Types of LOOP Structures Do While ……. Loop Do Until …… Loop For …… Next loop.
Bell Road Loop 101 to Grand Avenue ITS Design
description
Transcript of Bell Road Loop 101 to Grand Avenue ITS Design
![Page 1: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.fdocuments.net/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/1.jpg)
Bell RoadBell RoadLoop 101 to Grand AvenueLoop 101 to Grand Avenue
ITS DesignITS Design
![Page 2: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.fdocuments.net/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/2.jpg)
Project Overview
• Multi-Agency Project for the design of:– 6.5 miles of Fiber Optic Cable– Interconnection of 14 traffic signals– 6 CCTV camera installations– 4 arterial DMS installations
![Page 3: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.fdocuments.net/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/3.jpg)
Traffic Signal Interconnect
• 6 City of Surprise traffic signals• 5 MCDOT traffic signals• 3 City of Peoria traffic signals • Benefit:
– Remote monitoring and control of traffic signal timing
– Improved progression across jurisdictions and along the corridor
![Page 4: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.fdocuments.net/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/4.jpg)
Traffic Signal Coordination
![Page 5: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.fdocuments.net/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/5.jpg)
Traffic Signal Coordination
![Page 6: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.fdocuments.net/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/6.jpg)
Traffic Signal Coordination
![Page 7: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.fdocuments.net/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/7.jpg)
Traffic Signal Coordination
![Page 8: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.fdocuments.net/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/8.jpg)
Traffic Signal Coordination Considerations
• Distance between intersections• Progression speed• Peak hour balancing• Trade-offs between side street delay
and arterial bandwidth
![Page 9: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.fdocuments.net/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/9.jpg)
CCTV Cameras• 3 City of Surprise locations
Grand Avenue, R.H. Johnson Blvd, El Mirage Road • 2 MCDOT locations
East of Avenue of the Arts, 99th Avenue
• 1 City of Peoria location91st Avenue
• Benefit: – Remote monitoring of traffic conditions– Incident verification and management
![Page 10: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.fdocuments.net/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/10.jpg)
Dynamic Message Signs
• 2 City of Surprise locationsEast of Dysart Road and East of R.H. Johnson Boulevard
• 2 City of Peoria locationsEast of 91st Avenue and East of 84th Avenue
• Benefit: – Inform motorists of incidents, closures and
special events
![Page 11: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.fdocuments.net/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/11.jpg)
Future Considerations
• Spare fiber for additional CCTV installations
• Phase 2 ITS Design: Bell Road, Grand Avenue to Loop 303