CIRCE FOUNDATION

14
1 CIRCE FOUNDATION Gorka Goicoechea Account Manager Novel integrated refurbishment solution as a key path towards creating eco-efficient and competitive furnaces February 13th, 2018

Transcript of CIRCE FOUNDATION

Page 1: CIRCE FOUNDATION

1

CIRCE FOUNDATION

Gorka Goicoechea

Account Manager

Novel integrated refurbishment solution as

a key path towards creating eco-efficient

and competitive furnaces

February 13th, 2018

Page 2: CIRCE FOUNDATION

2

CIRCE – An innovative Model of Research Centre

R&D&i: “Knowing how, teaching how”

Page 3: CIRCE FOUNDATION

3

Leaders in Applied Collaborative R&D

14 National projects> Funded by Spanish Government

32 Horizon2020 Programme> 9 Coordinated

Participation in other European Projects> LIFE+> Regional Funds

70 million €for our partners in the 7FP and H2020 projects that we coordinate

Page 4: CIRCE FOUNDATION

4

Leading the Change Towards Eco-Efficient Furnances

VULKANO project will develop,implement and validate anadvanced retrofitting integratedsolution to increase the energy andenvironmental efficiency in existingpreheating and melting industrialfurnaces currently fed with naturalgas.

VULKANO project will contribute not only to update the mainlyold-aged furnaces but also to create a path to follow in order toensure a successful design in case of new furnaces

Page 5: CIRCE FOUNDATION

5

Process & Demos

20%

27% Savings of FUEL CONSUMPTION with a subsequent reduction

of CO2 emissions

15-40%

REDUCTIONof fossil fuel consumption

Increase of the OVERALL EFFICIENCY in two of the main types of industrial furnaces

Page 6: CIRCE FOUNDATION

6

DEMO IPre-heating furnace

Steel Sector Valji - Slovenia

Batch Process: 100 – 400 o C

DEMO IIMelting furnace

Ceramic SectorSpain – Torrecid

Continuous Process. 1500-1580 o C

REPLICABILITY VALIDATIONPre-heating and melting

furnace

Aluminium SectorTurkey – ASAS

450-500 oC /700-720 oC

Process & Demos

Page 7: CIRCE FOUNDATION

7

Process & Demos

Page 8: CIRCE FOUNDATION

8

Phase Change Materials – Based Energy Recovery

Highlights:• Providing an important progress in the knowledge of potential

applications for PCM implementing these materials at high temperatureranges.

• Overcoming difficulties of commercial solutions due to technologicallimits.

• Capture thermal energy from off-gas, increasing around 100-200°Cthe current temperature reached in the air flow used in the furnacecombustion process.

Milestones achieved so far:• Selection of PCM system depending on application, configuration and

industrial sector.

• Tests at laboratory and industry scale with different PCM materials.

• Basic engineering of the PCM-Heat Exchanger (preliminar)

Page 9: CIRCE FOUNDATION

9

Holistic In-House Predictive tool

Highlights:• Optimises the furnace design and its energy and environmental

performance• Considers the interaction between the furnace and the eco-innovative

retrofitting solutions and upstream/downstream processes .• A cross sectorial database structure will be developed for replication• Modular algorithm based on KPIs adaptable to different retrofitting

solutions.• Mission: predict system performance, decision support tool for operators,

feedback to the control system, optimize control efficiency.

Milestones achieved so far:• Selection of most relevant parameters and KPIs for the industry and the

technology providers

• Creation of the baseline algorithm

• Exergy preliminary evaluation

Page 10: CIRCE FOUNDATION

10

Expectations from the industry – Steel

Energy utilisation ofrenewables

Reducing consumption of fossil fuels

Lowering heat losses and CO2 production (novel refractories)

Lower consumption of fossil fuel (NG)

Production of alternative gaseous fuel from solid residual fuels and its

use in thermal processes

Advanced reuse of residual waste heat (increasing

process efficiency)

New know-how, testing ground and

demo site.

Page 11: CIRCE FOUNDATION

11

Expectations from the industry – Ceramic

› Novel heat processing solutions to improve efficiency of exiting burners

› Novel heat processing solutions for heat exchange

› Novel refractories

› Burner modelization

› Co firing of NG and BG.

› Advanced furnace control system

› Frit smelter

› Ceramic pigments sintering

› Ceramic tile furnace ( 1200 ºc)

› Glass furnaces

› Ceramic sanitary ware

› Brick industry

VULKANO CONTRIBUTION WHERE TO APPLY ?

Page 12: CIRCE FOUNDATION

12

Expectations from the industry – Alumnium

Monitoring and control system savings:

3%

Increasing overall efficiency in 20%

20%

New heat resistance materials savings:

5%

Heat recovery systems like PCMs savings:

10%

Page 13: CIRCE FOUNDATION

13

Opportunities for industry

Reduce energy consumption, operating costs and CO2emissions

Improve the performance of the furnaces

Better market competitiveness and eco-efficiency via non-conventional technologies.

Energy utilisation of solid waste fuels after demonstrating co-firing system.

Coping with future energy challenges

Page 14: CIRCE FOUNDATION

14

February 13th, 2018

THANK YOU FOR YOUR ATTENTIONGorka GoicoecheaAccount Manager

[email protected]://www.fcirce.es