Chehalis River Basin Flood Authority Education and Outreach Subcommittee

23
Chehalis River Basin Flood Authority Education and Outreach Subcommittee Actions and Activities Benefiting the Basin February 2013

description

Chehalis River Basin Flood Authority Education and Outreach Subcommittee. Actions and Activities Benefiting the Basin February 2013. Today’s Presentation. Raise awareness Encourage discussion Key messages we’d like to leave you with . . . - PowerPoint PPT Presentation

Transcript of Chehalis River Basin Flood Authority Education and Outreach Subcommittee

Page 1: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

Chehalis River Basin Flood AuthorityEducation and Outreach Subcommittee

Actions and Activities Benefiting the Basin

February 2013

Page 2: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

2

Today’s Presentation Raise awareness

Encourage discussion

Key messages we’d like to leave you with . . .1. Broad agreement -- For the first time in a century there is broad

agreement on the next steps to reduce flood damage and enhance salmon runs in the Basin.

2. Basin-wide strategy -- A Basin-wide strategy can protect communities along the river and enhance salmon runs.

3. Flood Authority – Positioned to continue to be a galvanizing force in the Basin for implementation of tools, and projects.

Discussion

Feb. 2013

Page 3: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

3

Chehalis River Basin Flood Authority

Feb. 2013

Grays Harbor County Lewis County Thurston County City of Aberdeen

City of Napavine City of Oakville Town of Pe Ell Town of Bucoda

Formed in 2008

Formal body focused on (1) flood hazard mitigation throughout the Basin and (2) decisions that would be . . . informed by science protective of Basin residents/communities environmentally appropriate

Basin jurisdictions represented City of Centralia City of Chehalis City of Cosmopolis City of Montesano

Page 4: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

4Feb. 2013

2007 Flood -- $938 million in damage (Basin-wide)

City of Centralia STEVE RINGMAN / SEATTLE TIMES

City of Chehalis BRUCE ELY / THE OREGONIANExit 77 (I-5) in Chehalis

STEVE RINGMAN / SEATTLE TIMES

Background

Page 5: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

5

2007 Flood -- $300 million in lost economic activity (Washington State)

Feb. 2013

Photos Source: Lewis County,Division of Emergency Management

Background

Page 6: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

6

2007 Flood – Immense impact on the lives of victims, responders alike

Feb. 2013

Photos Source: Lewis County,Division of Emergency Management

Background

Page 7: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

7

High flow events . . . I-5 closed 1990, 1996, 2007, 2009 Five largest events since 1986 -- Frequent Floods are getting worse and

damage is increasing . . . Chart -- Chehalis River Flow Rates near Grand Mound (cubic ft./sec.)

Feb. 2013

1932

1934

1936

1938

1940

1942

1944

1946

1948

1950

1952

1954

1956

1958

1960

1962

1964

1966

1968

1970

1972

1974

1976

1978

1980

1982

1984

1986

1988

1990

1991

1993

1995

1996

1998

2000

2002

2004

2006

2008

2010

2012

0

10000

20000

30000

40000

50000

60000

70000

80000

90000

913

7

13 11

6

1610

4

3

8

2

12 15

1

5

Background

Page 8: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

8

Chehalis is the second largest river basin in the state, rich in natural resources . . .

Feb. 2013

Background

Page 9: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

9

Need -- Strategy, Tools, Action. . .

Feb. 2013

Strategy = Basin-Wide SolutionA. Significant reduction of flood damage.B. Solving one area’s problems doesn’t

increase problems for others.C. Maintain focus in five areas:

1. major capital projects2. localized projects3. land use management4. environmental enhancements5. flood warning and emergency response

William D. Ruckelshaus Center

Page 10: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

10

Tools -- Flood Warning System

www.chehalisriverflood.com

Feb. 2013

Front-facing website.

Back-end data collection and data synchronization system.

Improves forecasting and early-warning.

Page 11: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

11

Tools -- Flood Warning System Localized tracking, forecasting . . .

Feb. 2013

Chehalis River near Grand Moundwww.chehalisriverflood.com

Page 12: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

12

Tools -- Hydraulic Analysis Model

Science-based model to inform decision-makers on the hydraulic effects of potential flood relief alternatives (at basin-wide and localized scales).

25 potential flood relief projects or project combinations were analyzed/evaluated with the model.

Covers mouth of the Chehalis River upstream to Pe Ell (108 miles).

Feb. 2013

Page 13: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

13

Tools -- Hydraulic Analysis Model

Feb. 2013

Now have analytic ability to understand potential project effects, downstream and up.

Page 14: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

14

Tools -- Hydraulic Analysis Model

Feb. 2013

Example: Basin-wide effects analysis (Chehalis Basin Flood Hazard Mitigation Alternatives Report, 12/2012)

Page 15: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

15

Tools -- Fish Studies Two significant fish studies conducted in Upper Basin (WRIA 23).

1. Analyze effect of dam alternatives on Spring Chinook, Steelhead and Coho.2. Prioritize potential fish habitat enhancement opportunities.

Initial projections . . .

Feb. 2013

Species Multi-Purpose Dam

Flood Control-Only Dam

Fish Habitat Enhancement

Measures

Spring Chinook 20% 4% likely same as Coho

Steelhead 7% 11% likely same as Coho

Coho 1% 1% 4-5%

Page 16: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

16

Action -- 2012 Jobs Now Act Projects $5,000,000 provided under 2012 Jobs Now Act.

$1,875,000 -- Repair/modification of levees and dikes. $2,075,000 -- Modification of Sickman Ford bridge, and floodplain culverts.  $50,000 -- Installation/calibration of rain gauge on Chehalis reservation. $500,000 -- Construction of evacuation routes and critter pads. $500,000 -- Improvements to areas affected by Satsop river.

Feb. 2013

Half the funds allocated to date. Adna Aberdeen Bucoda Chehalis-

Centralia Airport

See http://goo.gl/maps/v7vO3.

Grays Harbor County Montesano WA Conservation

Commission

Page 17: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

17

Action -- 2013 Proposed State CapitalBudget

Governor workgroup convened to develop prioritized list of projects for 2013 state capital budget based on Basin-wide solution.

Feb. 2013

Chehalis Tribe Chehalis Flood Authority

Washington Dairy Federation Governor’s staff

Proposed budget . . . 1. Construct local flood damage reduction projects now ($10.7 million)2. Complete design alternatives for large-scale flood damage reduction projects

($9.2 million): Upper basin water retention-engineering and design I-5 protection options

3. Construct multipurpose projects that reduce flood damage and benefit fish ($4.3 million)

4. Reduce residential damage ($1.8 million)5. Ensure successful implementation ($2.2 million)

Page 18: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

18

Action -- 2013 Proposed State CapitalBudget

Proposed budget ($10.7 million for local projects) . . .

Feb. 2013

http://goo.gl/maps/gWob9

Page 19: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

19

Action -- 2013 Proposed State CapitalBudget

Local contribution . . .

Feb. 2013

Page 20: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

20

Looking Ahead . . .

Continue to focus on local small/mid-scale projects (like was done in 2012 with Jobs Now Act projects).

Major projects: Upper Basin Dam – Evaluate design alternatives to determine permit feasibility,

engineering safety and mitigation requirements by December 2014. I-5, Airport, Twin Cities – Conduct design and engineering analysis on four

protection alternatives.

Continue to improve existing tools (usability improvements to Flood Warning System).

Continue to be a galvanizing force for the Basin.

Feb. 2013

Page 21: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

21

Resources, Additional Information Visit Flood Authority’s Web Library for recent documents and

products of note (click here). Flood Warning System Brief Sheet Flood Authority Funded Additional Flood Warning Gages Hydraulic Model video presentation Anchor QEA Fish Studies Summary Jobs Now Act Projects Governor’s Work Group Capital Budget Package Flood Authority Supporting Documentation (All Proposed Projects, Tier I

and Tier II) Ruckelshaus Center’s Chehalis Basin Flood Hazard Mitigation Alternatives

Report Lewis County Flood Authority Website State of Washington Flood Authority Website This PPT (Actions and Activities Benefiting the Basin)

Feb. 2013

Page 22: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

22

Questions? Perspectives? Input?

Feb. 2013

Page 23: Chehalis River Basin Flood Authority Education and Outreach Subcommittee

23

Thank You!

Vickie Raines, ChairChehalis Basin Flood Authority360/590-4100 [email protected]

Feb. 2013

Karen Valenzuela, Vice-ChairChehalis Basin Flood Authority(360) [email protected]

Dan Thompson, Oakville Rep.Chehalis Basin Flood Authority360/[email protected]

Scott Boettcher, StaffChehalis Basin Flood Authority360/[email protected]

Edna Fund, ChairEducation and Outreach Subcommmittee (Flood Authority)360/[email protected]