CBT Training March 2010

31
CBT Training March 2010 Jami-Jon M. Pearson, PhD Canyons School District Research & Assessment Coordinator [email protected] 1

description

CBT Training March 2010. Jami-Jon M. Pearson, PhD Canyons School District Research & Assessment Coordinator Jami- [email protected]. What did we learn from DWA? PROS CONS. 2010 Direct Writing Assessment Administration. Important Dates: - PowerPoint PPT Presentation

Transcript of CBT Training March 2010

Page 1: CBT Training March 2010

CBT TrainingMarch 2010

Jami-Jon M. Pearson, PhDCanyons School DistrictResearch & Assessment [email protected]

1

Page 2: CBT Training March 2010

2010 Direct Writing Assessment Administration

What did we learn from DWA?

◦PROS

◦CONS

Page 3: CBT Training March 2010

Important Dates:

Mar. 12 Secondary Pre-prints due (Course & Section)

Mar. 15 CBT testing schedule due

Mar. 22 Student Logs sent to schools

Mar. 23 CRT training at CAB

Ele. 8-10am; Sec. 10:30-12:30pm

Mar. 31 Student rosters need to be verified for accuracy

(including accommodations codes withdrawn students, etc.)

3

Page 4: CBT Training March 2010

Important Dates:

Mar. 15 – Apr. 9 CBT Practice Session available

Apr. 7-9 Schools receive CRT Paper-based testing (PBT)

materials

Apr. 19-May 21 Core CRT Testing window

May 24-27 Student Logs, Accountability Logs, CRT paper-

based & CBT returns

TESTING NOTICE-www.canyonsdistrict.org

June. 1 Paper-based testing materials ready for pick up

by district drivers.

Page 5: CBT Training March 2010

5

Page 6: CBT Training March 2010

6

Page 7: CBT Training March 2010

7

Lab Proctor /CBT Test Manager Teacher

Principal& proctor create/coordinate CBT testing schedule.

Submit test for scoring only when the student has completed all sections of test.

Prepare student by using Measured Progress practice tests.

Verify accuracy of the class rosters-including accom. codes, withdrawn students, etc. by Mar.31.

Indentify and report security issues.

Verify accuracy of the class roster, including accom., with the proctor by Mar. 31.

Coordinate withtech to make sure all technology is ready for testing. Should be set up by Mar. 15.

Print student tickets , help students log in, provide Test Access Code to students.

Handout student tickets for day of testing& help students log in.

Check thatcomputers are operational daily before testing.

Manage testing sessions, monitorproctor station,& retrieve reports for school/teachers.

Assign student seating in the lab – thoughtfully and strategically.

Keep checklist to verify all students complete testing.

Verify that all tests completed & correctly submitted.

Conduct/monitor the entire test.

Refer to Canyon’s CBT Wiki page (http://computerbasedtesting.wikispaces.com) for latest information & resources.

Advise Proctorwhen students have finished their test.

Collect the student tickets at the end of a same subject test section and give them to proctor.

Page 8: CBT Training March 2010

iTest Components

DAS – Data Administration SystemWeb Application: requires a login

School Testing Admin & Proctor Accounts

(*same person)

Manage student and staff accounts

Create student login tickets for testing

sessions

Monitor test progress

Generate reports

8

Page 9: CBT Training March 2010

iTest Cont.

PTW – Proctor Test Workstation:Secure login required

Web application for administering

tests to students

Start, pause and end test sessions

Monitor student progress

End test sessions and submit selected

student results for scoring9

Page 10: CBT Training March 2010

iTest Cont.STW – Student Test Workstation:

Web application for accessing test

content

Students answer questions using mouse

and/or keyboard

Virtual tools such as rulers and reference

sheets

Secure application; other programs

cannot be accessed10

Page 11: CBT Training March 2010

iTest Cont.

Mathematics tools

Navigation tools

Flags

Test Map and Test Map Key

Test appearance

Answer automatically saved

when student selects the NEXT

button. 11

Page 12: CBT Training March 2010

http://utah.measuredprogress.org

•Use “Proctor a Training Test” to proctor practice tests•Use “Go to Training DAS Site” to set up practice tests•Use “Proctor a Live Test” to proctor live tests•Use “Go to Live DAS Site” to set up live tests

12

Page 13: CBT Training March 2010

13

Assign Proctor Test Sessions

Log into the MP website &click “Go to Training DAS Site”

Type USERNAME & PASSWORD

Click “Manage”& then “Staff Accounts”

Choose“School”from the drop down

Page 14: CBT Training March 2010

To Add/Modify Staff• Enter proctor name, user name, password (6

letters/numbers), email (use yours)

• Click “Tests” button& choose the tests they can proctor

• Click “Groups”& choose the groups they can proctor

• Select the “Role” as Proctor from the drop down arrow

14

Page 15: CBT Training March 2010

To Edit a Staff Member

• Click “Edit” (it will change to Update/Cancel)

• Click “Groups Button”

• Select the Groups you want to assign or change to the Proctor

• Check or uncheck• You can change any info here except the username

• When you are done click “Update” to your left

15

Page 16: CBT Training March 2010

Manage Student Data• Select “Manage”

•then “Student List”

• Select “Grade” on your right

• To Filter click icon

• To add select “Add Student”

16

Reporting Groups

Page 17: CBT Training March 2010

Add New Student/Test/Accommodations

• Click on Add Student, add information, then click “Validate Student.”

• Assign Testing Session, Test Name, Reporting group, Participation Status &Accom. for student in each subject.

• Click “CLOSE” at the bottom

17

Page 18: CBT Training March 2010

Adjust Student’s Participation• Click “View” next to student’s name & then “Edit” by Testing Session enter changes

• Click “Update” and at the bottom of the page

18

Page 19: CBT Training March 2010

Manage Groups• Click “Manage” and then “Reporting Groups.”

• To add group, edit alternate name, move students, or print tickets

19

Page 20: CBT Training March 2010

How to Print Log-In Tickets

1. On the Navigation Bar, click on “Reporting” then “Monitor Test Progress”

2. Select a “School” in the drop down

3. Go to “Test” and choose the appropriate test

20

Page 21: CBT Training March 2010

21

4. Choose one group from the “Group” drop-down list

5. Choose Progress or Receipt

6. Choose report type PDF, Excel, etc.

7. Choose 1 or 4

8. Click “Red Ticket”

Page 22: CBT Training March 2010

22

6. Print Tickets click “Red Ticket Button” (1 or 4 per pg).

Page 23: CBT Training March 2010

1. Select the “Proctor a Training Test” Button

23

2. Type in your assigned “User Name” and selected “Password” then click, “Login”

Proctor Workstation: Starting Test

Page 24: CBT Training March 2010

3. Choose the appropriate test from the “Test Available for Starting a New Session” screen.

4. Note “Test Access Code.” This is the portal that allows the students to test. Write the code on the board. Choose “General Directions” then the “Go”Button.

24

Page 25: CBT Training March 2010

STUDENT1. At the Student Workstation, Login use the information from your student ticket, and click the “Login” Button.http://students.utah.measuredprogress.org

2. Then enter “Test Access Code” on the board, and click “Start Test” button.

3. You will then be guided through the test by your Teacher.When finished with the test,select “Complete” then “Close.”

25

Page 26: CBT Training March 2010

TeacherTeacher: From TAM (Teacher Administration Manual), read directions aloud as students follow along on screen. When finished, advise the Proctor that you are ready to proceed.Proctor:Move to “Section 1,” then click the “Go” button.

Teacher: Conduct test, advising theProctors when studentshave finished their tests.

Proctor: Monitor student progress on the right side of the Proctor screen.

26

All sections

Page 27: CBT Training March 2010

Use “Pause Test” button in case of emergency i.e., fire drill. There is 20 min. window from the time you hit “Pause Test” button.

27

Page 28: CBT Training March 2010

When students have completed Section 1, click “Section 2” in the

test Navigation Window, then click “Go.”

When students have completed all sections of the test, click “End Session” button.

28

All sections

Page 29: CBT Training March 2010

Click “Test Session Comments” window for reporting.

Click “End Session” then the “Confirmation Window” will appear. Click “OK”

29

Page 30: CBT Training March 2010

The “Scoring Submission Receipt” window will open. For live sessions, please printthese receipts and staple them to the CBT Testing Logs.

Click on “Test Selection”. This goes back to“Test Selection” Screen. Repeat the process to do additional tests or when finished, click “Logout”. 30

Page 31: CBT Training March 2010

Contact Information

Measured Progress 1-877-934-8378 [email protected].

Jami-Jon Pearson (801) 501-1388 [email protected]

PJ Giles (801) 501-1040 [email protected]

ComputerBasedTesting.wikispaces.com