2018 FRENGER FOOD COURT ROOFING PROJECT · 2018-01-12 · DATE DATE DATE DATE 10/18/2017 GY GY 2018...

6
2018 FRENGER FOOD COURT ROOFING PROJECT 2018 FRENGER FOOD COURT ROOFING PROJECT For: Facilities and Services, NMSU Main Campus, New Mexico State University, Las Cruces, NM CONSULTANTS: SHEET INDEX: CODE INFORMATION: PROJECT LOCATION: ARCHITECT: PROJECT DESCRIPTION: REMOVAL AND REPLACEMENT OF APPROXIMATELY 7,026 SF EXISTING ROOFING. APPLICABLE CODES: 2003: ANSI A117, IFC, INTERNATIONAL FIRE CODE 2009: NM ENERGY CODE 2012: NM PLUMBING CODE, NM MECHANICAL CODE 2014: NM ELECTRICAL CODE 2015: NM COMMERCIAL BUILDING CODE ZONING: NMSU CONSTRUCTION TYPE: III-B ALLOWABLE AREA: 9,500 SF ACTUAL AREA: 7,026 SF ALLOWABLE HEIGHT: 2 STORIES ACTUAL HEIGHT: 1 STORY OCCUPANCY: A-2 (FOOD COURT) REPLACEMENT ROOFING: CLASS A DATE: 01/XX/2018 - ISSUED FOR RFP #: NORTH BID LOTS: NORTH STAGING AREA: APPROX. 66' (N/S) X 145' (E/W) NOTE: USAGE OF THE METERED PARKING LOT TO THE NORTH OF THE STAGING AREA IS PROHIBITED. REFER TO SPEC. SECT. 011100 "SUMMARY" PARAGRAPH 1.6C FOR PROTECTION OF EXISTING LANDSCAPE WILLIAMS AVE. McFIE CIRCLE FRENGER FOOD CRT.

Transcript of 2018 FRENGER FOOD COURT ROOFING PROJECT · 2018-01-12 · DATE DATE DATE DATE 10/18/2017 GY GY 2018...

Page 1: 2018 FRENGER FOOD COURT ROOFING PROJECT · 2018-01-12 · DATE DATE DATE DATE 10/18/2017 GY GY 2018 FRENGER FOOD COURT ROOFING PROJECT Facilities & Services - NMSU, Main Campus, Las

2018 F

RE

NG

ER

F

OO

D C

OU

RT

R

OO

FIN

G P

RO

JE

CT

2018 FRENGER FOOD COURT

ROOFING PROJECT

For: Facilities and Services, NMSU

Main Campus, New Mexico State University, Las Cruces, NM

CONSULTANTS: SHEET INDEX:CODE INFORMATION:PROJECT LOCATION:

ARCHITECT:

PROJECT DESCRIPTION:

REMOVAL AND REPLACEMENT OF

APPROXIMATELY 7,026 SF EXISTING ROOFING.

APPLICABLE CODES:

2003: ANSI A117, IFC, INTERNATIONAL FIRE

CODE

2009: NM ENERGY CODE

2012: NM PLUMBING CODE, NM MECHANICAL

CODE

2014: NM ELECTRICAL CODE

2015: NM COMMERCIAL BUILDING CODE

ZONING: NMSU

CONSTRUCTION TYPE: III-B

ALLOWABLE AREA: 9,500 SF

ACTUAL AREA: 7,026 SF

ALLOWABLE HEIGHT: 2 STORIES

ACTUAL HEIGHT: 1 STORY

OCCUPANCY: A-2 (FOOD COURT)

REPLACEMENT ROOFING: CLASS A

DATE: 01/XX/2018 - ISSUED FOR RFP #:

NORTH

BID LOTS:

NORTH

STAGING AREA:

APPROX. 66' (N/S) X 145' (E/W)

NOTE: USAGE OF THE

METERED PARKING LOT TO

THE NORTH OF THE STAGING

AREA IS PROHIBITED. REFER

TO SPEC. SECT. 011100

"SUMMARY" PARAGRAPH

1.6C FOR PROTECTION OF

EXISTING LANDSCAPE

W

IL

L

IA

M

S

A

V

E

.

M

c

F

I

E

C

I

R

C

L

E

F

R

E

N

G

E

R

F

O

O

D

C

R

T

.

Page 2: 2018 FRENGER FOOD COURT ROOFING PROJECT · 2018-01-12 · DATE DATE DATE DATE 10/18/2017 GY GY 2018 FRENGER FOOD COURT ROOFING PROJECT Facilities & Services - NMSU, Main Campus, Las

DATE

DATE

DATE

DATE

10/18/2017

GY

GY

(LINE OF EXTERIOR WALLS BELOW ROOF OVERHANG)

1

/

2

"

S

L

O

P

E

1

/

2

"

S

L

O

P

E

1

/

2

"

S

L

O

P

E

1

/

2

"

S

L

O

P

E

1

/

2

"

S

L

O

P

E

1

/

2

"

S

L

O

P

E

(E

XIS

TIN

G S

LO

PE

O

F 1-5/8" P

ER

F

OO

T)

(E

XIS

TIN

G S

LO

PE

O

F 1-3/8" P

ER

F

OO

T)

(E

XIS

TIN

G S

LO

PE

OF

1-1/2" P

ER

F

OO

T)

(E

XIS

TIN

G S

LO

PE

OF

1-1/2" P

ER

F

OO

T)

(LINE OF EXTERIOR WALLS BELOW ROOF OVERHANG)

ADDITIVE ALTERNATE #1

(AREA B)

2018 F

RE

NG

ER

F

OO

D C

OU

RT

RO

OF

IN

G P

RO

JE

CT

Fa

cilitie

s &

S

ervice

s - N

MS

U, M

ain

C

am

pu

s, L

as C

ru

ce

s, N

M

Issue Date:

Drawn by:

Checked by:

Revisions:

YA

BU

MO

TO

(MA

ILIN

G)

PO

BO

X 2

484

110 C

OR

RID

A D

E R

IO

AL

TO

, N

M 88312

575.6

44.6

986

Arc

hite

cts

2018 F

RE

NG

ER

F

OO

D C

OU

RT

R

OO

FIN

G P

RO

JE

CT

-

PLAN

NORTH

TEST BORING #1

TEST BORING #2

TEST BORING #3

TEST BORING #4

TEST BORING #5

P-1

P-2

P-3

P-4

P-5

P-6

P-7

P-8

P-9

P-10

P-11

P-12

P-13

P-14

P-15

P-16

P-17

P-18

P-19

P-20

P-21

P-22

P-15

A6 / A

- 3.0

A4 / A

- 3.0

A4 / A - 3.0

(SIM.)

A5 / A - 3.0

A5 / A - 3.0

A4 / A - 3.0

A6 / A

- 3.0

A5 / A

- 3.0

(S

IM

.)

A5 / A - 3.0

A5 / A - 3.0

ADDITIVE ALTERNATE #1

(AREA A)

EXISTING TRELLIS TO REMAIN (NO WORK)

BASE BID

BASE BID

BASE BID

ADDITIVE ALTERNATE #1

(AREA B)

(ROOFTOP HVAC

UNIT #1)

(ROOFTOP HVAC

UNIT #2)

(PHOTO NUMBER AND

DIRECTION OF SHOT,

REFER SHEETS A-2.0 &

A-2.1)

(PHOTO NUMBER AND

DIRECTION OF SHOT,

REFER SHEETS A-2.0 &

A-2.1)

(PHOTO NUMBER AND

DIRECTION OF SHOT,

REFER SHEETS A-2.0 &

A-2.1)

(PHOTO NUMBER AND

DIRECTION OF SHOT,

REFER SHEETS A-2.0 &

A-2.1)

RO

OF

&

D

EM

O. P

LA

N

GENERAL NOTE APPLYING TO ALL NEW "HOT-MOPPED" ROOFING

SYSTEMS: A "HOT WORKS PERMIT" MUST BE OBTAINED FROM THE NMSU

FIRE MARSHAL @ (575) 646-2519, 1510 WELLS ST., AND POSTED AT THE

JOB SITE PRIOR TO THE START OF ANY WORK.

GENERAL DEMOLITION NOTE: ALL ROOF

AREAS INDICATED AS PART OF BASE BID

AND ADD. ALT. #1 SHALL HAVE THEIR

RESPECTIVE EXISTING ROOFING SYSTEM

REMOVED AND PROPERLY DISPOSED OF.

LOCATION OF DUMPSTER(S) SHALL BE

COORDINATED WITH NMSU AND

ARCHITECT PRIOR TO DEMOLITION.

REFER TO SPEC. SECT. 075500 "SBS

MODIFIED BITUMEN ROOFING". IN THE

EVENT OF LT.WT. CONC. DECK DAMAGE,

REFER TO SPEC. SECT. 012300

"ALTERNATES & UNIT PRICE", AND ALSO

INCLUDE "UNIT PRICE" IN THE BID FORM.

(E

XIS

TIN

G S

LO

PE

OF

1-3/8" P

ER

F

OO

T)

(E

XIS

TIN

G S

LO

PE

OF

1-5/8" P

ER

F

OO

T)

EXISTING SUNSCREEN AND WALL (NO WORK)

Page 3: 2018 FRENGER FOOD COURT ROOFING PROJECT · 2018-01-12 · DATE DATE DATE DATE 10/18/2017 GY GY 2018 FRENGER FOOD COURT ROOFING PROJECT Facilities & Services - NMSU, Main Campus, Las

DATE

DATE

DATE

DATE

10/18/2017

GY

GY

2018 F

RE

NG

ER

F

OO

D C

OU

RT

RO

OF

IN

G P

RO

JE

CT

Fa

cilitie

s &

S

ervice

s - N

MS

U, M

ain

C

am

pu

s, L

as C

ru

ce

s, N

M

Issue Date:

Drawn by:

Checked by:

Revisions:

YA

BU

MO

TO

(MA

ILIN

G)

PO

BO

X 2

484

110 C

OR

RID

A D

E R

IO

AL

TO

, N

M 88312

575.6

44.6

986

Arc

hite

cts

2018 F

RE

NG

ER

F

OO

D C

OU

RT

R

OO

FIN

G P

RO

JE

CT

-

PLAN

NORTH

TEST BORING #1

TEST BORING #2

TEST BORING #3

TEST BORING #4

TEST BORING #5

EXIST. TRELLIS (NO WORK)

APPROX. AREA OF

ROOF WHERE TEST

BORING #1 APPLIES:

180 SF

APPROX. AREA OF

ROOF WHERE TEST

BORING #3 APPLIES:

1,104 SF

APPROX. AREA OF

ROOF WHERE TEST

BORING #2 & 4 APPLIES:

5,208 SF

APPROX. AREA OF

ROOF WHERE TEST

BORING #5 APPLIES:

620 SF

EX

IS

T. R

OO

F S

YS

T.

LEGEND OF EXIST.

ROOF CONDITIONS

SEE TEST BORING #1 AT RIGHT

SEE TEST BORING #2 AT RIGHT

SEE TEST BORING #3 AT RIGHT

SEE TEST BORING #4 AT RIGHT

SEE TEST BORING #5 AT RIGHT

Page 4: 2018 FRENGER FOOD COURT ROOFING PROJECT · 2018-01-12 · DATE DATE DATE DATE 10/18/2017 GY GY 2018 FRENGER FOOD COURT ROOFING PROJECT Facilities & Services - NMSU, Main Campus, Las

DATE

DATE

DATE

DATE

10/18/2017

GY

GY

2018 F

RE

NG

ER

F

OO

D C

OU

RT

RO

OF

IN

G P

RO

JE

CT

Fa

cilitie

s &

S

ervice

s - N

MS

U, M

ain

C

am

pu

s, L

as C

ru

ce

s, N

M

Issue Date:

Drawn by:

Checked by:

Revisions:

YA

BU

MO

TO

(MA

ILIN

G)

PO

BO

X 2

484

110 C

OR

RID

A D

E R

IO

AL

TO

, N

M 88312

575.6

44.6

986

Arc

hite

cts

2018 F

RE

NG

ER

F

OO

D C

OU

RT

R

OO

FIN

G P

RO

JE

CT

-

P - 1: LOOKING SOUTHWEST

P - 4: LOOKING NORTH

P - 7: LOOKING NORTH

P - 10: LOOKING SOUTHEAST

P - 2: LOOKING WEST

P - 5: LOOKING SOUTHWEST

P - 8: LOOKING NORTHEAST

P - 11: LOOKING WEST

P - 3: LOOKING NORTHWEST

P - 6: LOOKING NORTH

P - 9: LOOKING EAST

P - 12: LOOKING WEST

RO

OF

P

HO

TO

S

NOTE: ELECTRICAL LINES

SUPPLYING THIS UNIT SHALL

BE BROUGHT UP TO CURRENT

2014 NM ELECTRICAL CODE

Page 5: 2018 FRENGER FOOD COURT ROOFING PROJECT · 2018-01-12 · DATE DATE DATE DATE 10/18/2017 GY GY 2018 FRENGER FOOD COURT ROOFING PROJECT Facilities & Services - NMSU, Main Campus, Las

DATE

DATE

DATE

DATE

10/18/2017

GY

GY

2018 F

RE

NG

ER

F

OO

D C

OU

RT

RO

OF

IN

G P

RO

JE

CT

Fa

cilitie

s &

S

ervice

s - N

MS

U, M

ain

C

am

pu

s, L

as C

ru

ce

s, N

M

Issue Date:

Drawn by:

Checked by:

Revisions:

YA

BU

MO

TO

(MA

ILIN

G)

PO

BO

X 2

484

110 C

OR

RID

A D

E R

IO

AL

TO

, N

M 88312

575.6

44.6

986

Arc

hite

cts

2018 F

RE

NG

ER

F

OO

D C

OU

RT

R

OO

FIN

G P

RO

JE

CT

-

P - 13: LOOKING NORTHEAST

P - 16: LOOKING EAST

P - 19: LOOKING SOUTH

P - 22: LOOKING WEST

P - 14: LOOKING NORTH

P - 17: LOOKING NORTHWEST

P - 20: LOOKING SOUTHWEST

P - 15: LOOKING SOUTHEAST

P - 18: LOOKING NORTHEAST

P - 21: LOOKING WEST

RO

OF

P

HO

TO

S

Page 6: 2018 FRENGER FOOD COURT ROOFING PROJECT · 2018-01-12 · DATE DATE DATE DATE 10/18/2017 GY GY 2018 FRENGER FOOD COURT ROOFING PROJECT Facilities & Services - NMSU, Main Campus, Las

STRAINER BASKETCOMPRESSION RING

SBS BASE SHEET

MULTI-PURPOSE MB FLASHING CEMENT12"

1"

SBS SMOOTH TARGET PATCH CUT TOFIT IN CLAMPING RING (EXTEND TOOUTER EDGE OF DRAIN SUMP OR 39")

SBS MODIFIEDBITUMEN CAP SHEET

BASE AND INTERPLYSHEET EXTENDINGUNDER DRAIN RING

TAPEREDPOLYISO.RIGIDINSUL.

EXIST. METAL DECK

2"

5/8" DENSDECK

2 LAYERS OF 2.5" RIGID POLYISO. INSUL.

VENT/

3" MIN2"MIN

FLASHING FABRIC

5/8" DENSDECK

BASE &INTERPLY SHEETS

6"

2"

LIQUID FLASHING

LIQUID FLASHING

3" MIN

FLASHING FABRIC

FLASHING FABRICSBS MODIFIED BITUMEN CAP SHEET

PIPE

2 LAYERS OF 2.5" RIGID POLYISO. INSUL.

LINE OF EXISTING LIGHTWEIGHTCONCRETE OR METAL DECKING

ROUN

D PE

NETR

ATIO

N

APPLY PATCH MEMBRANEIN MB COLD ADHESIVE.PATCH SHALL BE AMINIMUM OF 4" LARGER

INSTALL PATCH MEMBRANESO THAT IT EXTENDS AMINIMUM OF 1/2" UP PIPE

SHEET METAL HOOD WITH CONTINUOUSBEAD OF POLYURETHANE SEALANTCONTINUOUS BEAD OFPOLYURETHANE SEALANTSTAINLESS STEEL CLAMPINGRINGPRE-MOLDED PIPE FLASHING

2 LAYERS OF 2.5" RIGID POLYISO. INSUL.

LINE OF EXISTING LIGHTWEIGHTCONCRETE OR METAL DECKING

5/8" DENSDECK

BASE &INTERPLY SHEETS

SBS MODIFIED BITUMEN CAP SHEET

2" MIN 6" MIN 2" MIN

1/4"

1" MAX(NAILING AREA)

BASE COAT MEMBRANE FLASHING

EMBED BASE COAT IN LIQUID FLASHING

2 LAYERS OF 2.5" RIGID POLYISO. INSUL.LINE OF EXISTING LIGHTWEIGHT CONCRETE DECKING

5/8" DENSDECKBASE & INTERPLY SHEETS

2 X 6 NAILERS

GALVANIZED METALCLEATS @ 18" O.C.

24 GA. KYNAR FINISHED METALFASCIA / TRIM, MIN. 8" DEEP, V.I.F.

SBS MODIFIED BITUMEN CAP SHEET

INTERPLY SHEET

3" MIN.

3" MIN.

FASTENERS @ 8" O.C.

GALVANIZED SHEET METALCOUNTERFLASHING3" MIN. FACE

MFG. RECOMMENDED FASTENERS @ 12"O.C. MAX.

CONTINUOUS BEAD OF POLYURETHANESEALANT

EXISTING STUCCO /MTL. STUD WALL SBS MODIFIED BITUMEN CAP

SBS MODIFIEDBITUMEN CAP SHEET

5/8" DENSDECK

2 LAYERS OF 2.5" RIGID POLYISO. INSUL.LINE OF EXISTING LIGHTWEIGHT CONCRETE DECKING

BASE & INTERPLY SHEETS

CONTINUAL MINERAL FIBER CANT

4"

6"MIN.

8" M

INRAISED EXISTING R.T.U. CURBFASTENERS @ 8" O.C.

METAL COUNTERFLASHING, 3" MIN. FACE

GASKETED FASTENERS @ 12" O.C. MAX

SBS MODIFIEDBITUMEN CAP SHEET

5/8" DENSDECK

2 LAYERS OF 2.5" RIGID POLYISO. INSUL.LINE OF EXISTING LIGHTWEIGHT CONCRETE OR METAL DECKING

BASE & INTERPLY SHEETS3" MIN.

3" MIN.

INTERPLY SHEET

SBS MODIFIED BITUMEN CAP SHEET CONTINUAL MINERAL FIBER CANT

2 X 6 NAILERS

FASTENERS @ 8" O.C.

GALVANIZED SHEET METALCOUNTERFLASHING3" MIN. FACE

MFG. RECOMMENDED FASTENERS @ 12"O.C. MAX.

CONTINUOUS BEAD OF POLYURETHANESEALANT

EXISTING STUCCO / MTL. STUD WALL

SBS MODIFIED BITUMEN CAP

SBS MODIFIEDBITUMEN CAP SHEET

5/8" DENSDECK

BASE & INTERPLY SHEETSSHAVE 4" MINERAL FIBER

RE-INSTALLED STRAINER BASKETRE-INSTALLED DRAIN COMPRESSION RING

EXIST. METAL DECK

2"

2 LAYERS OF 2.5" RIGID POLYISO. INSUL.

PRIMARY ROOF DRAIN

EXISTING STUCCO / MTL. STUD WALL

UNDER OVERFLOW DRAIN

INTERPLY SHEET FROM FLASHING

WRAPPED INTO DRAIN MIN. OF 2" AND BEDDED IN MULTI-PURPOSE MB FLASHING CEMENT

24 GA. GALV. MTL. THRUPARAPET SCUPPER/DRAIN 6" WIDE. LENGTH AS REQ'D.PER PARAPET THICKNESS, VERIFY IN FIELD. PAINT DRAIN/SCUPPER TO MATCH ADJACENT STUCCO.

NOTE!: SET BOTTOM OF SCUPPER/DRAIN2" ABOVE EDGE OF PRIMARY DRAIN!

NOTE!: THIS IS THE STANDARD COUNTERFLASHING DETAIL AT PARAPET, BEYOND

CONTINUOUS BEADOF POLYURETHANESEALANT

CONTINUOUS BEADOF POLYURETHANESEALANT

DATE

DATE

DATE

DATE

10/18/2017

GY

GY

2018 F

RE

NG

ER

F

OO

D C

OU

RT

RO

OF

IN

G P

RO

JE

CT

Fa

cilitie

s &

S

ervice

s - N

MS

U, M

ain

C

am

pu

s, L

as C

ru

ce

s, N

M

Issue Date:

Drawn by:

Checked by:

Revisions:

YA

BU

MO

TO

(MA

ILIN

G)

PO

BO

X 2

484

110 C

OR

RID

A D

E R

IO

AL

TO

, N

M 88312

575.6

44.6

986

Arc

hite

cts

2018 F

RE

NG

ER

F

OO

D C

OU

RT

R

OO

FIN

G P

RO

JE

CT

-

A1

ROOF DRAIN

A2

NON-COLLAR VENT FLASHING

A3

OPTION - COLLARED VENT FLASH.

A4

EXPOSED EDGE CONDITION

A5

TYP. PARAPET FLASHING

A6

HVAC/RTU CURB

DE

TA

ILS

A8

TYP. SECONDARY OVERFLOW DRAIN / SCUPPER

6"

1/2"

2"

2"

1"

VARIES, VERIFY

IN FIELD

1"

4"

2"

4"

A7

TYP. GAS PIPE SADDLE ISOMETRIC