Canaccord Global Resource Conference Corporate Presentation

45
1 1 BUILDING CANADA’S LARGEST GOLD MINE Production Early 2013 Canaccord Genuity Global Resources Conference | Miami, FL October 16-18, 2012

description

Canaccord Global Resource Conference Corporate Presentation

Transcript of Canaccord Global Resource Conference Corporate Presentation

Page 1: Canaccord Global Resource Conference Corporate Presentation

1 1

BUILDING CANADA’S LARGEST GOLD MINE Production Early 2013

Canaccord Genuity

Global Resources Conference | Miami, FL

October 16-18, 2012

Page 2: Canaccord Global Resource Conference Corporate Presentation

2

Forward Looking Information This presentation contains certain forward-looking information as defined in applicable securities laws (referred to herein as

“forward-looking statements”). Specifically, this presentation contains forward-looking statements regarding the reserve and

resource estimates, ore grade, expected mine life, anticipated gold production, gold recovery, cash operating costs and other

costs, capital costs, sensitivity to metal prices and other sensitivities, financial analysis of the project, commencement of

operations, potential expansion opportunities, and plans for organic growth. Forward-looking statements involve known and

unknown risks, uncertainties and other factors which are beyond Detour Gold’s ability to predict or control and may cause

Detour Gold’s actual results, performance or achievements to be materially different from any of its future results, performance

or achievements expressed or implied by forward-looking statements. These risks, uncertainties and other factors include, but

are not limited to, gold price volatility, changes in debt and equity markets, the uncertainties involved in interpreting geological

data, increases in costs, environmental compliance and changes in environmental legislation and regulation, interest rate and

exchange rate fluctuations, general economic conditions and other risks involved in the gold exploration and development

industry, as well as those risk factors discussed in the section entitled “Description of Business - Risk Factors” in Detour Gold’s

2011 AIF and in the continuous disclosure documents filed by Detour Gold on and available on SEDAR at www.sedar.com.

Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, including, but

not limited to, assumptions about the following: the supply and demand for gold, and the level and volatility of the price of gold;

the availability of financing for exploration and development activities; the estimated timeline for the development of the Detour

Lake gold project; the expected mine life; anticipated gold production; gold recovery; the development schedule; cash

operating costs and other costs; the financial analysis for the project; capital costs; sensitivity to metal prices and other

sensitivities; the accuracy of reserve and resource estimates and the assumptions on which the reserve and resource

estimates are based; the receipt of necessary permits; market competition; ongoing relations with employees and impacted

communities; and general business and economic conditions. Accordingly, readers should not place undue reliance on

forward-looking statements. The forward-looking statements contained herein are made as of the date hereof, or such other

date or dates specified in such statements. Detour Gold undertakes no obligation to update publicly or otherwise revise any

forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as

may be required by law. If the Company does update one or more forward-looking statements, no inference should be drawn

that it will make additional updates with respect to those or other forward-looking statements.

Page 3: Canaccord Global Resource Conference Corporate Presentation

3

The mineral reserve and resource estimates reported in this presentation were prepared in accordance with Canadian

National Instrument 43-101Standards of Disclosure for Mineral Projects (“NI 43-101”), as required by Canadian securities

regulatory authorities. For United States reporting purposes, the United States Securities and Exchange Commission (“SEC”)

applies different standards in order to classify mineralization as a reserve. In particular, while the terms “measured,” “indicated”

and “inferred” mineral resources are required pursuant to NI 43-101, the SEC does not recognize such terms. Canadian

standards differ significantly from the requirements of the SEC. Investors are cautioned not to assume that any part or all of

the mineral deposits in these categories constitute or will ever be converted into reserves. In addition, “inferred” mineral

resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal

feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category.

Under Canadian securities laws, issuers must not make any disclosure of results of an economic analysis that includes

inferred mineral resources, except in rare cases.

On January 31, 2011, Detour Gold announced an updated mineral resource and reserve estimate. The following QPs

participated in this update: Michel Dagbert, Eng., Senior Geostatistician and André Laferrière, P. Geo., Senior Geologist of

SGS Canada Inc. (mineral resources); and André Allaire, Eng., Director Mining and Metals and Patrice Live, Eng., Mining

Manager of BBA Inc. (mineral reserves). The NI 43-101 compliant Technical Report for this update was filed on SEDAR on

March 15, 2011.

On January 25, 2012, Detour Gold announced a mineral resource and reserve update. The following QPs participated in this

update: Michel Dagbert, Eng., Senior Geostatistician of SGS Canada Inc (mineral resources) and Patrice Live, Eng., Mining

Manager of BBA Inc. (mineral reserves).

On September 4, 2012, Detour Gold announced an updated mine production plan prepared by Patrice Live, Eng., Mining

Manager of BBA Inc. (mineral reserves) with the collaboration Detour Gold Corporation. The NI 43-101 compliant Technical

Report for this update will be filed on SEDAR within 45 days of the press release.

NI-43 101 Disclosure

Information Containing Estimates of Mineral Reserves and Resources

Page 4: Canaccord Global Resource Conference Corporate Presentation

4

Focus on a world-class asset – Detour Lake

Canada’s largest pure gold play with 15.6 M oz in reserves

Construction progressing on schedule (92% as of September 30)

One of the best cash flow/share opportunities

Gold production starting in Q1 2013

Average annual gold production of 657,000 oz

Excellent organic growth potential (5 year plan)

Potential expansion of mill throughput

Invest in Detour Gold

Our Vision

Page 5: Canaccord Global Resource Conference Corporate Presentation

5

Market cap: C$3.2 billion

Cash position: C$348 million

Major shareholders: Paulson & Co. 15%

Fidelity Mgmt 8%

Detour Gold Mgmt <2%

Institutions total >90%

Note: Share data and cash position as at September 30, 2012.

Share Capital

FULLY DILUTED

134.7 M

OPTIONS & FN SHARE

COMMITMENTS

8.8 M

CONVERTIBLE

NOTES

13.0 M

ISSUED AND

OUTSTANDING

112.9 M

Page 6: Canaccord Global Resource Conference Corporate Presentation

6

ABX NEM

Gabriel

Anglo Gold Ashanti AEM

GSC Eco Oro

Andina

Osisko

(239%)

Yamana

Randgold

Eldorado

Buenaventura

Newcrest IMG

Kinross Hecla

Goldfields CG

AGI

Aurizon G

Jan. 2007 to Present % Change in Shares Outstanding

100 150 0 50 200

Share Issuance vs. Performance

Source: BMO, Aug. 2012

Ja

n. 2

00

7 t

o P

res

en

t To

tal

Retu

rn

400%

300%

200%

100%

0%

-100%

500%

600%

700%

800%

900%

1000%

AuRico

Great Basin

(209%)

DGC

01/12

DGC

08/11

DGC

07/10

DGC

11/09

DGC

04/08

DGC

07/09

IPO

705% total

return since IPO

Share Capital

Note: Date of DGC equity financings

Page 7: Canaccord Global Resource Conference Corporate Presentation

7

PRODUCTION 2013

Record Timing from “Discovery” to Projected Production

Detour Lake in 6 years

ACQUISITION /DISCOVERY

PRE-FEASIBILITY STUDY

FEASIBILITY STUDY & PERMITTING

DEVELOPMENT PRODUCTION

2007 2009 2010 2011-12 2013

Successful Focused Approach

Page 8: Canaccord Global Resource Conference Corporate Presentation

8

• Mineral reserves/resources update for 2011 year-end

• Top up of $277 million to complete the project and working capital

• Second 45 km segment of transmission line complete

• 230 kV transmission line connection in Q3

• Phase 1 drilling (49,000m) for Block A pre-feasibility study

Updated mine plan & operational forecast in Q3

Commissioning mills in Q4

Ore stockpile of 2.3 Mt available in Q4 for processing

Manpower ramp-up to 400 (now 346 employees at site and

Cochrane)

2012 Year end = 20 haul trucks + 4 shovels

Detour Gold 2012 Objectives

Page 9: Canaccord Global Resource Conference Corporate Presentation

9

Resource Growth Exceeding 750% Since IPO

Date Accumulative DGC Drilling

Resources/Reserves (M oz) Inferred

2007-12 50,000m

2008-06 123,000m

2012-01 523,000m $850/oz 15.6

2011-01 430,000m $850/oz 14.9

2010-06 334,000m $850/oz 11.4

2009-09 249,000m 8.8

2005-05 Estimated by Pelangio

2006-09 DGC due diligence

10M 20M 30M

M&I 2P

Growing Reserve/Resource Base

Page 10: Canaccord Global Resource Conference Corporate Presentation

10

1.0 g/t Au

0.5 - 1.0 g/t Au

<0.5 g/t Au

20,600E

16,500E

700 m

Open pit

@ 0.5 g/t cut-off

Detour Lake September

2012 Mine Plan

Production Start Q1 2013

OP Reserves (M oz) 15.6

Mill throughput (tpd) 55,000

Strip Ratio (waste:ore) 3.7

Gold recoveries 91%

Average grade (g/t) 1.03

Estimated mine life (yrs) 21.5

Avg. Production (oz/yr) 657,000

Cash operating costs (C$/oz) $710

Total cash costs (C$/oz) $749

Initial Capex (C$ B) 1.45

Detour Lake Profile

Note: Gold price assumptions: US$1,600/oz for 2013, US$1,500/oz for 2014, and US$1,400/oz for 2015.

Page 11: Canaccord Global Resource Conference Corporate Presentation

11

800

700

600

500

400

300

200

100

0

Gold Production (‘000 oz)

1.6

1.4

1.2

1.0

0.8

0.6

0.4

0.2

0

Grade (g/t Au)

Updated LOM Gold Production

Avg. 657,000 oz/yr

Page 12: Canaccord Global Resource Conference Corporate Presentation

12

MAINTENANCE

LABOUR POWER

DIESEL

G&A

ROYALTY+

OTHER

(2% NSR)

CONSUMABLES

29%

22%

18% 12%

8%

5%

6%

Breakdown of 2013-14 TCC

Operating Costs (LOM) C$/t milled C$/t mined C$/oz

Mining costs 11.65 2.49 388

Processing cost 7.83 -- 260

G&A 1.86 -- 62

Cash operating costs 21.34 -- 710

Royalty (2%) and other 1.26 -- 42

Refining 0.12 -- 4

Silver credit (0.20) -- (7)

Total cash costs (TCC) 22.52 -- 749

Updated Operating Costs

2013 TCC estimated between C$800/oz and C$900/oz (on commercial production of 200,000 oz to 250,000 oz sold)

10% change in diesel or power = $9/oz change in TCC

10% change in Cdn$ FX rate = $63/oz in TCC

Page 13: Canaccord Global Resource Conference Corporate Presentation

13

12-08-20

Capital Expenditures (C$ M) Spent

09/30/2012

PCE

11/2011

Mining Fleet and Facilities 180 203

Crushing and Processing (P&E) 548 565

Tailings and Water Mgmt 33 65

Infrastructure and Power line 146 156

Other Indirect 191 310

EPCM 89 101

Contingency (10%) - 50

Total (pre-production) 1,187 1,450

Capex & Sustaining Capital

Note: As of September 30, 2012, the Company has approximately $348 million in cash and short-term investments

sufficient to fully finance the remaining project expenditures ($263 million).

Estimated LOM sustaining capital of C$1.2 billion: 2013 = C$180 M

2014 = C$140 M

Page 14: Canaccord Global Resource Conference Corporate Presentation

14

Gold - US$1,200/oz (1)

F/X - $Cdn/$US = 1.00

Base Case (1)

US$ Billions Undiscounted (0%) 5.0%

Pre-tax cash flow 4.3 1.7

Net cash flow after tax 3.0 1.1

Pre-tax IRR 14.4%

49

Power Cdn $0.065/kwh

Diesel US$100/barrel (WTI)

Financial Analysis

Base Case Assumptions

1. Gold price US$1,600/oz for 2013, US$1,500/oz for 2014, and US$1,400/oz for 2015.

@ US$1,600/oz

US$ Billions Undiscounted (0%) 5.0%

Pre-tax cash flow 9.4 4.4

Net cash flow after tax 6.6 3.0

Pre-tax IRR 24.6%

Page 15: Canaccord Global Resource Conference Corporate Presentation

15

DETOUR LAKE DEVELOPMENT Progressing on Schedule

Page 16: Canaccord Global Resource Conference Corporate Presentation

16

2010 2011 2012 2013

Construction Schedule Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1

Award of Engineering Contract

Award of PCM Contract

Detailed Engineering

Construction Camp (1,200 people)

Power line (Phase 1&2) - Electrification

Equipment purchase/delivery/assembly

Pre-production stripping

Process Plant - Commissioning start-up

Tailings Dam Construction (first cell)

Provincial Permits/Aboriginal IBAs

Federal Permits

Start production and ramp-up

Detour Lake: We are on Schedule

1 2

Gold Production Projected in Q1 2013

Page 17: Canaccord Global Resource Conference Corporate Presentation

17

12-08-20 Ore ready to be processed

by Q4 2012

Plan to have 2.3 Mt @ 0.81 g/t stockpiled

Average daily mining rates in September ~ 104,000 tpd

4 crews working on 2 shifts operating 8 haul trucks (CAT 795F) and

2 hydraulic shovels (CAT6060- 34m3 electric and 28 m3 diesel)

2012 Pre-Stripping Status (09/30/2012)

Overburden/Till 11.5 Mt

Waste 4.4 Mt

Low Grade (0.3-0.5 g/t) 0.5 Mt

Ore 0.7 Mt

Total 17.1 Mt

ORE WASTE

Mining is Ramping Up

Page 18: Canaccord Global Resource Conference Corporate Presentation

18

NORTH WASTE

DUMP PLANT SITE

CAMPBELL

PIT

APPROX. PIT SHELL

AT END OF 2014

CURRENT PIT SHAPE

JULY 2012

MINERALIZED

ZONE

Mining is Ramping Up

Page 19: Canaccord Global Resource Conference Corporate Presentation

19

2013 Mine Plan

Based on January 2013 Startup

Total gold production estimate of 407,000 oz (1)

Pre-commercial production = 144,000 oz

Commercial production = 250,000 oz (excludes 12,715 oz locked in

circuit load)

Management guidance:

350,000 to 400,000 oz

Total cash costs between

C$800/oz and C$900/oz

1. 2013 production of 394,000 ounces of saleable gold plus 12,715 ounces locked in circuit load.

Page 20: Canaccord Global Resource Conference Corporate Presentation

20

DETOUR LAKE CONSTRUCTION

Progressing on Schedule

Page 21: Canaccord Global Resource Conference Corporate Presentation

21

Overview Detour Lake Facilities

PROCESSING

PLANT

STOCKPILE

RECLAIM

TRUCK SHOP &

WAREHOUSE

TRUCK WASH

MINE OFFICES

12-08-20

Page 22: Canaccord Global Resource Conference Corporate Presentation

22

Overview Detour Lake Facilities

12-08-20

SECONDARY

CRUSHERS

GEODESIC

DOME

STOCKPILE

RECLAIM

PRIMARY

CRUSHER

Page 23: Canaccord Global Resource Conference Corporate Presentation

23

35 m to surface

Gyro is

9 m high 12-10-02

Primary Crusher (up to 100,000 tpd capacity)

Page 24: Canaccord Global Resource Conference Corporate Presentation

24

Stockpile Reclaim

12-09-08

Page 25: Canaccord Global Resource Conference Corporate Presentation

25

Secondary & Pebble Crushers

12-09-08 12-09-08

12-10-10 12-09-07

Page 26: Canaccord Global Resource Conference Corporate Presentation

26

Processing Plant Building

12-08-20

SAG MILLS

BALL MILLS

12-09-07

Conventional gravity and CIP plant

55,000 tpd (=92% availability of 60,000 tpd capacity)

2 parallel lines (each with 1 secondary cone crusher + 1 SAG & 1 ball mill)

Page 27: Canaccord Global Resource Conference Corporate Presentation

27

Processing Plant Building

CIP TANKS

PUMPS

12-08-20

Estimated gravity recovery: 30-40%

Estimated overall gold recovery: 91.0%

Leach time 29 hours; leach feed size 80% passing 95 μm

Page 28: Canaccord Global Resource Conference Corporate Presentation

28

Gyratory

crusher:

60” x 113”

90,000 tpd

SAG mills:

2 X 36’ x 20’, 15MW

55,000 tpd To

leaching

circuit

To

gravity

circuit

Secondary crushers:

2 X XL-1100

67,000 tpd

Pebble crushers:

2 X XL-1100

73,000 tpd

Circ. load

28 % Circ. load

250 % From

gravity

circuit

Stockpile

12 h live capacity

Ball mills:

2 X 26’ x 40’6’’, 15MW

55,000 tpd

Leach circuit:

55,000 tpd + 15% contingency in piping capacity

Simple Process Plant @ 92% Availability

Page 29: Canaccord Global Resource Conference Corporate Presentation

29

Construction Phase

+1,400 workers (at Sept. 30, 2012)

Ramping up DGC team (346)

Operation Phase (Starting 2013)

400-500 employees

Rotation 1 week in/out

New modern camp facilities with 400 en-suite rooms completed

Detour Lake Employees & Contractors

Page 30: Canaccord Global Resource Conference Corporate Presentation

30

FRONT LINE

81%

PROFESSIONAL

19%

Professional are: MGMT, Eng., Geo., Supt.

Front Line are: Operators, Admin, Support

Continuing focus on hiring local/regional

23% of employees are Aboriginal

NORTHERN

ONTARIO

44%

COCHRANE

27%

COCHRANE

AREA

24%

REST OF

ONTARIO

3%

2%

WORKFORCE ORIGIN DIVISION OF LABOUR

OTHER

* Excludes Corporate office. 400 is minimum target.

Focus: Hiring Local First

Year-end 2012 Employment Objective: 346/400 as of September 30, 2012*

Page 31: Canaccord Global Resource Conference Corporate Presentation

31

PLANNING FOR ORGANIC GROWTH

Under-Explored Greenstone Belt

Page 32: Canaccord Global Resource Conference Corporate Presentation

32

• Two main gold structures with total strike length of >80km

• Continue focus on Detour Lake deposit extension (northern

structure i.e. Block A)

• Test targets on structure south of Detour Lake

Grow reserve base to +20 M oz (@ US$850/oz)

Increase mill throughput to above 75,000 tpd for gold production

output of +800,000 oz/yr

Find high-grade ore near-surface within trucking distance to

supplement mill

Planning for Organic Growth

5 Year Plan for Successful Organic Growth

Large prospective land position of approx. 540 km2

Future objectives

Page 33: Canaccord Global Resource Conference Corporate Presentation

33

*Not updated with TWD Dec. 30th PR. On Dec. 1, 2011, Detour Gold announced the acquisition of TWD.

Block A

Pre-feasibility

Priority #1 – Block A Target

Detour Lake deposit open to the west and at depth

Block A Pre-feasibility underway: Phase 1 drilling (49,000 m)

completed

Page 34: Canaccord Global Resource Conference Corporate Presentation

34

Block A near-surface resource

Detour Lake

2011 year-end reserves = 15.6 M oz

Priority # 1 - Block A Target

DH included in 2011 year-end reserves

DH not included in 2011 year-end reserves

2012 proposed DH

2012 extension DH

Historical DH

Priority #1 – Block A Target

Page 35: Canaccord Global Resource Conference Corporate Presentation

35

Existing DDH Gold occurrence (OGS)

DDH intersection >1g/2m DDH intersection >1g/10m

*Note: Excludes drilling around Detour Lake and M zone (Block A).

+80 km of favourable geology

MMI Survey Coverage

MMI Au Anomaly

Priority #2 – South Structure

15.6 M oz in Reserves

Sunday Lake Option

Page 36: Canaccord Global Resource Conference Corporate Presentation

36

Best scenario is throughput increase 55,000 to 75,000 tpd @ US$1,200/oz

Start pre-feasibility on block A

2013

2012

2014

Complete feasibility study and assess technical feasibility and resultant project economics

At >US$1,000/oz and after successful commercial production is achieved, proceed with plant expansion

Complete expansion within 2 years

Evaluating Expansion Opportunities

Page 37: Canaccord Global Resource Conference Corporate Presentation

37

Focus on a world-class asset – Detour Lake

Canada’s largest pure gold play with 15.6 M oz in reserves

Construction progressing on schedule (92% as of September 30)

One of the best cash flow/share opportunities

Gold production starting in Q1 2013

Average annual gold production of 657,000 oz

Excellent organic growth potential (5 year plan)

Potential expansion of mill throughput

Invest in Detour Gold

Our Vision

Page 38: Canaccord Global Resource Conference Corporate Presentation

38

ADDITIONAL INFORMATION

Page 39: Canaccord Global Resource Conference Corporate Presentation

39

Detour Lake Profile

Detour Lake January 2011

Update (2)

September 2012

Mine Plan

Gold price (US$/oz) (1) 850 1,200

Foreign exchange rate (US$/Cdn$) 1.10 1.00

Assumptions Fuel price (US$/barrel) 80 100

Income/mining tax rate (%) 25/10 25/10

Net Smelter Royalty (%) 2 2

Ore milled (Mt) 449.6 470.0

Waste mined (Mt) (3) 1,654 1,734

Mine Strip ratio (waste:ore) 3.9 3.7

Parameters Average gold grade (g/t) 1.03 1.03

Total contained gold (M oz) 14.9 15.6

Estimated gold recovery (%) 91.0 91.0

Total recovered gold (M oz) 13.5 14.1

Mine life (years) 21 21.5

Average annual gold production (oz) 657,000 657,000

1. US$1,600/oz for 2013, US$1,500/oz for 2014, and US$1,400/oz for 2015.

2. Press release dated January 31, 2011 with Technical Report dated March 15, 2011.

3. Includes low-grade stockpile.

Page 40: Canaccord Global Resource Conference Corporate Presentation

40

800

700

600

500

400

300

200

100

0

Gold Production (‘000 oz)

900

850

800

750

700

650

600

550

500

Total Cash Costs (C$/oz)

Gold Production/Cost Profile

Note: Excludes stripping adjustments.

Avg. C$749/oz

Page 41: Canaccord Global Resource Conference Corporate Presentation

41

@ US$850/oz Tonnes

(millions)

Grade

(g/t)

Contained Gold

(‘000 oz)

Reserves (1)

Proven 101.6 1.29 4,222

Probable 368.4 0.96 11,351

P&P 470.0 1.03 15,573

Resources (2)

Measured 124.5 1.36 5,424

Indicated 554.3 1.00 17,836

M&I 678.8 1.07 23,261

Inferred 208.5 0.86 5,785

1. After a 95% mining recovery rate; Mining dilution factor of 15.5%.

2. Inclusive of mineral reserves.

Detour Lake Reserves & Resources

As at December 31, 2011

Page 42: Canaccord Global Resource Conference Corporate Presentation

42

1,600

1,400

1,200

1,000

800

600

400

200

0

Ou

nces (

000’s

)

0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 3.0

Cut-off BINs

OK (oz Au)

ID3 (oz Au)

Approx. 3 M oz between 0.3-0.5 g/t Au

Block Model – Gold Distribution

Stockpile over LOM

0.3-0.5 g/t material

Page 43: Canaccord Global Resource Conference Corporate Presentation

43

Bench

6264m

Bench

6252m

Grade Control

DDH

DDH

RC G/C

RC G/C

Page 44: Canaccord Global Resource Conference Corporate Presentation

44

Gerald Panneton Founder, President & CEO

Director

Michael Kenyon Chairman

Paul Martin CFO

Pierre Beaudoin Sr. VP Capital Projects

Pat Donovan VP Corporate Development

Julie Galloway VP General Counsel &

Corporate Secretary

James Mavor VP Finance

Rachel Pineault VP HR & Northern Affairs

James Robertson VP Environment &

Sustainability

Derek Teevan VP Aboriginal &

Government Affairs

Eric Josipovic Controller

Drew Anwyll Director of Operations

Andrew Croal Director Technical Services

Laurie Gaborit Director Investor Relations

Jean-Francois Metail Director Reserves and

Resources

Greg Miazga Director Construction & Engineering

Bill Snelling Director Corporate Systems

and Controls

Christian Brousseau Project Manager

Patrik Gillerstedt Mine Manager

Peter Crossgrove

Louis Dionne

Robert E. Doyle

Ingrid Hibbard

Jonathan Rubenstein

Graham Wozniak

Michael Kenyon

Alex G. Morrison

Gerald Panneton

Management & Directors

Management

Directors

Page 45: Canaccord Global Resource Conference Corporate Presentation

45

Gerald Panneton President & CEO

Email: [email protected]

Phone: 416.304.0800

Laurie Gaborit Director Investor Relations

Email: [email protected]

Phone: 416.304.0800

www.detourgold.com

Contact Information