Chi Nguyen Designer

28
• Design & Build • Experiential Projects • Furniture • CURRENT PROJECT, Garland, TX, ( 57,000 sq.ft ) 07/2009 - current • RETREAT CENTER, Da Lat, VIETNAM, ( 36,000 sq.ft ) 04/2009 - 07/2009 • 1ST PLACE DESIGN AWARD, PUBLICATION, contructed for $100,000 project, 02/2007 - 08/2007 PROJECT • CHI NHAN VU NGUYEN • c:(972) 890-4279 [email protected]

Transcript of Chi Nguyen Designer

Page 1: Chi Nguyen  Designer

• Design & Build

• Experiential Projects• Furniture

• CURRENT PROJECT, Garland, TX, ( 57,000 sq.ft )07/2009 - current

• RETREAT CENTER, Da Lat, VIETNAM, ( 36,000 sq.ft )04/2009 - 07/2009

• 1ST PLACE DESIGN AWARD, PUBLICATION, contructed for $100,000 project, 02/2007 - 08/2007 PROJECT

• CHI NHAN VU NGUYEN • c:(972) 890-4279 • [email protected]

Page 2: Chi Nguyen  Designer

• CHI NHAN VU NGUYEN • c:(972) 890-4279 • [email protected]

CURRENT PROJECTS

Page 3: Chi Nguyen  Designer

INSTITUTION & AUDITORIUM PROJECT.Garland, Texas.57,000 sq.ft, 07/2009 -current Position: Project Designer & rendering

Page 4: Chi Nguyen  Designer
Page 5: Chi Nguyen  Designer

INSTITUTION & AUDITORIUM PROJECT.Garland, TX. Interior space concept Position: Project Designer & Rendering

Page 6: Chi Nguyen  Designer
Page 7: Chi Nguyen  Designer

RETREAT CENTER PROJECT. Da Lat, VIETNAM. 22,000 sq.ft. 04/2007 Position: Project Designer & rendering

Page 8: Chi Nguyen  Designer

Cafeteria View

Conference View

Outdoor Mass

RETREAT CENTER PROJECT. Da Lat, VIETNAM. Entrance conceptPosition: Project Designer & rendering

Page 9: Chi Nguyen  Designer

BISTRO-V PROJECT. Plano, Texas.( 2,600 sq.ft ). 10/2009Position: Designer consultant & rendering

Page 10: Chi Nguyen  Designer
Page 11: Chi Nguyen  Designer

• CHI NHAN VU NGUYEN • c:(972) 890-4279 • [email protected]

DESIGN & BUILD PROJECTS

Page 12: Chi Nguyen  Designer

PLAYGROUND SLIDE & JUNGLE GYM.Lafayette, LA. 01/2006-05/2006 Boys & Girls ClubPosition: Construction Coordinator & Fabricator.

Page 13: Chi Nguyen  Designer

SHADES OF BLUE.Lafayette,LA.(4,700 sq.ft) 02/2007-08/2007Position:Project Designer & Assistanting constructional phase

Page 14: Chi Nguyen  Designer

•1st PLACE DESIGN AWARD , 05/2007•CONSTRUCTION COST -$100,000 •Position: • Project Designer • Assistant in fabric fabrication, construction, machine-operation, some in management, and design leadership.

Page 15: Chi Nguyen  Designer
Page 16: Chi Nguyen  Designer

• CHI NHAN VU NGUYEN • c:(972) 890-4279 • [email protected]

OTHER PROJECTS

Page 17: Chi Nguyen  Designer

Salon & Spa.Baton Rouge,LA. ( 1,400 sq.ft ) Position: Designer consultant & rendering

Page 18: Chi Nguyen  Designer
Page 19: Chi Nguyen  Designer

ADDITIONAL PATIO. Garland, Texas. ( 400 sq.ft ) 06/2009 Position: Project Designer & rendering

Page 20: Chi Nguyen  Designer

ADDITIONAL PATIO. Plano, Texas. 1,000 sq.ft. ( 06/2009 )Position: Project Designer & rendering

Page 21: Chi Nguyen  Designer

GARDEN STATUE. Baton Rouge, LA.( 100 sq.ft) 04/2009Position: Project Designer & rendering

Page 22: Chi Nguyen  Designer

• CHI NHAN VU NGUYEN • c:(972) 890-4279 • [email protected]

FURNITURE DESIGN

Page 23: Chi Nguyen  Designer

THE MULTIPUROSE TABLE, ( 05/2005 )Materials: Natural pinewood, pvc, glass, metal rod, hardwares

SUSTAINABLE DESIGN INCLUDE:• materials - can acquire from many local store• function - the frame can be easy taking apart• Mulitpurpose Use - the table can be use for coffee tabke, desk, and other.

Page 24: Chi Nguyen  Designer

THE TOOL BOX ( 05/2005 )Materilas.: Natural pinewood, metal rods, clear plastic tubing, hardwares

Page 25: Chi Nguyen  Designer

THE CHAR ( 05/2005 )Materials: Natural pinewood, metal rods, hardwares

Page 26: Chi Nguyen  Designer

THE CHAIR ( 01/2005 )Materials: Concrete, wood, pvc,metal rod, hardwares

Page 27: Chi Nguyen  Designer

THE CANDLE HOLDER, Materials: Natural pinewood, metal rods, plexy glass, hardwares

Page 28: Chi Nguyen  Designer

THE LIGHT TOWER Materials : Paper, wood, hardwares