A Review of Traffic Light Protocol for Induced Seismicity ...

23
1 A Review of Traffic Light Protocol for Induced Seismicity and Its Effectiveness in Canada Honn Kao Geological Survey of Canada, NRCan Also at School of Earth and Ocean Sciences, University of Victoria 3 Geoscience BC 4 Western University

Transcript of A Review of Traffic Light Protocol for Induced Seismicity ...

Page 1: A Review of Traffic Light Protocol for Induced Seismicity ...

1

AReviewofTrafficLightProtocolforInducedSeismicityandItsEffectivenessinCanada

Honn Kao

GeologicalSurveyofCanada,NRCanAlsoatSchoolofEarthandOceanSciences,UniversityofVictoria

3 GeoscienceBC4 WesternUniversity

Page 2: A Review of Traffic Light Protocol for Induced Seismicity ...

2

Outline

§ DefinitionofaTrafficLightProtocol(TLP)§ HistoricaldevelopmentoftheTLPforinducedseismicity(IS-TLP).§ IS-TLPinCanada.§ Casestudiesofred-lighteventsinBCandAB.§ Summaryandimplications.

Page 3: A Review of Traffic Light Protocol for Induced Seismicity ...

3

WhatisaTrafficLightProtocol?§ ATLPisasite-specific,real-time,riskmanagementsystem

withmultiplediscreteresponselevels.§ EachTLPlevelisdeterminedusingobservablecriteriaand

invokesspecificactionsdesignedtomitigatetheassociatedrisk.

§ MostIS-TLPsworkbyprovidingafeedbacksystemthatallowsforanoperationalresponsetothenearbyoccurrenceofseismiceventsexceedingaprescribedsetofcriteria.

Page 4: A Review of Traffic Light Protocol for Induced Seismicity ...

4

IS-TLPfromRegulator’sPerspective§ Identification,analysis,andtreatmentofseismicrisk

associatedwithinducedseismicity.§ IS-TLPisconsideredareactive riskmanagementtoolinthe

“treatment”catagory.§ Ingeneral,seismicdamagestartswhenpeakground

acceleration(PGA)exceeds5–10%ofEarth’sgravity(g).§ Ultimategoal:Toensureaquickandeffectivereductionin

boththenumberandsizeofinducedearthquakes.

Page 5: A Review of Traffic Light Protocol for Induced Seismicity ...

5

IS-TLPfromOperatorandServiceProvider’sPerspective§ CAPPPublication2012-0024“CAPPHydraulicFracturing

OperationPractice:Anomalousinducedseismicity:assessment,monitoring,mitigationandresponse”

§ IS-TLPispartofthe“monitoring,mitigationandresponse”category.

§ Fortheindustry,IS-TLPispartofthedecision-makingprocess.Thus,itmustbeeasytounderstand,communicate,develop,andimplement.

§ Ultimately,theeconomicrealityisthebottomline.

Page 6: A Review of Traffic Light Protocol for Induced Seismicity ...

6

TheFirstIS-TLP§ Proposedfortheoperationsofhydraulicstimulationsof

enhancedgeothermalsystemsineasternElSalvador,CentralAmerica(Bommer etal.2006).

§ Basedonpeakgroundvelocity(PGV).§ Green:Groundmotionbelowthethresholdofgeneral

detectability,ortheoccurrencerateofseismicitylowerthanthealreadyestablishedbackgroundlevel.

§ Amber:Groundmotioncanbefelt,butdamageisunlikely.§ Red:Damagetobuildingsisexpectedtosetin.

Page 7: A Review of Traffic Light Protocol for Induced Seismicity ...

7

IS-TLPinEurope§ EnhancedGeothermalSystem,Basel,Switzerland(Haringetal.,2008).

§ Green:PGV<0.5mm/s,ML <2.3,nofeltreport(Proceedasplanned)§ Yellow:PGV≤2.0mm/s,ML ≥2.3,fewfeltreport(Informregulators,stop

increasingrate)§ Amber:PGV≤5.0mm/s,ML ≤2.9,manyfeltreports(Reducepumpingrate)§ Red:PGV>5.0mm/s,ML >2.9,generallyfelt(Stoppumping,bleedwells)

§ HydraulicFracturingofShaleGas,UK(https://www.gov.uk)§ Green:ML ≤0.0(Proceedasplanned)§ Amber:ML between0and0.5(Proceedwithcaution,lowerrates,

intensifymonitoring)§ Red:ML >0.5(Suspendinjectionimmediately)

Page 8: A Review of Traffic Light Protocol for Induced Seismicity ...

8

IS-TLPinUSA§ CO(Wongetal.,2015)

§ Yellow:Feltatthesurface(Modifyoperations)§ Red:ML ≥4.5(Suspendoperations)

§ OK(Stoplight System,http://earthquakes.ok.gov)§ Escalatingreviewofoperator’smitigationproceduresasML ≥2.5,≥3.0.

SuspendoperationswhenML ≥3.5.§ OH(Brudzinski etal.,2017;Dade,2017)

§ ML <1.5(Proceedasplanned)§ ML ≥1.5(Informregulator)§ ML between2.0and2.4(Modifyoperations)§ ML ≥2.5(Temporaryhaltcompletionsonlateral)§ ML ≥3.0(Suspendoperation)

Page 9: A Review of Traffic Light Protocol for Induced Seismicity ...

9

IS-TLPinAB,Canada§ SubsurfaceOrder#2,issuedonFebruary19,2015.

§ ApplicabletotheDuvernay ZonewithintheFoxCreekarea.§ Green:ML <2.0(Proceedasplanned)§ Yellow:ML between2and4within5kmofaninjectionwell

(ImmediatelyreporttoAER,implementmitigatingplan)§ Red:ML ≥4within5kmofaninjectionwell(ImmediatelyreporttoAER

andceasehydraulicfracturingoperations)

Page 10: A Review of Traffic Light Protocol for Induced Seismicity ...

10

IS-TLPinBC,Canada§ Section21.1oftheDrillingandProductionRegulation(since

June2015,presentedassite-specificpermitconditionsinceOctober2012).§ Astoplightsystem,noescalatinglevels.§ ApplicabletoallinjectionoperationsinBC.§ Red:ML ≥4within3kmofthedrillingpad,oragroundmotionfeltonthesurfacebyanyindividualwithinthe3kmradius(Suspendoperations).

Page 11: A Review of Traffic Light Protocol for Induced Seismicity ...

11

MajorDeficienciesofMagnitude-basedIS-TLP§ Possibleconfusionduetomagnitudeuncertainty.

§ Differentscalesand/ormethodology(ML,Mw,Mn,etc.)§ Differentchoice/availabilityofdata(localarrayvs.regionalnetworks)§ Differentsourcecharacteristics(momentscaling,stressdrop,focal

mechanism)§ Differentattenuation/distancecorrections§ Differentsiteeffects

§ Notlinkedtotheimpact/consequencesofreportedevents.§ Completelyignoreotherpotentialusefulindicators(e.g.,changeof

earthquakeoccurrencerate,migrationofhypocenters,correlationwithgeologicalstructures).

Page 12: A Review of Traffic Light Protocol for Induced Seismicity ...

12

DesignatedGroundMotionMonitoringAreasinBC§ Newpermitconditionforwellsintwodesignatedareas.§ Requirepresenceofadequatemonitoringofgroundmotionduring

hydraulicfracturing.§ Minimumof1groundmotionmonitorwithin3kmofthe

commondrillingpad.§ Instrumentwithadynamicrangeof+/-2gandaminimum

detectabilityof0.02g.§ Submitgroundmotionmonitoringreportwithin30daysof

completion.§ Seismicdataforanygroundmotionsexceeding0.02gmustbe

submitted.

(BCOGCIndustryBulletin2016-19)

Page 13: A Review of Traffic Light Protocol for Induced Seismicity ...

13

DistributionofRegionalSeismicityinnortheastBCandwestAB

• 4919eventsintotal.• 3030(~62%)occurredinthedesignated

monitoringareas.• Green:~81.5%,Yellow:~18.3%,Red:<0.2%

Page 14: A Review of Traffic Light Protocol for Induced Seismicity ...

14

Red-Light EventsinBCandAB§ 1.August4,2014,Mw 4.5(ML 4.1)

§ 2.January23,2015,Mw 4.4(ML 4.1)*Mw 3.6(Schultzetal.,2017).

§ 3.June13,2015,Mw 4.6(ML 4.3)*Mw 3.9(Wangetal.,2016),ML 4.4(AGS).

§ 4.August17,2015,Mw 4.6(ML 4.9)

§ 5.January12,2016,Mw 4.4(ML 4.6)*Mw 4.1(Schultzetal.,2017),ML 4.8(AGS).

§ 6.July12,2016,Mw 3.9(ML 4.0)

Page 15: A Review of Traffic Light Protocol for Induced Seismicity ...

15Event1,Mw 4.5(ML 4.1)

August4,2014northernMontney,BC

§ ActiveHFandWDduring7/25– 8/07.§ Oneyellow-light (Mw 3.8)event

occurredon7/30.§ Thered-lighteventoccurredwith

reducedinjectionrateandpressure.§ Prior,during,andpost-injection

earthquakeratesare0,0.14,and0eventperday,respectively.

§ NomoreM4+eventafterwards.

Page 16: A Review of Traffic Light Protocol for Induced Seismicity ...

16Event2,Mw 4.4(ML 4.1)

January23,2015FoxCreek,AB

§ ActiveHFduring12/17– 1/10.§ 1green- and3yellow-lightevents

duringthelast5daysofinjection.§ Seismicitycontinuedafterthe

completionofHFfor2moreweeks.§ Prior,during,andpost-injection

earthquakeratesare<0.01,0.32,and0.21 eventsperday,respectively.

§ AnotherM4+eventaboutayearlater.

§ Aclearcaseof”delayed”triggering.

(Schultzetal.,2017;Wangetal.,2016)

Page 17: A Review of Traffic Light Protocol for Induced Seismicity ...

17Event3,Mw 4.6(ML 4.3)

June13,2015FoxCreek,AB

§ ActiveHFduring5/22– 6/07at6nearbywells.

§ Amongthehighestdailyinjectionvolume.

§ Oneyellow-lighteventoccurredon5/27.

§ Prior,during,andpost-injectionearthquakeratesare0,0.18,and0.01 eventperday,respectively.

§ NomoreM4+eventafterwards.§ Anotherexampleof“delayed”

triggering.

(Schultzetal.,2017)

Page 18: A Review of Traffic Light Protocol for Induced Seismicity ...

18Event4,Event4,Mw 4.6(ML 4.9)

August17,2015northernMontney,BC

§ ActiveHFandWDduring8/11–8/28.

§ Onegreen butNO yellow-lighteventoccurredsincetheinjectionbeganbeforetheMw 4.6event.

§ Seismicitycontinuedfor~oneweek.

§ Prior,during,andpost-injectionearthquakeratesare0.03,0.59,and0.19 eventsperday,respectively.

§ NomoreM4+eventafterwards.

(Babaie Mahani etal.,2017a,2017b)

Page 19: A Review of Traffic Light Protocol for Induced Seismicity ...

19Event5,Mw 4.4(ML 4.6)

January12,2016FoxCreek,AB

§ SamegeneralareaoftheJanuary23,2015,Mw 4.4,red-lightevent.

§ ActiveHFstartedon1/04,stoppedrightafterthered-lightevent,neverresumed.

§ Twoyellow-lighteventsoccurredon1/09and1/10.

§ Prior,during,andpost-injectionearthquakeratesare0.08,1.11,and0.21 eventsperday,respectively.

§ NomoreM4+eventafterwards.ButscatteredM<4seismicitycontinuedtilltheendofourstudyperiod.

(Schultzetal.,2017;Wangetal.,2017)

Page 20: A Review of Traffic Light Protocol for Induced Seismicity ...

20Event6,Mw 3.9(ML 4.0)

July12,2016northernMontney,BC

§ InitiallyreportedML =4.0,laterrevisedtoMw =3.9

§ ActiveHFstartedon7/08.§ Noeventoccurredbeforethis

red-lightevent.§ Prior,during,andpost

earthquakeratesare<0.001,0.6,and0.23 eventsperday,respectively.

§ NomoreM4+eventafterwards.

Page 21: A Review of Traffic Light Protocol for Induced Seismicity ...

21

KeyObservationsAboutRed-LightEventsinBCandABKeyFeatures Event1

(BC)Event2(AB)

Event3(AB)

Event4(BC)

Event5(AB)

Event6(BC)

Totalnumberofeventsduringinjectionstage 2 12 4 10 10 3

Precursoryseismicityduringinjectionstage YLE YLE+GLE YLE+GLE GLE YLE+GLE None

Rateofseismicitybeforethestartofinjection 0.00 <0.01 0.00 0.03 0.08 <0.01

Rateofseismicityduringtheinjection 0.14 0.32 0.18 0.59 1.11 0.60

Rateofseismicityaftertheinjection 0.00 0.21 0.01 0.19 0.21 0.23

Seismicityrespondingtoinjectionadjustment Yes N/A N/A Yes Yes Yes

Followedbyalargereventcausingdamage No No No No No No

Page 22: A Review of Traffic Light Protocol for Induced Seismicity ...

22

SummaryandImplications§ AnIS-TLPbasedonescalatingmagnitude(green –>yellow –>red)ismoreapplicabletoAB

thanBC.

§ Backgroundseismicitymaybeausefulreferenceinforecastingtheoverallseismicresponsetoinjections.§ Lowpre-injectionseismicityrate~Lowseismicityrateduringinjection

§ Aclearjumpintheseismicityratefromthepre-injectionperiodtotheinjectionperiod,especiallyafter2015.

§ Thephenomenonof“delayedtriggering”(twored-lighteventsinAB)canbeaproblemfortheeffectivenessoftheIS-TLPandshouldbecarefullyconsidered

§ ExistingIS-TLPforinducedseismicityinbothBCandABappeartobeworkinginthesensethatitpreventsanydamagingearthquakes(M>5.5)fromhappening.

Page 23: A Review of Traffic Light Protocol for Induced Seismicity ...

23

QuestionsorComments?§ Sendyourquestionsorcommentsto

Dr.Honn KaoProjectLeader,InducedSeismicityResearchGeologicalSurveyofCanada(250)[email protected]