Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle...
Transcript of Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle...
![Page 1: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/1.jpg)
Advanced Pile EncapsulationSolutions for the Repair and Protection of Underwater Structures
Hazem Jadallah
![Page 2: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/2.jpg)
LPG Trestle, Ju’Aymah, Saudi Arabia
•Trestle constructed in 1980•Precast concrete cylinder piles
![Page 3: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/3.jpg)
LPG Trestle, Ju’Aymah, Saudi Arabia
•Routine inspection in 1983 (3 years after construction) revealed severe marine borer attack•616 piles affected
1”
![Page 4: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/4.jpg)
LPG Trestle, Ju’Aymah, Saudi Arabia
•The owner required that the repair method…•Would eradicate the existing borers•Would repair the damage done by the borers•Would not be susceptible to future borer attack•Would stay in place and continue to provide protection for 20+ years without any maintenance
![Page 5: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/5.jpg)
LPG Trestle, Ju’Aymah, Saudi Arabia
•The 616 piles were encapsulated using the advanced pile encapsulation technique in 1984
![Page 6: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/6.jpg)
Repairing Marine Structures
•Marine Structures• Submerged Piles• Submerged Piers• Seawalls• Dams / raceways• Offshore Platform Supports
![Page 7: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/7.jpg)
The Need for Repair and Protection
•Marine Environment• Highly Corrosive Environment• Susceptible to Rot• Attack from Marine Organisms• Damage from Scour and Abrasion
![Page 8: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/8.jpg)
Repairs to Marine Structures
•Repair Zones• Atmospheric Zone• Splash Zone• Submerged Zone
Atmospheric Zone
Splash ZoneSubm
erged Zone
![Page 9: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/9.jpg)
Repairs to Marine Structures
•Splash Zone• Wetting & Drying
Cycles• Available Oxygen• Heavy Wear &
AbrasionSplash Zone
![Page 10: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/10.jpg)
Repairs to Marine Structures
•Repair Challenges• Durability of Materials for Repair / Protection• Adequate Performance of Materials for Repair / Protection• Proper Placement of Materials for Repair / Protection
![Page 11: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/11.jpg)
The Encapsulation Process
•Step 1• Surface preparation• Remove marine
growth• Clean rust and scale• Profile substrate
![Page 12: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/12.jpg)
The Encapsulation Process
•Step 1• Sandblasting• Pneumatic Rotary Grinder
![Page 13: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/13.jpg)
The Encapsulation Process
•Step 1• Sandblasting• Pneumatic Rotary Grinder
![Page 14: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/14.jpg)
The Encapsulation Process
•Step 2• Fiberglass Jackets
Placed Around Structure
• Leaving 3/8” to 1/2” Annulus between Jacket and Structure
• Seams are sealed with epoxy
Translucent Fiberglass Jackets
![Page 15: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/15.jpg)
Purpose Designed FRP Jackets
•Step 2• Appropriately sized FRP
Jackets Delivered to Site• Polymer Stand-offs• Seam adhesive applied
on deck
![Page 16: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/16.jpg)
Purpose Designed FRP Jackets
•Step 2• Jackets set in place
around pile
![Page 17: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/17.jpg)
The Encapsulation Process
•Step 3• Seams are riveted
in place• Temporary bracing
is installed• Bottom of Jacket is
sealed w/ epoxy coated backer rod
Temporary Bracing
Epoxy Seal
![Page 18: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/18.jpg)
Encapsulation Purpose Designed FRP Jackets
•Step 3• Temporary bracing
installed
![Page 19: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/19.jpg)
The Encapsulation Process
•Step 4•Each component of a two-component marine grade epoxy is mixed with sand
A B
![Page 20: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/20.jpg)
Epoxy Grout Infill Properly Placed
•Step 4• Plural component
grout plant• Part A & Part B
mixed with sand in each hopper
![Page 21: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/21.jpg)
The APE Process
•Step 5• Grout plant is
attached to injection port in fiberglass jacket
• Dual-umbilical hose w/ static mixer at injection site
A B
![Page 22: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/22.jpg)
Epoxy Grout Infill Properly Placed
•Step 5• Downstream mixer
![Page 23: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/23.jpg)
Epoxy Grout Infill Properly Placed
•Step 5• Fluid sand-filled epoxy
grout is dispensed out of the mixer
![Page 24: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/24.jpg)
The Encapsulation Process
•Step 6• Epoxy grout is
pumped into annulus
• Water in the annulus is displaced and expunged out of the top of the jacket
A B
![Page 25: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/25.jpg)
Epoxy Grout Infill Properly Placed
•Step 6•Grout is pumped into the annulus•Water is displaced above grout•Grout progress is monitored
![Page 26: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/26.jpg)
Epoxy Grout Infill Properly Placed
•Step 6•Water is expunged out of the top of the jacket
![Page 27: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/27.jpg)
The Encapsulation Process
•Step 7•Top of jacket is sealed with epoxy•Bracing is removed
Seal top of jacket
![Page 28: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/28.jpg)
The Encapsulation Process
•Encapsulation is complete!
![Page 29: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/29.jpg)
Complete Encapsulation
•FRP Jacket •Epoxy Grout Infill•Complete Coverage of Grout•Well Bonded to the Pile
![Page 30: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/30.jpg)
Complete Encapsulation
•Epoxy Grout is pumped under pressure•Grout penetrates into cracks and voids in the substrate
![Page 31: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/31.jpg)
Lake Pontchartrain Causeway, New Orleans, Louisiana
![Page 32: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/32.jpg)
Lake Pontchartrain Causeway, New Orleans, Louisiana
•Pile Encapsulation• Started in 1988 – still ongoing• 26 mile long bridge• 54” diameter concrete cylinder
piles
![Page 33: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/33.jpg)
Lake Pontchartrain Causeway, New Orleans, Louisiana
•Pile Encapsulation• Encapsulations soon after
completion in 1989
![Page 34: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/34.jpg)
Lake Pontchartrain Causeway, New Orleans, Louisiana
Pile Encapsulation• Encapsulations in 2002
![Page 35: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/35.jpg)
Lake Pontchartrain Causeway, New Orleans, Louisiana
• Core sample
![Page 36: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/36.jpg)
Lake Pontchartrain Causeway, New Orleans, Louisiana
•Bond testing 13-year old encapsulations
![Page 37: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/37.jpg)
Rappahannock River Bridge, Tappahannock, Virginia
![Page 38: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/38.jpg)
Rappahannock River Bridge, Tappahannock, Virginia
•1993•RC Piers Showing Corrosion and Spalling•Encapsulations all Above Water
![Page 39: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/39.jpg)
Rappahannock River Bridge, Tappahannock, Virginia
•1993•RC Piers Showing Corrosion and Spalling•Encapsulations all Above Water
![Page 40: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/40.jpg)
Rappahannock River Bridge, Tappahannock, Virginia
•Jackets placed over spalled areas•No patching was done
![Page 41: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/41.jpg)
Rappahannock River Bridge, Tappahannock, Virginia
•Completed Encapsulation
![Page 42: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/42.jpg)
BG&E Facility, Baltimore, Maryland
•Badly deteriorated H-Piles
![Page 43: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/43.jpg)
BG&E Facility, Baltimore, Maryland
•Encapsulate 44 “H” Piles•Completed in 1993
![Page 44: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/44.jpg)
BG&E Facility, Baltimore, Maryland
•Corroded steel section replaced with new structural steel•Steel channels bolted and spliced onto existing piles
![Page 45: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/45.jpg)
BG&E Facility, Baltimore, Maryland
•Jackets sized to H-Pile Profile
![Page 46: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/46.jpg)
BG&E Facility, Baltimore, Maryland
•Encapsulations in place
![Page 47: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/47.jpg)
Warren Road Bridge, Baltimore, Maryland
![Page 48: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/48.jpg)
Warren Road Bridge, Baltimore, Maryland
Deteriorated piers Large concrete pier
![Page 49: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/49.jpg)
Warren Road Bridge, Baltimore, Maryland
Pier Encapsulation: Large concrete pier
Jacket Fabrication
![Page 50: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/50.jpg)
Warren Road Bridge, Baltimore, Maryland
Pier Encapsulation: Large concrete pier
![Page 51: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/51.jpg)
Des Joachims Hydroelectric DamDeep River, Ontario, Canada
•Tailrace Structure• Sits on the Ottawa River between
Ontario and Quebec• 200-km Upstream from Ottawa,
ON• 8 power generation units
![Page 52: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/52.jpg)
Challenges
•Tailrace Structure• Structure built in 1940’s• Damage to tailrace from scour
and abrasion
![Page 53: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/53.jpg)
Challenges
•Damage to Piers• Loss of section• 12” to 18” of section loss in
some instances• Reinforcing steel exposed
![Page 54: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/54.jpg)
Challenges
•Repair Procedure• Restore loss of section• Protect against future abrasion
damage• Protect the downstream
ecosystem• Minimize dam shutdown time to
less than 10-days
![Page 55: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/55.jpg)
Concept
Epoxy Grout Pumped In
Contaminated Water Vacuumed Out
Fiberglass Jacket
Encapsulation Complete
![Page 56: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/56.jpg)
Implementation
•FRP Panels • Face of peirs encapsulated using
FRP panels• Thicker than usual panels (1/4”)
were used due to severity of scour and abrasion
• Panels hoisted into place
![Page 57: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/57.jpg)
Implementation
•Panels Installed• Panels are anchored into the
face of the wall at appx 12”o.c. EW
• Stiffeners are placed to resist grouting pressure
![Page 58: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/58.jpg)
Implementation
•Grouting Operation• Grout pumped into annular space• Expunged water and excess grout
reclaimed by vacuum pumps installed on upper ports
• Contaminated water disposed of separately to minimize environmental impact
![Page 59: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/59.jpg)
Des Joachims Hydroelectic DamDeep River, Ontario, Canada
•Encapsulation in Place• Completed without dewatering• Only 7-days of shutdown time for
the generators
![Page 60: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/60.jpg)
Testing
•Core Samples• Excellent bond to backwall• Good grout consolidation• No cracking in grout from
exotherm
![Page 61: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/61.jpg)
Conclusion
•Before…
![Page 62: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/62.jpg)
Conclusion
•…and After
![Page 63: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/63.jpg)
Des Joachims Hydroelectric DamDeep River, Ontario, Canada
•…and In Service
![Page 64: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/64.jpg)
Gandy BridgeTampa Bay, FL USA
![Page 65: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/65.jpg)
Gandy BridgeTampa Bay, FL USA
![Page 66: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/66.jpg)
Gandy BridgeTampa Bay, FL USA
2010 • Condition Survey• First Encapsulated in 1987
![Page 67: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi](https://reader034.fdocuments.net/reader034/viewer/2022042804/5f58db7c3fdcc7554d53bd9b/html5/thumbnails/67.jpg)
LPG Trestle, Ju’Aymah, Saudi Arabia
32 years later…
The repair and protection via Advanced Pile Encapsulation remains in place and continues to provided protection without any maintenance