COMMUNITY DEVELOPMENT PLAN GILBERT, MINNESOTA Prepared by Gilbert Development Plan Steering Commiee Mark St. Lawrence, Erik Wedge, Rudy Vertachnik, Emily Rova-Hegener, Cathy Uhan, Judy Kramarich, Tom Nemanick, Karrie Omersa, and Mike Sailer with assistance from MSA Professional Services, Inc. Peter Weidman, Renee Samuelson, Jason Valerius, and Stephen Tremle Adopted January 22, 2013 Existing Conditions (EC) 2-13 Community Branding (CB) 14-17 Land Use (LU) 18-27 Urban Design (UD) 28-33 Downtown Master Plan (MP) 34-39 Implementation (I) 40 June 23, 2011 Pot Luck Community Dinner July 25/26, 2011 Downtown Design Forum August 24, 2011 Downtown Draſt Review 1 September 28, 2011 Downtown Draſt Review 2 February 21, 2012 Land Use Draſt Review 1 June 4, 2012 Land Use Draſt Review 2 October 9, 2012 Final Document Review January 22, 2013 Public Hearing and Adopon MEETING DATES TABLE OF CONTENTS

description

A plan to guide the location and character of public and private investment.

Transcript of 2013 Gilbert, MN Community Development Plan

Page 1: 2013 Gilbert, MN Community Development Plan

COMMUNITY DEVELOPMENT PLAN

GILBERT, MINNESOTA

Prepared by Gilbert Development Plan

Steering CommitteeMark St. Lawrence, Erik Wedge,

Rudy Vertachnik, Emily Rova-Hegener, Cathy Uhan, Judy Kramarich, Tom Nemanick, Karrie Omersa, and Mike Sailer

with assistance from MSA Professional Services, Inc.

Peter Weidman, Renee Samuelson, Jason Valerius, and Stephen Tremlett

Adopted January 22, 2013

Existing Conditions (EC) 2-13

Community Branding (CB) 14-17

Land Use (LU) 18-27

Urban Design (UD) 28-33

Downtown Master Plan (MP) 34-39

Implementation (I) 40

June 23, 2011 Pot Luck Community DinnerJuly 25/26, 2011 Downtown Design ForumAugust 24, 2011 Downtown Draft Review 1September 28, 2011 Downtown Draft Review 2February 21, 2012 Land Use Draft Review 1June 4, 2012 Land Use Draft Review 2October 9, 2012 Final Document Review

January 22, 2013 Public Hearing and Adoption

MEETING DATES

TABLE OF CONTENTS

Page 2: 2013 Gilbert, MN Community Development Plan

CO

MM

UN

ITY

D

EV

ELO

PE

MN

T P

LA

N

MSA Professional Services Inc.

2

1901-1910

• OliverMiningCompanypurchasedthelandfromSparta,andSpartaresidentsandbusinessesmovedtowhatisnowGilbert

• GilbertbecameincorporatedasaVillage

• ThefirstGilbertbrickbuilding(BaileyBlock)wasbuilt

• StateSupremeCourtupheldPittIronCompany’sprotestofincorporationasaVillage

• Gilbert(re)incorporatedasaVillage

• StateBankestablishedinGilbert

1891-1900

• VillageofSpartaincorporatedaroundminingoperations

1911-1920

• VillageofSpartadissolved

• StateBanktakenoverbyFirstNationalBank

• Annexedsurroundingminingland,increasingtheVillage’svaluefromlessthanamillionto5+million

• Consideredthe“prospectiveprincipalcityoftheIronRange”andcalled“theVillageofDestiny”

• Populationreached3,500+people

1921-1930

• Stockmarketcrash:factoriesandshopsclosed(unemploymentincreased)

• Populationdeclinedbelow2,500people

1931-1940

• AfterWWI,populationontheriseandby2040Censusreachedabove2,500people

1941-1970

• VillagebecameaCity

• Miningcompaniesenlargedtheiroperations

• Cluett-Peabody,Inc.,(ArrowProducts)locatedinCity

• Broadwaystartedthinningoutandmanyoldbuildingsweretorndown

1971-1980

• Broadwayfurtherdeclined(partlyduetofires)

• ArrowProductsleftGilbert

1981-Present

• 3rdofJulyParadescontinueinGilbert

• LakeOre-Be-Gonedeveloped

• DeltaDentalopensinGilbert

Gilbert’s beginnings can be linked to the Village of Sparta (a mining town incorporated in 1896), which was bought by the Oliver Mining Company for its high-grade iron ore deposits. This resulted in Sparta residents and businesses moving to a nearby location and taking the name of the nearest group of mines - Gilbert. Gilbert fast became known as the “principal city of the Range.” Officially Gilbert became a Village on April 29, 1909.

In the first few years of incorporation, the Village grew substantially. During this period a pine forest was cleared to make way for a road, which was a part of a twenty-eight-mile boardwalk that connected the eastern Mesabi Range towns. This road would become Broadway Avenue. Later the Mesabi Electric Railway built an interurban streetcar along this roadway, connecting Gilbert to Hibbing.

Through the stock market crash and two world wars

(1910-1940), Gilbert saw substantial growth, substantial decline, and then slow growth. In 1941, the Village became a City with a population around 2,500 people.

Today the Gilbert mine, boardwalk and electric streetcar are gone, but the City of Gilbert lives on, and recreation and tourism are now a prominent part of the City’s economy and identity. As of the 2010 Census, the City has a total area of 12.6 square miles and has approximately 1,800 residents.

Source: http://www.lakesnwoods.com/gilbert.htm

History

existing Conditions

Page 3: 2013 Gilbert, MN Community Development Plan

hIS

TOR

Y &

DE

MO

GR

AP

hIC

S

EC

City of Gilbert MN

3

demograPHiCs

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

Gilbert Virginia Eveleth Mountain Iron

MN US

PERCENT OF OWNER OCCUPIED HOUSING

0 1,000 2,000 3,000

1980

1990

2000

2010

Density

Households

Housing Units

Population

HISTORIC TRENDS

Source: ESRI Business Analyst

existing Conditions

Low* High**

2010 200,266 5,305,925

2015 projection 1,768 1,810 199,130 5,709,700

2020 projection 1,737 1,821 200,490 5,943,240

2025 projection 1,706 1,832 201,850 6,135,060

2030 projection 1,676 1,843 202,040 6,297,950

* 1.75% Decline (based on existing trends since 1990)

** 0.6% Growth Rate (based on St. Louis County projected growth)

+ Minnesota State Demographic Center 2007 Projections

1,799

POPULATION ESTIMATES

City of Gilbert* St. Louis County +

MN +

Total % Change Total % Change Total % Change

1960 2,591 --- 231,588 --- 3,413,864 ---

1970 2,287 -11.7% 220,693 -4.7% 3,804,971 11.5%

1980 2,721 19.0% 222,229 0.7% 4,075,970 7.1%

1990 1,934 -28.9% 198,213 -10.8% 4,375,099 7.3%

2000 1,847 -4.5% 200,528 1.2% 4,919,479 12.4%

2010 1,799 -2.6% 200,266 -0.1% 5,305,925 7.9%

Source: US Census

City of Gilbert St. Louis County MinnesotaPOPULATION

Total % Change Occupied Total % Change Total % Change

1960 813 --- n.a. 81,522 --- 1,119,271 ---

1970 764 -6.0% n.a. 80,859 -0.8% 1,276,552 14.1%

1980 n.a. n.a. n.a. 95,324 17.9% 1,612,960 26.4%

1990 940 n.a. 839 95,403 0.1% 1,848,445 14.6%

2000 900 -4.3% 842 95,800 0.4% 2,065,946 11.8%

2010 937 4.1% 835 103,058 7.6% 2,347,201 13.6%

Source: US Census

HOUSING UNIT

St. Louis County MinnesotaCity of Gilbert

Source: ESRI Business Analyst

HOUSEHOLDS PROJECTIONS

City of Gilbert

St. Louis County

MN

2010 835 84,783 2,087,277

2010 projection 821 83,330 2,141,830

2015 projection 831 84,420 2,257,210

2020 projection 842 85,530 2,374,360

2025 projection 853 86,650 2,472,940

2030 projection 866 87,910 2,566,940

* Minnesota State Demographic Center 2005 Projection

** 0.98% of County projections (Gilbert's share of the County households in 2010)

2010 Population = 1,799 (10.3% of Quad Cities)

2000-2010 % Change = -2.6% (smallest decrease among Quad Cities)

Median Age = 44.7 (MN = 37.4, US = 37.2)

25 to 44 Cohort = 23.8% (MN = 26.4, US = 26.6)

Average Household Size = 2.15 (MN = 2.48, US = 2.58)

Page 4: 2013 Gilbert, MN Community Development Plan

CO

MM

UN

ITY

D

EV

ELO

PE

MN

T P

LA

N

MSA Professional Services Inc.

4

The first table summarizes supply vs. demand for various retail categories. The area of analysis is a 15-minute drive time area from downtown Gilbert (see the Regional Context Map). This summary indicates significant retail leakage from Gilbert itself (about a 5-min. drive), but a surplus of retail in the entire analysis area, reflecting the fact that the Quad Cities area serves a wider market than we are analyzing here.

The second table indicates mismatches between supply and demand for more detailed retail industry types, and allows comparison between the City of Gilbert and the 15-minute drive time area, which includes all of Eveleth and Virginia. It identifies only those market sectors with insufficient local supply, and suggests opportunity for building material supply, lawn and garden supply, clothing stores, other general merchandise, and restaurants.

market study

Gilbert - 15-min_V2

July 11, 2011

Made with Esri Business Analyst©2011 Esri www.esri.com/ba 800-447-9778 Try it Now! Page 1 of 1

GILBERT DOWNTOWN PLAN Local/Regional Retail Market Analysis Preliminary Draft – July 11, 2011 This table summarizes an analysis of supply vs. demand for various retail categories. The area of analysis is a 15-minute drive time area from downtown Gilbert (see the Regional Context Map). This summary indicates significant retail leakage from Gilbert itself (about a 5-min. drive), but a surplus of retail in the entire analysis area. There appears to be room in the regional market for more food and drink establishments.

Industry Summary Demand Supply Retail Gap Surplus / Leakage Number of

(Retail Potential) (Retail Sales) (Demand - Supply) Factor Businesses

5-min drive Total Retail Trade and Food & Drink (NAICS 44-45, 722) $13,713,508 $8,489,801 $5,223,707 23.5 20 Total Retail Trade (NAICS 44-45) $11,839,287 $7,585,744 $4,253,543 21.9 13 Total Food & Drink (NAICS 722) $1,874,221 $904,057 $970,164 34.9 7 10-min drive

Total Retail Trade and Food & Drink (NAICS 44-45, 722) $99,240,661 $124,184,320 -$24,943,659 -11.2 167 Total Retail Trade (NAICS 44-45) $84,952,545 $110,196,070 -$25,243,525 -12.9 109 Total Food & Drink (NAICS 722) $14,288,116 $13,988,250 $299,866 1.1 58 15-min drive

Total Retail Trade and Food & Drink (NAICS 44-45, 722) $163,765,916 $204,446,214 -$40,680,298 -11.0 258 Total Retail Trade (NAICS 44-45) $140,094,920 $183,454,477 -$43,359,557 -13.4 182 Total Food & Drink (NAICS 722)

$23,670,996 $20,991,737 $2,679,259 6.0 76

Gilbert Gilbert Market Area (15-min drive time) Surplus / Leakage Number of Surplus / Leakage Number of

Industry Group Retail Gap Factor Businesses Retail Gap Factor Businesses

Electronics & Appliance Stores (NAICS 443/NAICS 4431) $230,218 58.2 1 $1,110,947 21.5 9

Bldg Materials, Garden Equip. & Supply Stores (NAICS 444) $488,066 87.1 1 $1,720,987 20.4 16 Building Material and Supplies Dealers (NAICS 4441) $454,560 86.3 1 $1,509,994 18.8 15 Lawn and Garden Equipment and Supplies Stores (NAICS 4442) $33,506 100.0 0 $210,993 52.6 1

Specialty Food Stores (NAICS 4452) $13,591 14.8 1 $62,418 6.3 4 Beer, Wine, and Liquor Stores (NAICS 4453) $27,638 6.1 1 $801,183 18.1 9

Health & Personal Care Stores (NAICS 446/NAICS 4461) $596,760 100.0 0 $79,697 0.7 15 Clothing and Clothing Accessories Stores (NAICS 448) $518,904 100.0 0 $2,230,153 25.3 15 Clothing Stores (NAICS 4481) $414,231 100.0 0 $2,025,710 29.8 10 Shoe Stores (NAICS 4482) $60,277 100.0 0 $96,920 8.4 2 Jewelry, Luggage, and Leather Goods Stores (NAICS 4483) $44,396 100.0 0 $107,523 12.7 3 Other General Merchandise Stores (NAICS 4529) $1,124,973 100.0 0 $4,854,108 31.5 3

Miscellaneous Store Retailers (NAICS 453) -$194,249 -26.7 5 $383,149 8.9 29 Office Supplies, Stationery, and Gift Stores (NAICS 4532) -$9,364 -4.7 1 $190,926 12.3 7 Used Merchandise Stores (NAICS 4533) -$9,420 -14.4 2 $85,928 18.4 8 Other Miscellaneous Store Retailers (NAICS 4539) -$37,977 -14.2 1 $491,844 34.2 8

Nonstore Retailers (NAICS 454) $597,350 100.0 0 $2,751,896 35.4 2 Electronic Shopping and Mail-Order Houses (NAICS 4541) $345,162 100.0 0 $3,270,653 100.0 0 Vending Machine Operators (NAICS 4542) $20,169 100.0 0 $187,091 100.0 0

Food Services & Drinking Places (NAICS 722) $908,523 25.5 10 $2,062,322 5.0 69 Special Food Services (NAICS 7223) $147,261 100.0 0 $810,854 40.0 5

DRIVE TIME5-Minutes 10-Minutes15-Minutes

Source: ESRI Business Analyst, City of Gilbert

existing Conditions

Page 5: 2013 Gilbert, MN Community Development Plan

MA

Rk

ET S

TUD

YE

C

City of Gilbert MN

5Drafted by: J. ValeriusJuly 8, 2011

11,500

4,700

7,400

14,40022,800

11,700

10,000

2,350

2,050

Active MiningJobs, landscape disruption

U.S. Hockey Hall of Fame9 min. from Gilbert

Giants Ridge Golf & Ski Resort24 min. from Gilbert

Minnesota Discovery Center30 min. from Gilbert

1,799(-2.6%)

3,718(-3.8%)

8,712(-4.9%)

2010 Population(change since 2000)

2007 Annual Average Daily Traffic

GILBERT

EVELETH

VIRGINIAMOUNTAIN IRON

2010 Employment(% of Quad Cities employment)

8,661(48.8%)

City of Gilbert, Minnesota Downtown PlanRegional Context

6,922(39%)

2,869(-4.3%)

5, 10, & 15-minute market areas from Downtown Gilbert

1,706(9.6%)

466(2.6%)

existing Conditions

Page 6: 2013 Gilbert, MN Community Development Plan

CO

MM

UN

ITY

D

EV

ELO

PE

MN

T P

LA

N

MSA Professional Services Inc.

6

eConomiCs

Virginia Employment1. Health Services (21.3%)2. Government (12.9%)3. Construction (8.0%)4. Manufacturing (6.8%)5. Education & Libraries (5.8%)

Mountain Iron Employment1. Mining (59.2%)2. Manufacturing (22.7%)3. Health Services (2.6%)4. Eating & Drinking Places (2.1%)5. Other (10.8%)

Eveleth Employment1. Health Services (19.9%)2. Education & Libraries (19.2)3. Construction (9.3%)4. Administration & Support (7.7%)5. Manufacturing (7.3%)

Quad Cities EmploymentMining - 23.5%

Health Services - 13.4%

Manufacturing - 13.1%

Government - 7.3%

Education & Libraries - 5.9%

Construction - 5.2%

Eating & Drinking Places - 3.8%

Administrative & Support - 1.9%

Transportation - 1.8%

Other - 24%

Gilbert Employment

Manufacturing - 9.2%

Government - 3%

Education & Libraries - 9%

Construction - 7.7%

Eating & Drinking Places - 9.9%

Transportation - 26.4%

Other - 34.8%

existing Conditions

natural limits

LAND SUPPLY (2012) Acres PercentDeveloped* 2,920.1 30.4%

Development Limitations** 2,305.3 24.0%

Developable 4,388.4 45.6%

TOTAL 9,613.8 100.0%

* Includes Commercial, Residential, Public Parks/Buildings, Recreational, & Transportation

** Includes Waterways, Steep Slopes, , Floodplain, & Wetland Soils

Over 45% of the land within the City may be developed in time with the majority of the undevelopable land located in the northwest section of the City.

Source: ESRI Business Analyst

Source: ESRI Business Analyst

Page 7: 2013 Gilbert, MN Community Development Plan

EC

ON

OM

ICS

& N

ATU

RA

L L

IMITS

EC

City of Gilbert MN

7

existing Conditions

P ike River

Deep Lake

Lost Lake

Gill Lake

Leaf Lake

Leaf Lake

SPARTA RD

ENTER

PRISE TRL

PETTIT R

D

FRENCH AVE

CEDA R ISLAND DR

COUNTY ROAD 97

SPA

RTA CI R CLE DR

NIEMI

COUNTY ROAD 97

¬«135

¬«37

¬«135

25

12

35

11

36

26

24

1314

23

27

34

22

33

MAP-3

City of Gilbert St. Louis County, Minnesota

Sources:- St. Louis County Base Data

- 2010 NAIP ortho provided by ESRI

Drafted - LSR, Date - 01-20-12, File - p:/08445001

Development LimitationsLegend

Corporate Limits

PLSS Sections

Roads

Lakes

Streams

Floodplain

NRCS Soils - Wet Soils

Wetlands

NRCS Soils - Slope

12 - 20%

Over 20%

°0 2,200 4,400

Feet

Note: The Wetland Indicators Map shows soils mapped by theUSDA Natural Resources Conservation Service in the drainageclass of very poorly drained soils.Soils mapped within this drainage class are soil types typicallyfound within areas designated as wetlands. Therefore, this maplayer can be used to indentify potential wetlands. For moreinformation on the mapped soil types please use the "identiy tool"and link to the USDA Natural Resources Conservation Serviceweb soil report.

Page 8: 2013 Gilbert, MN Community Development Plan

CO

MM

UN

ITY

D

EV

ELO

PE

MN

T P

LA

N

land use

MSA Professional Services Inc.

8

existing Conditions

EXISITING LAND USE (2012)

Acres Percent

Commercial 42.8 0.4%

Multi-Family Residential 86.0 0.9%

Single-Family Residential 1,297.3 13.5%

Mobile Homes 10.3 0.1%

Public & Institutional 88.6 0.9%

Mines 1,779.4 18.5%

Vacant 45.3 0.5%

Open Space 70.9 0.7%

Recreational 940.9 9.8%

Parks 23.8 0.2%

Transportation 430.3 4.5%

Woodlands 4,243.6 44.1%

Water 554.5 5.8%

TOTAL 9,613.8 100.0%

Source: MSA GIS

PROJECTED LAND USE NEEDS 2010-2030

2010 2015 2020 2025 203020-Yr

ChangePopulation 1799 1810 1821 1832 1843 44

Housing Units 937 943 948 954 960 23

Residential (acres)* 1394 1396 1399 1402 1405 11

Commercial (acres)** 42.8 42.9 43.0 43.1 43.2 0.3

Undeveloped Land (acres) 4388 4386 4383 4380 4377 -12

* Based on 0.5-acre residential lots

** Directly proportional to increase in residential development

*** Does the City expect the mines to grow or shrink? This would not be tied to population projections.

The population and land use demand projections below assume modest growth consistent with St. Louis County projected growth, despite a 30-year trend of population decline in Gilbert. The City sees the potential for some growth and notes that a developer may find success marketing lots overlooking Lake Ore-Be-Gone.

SUM

MIT

ST

INDIANA AVEMICHIGAN AVE

FIRST

CT

MINNESOTA AVE

DAKOTA AVE

IOWA AVE

ENTERPRISE T

RL

KANSAS AVE

WISCONSIN AVE

BROADWAY

FOURTH

CT NEVADA AVE W

PLEA

SANT

ST

NEBRASKA AVE

HILL

ST

NEW JERSEY AVE

VIRGINIA AVE

OLD HIG

HWAY 135

NEW YORK AVE

FLORIDA AVE

OHIO AVE

LOUISIANA AVE

CIRCLE D

R

DEERWOOD DR

RO

CK

Y R

D

ARIZONA AVE

BOULDER BLVD

CAROLINA AVE

BROADW

AY

KANSAS AVE

37

135

MAP-2A

City of Gilbert St. Louis County, Minnesota

Sources:- St. Louis County Base Data

- 2010 NAIP ortho provided by ESRI

Drafted - LSR, Date - 07-09-12, File - p:/08445001

Existing Land Use - InsetLegend

Parcels

Lakes

Streams

City Lands

State Lands

Trails

Mesabi Trail

Off-Highway ATV

Exising Land Use

Open Space

Wooded Land

Single Family Residential

Multi-Family Residential

Vacant Platted Lands

Commercial

Mines

Recreational

Parks

Public & Institutional

Transportation

0 700 1,400

Feet

Page 9: 2013 Gilbert, MN Community Development Plan

LA

ND

US

EE

C

City of Gilbert MN

9

existing Conditions

Page 10: 2013 Gilbert, MN Community Development Plan

CO

MM

UN

ITY

D

EV

ELO

PE

MN

T P

LA

N

MSA Professional Services Inc.

10

existing Conditions

Amy’s Bar0.06 acres

Sand Bar0.06 acres

Open0.06 acres

Open0.06 acres

Open0.32 acres

Garage0.06 acres

98-2S. Broadway Avenue

Fire Department0.25 acres

Police Department0.13 acres

City Hall0.25 acres

100-198N. Broadway Avenue

The Gilbert Laundromat0.13 acres

Yo’r Mudders Place0.13 acres

Ziemer-Moeglein-Shatava Funeral Home

0.13 acres

Commercial Office0.25 acres

Residence0.13 acres

File

Nam

e: C

:\Use

rs\jl

uom

a\D

eskt

op\g

ilber

t.dw

g

0 150 300 600

PROJECT AREA

Nick’s Bar0.13 acres

Open0.13 acres

Residences0.06 acres

Residence0.19 acres

300-398N. Broadway Avenue

500-598N. Broadway Avenue

Open0.06 acres

Residence0.06 acres

Northland Small Engine Repair0.38 acres

298-200 S. Broadway Avenue

200 S. 100 S. 10 S. 10 N. 100 N.

Page 11: 2013 Gilbert, MN Community Development Plan

BU

SIN

ES

S IN

VE

NTO

RY

(WE

ST S

IDE

)E

C

City of Gilbert MN

11

existing Conditions

198-100 S. Broadway Avenue

Residence0.26 acres

Residences 0.06 acres

Anton I Lopp0.06 acres

Barbs Jewelry Plus

0.13 acres

Park Space.013 acres

Barber Shop0.06 acres

U.S. Post Office

0.06 acres

First National Bank0.06 acres

Open0.13 acres

Gilbert Dental Service

0.06 acres

Residence0.13 acres

Gilbert Herald

0.06 acres

Find It Fast0.06 acres

2-98N. Broadway Avenue

Vacant Building0.44 acres

VFW0.25 acres

200-298N. Broadway Avenue

File

Nam

e: C

:\Use

rs\jl

uom

a\D

eskt

op\g

ilber

t.dw

g

0 150 300 600

PROJECT AREA

400-498N. Broadway Avenue

Storage (DGust Inc.)0.19 acres

Storage0.19 acres

Storage0.06 acres

Residence0.06 acres

100 N. 200 N. 300 N. 400 N. 500 N.

Page 12: 2013 Gilbert, MN Community Development Plan

CO

MM

UN

ITY

D

EV

ELO

PE

MN

T P

LA

N

MSA Professional Services Inc.

12

existing Conditions

File

Nam

e: C

:\Use

rs\jl

uom

a\D

eskt

op\g

ilber

t.dw

g

0 150 300 600

PROJECT AREA

101-199 S. Broadway Avenue

Sugar Bear

Bakery0.06 acres

Sweetheart Treasures & Residences (above)

0.13 acres

AAI0.13 acres

Residence0.13 acres

Koshar’s Sausage Kitchen

0.19 acres

99-1 N. Broadway Avenue

Community Center & Public Library0.34 acres

Gilbert Get-N-Go0.39 acres

United Hardware0.07 acres

299-201 N. Broadway Avenue

499-401 N. Broadway Avenue

Residence0.06

acres

Residence0.13 acres

Memory Lane Cafe0.06 acres

Wandering Pines Eatery & Pub +/- 1.1 acres

599-501N. Broadway Avenue

200 S. 100 S. 10 S. 10 N. 100 N.

Broad-way

Tonys0.06

acres

Seams 2Incredible

0.06 acres

Risky Business (burned down)

0.13 acres

Residence0.13 acres

Open0.13 acres

Knotty Pine Liquors0.39 acres

Open0.25 acres

TaxForfeit

0.06 acres

Page 13: 2013 Gilbert, MN Community Development Plan

BU

SIN

ES

S IN

VE

NTO

RY

(EA

ST S

IDE

)E

C

City of Gilbert MN

13

existing Conditions

File

Nam

e: C

:\Use

rs\jl

uom

a\D

eskt

op\g

ilber

t.dw

g

0 150 300 600

PROJECT AREA

Jim’s Seldom Inn0.13 acres

Residences0.13 acres

AAI0.06 acres

Iron Range Antiques

0.06 acres

Open0.25 acres

201-299 S. Broadway Avenue

1-99 S. Broadway Avenue

Public Works Dept.0.13 acres

Quad City Food Shelf0.25 acres

Open0.06 acres

Iron Range Historical Society

0.13 acres

199-101N. Broadway Avenue

The Alibi0.06 acres

Back in Time

Antiques0.06

acres

Open0.13 acres

Whistling Bird Cafe 0.25 acres

The Gladiator0.06 acres

Smith Construction

0.06 acres

Open0.13 acres

Range Partnership

LLC 0.06 acres

399-301N. Broadway Avenue

100 N. 200 N. 300 N. 400 N. 500 N.

Lynn’sCeramics

Studio0.06 acres

Open0.19 acres

Tax Forfeit0.06 acres

Residences0.13

acres

Residence0.06 acres

Open0.06 acres

Page 14: 2013 Gilbert, MN Community Development Plan

CO

MM

UN

ITY

D

EV

ELO

PE

MN

T P

LA

N

MSA Professional Services Inc.

14

Community ProfileGilbert is a part of the Quad Cities, which also includes Virginia, Eveleth and Mountain Iron. They were founded in support of the local mining industry between 1890 and 1910, and mining continues to support the local economy. Virginia and Mountain Iron are the business leaders of the region, while Eveleth and Gilbert are now primarily residential and tourist-oriented communities. Below are some of the businesses and activities that define Gilbert’s current identity.

Off-Highway Vehicle (OHV) Park This OHV Park is one of the largest in the Midwest with more than 1,200 acres of recreational trails, scramble areas, hill climbs and rock crawls. The park is open to the public, allowing recreational riding of off-road motorcycles, all-terrain vehicles, and 4X4 jeeps/trucks.

Lake Ore-Be-GoneThis reclaimed mine pit has become a modern “Mecca” for water skiers, fishermen, swimmers and scuba divers. This huge mine pit lake spans over 140 acres. The lake includes a boat landing, a swimming beach area, changing rooms, a large parking area, a pavilion, and even a fish cleaning hut to clean the day’s catch.

Mesabi TrailThis recreational trail runs 75 miles from Grand Rapids to McKinley, with spurs of 4 miles from Gilbert to Eveleth and 5 miles between Biwabik and Giants Ridge.

Sherwood Forest Campground & West Forty RV ParkThe campgrounds are a short distance from downtown Gilbert and are adjacent to the Mesabi Trail. Since there aren’t any hotels in Gilbert, this is one of the few places within the city limits that tourists can stay at while visiting.

Mining (Iron Range Historical Society)Mining has been, and continues, to be a significant presence in the Quad Cities, including in the City of Gilbert. The Iron Range Historical Society is located in the old Gilbert City Hall, bringing tourists into the heart of downtown Gilbert.

Delta DentalThis dental benefits provider employs approximately 150 workers and is one of the largest employers in the City.

Community Bra nding

Page 15: 2013 Gilbert, MN Community Development Plan

CO

MM

UN

ITY P

RO

FIL

E

West Forty RV Park

City of Gilbert, Minnesota Downtown PlanLocal Forces and Issues

Drafted by: J. ValeriusJuly 8, 2011

Land Available Commercial Development

Iron Range Off-Highway Vehicle Recreation Park1,200 acres, 30 miles of trail

Broadway AvenueToo wide, too fast

Active MiningJobs, heavy truck traffi c through downtown

Mesabi Trail10’ paved path from McKinley to Grand Rapids.

4 min.

to U

S 53

7 min.

to E

velet

h

5 Min. to US 53

9 min. to Virginia

Land Available Residential Development

Downtown Commercial DistrictEmpty storefronts, empty lots, residential use, no “anchor” business

Gateways and Wayfi ndingInadequate signage, no clear point of arrival

Sherwood Forest Campground

Lake Ore-Be-Gone225 acres, public beach and boat access, underwater exploration park

Organized RecreationBaseball, soccer facilities

CB

City of Gilbert MN

15

Community Bra nding

Page 16: 2013 Gilbert, MN Community Development Plan

CO

MM

UN

ITY

D

EV

ELO

PE

MN

T P

LA

N

MSA Professional Services Inc.

16

Community Bra nding

CITY OF GILBERTBRANDING EXERCISE

Words that describe the City of Gilbert today (current perception)Losing business Fear To many barsGreat community Community minded No grocery storeHelpful Ethnic No retail storesWarm Family based QuietOptimistic Law enforcement ‘heavy’ Beautiful areaHopeful Rolling up & dying Lots of recreationProud Small SafeTraditional No energy Slow paced‘hungry’ Doom and gloom NeighborlyPeacefull Lots of parking Community sensitiveHappy as is Ugly streets Family freindlyPotential Boring Old, stressed

Words that describe the City of Gilbert 10 years from nowVibrant businesses Great communityCommunity involvement ProductiveBedroom Community New businessLots of tourists Mining up and runningFamily oriented Community connectedOutdoor connectivity Diversified businessLakeside homes Artistic diversityLimited growth Visitor friendlyPopulation tripled More amenitiesBetter public transportation New youth centerVibrant community center Plenty of kids eventsHeritage is kept Back to rootsTrue to it’s residents Community collaborationOpen area Youth outdoor connectionCutting edge Retained small community valuesMany campers Nationally recognized ORV parkVital Retail diversityGood library Reopen schoolsHistorically preserved Essence of place

Come together as a community

Additional CommentsNeed a kid’s arcadeWant a combination roller rink/pizza shopMain street median with decorative lights/ landscapingSoften curb appeal with landscapingSoften look of City

Branding exerCiseOn June 23, 2011, City and MSA staff engaged residents and business owners in a discussion about what they liked or disliked about the City of Gilbert. The list on the right shows their responses broken down into three categories: positive view, negative view, and neutral/ambiguous.

Photo from the June 23, 2011 Potluck Dinner where residents and business owners took part in a community visioning exercise

These sentiments (as shown in the list above) can be summed up in the following statement:

“Gilbert is a safe, community-minded city that treasures its beautiful natural vistas and recreational opportunities. There is room to grow and its residents are optimistic about the future of Gilbert.”

Using this information as a baseline, the residents and business owners were asked what words would describe what they want Gilbert to be 10 years from now. The list to the right provides some insight to residents’ vision for the City of Gilbert. The majority of the statements relate to good community facilities and services, plenty of recreational opportunities, strong community collaboration, and healthy businesses.

BoringOld, stressedFearToo many barsNo grocery storeLosing businesses

Happy as isHungry for changeLots of parkingSlow-pacedSmallTraditional

HelpfulEthnicFamily-friendlyPotentialNeighborlyPeacefulLots of recreationProudSafeGreat communityCommunity-mindedBeautiful areaHopefulWarmFamily-basedQuietOptimisticCommunity sensitive

NEGATIVE POSITIVE

NEUTRAL

Page 17: 2013 Gilbert, MN Community Development Plan

ThE

“GIL

BE

RT” B

RA

ND

CB

City of Gilbert MN

17

Community Bra nding tHe “gilBert” BrandA brand speaks to the identity of a business, product, or a community. For potential visitors and passing-by travelers, the brand can provide the first impression of our community. Therefore the brand should represent the identity we want to promote.

A good brand is simple, easily communicated, and includes both a graphic component and a tagline of some sort, both of which reinforce the community’s desired identity. Good logos are unique, they convey something about the product or organization they represent, and they are easily recognizable. The tag line provides an opportunity to evoke the character of the area in a concise statement.

The current “Gilbert” brand identity, as evident on the City website and the downtown banners, is off-highway vehicle recreation. However, this does not describe all the recreational activities Gilbert has to offer. The City should create a brand around all of its recreational activities, including scuba diving, on-road and off-road biking, ATVs and 4x4 trucks riding, sand and mud drags, mountain biking, and snowmobiling. If there is one word that describes those type of recreational activities it would be “adventurous”. Therefore it is our recommendation that the City adopt as its tagline:

“Minnesota’s Adventure Recreation Capitol”

In addition to the tagline, the community should have a logo to reinforce this identity, such as the example shown below. The adopted logo and tagline should be utilized on the city’s website, street light banners, welcome/gateway signage, and marketing materials.

logo & tag linesEach of the four Quad cities has a brand identity expressed through a graphic image and/or a written tag line. Only Virginia and Mountain Iron have logos. Gilbert has a banner on downtown streetlights that showcases an all-terrain vehicle. The Village’s website does not utilize that image.

City of VirginiaQueen City of the North!

City of EvelethHome of the US Hockey Hall of Fame Museum

City of Mountain IronTaconite Capitol of the World!

City of GilbertHome of Minnesota’s First OHV Park

Page 18: 2013 Gilbert, MN Community Development Plan

CO

MM

UN

ITY

D

EV

ELO

PE

MN

T P

LA

N

Objectives: 1. The City will utilize this plan, including the Future

Land Use map, when making decisions about land use.

2. The City will maintain policies for considering amendments to the Future Land Use Map if and when requested by eligible petitioners.

3. The City will Provide flexibility in development options/tools to create win-win outcomes between landowner desires and community interests.

Policies: 1. Planned Unit Development - A subdivider may

elect to apply for approval of a plat employing a planned unit development (PUD) process if conventional zoning districts cannot meet the desired end.

2. Conservation & Cluster Subdivision Development - A subdivider may elect to apply for approval of a plat employing cluster design (preferred for City development) or conservation design (preferred in rural areas).

3. Future Land Use Map - The Future Land Use map will be used by City staff and officials to guide recommendations and decisions on rezoning and other development requests. See pages 20-21 for the Future Land Use Map.

4. Amending the Future Land Use Map (FLU) - Petitions to change future land use classifications may be submitted by landowners (or their agents) within the City, by City Officials, or by officials from adjacent municipalities. Changes in the Future Land Use Map, and associated policies, shall require a recommendation from the City Plan Commission, a public hearing, and City Council approval.

MSA Professional Services Inc.

18

Allow for infill development and growth in ways that enhance the City’s unique character, while balancing community interests with individual property rights G

OA

L

goals, oBjeCtives, & PoliCies

land use

Page 19: 2013 Gilbert, MN Community Development Plan

LU

The future land use categories identify areas of similar character, use and density. These land use areas are not zoning districts, as they do not legally set performance criteria for land uses (i.e. setbacks, height restrictions, etc.); however, they do identify those zoning districts from the City of Gilbert Zoning Code (as of July 2012) that fit within each future land use classification.

NRP - Natural Resource Protection (green cross-hatch)The NRP overlay classification identifies sensitive lands that may be subject to development restrictions enforced by County, State, or Federal agencies. Mapped NRP areas include all land that meets one or more of the following conditions:

• Water bodies and wetlands mapped as part of the MNDNR

• 100-Year Floodplains based on FEMA maps

• Areas with steep slopes greater than 20%

• Areas within 1,000 feet of the ordinary high water mark of navigable lakes, ponds or flowages; or within 300 feet of the ordinary high water mark of navigable rivers or streams, or to the landward side of the floodplain, whichever distance is greater. Note that manmade lakes such as Lake Ore-Be-Gone are not subject to this setback restriction.

The primary intent of these areas is to retain sensitive natural areas in either public or private ownership for the benefit of maintaining fish and wildlife habitat; to prevent and control water pollution; to prevent erosion and sedimentation; to prevent property damage caused by flooding; to preserve areas of natural beauty; and to provide areas for outdoor recreation. A majority

City of Gilbert MN

19

A Planned Unit Development (PUD) refers to a parcel of land planned as a single unit, rather than as an aggregate of individual lots, with design flexibility from traditional siting regulations. Within a PUD, variations of densities, setbacks, streets widths, and other requirements are allowed. The variety of development that is possible using PUDs creates opportunities for creativity and innovation within developments. Since there is some latitude in the design of PUDs, the approval process provides opportunities for cooperative planning between the developer, reviewing boards, and other interested parties.

land useG

OA

LS

, OB

jEC

TIVE

S, &

PO

LIC

IES

The Future Land Use Map has been designed to accommodate a larger population and more growth than what is projected. The City does not assume that all growth areas depicted on the Future Land Use Map will develop during the next 20 years. Instead, the Future Land Use Map depicts those areas that are the most logical development areas based on the goals and policies of this plan, overall development trends, environmental constraints, proximity to existing development, and the ability to provide services. The City does not support the rezoning or development of all the lands identified on the maps immediately following adoption of this Plan. Other factors will have to be considered, such as the quality of the proposed development, the ability to provide services to the site, and the phasing of development.

future land use - Categories

Page 20: 2013 Gilbert, MN Community Development Plan

CO

MM

UN

ITY

D

EV

ELO

PE

MN

T P

LA

N

of the NRP represents areas that are vital to the region’s ecosystem, and thus development in areas designated NRP shall be limited.

Appropriate Zoning DistrictNRP lands may be zoned as described by the underlying land use classification, but are subject to development restrictions defined by the Minnesota DNR, the City of Gilbert Shoreland Management Zoning (Section 152.13), and the St. Louis County Floodplain Zoning (Chapter 43) ordinances. In Gilbert these lands have a separate Shoreland Zoning district, W-4, Natural Environment.

Policies1. This classification is intended to function as

an overlay district, such that the underlying future land use classification (Rural Lands, Residential-General, Commercial, etc.) remains in place, but the overlay classification indicates the possibility of additional restrictions on development.

2. Landowners are advised that land within NRP areas may be restricted from building development, site grading, or vegetation clearing.

3. Agricultural and silviculture operations are permitted in accordance with county, state, and federal law. Best Management Practices are highly encouraged in these areas.

RL - Rural Lands (tan with black dots)This land use category is intended for areas to be preserved mainly as woodlands and/or open space until such time that more intensive development may be appropriate. As mapped, this designation includes farmland, scattered open lands, woodlots, farmsteads, and limited single-family residential development. Developments within this category are served by private wells and on-site waste treatment (septic) systems.

Appropriate Zoning DistrictThe City’s Floating Zone (FZ) and Public Recreation and Forest Reserve (P) districts are most appropriate for this future land use category.

Policies1. The City discourages commercial uses in areas

planned for Rural Lands and directs such developments to areas mapped as “Mixed Use-General”, “Mixed Use-Downtown”, or “Commercial”.

2. The City will allow limited new residential lot development via certified survey map (CSM) in lands designated as “Rural Lands”, but the City will not support larger-scale subdivisions plats.

MSA Professional Services Inc.

20

land use

future land use - Categories (Cont.)

Page 21: 2013 Gilbert, MN Community Development Plan

P - Park (dark green)This land use category includes property where active recreation is the primary activity and where there is typically no commercial or residential use. The City, County, or State usually owns these properties. Some stormwater management or other utility/institutional uses (e.g., water towers) may be located within these areas.

Appropriate Zoning DistrictThe City’s Public Recreation and Forest Reserve (P) district is most appropriate for this future land use category.

Policies1. The City intends to provide sufficient parkland

and recreation facilities to meet the recreation demand of City of Gilbert residents.

LU

R/OS - Recreation & Open Space (light green)This land use category includes property where passive recreation (e.g. ATV trail, multi-use trail, cross country skiing, camping, etc.) is the primary activity and where there is typically no commercial or residential use. Recreation areas may also include land that is otherwise developable but which the City chooses to protect to provide a buffer between conflicting uses, such as ATV trails and residential lots.

Appropriate Zoning DistrictThe City’s Public Recreation and Forest Reserve District (P) is the most appropriate zoning district for this future land use category.

Policies1. Building development is generally prohibited,

except for storage of materials or other uses directly supporting recreational uses.

2. Where ATV or multi-use trails are near residential uses, the City will work to establish screening to mitigate residents’ concerns about noise or light. Screening may include trees or other plantings, berms or fencing, separation of distance or height from the existing residential, and/or other appropriate measures.

City of Gilbert MN

21

land use F

UTU

RE

LA

ND

US

E C

ATE

GO

RIE

S

Page 22: 2013 Gilbert, MN Community Development Plan

CO

MM

UN

ITY

D

EV

ELO

PE

MN

T P

LA

N R/G - Residential - General (yellow)This land use category is intended for existing and planned neighborhoods with a mix of housing types, including single-family, duplex and multi-family (3-12 units).

Appropriate Zoning DistrictThe most appropriate zoning for single-family homes is the City’s Low Density Residence (R-1) district and for multi-family buildings the Medium Density Multiple Dwelling Residence (R-2) and Planned Unit Development (PUD) Districts.

Policies1. The preferred density range is 4-10 units per

acre.

2. Natural areas, including wetlands, wildlife habitats, woodland and unique open spaces, will be protected to the greatest extent possible. The City strongly encourages development and redevelopment of parcels with access to existing public infrastructure, including streets, sewer and water. The City will require connection to the City’s sanitary sewer and water systems.

3. Multi-family residences are encouraged to be located in areas with safe and convenient walking access to the downtown civic and business district.

4. Municipal and institutional land uses (parks, schools, churches, and stormwater facilities) may be built within this district area.

Garages should be set back a minimum of two feet from the primary façade, and a minimum of 20 feet from the street right-of-way (especially where there are public sidewalks to prevent parked cars from obstructing the sidewalk).

R/C - Residential - Conservation Design (tan)This land use category is intended for the creation of planned neighborhoods in undeveloped areas with natural features that merit preservation, such as woodlands or steep slopes. Contrary to conventional residential development practices that divide all land in the plat into individually owned lots, conservation design is intended to cluster homes on relatively smaller lots while conserving large portions of the landscape as undeveloped, permanently protected outlots.

Appropriate Zoning DistrictThe most appropriate zoning is the Planned Unit Development (PUD) district, unless the property is near (or adjacent to) Lake Ore-Be-Gone, then the City’s Ore Be Gone Residential Special Zoning (R-4) district is most appropriate.

Policies1. A minimum of 30% of the platted area should

be permanently preserved as open space, either in public or private ownership. Noteworthy trees, topography, or habitat features should be prioritized for preservation. Any public park space dedicated to the Village will count toward the 30% minimum open space requirement.

2. The preferred density range for the platted area is 0.25 to 1.0 units per acre, and the preferred size of individual residential parcels is 0.25 to 2.0 acres. For example, a 40-acre parcel could have between 10 and 40 residential parcels, and the home sites could be of various sizes, adding up to no more than roughly 24 acres (~60% of total land area). Note that road infrastructure will consume some of the land available for development.

MSA Professional Services Inc.

22

land use

future land use - Categories (Cont.)

Page 23: 2013 Gilbert, MN Community Development Plan

3. Single family homes will be the preferred and predominant unit type, but the City will consider proposals to include other residential formats, such as duplexes or attached condominiums.

4. The City will require connection to the City’s sanitary sewer and water systems.

5. Mature trees within the development area should be preserved as possible, including those on individual residential lots. Indiscriminant lot clearing is strongly discouraged.

6. Provisions for safe pedestrian and bicycle access throughout the neighborhood are required, especially including connections to the existing sidewalk and trail networks. This may be accomplished through any combination of sidewalks, off-street trails, and low traffic, shared-space streets.

LU

MU/G - Mixed Use - General (dark purple)This land use category is intended to be flexible, letting the market dictate the most appropriate land use or mix of land uses (i.e. multi-family residential, retail, office, commercial, or civic use. “Mixed use” can be within a single building (i.e. vertical mixed use) or adjacent to one another (i.e. horizontal mixed use). High-quality site and building design is essential to seamlessly integrating any of the above uses within the same neighborhood/area.

Appropriate Zoning DistrictThe City’s Planned Unit Development (PUD) district is the most appropriate zoning to achieve the intent of this land use category; however, the City’s Commercial (C) and Medium Density Multiple Dwelling Residence (R-2) districts are also appropriate.

Policies1. The City will promote site design featuring

minimal setbacks and limited off-site parking areas.

2. The City encourages site and building designs that enhance the adjacent street and pedestrian environment, especially along Broadway St.

3. The City strongly encourages new development to respect the existing character of surrounding neighborhood.

The City will require connection to the City’s sanitary sewer and water systems.

City of Gilbert MN

23

land use F

UTU

RE

LA

ND

US

E C

ATE

GO

RIE

S

Page 24: 2013 Gilbert, MN Community Development Plan

CO

MM

UN

ITY

D

EV

ELO

PE

MN

T P

LA

N MU/D - Mixed Use - Downtown (light purple)This land use category is intended for pedestrian-oriented commercial, office, entertainment, civic/institutional, and residential uses in a “traditional downtown setting” with on-street parking and minimal building setbacks. This area will remain as the City’s focal point and activity center. Businesses that are encouraged for this area include restaurants, small grocery or specialty food shops, laundromats, hairdressers/barbers, jewelers, hardware stores, small professional/business offices uses that reinforce the City center’s “small-town” character. Several parcels within this area are under-utilized or are in disrepair and are candidates for redevelopment.

Appropriate Zoning DistrictThe City’s Planned Unit Development (PUD) district is the most appropriate zoning to achieve the intent of this land use category. City’s Commercial (C) district meets most of the criteria for this land use category; however, there should be a maximum building setback of no more than 5 feet along Broadway Avenue.

Policies1. In order to maintain the City’s small-town

character, the City will promote site design featuring minimal setbacks and limited off-site parking areas. Uses requiring extensive parking may be directed to areas outside the downtown.

2. The City strongly encourages the concentration of new downtown development placing emphasis on creating an integrated business street, rather than several separated, individual business sites.

3. The City will strongly encourage site and building design meet the “small town” downtown character through design principles provided in the Community Character section. The City will consider adopting more detailed design

standards in the future to guide development further.

4. The City strongly encourages infill and redevelopment of existing (non-historic) properties in the City’s central area.

5. The City supports preservation and rehabilitation of historic buildings within the downtown. The City will look to provide assistance in these efforts in the future.

6. The City will require connection to the City’s sanitary sewer and water systems.

C - Commerical (red)This land use category is intended for office, retail, and service uses that need larger parcels unavailable within the historic downtown area. Community Businesses may include bowling alleys, supermarkets, furniture stores, banks, larger professional/business offices and similar commercial uses. This development will be served by municipal sanitary sewer and water systems.

Appropriate Zoning DistrictThe City’s Commercial (C) zoning district is most appropriate for this future land use category.

Policies1. The City discourages “strip” retail development

and encourages unique buildings built as close to the street as allowed by zoning. See the Community Character section.

2. The City encourages new development to respect the existing character of the surrounding neighborhood.

3. The City encourages commercial uses that fit the “small-town” character of the downtown area to develop or remain in the Mixed Use - Downtown (MU/D) district.

4. The City will require connection to the City’s sanitary sewer and water systems.

MSA Professional Services Inc.

24

land use

future land use - Categories (Cont.)

Page 25: 2013 Gilbert, MN Community Development Plan

P - Public/Institutional (blue)This land use category includes government-owned properties, the school district, and religious institutions. These uses are planned to remain at their present locations in and near the center of the City to continue to conveniently serve residents.

Appropriate Zoning DistrictThe City’s Low Density Residence (R-1) and Medium Density Multiple Dwelling Residence (R-2) districts are most appropriate for this future land use category.

Policies1. The City will work with institutions and the

surrounding neighborhood when discussing potential expansions or new facilities and how these plans would impact the area.

2. The City does not intend to require an amendment to the Future Land Use Map prior to the approval of a proposed public or institutional use in an area that is currently mapped as another future land use, provided such use is either listed as a permitted or conditional use in one of the appropriate zoning districts for this classification.

LU

M - Mine (brown)This category includes lands currently dedicated to mining operations within the Plan Area. While the plan does not identify new quarry lands, expansion of existing quarry lands is undetermined.

Appropriate Zoning DistrictThe City’s Mining and Related Activities (M-2) zoning district is most appropriate for this future land use category.

Policies1. The City will establish appropriate setbacks for

new development to protect residents from objectionable odors or sounds.

2. The City will work with the mine owner(s) to plan for future expansions to mitigate any negative effects on surrounding land uses and local natural resources.

3. When any new, expanded, or extended mine operation is proposed near the City, the City will seek the following conditions:

a. There shall be a safety fence around the entire extraction area at all times with “NO TRESPASSING” signs posted at regular intervals along the fence perimeter.

b. The operator shall require all trucks and excavation equipment to have muffler systems that meet or exceed the current industry standards for noise abatement.

City of Gilbert MN

25

land use F

UTU

RE

LA

ND

US

E C

ATE

GO

RIE

S

Page 26: 2013 Gilbert, MN Community Development Plan

CO

MM

UN

ITY

D

EV

ELO

PE

MN

T P

LA

N

MSA Professional Services Inc.

26

future land use - maPs

land use

Page 27: 2013 Gilbert, MN Community Development Plan

LU

City of Gilbert MN

27

land useF

UTU

RE

LA

ND

US

E M

AP

S

Page 28: 2013 Gilbert, MN Community Development Plan

CO

MM

UN

ITY

D

EV

ELO

PE

MN

T P

LA

N

Objectives: 1. Guide the design of new development such that

new development and existing development can coexist in an attractive manner.

2. Maintain site and building design guidelines for new development, especially commercial development, which establish a small-town, “pedestrian-oriented” environment.

3. Enhance the aesthetic appearance of the City, especially along Broadway Avenue.

Policies: 1. Utilities – The City wishes to bury overhead

utilities lines and will evaluate the cost of doing so during street reconstruction projects.

2. Historic Resources – The City encourages maintenance and rehabilitation of older and historic buildings and will support community events and programs that celebrate the history and culture of Gilbert.

3. Natural Resources – Avoid fragmentation and isolation of natural areas and corridors. To the extent possible, developers shall preserve any existing woodlands and mature trees during and after development. Building development shall be severely limited in areas designated as shorelands, wetlands, floodplains, and areas within steep slopes. In areas with significant environmental sensitive resources or prime agricultural land, the City encourages the use of cluster development in and adjacent to the City’s municipal boundary, and conservation subdivision design in rural sections of the Planning Area. Both design practices are alternatives to conventional land division practices, and help to protect the rich natural and agricultural resources of the region.

MSA Professional Services Inc.

28

urBan design

goals, oBjeCtives & PoliCies

8

Ensure high quality site and building designs within the community to uphold property values and reinforce the character of the City G

OA

L

Page 29: 2013 Gilbert, MN Community Development Plan

4. Transportation Facilities - Transportation facilities shall be designed and maintained according to the following guidelines.

• Street Design: Streets should be designed to the minimum width that will reasonably satisfy safety and maintenance needs. Local streets should not be as wide as collector streets, or “micro-freeways,” which encourages higher travel speeds. Streets should be laid out in a manner that takes advantage of the natural topography and aligns with existing facilities. The use of traditional or modified grid-like street patterns, as opposed to multiple cul-de-sacs and dead end roads, is strongly encouraged.

• Traffic-Calming Devices: Traffic-calming devices and designs are encouraged, where appropriate. Specific measures may include: curb extensions/intersection bump outs, roundabouts, teardrop islands, median and refuge islands, or turning circles.

• ATV Trails: The City will continue to mitigate negative impacts between the ATV trails and residential uses. Tools to be used include moving the trail, adding screening, or dedicating adjacent land as open space (thus creating a buffer between it and new development).

• Pedestrian and Bicycle Improvements: The City will design streets for bike safety, and will consider pedestrian/bike facility improvements when roads are reconstructed/repaved/constructed, especially in areas near existing facilities. Specific measures include sidewalks, on-street bike lanes, bicycle route markers, off-street trails, and tweetens (mid-block foot paths). Some local streets may be safe for walking and biking without the need for sidewalks; however, collector or arterial streets should feature sidewalks for walking and off-street bike paths or marked bike lanes for biking. Bicycle and pedestrian ways shall be designed to connect to adjacent developments, schools, parks, shopping areas, and existing or planned pedestrian or bicycle facilities.

5. Park Facilities - The City will develop new park and recreational facilities where City growth creates a need for additional facilities and where existing residents are underserved by existing City parks. Park dedication, or fee in lieu of, will be required by developers to help achieve this goal. In addition, the City will continue to improve interconnectivity and visibility of the parks and open space throughout the community.

UD

City of Gilbert MN

29

GO

AL

S, O

BjE

CTIV

ES

, & P

OL

ICIE

SurBan design

Page 30: 2013 Gilbert, MN Community Development Plan

CO

MM

UN

ITY

D

EV

ELO

PE

MN

T P

LA

N 6. Single-Family Residential - The City encourages well-designed neighborhoods and homes that reflect aspects of traditional neighborhood design principles. The following illustration provides examples of preferred design features.

MSA Professional Services Inc.

30

urBan design

goals, oBjeCtives & PoliCies (Cont.)

Page 31: 2013 Gilbert, MN Community Development Plan

7. Multi-Family Residential - The City encourages multi-family housing be designed to blend in with traditional neighborhoods. The following illustration provides examples of preferred design features.

UD

City of Gilbert MN

31

GO

AL

S, O

BjE

CTIV

ES

, & P

OL

ICIE

SurBan design

Page 32: 2013 Gilbert, MN Community Development Plan

CO

MM

UN

ITY

D

EV

ELO

PE

MN

T P

LA

N 8. Commercial and Industrial Development - Commercial and industrial uses provide the City with economic stability and provides goods, services, and jobs for its residents. The following illustrations provides examples of preferred design features to ensure an attractive and flexible development pattern.

MSA Professional Services Inc.

32

urBan design

goals, oBjeCtives & PoliCies (Cont.)

Page 33: 2013 Gilbert, MN Community Development Plan

UD

City of Gilbert MN

33

GO

AL

S, O

BjE

CTIV

ES

, & P

OL

ICIE

SurBan design

Page 34: 2013 Gilbert, MN Community Development Plan

CO

MM

UN

ITY

D

EV

ELO

PE

MN

T P

LA

N

MSA Professional Services Inc.

34

A well-designed streetscape incorporates crosswalks, sidewalks, light fixtures, trees, planters, trash receptacles, banners/flags, benches and green spaces within the public right of way. The streetscape design affects how people - residents and visitors - feel about the space and their decisions to stop and shop, or not.

This section provides a series of general guidelines to address streetscaping issues within the planning area. The City will consult these recommendations prior to reconstruction of the public right-of-way or other streetscaping improvement projects.

Landscaping• Provide a cohesive planting policy and select trees

based upon the tree’s characteristics of growth, durability, branching habit, visual appeal, and maintenance requirements.

• No pavement closer than 30 inches to the center of tree trunks.

• Maintain a 7-foot height clearance within the clear path zone. Prune trees that impede this zone.

• Create a seasonal planting program that prescribes procedures for locating, installing, and maintaining seasonal color plantings in at-grade planting beds, raised planters, and hanging baskets.

Signs• Enhance the existing sign system with unique signage

for tourist attractions. Add signs along STH 135 directing travelers to downtown, campgrounds, OHV Park, Iron Range Historical Society, and Lake Ore-Be-Gone.

• Provide a gateway feature at the STH 135/STH 37 intersection with an electronic message sign displaying community events (see example below), and fix the existing welcome sign south of downtown.

• Provide informational signage throughout the downtown regarding the significance of “welcome” street signs, museum, City history, Lake Ore-Be-Gone, OHV Park, etc.

• Provide a map at major destinations (Mesabi Trail kiosk, Lake Ore-be-Gone, Iron Range OHV Park, and major parking lot, etc.), identifying downtown retail and service amenities.

Miscellaneous • Develop uniform details/materials for hangers,

baskets, poles, planters, trash receptacles, etc. (Paint light poles to match street furniture until replacement poles are needed/desired).

• Provide a bench on every block and trash receptacles at crosswalks.

• Provide bike racks at major destinations and near large parking lots.

streetsCaPing guidelines

downtown master Plan

Page 35: 2013 Gilbert, MN Community Development Plan

STR

EE

TSC

AP

ING

& W

AY

FIN

DIN

GM

P

City of Gilbert MN

35

Broadway redesign

DOW

NTO

WN

RESIDENTIAL

BOULEVARD22’

DRIVE13.5’

SW5’

POTENTIAL TWO-LANED STREET

DRIVE13.5’

PARK7.5’

SIDEWALK+/- 20’

PARK8’

TR+/- 8.5’

TR5’2’

2’ 2’

Broadway is a typical highway corridor (i.e. extensive right-of-way, four lanes, large overhead street lights, etc.); however, it is also the major thoroughfare through Gilbert and its downtown. The lack of character, uniqueness and pedestrian safety features has limited the downtown’s commercial viability. The City has taken steps to enhance the corridor by adding american flags, “welcome” signs, banners and potted flowers, but the overall character of the street still resembles a highway, rather than a downtown.

In order to reinvigorate the downtown, the City is interested in reconstructing Broadway into a street that is unique and distinctive from other communities in the region. After discussions with City staff, the Downtown Committee, the general public and MNDOT, a two-laned street with wider sidewalks in the downtown section (Nebraska Ave. to STH 135) was the desired redesign (see illustrations below). Strengths of this design are:• Narrowing the road can help reduce vehicle speeds and can

make it easier for pedestrian to cross the street

• A boulevard (residential) and refuge medians (downtown) make the road unique and safer for pedestrians to cross the street

• Additional landscaping provides visual interest and character to the corridor

• A unified streetscape (i.e. benches, trash cans, outdoor seating areas, banners, pedestrian-scaled lighting, etc.) fosters an identity that is unique in the region

Downtown Existing Condition - Nebraska to Indiana

Residential Existing Condition - Kansas to Nebraska

downtown master Plan

Page 36: 2013 Gilbert, MN Community Development Plan

CO

MM

UN

ITY

D

EV

ELO

PE

MN

T P

LA

N

MSA Professional Services Inc.

36

redeveloPment - Priority 1These sites listed below will be the City’s first priority when marketing development opportunities in downtown Gilbert. Each of these projects can be a catalyst for new development throughout downtown Gilbert.

#1 - Community Center & Food ShelfThe existing Community Center building could be renovated with the basement being redesigned in order to relocate Quad City Food Shelf. The existing Senior Center and public works building (if also needed) will be torn down in order to build a new Senior Center. The City-owned parcel at the intersection of New Jersey and Iowa (#1a) will be built as public parking lot to serve both these uses, as well as relief parking for stores along Broadway. It is suggested that there be a designated parking area here for off-highway vehicles.

#2 - 202 N. Broadway (former Olde Country Floral)This 10,000 sq.ft. building is in good shape, but is currently sitting vacant. Based on the market analysis and building size, this building is a good fit for re-use as an outdoor recreation supply store/outfitter, building materials supply store, or lawn and garden supply store. The City’s is strongly interested in an outdoor recreation outfitter to support local recreation amenities (fishing/scuba/camping gear, swimwear, etc.).

#3 - Dakota & STH 135 SiteThis site is approximately 1.8 acres, has great visibility from STH 135, and has easy access off of Broadway (STH 37). The City is interested in a hotel/motel development to provide tourists/visitors a place to stay without leaving the City. The relative small parcel size may necessitate a shared parking arrangement with the adjacent Wandering Pines Eatery and Pub, and/or additional parking on City land across the street (#3a)

The map on the right displays the (re)development sites within downtown Gilbert. All may be developed at anytime, but due to location, availability, existing conditions, and other factors each site has been described as a Priority One, Two, or Three for the City.

redeveloPment - Priority 2These sites will have an impact on the downtown, but would not be the strongest catalysts for new growth downtown (as compared to Priority One sites).

#5 - Kansas & S. Broadway (STH 37) BlockThis 1.9-acre undeveloped site is at the edge of the City along Broadway (STH 37). The site is extremely visible when entering into the heart of Gilbert from the south. It is ideal for a sit-down restaurant or office building. Depending on the size of the development, there is an opportunity for townhomes or single-family homes along the backside of development facing Kansas Avenue South. The site south of this site (#5a) could provide additional parking for the development (if needed). The site across the street on Kansas Avenue South (#5b) could be additional housing.

#6 - Kansas Avenue & Mesabi TrailThis 3.9-acre site is close to both Broadway (STH 37) and STH 135; however, visibility is limited. The site is ideal for residential or commercial recreation businesses. The City is interested in an “adventure” miniature golf course plus other recreational uses not available in the area, such as batting cages, go karts, etc.

#7 - 419-499 N. Broadway This site is approximately 0.35 acres and is currently undeveloped. Due to its size, this site is ideal for small retail, office, or restaurant/cafe with second-story residential.

redeveloPment - Priority 3There are four infill sites along Broadway that, if developed, would benefit the overall character of the street. Due to the size of these sites, they should be marketed towards new retail or office with potential for second-story residential. See map on the right for specific locations (in purple).

#4 - 201-209 N. BroadwayThis site includes Risky Business (burned down), a single-family home, and a undeveloped lot. Due to its small size (approximately 0.38 acres), this site is ideal for small retail, office, or restaurant/cafe with second-story residential.

downtown master Plan

Page 37: 2013 Gilbert, MN Community Development Plan

RE

DE

VE

LOP

ME

NT O

PP

OR

TUN

ITIES

1,250 0 1,250625 Feet

¯

MP

City of Gilbert MN

37

redeveloPment - Priority 2

downtown master Plan

3

1

1

24

55b

5a

6

7 3a

1a

Priority Legend One Two Three

Page 38: 2013 Gilbert, MN Community Development Plan

CO

MM

UN

ITY

D

EV

ELO

PE

MN

T P

LA

N

MSA Professional Services Inc.

38

WAYFINDING SIGNAGE(MNDOT)

Downtown Gilbert

Lake Ore-Be-Gone 1

Mesabi Trail Access 1

OHV Park 1

Shorewood ForestCampground 1

Back Forty Campground 2

1 - STH 135 (south)

Downtown Gilbert

Lake Ore-Be-Gone 1

Mesabi Trail Access 1

Sherwood ForestCampground 1

Back Forty Campground 2

2 - STH 135 (north)

3 - Wisconsin (west)Lake Ore-be-Gone

Mesabi Trail Access

Sherwood ForestCampground

4 - Wisconsin (east)Lake Ore-Be-Gone

Mesabi Trail Access

Sherwood ForestCampground

5 - Wisconsin (east)OHV Park 1

IMPROVED INTERSECTIONSCOMMUNITY GATEWAYS

downtown master Plan

Potential mixed use develoPment

Potential senior Center site

Build a welcome sign at the STH135/37 intersection with the City’s new tagline and a message board listing community events.

Replace the brick, prune shrubs/trees, and add flowering plants. Consider replacing flags with taller ones.

Provide stamped concrete or inlaid brick crosswalks at major intersections along Broadway.

Add wayfinding signage. Consult MNDOT to review and implement the listed attractions and sign locations.

Page 39: 2013 Gilbert, MN Community Development Plan

DO

WN

TOW

N M

AS

TER

PL

AN

MP

City of Gilbert MN

39

Iron Range Historical Society

Library

Senior Center

a - Dakota (west)

(P) Library

(P) Senior Center

Hopkins Park

b - Iowa (west)

Hopkins Park

c - Virginia (west)

Hopkins Park

Downtown

Iron Range Historical Society

d - Kansas (east)

Hopkins Park

f - Virginia (east)

(P) Library

(P) Senior Center

g - Iowa (east)

BROADWAY AVENUE RECONSTRUCTION

P

WAYFINDINGSIGNAGE

(City of Gilbert)

downtown master Plan

Potential Hotel site

Potential mini golf (& more) site

Reconstruct as a two-laned boulevard street from Kansas to Nebraska, a two-laned street with 25-ft sidewalks (including a 5-ft terrace--furniture zone) from Nebraska to Indiana, and maintain four-lanes with a narrow median using stamped concrete or brick from Indiana to STH 135. Add streetscaping features in the downtown section similar to the image on the right.

Add additional community wayfinding signage following the Community Destination Sign Program, which allows up to three attractions per sign. Consult MNDOT regarding attractions listed and sign locations.

Page 40: 2013 Gilbert, MN Community Development Plan

Action 1: Strengthen the Gilbert Brand around an adventure recreation theme

Steps1) Select tagline to promote (Early 2013)

2) Create a new logo (2013)

3) Incorporate the new logo and tagline in marketing materials (2015)

4) Host a public event, reinforcing the adventure recreation identity (Annually)

Action 2: Recruit a sporting goods/outfitter user for 202 N. Broadway (Olde Country Floral)

Steps1) Discuss with the property owner (and the realtor) the City’s interest in this specific type of use based on market study results and the City’s new brand (Early 2013)

2) Assist with marketing the building as possible and appropriate (On-going)

Action 3: Rebuild Broadway Avenue from Kansas Ave to Indiana Ave

Steps1) Negotiate right-of-way transfer from State to City in the commercial area to reduce state-owned width from +/- 100 feet to +/- 56 feet (2012)

2) Seek grant funding assistance through MNDOT Transportation Enhancement Grant and MN DEED Transit Improvement Area Grants (2013)

3) Initiate detailed engineering (2016)

4) Construction (2017)

Action 4: Improve wayfinding signage

Steps1) Provide more information about the downtown businesses at the Mesabi Trailhead (Early 2013)

2) Work with MNDOT to install DOT-issued wayfinding signs (2013)

3) Design, purchase, and install unique community wayfinding signs (2014)

4) Install informational signs/kiosks downtown about local history and landmarks (2015)

Action 5: (Re)Build gateway features

Steps1) Repair and update the existing gateway feature (2013)

2) Construct a gateway sign feature at the SW corner of STH 135 and STH 37 (2015)

Action 6: Enhance and enliven Broadway Avenue

Steps1) Encourage and permit outdoor dining on the expanded sidewalk (2013)

2) Allow the use of projecting signs on building facades and temporary sandwich board signs on the sidewalk (if removed each night) (2013)

3) Develop and adopt design guidelines (or standards) for the downtown section of Broadway either as a standalone document, or as a part of the City’s Comprehensive Plan (2013)

Action 7: Build a new downtown Senior Center

Steps1) Seek grant funding assistance through the Greater MN Businesss Development Public Infrastructure Grant Program, Community Development Block Grants, and the Small Cities Development Program (On-going)

2) Hire an architect to provide a Needs Assessment and/or Cost Estimate Study for Food Shelf relocation and construction of a Senior Center (2014)

3) Remodel Community Center’s basement for Food Shelf relocation (2015)

4) Tear down the existing Food Shelf building and build a Senior Center (2017)

Action 8: Promote development of a hotel on Dakota Street

Steps1) Work with the property owner (and their realtor) to identify hotel chains with a facility model consistent with the site (On-going)

2) Work with the property owner (and their realtor) to identify and promote the site to developers or owners of similar facilities in the region (On-going)

3) Assist with marketing the site as possible and appropriate (On-going)

imPlementation

MSA Professional Services, Inc.

The action items and steps listed below are deemed most important in helping the City successfully reach its vision for the downtown. This Action Plan identifies specific steps to achieve positive community changes. These actions will take time to complete, and can be achieved with help of grant funding. See the Downtown Plan Action Cards for more detailed information, including cost estimates.