Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346 LHC ACCESS SYSTEM 1 Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile T. Ladzinski

description

Access Control and Safety System for the LHC Experiments. P. Ninin L. Scibile T. Ladzinski. Scope. LHC Access Safety System LASS Interlock System Beam => No Access Access => No Beam (Nuclear category). LHC Access Control System LACS Off-the-shelf Access Equipement. - PowerPoint PPT Presentation

Transcript of Access Control and Safety System for the LHC Experiments

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

1

Access Control and Safety Systemfor the LHC Experiments

P. Ninin

L. Scibile

T. Ladzinski

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

2

Scope

LHC Access Control SystemLACS

Off-the-shelf Access Equipement

LHC Access Safety SystemLASS

Interlock SystemBeam => No AccessAccess => No Beam(Nuclear category)

Integrated concept for LHC Machine & Experiments to protect people against the LHC radiation hazards.

Each Experiment is one single Access sector

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

3

Scope of supply to the Experiments

• Provision of a access control and safety system.

• This system consists of:• Grids• Locks• Personal and material access points, • Patrol system • Monitoring software• Machine Interlock system.

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

4

LHC Underground areas classification

BEAM ZONES

LHC TUNNELS/ EXPERI MENTS Point 7

Point 8

Point 6

Point 5

Point 4

Point 3.3

Point 2

Point 1

SPS

TI8

TI2

PX16

PX14

PX15

PM15

USA1

UX15

U S15 UL14

PM18

UJ18 UJ16

UJ 14 U L1 6

R B14 RB16 RR13

UJ 23 UJ 24

UA23 RA23

PX24

UL24

US25

UW25

PM25 U L2 6

UX25

UJ 26 PGC2 U A27

RA27

UJ 27

R32

UJ32 TZ32

PM32

R33

R28

R22

PZ33 UJ 33

UP33

R34 R36

R42 UJ 43 UJ44 UA43 RA43 UL4

4 US45

UX45

PM45

PX46

PZ45

UL46 RB44 RB46 UJ 46

UA47

RA47 UJ47 R48 TX4

6 UW45

UJ 53 UL54

PM54

UXC55 USC5

5 UJ56 PM56

PX56

UL56

UJ 57 RZ54

TD62 R62 UJ 63

U A63 RA6 3

UJ64 U L64

UL66 UJ 66 RB66

PM65

PX64 P

Z65

UW65

US65

UX65

TX6 4

U A67

R A6 7

UJ67 UJ68

TD68

R68

UJ 76 TZ76

PM76

R76

R77

UJ83 U A83

RA8 3 UJ84

PX84

PZ85

PM85

U L84

U L86

UW85 U

S85 UX8

5 TX 84

UJ 86 RB84

R B86 U A8

7 RA87

UJ87 UJ88 R88

Point 3.2 SERVI CE ZONES

LHC SERVI CE GALLERI ES/ CAVERNS/ SHAFTS

NON- INTERLOCKED AREAS

US32

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

5

Access to future interlocked areas

The LHC sites access control systems

The LHC buildings access control systems

the LHC experimental services areas access control systems: for ACCESSIBLE areas during beam operation

Special for the LHC INSTALLATIONperiod only!

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

6

the LHC accelerator and experiment access control systems:For NON ACCESSIBLE areas during beam operation

The LHC sites access control systems

The LHC buildings access control systems

the LHC experimental services areas access control systems: for ACCESSIBLE areas during beam operation

In LHC OPERATION

?

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

7

From card to dosimeter - the plan is:

• During LHC Installation- New LHC Access control system gradually operational in pit access points (and elsewhere)

• Operational in PM85, PM76, PM45

- Renewal of the Access points of the non-interlocked areas will be done after LHC start-up

• Minimized perturbation for users- Renew their access card (Bat 55)- No Biometry

• Assistance provided by the CSA & CCC

• For LHC Operation- Biometry enrolment will start in June 07- Access badge integrated into the dosimeter- Delivered in Bat55

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

8

LHC Access Control System

Goals:

• Control access to the LHC installation (INB)

• Manage users’ access rights

• Identify user

• Verify authorization

• Automatic or remote access control

Status:- LHC4 :

• PM45 access point under test, UJ43 & UJ47 installation completed- LHC5: Preparation of the installation- LHC 8: installation completed and local acceptance test started

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

9

LHC Access as seen by the Experiments

• Local Experiment Room Access Console- Allows the experiment to operate their access points in

only in Restricted Access mode, after delegation by the CCC

- Remote supervision includes audio and video

• Software interface is available to get information from the Access system about User entry/exit and Operational states.

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

10

LES MODES D’ EXPLOITATION

Ghislain Roy - Louis. Hammouti

FAISCEAU LHCFAISCEAU TI2 FAISCEAU TI8

Mode ACCES LHCMode ACCES Pt 2 Mode ACCES Pt 8

Acces tunnel

(sites 1, 6)

Acces tunnel

(site 2)

Delegation

ALICE

Delegation

Atlas, CMS

Delegation

LHC_B

Acces tunnel

(site 8)

Delegation

RF

M.A.- E.ST.

Acces tunnel Hors zone RF

(site 4)

M.A. -RF

Acces RF

Acces LHC-BAcces service

(site 8)

Acces AliceAcces service

(site 2)

Acces service

(sites 1, 4 , 6)

Acces tunnel

(sites 3, 5 , 7)

Acces experience

Atlas, CMS

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

11

LE PUPITRE DE CONTROLE

Ghislain Roy - Louis. Hammouti

EIS-RF

ONOFF

RF

ON OFF

ACCESTUNNEL

POINT 1

ATLAS

ON OFF

ACCESTUNNEL

ON OFF

ACCESSERVICE

ON OFF

ACCESEXPERIENCE

ON OFF

ACCESTUNNEL

ON OFF

ACCESSERVICE

ON OFF

ACCES RF

ON OFF

ACCESTUNNEL

ALICE

ON OFF

ACCESEXPERIENCE

ON OFF

ACCESSERVICE

ON OFF

ACCESTUNNEL

CMS

ON OFF

ACCESEXPERIENCE

ON OFF

ACCESTUNNEL

ON OFF

ACCESSERVICE

ON OFF

ACCESTUNNEL

ON OFF

ACCESTUNNEL

LHC-B

ON OFF

ACCESEXPERIENCE

ON OFF

ACCESSERVICE

Electronsstoppers

ONOFF

Electron Sto.

ATLAS

YES NO

DELEGATION

YES NO

DELEGATION

YES NO

DELEGATION

YES NO

DELEGATION

YES NO

DELEGATION

POINT 2 POINT 3 POINT 4 POINT 5 POINT 6 POINT 7 POINT 8

LHC

OK OK

EIS-a

ON OFF

ACCES

Key release

ON

FAISCEAU

OFF

EIS-f

Key release

AlarmeFaisceauImminent

DélaiDécroissance

Radiation18 18

TI8

EIS-f

FAISCEAU

Key release

OFF ON

ACCES Point 8

Key release

TI2

EIS-f

FAISCEAU

Key release

OFF ON

ACCES Point 2

Key release

Commande pour établir un mode (= retirer un VETO)Allumé = confirmation que le VETO est retiré

Position sûre de tous les EIS (non alimenté, fermé etc.)

Commande pour annuler un mode (= mettre un VETO)Allumé = confirmation que le VETO est mis

MODEAllumé = Mode établiAucun VETO sur le groupe d’EIS correspondant

Position non sûre d’au moins un EIS (alimenté, ouvert, etc.)

Clignotement signalant un incident ou anomalie sur les EIScorrespondants (ex intrusion)

OFF

ON

18 Compteur décroissant

Clef en position insérée et verrouillée

OFFON OFFON

EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a

EIS-a EIS-a EIS-a EIS-a EIS-a

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

12

Delegation

• Synchronised operation from XCR and CCC

• Only the Access requests are re-routed to XCR (No control of any Machine related element).

• Audio & Video control

• Delegation cancelled by a LASS VETO or by the CCC

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

13

LHC Access Safety System

Goals:• Protect personnel during Beam operation

- nobody inside - Stop LHC if a door is forced

• Allow Access operation when safety conditions are met- No radiation hazards (LHC beam, RF).

• Nuclear Safety system- Audits by the French Nuclear Authority INB

Status:- Successful Factory acceptance of the CCR and LHC8 racks - LHC4 – LHC5 rack design and fabrication started- Ongoing Cabling verification in LHC5- Installation of the LHC8 racks completed and on going in CCR

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

14

LHC8 - LHCb

• Installation completed

• Patrol definition done

• LHC8 Functional tests starting mid-February

• LACS console in XCR – June 07

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

15

Layout of LHCb in UX85 Area

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

16

LHC5 - CMS

• Access safety aspects managed by the LASS- Safety of the underground UX area (sector 12)

• Any entry into this zone SHALL be detected by the system. No unmonitored “holes” may exist…

• Patrol definition done

• Installation: 18/02- 15/04- Constraints ?

• LHC5 functional testing 15/04 – 27 April

• LACS console in XCR – June 07

• Sectorisation completed

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

17

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

18

LHC1-ATLAS

• Access safety aspects managed by the LASS and the SSA for the Patrol aspects. ATLAS detector is patrolled by ATLAS.- Cfr Elena’s slideshow

• Installation: 26/02- 27/04- Constraints ?

• LHC1 functional testing 15/04 – 27 April• LACS console in XCR – June 07• Most of grids in place, TE 14 & 16 will be relocate• Installation of UPX16 & ULX15 could start end of

February- To be coordinated between us and you!

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

19

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

20

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

21

LHC2- ALICE

• Installation and commissioning planned for the summer 07

• Patrol definition planned for the 21/02

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

22

LHC2- ALICE

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

23

Access via PX24

Authors: P. Ninin, L. Scibile, T. Ladzinski EDMS: 819346

LHC ACCESS SYSTEM

24

Conclusion

• Good progress – despite a hesitant Contractor.

• Expect to be ready as planned (Master Schedule)

• Co-ordination with the Experiments: we need a better definition of linkmen for different aspects. Presently we are sometimes grasping for the right person…(wastes our and your time).