6-81-1043 Rev 2
Click here to load reader
Transcript of 6-81-1043 Rev 2
7/28/2019 6-81-1043 Rev 2
http://slidepdf.com/reader/full/6-81-1043-rev-2 1/5
2 29.06.12 Revised and Re-issued RJ
1 28.09.07 Revised and Re- issued AKG PP M
0 25.07.02 Issued for implementation 1W AKC
Rev.No .
Date PurposePrepared
byChecked
by
1--"IC DM
MVKK VC
AKB GR R
Standards Committee StandardsConvenor Bureau Chairman
Approved by
latiitaqs . ENGINEERS
og9 teegs INDIA LIMITEDmNSP ECTION AND TEST PLANF O R
NEUTRAL GROUNDING RESISTOR
STANDARD SPECIFICATION NO.
6-81-1043 Rev. 2
Page 1 of 5
4A141341 4 f t e r f fr lam
INSPECTION AND TEST PLAN
FORNEUTRAL GROUNDING RESISTOR
Format No. 8-00-0001-F7 Rev. 0 Copyr ight EIL — Al l r ights reserved
7/28/2019 6-81-1043 Rev 2
http://slidepdf.com/reader/full/6-81-1043-rev-2 2/5
o g 7 N a t e g o I N D I A LIMITED( AWN U MNeUnd.1441.9)
INSPE CTION AND TEST PLANFO R
NEUTRAL GROUNDING RESISTOR
STANDARD SPEC IF ICATION NO .
6-81-1043 Rev. 2
Page 2 of 5
Abbreviations
AS
BASEEFA
BIS
CCE or CCOE
CELL
CIMFR
CE
DFT
DT
DPT
ERTL
FCRI
FM
FLP
HIC
ITPIP
IC
IGCIE C
JEC
LPT
Alloy Steel
British Approval Service for Electrical Equipment in Flammable
Atmospheres
Bureau of Indian Standards
Chief Controller of Explosives
Certification Engineers International Limited
Central Institute of Mining & Fuel Research
Carbon Equivalent
Dry Film Thickness
Destructive Testing
Dye Penetrate Testing
Electronics Regional Test Laboratory
Fluid Control Research Institute
Factory Mutual
Flame Proof
Hydrogen Induced Cracking
Inspection and Test Plan
Ingress Protection
Inspection Certification
Inter Granular Corrosion
International Electro technical Commission
Japanese Electro technical Committee
Liquid Penetrate Testing
MPT/MT
MRT
MTC
MO C
NPSH
NDT
NEMA
PO
PESO
PQR
PR
PMI
PV C
QC
RT
TC
TPI or TPIA
UT
UL
VDR
WPSWPQ
XLPE
Magnetic Particle Testing
Mechanical Run Test
Material Test Certificate
Material of Construction
Net Positive Suction Head
Non Destructive Testing
National Electrical Manufacturers Association
Purchase Order
Petroleum Explosive Safety Organization
Procedure Qualification Record
Purchase Requisition
Positive Material Identification
Poly Vinyl Chloride
Quality Control
Radiography Testing
Test Certificate
Third Party Inspection Agency
Ultrasonic Testing
Under writer Laboratories
Vendor Data Requirement
Welding Procedure Specification
Welders Performance Qualification
Cross Linked Poly Ethylene
Inspection Standards Committee
nvenur. r. . LDauanaiy
Members:
Mr. S.C. Gupta Mr. RK Singh Mr. MP Jain (Projects)
Mr. G. Suresh Mr. Rajeev Kumar Mr. G. Poomachandra Rao
Format No. 8 -00-0001-F7 Rev . 0
Copyright EIL — AII rights reserved
7/28/2019 6-81-1043 Rev 2
http://slidepdf.com/reader/full/6-81-1043-rev-2 3/5
fte-ziegia ENGINEERS
lt9 'Mere INDIA LIMITED
INSPECTION AND TEST PLANFO R
NEUTRAL GROUNDING RESISTOR
STANDARD SPECIFICATION NO.
6-81-1043 Rev. 2
Page 3 of 5
1.0 SCOPE
This Inspection and Test Plan covers the minimum testing & inspection requirements of Neutral Grounding Resistors.
2.0 REFERENCE DOCUMENTS
PO/PR & Standards referred there in /Job specifications / Approved documents.
3.0 INSPECTION AND TEST REQUIREMENTS
SL
N O .STAGE/ ACTIVITY CHARACTERISTICS
QUANTUM
OF CHECKRECORD
SCOPE OF INSPECTION
SU BSUPPLIER ElL/TPIA
SUPPLIER
1.0 Procedures -- -- -- -- --
2.0 Material Inspection
2.1
Incoming Material like
Stainless steel grids,
Resistors, Insulators, Bus
Bars, Bushings, Current
Transformers, Isolators,
Sheet metal, cable gland,
etc.
Visual, Dimensional, Chemical, Physical,
Dielectric properties, Review of Manufacturer's
certificates, etc. applicableest etc as a
As per
supplier's
sampling
plan
Sub-Supplier's
TC / Supplier
Test Records/
Third party lab
H H R
3.0 Inprocess Inspection
Format No. 8-00-0001-F7 Rev. 0 Copyright EIL — All rights reserved
7/28/2019 6-81-1043 Rev 2
http://slidepdf.com/reader/full/6-81-1043-rev-2 4/5
satRad dark ENIGINEERS
lg;alnleVarINDIA LIMITEDINSPE CTION AND TEST PLAN
F O RNEUTRAL GROUNDING RESISTOR
STANDARD SPECIFICATION NO.
6-81-1043 Rev. 2
Page 4 of 5
SL
N O .STAGE/ ACTIVITY CHARACTERISTICS
QUANTUM
OF CHECKRECORD
SCOPE OF INSPECTION
SU BEIL/TPIAUPPLIER
SUPPLIER
4.0 Final Inspection
4.1 NGR(Acceptance Tests)
Physical and BoM Verification.
Check calibration status of all testing
equipment.
Dimension check including Bus size,
Clearances, Creepage distances, etc.
Verification for external cable termination, Non
magnetic gland plate and size of terminals/cable
gland.
Provision of lifting hooks and grouting of NGR
Panel.
Series/parallel arrangements check of elements.Measurement of Resistance
Temperature Rise test in a proportionately sized
enclosure by passing rated current on a limited
resistor section as per specification
Temperature Rise Test on complete enclosure
for continuous duty as per specification if
specified in data sheet
Power frequency voltage (HV) withstand test
Insulation resistance before and after HV tests
Verify provision of earthing.
Space heater functioning.
100% by
supplier and
on random
basis by
Inspection testrecords
- H H
Degree of protection certificate as applicable.
4. 2Submission of certificates
/documents
Sample/Proto
type
Statutory
Approval
Certificates /
Type Test
Certificates
- H R
Copyright EIL — All rights reservedormat No. 8-00-0001-F7 Rev. 0
7/28/2019 6-81-1043 Rev 2
http://slidepdf.com/reader/full/6-81-1043-rev-2 5/5
lital &ape INDIA LIMITEDIA Gov/ Of WAS LIIIM Wor101
INSPE CTION AND TEST PLANF O R
NEUTRAL GROUNDING RESISTOR
STANDARD SPECIFICATION NO.
6-81-1043 Rev. 2
Page 5 of 5
SL
N O .STAGE/ ACTIVITY CHARACTERISTICS
QUANTUM
OF CHECKRECORD
SCOPE OF INSPECTION
SU B
SUPPLIERSUPPLIER EIL/TPIA
5.0 Painting
5.1 Painting of ResistorsPre treatment, primer and final paint, shade,
thickness100% Test records - H --
6.0 Documentation and IC
6.1 Documentation and IC
Review of Internal Test Reports and MTCs.
IC issuance -
Supplier's Test
Records /
Inspection
Certificate (IC)
- H H
Legends: H- Hold (Do not proceed without approval), Random -10% , R-Rev ew, RW-Random witness, W- Witness (Give due notice, work may proceed
aeschedueddae
NOTES (As applicable):Wherever W/R or H/W is indicated, Inspection Engineer shall decide the option to be exercised for the particular stage and supplier
In case of conflict between purchase specification, contract documents and ITP, more stringent conditions shall be applicable.
This document describes generally the requirements pertaining to all types of the item. Requirements specific to PO and the item are only applicable.
Acceptance Norms for all the activities shall be as per PO/PR/ Standards referred there in/ Job specifications /Approved documents
Format No. 8-00-0001-F7 Rev. 0