2. competition, markets, ets & renewables final

143
Silvester van Koten, www.energyeconomics.tk , www.slideshare.net/slvstr Economic Policy Energy and the electrical system Silvester van Koten CERGE-EI, Prague Florence School of Regulation LEE, VŠE

Transcript of 2. competition, markets, ets & renewables final

Page 1: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Economic Policy

Energy and the electrical system

Silvester van KotenCERGE-EI, Prague

Florence School of RegulationLEE, VŠE

Page 2: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Mettlen-Lavorgo

Sils-Soazza

03:01-03.16

Huge blackout cripples Italy!

Page 3: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Mettlen-Lavorgo

Sils-Soazza

03:01

Tree flashover!

Transmission lines limits

Page 4: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Net Withdrawal:

50MW

Physical flow: 50MW

A B

Net Injection: 50MW ∆ -10MW

40MW

∆-10MW

40MW

∆ -10MW

40MW

Dispatch

Page 5: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

03:11

The Swiss TSO operator asks the Italian TSO for countermeasures

Dispatch is done by national TSOs

Page 6: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

A:+10 MW

A: 20MW

A

B

Injection: 60MW30$/MWh

С

Withdrawal: 120MW

Limit: 500MWLimit: 20MW

A: 40MW

A: 20MW

Limits+30 MW

B: +10 MW

+30 MW70$/MWh

Page 7: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

http://www.dynamicdemand.co.uk/grid.htm

Frequency and Synchronicity

Page 8: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

All generators are synchronized

UCTE = Continental Synchronous Area

•Azerbaijan, Belarus, Georgia, Kazakhstan, Moldova,

Mongolia, Ukraine•Armenia•Latvia, Lithuania, Estonia•Uzbekistan, Tajikistan & Kazakhstan, Kyrgyzstan?

Page 9: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

1. Transmission lines limits

2. Dispatch

3. Frequency and synchronicity

4. Transmission shortage in the EU

Page 10: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

03:26

Interconnectors very high loaded at night!

The future of the EU transmission network

Page 11: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Internal EU market induces increase in cross-border trading

The future of the EU transmission network

Page 12: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 13: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Massive deployment of wind and solar energy

The future of the EU transmission network

Page 14: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

European Climate

Foundation

Increase of almost

400%

The future of the EU transmission network

2050 Increase from 34 GW to 127

GW

Page 15: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 16: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Power Plants

Transmission

Industrial consumers

Distributors

Residential consumers: Households

Other countries

Page 17: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

2. Power plants

Page 18: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Hydro-plant

Page 19: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

VIDWednesday 2_ Hydroelectic Power - How it Works (hq).mp4

Page 20: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 21: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Large coal plants

Baseload

Page 22: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 23: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Nuclear plants

Baseload

Page 24: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 25: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Oil burning plants

Peaker

Page 26: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Wind turbines

Solar panels

Renewable energies

Page 27: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

VIDWednesday 2_ Wind Turbines - How does it actually work- Investment- (hq).mp4

Page 28: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 29: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Renewable energies

Concentrated solar power

Page 30: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Gas burning plants

Peaker

http://iea-etsap.org/web/Highlights%20PDF/E02-gas_fired_power-GS-AD-gct%201.pdf

OCGT

CCGT

Page 31: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

OCGT

Page 32: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

VIDWednesday 2_ Gas Turbine Basics (hq).mp4

Page 33: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

CCGT

Page 34: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 35: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Multitude of generation types

Trade-off:Economics of scale

High fixed costLow variable costs

FlexibilityLow fixed costsHigh variable costs

Baseload power plants

Peaker power plants

Page 36: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Market equilibrium&

Setting of the wholesale electricity Price

Page 37: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

P

Q (units)q1*

P*

Demand faced by individual firm

s1

D

Page 38: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

P

Q (Thousands of units)

P*

Demand in the total market

D

Q*

S

Page 39: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

P

P*

Demand faced by individual firm

D

Q* Q (Thousands of units)

Page 40: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

P

P*

Demand faced by individual firm

D

Q* Q (Thousands of units)Q (Hunderds of units)

Page 41: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

P

P*

Demand faced by individual firm

D

Q* Q (Hunderds of units)

Page 42: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

P

P*

Demand faced by individual firm

D

Q* Q (Hunderds of units)Q (Tenths of units)

Page 43: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

P

Q (units)Q1*

P*

Demand faced by individual firm

S1

D

Page 44: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Costs and

Revenue

Quantity0

MC1

Q1

MC

AVC

Q MAX

MC2

Q 2

P = MR1 = MR2 P = AR = MRATC

Figure 14-1: Profit Maximization for a Competitive Firm

Page 45: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Price

Quantity0

MC

AVC

ATC

Firm shuts down

Figure 14-3: The Competitive Firm’s Short-Run Supply Curve

Firm produces (at a loss)

Firm produces (with profit)

Page 46: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Setting of the wholesale electricity Price

Page 47: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

D S

$/MWHUniform price auction

Baseload plants (MC=0)

Peaker plants

80PROFITS!

Page 48: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

D S

$/MWHUniform price auction

Baseload plants (MC=0)

Peaker plants

80

Page 49: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

D S

$/MWHUniform price auction

Baseload plants (MC=0)

Peaker plants

80

Page 50: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

D S

$/MWHUniform price auction

Baseload plants (MC=0)

Peaker plants

8060

Page 51: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

D S

$/MWHUniform price auction

Baseload plants (MC=0)

Peaker plants

8060

Quasi-PROFITS!

Page 52: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

3 6 9 12105421 7 8 11

Price

System Marginal

Price

Needed reserves Bids

Quantity

Uniform price auction

1.Procuring ancillary reserves

Profits

Profits

Profits

Page 53: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

3 6 9 12105421 7 8 11

PriceNeeded reserves Bids

Quantity

Price 1

Price 2

Price 3

Zero profit!

Pay-as-bid auction

1.Procuring ancillary reserves

Page 54: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

3 6 9 12105421 7 8 11

Price Costs

Quantity

Profits

Profits

Profits

Needed reserves

Pay-as-bid auction

1.Procuring ancillary reserves

Page 55: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Multitude of generation types

Trade-off:Economics of scale

High fixed costLow variable costs

FlexibilityLow fixed costsHigh variable costs

Baseload power plants

Peaker power plants

Page 56: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

9 12 15 170 24 TIME

Demand in MW

1

3

5

Page 57: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

9 12 15 170 24

Demand in MW

1

3

5

TIME

DURATION (%)

Demand in GW

0.37

1.20

1.83

Page 58: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

9 12 15 170 24

Demand in MW

1

3

5

TIME

DURATION (%)

Demand in GW

0.37

1.20

1.83

100

Page 59: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

9 12 15 170 24

Demand in MW

1

3

5

TIME

DURATION (%)

Demand in GW

0.37

1.20

1.83

10025

Page 60: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

9 12 15 170 24

Demand in MW

1

3

5

TIME

DURATION (%)

Demand in GW

0.37

1.20

1.83

10025160

Page 61: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Fixed cost per MWh

Variable cost per MWh

Baseload 40 0

Peaker 10 50

Page 62: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

0

60

40

Capacity factor

Baseload

Peaker

100%60%

Fixed cost per MWh

Variable cost per MWh

Baseload 40 0

Peaker 10 50

10

(=8760 hours/year)

Page 63: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Use baseload when capacity factor > 60%

Use peakers when capacity factor < 60%

0

60

40

Capacity factor

Baseload

Peaker

100%60%

10

Page 64: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

9 12 15 170 24

Demand in MW

1

3

5

TIME

DURATION (%)

Demand in GW

0.37

1.20

1.83

10025160 60

BASELOAD

PEAKER

Page 65: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 66: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 67: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 68: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 69: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 70: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 71: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 72: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 73: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 74: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 75: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

3 6 9 12105421 7 8 11

Price

System Marginal

Price

Needed reserves Bids

Quantity

Uniform price auction

1.Procuring ancillary reserves

Page 76: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 77: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

BASELOAD

PEAKER

Page 78: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

0 1% =87 hours

Very expensive to built a plant for only 87 hours!Cost?

$1050/MWH (=100*10+50)

Page 79: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Price spike

Page 80: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Can price-spikes be avoided?

- Cap the price, eg at $1000/MWH

Page 81: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

0 1% =87 hours

Cost is $1050/MWH

>

price cap

?

Page 82: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Can price-spikes be avoided?

Cap the price, eg at $1000/MWHCapacity market

Pay power plants for being prepared to generate, even if they are not called upon

Page 83: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Income of a power plant:Price of electricityCapacity payments (reserve)

Page 84: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

What price are people paying?

Page 85: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

CLIMATE CHANGE

Page 86: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 87: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 88: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Greenhouse gasses heat up the earth

Page 89: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Abate CO2

Page 90: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

UNCOP United Nations Framework Convention on Climate

Change

serving as the Meeting of the Parties to the Kyoto Protocol

Page 91: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Tyoko protocol’s 1st phase ends in about 1 month

Page 92: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 93: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 94: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

 UNCOP 17:2011 Durban, South Africa

Agreed...…to agree to a legally binding document in 2012

To be signed in 2015

And in force from 2020

Page 95: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

UNCOP 18, Doha, Qatar

2nd commitment period 2012- 2020

Japan, Russia, Belarus, Ukraine, New Zealand, United States and Canada,

15% of the global carbon dioxide emissions

Page 96: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 97: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

2020 Targets: 20% decarbonization

2050 Targets: 80% decarbonization

Page 98: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

productionOptimal production

Optimal production

Private production

costs = Supply curve

Production + social costs

social costs

P

Q

Demand Curve

Page 99: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

productionOptimal production

Private production

costs = Supply curve

Production + social costs

social costs

P

Q

Demand Curve

Optimal production

Page 100: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

QemissionsOptimal Emissions

Optimal emissions, by ETS

Private production

costs = Supply curve

Production + social costs

P

Emissions

Demand Curve

Maximum emission we

will allow

Page 101: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Private production

costs = Supply curve

Production + social costs

P

Q

Demand Curve

Optimal emissions, by tax

Add tax

emissionsOptimal Emissions

Page 102: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 103: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 104: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 105: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 106: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Large coal plants

LESS

Page 107: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Nuclear plants

MORE?

Page 108: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Gas burning plants

http://iea-etsap.org/web/Highlights%20PDF/E02-gas_fired_power-GS-AD-gct%201.pdf

CCGT

MORE

Page 109: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Wind turbines

Solar panels

Renewable energies

?Why?

Page 110: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Why?

1. Expensive

Page 111: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Retire 1 coal or CCGT plant

=(3000-5000 MW wind or solar)

Install over 1000 wind turbines

=(500 MW conventional)

Why?

1.Expensive

2.Non-dispatchable

Page 112: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Wind and solar needs conventional backupFirm capacity 10%-15%

http://ejournal.windeng.net/3/01/GGiebel-CapCredLit_WindEngEJournal_2005_right_links.pdf

Page 113: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

What is the hardest stress for the system to endure regarding wind generation?

Page 114: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Power increases with wind speed up to a cut-off point

Page 115: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 116: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Maybe we should not expect politicians to be the ones who can point out the solution.

In foreign trade politicians have a terrible track record

2008 Nobel price winner Paul Krugman

Page 117: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

How to create a framework that leads to cleaner

electricity?

WITHOUT POLITICIANS

PICKING “WINNERS”?

Page 118: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

2mT 4mT 5mT

A B C

Emissions:

Page 119: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

2mT 4mT 5mT

A B C

Emissions:

4$/T 5$/T 20$/TAbatement cost:

Page 120: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

2mT

A B C

4$/T 5$/T 20$/TAbatement cost:Abatement-investment

7$/T

5mT4mT1mT

1$/T

Emissions:

Page 121: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

A B C

Abatement cost:Abatement-investment ?Emissions:

Page 122: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 123: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

A B C

Abatement cost:Abatement-investment

Emissions:

Page 124: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

A B C

EMISSION PERMIT MARKET

Competition for

permits

Solution 1:EU Emission Trading Scheme (EU-ETS)

Page 125: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

2005- end 2007: Phase 1 (test phase)

2007- end 2012: Phase 2 (6.5% below 2005 level)

2012- end 2020: Phase 3 (linear 1.74% reduction/year)

Kyoto Protocol

Page 126: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Reduction of 21%

Page 127: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 128: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

1999-2010

Page 129: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Wind turbines

Solar panels

Renewable energies

?Politicians say yes

Page 130: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 131: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

http://www.pnl.gov/main/publications/external/technical_reports/PNNL-19225.pdf

Wind generation in Germany

Page 132: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Feed-in tariffs

0.50 €/kWh 0.20€/kWh

Coal or gas plant costs

0.04€/kWh

2004 2012

Case of Germany

Page 133: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Do the subsidies and feed-in tariffs lead to less CO2 emission

in the EU?

Page 134: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

CO2 produced

Electricity demand

Power produced

Hydro & Nuclear

Gas

Coal

CO2 without

ETS

ETS reduces CO2 emissions

Page 135: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Permits SUPPLY CO2 produced

Electricity demand

Power produced

Hydro & Nuclear

gas

Coal

ETS reduces CO2 emissions

CO2 without

ETS

CO2 with ETS

Shortage of permits!

Page 136: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Permits SUPPLY CO2 produced

Electricity demand

Power produced

Hydro & Nuclear

gas

Coal

ETS reduces CO2 emissions

CO2 without

ETS

CO2 with ETS

Shortage of permits!

Page 137: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Electricity demand

Permits demand

Power produced

Hydro & Nuclear

gas

Coal

ETS affects generation choices

CO2 produced

Wind & solar with subsidies

Page 138: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Electricity demand

Permits demand

Hydro & Nuclear

gas

Coal

ETS affects generation choices

CO2 produced

Wind & solar with subsidies

Wind & solar

Excess of permits!

Page 139: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Electricity demand

Permits demand

Hydro & Nuclear

gas

Coal

ETS affects generation choices

CO2 produced

Wind & solar with subsidies

Wind & solar

Page 140: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Electricity demand

Permits demand

Hydro & Nuclear

Coal

ETS affects generation choices

CO2 produced

Wind & solar with subsidies

Wind & solar

Page 141: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Page 142: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

“Europe is burning more coal, while demand for gas – which emits much less CO2 than coal – is declining ”

Page 143: 2. competition, markets, ets & renewables  final

Silvester van Koten, www.energyeconomics.tk, www.slideshare.net/slvstr

Under a cap& trade program:

subsidy to renewables =

subsidies to dirty production

Net no effect on CO2