 11 Noconduit

    supply and install Electrical concrete ATTIC includingtrenching and backfilling for duct banks, conduits for M.Vcables in duct banks, tapes, all as required to suit locationsas shown on drawings E201--E220and as per specificationssection 16180 and by making arrangement with supervisingengineer to achieve the work to the best possiblespecifications

    02 Concrete ATTIC for electrical works 25 M

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    52 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    53/74

  • 7/28/2019 CL06 (MAY 2012)

    54/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    MAIN AND SUB-MAIN POWER

    Supply , install , testing and commissioning of panel boardsincluding grounding, circuit breakers, grounding, fixings,markers and , other functional units and all associated worksas required and shown on drawings E 701,E704 , E201--E220and coordination & integration with other systems shall beconducted during work execution as per technicalspecificationssection 16442,16410,16415 and by makingarrangement with supervising engineer to achieve the workto the best possible specifications

    01 Ref. DP11 6 No.

    02 Ref. DP12 6 No.

    03 Ref. DP13 6 No.

    04 Ref. DP14 6 No.

    05 Ref. DP15 6 No.

    06 Ref. DP16 6 No.

    07 Ref. DP21 10 No.

    08 Ref. DP22 10 No.

    05 Ref. DPS1 6 No.

    09 Ref. EDPS1 with ATS built in and interlock 6 No.

    10 Ref. EPMSB1A 1 No.

    11 Ref. EPMSB1B 1 No.

    12 Ref. EPMSB2A 1 No.

    13 Ref. EPMSB2B 1 No.

    14 Ref. EPMSB3A 1 No.

    15 Ref. EPMSB3B 1 No.

    16 Ref. EPMSB4A 1 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    54 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    55/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    MAIN AND SUB-MAIN POWER

    Supply , install , testing and commissioning of panel boardsincluding grounding, circuit breakers, grounding, fixings,markers and , other functional units and all associated worksas required and shown on drawings E 701,E704 , E201--E220and coordination & integration with other systems shall beconducted during work execution as per technicalspecificationssection 16442,16410,16415 and by makingarrangement with supervising engineer to achieve the workto the best possible specifications

    01 Ref. EPMSB4B 1 No.

    02 Ref. EPSB with ATS built in and interlock 10 No.

    03 Ref. EPSB1 1 No.

    04 Ref. EPSB2 1 No.

    05 Ref. EPSB3 1 No.

    06 Ref. EPSB4 1 No.

    07 Ref. PPSB3 1 No.

    08 Ref. PPSB4 1 No.

    09 Ref. SLP6A 1 No.

    10 Ref. SLP6B 1 No.11 Ref. EPSA 6 No.

    12 Ref. PPSA 6 No.

    13 Ref. PPSB 10 No.

    14 Ref. DPSB1 1 No.

    15 Ref. DPSB2 1 No.

    16 Ref. PPSB1 1 No.

    17 Ref. PPSB2 1 No.

    18 Ref MCC with automatic transfer switch ,(ATS), 200A built in 1 No.for pump room supplied with pumps

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    55 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    56/74

  • 7/28/2019 CL06 (MAY 2012)

    57/74

  • 7/28/2019 CL06 (MAY 2012)

    58/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    POWER INSTALLATION

    Supply , install, testing and commissioning of power andsockets accessories including all necessary boxes,faces(according to the engineer approvement ) comprisingcables, conduits, fittings, connections, from the outlets toPanelboards feeder associated works as required to suit thelocations shown on drawings E201--E220,E101--E120 and Coordination with other disciplines shall beconducted during work execution as per technicalspecifications, section 16050 and by making arrangiementwith supervising engineer to achieve the work to the best

    possible specifications

    01 Duplex socket outlet, 16A, 230V, grounding type 16 No

    02 Duplex socket outlet, 16A, 230V, grounding type, EF 6 No

    03 Single phase power socket outlet, 20A, 230V, grounding type, GF 6 No.

    04 Single pole one-way ,one gang switch (13A) 51 No.

    05 Single pole one-way ,one gang switch (13A), weatherproof 42 No.

    06Single pole one-way ,two gang switch (13A) 28 No.

    07 Push button switch 38 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    58 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    59/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    LIGHTING INSTALLATION

    Supply, install , testing and commissioning of lightingfixture outlets and including conduits, wires and all boxesbelong to Lighting Panelboards and associated works asrequired to suit the locations shown on drawings E101--E120.Coordination with other disciplines shall be conductedduring work execution as per technical specifications,section 16050 and by making arrangiement with supervisingengineer to achieve the work to the best possiblespecifications

    01 Lighting fixer outlet 1686 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    59 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    60/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    LIGHTING INSTALLATION

    Supply ,install, testing and commissioning of lightingfixture (furnishe with lamp and electronic blast, accessoriesand internal wires) mounting accessories.(according to theengineer approval ) associated works as required to suit thelocations shown on drawings E101--E120 ,GE-E01,GE-E01 andCoordination with other disciplines shall be conductedduring work execution as per technical specifications,section 16500 and by making arrangiement with supervisingengineer to achieve the work to the best possiblespecifications

    01 Type EX ( wall mounted, single sided) 15 No.

    02 Type EX ( ceiling mounted, double sided) 76 No.

    03 Type F1 560 No.

    04 Type F1E 237 No.

    05 Type F2 284 No.

    06 Type F2E 143 No.

    07 Type F3 6 No.

    08 Type F4 36 No.

    09 Type F4E 12 No.

    10 Type F5E 6 No.

    11 Type F7E 120 No.

    12 Type F8E 38 No.

    13 Type WL3 44 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    60 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    61/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    LIGHTING INSTALLATION

    Supply ,install, testing and commissioning of lightingfixture (furnishe with lamp and electronic blast, accessoriesand internal wires) mounting accessories.(according to theengineer approval ) associated works as required to suit thelocations shown on drawings E101--E120 ,GE-E01,GE-E01 andCoordination with other disciplines shall be conductedduring work execution as per technical specifications,section 16500 and by making arrangiement with supervisingengineer to achieve the work to the best possiblespecifications

    01 Type WL4 37 No.

    02 Type WL4E 40 No.

    03 Type FT1 flixible tube LED cove light 782 M.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    61 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    62/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    GROUNDING SYSTEM

    Supply, installation , test and commissioning of a groundingsystem comprising bare copper conductor to bond thebuilding's distribution boards and HVAC equipments to themain ear thing grid of the building. Including necessaryearthwork, buried galvanized steel foundations stripssurrounding the building phosphor bronze test joints &triangular counter poise and all associated works to suitgrounding resistivity required as shown on drawingsE301--E310 and as described in specifications16452,16453by making arrangiement with supervising engineer to

    achieve the work to the best possible specifications

    01 Complete building grounding system network to suit ground 1 Itemresistivity as shown on drawings and specification

    02 To suit grounding system for low current system equipment as 1 Itemshown on drawings and specification

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    62 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    63/74

  • 7/28/2019 CL06 (MAY 2012)

    64/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    TELECOMMUNICATION SYSTEM

    Supply, installation, testing and commissioning of telecommunication system commporising of server, Buildingdistributor with core switch,floor distribution, data/telephoneoutlets including cable / wires and conduits as shown ondrawings E- 501--E520 ,E801 and as described in specificationsection 16715,16720 and by making arrangiement withsupervising engineer to achieve the work to the bestpossible specifications

    01 Wall mounted telecommunication outlet 1 port ( 1 TV ) , ref. (T03) 6 No.

    02 Wall mounted telecommunication outlet 3 port ( 2data , 1Tel.) , 16 No.ref. (T04)

    03 Primary and secondary activ switch ( NIC) 2 No.

    04 Data and voice system network including conduits, wiring, pull boxes, 1 Itemconnections, and all required accessories to form a complete andfully operative system

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    64 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    65/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    VOICE EVACUATION SYSTEM

    Supply, install , testing and commissioning of voiceevacuation system comprising of voice evacuationspeakers including associated cable wires, earthing for equipment and conducting, interfacing with other systemsas shown on drawings E401--E404,E-801and .Coordination,integration with other disciplines shall be conductedduring work execution as per technical section 16721 anddrawings and by making arrangiement with supervisingengineer to achieve the work to the best possible andspecifications

    To suit system network equipped with:

    01 Master control panel for voice evacuation system with master mic 1 No.control ,96 switch control .integrated fire phone conneted withpower supply with battary back up ( 3 hours continual operation)

    02 Distribution panel for voice evacuation system with ( 3 amplifier 1 No.100 watt) and conneted with emergency power supplyof (CL-06)

    03 Distribution panel for voice evacuation system with ( `2 amplifier 16 No.100 watt) and conneted with emergency power supply of (AP-01,02)

    04 2 watt, voice evacuation speakers, wall mounted 80 No.

    05 2 watt, voice evacuation speakers, ceiling mounted 60 No.

    06 Voice evacuation systemnetwork including conduits, wiring, pull 1 Itemboxes, connections, and all required accessories to form acomplete and fully operative system

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    65 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    66/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    FIRE ALARM SYSTEM

    Supply, installation, testing and commissioning of firedetection/alarm system comprising of Modular analogueaddressable fire alarm system with back up battary,sounders detectors, control, alarm bell, pull stations,modules including associated cable wires and conduiting,interfacing as shown on drawings E-401--E420,E801and asdescribed in specifications 16721 and by makingarrangiement with supervising engineer to achieve the workto the best possible specifications

    To suit system network equipped with:

    01 Master analouge musicable fire alarm control panel , ref.FACPwith TCP-IP interface and power supply unit and auto 1 No.

    dialer connected to civil defense authority located at (CL06-B03)

    02 Master analouge addressable fire alarm control panel , ref.FACP5 loops ) with TCP-IP interface, power supply unit and auto dialer 6 No.connected to civil defense authority at ground floor of (AP-01)

    03 Master analouge addressable fire alarm control panel , ref.FACP2 loops withTCP-IP interface, power supply unit and auto dialer 10 No.connected to civil defense authority at ground floor of (AP-02)

    04 Optical smoke detector Ceiling mounted 145 No.

    05 Ceiling mounted heat detector 6 No.

    06 Ceiling mounted multi sensor (CO, heat, smoke) 237 No.

    07 Fire alarm manual call station 88 No.

    08 Fire alarm bill 38 No.

    09 Fire alarm interface unit 41 No.

    10 Fire man s telephone jack 38 No.

    11 Fire fighting telephone panel( FFT) 16 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    66 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    67/74

  • 7/28/2019 CL06 (MAY 2012)

    68/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    AUDIO VIDIO INTERCOM SYSTEM

    Supply , installation testing and commisioning of audiovideo intercom system comprising of outdoor Intercomstation with camera , electrical door lock , power supply ,cables and conduits and associated works as required to suitthe locations shown on drawingsE-601--E620 andcoordination & integration & communication kit with other systems shall be conducted during work execution as per technical specifications section 16760 and by makingarrangement with supervising engineer to achieve the workto the best possible and specifications

    To suit audio video intercom system network equipped with:

    01 Outdoor Intercom station with camera( 72 lines ) for AP-01 type 12 No.

    02 Outdoor Intercom station with camera ( 16 lines ) for AP-02 type 10 No.

    03 Electrical door loock 22 No.

    04 power supply unit 22 No.

    05 Network controller 1 No.

    06 Audio video intercom system network including conduits, wiring, 1 Item

    pull boxes, connections, and all required accessoriesto form a complete and fully operative system

    To Collection SR

    DIVISION 16 - ELECTRICAL

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    68 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    69/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    SECURITY SYSTEMS ( ACCESS CONTROL&CCTV IP )

    Supply , installation testing and commisioning of securitysystems ( access control&CCTV IP )comprising of Reader interface module card, readers ,push buttons, electromagnetic locks,IP cameras, conduits, interfaces,programming and software as required to form completefunctional security system as per drawingsE-601--E620 .E-801 ,riser diagrams and specifications section 16783 according tolatest technology

    To suitl security system network equipped with:

    01 Intelligent security controler ( ISC) 17 No.

    02 Reader interface module ,ref (RIM) with power supply 52 No.

    03 Double reader interface module ,ref (DRIM) with power supply 18 No.

    04 Access control push button ,ref (PB) 74 No.

    05 Access control card reader,ref (CR) 118 No.

    06 magnetic door contact 105 No.

    07 electromagnetic lock for one side door 41 No.

    08 electromagnetic lock for double side door 32 No.

    09 Wall mounted IP CCD DAY / night camera 21 No.

    10 Ceiling mounted Indoor IP CCD DAY / night camera 16 No.

    11 Ceiling mounted IP fixed dome camera 22 No.

    12 Outdoor IP CCD DAY / night camera 36 No.

    13 Outdoor motion sensor with time delay 64 No.

    14 security system network including conduits, wiring, pull 1 Itemboxes, connections, and all required accessories toform a complete and fully operative system

    To Collection SR

    DIVISION 16 - ELECTRICAL

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    69 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    70/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    IP TV SYSTEM

    Supply, install, test and commissioning of televisionsystem connected with TCP/IP (LAN) comprising of set topbox , power supply ,(RJ 45 TV outlet measuredelsewhere )and all as shown on drawings E-501--E-520E-801 and .Coordination, integration with other systemsdisciplines shall be conducted during work execution asper technical specificationssection 16787 and by makingarrangement with supervising engineer to achieve thework to the best possible and specifications

    To suit IPTV system network equipped with:

    01Set top box

    6 No

    02 IP TV system network including coaxialcables , boxes, cables 1 Itemand all required accessories to form a complete and fullyoperative system

    To Collection SR

    DIVISION 16 - ELECTRICAL

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    70 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    71/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    BUILDING MANAGEMENT SYSTEM (BMS)

    Supply, install, testing, commissioning and integrating thebuilding / cluster BMS system or sub system items(equipment controllers, routers, cables inside the buildingbetween system items, conduits, boxes, fiber opticcables,..etc) with phase 1 main BMS system (located in thedata center)via LAN network as shown on the buildingdrawings, indicated in plumbing, HVAC and electrical input/output schedules (all BMS schedules) and as described in thespecifications, consisting of but not limited to:

    01 To suit building BMS system network and the system should be 1 Itemapplicable to linked with existing operating system in phase one

    after getting approval from service and operation team in phaseone to complete the work to the best possible

    To Collection SR

    DIVISION 16 - ELECTRICAL

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    71 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    72/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    Col l ec t i on

    Sheet - 46Sheet - 47

    Sheet - 48

    Sheet - 49

    Sheet - 50

    Sheet - 51

    Sheet - 52

    Sheet - 53

    Sheet - 54

    Sheet - 55

    Sheet - 56

    Sheet - 57

    Sheet - 58

    Sheet - 59

    Sheet - 60

    Sheet - 61

    Sheet - 62

    Sheet - 63

    Sheet - 64

    Sheet - 65

    Sheet - 66

    Sheet - 67

    Sheet - 68

    To Collection SR

    DIVISION 16 - ELECTRICAL

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    72 / 74

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL06 (MAY 2012)

    73/74

    PROJECT: Infrastructure buildings of the residential complex (phase 2)of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL06)

    AMOUNTSR

    RATEITEM D E S C R I P T I O N QTY UNIT

    Col l ec t i on

    Sheet - 69Sheet - 70

    Sheet - 71

    To Collection SR

    Collection

    Sheet - 72

    Sheet - 73

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    73 / 74

    REVISED PAGE

    Date: MAY 2012