cerion_product_demonstration.pdf
-
Upload
sulis-setiawati-firdaus -
Category
Documents
-
view
217 -
download
4
Transcript of cerion_product_demonstration.pdf
-
Cerion Optimization Services Inc.2591 Dallas Parkway, suite 404Frisco, Texas, USA 75034Office: +1 (214) 619-8000Fax: +1 (214) 619-8001Email: [email protected]: www.cerioninc.com
This document contains information that is protected by copyright. Any reproduction, adaptation, or translation without prior permission is prohibited, except as allowed under the copyright laws. All rights reserved. A license is hereby granted to download and print a copy of this document for personal use only. No other license to any other intellectual property rights is granted herein. Unless expressly permitted herein, reproduction, transfer, distribution or storage of part or all of the contents in any form without the prior written permission of Cerion is prohibited.
Optimiser TM and IntelligenceBuilder TM
Product Demonstration
by Cerion Optimization Services
.
B e t t e r d e c i s i o n s l e a d i n g t o m o r e r e l i a b l e o u t c o m e s
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Topics
2SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Topics
Solution Overview
Performance Monitoring
Capacity Planning and Forecasting
Network Design and Optimization
Deployment Sequencing
2SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
System Architecture View
3SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
IntelligenceBuilderServer Modules
OptimiserClient Modules
UnifiedNetworkModel
SGSNGGSN
BSCRNC BTS
NodeB
SectorCarrierBand
Links
MSCCS/MGW
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
System Architecture View
3SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
IntelligenceBuilderServer Modules
Iu-x Link Planning
Capacity Analysis
Load Optimization
NetworkMeasurements
Site, Equipment,And Marketing Forecasts
Per Element EngineeringGuidelines
NetworkConfiguration
Re-home Planning
Border Optimization
OptimiserClient Modules
UnifiedNetworkModel
SGSNGGSN
BSCRNC BTS
NodeB
SectorCarrierBand
Links
MSCCS/MGW
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Capacity Management Process
4SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
UnifiedNetwork
Model
SGSNGGSN
BSCRNC
BTSNodeB
SectorCarrierBand
Links
MSCCS/MGW
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Capacity Management Process
4SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
UnifiedNetwork
Model
SGSNGGSN
BSCRNC
BTSNodeB
SectorCarrierBand
Links
MSCCS/MGW
DESIGNImplementation
Planning
(Sequencing)
IMPLEMENT& MEASURE
Re-ParentingPlans
Measurement & Assessment
(Actual Traffic)
CS, PS, Subs & Transaction Forecasting
Capacity Planning
(Actual Capacity &Demand Forecast)
OPERATE
FORECAST
Capacity Demand& Requirements
Network Optimization
(What-If Scenarios)
PLAN
Polygon Planning& Border Analysis
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
OptimiserTM Dashboard
5SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
OptimiserTM Dashboard
5SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Optimiser dashboard provides an easy and
simple access to network performance status.
(A)ctuals (P)rojected Actuals
(F)orecasted
Optimiser also calculates bandwidth requirements to
match the current and forecasted demand.
Optimiser home page enables users to access
the different networks technologies and
elements.
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Import of Actuals for Trending
6SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Import of Actuals for Trending
6
The imported data is used to create a highly granular
demand forecast which the user can then adjust to
evaluate different scenarios.
Field demand measurements, network configuration information and marketing projections are imported at monthly intervals from the IntelligenceBuilder server.
SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Optimiser uses the actuals to assess end-to-end capacity
requirement trends over time.
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Input of Future Demand
7SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Input of Future Demand
7SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Forecast data can also be entered manually or via the import function.
Every row of the forecast can be displayed as a graph for reporting purposes or just for clarity sake.
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Multi-Vendor Libraries
8SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Multi-Vendor Libraries
8SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
new element type can be added and various configurations (mid-cap, high-cap) defined in this view.
Every node type in the library is modeled and the engineering parameters can be modified to match various model types and customized configurations.
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Element Management
9SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Element Management
9SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Every element in the network is mapped and its configuration is inventoried in the system from a lifecycle standpoint.
new elements can be added and connectivity defined in this view.
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Capacity Planning (Before Optimization)
10SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Capacity Planning (Before Optimization)
10
The forecast can be viewed by equipment
vendor or network wide.
SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
The red bar for the month indicates that at least one RNC will be operating above at least one
engineering limit during that month. This issue can be resolved through
optimization. Users can also drill down to get more detailed reports of
the constraint.
while the orange bar indicates that additional RNCs must be added to support the forecasted
demand.
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Constraints Details
11SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Constraints Details
11SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
The OptimiserTM has extensive drill down
capabilities, allowing the engineers to see and
analyze the root cause of the capacity issue.
In this view, the engineer can see which RNC has exceeded the
engineering limit and which (could be many) constraints has triggered
it.In this view, the engineer can drill down on which
constraints was over limit and this for each RNC
over limit.
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Capacity Planning (Before & After)
12SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Capacity Planning (Before & After)
12SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
This chart shows the original Capacity Planning view of the
network from an RNC perspective.
After using the optimization engine the new Capacity Plan
ensures that all system elements are within engineering limits
across all months.
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Network Design (What-If Scenario Analysis)
13SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Network Design (What-If Scenario Analysis)
13
This bar chart shows the operating points and
associated engineering limit of selected NodeBs in a
specific month.
SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
This is a geo-based design view. A comprehensive selection of tabular and graphical views is also
available.
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
NodeB and Handovers Details
14SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
NodeB and Handovers Details
14SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Optimiser provides the user with the ability to analyze and modify the detailed
design of the network for each month of the capacity plan on-the-spot and see the
impact on network performance.
This view shows RNC borders with projected loading and handovers at a
NodeB level.
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Design Optimization
15SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Design Optimization
15
Using the automated optimization engine users can load balance
elements, optimize borders, and minimize re-parenting on the click
of a button.
SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
The optimization parameters and element capacity constraints
settings can be adjusted to meet the desired engineering guidelines
of any customers.
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Design Optimization (Before & After)
16SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Design Optimization (Before & After)
16SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
This chart shows the original RNC capacity plan and the
various constraints.
Using the design optimization engine the new design is clearly more balanced than the original and the quality of service has been enhanced by improving
RNC borders.
while this chart shows how the original RNC network was
optimized by adding more RNCs and using the Optimiser to reconfigure and balance the
network load.
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Capacity Utilization Reporting
17SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Capacity Utilization Reporting
17
Cerion Optimiser provides many different end-to-end
utilization reports.
This chart shows the highest projected operating points for
different RNCs.
Here are the highest projected operating points
for different NodeBs. and this chart shows
projected CPU loading and profiling on multiple SGSNs
over time.
SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Implementation Planning (Before)
18SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Implementation Planning (Before)
18
The implementation plan must address equipment
changes.
and re-parenting.
SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Optimiser implementation module enables users to
automatically generate an optimal implementation plan in
a few simple steps.
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Implementation Planning
19SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Implementation Planning
Optimiser automated sequencing engine creates an optimal
reconfiguration plan that avoids engineering
overload and quality of service issues.
Start and end dates for implementation are
entered using this tab.
The date that each change occurs can be adjusted using this tab.
19SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Implementation Planning (After)
20SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Implementation Planning (After)
20
Optimiser automatically sequences each step to
eliminate interim capacity and performance issues across any
network element throughout implementation.
Implementation of the new design occurs in multiple
day-by-day steps, creating interim network
configurations that can cause overload and end
user performance issues if not properly managed.
Optimiser generates reports showing the Utilization for each element during each step of the
Sequence. Individual steps (days)in Sequencing Plan.
SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Closed-Loop Approach
21SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
UnifiedNetwork
Model
SGSNGGSN
BSCRNC
BTSNodeB
SectorCarrierBand
Links
MSCCS/MGW
DESIGNImplementation
Planning
(Sequencing)
IMPLEMENT& MEASURE
Measurement & Assessment
(Actual Traffic)
Capacity Planning
(Actual Capacity &Demand Forecast)
OPERATE
FORECAST
Network Optimization
(What-If Scenarios)
PLAN
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Closed-Loop Approach
21SolutionOverview
PerformanceMonitoring
CapacityPlanning
NetworkDesign
DeploymentSequencing
UnifiedNetwork
Model
SGSNGGSN
BSCRNC
BTSNodeB
SectorCarrierBand
Links
MSCCS/MGW
DESIGNImplementation
Planning
(Sequencing)
IMPLEMENT& MEASURE
Measurement & Assessment
(Actual Traffic)
Capacity Planning
(Actual Capacity &Demand Forecast)
OPERATE
FORECAST
Network Optimization
(What-If Scenarios)
PLAN
Any changes made at any level on the network model using the Optimiser is propagated
downward and upward from NodeB through MSC, thus
promoting concurrent engineering and avoiding human errors created by handoff of data between groups.
Wednesday, August 1, 12
-
Wednesday, August 01, 2012
Proprietary and Confidential
Conclusion
We provide cross-functional, multi-vendor, multi-layer, multi-configuration, and multi-technology high-grade consulting services
We can help you achieve a better utilization of network assets, improve end-user experience, reduce costs, eliminate risks and increase efficiency
We want to earn your business and your trust as a valued engineering partner
22Company
BackgroundCustomerBenefits
SolutionsOffering
CaseStudies
ContactInfo
Daniel PichePresident
2591 Dallas Parkway, suite 404 Office: +1 (214) 619-8017Frisco, Texas, US 75034 Mobile:+1 (469) 247-5051www.cerioninc.com Fax: +1 (214) [email protected] [email protected]
Call us now to learn about our serviceguarantee.
Dan.
Wednesday, August 1, 12