6-81-1031 Rev 2
Transcript of 6-81-1031 Rev 2
7/28/2019 6-81-1031 Rev 2
http://slidepdf.com/reader/full/6-81-1031-rev-2 1/6
ItiezIefilli ENGINEERSlelfatglir INDIA LIMITED
=AT.° (A Gat of Iota Uncienakingi
INSPECTION AND TEST PLANFO R
HIGH VOLTAGE INDUCT ION M OTORS
STANDARD SPECI F I CATI ON NO.
6-81-1031 Rev. 2
Page 1 of 6
*zetviri fic(
ffitte rr rtaTur
INSPECTION AND TEST PLAN
FORHIGH VOLTAGE INDUCTION MOTORS
• 4(VAi---
2.1-e
2 29.06 .12 Revised and Re- issued I K P R J D K C D M
1 24.12.07 Revised and Re- issued SA C R M M V KK VC
0 30.04.02 Issued fo r implementat ion R G AK C AK B G R R
Rev.N o.
Date P u r p o s ePrepared
byCh ec k ed
Standards Com mitteeConvenor
Standards BureauChai rman
byA ppro v e d by
Format No. 8 -00-0001-F7 Rev. 0 Copyright EIL — A ll r ights reserved
7/28/2019 6-81-1031 Rev 2
http://slidepdf.com/reader/full/6-81-1031-rev-2 2/6
saeziekit, E N G I N E E R S
$1 ? -9 lailegle I N D I A L I M I T E D0, God d India Undmil icd9)
INSPECTION AND TEST PLANFO R
HIGH VOLTAGE INDUCT ION MO TORS
STANDARD SPECIFICATION NO.
6-81-1031 Rev. 2
Page 2 of 6
Abbreviations
AS
BASEEFA
BIS
CCE or CCOE
CELL
CIMFR
C EDFT
DT
DPT
ERTL
FCRIFM
FLP
HICITP
IP
IC
IG C
IE C
JECLPT
Alloy Steel
British Approval Service for Electrical Equipment in Flammable
Atmospheres
Bureau of Indian Standards
Chief Controller of Explosives
Certification Engineers International Limited
Central Institute of Mning & Fuel Research
Carbon Equivalent
Dry Film Thickness
Destructive Testing
Dye Penetrate Testing
Electronics Regional Test Laboratory
Fluid Control Research InstituteFactory Mutual
Flame Proof
Hydrogen Induced Cracking
Inspection and Test Plan
Ingress Protection
Inspection Certification
Inter Granular Corrosion
International Electro technical Commission
Japanese Electro technical Committee
Liquid Penetrate Testing
MPT/MT
MRT
MTC
MO CNPSH
NDT
NEMA
PO
PESO
PQR
PR
PMIPV C
QCRT
TCTPI or TPIA
UT
UL
VDR
WPSWPQ
XLPE
: Magnetic Particle Testing
: Mechanical Run Test
Material Test Certificate
: Material of Construction
: Net Positive Suction Head
Non Destructive Testing
: National Electrical Manufacturers Association
: Purchase Order
Petroleum Explosive Safety Organization
: Procedure Qualification Record
Purchase Requisition
:
Positive Material IdentificationPoly Vinyl Chloride
Quality Control
Radiography Testing
Test Certificate
: Third Party Inspection Agency
: Ultrasonic Testing
Under writer Laboratories
Vendor Data Requirement
Welding Procedure Specification
Welders Performance Qualification
Cross Linked Poly Ethylene
Inspection Standards Committee
Convenor : Mr. A.K. Chaudhary
Memb ers :Mr. S.C. Gupta Mr. MC Singh Mr. MP Jain (Projects)
Mr. G Suresh Mr. Rajeev Kumar Mr. G Poornachandra Rao
Format No. 8 -00-0001-F7 Rev. 0
Copyright E I L — A l l rights reserved
7/28/2019 6-81-1031 Rev 2
http://slidepdf.com/reader/full/6-81-1031-rev-2 3/6
Sd1Raela. ENGINEERSz1 f Oliteeki, INDIA LIMITED
I N S PE C T I O N A N D T E S T P L A NFO R
H I G H V O L T A G E I N D U C T I O N M O T O R S
STANDARD SPECIFICATION NO.
6-81-1031 Rev. 2
Page 3 of 6
1.0 SCOPE
This Inspection and Test Plan covers the minimum testing & inspection requirements of High Voltage Squirrel Cage Induction Motors..
2.0 REFERENCE DOCUMENTS
PO/PR & Standards referred there in /Job specifications / Approved documents.
3.0INSPECTION AND TEST REQUIREMENTS
SL
N O .STAGE/ ACTIVITY CHARACTERISTICS
QUANTUM
OF CHECKRECORD
SCOPE OF INSPECTION
SU BEIL/TPIAUPPLIER
SUPPLIER
1 .0 Procedures -- -- -- -- --
2.0 Material Inspection
2.1
Raw Material like Copper,
Frame castings, Core
laminations, Insulation
material, Shaft, Cooling fans,
Cage covers, Heat Exchanger,
Lubrication system, Bearings,
CT, RTD BTD and Terminal
box, Cable glands, etc
Chemical, Physical properties , finish as per
relevant standard
Shaft - MPT & UT
100%
Material Test
Certificates /
Test records
H H/R
R
(For major
items only)
3.0 Inprocess Inspection
Vacuum impregnation and bracing of winding,
3.1 Motor Assembly
core assembly, Rotor bars and end rings assembly,
Rotor balancing, Terminal box mounting and
clearances in between, Bearing setting, Heat
Exchanger type, Lubrication system type etc as
per Supplier's internal standards
100% Test Records - H R
Copyright EIL — All rights reservedormat No. 8-00-0001-F7 Rev. 0
7/28/2019 6-81-1031 Rev 2
http://slidepdf.com/reader/full/6-81-1031-rev-2 4/6
laNze ria E N G I N E F _ R S5 9 0151eVer INDIA UMITED
3o 4) (A Cum a hda undettSungi
INSPECTION AND TEST PLANFO R
HIGH VOLTAGE INDUCT ION M OTORS
STANDARD SPECIFICATION NO.
6-81-1031 Rev. 2
Page 4 of 6
SL
NO.STAGE/ ACTIVITY CHARACTERISTICS
QUANTUM
OF CHECKRECORD
SCOPE OF INSPECTION
SUB
SUPPLIERSUPPLIER EIL/TPIA
4.0 Final Inspection
4.1 Motor (Routine Tests)
Physical, Dimensional and BoM Verification
Check calibration status of all testing
equipment.
Terminals type for Type EX-e, EX d and Type
n motors
Free rotation of Shaft, Direction of Rotation
Winding resistance
Reduced voltage starting and running at No
Load.
No load test and measurement of Voltage,
Speed, Current, WattageLocked Rotor test at reduced voltage and
measurement of Voltage, Current and
Wattage.
Insulation resistance before and After ID /
Polarization Index
High Voltage
Vibration Measurement [under no-load]
Measurement of Shaft Vibrations in case of
sleeve bearing motors.
Verification of marking of End play on Shaft
and measurement of end play, in case of
Sleeve Bearing Motors.
100% Inspection test
records
- H H/W
-.--13verring-Nuioc.
Shaft voltage
Resistance measurement of Space heaters,
RTDs and BTDs.
Operation of control panel (in case of Ex-p
motors)
Copyright El L — All rights reservedormat No. 8-00-0001-F7 Rev. 0
7/28/2019 6-81-1031 Rev 2
http://slidepdf.com/reader/full/6-81-1031-rev-2 5/6
ISO lz ta ENGINEF_RS
au&Reece? INDIA LIMITEDelem.=
INSPECTION AND TEST PLANFO R
HIGH VOLTAGE INDUCT ION M OTORS
STANDARD SPECI F I CATI ON NO.
6-81-1031 Rev. 2
Page 5 of 6
SL
NO.STAGE/ ACTIVITY CHARACTERISTICS
QUANT
OF CHECK
UMRECORD
SCOPE OF INSPECTION
SU B
SUPPLIERSUPPLIER EIL/TPIA
4.2 Motor (Type Tests)
Full load test and measurement of Voltage,
Current, Power, Slip, Power factor. Efficiency
and Pf at 100%, 75% and 50% load
Temp Rise test
Momentary overload test
Noise Level
Over speed
Measurement of Starting Torque, Starting
Current*, full Load Torque, Pull out torque
Tan delta test
Measurement of radial and axial clearance
between fan and stationary parts and
Measurement of air gap.(if provision for
measurement is not available in fully
assembled motor stage records/calculations to
be reviewed)
One sample
from each
type/rating
Inspection test
records_ H H/W
4. 3Submission of Certificates/
Documents
Test certificate from recognized testing
laboratory for area classification.
BIS certificate for FLP motors and accessories
as applicable.
CCOE/PESO approved certificates for motors
and accessories as applicable.
Fault level of Terminal Box
Degree of protection of enclosure as per latestIS/IEC Standards.
1 Machine/
Type/Rating
Statutory Body
Test
Certificates,
Supplier TestCertificates,
Inspection TestRecords
H R
Impulse test certificate for coils
Hydraulic test certificate for coolers
5.0 Painting
5.1 Painting of Motor framesPre treatment, primer and final paint,
shade, thickness100% Test records - H -
Copyright EIL — All r ights reservedormat No. 8-00-0001-F7 Rev. 0
7/28/2019 6-81-1031 Rev 2
http://slidepdf.com/reader/full/6-81-1031-rev-2 6/6
Sall i t Zlek t MENGI NEERSOW , I F titterer INDIA LIMITED
J0740 (A Govt 01100a Undenaknal
I N S PE C T I ON A N D T E S T P L A NFO R
H I G H V O L T A G E I N D U C T I O N M O T O R S
STANDARD SPEC IF ICAT ION NO .
6-81-1031 Rev. 2
Page 6 of 6
SL
N O .STAGE/ ACTIVITY CHARACTERISTICS
QUANT
OF CHECK
UMRECORD
SCOPE OF INSPECTION
SU BSUPPLIER EIL/TPIA
SUPPLIER
6.0 Documentation and IC
6.1 Documentation and ICReview of Internal Test Certificates
IC issuance100%
Supplier Test
Certificates/
Inspection
Certificate (IC)
- H H
* Measurements will be made in accordance with standard JEC (Logarithmic proportion method H)
Legends: H- Hold (Do not proceed without approval), Random -10% , R-Review, RW-Random witness, W- Witness (Give due notice, work may proceed
aeschedueddae
NOTES (As applicable):Wherever W/R or H/W is indicated, Inspection Engineer shall decide the option to be exercised for the particular stage and supplier
In case of conflict between purchase specification, contract documents and ITP, more stringent conditions shall be applicable.
This document describes generally the requirements pertaining to all types of the item. Requirements specific to PO and the item are only applicable.
Acceptance Norms for all the activities shall be as per PO/PR/ Standards referred there in/ Job specifications /Approved documents
Format No. 8 -00-0001-F7 Rev. 0
Copyright EIL — All rights reserved