8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 1/175
PPeettr r oolleeuumm DDeevveellooppmmeenntt OOmmaann ((PPDDOO)) FFaahhuudd FFaacciilliittyy
SSttaaggee II aanndd IIII BBuuiillddiinngg RRiisskk AAsssseessssmmeenntt RReeppoor r tt
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 2/175
Fahud Stage I and II BRA Report
RReeppoor r tt AAppppr r oovvaall aanndd RReevviissiioonn RReeccoor r dd Project PDO Northern Directorate BRA
Document Title Fahud Facilities Stage I and II Building Risk AssessmentReport
Client Petroleum Development Oman (PDO)
Document Number 296-3241-R02
Job Number
296-3241
Rev Date Issue Prepared Reviewed Approved
A
0
December 07
March 08
Draft
Final
Vijaya Kumar
Vijaya Kumar
John King
Laurent Depooter
Hugh Miller
Hugh Miller
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 3/175
Fahud Stage I and II BRA Report
TTaabbllee oof f CCoonntteennttss
Report Approval and Revision Record 2
Table of Contents 3
List of Tables 6
List of Figures 7
Executive Summary 8
Acronyms and Abbreviations 10
1.0
Introduction 11
2.0 Scope Of Work 12
2.1 Facilities Location 12
2.2 Fahud B Gathering Station 12
2.2.1 Facility Location 12
2.2.2 Facility History 12
2 2 3
Function of the Facility 12
2 3 F h d C G th i St ti 13
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 4/175
Fahud Stage I and II BRA Report
2.9.3
Facility Function 17
2.10 Buildings 17
2.10.1 Vulnerability of occupants 17
2.10.2 Building Types 17
2.10.3 Overpressure Damage for Building types 17
2.10.4 Overpressure damage and Vulnerability relationship 18
2.10.5 Identification of Buildings for Modelling 18
3.0
Stage I Assessment 20
3.1 Basis 20
3.2 Screening Criterion 20
3.2.1 Occupancy Screening 20
3.2.2 Functional Significance Screening 20
3.3 Stage I Results 21
4.0 Stage II Assessment Methodology 24
4.1 Hazard Identification Process 24
4.2 Major Assumptions 24
4.3 Weather Condition and Meteorological Data 24
4.4 Modelling Criteria 24
4.5 Modelling Input Data 25
4.5.1 Release Sizes and Durations 26
4.5.2 Inventory Analysis 26
4 5 3
Process Block Definition 29
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 5/175
Fahud Stage I and II BRA Report
Appendix F – Congested areas 110
Appendix G – Hazard to Building Distances 114
Appendix H – BRA II Assessment Sheets 123
Appendix I – Plot plans showing assessed buildings 165
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 6/175
Fahud Stage I and II BRA Report
LLiisstt oof f TTaabblleess
Table 2-1 – Building type descriptions ................................................................................ 17
Table 2-2 –Building list for Stage I BRA.............................................................................. 19
Table 3-1 – Stage I BRA Results ........................................................................................ 21
Table 4-1 – Impact Criteria for Flammable Gas Dispersion................................................. 25
Table 4-2 – Impact Criteria for Exposure to Hydrogen Sulphide.......................................... 25
Table 4-3 – Impact Criteria for Thermal Radiation............................................................... 25
Table 4-4 – Impact Criteria for Blast Overpressure for Stage II BRA................................... 25
Table 4-5 – Flammable characteristics ............................................................................... 28
Table 4-6 – Summary of Fahud facility congested area ...................................................... 31
Table 4-7 – Flammable dispersion summary ...................................................................... 33
Table 4-8 – Jet fire summary .............................................................................................. 35
Table 4-9 – Distance to thermal radiation impact ................................................................ 37
Table 4-10 – H2S dispersion summary................................................................................ 38
Table 4-11 – Stage II Building Identification........................................................................ 41
Table 4-12 – Summary of Stage II BRA results................................................................... 44
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 7/175
Fahud Stage I and II BRA Report
LLiisstt oof f FFiigguur r eess
Figure 2-1 – Field Layout Plan............................................................................................ 12
Figure 4-1 – Typical overpressure profile (Fahud B, CA:02)................................................ 32
Figure 4-2 – Typical flammable dispersion profile (Fahud B23)........................................... 34
Figure 4-3 – Typical Jet Fire thermal radiation contours (Fahud B23)................................. 36
Figure 4-4 – Typical toxic dispersion contours (Fahud B23)................................................ 40
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 8/175
Fahud Stage I and II BRA Report
EExxeeccuuttiivvee SSuummmmaar r yy Petroleum Development Oman (PDO) are in the process of upgrading their facilitiesacross their Northern Directorate. As a part of their Hazard ManagementProgramme, they have requested Vectra Middle East (VME) to carry out BuildingRisk Assessments (BRA) on various facilities.
The approach to the Stage I & II BRA will be standard methodology in compliance
with API 752 and API 753 to assess the risk by using specific Shell programsincluding CAM2 methodology for explosions.
This report summarises the methodologies adopted to evaluate the consequencesassociated with hazards arising from the Fahud Facilities. Outputs from theconsequence models are presented in the Appendices.
Flammable dispersion
Examination of the results demonstrates that flammable vapour clouds potentially
impact every single building under 1.5F wind category. This is expected for buildingsthat are within a facility handling large volumes of flammable gas.
The distances reported for indoor concentrations of 0.25 LFL are based upon anoutdoor concentration of 0.4 LFL, which is in turn based upon a building exchangerate of 2 air changes per hour and a 30-minute exposure time. This does not allow forprotective measures in place to prevent the ingress of flammable atmospheres intobuildings, such as an HVAC system.
A fl bl l d t id b ildi ill t i t th t i iti if th
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 9/175
Fahud Stage I and II BRA Report
Overall Conclusion
All buildings have the potential to be impacted outside to a flammable vapour cloudconcentration of 0.5 LFL. On the basis of 2 air changes per hour then all buildingscan also be impacted inside.
No building is potentially impacted by a toxic release to the stated criteria of 30 ppm,100 ppm and 300 ppm.
Two buildings in Nahada1, one building in Nahada2, one building in MLPS and onebuilding in Natih are impacted by 10 ppm.
It is recommended that all the buildings studied in this Stage II BRA be reviewed fortheir ability to protect the occupants from flammable gas ingress. Protection of thebuilding occupants from flammable gas ingress will also protect them from toxic gasingress.
Additionally the buildings design should be reviewed to confirm their ability towithstand the impact from thermal radiation to the level of 37.5 kW/m2 for the
durations likely given the activation times required for the Emergency ShutdownSystem.
The congested area model assessment concluded that none of the identifiedbuildings at Fahud are impacted from the overpressure
If the buildings are to be used for temporary refuge in a serious emergency situation,the Emergency Response Plans should be reviewed for adequacy of dealing withflammable releases within the buildings.
P t bl b ildi i
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 10/175
Fahud Stage I and II BRA Report
AAccr r oonnyymmss aanndd AAbbbbr r eevviiaattiioonnss API American Petroleum Institute
BRA Building Risk Assessment
CA Congested Area
CAM Congested Area Model
ERPG Emergency Response Planning Guideline
ESD Emergency Shut Down
FRED Fire, Release, Explosion, Dispersion.
HAZID Hazard Identification
HVAC Heating, Vacuum, Air Conditioning
ID Immediate dilution
KO Knock Out
LFL Lower Flammable Limits
LRVC Liquid Ring Vacuum Compressor
MCF Multi-Component Flowmeter
MLPS Main Line Pumping Station
MPFM M lti Ph Fl t
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 11/175
Fahud Stage I and II BRA Report
1.0 Introduction
Petroleum Development Oman (PDO) have requested Vectra Middle East (Vectra) tocarry out a Building Risk Assessment (BRA) Stages I and II on the Fahud Facilities inthe Northern Directorate. This BRA will include the following facilities:
o Fahud B
o Fahud C
o Fahud D
o Fahud E
o Fahud F
o Fahud MLPS & NOCS
o Nahada I & Nahada II
o Natih
BRAs are normally carried out in three stages and this, being the Stage II BRAfocuses on the consequence assessment including Congested Area Modelling(CAM2).
The hazards associated with each zone within the Fahud facilities are dependent onthe hazardous inventories within that zone. These inventories, hence the hazards tobe modelled, are defined and supplemented by a detailed inventory calculation.
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 12/175
Fahud Stage I and II BRA Report
2.0 Scope Of Work
2.1 Facilities Location
The Fahud B, Fahud C, Fahud D, Fahud E, Fahud F, Fahud MLPS - NOCS, Nahada1, Nahada 2 and Natih stations are part of the North Oman (Fahud) operating area.
See Figure 2-1 for field facilities location details.Figure 2-1 – Field Layout Plan
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 13/175
Fahud Stage I and II BRA Report
The Solar compressors discharge gas into the HP Grid at a pressure ofapproximately 4800 kPa. Gas lift and gas injection at B Station are supplied from theHP Gas Grid.
The Demag blowers compress the remaining gas to a pressure of 276 kPa. This gasis routed via the LP Grid to F Station.
2.3 Fahud C Gathering Station
2.3.1 Facility Location
The station is located 1.7 km west of the Fahud MLPS.
2.3.2 Facility History
Oil and gas production from the Fahud-C area started in 1969. The present facilityconfiguration of manifolds, separators and gas compressors was established in 1982.
2.3.3 Facility Function
The Fahud-C Gathering station gathers the oil, gas and water produced from wells inthe Fahud-C area. The oil water emulsion is evacuated to Fahud MLPS. Gas iscompressed and fed either into the H.P grid or partly exported as L.P gas to Fahud-FGas Compression Station through blowers.
2.4 Fahud D Gathering Station
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 14/175
Fahud Stage I and II BRA Report
2.5.3 Facility Function
Well fluids enter Fahud E Station via individual flowlines into on-plot manifolds. Thewell fluids are then distributed between four 2-phase Production Separators. Two 3-phase Test Separators and one multiphase flow metering unit are provided for testingof individual wells. The liquid discharging from the bulk and test separators andMPFM is fed into three atmospheric surge tanks. The liquid leaving these tanks ispumped by centrifugal pumps to Fahud MLPS. The gas discharging from theproduction/test separators is preferentially fed to two gas turbine driven Solarcompressors, the remaining excess gas being directed to two electrically drivenDemag blowers. The Solar compressors discharge gas into the HP Grid at apressure of approximately 4200 kPa. Gas lift and gas injection at E Station aresupplied from the HP Gas Grid. The Demag blowers compress the remaining gas toa pressure of 276 kPa. This gas is routed to F station.
2.6 Fahud F Gathering Station
2.6.1 Facility Location
The Fahud F Compression Station is part of the North Oman operating area and isapproximately 250 km WSW of Mina Al Fahal.
2.6.2 Facility History
Oil and gas production from the Fahud field started in 1967. The Fahud FCompression Station was completed in 1982/83 with three compressors. The station
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 15/175
Fahud Stage I and II BRA Report
2.7.3 Facility Function
Fahud NOCS (CSP) plant receives dehydrated “live” crude from Yibal and Lekhwairthrough MLPS/NOCS manifold system. The wet crude from Natih and Fahud isdehydrated in the six dehydration tanks at MLPS before pumping into the NOCSinlet.
The whole of the North Oman crude is stabilized at the CSP using Liquid RingVacuum Compressor (LRVC) to control the sub-atmospheric true vapour pressure of
the crude oil stream flowing out of Fahud to MAF. This is necessary to provideprotection to the floating roof storage tanks at MAF. The MAF tanks receive stabilizedcrude from the both Qarn Alam VFP and Fahud CSP through Nahada pumpingstation. Another objective of the overall facility is to enhance the hydrocarbonrecovery thereby reducing flaring at the interior location. Vapour pressure control ofthe incoming live crude is achieved via a single stage vacuum flash operation, whichremoves the lighter hydrocarbons from the crude stream. The flashed gas iscompressed and cooled to produce a liquid feed stream for the stabiliser column
which removes methane and ethane components. The removal of methane andethane allows retention of increased volumes of more stable propane, butane andpentane components in the liquid phase thereby increasing the overall hydrocarbonrecovery whilst maintaining the sub-atmospheric vapour pressure for safe storage,thus it meets both objectives.
The off gas from the overall process plant is primarily fed to the Fahud Power Plantas fuel, in order to ensure its operational integrity.
Prior to the current project B.I. No. 94.032F (Fahud Fuel Gas System) was approved
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 16/175
Fahud Stage I and II BRA Report
receiving temperature. The lighter gases from the stabiliser top are routed either toFahud Power Plant as fuel or to an air assisted elevated flare system.
2.8 Fahud Nahada 1 & Nahada 2 Booster Stations
2.8.1 Facility Location
The Nahada-1 and Nahada-2 Booster Stations are located at the confluence of the
Fahud and Qarn Alam streams of the main oil line at 80 Km North East of FahudMLPS. The Qarn Alam stream contains all the oil produced from South and CentralOman whilst the Fahud stream has the output from Northern fields.
For the purpose of identification, the old booster station is referred to as Nahada-1and the new one as Nahada-2 booster station.
Nahada-1 and Nahada-2 booster stations are located 100 m apart (fence to fence)and are designed to operate independently.
2.8.2 Facility History
The Nahada-1 Booster station was commissioned in 1981 with three gas turbinedriven booster pumps P-5501, P-5502 & P-5503 for primarily boosting Qarn Alamstream. In 1988 the facility was expanded by the addition of a fourth pump P-5504.The fifth pump P-5505 was added in 1992. A new mode of operation with Nahada-1Booster station boosting only the Fahud crude was adopted in January 1993. Thisrequired the station to operate continuously. To make the booster station morereliable a sixth pump was installed in 1994. The Nahada-2 Booster station was
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 17/175
Fahud Stage I and II BRA Report
2.9.3 Facility Function
The Natih Gathering station gathers the oil, gas and water produced from wells in theNatih area. The liquid oil with water is evacuated to Fahud MLPS and water to rigs.Gas is compressed and fed either to the gas lift header or to gas injection wellsthrough booster compressors.
2.10 Buildings
Damage categorization for buildings and vulnerability of occupants to explosionoverpressure is explained as below:
2.10.1 Vulnerability of occupants
To assess the vulnerability of occupants within a given building from explosionoverpressure, the following information is required.
o Type of building
o Overpressure relationship for each type of building
o Damage-vulnerability relationship
2.10.2 Building Types
Buildings within the facilities have a wide range of design and construction features,however, the most important is building structure. The following types of majorstructure can be found:
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 18/175
Fahud Stage I and II BRA Report
o Steel frame with metal siding, B2: The frame in this type of buildingprovides support to the roof, which is independent of walls. Information isavailable in the literature on explosion performance from war records.These records indicate that sheeting is ripped off and internal walls aredamaged at overpressures> 1.5 PSI; the building frame stands butcladding and walls are damaged at > 2.5 PSI, and complete buildingcollapse occurs at >5 PSI
o Brick, un-reinforced masonry, B3: This type of building is similar todomestic /small commercial buildings. The walls collapse about 1.0 PSIand total building collapse occurs about 1.5 PSI
o Steel or concrete frame, with masonry fill or cladding, B4: This type ofbuilding regularly suffers damage in storm conditions: however, this typeof building provides robust performance under explosion loading. Walldamage may occur at 1.0 PSI. The roof slab may collapse at 2.0 PSI andtotal building collapse at 2.5 PSI
o Blast resistant, reinforced concrete, B5: The building is generallydesigned for 2.0 PSI, so very minor damage will occur. The roof and wallswill deflect under loading and internal wall damage at about 4.0 PSI .Thebuilding has major damage and possible collapse at 6.0 PSI
2.10.4 Overpressure damage and Vulnerability relationship
Assumptions on the relationship between damage and vulnerability of occupants(probability of fatality) were derived from several sources. The following general data
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 19/175
Fahud Stage I and II BRA Report
Table 2-2 –Building list for Stage I BRA
Bldg ID Name of Building Area #
1 Booster pump 2 CR Nahada 2
2 Switch room 2 Nahada 2
3 Booster pumps CR 1 Nahada 1
4 Switch room 1 Nahada 1
5 Police station across the road Nahada 1
6 Government gas control room Nahada 1
7 CCR Natih
8 Rest room Natih
9 Old mess (tool storeroom) Natih
10 Electric switch room Natih
11 Instruments/switch room next to CCR Natih
12 CCR MLPS
13 Substation MLPS
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 20/175
Fahud Stage I and II BRA Report
3.0 Stage I Assessment
3.1 Basis
API 752 [1] provides a methodology for identifying buildings on a process plant thatare potentially at risk from hydrocarbon releases. The hazard associated withindividual releases may manifest itself as a vapour cloud explosion, fire hazard or
generation of a flammable or toxic cloud.
The standard requires that a building risk assessment be undertaken in three distinctstages involving, identification of buildings at risk, potential consequences resultingfrom credible releases and finally, a risk assessment.
3.2 Screening Criterion
3.2.1 Occupancy Screening
A stage-two building evaluation is required if a building is considered occupied. Abuilding is considered occupied, for the purposes of occupancy screening, if thebuilding occupancy load is 300 or more man-hours per week or if, during peakoccupancy, 5 people or more are routinely expected in the building for at least onehour.
3.2.2 Functional Significance Screening
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 21/175
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 22/175
Fahud Stage I and II BRA Report
Report Number: 296-3241-R02
Revision: 0
March 2008
Page 22 of 175
Location Input
Bldg
ID Name of Building Area #
Peak
Occupancy
Occupancy
[man hrs /week]
Occupied
Functionally
Significant
Building
Type BRA II ?
13 Substation MLPS 2 14 No Yes B4 Yes
14 Accommodation buildings MLPS 40 3500 Yes No B4 Yes
15 Administration Building MLPS 100 7056 Yes No B4 Yes
16 Analyser cabinet NOCS 1 2 No No B1 No
17 Instrument building NOCS 2 14 No Yes B4 Yes
18Permit office for water inj
plant (disused)NOCS 0 0 No No B1 No
19 Water Inj Shed (disused) NOCS 0 0 No No B3 No
20 CCR-Switch room Fahud B 4 140 No Yes B4 Yes
21 CCR Fahud C 4 140 No Yes B4 Yes
22 Switch room Fahud C 2 4 No Yes B4 Yes
23 CCR Fahud F 4 70 No Yes B4 Yes
24 CCR Fahud D 5 280 Yes Yes B4 Yes
25 Switch room Fahud D 2 6 No Yes B4 Yes
26 New CR and switch room Fahud D ? 0 Yes No B4 Yes
27 New CCR Fahud E 4 140 No Yes B4 Yes
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 23/175
Fahud Stage I and II BRA Report
Report Number: 296-3241-R02
Revision: 0
March 2008
Page 23 of 175
Location Input
Bldg
ID Name of Building Area #
Peak
Occupancy
Occupancy
[man hrs /week] Occupied
Functionally
Significant
Building
Type BRA II ?
28 Old CCR/switch room Fahud E 2 6 No No B4 No
29 New switch room Fahud E 2 4 No Yes B4 Yes
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 24/175
Fahud Stage I and II BRA Report
4.0 Stage II Assessment Methodology
The Stage II Building Risk Assessment has been carried out in accordance with API752 standards.
The Major Accident Hazard events identified during the HAZID are taken forward intoBRA for evaluation of the severity of harm or damage being caused, together with thevalue judgments made concerning the significance of the results.
4.1 Hazard Identification Process
A desktop Hazard Identification (HAZID) study has been performed to identify anypotential major hazards, which may arise at the Fahud Facilities. The study wasbased upon a review of site data including plot plans, process flow diagrams andheat & mass balance data for the facilities, in conjunction with a site visit.
The HAZID output will be used as a part of the Stage II BRA for the Fahud Facilities.The HAZID process identified hazard sources. The HAZID summary is shown in Appendix B of this report.
4.2 Major Assumptions
The consequence modelling for hazards associated with explosions, fires, f lammablecloud, and toxic releases for Stage II BRA was carried out using Shell FRED
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 25/175
Fahud Stage I and II BRA Report
Impact criteria have been specified in the Method Statement and were agreed withPDO. The criteria are summarized in Table 4-1 to Table 4-4. Please note that theexplosion response largely depends on the type of building.
Table 4-1 – Impact Criteria for Flammable Gas Dispersion
Flammable limit Impact
0.5 LFL Outdoor limit
0.25 LFL Indoor limit
Table 4-2 – Impact Criteria for Exposure to Hydrogen Sulphide
H2S Concentration (ppm) Impact
10 Alarm level for H2S detectors
30 ERPG-2 threshold (for 60 min exposure)
100 Indicative of 1% fatality (for 30 min exposure)300 For information only
Table 4-3 – Impact Criteria for Thermal Radiation
Thermal Flux (kW/m2) Impact
37.5 Indicative of total asset loss (100% fatality)
12.5 Indicative of piloted ignition for susceptible
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 26/175
Fahud Stage I and II BRA Report
been obtained from the Process Flow Schemes, Process Engineering Flow Schemesand accompanying mass balances provided by and is documented in the inventorycalculations.
4.5.1 Release Sizes and Durations
The effect of inventory isolation has been considered in assessing the impact ofhazards. The isolation consists of shutdown of pumps and closure of isolation valves.
To model this, the consequence assessments are required to consider scenarios forcases where isolation has occurred. This will have a time factor associated with itdue to detection time (by fire or gas detectors, instruments or by operators), action(manual remote operation by the control room) and the shutdown of pumps andclosure of valves.
For the Stage II BRA, only large releases and ruptures are considered (full borerupture for pipes up to 6” diameter and 6” diameter holes for pipes larger than 6“diameter), ESD is assumed to have occurred 2 minutes after a potential release.
In general a release from a liquid system will be at its worst case early in a release.The effects distances tend to reach their equilibrium condition relatively quickly, afterwhich time the pressure has quickly subsided, and then equilibrium distances reduceas the source of material for release reduces.
To model a liquid release the volume available for release was calculated by themaximum flow release (peak pressure) for 2 minutes. The purpose of this is tosimulate the fact that the impact reduces with time. It also represents a release at its
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 27/175
Fahud Stage I and II BRA Report
release. Inclusion of water in the model leads to problems with the software, andinaccurate results, or no results are produced.
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 28/175
Fahud Stage I and II BRA Report
Table 4-5 – Flammable characteristics
Facility Stream No LFL, ppm 0.4 LFL, ppm 0.5 LFL, ppm
Fahud B SER B 36267 14506.8 18133.5
Fahud B B2 15504 6201.6 7752
Fahud B B 31 12304 4921.6 6152
Fahud B B 23 41196 16478.4 20598
Fahud B B 23A 41196 16478.4 20598
Fahud C NWRC 36570 14628 18285
Fahud C C2 15504 6201.6 7752
Fahud C C23 41196 16478.4 20598
Fahud D NWRD 36570 14628 18285
Fahud D D2 15504 6201.6 7752
Fahud D D31 12304 4921.6 6152
Fahud D D23 41196 16478.4 20598
Fahud E NWRE 36267 14506.8 18133.5
Fahud E E2 15504 6201.6 7752
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 29/175
Fahud Stage I and II BRA Report
Facility Stream No LFL, ppm 0.4 LFL, ppm 0.5 LFL, ppm
Fahud Nahada 1 4 12909 5163.6 6454.5
Fahud Nahada 2 3 12909 5163.6 6454.5
Fahud Natih 1A 36570 14628 18285
Fahud Natih 2A 36570 14628 18285
Fahud Natih 3A 41196 16478.4 20598Fahud Natih 4A 41196 16478.4 20598
Fahud Natih 5A 12304 4921.6 6152
Fahud Natih 6A 12304 4921.6 6152
Note that 0.4 LFL is the target outdoor concentration to obtain an indoorconcentration of 0.25 LFL, given a building exchange rate of 2 air changes per hour
and an exposure time of 30 minutes.Stream numbers shown relate to stream numbers on mass balance data sheetsprovided.
4.5.3 Process Block Definition
Each inventory was divided into suitably sized process blocks. Each process blockwas defined by the following:
o
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 30/175
Fahud Stage I and II BRA Report
on the objects contained within the congested area. This congestion isspecified as a number of rows (grids) of obstacles of specified blockage inany one dimension. Appropriate number of grids for each congested areabased on the plot plan and information provided
o Blockage Ratio – The blockage ratio is the blockage on a 2D aspect (floorarea). The higher the ratio the more obstacles that are present on thefloor plan such as walls and equipment. The blockage ratio makesallowance for the drag influence. The higher the blockage ratio the higher
the drag influences. Typically smooth edged obstacles have less of a drageffect than sharp ones. Blockage ratios for each congested area areselected based on the plot plan and experience of performing similarstudies
o Obstacle Complexity – Obstacles have an effect on a gas explosion in twoprincipal ways. Firstly, as gas flows past an obstacle it generatesturbulence. Turbulence increases the burning rate of the gas. The secondis that the obstacles distort the flames, which distorts and potentiallyincrease the area affected by the explosion. There are 4 levels, these are:
1. Idealised arrangements of equipment, symmetrical and similarin diameter or very few obstacles, which may or may not be inan idealised arrangement.
2. More complex than level 1. Obstacles of varying size by anorder of magnitude.
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 31/175
Fahud Stage I and II BRA Report
4.5.5 Calculation of distance between buildings and hazard sources
The distance between the process blocks and the buildings and distance betweenthe congested areas and the buildings are calculated. These can then be comparedto the calculated consequence distances to establish if there is an impact or not. Thedistance from each hazard source is calculated to the edge of each building. Thecalculated distances are presented in Appendix G.
4.6 Shell FRED
Selected inventories have been modelled using FRED V5.0 software to assess theimpact for various LFL (0.25 LFL & 0.5 LFL), and thermal radiation (12.5 kW/m2 and37.5 kW/m2) from the process blocks and over pressurisation (70 mbar, 100 mbarand 275 mbar) from congested areas. Each result of LFL and Thermal radiation fromPBs and over pressurisation from CA is calculated to see the impact on the Buildingsidentified.
4.7 Explosion CAM2 Hazard Modelling
Listed in the table below are the congested areas for Fahud facilities with theircorresponding over pressure distances for the criteria stated in Section 4.4. Theseare input into the consequence assessment model.
Table 4-6 – Summary of Fahud facility congested area
Over pressure (mbar)
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 32/175
Fahud Stage I and II BRA Report
A typical overpressure profile for the CAM assessment is presented below.Figure 4-1 – Typical overpressure profile (Fahud B, CA:02)
4.8 Fire, Flammable and Toxic Hazard Modelling
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 33/175
Fahud Stage I and II BRA Report
4.8.1 Flammable dispersion results
The following table indicates the downwind distance that will have potential to causea fire hazard.
Table 4-7 – Flammable dispersion summary
Facility Stream No0.25 LFL (indoor)
(m)0.5 LFL (outdoor)
(m)
Fahud B SER B 120 95
Fahud B B2 150 115
Fahud B B31
Fahud B B23 184 140
Fahud B B23 A 50 44
Fahud C NWRC 120 91
Fahud C C2 150 115
Fahud C C23 185 140
Fahud D NWRD 120 90
Fahud D D2 150 115
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 34/175
Fahud Stage I and II BRA Report
Facility Stream No 0.25 LFL (indoor)(m)
0.5 LFL (outdoor)(m)
Fahud Nahada 1 4 1199 979
Fahud Nahada 2 3 1199 979
Fahud Natih 1A 80 65
Fahud Natih 2A 60 50
Fahud Natih 3A 204 155
Fahud Natih 4A 364 239
Fahud Natih 5A
Fahud Natih 6A 1339 1039
Note: Outdoor limit for flammable gas dispersion is 0.5 LFL.
Indoor limit for flammable gas dispersion is 0.25 LFL.Target outdoor concentration to achieve indoor concentration of 0.25 LFL is 0.4 LFLNote that B31, D31, E31, F26, 11B and 5Aare stabilised crude and the FREDdispersion model did not generate flammable dispersion distances.Note that 5B, 14 and 15 are low pressure so the FRED dispersion model did notgenerate flammable dispersion distances.
A typical dispersion profile is presented in the figure below:
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 35/175
Fahud Stage I and II BRA Report
4.8.2 Thermal radiation results
Jet flames
The following table reports the flame length calculated for each of the identifiedinventories. All the results are for a 6” release as all identified process blocks havepipes of 6” or greater.
Table 4-8 – Jet fire summary
Facility StreamNo
Flame length (m) Surface emissivepower (KW/m2)
Fahud B SER B 41 247
Fahud B B2 23 205
Fahud B B31 64 141
Fahud B B23 54 252
Fahud B B23 A 18 217
Fahud C NWRC 41 247
Fahud C C2 23 205
Fahud C C23 54 252
Fahud D NWRD 41 247
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 36/175
Fahud Stage I and II BRA Report
Facility StreamNo
Flame length (m) Surface emissivepower (KW/m2)
Fahud MLPS and NOCS 18 143 192
Fahud Nahada 1 4 155 197
Fahud Nahada 2 3 155 197
Fahud Natih 1A 28 243
Fahud Natih 2A 22 230
Fahud Natih 3A 57 253
Fahud Natih 4A 69 249
Fahud Natih 5A 126 184
Fahud Natih 6A 137 189
Note: The flame length (of frustum) is the length of flame where gas is burning, inmetres.
The surface emissive power is the amount of heat radiated from the surface of theflame.
A typical jet flame is presented in the following figure showing the radiation contoursof interest (12.5 and 37.5 kW/m2) as well as lower thermal radiation contours (notused in the assessment).
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 37/175
Fahud Stage I and II BRA Report
not input into the model. The representative mixtures are presented in Appendix D. All C7+ components are input into the model as heptane. The outcome of theanalysis is that all potential liquid releases will have a jet fire and concomitant poolfire. The jet fire is deemed the most far reaching, and hence has the greatest impactin the context of this assessment.
Thermal radiation Summary
The distances to thermal radiation contours of interest are reported in the followingtable. The effects distances are reported for 1.5F though wind speed and stabilitycategory has little impact on jet flames.
Table 4-9 – Distance to thermal radiation impact
Downwind distance (metres)Facility Stream No
12.5 kW/m2 37.5 kW/m2
Fahud B SER B 84 73
Fahud B B2 37 32
Fahud B B31 164 113
Fahud B B23 111 97
Fahud B B23 A 164 113
Fahud C NWRC 83 73
Fahud C C2 37 32
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 38/175
Fahud Stage I and II BRA Report
Downwind distance (metres)Facility Stream No
12.5 kW/m2 37.5 kW/m2
Fahud MLPS and NOCS 14 171 119
Fahud MLPS and NOCS 15 184 144
Fahud MLPS and NOCS 18 262 205
Fahud Nahada 1 4 281 217Fahud Nahada 2 3 281 225
Fahud Natih 1A 57 50
Fahud Natih 2A 40 35
Fahud Natih 3A 118 103
Fahud Natih 4A 141 121
Fahud Natih 5A 233 171
Fahud Natih 6A 253 183
4.8.3 Toxic dispersion results
Even though Fahud facilities contain no H2S, 0.01 percent of H2S is assumed forsome streams to demonstrate the dispersion distance in case of toxic release.
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 39/175
Fahud Stage I and II BRA Report
Downwind distance (metres)Facility Stream No H2S 10
ppmH2S 30
ppmH2S 100
ppmH2S 300
ppm
Fahud D NWRD 12 3 ID -
Fahud D D2
Fahud D D31
Fahud D D23 19 5 ID -
Fahud E NWRE 12 3 ID -
Fahud E E2
Fahud E E23 19 5 ID -
Fahud E E31
Fahud F A 16 4 ID -
Fahud F F26
Fahud F B
Fahud MLPS and NOCS 11B
Fahud MLPS and NOCS 1
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 40/175
Fahud Stage I and II BRA Report
Figure 4-4 – Typical toxic dispersion contours (Fahud B23, 30 and 100 ppm)
Figure 4-5– Typical toxic dispersion contours (Fahud B23, 10 and 300 ppm)
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 41/175
Fahud Stage I and II BRA Report
4.9 Stage II BRA Results and Discussion
The buildings identified for inclusion in the Stage II BRA are listed below. Theseoriginate from the screening process outlined in Table 3-1. Not that additionalbuilding s have been included in the Stage 2 assessment that were not included inthe Stage 1 assessment (buildings 30 to 41).
Table 4-11 – Stage II Building Identification
Bldg ID Name of Building FacilityBuilding
constructiontype
1 Booster pump 2 CR Fahud Nahada 2 B4
2 Switch room 2 Fahud Nahada 2 B4
3 Booster pumps CR 1 Fahud Nahada 1 B4
4 Switch room 1 Fahud Nahada 1 B4
5 Police station across the road Fahud Nahada 1 B4
7 CCR Fahud Natih B4
8 Rest room Fahud Natih B3
9 Old mess (tool storeroom) Fahud Natih B1
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 42/175
Fahud Stage I and II BRA Report
Bldg ID Name of Building FacilityBuilding
constructiontype
26 New CR and switch room Fahud D B4
27 New CCR Fahud E B4
28 Old CCR/switch room Fahud E B4
29 New switch room Fahud E B4
30 Main office Bldg (A)Fahud MLPS and
NOCSB4
31 New Control Bldg (B)Fahud MLPS and
NOCSB4
32 Generator Bldg (C)Fahud MLPS and
NOCS
B4
33Control room (D)
Fahud MLPS andNOCS
B4
34 Electrical switch room (E)Fahud MLPS and
NOCSB4
35 New switch room (F)Fahud MLPS and
NOCSB4
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 43/175
Fahud Stage I and II BRA Report
The numbers in each of the boxes represents the number of hazard sources thatcould impact the buildings: (e.g. ‘0’ indicates no sources are impacted to that buildingfrom any sources, and ‘9’ indicated there are 9 sources which are potentially affectingthat building).
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 44/175
Fahud Stage I and II BRA Report
Report Number: 296-3241-R02
Revision: 0
March 2008
Page 44 of 175
Table 4-12 – Summary of Stage II BRA results
Facility
Bldg
ID Label
Build
ingType
0.25
LFL (Indoor)
0.5 LFL
(Outdoor)
10
ppmH2S
30
ppmH2S
100
ppmH2S
300
ppmH2S
12.5
Kw/m2
37.5
Kw/m2
70mbar
overpressure
100mbar
overpressur e
275mbar
overpressure
FahudNahada 2
1 Booster pump 2 CR B4 4 4 1 0 0 0 4 4 0 0 0
FahudNahada 2
2 Switch room 2 B4 4 4 0 0 0 0 4 4 0 0 0
FahudNahada 1
3 Booster pumps CR 1 B4 6 6 1 0 0 0 6 6 0 0 0
Fahud
Nahada 1 4 Switch room 1 B4 6 6 2 0 0 0 6 6 0 0 0
FahudNahada 1
5Police station across
the roadB4 6 6 0 0 0 0 6 0 0 0 0
Fahud Natih 7 CCR B4 13 11 0 0 0 0 13 13 0 0 0
Fahud Natih 8 Rest room B3 11 11 0 0 0 0 13 13 0 0 0
Fahud Natih 9Old mess (tool
storeroom)B1 11 11 0 0 0 0 13 13 0 0 0
Fahud Natih 10 Electric switch room B4 17 13 2 0 0 0 10 5 0 0 0
Fahud Natih 11 Instruments/switchroom next to CCR
B4 11 11 0 0 0 0 13 13 0 0 0
FahudMLPS and
12 CCR (12) (MLPS) B4 10 7 0 0 0 0 7 4 0 0 0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 45/175
Fahud Stage I and II BRA Report
Report Number: 296-3241-R02
Revision: 0
March 2008
Page 45 of 175
FacilityBldgID
LabelBuilding
Type
0.25LFL (Indoor)
0.5 LFL(Outdoor)
10ppmH2S
30ppmH2S
100ppmH2S
300ppmH2S
12.5Kw/m2
37.5Kw/m2
70mbarover
pressu
re
100mbarover
pressur
e
275mbarover
pressure
NOCS
FahudMLPS and
NOCS13
Substation (13)(MLPS)
B4 10 10 2 0 0 0 7 4 0 0 0
FahudMLPS and
NOCS
14 Accommodation
buildings (14) (MLPS)B4 10 4 0 0 0 0 4 4 0 0 0
FahudMLPS and
NOCS
15 Administration
Building (15) (MLPS)B4 10 10 0 0 0 0 7 7 0 0 0
FahudMLPS and
NOCS17
Instrument building(17) (NOCS)
B4 14 14 0 0 0 0 20 13 0 0 0
Fahud B 20CCR / Switch room
(20)B4 8 8 0 0 0 0 10 10 0 0 0
Fahud C 21 CCR (21) B4 9 9 0 0 0 0 7 7 0 0 0
Fahud C 22 Switch room (22) B4 9 9 0 0 0 0 7 7 0 0 0
Fahud F 23 Control Room (23) B4 4 4 0 0 0 0 7 4 0 0 0Fahud D 24 CCR (24) B4 9 9 0 0 0 0 9 9 0 0 0
Fahud D 25 Switch room (25) B4 9 9 0 0 0 0 9 9 0 0 0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 46/175
Fahud Stage I and II BRA Report
Report Number: 296-3241-R02
Revision: 0
March 2008
Page 46 of 175
FacilityBldgID
LabelBuilding
Type
0.25LFL (Indoor)
0.5 LFL(Outdoor)
10ppmH2S
30ppmH2S
100ppmH2S
300ppmH2S
12.5Kw/m2
37.5Kw/m2
70mbarover
pressu
re
100mbarover
pressur
e
275mbarover
pressure
Fahud D 26New CR and switch
room (26)B4 9 8 0 0 0 0 7 6 0 0 0
Fahud E 27 New CCR (27) B4 9 9 0 0 0 0 7 6 0 0 0
Fahud E 28Old CCR/switch room
(28)B4 9 9 0 0 0 0 8 7 0 0 0
Fahud E 29 New switch room (29) B4 9 9 0 0 0 0 6 5 0 0 0
FahudMLPS and
NOCS
30 Main office Bldg (A) B4 10 7 0 0 0 0 8 4 0 0 0
FahudMLPS and
NOCS
31 New Control Bldg (B) B4 10 10 0 0 0 0 10 7 0 0 0
FahudMLPS and
NOCS32 Generator Bldg (C) B4 11 10 0 0 0 0 20 11 0 0 0
FahudMLPS and
NOCS33 Control room (D) B4 14 14 0 0 0 0 17 13 0 0 0
FahudMLPS and
NOCS34
Electrical switch room(E)
B4 14 14 0 0 0 0 13 13 0 0 0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 47/175
Fahud Stage I and II BRA Report
Report Number: 296-3241-R02
Revision: 0
March 2008
Page 47 of 175
FacilityBldgID
LabelBuilding
Type
0.25LFL (Indoor)
0.5 LFL(Outdoor)
10ppmH2S
30ppmH2S
100ppmH2S
300ppmH2S
12.5Kw/m2
37.5Kw/m2
70mbarover
pressu
re
100mbarover
pressur
e
275mbarover
pressure
FahudMLPS and
NOCS
35 New switch room (F) B4 14 14 0 0 0 0 17 13 0 0 0
FahudMLPS and
NOCS
36WIP Control Bldg (G)
(demolished)B4 14 13 0 0 0 0 20 12 0 0 0
FahudMLPS and
NOCS
37 Unknown Bldg (H) B4 10 7 0 0 0 0 10 4 0 0 0
FahudMLPS and
NOCS38 Unknown Bldg (I) B4 10 4 0 0 0 0 7 1 0 0 0
FahudMLPS and
NOCS39 Unknown Bldg (J) B4 8 4 0 0 0 0 3 1 0 0 0
FahudMLPS and
NOCS
40 Unknown Bldg (K) B4 4 4 0 0 0 0 0 0 0 0 0
FahudMLPS andNOCS
41 RO building B4 13 12 0 0 0 0 24 13 0 0 0
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 48/175
Fahud Stage I and II BRA Report
4.9.1 Flammable dispersion
Examination of the results demonstrates that flammable vapour clouds potentiallyimpact every single building under 1.5F wind category. This is expected for buildingsthat are within a facility handling large volumes of flammable gas.
The distances reported for indoor concentrations of 0.25 LFL are based upon anoutdoor concentration of 0.4 LFL, which is in turn based upon a building exchangerate of 2 air changes per hour and a 30-minute exposure time. This does not allow for
protective measures in place to prevent the ingress of flammable atmospheres intobuildings, such as an HVAC system.
A flammable cloud outside a building will not impact the occupants upon ignition if thebuilding is designed to protect against the ingress of flammable gas and the buildingcan withstand the flash fire.
4.9.2 Toxic dispersion
Even though Fahud facilities contain no H2S, 0.01 percent of H2S is assumed forsome streams to demonstrate the dispersion distance in case of toxic release.
No building is potentially impacted by a toxic release to the stated criteria of 30 ppm,100 ppm and 300 ppm.
Two buildings in Nahada1, one building in Nahada2, one building in MLPS and onebuilding in Natih are potentially impacted by 10 ppm.
4.9.3 Thermal radiation
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 49/175
Fahud Stage I and II BRA Report
5.0 Conclusion
Overall Conclusion
All buildings have the potential to be impacted outside to a flammable vapour cloudconcentration of 0.5 LFL. On the basis of 2 air changes per hour then all buildingscan also be impacted inside.
Toxic dispersion could not impact any of the identified buildings.
It is recommended that all the buildings studied in this Stage II BRA be reviewed fortheir ability to protect the occupants from flammable gas ingress. Protection of thebuilding occupants from flammable gas ingress will also protect them from toxic gasingress, event though toxicity is concluded not to be an issue here.
Additionally the buildings design should be reviewed to confirm their ability towithstand the impact from thermal radiation to the level of 37.5 kW/m2 for thedurations likely given the activation times required for the Emergency Shutdown
System.The congested area model assessment concluded that none of the identifiedbuildings at Fahud are impacted from the overpressure.
If the buildings are to be used for temporary refuge in a serious emergency situation,the Emergency Response Plans should be reviewed for adequacy of dealing withflammable releases within the buildings.
Portable buildings issue:
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 50/175
Fahud Stage I and II BRA Report
6.0 References
[1] Management of Hazards Associated with Location of Process Plant Buildings- American Petroleum Institute, API Recommended Practice 752, SecondEdition, November 2003.
[2] Management of Hazards Associated with Location of Process Plant PortableBuildings- American Petroleum Institute, API Recommended Practice 753,
First Edition, June 2007.
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 51/175
Fahud Stage I and II BRA Report
AAppppeennddiixx AA – – BBRRAA 11 RReeccoor r dd SShheeeettss
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 52/175
Fahud Stage I and II BRA Report
Stage I Building Risk Assessment
BuildingNumber
1
Area Name Nahada 2
Building NameBooster pump 2
CR
Building Type B4
BuildingStructure
1 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
7 5people?(Y/N)
Yes
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 2 7 5 70
Day Shift( k d)
0
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 53/175
Fahud Stage I and II BRA Report
Stage I Building Risk Assessment
BuildingNumber
2
Area Name Nahada 2
Building Name Switchroom 2
Building Type B4
BuildingStructure
1 storey
Engineer: LGJD
Date:
PeakOccupancy(for at leastone hour):
3 5people?(Y/N)
No
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 2 7 0.5 7
Day Shift(weekend)
0
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 54/175
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 55/175
Fahud Stage I and II BRA Report
Stage I Building Risk Assessment
BuildingNumber
4
Area Name Nahada 1
Building Name Switchroom 1
Building Type B4
BuildingStructure
1 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
3 5people?(Y/N)
No
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 2 7 0.5 7
Day Shift(weekend)
0
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 56/175
Fahud Stage I and II BRA Report
Stage I Building Risk Assessment
BuildingNumber
5
Area Name Nahada 1
Building NamePolice station
across the road
Building Type B4
Building
Structure
1 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
6 5people?(Y/N)
Yes
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
0
Day Shift0
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 57/175
Fahud Stage I and II BRA Report
Stage I Building Risk Assessment
BuildingNumber
6
Area Name Nahada 1
Building NameGovernment gas
control room
Building Type B2
Building
Structure
1 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
2 5people?(Y/N)
No
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 2 1 1 2
Day Shift0
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 58/175
Fahud Stage I and II BRA Report
Stage I Building Risk Assessment
BuildingNumber
7
Area Name Natih
Building Name CCR
Building Type B4
BuildingStructure
1 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
10 5people?(Y/N)
Yes
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 4 7 10 280
Day Shift(weekend)
0
F h d S I d II BRA R
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 59/175
Fahud Stage I and II BRA Report
Stage I Building Risk Assessment
BuildingNumber
8
Area Name Natih
Building Name Rest room
Building Type B3
BuildingStructure
1 storey
Engineer: LGJD
Date: 29/08/2007
PeakOccupancy (forat least onehour):
10 5people?(Y/N)
Yes
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 4 7 1 28
Day Shift(weekend)
0
F h d St I d II BRA R t
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 60/175
Fahud Stage I and II BRA Report
Stage I Building Risk Assessment
BuildingNumber
9
Area Name Natih
Building NameOld mess (tool
storeroom)
Building Type B1
BuildingStructure
1 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
10 5people?(Y/N)
Yes
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 10 7 2 140
Day Shift0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 61/175
Fahud Stage I and II BRA Report
Stage I Building Risk Assessment
BuildingNumber
10
Area Name Natih
Building NameElectric
switchroom
Building Type B4
BuildingStructure
1 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
2 5people?(Y/N)
No
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 2 3 1 6
Day Shift( k d)
0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 62/175
Fahud Stage I and II BRA Report
Stage I Building Risk Assessment
BuildingNumber
11
Area Name Natih
BuildingName
Instruments/switchroomnext to CCR
Building Type B4
BuildingStructure
1 storey
Engineer: LGJD
Date:
PeakOccupancy(for at leastone hour):
2 5people?(Y/N)
No
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 2 3 1 6
Day Shift0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 63/175
Fahud Stage I and II BRA Report
Stage I Building Risk Assessment
BuildingNumber
12
Area Name MLPS
Building Name CCR
Building Type B4
BuildingStructure
1 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
6 5people?(Y/N)
Yes
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 2 5 8 80
Day Shift(weekend)
0
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 64/175
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 65/175
Fahud Stage I and II BRA Report
Stage I Building Risk Assessment
BuildingNumber
14
Area Name MLPS
Building Name Accomodation
buildings
Building Type B4
BuildingStructure
2 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
40 5people?(Y/N)
Yes
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 10 7 10 700
Day Shift0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 66/175
Fahud Stage I and II BRA Report
Stage I Building Risk Assessment
BuildingNumber
15
Area Name MLPS
Building Name Administration
Building
Building Type B4
BuildingStructure
2 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
100 5people?(Y/N)
Yes
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 80 7 12 6720
Day Shift0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 67/175
g p
Stage I Building Risk Assessment
BuildingNumber
16
Area Name NOCS
Building Name Analyser cabinet
Building Type B1
BuildingStructure
1 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
1 5people?(Y/N)
No
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 1 3 0.5 1.5
Day Shift(weekend)
0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 68/175
g p
Stage I Building Risk Assessment
BuildingNumber
17
Area Name NOCS
Building Name Instrument building
Building Type B4
BuildingStructure
1 storey
Engineer: LGJD
Date:
PeakOccupancy(for at leastone hour):
2 5people?(Y/N)
No
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 2 7 1 14
Day Shift(weekend)
0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 69/175
Stage I Building Risk Assessment
BuildingNumber
18
Area Name NOCS
Building NamePermit office forwater inj plant
(disused)
Building Type B1
BuildingStructure 1 storey
Engineer: LGJD
Date: 29/08/2007
PeakOccupancy(for at leastone hour):
5people?(Y/N)
No
Occupancy
Data
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 70/175
Stage I Building Risk Assessment
BuildingNumber
19
Area Name NOCS
Building NameWater Inj Shed
(disused)
Building Type B3
BuildingStructure
1 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
5people?(Y/N)
No
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
0
Day Shift0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 71/175
Stage I Building Risk Assessment
BuildingNumber
20
Area Name Fahud B
Building Name CCR-Switchroom
Building Type B4
BuildingStructure
1 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
4 5people?(Y/N)
No
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 2 7 10 140
Day Shift(weekend)
0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 72/175
Stage I Building Risk Assessment
BuildingNumber
21
Area Name Fahud C
Building Name CCR
Building Type B4
BuildingStructure
1 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
4 5people?(Y/N)
No
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 2 7 10 140
Day Shift(weekend)
0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 73/175
Stage I Building Risk Assessment
BuildingNumber
22
Area Name Fahud C
Building Name Switchroom
Building Type B4
BuildingStructure
1 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
2 5people?(Y/N)
No
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 2 2 1 4
Day Shift(weekend)
0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 74/175
Stage I Building Risk Assessment
BuildingNumber
23
Area Name Fahud F
Building Name CCR
Building Type B4
BuildingStructure
1 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
4 5people?(Y/N)
No
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 1 7 10 70
Day Shift(weekend)
0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 75/175
Stage I Building Risk Assessment
BuildingNumber
24
Area Name Fahud D
Building Name CCR
Building Type B4
BuildingStructure
1 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
5 5people?(Y/N)
Yes
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 4 7 10 280
Day Shift(weekend)
0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 76/175
Stage I Building Risk Assessment
BuildingNumber
25
Area Name Fahud D
Building Name Switchroom
Building Type B4
BuildingStructure
1 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
2 5people?(Y/N)
No
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 2 3 1 6
Day Shift(weekend)
0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 77/175
Stage I Building Risk Assessment
BuildingNumber
26
Area Name Fahud D
Building NameNew CR and
switchroom ???
Building Type B2
BuildingStructure
1 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
? 5people?(Y/N)
Yes
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
0
Day Shift0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 78/175
Stage I Building Risk Assessment
BuildingNumber
27
Area Name Fahud E
Building Name New CCR
Building Type B4
BuildingStructure
1 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
4 5people?(Y/N)
No
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 2 7 10 140
Day Shift(weekend)
0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 79/175
Stage I Building Risk Assessment
BuildingNumber
28
Area Name Fahud E
Building NameOld
CCR/switchroom
Building Type B4
BuildingStructure
1 storey
Engineer: LGJD
Date:
PeakOccupancy (forat least onehour):
2 5people?(Y/N)
No
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 2 3 1 6
Day Shift( k d)
0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 80/175
Stage I Building Risk Assessment
BuildingNumber
29
Area Name Fahud E
Building Name New switchroom
Building Type B4
BuildingStructure
1 storey
Engineer: LGJDDate:
PeakOccupancy (forat least onehour):
2 5people?(Y/N)
No
OccupancyData
A B C D E
Activity orEvent
Personnel TitlesNumberof Shifts
Numberof
Peopleper Shift
WorkingDays/Week
Hours/Shiftor
Hours/Event
ManHours
perWeek
Day Shift(weekday)
1 2 2 1 4
Day Shift(weekend)
0
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 81/175
AAppppeennddiixx BB – – HHAAZZIIDD SSuummmmaar r yy
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 82/175
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 83/175
Area of concern
Facility StreamThermalradiation
Hydrocarbongas dispersion
Toxic gasdispersion
Fahud Natih 2A ü ü
Fahud Natih 3A ü ü
Fahud Natih 4A ü ü
Fahud Natih 5Aü
ü
Fahud Natih 6A ü ü ü
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 84/175
AAppppeennddiixx CC – – AAssssuummppttiioonnss SShh tt
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 85/175
In order to undertake the PDO Fahud Stage II BRA certain assumptions have to be made.
These form the rule set for the assessment.The assumptions are presented as assumption sheets, and are provided for:
001 Release coefficients
002 Isolation time
003 Hole size
004 Building exchange rates
005 Dispersion criteria
006 Toxic criteria
007 Jet flame criteria
008 Explosion criteria
009 Building pressure thresholds
010 Meteorological data
011 Surface Roughness
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 86/175
ASSUMPTION SHEET
PDO Fahud Building Risk Assessment
Assumption No.: 001 Revision: A Date: December 2007
Subject: Release coefficients
Assumption:
Discharge coefficient§ For liquids Cd=0.6§ For gases Cd=0.8§ All flows to be assumed to be from short frictionless pipes
Justification:
Recommended by the consequence modelling software and considered to be reasonable.
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 87/175
ASSUMPTION SHEET
PDO Fahud Building Risk Assessment
Assumption No.: 002 Revision: A Date: December 2007
Subject: Isolation time
Assumption:
Manual inventory isolation time assumed to be 30 minutes after start of a release. Automatic inventory isolation time assumed to be 2 minutes after start of a release. All isolations are assumed to be manual
Justification:
Conservative approximation
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 88/175
ASSUMPTION SHEET
PDO Fahud Building Risk Assessment
Assumption No.: 003 Revision: A Date: December 2007
Subject: Hole size
Assumption:
Release hole size for BRA Stage II consequence modelling shall be:
6” (150 mm) release, orFull bore rupture,
Whichever is the smaller
Justification:
Discussions with PDO
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 89/175
ASSUMPTION SHEET
PDO Fahud Building Risk Assessment
Assumption No.: 004 Revision: A Date: December 2007
Subject: Building exchange rates
Assumption:
Ventilation rate for all buildings will be taken as 2 Air Changes Per Hour (ACPH)
Justification:
In the absence of any specific information 2 ACPH is a standard ventilation rate and is thedefault value used in Shepherd.
References:
Standard approach
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 90/175
ASSUMPTION SHEET
PDO Fahud Building Risk Assessment
Assumption No.: 005 Revision: A Date: December 2007
Subject: Dispersion criteria
Assumption:
Outdoor limit for flammable gas dispersion is 0.5 LFL.
Indoor limit for flammable gas dispersion is 0.25 LFL.
Shell FRED will calculate the outdoor concentrations. The indoor concentrations will becalculated based upon building exchange rates, using the equation:
−⋅=
⋅− t
V
Q
e1CextCi
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 91/175
ASSUMPTION SHEET
PDO Fahud Building Risk Assessment
Assumption No.: 006 Revision: A Date: December 2007
Subject: Toxic criteria
Assumption:The only toxic material considered is hydrogen sulphide (H2S). Toxic end pointsconsidered are 10 ppm, 30 ppm, 100 ppm and 300 ppm (provided for information as perrequest). These are assumed as outdoor limits.
10 ppm is the concentration at which the alarms are set on site.
30 ppm is the ERPG-2 threshold for 60 minute exposure
100 ppm is indicative of 1% fatality for 30 minute exposure
Justification:
Standard Approach
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 92/175
ASSUMPTION SHEET
PDO Fahud Building Risk Assessment
Assumption No.: 007 Revision: A Date: December 2007
Subject: Jet flame criteria
Assumption:
Jet fires will be modelled to 12.5 and 37.5 kW/m2. These equate to:
Thermal Flux (kW/m2) Impact
37.5 Indicative of total asset loss (100% fatality)
12.5 Indicative of piloted ignition for susceptiblestructures (50% fatality)
Gas, liquid and 2-phase jets will be considered.
Justification:
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 93/175
ASSUMPTION SHEET
PDO Fahud Building Risk Assessment
Assumption No.: 008 Revision: A Date: December 2007
Subject: Explosion criteria
Assumption:
The CAM2 model within Shell FRED will be used.
The extent of congested regions will be determined using engineering judgement.
The area blockage ratios and number of grids will be based on the site visit andengineering judgement using the Unit Plot Plan.
Separation distances between buildings and explosion sources have been calculated fromcentre point to centre point. Average radiuses (from these points) where calculated usingvolume or area information then subtracted from the direct distance calculated point topoint. This applies to Stage II BRA – CAM only.
Justification:
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 94/175
ASSUMPTION SHEET
PDO Fahud Building Risk Assessment
Assumption No.: 009 Revision: A Date: December 2007
Subject: Building pressure thresholds
Assumption:
For Stage II assessment, the following blast resistance criteria will be used:
Building Type Impact Criteria(mbar)
Impact Description
B1 Wood Frame Trailer or
Shack
70 Isolated buildings
overturn, Roofs andwalls collapse
B2 Steel-framed/metal sidingpre-engineered
100 Sheeting ripped off,internal walls damaged;danger from fallingobjects.
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 95/175
ASSUMPTION SHEET
PDO Fahud Building Risk Assessment
Assumption No.: 010 Revision: A Date: December 2007
Subject: Meteorological data
Assumption:
Consequence analysis for the Stage II BRA will utilise F1.5 wind speed and stability only.
Temperature will be 20°CHumidity will be 70%
Pressure will be 1 bar
Justification:
Conservative (worst case) of F1.5 be used.
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 96/175
ASSUMPTION SHEET
PDO Fahud Building Risk Assessment
Assumption No.: 011 Revision: A Date: December 2007
Subject: Surface roughness
Assumption:
The surface roughness used is 0.1 m to reflect the open spaces between plant units
Justification:
Discussions with PDO
References:
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 97/175
ASSUMPTION SHEET
PDO Fahud Building Risk Assessment
Assumption No.: 013 Revision: A Date: December 2007
Subject: Study case
Assumption:
The Stage II BRA will use the worst-case streams for the study, based upon data suppliedon the Process Flow Schemes.
The worst-case material is defined first as the highest hydrogen sulphide content, and
second by the highest proportion of light hydrocarbons (methane as the most volatile).
Justification:
Ensures that the worst case is taken into account.
References:
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 98/175
ASSUMPTION SHEET
PDO Fahud Building Risk Assessment
Assumption No.: 014 Revision: B Date: December 2007
Subject: Reference drawings and documents
Assumption:
The Stage II BRA will be based upon supplied drawings. There are a variety of dates ofissue and revision numbers, drawings are assumed to be correct.
Justification:
These are the latest revisions supplied to date.
References:
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 99/175
ASSUMPTION SHEET
PDO Fahud Building Risk Assessment
Assumption No.: 015 Revision: A Date: December 2007
Subject: Pool fires
Assumption:
Pool fires are included in Stage II BRA. These are compared to the concomitant jet fire,and the greater of the two will be used in the BRA.
Justification:
Worst case approach
References:
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 100/175
AAppppeennddiixx DD – – IInnvveennttoor r yy DDaattaa
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 101/175
Facility Equipment Inventory
Compressor package B23
Compressor package B23
Oil shipping pump B31
Oil shipping pump B31
Surge tank B2
Surge tank B2
Production separator SER BProduction separator SER B
Production separator SER B
Test separator SER B
Booster compressor B23 A
Fahud B
Booster compressor B23 A
Compressor package C23
Compressor package C23
Surge tank C2
Surge tank C2
Production separator NWRC
Production separator NWRC
Production separator NWRC
Fahud C
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 102/175
Facility Equipment Inventory
Test separator NWRE
Test separator NWRE
Gas compressor A
Gas compressor A
Gas compressor A
Gas compressor A
Atm flash tank F26
LP flash tank F26
Condensate recovery pumps F26
Fahud F
Slug catcher B
Crude oil booster pumps 11B
Crude oil booster pumps 11B
Crude oil booster pumps 11B
Vacuum separators 1
Vacuum separators 1Vacuum separators 1
Liquid ring vacuum compressorpackage
5B
Liquid ring vacuum compressorpackage
5B
Liquid ring vacuum compressor
MLPS & NOCS
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 103/175
Facility Equipment Inventory
Mainline pumps 18
Mainline pumps 18
Mainline pumps 18
Mainline Pump 4
Mainline Pump 4
Mainline Pump 4
Mainline Pump 4
Mainline Pump 4
Nahada 1
Mainline Pump 4
Booster Pump 3
Booster Pump 3
Booster Pump 3Nahada 2
Booster Pump 3
Production Separator 2A
Production Separator 2AProduction Separator 2A
Test Separators 1A
Test Separators 1A
Production Separator 2A
Gas Lift Compressor 3A
G Lift C 3A
Fahud Stage I and II BRA Report
Inventory Composition
Components in stream (%)
Facility StreamPressurekPa (a)
Pressurebar (a)
Temp CM th Eth P I b t b t t h h t H S
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 104/175
Report Number: 296-3241-R02
Revision: 0
March 2008
Page 104 of 175
kPa (a) bar (a) Methane Ethane Propane Iso-butane n-butane n-pentane n-hexane n-heptane H2S
SER B 2700 26.73 60 77 8.5 5.5 1.5 2.5 2 0 3 0.01
B2 250 2.48 35 6 4 8 5 25 22 0 29 0
B 31 101 1.00 35 0 1 4 3 6 14 20 50 0
B 23 4751 47.04 30 81 9 6 1 2 1 0 0 0.01
Fahud B
B 23A 260 2.57 35 81 9 6 1 2 1 0 0 0
NWRC 2700 26.73 60 77 8.5 5 0 2.5 1.5 0 3 0.01
C2 250 2.48 35 6 4 8 5 25 22 0 29 0Fahud C
C23 4828 47.80 30 81 9 6 1 2 1 0 0 0.01
NWRD 2700 26.73 60 77 8.5 5 0 2.5 1.5 0 3 0.01
D2 250 2.48 35 6 4 8 5 25 22 0 29 0
D31 101 1.00 35 0 1 4 3 6 14 20 50 0Fahud D
D23 4773 47.26 30 81 9 6 1 2 1 0 0 0.01
NWRE 2700 26.73 60 77 8.5 5.5 1.5 2.5 2 0 3 0.01E2 250 2.48 35 6 4 8 5 25 22 0 29 0
E31 101 1.00 35 0 1 4 3 6 14 20 50 0.01Fahud E
E23 4831 47.83 30 81 9 6 1 2 1 0 0 0
A 5300 52.48 105 81 9 6 1 2 1 0 0 0.01
B 260 2.57 60 6 4 8 5 25 22 0 29 0Fahud F
F26 260 2.57 11.5 1 1 9 7 15 25 23 19 0
1 350 3.47 52 1 3 8 14 0 0 20 55 0
5B 180 1.78 60 1 20 30 20 0 0 10 10 0
11B 830 8.22 50 0 0 8 4 0 25 25 38 0
34 3100 30.69 39 81 9 6 1 2 0 0 0 0.01
24 3000 29.70 35 81 9 6 1 2 0 0 0 014 175 1.73 35 2 4 19 4 0 0 0 71 0
MLPS &NOCS
15 441 4.37 35 2 4 19 4 0 0 0 71 0
Fahud Stage I and II BRA Report
Components in stream (%)
Facility StreamPressurekPa (a)
Pressurebar (a)
Temp CMethane Ethane Propane Iso-butane n-butane n-pentane n-hexane n-heptane H2S
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 105/175
Report Number: 296-3241-R02
Revision: 0
March 2008
Page 105 of 175
18 4000 39.60 35 2 4 19 4 0 0 0 71 0.01
Nahada 1 4 6601 65.36 25 2 4 18 4 0 0 0 71 0.01
Nahada 2 3 6723 66.56 25 2 4 18 4 0 0 0 71 0.011A 1100 10.89 50 77 8.5 5 0 2.5 1.5 0 3 0.01
2A 360 3.56 50 77 8.5 5 0 2.5 1.5 0 3 0
3A 5200 51.49 30 81 9 6 1 2 1 0 0 0
4A 7300 72.28 30 81 9 6 1 2 1 0 0 0.01
5A 1800 17.82 35 0 1 4 3 6 14 20 50 0
Natih
6A 3000 29.70 35 0 1 4 3 6 14 20 50 0.01
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 106/175
AAppppeennddiixx EE – – PPr r oocceessss BBlloocckkss
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 107/175
Facility ID Number Equipment Inventory X Y
K0513 Compressor package B23 45 67
K0514 Compressor package B23 45 90
P0501 Oil shipping pump B31 51 45
P0502 Oil shipping pump B31 56 45
T0501 Surge tank B2 0 49
T0502 Surge tank B2 0 49
V0501 Production separator SER B 9 27V0502 Production separator SER B 16 27
V0503 Production separator SER B 24 27
V0516 Test separator SER B 36 30
K5001 Booster compressor B23 A 52 110
Fahud B
K5002 Booster compressor B23 A 52 125
K0516 Compressor package C23 43 15
K0517 Compressor package C23 43 25
T0504 Surge tank C2 43 69
T0505 Surge tank C2 43 79
V0510 Production separator NWRC 21 69
V0511 Production separator NWRC 21 61
V0512 Production separator NWRC 21 53
V0531 Test separator NWRC 15 40
Fahud C
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 108/175
Facility ID Number Equipment Inventory X Y
K5701 Gas compressor A 64 52
K5702 Gas compressor A 64 69K5703 Gas compressor A 64 85
K5704 Gas compressor A 64 101
V5725 Atm flash tank F26 42 20
V5724 LP flash tank F26 67 20
PC01/02 Condensate recovery pumps F26 48 20
Fahud F
A5724 Slug catcher B 105 -37
P4101 Crude oil booster pumps 11B 352 227P4102 Crude oil booster pumps 11B 324 229
P4103 Crude oil booster pumps 11B 299 231
V4101 Vacuum separators 1 347 243
V4102 Vacuum separators 1 317 245
V4103 Vacuum separators 1 294 245
K4101Liquid ring vacuum compressorpackage
5B 336 211
K4102Liquid ring vacuum compressorpackage
5B 310 213
K4103Liquid ring vacuum compressorpackage
5B 285 215
K4104 Compressor package 24 248 220
P4107 Condensate pumps 34 252 236
MLPS & NOCS
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 109/175
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 110/175
AAppppeennddiixx FF – – CCoonnggeesstteedd aar r eeaass
Fahud Stage I and II BRA Report
Fahud B
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 111/175
Area Description[Complexity]
Dimension Region Size (m) Number of Grids Blockage Ratio
Length 18 2 0.2
Width 8 3 0.3CA01
[4]Height 6 2 0.4
Area Description
[Complexity]Dimension Region Size (m) Number of Grids Blockage Ratio
Length 15 2 0.2
Width 7 3 0.3CA02
[4]Height 5 2 0.4
Fahud C
Area Description
[Complexity]Dimension Region Size (m) Number of Grids Blockage Ratio
Fahud Stage I and II BRA Report
Fahud E
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 112/175
Area Description[Complexity]
Dimension Region Size (m) Number of Grids Blockage Ratio
Length 22 3 0.2
Width 8 2 0.3CA01
[4]Height 4 3 0.4
Fahud F
Area Description
[Complexity]Dimension Region Size (m) Number of Grids Blockage Ratio
Length 16 3 0.2
Width 8 3 0.3CA01
[4]Height 6 2 0.4
MLPS & NOCS
Area DescriptionDimension Region Size (m) Number of Grids Blockage Ratio
Fahud Stage I and II BRA Report
Based on material balance and process conditions following composition was designed to
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 113/175
represent the fuel for congested area assessment.
Component Mol %
Methane 65
Ethane 20
Propane 15
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 114/175
AAppppeennddiixx GG – – HHaazzaar r dd ttoo
Fahud Stage I and II BRA Report
Process Blocks to Building Distances
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 115/175
g
Fahud B
BldgID 1
Bldg X 62
Y 16
PB ID R 8
001 45 67 45
002 45 90 68
003 51 45 23
004 56 45 21
005 0 49 62
006 0 49 62
007 9 27 46
008 16 27 39
009 24 27 31
010 36 30 21
Fahud Stage I and II BRA Report
F h d D
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 116/175
Fahud D
BldgID 1 2 3
Bldg X 6 8 51
Y 32 23 -3
PB ID R 5 6 4001 44 27 33 31 27
002 54 27 43 41 26
003 70 48 61 61 50
004 75 48 66 66 52
005 48 70 52 56 69
006 48 80 59 64 79
007 25 70 38 44 73
008 25 62 31 37 66
009 25 54 24 30 59
Fahud Stage I and II BRA Report
009 27 77 80 57 85
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 117/175
010 20 50 52 30 58
011 33 50 55 37 58
Fahud F
Bldg ID 1
Bldg X 85
Y 139PB ID R 9
001 64 52 81
002 64 69 64
003 64 85 49
004 64 101 34
005 42 20 118
006 67 20 111
007 48 20 116008 105 -37 168
MLPS & NOCS
BldgID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Fahud Stage I and II BRA Report
BldgID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 118/175
ID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Bldg X 572 447 474 539 255 597 553 569 238 218 241 310 620 643 664 706 465
Y 403 454 569 405 174 389 366 285 169 164 155 109 305 236 134 64.8 342
PB ID R 12 10 15 15 9 28 22 20 5 11 7 4 12 10 15 15 13
016 220 241 375 301 401 344 67 378 334 332 69 65 81 156 393 413 442 501 252
017 396 229 235 220 334 212 143 229 187 162 164 179 164 144 225 237 269 336 120
018 396 241 227 209 323 203 147 222 179 159 168 183 170 153 221 237 273 341 110019 396 250 221 200 314 196 152 217 174 157 172 187 174 161 219 238 277 346 103
020 396 220 242 229 343 219 140 235 193 165 161 176 161 136 228 238 266 331 128
021 396 208 250 241 355 228 137 243 201 170 158 173 157 127 232 239 263 326 138
022 405 250 214 198 312 190 160 209 166 148 181 195 182 166 210 228 269 338 97
023 412 218 233 229 343 211 155 225 183 151 176 191 175 145 214 222 250 316 123
024 456 218 206 226 338 190 197 194 156 112 218 233 217 178 174 178 209 278 112
025 456 171 247 273 384 233 193 232 196 141 213 228 208 154 200 188 196 256 158
026 500 171 230 277 384 222 236 211 180 113 257 271 252 196 168 147 153 217 162
027 500 218 187 232 338 176 240 169 136 77 261 276 259 215 137 134 169 241 117
028 546 171 221 289 390 219 283 196 173 96 303 318 299 240 141 106 108 177 176
Fahud Stage I and II BRA Report
Nahada 1
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 119/175
BldgID 1 2 3
Bldg X 11 21 -40
Y 18 27 260
PBID R 6 4 16
001 70 27 54 45 241
002 62 27 46 37 238
003 54 27 38 29 235004 78 27 62 53 245
005 86 27 70 61 249
006 94 27 78 69 252
Nahada 2
BldgID 1 2
Bldg X 134 75
Y 17 36
PB ID R 11 9
Fahud Stage I and II BRA Report
Natih
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 120/175
BldgID 1 2 3 4 5
Bldg X -14 -24 -38 54 -24
Y -83 -108 -110 67 -81
PB ID R 8 3 3 7 6
001 28 9 93 125 133 56 98
002 28 17 100 132 140 49 105
003 28 25 108 140 147 42 112
004 23 -6 77 109 117 72 83
005 24 -6 78 110 118 72 83
006 28 32 114 146 153 36 118
007 7 -43 37 69 78 112 43
008 17 -43 43 74 84 109 50
009 -52 -71 32 43 38 167 24
010 -52 -54 40 58 55 154 33
011 -8 -43 32 64 70 119 35
Fahud Stage I and II BRA Report
CAM to Building distances
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 121/175
Fahud B
BldgID 1 2
Bldg X 62 0
Y 16 0
PB ID R 8 0
01 12 35 45 3702 37 65 47 75
Fahud C
BldgID 1 2
Bldg X 4 6
Y 18 8
PB ID R 6 5
01 60 17 50 49
02 23 50 31 40
F h d D
Fahud Stage I and II BRA Report
Fahud F
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 122/175
BldgID 1
Bldg X 85
Y 139
PB ID R 9
01 39 102 50
MLPS & NOCS
BldgID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Bldg X 572 447 474 539 255 597 553 569 238 218 241 310 620 643 664 706 465
Y 403 454 569 405 174 389 366 285 169 164 155 109 305 236 134 64.8 342
PB ID R 12 10 15 15 9 28 22 20 5 11 7 4 12 10 15 15 13
01 87 47 589 533 636 562 201 586 543 518 190 165 180 227 580 577 568 604 467
Nahada 1
No Congested Area
Nahada 2
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 123/175
AAppppeennddiixx HH – – BBRRAA IIII
Fahud Stage I and II BRA Report
Fahud B
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 124/175
0.25 LFL
Bldg IDBldgID 1
Type Type B4
PBID
0.25LFL
001 184 H
002 184 H
003 0 -
004 0 -
005 150 H
006 150 H
007 120 H
008 120 H
009 120 H010 120 H
011 50 -
012 50 -
0.5 LFL
Fahud Stage I and II BRA Report
10 ppm H2S
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 125/175
Bldg IDBldgID 1
Type Type B4
PBID
10ppm
001 19 -
002 19 -
003 0 -
004 0 -
005 0 -
006 0 -
007 12 -
008 12 -
009 12 -
010 12 -
30 ppm H2S
Bldg
Fahud Stage I and II BRA Report
ID ppm
001 ID -
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 126/175
002 ID -
003 0 -
004 0 -
005 0 -
006 0 -
007 ID -
008 ID -
009 ID -010 ID -
011 0 -
012 0 -
300 ppm H2S
Bldg ID BldgID 1
Type Type B4
PBID
300ppm
001 0 -
Fahud Stage I and II BRA Report
Thermal radiation 12.5kW/m2
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 127/175
Bldg ID BldgID 1
Type Type B4
PBID
12.5
001 111 H
002 111 H
003 164 H
004 164 H
005 37 -
006 37 -
007 84 H
008 84 H
009 84 H
010 84 H
011 164 H012 164 H
Thermal radiation 37.5kW/m2
Bldg IDBldgID 1
Fahud Stage I and II BRA Report
CAM 100 mbar
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 128/175
Bldg IDBldgID 1
Type Type B4
CAID
100mbar
01 6 -
02 4.5 -
CAM 275 mbar
Bldg IDBldgID 1
Type Type B4
CAID
275mbar
01 0 -02 0 -
Fahud Stage I and II BRA Report
Fahud C0.25 LFL
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 129/175
Bldg IDBldgID 1 2
Type Type B4 B4
PBID
0.25LFL
001 185 H H
002 185 H H
003 150 H H
004 150 H H
005 120 H H
006 120 H H
007 120 H H
008 120 H H
009 120 H H
0.5 LFL
Bldg IDBldgID 1 2
Type Type B4 B4
PB 0 5
Fahud Stage I and II BRA Report
007 12 - -
008 12 - -
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 130/175
009 12 - -
30 ppm H2S
Bldg IDBldgID 1 2
Type Type B4 B4
PBID
30ppm
001 5
002 5
003 0 - -
004 0 - -
005 3 - -
006 3 - -
007 3 - -
008 3 - -
009 3 - -
100 ppm H2S
Fahud Stage I and II BRA Report
003 0 - -
004 0 - -
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 131/175
005 0 - -
006 0 - -
007 0 - -
008 0 - -
009 0 - -
Thermal radiation 12.5kW/m2
Bldg IDBldgID 1 2
Type Type B4 B4
PBID
12.5
001 112 H H
002 112 H H
003 37 - -
004 37 - -
005 83 H H
006 83 H H
007 83 H H
Fahud Stage I and II BRA Report
CAID
70mbar
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 132/175
01 11.5 - -02 11.5 - -
CAM 100 mbar
Bldg IDBldgID 1 2
Type Type B4 B4
CAID
100mbar
01 5.5 - -
02 5.5 - -
CAM 275 mbar
Bldg IDBldgID 1 2
Type Type B4 B4
CAID
275mbar
01 0 - -
Fahud Stage I and II BRA Report
Fahud D
0 25 LFL
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 133/175
0.25 LFL
Bldg IDBldgID 1 2 3
Type Type B4 B4 B4
PBID
0.25LFL
001 184 H H H
002 184 H H H003 0 - - -
004 0 - - -
005 150 H H H
006 150 H H H
007 120 H H H
008 120 H H H
009 120 H H H
010 120 H H H
011 120 H H H
0.5 LFL
Bldg
Fahud Stage I and II BRA Report
002 19 - - -
003 0 - - -
004 0
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 134/175
004 0 - - -005 0 - - -
006 0 - - -
007 12 - - -
008 12 - - -
009 12 - - -
010 12 - - -
011 12 - - -
30 ppm H2S
Bldg IDBldgID 1 2 3
Type Type B4 B4 B4
PBID
30ppm
001 5 - - -
002 5 - - -
003 0 - - -
004 0 - - -
Fahud Stage I and II BRA Report
011 ID - - -
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 135/175
300 ppm H2S
Bldg IDBldgID 1 2 3
Type Type B4 B4 B4
PBID
300ppm
001 0 - - -002 0 - - -
003 0 - - -
004 0 - - -
005 0 - - -
006 0 - - -
007 0 - - -
008 0 - - -
009 0 - - -
010 0 - - -
011 0 - - -
Thermal radiation 12 5kW/m2
Fahud Stage I and II BRA Report
ID
001 97 H H H
002 97 H H H
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 136/175
002 97 H H H003 113 H H H
004 113 H H H
005 32 - - -
006 32 - - -
007 73 H H -
008 73 H H H
009 73 H H H
010 73 H H -
011 73 H H -
CAM 70 mbar
Bldg IDBldgID 1 2 3
Type Type B4 B4 B4
CAID
70mbar
01 7.5 - - -
Fahud Stage I and II BRA Report
Type Type B4 B4 B4
PB
ID
0.25
LFL
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 137/175
ID LFL001 185 H H H
002 185 H H H
003 0 - - -
004 0 - - -
005 150 H H H
006 150 H H H
007 120 H H H
008 120 H H H
009 120 H H H
010 120 H H H
011 120 H H H
0.5 LFL
Bldg ID BldgID 1 2 3
Type Type B4 B4 B4
PBID
0.5LFL
001 140 H H H
Fahud Stage I and II BRA Report
008 12 - - -
009 12 - - -
010 12 - - -
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 138/175
010 12 - - -011 12 - - -
30 ppm H2S
Bldg IDBldgID 1 2 3
Type Type B4 B4 B4PBID
30ppm
001 5 - - -
002 5 - - -
003 0 - - -
004 0 - - -
005 0 - - -
006 0 - - -
007 3 - - -
008 3 - - -
009 3 - - -
010 3 - - -
Fahud Stage I and II BRA Report
Type Type B4 B4 B4
PB
ID
300
ppm
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 139/175
ID ppm001 0 - - -
002 0 - - -
003 0 - - -
004 0 - - -
005 0 - - -
006 0 - - -
007 0 - - -
008 0 - - -
009 0 - - -
010 0 - - -
011 0 - - -
Thermal radiation 12.5kW/m2
Bldg IDBldgID 1 2 3
Type Type B4 B4 B4
PBID
12.5
Fahud Stage I and II BRA Report
006 32 - - -
007 73 H H H
008 73 H H -
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 140/175
008 73 H H 009 73 - H -
010 73 H H H
011 73 H H H
CAM 70 mbar
Bldg IDBldg
ID 1 2 3Type Type B4 B4 B4
CAID
70mbar
01 23 - - -
CAM 100 mbar
Bldg ID BldgID 1 2 3
Type Type B4 B4 B4
CAID
100mbar
01 14 - - -
Fahud Stage I and II BRA Report
007 0 -
008 130 -
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 141/175
0.5 LFL
Bldg IDBldgID 1
Type Type B4
PBID
0.5LFL
001 90 H002 90 H
003 90 H
004 90 H
005 0 -
006 0 -
007 0 -
008 100 -
10 ppm H2S
Bldg IDBldgID 1
Type Type B4
Fahud Stage I and II BRA Report
007 0 -
008 0 -
100 H S
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 142/175
100 ppm H2S
Bldg IDBldgID 1
Type Type B4
PBID
100ppm
001 ID -002 ID -
003 ID -
004 ID -
005 0 -
006 0 -
007 0 -
008 0 -
300 ppm H2S
Bldg IDBldgID 1
Type Type B4
Fahud Stage I and II BRA Report
006 130 H
007 130 H
008 38 -
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 143/175
Thermal radiation 37.5kW/m2
Bldg IDBldgID 1
Type Type B4
PB
ID
37.5
001 91 H
002 91 H
003 91 H
004 91 H
005 97 -
006 97 -
007 97 -
008 28 -
CAM 70 mbar
Bldg
Fahud Stage I and II BRA Report
MLPS & NOCS
0.25 LFL
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 144/175
Bldg IDBldgID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Type Type B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4
PBID
0.25LFL
001 0 - - - - - - - - - - - - - - - - -
002 0 - - - - - - - - - - - - - - - - -003 0 - - - - - - - - - - - - - - - - -
004 215 - - - - H - - H H H H H - - - - H
005 215 - - - - H - - - H H H H - - - - H
006 215 - - - - H - - - H H H H - - - - H
007 0 - - - - - - - - - - - - - - - - -
008 0 - - - - - - - - - - - - - - - - -
009 0 - - - - - - - - - - - - - - - - -
010 125 - - - - H - - - H H H H - - - - -
011 445 H H H H H H H H H H H H H H H - H
012 445 H H H H H H H H H H H H H H H - H
013 445 H H H H H H H H H H H H H H H - H
014 445 H H H H H H H H H H H H H H - - H
Fahud Stage I and II BRA Report
0.5 LFL
Bld IDBldg
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 145/175
Bldg IDBldgID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Type Type B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4
PBID
0.5LFL
001 0 - - - - - - - - - - - - - - - - -
002 0 - - - - - - - - - - - - - - - - -
003 0 - - - - - - - - - - - - - - - - -004 165 - - - - H - - - H H H H - - - - H
005 165 - - - - H - - - H H H H - - - - H
006 165 - - - - H - - - H H H H - - - - -
007 0 - - - - - - - - - - - - - - - - -
008 0 - - - - - - - - - - - - - - - - -
009 0 - - - - - - - - - - - - - - - - -
010 95 - - - - H - - - H H H - - - - - -
011 370 H H - H H H H H H H H H H - - - H
012 370 H H - H H H H H H H H H H - - - H
013 370 H H - H H H H H H H H H H - - - H
014 370 - H - H H - H H H H H H - - - - H
015 370 - H - H H - H H H H H H - - - - H
Fahud Stage I and II BRA Report
10 ppm H2S
Bld IDBldg
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 146/175
Bldg IDg
ID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Type Type B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4
PB ID10
ppm
001 0 - - - - - - - - - - - - - - - -
002 0 - - - - - - - - - - - - - - - -
003 0 - - - - - - - - - - - - - - - -004 0 - - - - - - - - - - - - - - - -
005 0 - - - - - - - - - - - - - - - -
006 0 - - - - - - - - - - - - - - - -
007 0 - - - - - - - - - - - - - - - -
008 0 - - - - - - - - - - - - - - - -
009 0 - - - - - - - - - - - - - - - -
010 0 - - - - - - - - - - - - - - - -
011 42 - - - - - - - - - - - - - - - -
012 42 - - - - - - - - - - - - - - - -
013 42 - - - - - - - - - - - - - - - -
014 42 - - - - - - - - - - - - - - - -
015 42 - - - - - - - - - - - - - - - -
Fahud Stage I and II BRA Report
30 ppm H2S
Bldg IDBldg
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 147/175
Bldg IDg
ID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Type Type B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4
PBID
30ppm
001 0 - - - - - - - - - - - - - - - - -
002 0 - - - - - - - - - - - - - - - - -
003 0 - - - - - - - - - - - - - - - - -004 0 - - - - - - - - - - - - - - - - -
005 0 - - - - - - - - - - - - - - - - -
006 0 - - - - - - - - - - - - - - - - -
007 0 - - - - - - - - - - - - - - - - -
008 0 - - - - - - - - - - - - - - - - -
009 0 - - - - - - - - - - - - - - - - -
010 0 - - - - - - - - - - - - - - - - -
011 17 - - - - - - - - - - - - - - - - -
012 17 - - - - - - - - - - - - - - - - -
013 17 - - - - - - - - - - - - - - - - -
014 17 - - - - - - - - - - - - - - - - -
015 17 - - - - - - - - - - - - - - - - -
Fahud Stage I and II BRA Report
100 ppm H 2S
Bldg IDBldgID 1 2 3 4
5 6 7 8 9 10 11 12 13 14 15 16 17
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 148/175
gID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Type Type B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4
PB ID100ppm
001 0 - - - - - - - - - - - - - - - - -
002 0 - - - - - - - - - - - - - - - - -
003 0 - - - - - - - - - - - - - - - - -
004 0 - - - - - - - - - - - - - - - - -
005 0 - - - - - - - - - - - - - - - - -
006 0 - - - - - - - - - - - - - - - - -
007 0 - - - - - - - - - - - - - - - - -
008 0 - - - - - - - - - - - - - - - - -
009 0 - - - - - - - - - - - - - - - - -
010 0 - - - - - - - - - - - - - - - - -
011 5 - - - - - - - - - - - - - - - - -012 5 - - - - - - - - - - - - - - - - -
013 5 - - - - - - - - - - - - - - - - -
014 5 - - - - - - - - - - - - - - - - -
015 5 - - - - - - - - - - - - - - - - -
016 5
Fahud Stage I and II BRA Report
300 ppm H
2S
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 149/175
Bldg IDBldgID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Type Type B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4
PBID
300ppm
001 0 - - - - - - - - - - - - - - - -
002 0 - - - - - - - - - - - - - - - -
003 0 - - - - - - - - - - - - - - - -
004 0 - - - - - - - - - - - - - - - -
005 0 - - - - - - - - - - - - - - - -
006 0 - - - - - - - - - - - - - - - -
007 0 - - - - - - - - - - - - - - - -
008 0 - - - - - - - - - - - - - - - -
009 0 - - - - - - - - - - - - - - - -
010 0 - - - - - - - - - - - - - - - -011 0 - - - - - - - - - - - - - - - -
012 0 - - - - - - - - - - - - - - - -
013 0 - - - - - - - - - - - - - - - -
014 0 - - - - - - - - - - - - - - - -
015 0
Fahud Stage I and II BRA Report
Thermal radiation 12.5kW/m2
Bldg IDBldgID 1 2 3 4
5 6 7 8 9 10 11 12 13 14 15 16 17
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 150/175
Bldg IDID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Type Type B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4
PBID
12.5
001 210 - - - - H - - H H H H H - - - - H
002 210 - - - - H - - - H H H H - - - - H
003 210 - - - - H - - - H H H H - - - - H004 41 - - - - - - - - - - - - - - - - -
005 41 - - - - - - - - - - - - - - - - -
006 41 - - - - - - - - - - - - - - - - -
007 170 - - - - H - - - H H H H - - - - -
008 170 - - - - H - - - H H H H - - - - -
009 170 - - - - H - - - H H H H - - - - -
010 88 - - - - H - - - H H H - - - - - -
011 247 - - - - H - - - H H H H - - - - H
012 247 - - - - H - - - H H H H - - - - H
013 247 - - - - H - - - H H H H - - - - H
014 247 - - - - H - - - H H H H - - - - -
015 247 - - - - H - - - H H H H - - - - -
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 151/175
Fahud Stage I and II BRA Report
CAM 70 mbar
Bldg
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 152/175
Bldg IDBldgID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Type Type B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4
CAID
70mbar
01 20 - - - - - - - - - - - - - - - - -
CAM 100 mbar
Bldg IDBldgID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Type Type B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4
CAID
100mbar
01 11 - - - - - - - - - - - - - - - - -
CAM 275 mbar
Bld
Fahud Stage I and II BRA Report
Nahada 1
0.25 LFL
Bldg
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 153/175
Bldg IDBldgID 1 2 3
Type Type B4 B4 B4
PBID
0.25LFL
001 1199 H H H
002 1199 H H H
003 1199 H H H
004 1199 H H H
005 1199 H H H
006 1199 H H H
0.5 LFL
Bldg ID BldgID 1 2 3
Type Type B4 B4 B4
PBID
0.5LFL
001 979 H H H
Fahud Stage I and II BRA Report
30 ppm H2S
Bldg IDBldgID 1 2 3
Type Type B4 B4 B4
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 154/175
Type Type B4 B4 B4
PBID
30ppm
001 20 - - -
002 20 - - -
003 20 - - -
004 20 - - -005 20 - - -
006 20 - - -
100 ppm H2S
Bldg IDBldgID 1 2 3
Type Type B4 B4 B4PBID
100ppm
001 7 - - -
002 7 - - -
003 7 - - -
Fahud Stage I and II BRA Report
Thermal radiation 12.5kW/m2
Bldg IDBldgID 1 2 3
Type Type B4 B4 B4
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 155/175
Type Type B4 B4 B4
PBID
12.5
001 281 H H H
002 281 H H H
003 281 H H H
004 281 H H H005 281 H H H
006 281 H H H
Thermal radiation 37.5kW/m2
Bldg ID 1 2 3
Type B4 B4 B4PBID
37.5
001 217 H H -
002 217 H H -
003 217 H H -
Fahud Stage I and II BRA Report
Nahada 2
0.25 LFL
Bldg
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 156/175
Bldg IDBldgID 1 2
Type Type B4 B4
PBID
0.25LFL
001 1199 H H
002 1199 H H
003 1199 H H
004 1199 H H
0.5 LFL
Bldg IDBldgID 1 2
Type Type B4 B4
PBID
0.5LFL
001 979 H H
002 979 H H
003 979 H H
Fahud Stage I and II BRA Report
100 ppm H2S
Bldg IDBldgID 1 2
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 157/175
Type Type B4 B4
PBID
100ppm
001 7 - -
002 7 - -
003 7 - -
004 7 - -
300 ppm H2S
Bldg IDBldgID 1 2
Type Type B4 B4
PBID 300ppm
001 0 - -
002 0 - -
003 0 - -
004 0 - -
Fahud Stage I and II BRA Report
004 225 H H
CAM 70 mbar
NA
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 158/175
NA
CAM 100 mbar
NA
CAM 275 mbar
NA
Fahud Stage I and II BRA Report
Natih
0.25 LFL
Bldg IDBldg
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 159/175
Bldg IDg
ID 1 2 3 4 5
Type Type B4 B3 B1 B4 B4
PBID
0.25LFL
001 60 - - - H -
002 60 - - - H -
003 60 - - - H -
004 80 H - - H -
005 80 H - - H -
006 60 - - - H -
007 204 H H H H H
008 204 H H H H H
009 204 H H H H H
010 204 H H H H H011 204 H H H H H
012 364 H H H H H
013 364 H H H H H
014 364 H H H H H
Fahud Stage I and II BRA Report
013 239 H H H H H
014 239 H H H H H
015 239 H H H H H
016 0 - - - - -
017 0
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 160/175
017 0 - - - - -
018 1039 H H H H H
019 1039 H H H H H
10 ppm H2S
Bldg ID BldgID 1 2 3 4 5
Type Type B4 B3 B1 B4 B4
PBID
10ppm
001 0 - - - - -
002 0 - - - - -
003 0 - - - - -
004 8 - - - - -
005 8 - - - - -
006 0 - - - - -
007 0 - - - - -
008 0 - - - - -
Fahud Stage I and II BRA Report
007 0 - - - - -
008 0 - - - - -
009 0 - - - - -
010 0 - - - - -
011 0 - - - - -
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 161/175
011 0 - - - - -
012 0 - - - - -
013 0 - - - - -
014 0 - - - - -
015 0 - - - - -
016 0 - - - - -
017 0 - - - - -018 23 - - - - -
019 23 - - - - -
100 ppm H2S
Bldg IDBldgID 1 2 3 4 5
Type Type B4 B3 B1 B4 B4
PBID
100ppm
001 0 - - - - -
002 0 - - - - -
Fahud Stage I and II BRA Report
PBID
300ppm
001 0 - - - - -
002 0 - - - - -
003 0 - - - - -
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 162/175
003 0
004 0 - - - - -
005 0 - - - - -
006 0 - - - - -
007 0 - - - - -
008 0 - - - - -
009 0 - - - - -010 0 - - - - -
011 0 - - - - -
012 0 - - - - -
013 0 - - - - -
014 0 - - - - -
015 0 - - - - -
016 0 - - - - -
017 0 - - - - -
018 0 - - - - -
019 0 - - - - -
Fahud Stage I and II BRA Report
018 253 H H H H H
019 253 H H H H H
Thermal radiation 37.5kW/m2
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 163/175
Bldg IDBldgID 1 2 3 4 5
Type Type B4 B3 B1 B4 B4
PBID
37.5
001 35 - - - - -
002 35 - - - - -
003 35 - - - - -
004 50 - - - - -
005 50 - - - - -
006 35 - - - - -
007 103 H H H - H
008 103 H H H - H
009 103 H H H - H010 103 H H H - H
011 103 H H H - H
012 121 H H H - H
013 121 H H H - H
Fahud Stage I and II BRA Report
01 7.5 - - - - -
02 7.5 - - - - -
CAM 275 mbar
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 164/175
Bldg IDBldgID 1 2 3 4 5
Type Type B4 B3 B1 B4 B4
CAID
275mbar
01 0 - - - - -
02 0 - - - - -
Fahud Stage I and II BRA Report
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 165/175
AAppppeennddiixx II – – PPlloott ppllaannss
Fahud Stage I and II BRA Report
NAHADA 1
PPllaanntt NNoor r tthh
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 166/175
Report Number: 296-3241-R02Revision: 0
March 2008Page 166 of 175
Fahud Stage I and II BRA Report
NAHADA 2
PPllaanntt NNoor r tthh
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 167/175
Report Number: 296-3241-R02Revision: 0
March 2008Page 167 of 175
Fahud Stage I and II BRA Report
NATIH
PPllaanntt NNoor r tthh
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 168/175
Report Number: 296-3241-R02Revision: 0
March 2008Page 168 of 175
Fahud Stage I and II BRA Report
FAHUD NOCS
PPllaanntt NNoor r tthh
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 169/175
Report Number: 296-3241-R02Revision: 0
March 2008Page 169 of 175
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 170/175
Fahud Stage I and II BRA Report
FAHUD B
PPllaanntt NNoor r tthh
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 171/175
Report Number: 296-3241-R02Revision: 0
March 2008Page 171 of 175
Fahud Stage I and II BRA Report
`FAHUD C
PPllaanntt NNoor r tthh
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 172/175
Report Number: 296-3241-R02Revision: 0
March 2008Page 172 of 175
Fahud Stage I and II BRA Report
FAHUD D
PPllaanntt NNoor r tthh
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 173/175
Report Number: 296-3241-R02Revision: 0
March 2008Page 173 of 175
Fahud Stage I and II BRA Report
FAHUD E
PPllaanntt NNoor r tthh
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 174/175
Report Number: 296-3241-R02Revision: 0
March 2008Page 174 of 175
Fahud Stage I and II BRA Report
FAHUD F
PPllaanntt NNoor r tthh
8/9/2019 296-3241-r02 Pdo Fahud Stage II Bra Rev 0
http://slidepdf.com/reader/full/296-3241-r02-pdo-fahud-stage-ii-bra-rev-0 175/175
Report Number: 296-3241-R02Revision: 0
March 2008Page 175 of 175