BTS Installation
Transcript of BTS Installation
ONE EXAMPLE
OF
BTS INSTALLATION (Site NO.21)
Contents
1. Antenna installation ....................................................... 3
1.1 procedure ............................................................... 3
1.2 PICTURES ............................................................. 4
2. FEEDER CABLES ........................................................ 5
3. BATTERY INSTALLATION............................................ 9
4. DDF INSTALLATION................................................... 11
5. RACKS INSTALLATION.............................................. 13
6. BTS POWER CABLE INSTALLATION........................ 14
7. AC DISTRIBUTION BOX ............................................ 15
8. GROUND CABLES..................................................... 16
8.1 Inside eathing system........................................... 17
8.2 outside earthing system........................................ 18
9. PARTS OF THE INSTALLATION ACCESSORY
MATERIALS LIST ........................................................... 20
1. Antenna installation
1.1 procedure
Start
D irectional an tenna
nitia l assem b lin g of the d irec tion al an ten na in s talla tion accessories
In atalla tion sea lin g of th e an tenn a jum p er
A ntenna fix ing
E nd
A ntenna hoisting and handling
In stalla tion p osition d eterm in ation
O m ni- antenna
A djustm ent of the d irection al an tenn a d irection an d tilt an gle
I ni t i al f i x i ng of t he omni - ant enna
V ertical ad justm en t o f the om n i-an ten na
In itia l fix in g of the d irection al an tenn a
1.2 PICTURES
remark: waterproof self-conglutinant adhesive tape should be covered carefully to make sure the function available.
Antenna should be fixed well
waterproof
self-conglutina
2. FEEDER CABLES
remark: the radius should be more than 400mm
remark:
The normal distance between cable clips should be 3 steps on the cable tray. But in the picture ,it is 2 steps.
R>400mm
remark: Pay attention to the cable radius. It is should be more than 400mm.
remark: the lighting arrestor installation
remark: A: CELL 1 ; B: CELL 2; C: CELL 3 The antenna degree according to the survey report.
A B
C
3. BATTERY INSTALLATION
remark: when we install the battery, we should not put any tools or iron sticks on the battery, it is very dangerous.
remark: each battery should be connected to one sensor, pay attention to the sequence.
battery temperature sensor
remark: battery cables arrangement
4. DDF INSTALLATION
E1 CABLE AND GND CABLE
remark: one E1 cable including 8 cores,4 pairs. The SN 1,2,…8. for instance,1,5 is the first pair ,2,6 the second pair for 1E1.in the picture, the ground cable was not connected yet.
5. RACKS INSTALLATION
remark: the face of the two racks should be the same plane. In this site, there are one rectifier rack
and one BTS rack.
6. BTS POWER CABLE INSTALLATION
0V(BTS MARK:GND) :BLACK COLOR; -48V(BTS MARK:PWR):GREEN COLOR
7. AC DISTRIBUTION BOX
AC CABLE
remark: for equipment installation, we just need to consider the AC cables
8. GROUND CABLES
There are two GND systems. One for antenna and feeder cables, the other for inside equipment(inside earthing system).
8.1 Inside eathing system
Input
remark: in the shelter, the two ground bars should be connected with cable( ).this two ground bars are just for the equipment. All of the equipment ground cables should be connect to the two
Inside earthing system input bar
Connect to earthing system
ground bar. When we install the GND cables, we should confirm the cable diameter and the length and the color.
8.2 outside earthing system
antenna and feeder cable and tower earthing system
GND 1
GND 2
GND 3
OUTSIDE GND BAR
ARRESTOR GND CABLE (TO OUSIDE GSNBAR)
9. PARTS OF THE INSTALLATION
ACCESSORY MATERIALS LIST
Name Quantity Function Remark
nylon strip 300 Fix the cables
Circular exposed junction
port(copper connector)
20(70mm2) Battery and GND cables
M8×15 bolts 20 DDF
Small bolts 20 Cable slot Feeder cable GND clips
20 Feeder cable
Cable slot 6m AC cable GND cable 1m(16mm2) DDF BOX GND DC CABLE(0V) 3m(25mm2) BTS DC POWER DC CABLE(-48V) 3m(25mm2) BTS DC POWER GND cable 10m(35mm2) BTS-GND
RECTIFIER-GND(AC)YELLOW AND
GREEN DC CABLE(0V) 15(70mm2) Battery cable DC CABLE(-48V) 15(70mm2) Battery cable GND cable 10m(70mm2) BAR-BAR
RECTIFIRER-GND (DC)
Remark: other materials can be listed in the table.