Appendix 5Bridge Type Selection Study
1401 N Green Valley Parkway, Ste 160 Henderson, Nevada 89074
702-966-4063 www.horrocks.com
Page 1 of 9
Henderson Interchange Feasibility Study
Bridge Type Selection Study
1. Introduction
This report summarizes findings of the bridge type selection study for the Henderson Interchange (I-515/I-215/I-11) Feasibility Study project in Henderson, Nevada. Two interchange layout alternatives were considered as part of this project with each alternative consisting of approximately ten bridges each. In order to provide a cost-effective type selection study, only five bridges are included in this report. Two representative bridges were evaluated for Option 1- Expanded Existing Configuration including the “NW” Ramp and the “NBCD” Ramp. Three representative bridges were evaluated for the Option 2- Diverging Diamond Interchange consisting of the “WN” Bridge over UPRR, the “SW” Bridge over UPRR, and the I-515 South Crossover Bridge.
A design criteria summary and cost estimate are also provided as part of this report. The design criteria summary will document applicable loads to the bridge. The cost estimate provided only includes construction costs of the bridges and are based on a unit cost per square foot of deck area.
2. Project Purpose and Need
Due to the extraordinary growth in the Las Vegas area, the existing Henderson interchange has exceeded its design capacity in only the 15 plus years it has been in service. There are issues with traffic congestion, weaving, delays, and traffic accidents in the interchange. To relieve these issues and meet additional projected traffic demands, improvements to the interchange, including the new bridges and widenings, are needed. The bridge configurations and superstructure types presented herein provide a reasonable basis for developing preliminary interchange geometry and planning level cost estimates. Table 1 is a summary of the 5 bridges investigated for the two alternatives.
Table 1
Summary of Recommended Configurations and Types
Bridge Proposed
Description Improvement Bridge Configuration and Type
“NW” Ramp Flyover Bridge New 9-Span CIP PT Box Girder *
“NBCD” Ramp Flyover Bridge New 8-Span CIP PT Box Girder *
“WN” Bridge over UPRR New Single Span CIP PT Box Girder *
“SW” Bridge over UPRR New 3-Span Steel Plate I-Girder
I-515 South Crossover Bridge New Single Span PC/PS Bulb Tee Girder **
* CIP PT = Cast-in-place concrete, post-tensioned ** PC/PS = Precast-prestressed
1401 N Green Valley Parkway, Ste 160 Henderson, Nevada 89074
702-966-4063 www.horrocks.com
Page 2 of 9
3. Type, Selection and Layout Discussion and Recommendations
3.1 Option 1- Expanding Existing Configuration
“NW” Ramp Flyover Bridge
A new flyover structure is proposed to replace the existing ramp bridge (I-2110). The existing bridge is comprised of composite steel I-girders and was built in 2003. It consists of 12 spans with a total length of approximately 1673’. It is a single 12’ lane bridge with 12’ and 8’ shoulders. Since the existing bridge is a flyover structure with single column piers it is not feasible to widen. The only practical way to add capacity to the north to west movement is to replace the existing ramp bridge.
The proposed replacement bridge is a 9 span structure with a total length of 1525’. The longest span is 205’. The proposed structure type is cast-in-place post-tensioned concrete box girders with a structure depth of 8’-6” and a depth to span ratio of 0.0415. The overall width varies from 39’ to 45’-2 3/8” and accommodates two 12’ lanes, 8’ outside shoulder, a varying inside shoulder with a minimum width of 4’ and two 1’-6” barrier rails. This new proposed bridge width will increase capacity and meet future traffic projections.
An alternative to the post-tensioned concrete box girder would be composite steel I-girders. The biggest advantage to using the steel girders would be a faster construction time and less impact to maintenance of traffic (MOT). However, the steel girder alternative would result in a significantly higher cost.
A significant amount of falsework and shoring will be required to construct the post-tensioned concrete box girders. The roadway profile will need to be set to maintain the required 16’ temporary clearance for traffic below the falsework and shoring. Although more falsework and shoring make the MOT and construction of the post-tensioned concrete box girders a little more complicated, it is the most common structure type and has the lowest cost for construction and maintenance of all the bridge types in Nevada making it the preferred alternative.
The Nevada Department of Transportation selected Post-tensioned concrete box girders for similar flyover bridges on both the US-95/CC-215 and I-15/US-95 Interchange projects currently underway.
The proposed abutments are seat type and founded on spread footings. The interior supports are integral pier caps at the fixed piers and drop cap at the expansion piers. They are supported on 8’ diameter single columns founded on 10’ diameter over-sized drilled shafts. During final design, spread footings may be considered for the piers but limited space will most likely preclude the use of spread footings regardless of soil conditions at the site.
“NBCD” Ramp Flyover Bridge
A new flyover structure is proposed to replace the existing “EN” ramp bridge (I-2109). The existing bridge is comprised of composite steel I-girders and was built in 2003. It consists of 15
1401 N Green Valley Parkway, Ste 160 Henderson, Nevada 89074
702-966-4063 www.horrocks.com
Page 3 of 9
spans for a total length of approximately 2501.5’. It is a single 12’ lane bridge with 12’ and 8’ shoulders that was recently restriped to carry two travel lanes to provide additional capacity. Since the existing bridge is a flyover structure with single column piers it is not feasible to widen. The only practical way to add capacity to the east to north movement is to replace the existing ramp bridge.
The proposed replacement bridge for this portion of the ramp is an 8-span structure with a total length of 1460’. The longest span is 232’. The proposed structure type is cast-in-place post-tensioned concrete box girders with a structure depth of 9’-5” and a depth to span ratio of 0.0406. The overall width of 63’ accommodates three 12’ lanes, 12’ shoulders and two 1’-6” barrier rails. This new proposed width will increase capacity considerably and meet future traffic projections.
An alternative to the post-tensioned concrete box girder would be composite steel I-girders resulting in faster construction time and less impact to MOT. However, the steel girder alternative would result in a significantly higher cost.
Although construction of the post-tensioned concrete box girders is more complicated as previously mentioned, it is the most common structure type and has the lowest cost for construction and maintenance making it the preferred alternative.
The proposed abutments are seat type and founded on spread footings. The interior supports are integral pier caps at the fixed piers and drop cap at the expansion piers. Since this is a third level structure, column heights will get very tall resulting in a larger column diameter. The 10’ diameter single columns are founded on 12’ diameter over-sized drilled shafts. During final design, spread footings may be considered for the piers but limited space will most likely preclude the use of spread footings regardless of soil conditions at the site.
3.2 Option 2- Diverging Diamond Interchange
“WN” Bridge over UPRR
A new structure is proposed to accommodate the “WN” ramp over UPRR. Since the “EN” ramp will be relocated for this interchange configuration, the “WN” bridge will be able to replace the existing “EN” Ramp bridge in its current location. Refer to the previous section 3.1 for a description of the existing “EN” Ramp bridge (I-2109).
The proposed “WN” bridge over UPRR is a single span structure, 99’-1 ½” long. The proposed structure type is cast-in-place post-tensioned concrete box girders with a structure depth of 4’-6” and a depth to span ratio of 0.0454. The overall width is 27’, which accommodates one 12’ lane, an 8’ outside shoulder, a 4’ inside shoulder, and two 1’-6” barrier rails. This proposed bridge will be located to allow for the widening of the I-515 NB Bridge over UPRR. The ramp profile will be set to provide more than the 23’-4” minimum required UPRR clearance to accommodate falsework to construct the girders.
1401 N Green Valley Parkway, Ste 160 Henderson, Nevada 89074
702-966-4063 www.horrocks.com
Page 4 of 9
The 38’ widening of the I-515 NB Bridge over UPRR will be a continuation of the existing bridge type, a cast-in-place post-tensioned box girder superstructure. It will maintain the 2% cross slope and profile of the existing bridge, there-by reducing the existing 23’ minimum clearance. Coordination with UPRR will be needed as the design progresses for this bridge to verify that the sub-standard minimum vertical clearance is acceptable. If not, it may require the removal and replacement of the existing I-515 bridge to the median to meet the required minimum vertical clearance requirements.
The proposed abutments for both the new “WN” bridge and the widening will be in line with the existing abutments and MSE walls. They will be relatively short integral abutments founded on drilled shafts through the mechanically stabilized earth (MSE) fill. The existing abutment configuration of shallow spread footings founded on top of the MSE fill is no longer allowed.
“SW” Bridge over UPRR
A new structure is proposed for the “SW” ramp and to replace the north section of the I-215 Bridge over UPRR (G-1958). The existing bridge is comprised of composite steel I-girders and was built in 2003. It consists of 3 spans for a total length of approximately 328’-1”. It is a multi-lane bridge that carries the “SW” ramp, “NW” ramp and I-215 mainline over UPRR. In this alternative, this bridge will be entirely removed and replaced.
The new proposed “SW” bridge over the UPRR is a 3-span structure with a bridge length of 329’-6¾”. The span lengths are 82’-1 ¾”, 142’-6”, and 104’-11”. The proposed structure type is composite steel I-girders with a structure depth of 5’ and a depth to span ratio of 0.0351. The overall width is 43’, which accommodates two 12’ lanes, a 12’ outside shoulder, a 4’ inside shoulder, and two 1’-6” barrier rails. The bridge is skewed at an angle of approximately 60 degrees to the UPRR tracks. Due to the severe skew of the structure, a steel I-girder superstructure is proposed. The ramp profile for this bridge will be set to provide the required minimum vertical clearance over UPRR.
The proposed abutments are seat type abutments on spread footings. The abutments are approximately 8’tall. The interior supports are 4’-6” diameter multi-column hammerhead piers founded on spread footings.
I-515 South Crossover Bridge
The proposed I-515 South Crossover Bridge is needed to take the “NW” and I-515 NB roadways over I-515 SB, “ES”, and “WS” roadways. Due to the extreme skew of the structure, it is proposed to orient the girders normal to the roadway below instead of parallel with the roadway above as is common. The proposed bridge is a single span structure with the span length varying from 68’ to 137’-9”. The length of the bridge measured along the “N” line is 379’-7 ¾”. The proposed bridge will accommodate a minimum of four 12’ lanes, two 12’ shoulders, and two 2’ barrier rails.
1401 N Green Valley Parkway, Ste 160 Henderson, Nevada 89074
702-966-4063 www.horrocks.com
Page 5 of 9
The proposed structure type is precast/prestressed bulb tee girders with a 7’-3” structure depth and a minimum depth to span ratio of 0.0526. To save cost and to allow for better lighting and ventilation underneath the bridge, approximately half of the girders will remain uncovered (no deck). Girders will only be topped with a cast-in-place deck where needed to accommodate the roadways above. To provide better long-term maintenance and structural stability for the uncovered girders, bulb tee girders will be utilized. Bulb tee girders have a wider top flange and offer more stability than AASHTO type girders. Concrete girders are also less maintenance than steel girders.
The abutments have to step out to span the roadways below as they diverge underneath the structure. There are 2” deck joints at the step out locations to accommodate differential deflections in the girders and to break up the bridge transversely to reduce the amount of transverse thermal movement.
The proposed abutments are seat type abutments on spread footings. The abutments are approximately 25’ tall. The majority of the abutments will be retaining embankment, but there are portions that will not be retaining. At these locations one option to consider as the design progresses is to leave the abutment open and use columns and a pier cap instead of a full abutment wall. Opening up the abutment would allow better lighting and ventilation and also reduce the construction cost.
4. Preliminary Plans
See attached plan sheets for the layout of the recommended alternatives.
5. Cost Estimate
See Table 2 for the construction cost estimate of each of the five bridges included in this report.
Table 2
Construction Cost Estimate
Bridge
Description Deck Area Unit Cost Total Bridge Cost
“NW” Ramp Flyover Bridge 61830 SF $170/SF $10.5M
“NBCD” Ramp Flyover Bridge 94400 SF $170/SF $16.0M
“WN” Bridge over UPRR 2740 SF $150/SF $0.4M
“SW” Bridge over UPRR 14500 SF $240/SF $3.5M
I-515 South Crossover Bridge 69200 SF * $125/SF $8.7M
* Deck is based on total bridge area regardless if there is a deck on top of the girders
1401 N Green Valley Parkway, Ste 160 Henderson, Nevada 89074
702-966-4063 www.horrocks.com
Page 6 of 9
6. Design Criteria Summary
Specifications
1. NDOT Structures Manual with 2011-1 and 2014-01 Revisions
2. AASHTO LRFD Bridge Design Specifications, 8th Edition, 2017
3. AASTHO Guide Specification for LRFD Seismic Bridge Design, 2nd Edition, 2012 with current interims
Loads
1. Load Modifier (AASHTO 1.3.2)
a. AASHTO specifies an increase or reduction of strength loads via a load modification factor based on the ductility, redundancy and importance of the structure.
b. A load modification factor of 1.0 is used.
2. Load Factors and Load Combinations (AASHTO 3.4)
a. Load combinations and load factors are in accordance with AASHTO Tables 3.4.1-1 and 3.4.1-2.
3. Permanent Loads (AASHTO 3.5)
a. Components and Attached Dead Loads (DC)
1. Normal Weight (NW) Concrete = 0.150 kcf 2. Barrier Rail: Single sloped rail = 0.57 klf
b. Wearing Surface and Utilities (DW)
1. Wearing surface allowance = ½” sacrificial wearing surface 2. Future wearing surface = 0.038 ksf
c. Permanent loads applied to the composite structure are distributed evenly to all girders for bridges with 6 girders or less per NDOT Structures Manual Section 12.2.3
4. Live Load and Impact (AASHTO 3.6.1 & 3.6.2)
a. The design live load consists of the following: 1. HL-93, consisting of a combination of:
i. Design truck or design tandem, and ii. Design lane load.
2. NDOT P13 Permit Vehicle (Strength II)
b. Pairs of design tandems and design trucks, as described in AASHTO C3.6.1.3.1, are considered for multi-span bridges.
1401 N Green Valley Parkway, Ste 160 Henderson, Nevada 89074
702-966-4063 www.horrocks.com
Page 7 of 9
c. Deflection due to live load is investigated per AASHTO 3.6.1.3.2 with the live load deflection limit of 1/800 of the span for bridges with vehicular traffic. The live load will be combined for deflection evaluation per AASHTO 3.6.1.3.2. Live load distribution factor for deflection per AASHTO 2.5.2.6.2.
d. The dynamic load allowance (impact) is applied in accordance with AASHTO 3.6.2 to superstructure and substructure elements that are above ground level. Impact is not applied to foundation elements that are completely below ground level or to elastomeric bearings.
5. Braking Forces (AASHTO 3.6.4)
6. Vehicular Collision Forces (AASHTO 3.6.5)
a. Vehicle collision with parapets is designed in accordance with AASHTO 3.6.5.2 and Section 13.
b. Use TL-4 impact loads.
c. Protection of structures (AASHTO 3.6.5.1)
7. Wind Loads (AASHTO 3.8)
a. Wind loads are computed for base design wind velocities shown in AASHTO Table 3.8.1.1.2-1.
b. The site locations for wind design is "Open Terrain".
8. Earth Forces (AASHTO 3.11)
a. Due to the approach slabs, no live load surcharge (LS) is applied to the abutments or wingwalls.
b. 0.001H wall translation required for active pressure per AASHTO C.3.11.1.
9. Force Effects due to Superimposed Deformations (AASHTO 3.12)
a. Procedure A is used in determining the design thermal movement associated with uniform temperature obtained from Figure 19.1-A of the NDOT Structures Manual.
b. Forces and moments due to temperature rise and fall are calculated for the following temperature ranges:
1. Coefficient of thermal expansion = 6.0 x 10^-6 / °F for concrete and 6.5 x 10^-6 / °F for steel girder superstructures.
2. Assumed design installation temperature of 60° F
10. Centrifugal Forces (AASHTO 3.6.3)
11. Seismic Effects (AASHTO 3.10)
1401 N Green Valley Parkway, Ste 160 Henderson, Nevada 89074
702-966-4063 www.horrocks.com
Page 8 of 9
Materials
1. Concrete
Type Class f'c
(ksi) n
Unit
Weight
(kcf)
Design Unit
Weight
(kcf)
Cast-in-place Substructure Concrete
A Modified
4.5 8 0.145 0.150
Cast-in-place Superstructure Concrete
E Modified
5.0 8 0.145 0.150
Precast/ Prestressed Girders
PAA 6.5
(release) 8.0 (final)
5 0.150 0.155
2. Reinforcing Steel
a. Use Grade 60 reinforcing steel conforming to ASTM A615 unless noted otherwise.
b. All reinforcing steel bends conform to CRSI Standards or as noted otherwise.
c. Minimum concrete cover is 2 inches unless otherwise noted.
d. The maximum length for reinforcing bars is 60’-0”. Cut reinforcing bars to CRSI tolerances.
e. No allowance is made in bar length except for corrections associated with standard hooks and special bends.
f. All bent bar dimensions are taken as out-to-out.
g. Reinforcing splice lengths shall be determined according to AASHTO 5.11.5.
h. Minimum splice lengths are shown in the plans and/or bar lists.
3. Prestressing Steel (Girders)
a. Prestressing steel is 0.6 inch nominal diameter (area = 0.217 in²) Grade 270 "Uncoated Seven-Wire Low Relaxation Strands for Prestressed Concrete", AASHTO M203. Minimum ultimate strength per strand is 58.1 kips.
b. Limit initial stress to 70 percent of the specified minimum ultimate tensile strength (NDOT Standard Specification 503.03.06)
c. Limit temporary tensile stress, jacking stress, to 80 percent of the specified minimum ultimate tensile strength (NDOT Standard Specification 503.03.06)
d. Modulus of elasticity, E = 28,500 ksi is assumed (AASHTO 5.4.4.2).
1401 N Green Valley Parkway, Ste 160 Henderson, Nevada 89074
702-966-4063 www.horrocks.com
Page 9 of 9
4. Structural Steel
a. Welded plate steel I-girders will be AASHTO M 270 grade 50.
5. Miscellaneous Structural Steel
a. Angles, plates, stiffeners, gusset plates will be grade 36.
PROJECT NO.STATE
NEVADA
COUNTYSHEET
NO.
STATE OF NEVADA
DEPARTMENT OF TRANSPORTATION
c:\pw-cagworkdir\cpinzone\dms07440\BA-1_Ramp WN S&L_01.dgn
carmelo.pinzone1:99.9998 PLOT SCALE
PRELIMINARYSUBJECT TO REVISION
12/2/2019
12/2/2019
s
N67°
52'5
9"E
N67°
52'5
9"E
> UPRR Track
Typ
MSE Wall
N67°
52'5
9"E
3000'
R
395396
397
40 41
42
"L"
R 2676'
> Abut. No. 1 > Abut. No. 2
"WN" 40+18.40
> Abut. No. 1 "WN" 41+17.53
> Abut. No. 2
18°13'23" 16°06'0
2"
17°02'28"
"WN" 40+73.60
> UPRR Track
(Typ)
Approach Slab
"WN" Line
Be Widened
Separation (G-1463) To
Exist UPRR Grade
Removed
(I-2109) To Be
Exist Ramp "EN"
~~
MSE Wall
MSE Wall ~~
> Abut No. 1 > Abut No. 2
> UPRR Track
99'-1•" As Measured Along "WN" Line
48'-5" 37'-1"
Vert Clr
23'-
4"
Min.
* *
Exist Grade
Exp Exp
PLAN
ELEVATION
BA-1
RAMP "WN" OVER UPRR
CLARK
PLAN AND ELEVATION* Measured Perpendicular To UPRR Track
1850
1860
1870
1840
1830
1820
1850
1860
1870
1840
1830
1820 HENDERSON INTERCHANGE OPTION 2
PROJECT NO.STATE
NEVADA
COUNTYSHEET
NO.
STATE OF NEVADA
DEPARTMENT OF TRANSPORTATION
c:\pw-cagworkdir\cpinzone\dms07440\BA-2_ Ramp WN S&L_02.dgn
carmelo.pinzone1:99.9998 PLOT SCALE
PRELIMINARYSUBJECT TO REVISION
12/2/2019
12/2/2019
Shldr
4'-0" 1'-6"
Lane
12'-0"
Shldr
8'-0"
1'-0"
6"
3'-4"
1'-6"
5'-5" 6'-6" 5'-5" 3'-4"
1'-6"
To Be Removed
Exist Ramp "EN" (I-2109)
To Be Widened
Separation (G-I463)
Exist UPRR Grade
3'-4" 6'-6" 7'-8"7'-8" 6'-6"
1'-6" 1'-6"
3'-4"
Closure Pour
2'-9"
Varies-2.00%-2.00%
38'-0" Widening
13'-5" Min
Varies
8"
8"
"WN"
4'-
6"
27'-0"
(Typ.)
(Typ.)
(Typ.)
(Typ.)
(Typ.)
(Typ.)
TYPICAL SECTION
BA-2CLARK
RAMP "WN" OVER UPRRTYPICAL SECTION
"L"
72'-6"
HENDERSON INTERCHANGE OPTION 2
PROJECT NO.STATE
NEVADA
COUNTYSHEET
NO.
STATE OF NEVADA
DEPARTMENT OF TRANSPORTATION
c:\pw-cagworkdir\cpinzone\dms07440\BB-1_Ramp SW S&L_01.dgn
carmelo.pinzone1:0.999998 PLOT SCALE
PRELIMINARYSUBJECT TO REVISION
12/2/2019
12/2/2019
s
> Abut. No. 1 > Pier No. 2
"SW" Line
> Abut. No. 2
> UPRR Track
28
29 30 31 32
33
> Pier No. 1
> Abut. No. 1
"SW" 28+17.96
> Pier No. 1
"SW" 29+00.10
> Pier No. 2
"SW" 30+42.60
> Abut. No. 2
"SW" 31+47.52
(Typ)
Approach Slab
62°22'33"
> UPRR Track
"SW" 29+67.75
58°39'44"
50°48'18"
R 599'
G-1958 To Be Removed
Existing I-215 over UPRR
S80°47'50"W
> Pier No. 1 > Pier No. 2
> Abut. No. 1
> UPRR Track
> Abut. No. 2
Exp
ExpFixFix
142'-6" Measured Along "SW" Line82'-1ƒ" Measured Along "SW" Line 104'-11" Measured Along "SW" Line
329'-6ƒ" Measured Along "SW" Line
Top of Rail
Vert.
Clr.
23'-
4"
Min
(Typ)
Finished Grade
Exist Grade
ELEVATION
PLAN
* Measured Perpendicular to UPRR Track
BB-1CLARK
RAMP "SW" OVER UPRRPLAN AND ELEVATION
1920
1930
1940
1910
1900
1890
1920
1930
1940
1910
1900
1890
HENDERSON INTERCHANGE OPTION 2
43'-0"
Lane
12'-0"
Lane
12'-0"
Shldr
4'-0"
Barrier Rail
1'-6"
Varies
Barrier Rail
1'-6"
Varies
Shldr
12'-0"
"SW"
To Be Removed
Over UPRR G-1958
Existing I-215
3'-6"
Existing Grade
8"
"P"
3'-6" 3 Spaces @ 12'-0" = 36'-0"
11'-6"20'-0"11'-6"
Columns
4'-6" Diameter
5'-
0"
PROJECT NO.STATE
NEVADA
COUNTYSHEET
NO.
STATE OF NEVADA
DEPARTMENT OF TRANSPORTATION
c:\pw-cagworkdir\cpinzone\dms07440\BB-2_Ramp SW S&L_02.dgn
carmelo.pinzone1:0.999998 PLOT SCALE
PRELIMINARYSUBJECT TO REVISION
12/2/2019
12/2/2019
TYPICAL SECTION
BB-2CLARK
RAMP "SW" OVER UPRRTYPICAL SECTION
HENDERSON INTERCHANGE OPTION 2
PROJECT NO.STATE
NEVADA
COUNTYSHEET
NO.
STATE OF NEVADA
DEPARTMENT OF TRANSPORTATION
c:\pw-cagworkdir\cpinzone\dms07440\BC-1_ I-515 S Crossover S&L_01.dgn
carmelo.pinzone1:99.9998 PLOT SCALE
PRELIMINARYSUBJECT TO REVISION
12/2/2019
12/2/2019
s
P
P
P
s
s
19
20
2122 23 24 25 26 27
63
64
6566
67
68
69
70
71
26
27
28
29
30
31
32
33
358
359
360
361
362
363
364
365
366
367
19
20
2122 23
24
25
26
24'-
0"
>
Abut.
No. 2
>
Abut.
No. 1
>
Abut.
No. 2
>
Abut.
No. 1
132.21' Lt.
"N" 18+99.85
97.48' Lt.
"N" 22+77.56
29.93' Lt.
"N" 23+61.28
36.00' Rt.
"N" 26+34.84
104.86' Rt.
"N" 26+18.25
68.28' Rt.
"N" 23+37.61
40.39' Rt.
"N" 22+44.50
36.00' Lt.
"N" 18+92.67
"N" 21+02.26
> Abut No. 1
"N" 24+81.91
> Abut No. 2"L"
"NW"
"N"
(Typ)
Exposed Girder
(Typ)
Approach Slab
"ES"
"WS"
"NE"
R 2052'
N55°08'40"W
> Deck Joint > Deck Joint
> Abut. No. 1 > Abut. No. 2
Exist Grade
Approach Slab
Approach Slab
74" Bulb Tee Girders
"43
379'-7
379'-7ƒ"
8"
7'-
3"
(Typ.)
PLAN
BC-1CLARK
I-515 SOUTH CROSSOVERPLAN AND ELEVATION
LONGITUDINAL SECTION
(SHOWN ALONG "N" LINE)
1920
1940
1960
1900
1. See Sheet BC-2 For Sections A-A and B-B.
NOTES:
BB
BB
A
A
1920
1940
1960
1900
HENDERSON INTERCHANGE OPTION 2
PROJECT NO.STATE
NEVADA
COUNTYSHEET
NO.
STATE OF NEVADA
DEPARTMENT OF TRANSPORTATION
c:\pw-cagworkdir\cpinzone\dms07440\BC-1_ I-515 S Crossover_02.dgn
carmelo.pinzone1:99.9998 PLOT SCALE
PRELIMINARYSUBJECT TO REVISION
12/2/2019
12/2/2019
Varies 68-0" Min To 137'-8‡" Max (Measured Perpendicular to "L")
2'-0" Rail
Shld.
12'
Shld.
12'
Lane
12'
Lane
12'
Lane
12'
Lane
12'
Fix
Exp
Approach Slab
Exposed Girders - Varies
"ES"
Shld.
8'
Lane
12'
Lane
12'
Shld.
4'
Shld.
12'
Lane
12'
Lane
12'
Lane
12'
"WS"
Shld.
4'
Lane
12'
Gore
Varies
"L"
25'-6"
Gore
Varies
"N"2'-0" Rail
Shld.
8'
Exist Grade
> Abut. No. 1> Abut. No. 2
"NW"
Finished Grade
7'-
3"
74" Bulb Tee Girder
2'-7"
2'-7"
> 2" Open Joint
Girders (Typ.)
74" Bulb Tee
SECTION A-A
SECTION B-B
BC-2CLARK
I-515 SOUTH CROSSOVERSECTIONS
Note: Lane Dimensions Are Given Perpendicular To Roadway Alignments.
HENDERSON INTERCHANGE OPTION 2
PROJECT NO.STATE
NEVADA
COUNTYSHEET
NO.
STATE OF NEVADA
DEPARTMENT OF TRANSPORTATION
c:\pw-cagworkdir\cpinzone\dms07440\BD-1_Ramp NW S&L_01.dgn
carmelo.pinzone1:99.9998 PLOT SCALE
PRELIMINARYSUBJECT TO REVISION
12/2/2019
12/2/2019
6291846.88
6301870.21
6281874.92
> Abut. No. 1
"NW" 34+70.00
> Abut. No. 2
"NW" 49+95.00
31
32
33
34
35
36
37
38
39
40
414243
44
45
46
47
48
49
50
51
"E"
"W"
"ES"
"NW"
"L"
"WN"
"NBCD"
"SW"
"SL"
"EN"
"LT"
P
P
V
P
P
P
PP
MH
V
P
PP
P
P
P
P
P
PP
P V
P
s
FH
FH
s
MH
FH
s
V
V
V
MH
V
V
VMH
P
V
P
PP
V
FH
P
s
V
P
V V V
V
P
P
P
V
P
FH
P
P
P
P
P
P
P
P
P
P
P
sP
PP s
P
s
s
s
P
s
s
P
P
P
MH
V
P
P
P
V
P
P
P
V
P
s
V VP
s
P
P
P
MH
P V
V V
P
P
P
P
PP
P
P
P
P
P
FH
s
P
P
P
P
P
PP
P
P
P
s
P
P
MH
P
s
s
P
P P
s
P
PP
P
s
MH
P
P
MH
P
P
s
P
P
MH
PP
P
P
P
P
P
s
P
P
P
P
P
P
P
P
s
P
P
P
s
P
s
P
P
P
s
s
s
ss
s
s
s
s
MH
PP
s
MH
s
s
s
>
Abut. N
o. 1
> Ab
ut. N
o. 2
> Pie
r No. 8
> Pie
r No.
7
> Pie
r No.
6
> Pie
r No. 5
> Pier No. 4> Pier No. 3
> Pier No. 2
> Pier N
o. 1
FixFix Fix
Fix FixExpExpFixExp
1860
1880
1900
1920
1940
1960
1860
1880
1900
1920
1940
1960
Exp
"NBCD"
"SL" "E" "W"
"L"
"LT" "SL"
"EN"
1525'-0" ALONG "NW" LINE
127'-0"169'-0"141'-0"154'-0"205'-0"154'-0"185'-0"205'-0"185'-0"
> Abut. No. 1 > Abut. No. 2
Existing Grade
> Pier No. 1 > Pier No. 2 > Pier No. 3 > Pier No. 4 > Pier No. 5 > Pier No. 6 > Pier No. 7 > Pier No. 8
Along "NW" Line
Varies 4'-0" Min
T0 10'-2 …" Max
Varies
8'-0"
(Typ.)
(Typ.)
(Typ.)
(Typ.)
"NW"
(Typ.)
2'-
0"
(T
YP.)
Varies 39'-0" Min To 45'-2 …" Max
1'-
0"
8'-
6"
6" 16'-
6"
12'-0"12'-0" 1'-6"
9" (Typ.)
9" (Typ.)
6" (Typ.)
4'-0"
3'-0"
12"
8'-0" Dia Column
Shaft
10'-0" Dia Drilled
5'-0"
4 Equal Spaces 7'-6" Min To 9'-0 †" Max
Shaft
Column &
> Pier
Equal Space Equal Space Equal Space
(Typ.)
42" Rail
Shoulder
Lane Lane Shoulder
PROJECT NO.STATE
NEVADA
COUNTYSHEET
NO.
STATE OF NEVADA
DEPARTMENT OF TRANSPORTATION
c:\pw-cagworkdir\cpinzone\dms07440\BD-1_Ramp NW S&L_01.dgn
carmelo.pinzone1:99.9998 PLOT SCALE
PRELIMINARYSUBJECT TO REVISION
12/2/2019
ELEVATION
PLAN
TYPICAL SECTION AT DROP CAP
BD-1CLARK
RAMP "NW"PLAN, ELEVATION AND
TYPICAL SECTION
HENDERSON INTERCHANGE OPTION 1
PROJECT NO.STATE
NEVADA
COUNTYSHEET
NO.
STATE OF NEVADA
DEPARTMENT OF TRANSPORTATION
c:\pw-cagworkdir\cpinzone\dms07440\BE-1_Ramp NBCD S&L_01.dgn
carmelo.pinzone1:99.9998 PLOT SCALE
PRELIMINARYSUBJECT TO REVISION
12/2/2019
12/2/2019
6291846.88
6281874.92
> Abut. No. 1
"NBCD" 21+15.00
> UPRR Track
> Pier No. 1
> Abut. No. 2
"NBCD" 35+75.00
"E""W"
"ES"
"NW"
"L"
"WN"
"NBCD"
"SW"
"SL"
"EN"
"LT"
2021
2223
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
"SL"
MH
V
FH
P
P
MH s
s
V
P
P
P
PP
MH
V
P
PP
P
P
P
P
P
PP
P V
P
s
FH
FH
FH
s
V
V
V
P
V
P
PP
FH
P
P
P
V V
P
V
P
FH
P
P
s
P
P
P
P
P
P
P
P
P
P
P
P
MH
P
P
V
P
s
V VP
P
P
MH
P V
V V
P
P
PP
P
P
P
FH
P
P
P
P
P
PP
P
s
P
s
P
MH
P
P
P P
s
P
P
s
MH
P
P
MH
P
P
s
P
P
MH
PP
P
P
P
P
P
s
P
P
P
P
P
P
P
P
s
P
P
P
s
P
s
P
P
P
s
s
s
ss
s
s
s
s
MH
PP
s
MH
s
s
s
> Abut. No. 2
> Abut. No. 1
> Pier No. 2
> Pier No. 3
> Pier No. 4
> Pier No. 5
> Pier No. 6
> Pier No. 7
Exp FixFix
Exp
"SL"
"ES" "E" "W" "LT"
"NW""L"
"WN"Exp
Fix ExpFix
Fix
1460'-0" Along "NBCD" Line
150'-0"232'-0"150'-0"202'-0"221'-0"148'-0"192'-0"165'-0"
1860
1880
1900
1920
1940
1960
1980
1860
1880
1900
1920
1940
1960
1980
Existing Grade
> Abut. No. 1 > Abut. No. 2> Pier No. 1 > Pier No. 2 > Pier No. 3 > Pier No. 4 > Pier No. 5 > Pier No. 6 > Pier No. 7
> UPRR Track
Along "NBCD" Line
63'-0"
12"
9" (Typ.)
6" (Typ.)4'-0"
3'-0"
9"
12'-0"12'-0"12'-0"12'-0"12'-0"1'-6"
4'-6" (Typ.)
19'-9"12'-0"19'-9"
"NBCD"
Varies
(Typ.) Shoulder ShoulderLane Lane Lane
1'-
0"
9'-
5"
20'-
0"
(Typ.)
2'-
0"
(Typ.)
Shaft
12'-0" Dia Drilled
10'-0" Dia Column
(Typ.)
(Typ.)
(Typ.)
& Shaft
Column
> Pier
(Typ.)
42" Rail
5 Equal Spaces 40'-0"
5'-0" 5'-0"
ELEVATION
PLAN
TYPICAL SECTION AT DROP CAP
BE-1CLARK
RAMP "NBCD"PLAN, ELEVATION AND
TYPICAL SECTION
HENDERSON INTERCHANGE OPTION 1