1_SS Sawant

download 1_SS Sawant

of 36

Transcript of 1_SS Sawant

  • 8/11/2019 1_SS Sawant

    1/36

    Safety in Tanker

    Loading & Unloadingand SPM Operations

    S. S. SAWANT

    IOCL (PL)

  • 8/11/2019 1_SS Sawant

    2/36

    approx 45,000 DWT

    Handysize

    VLCCSuezmax

    Handymax Panamax

    ULCC

    TYPES OF OIL TANKERS (SIZE)

    20,000 - 30,000 DWT approx 79,000 DWT

    between 120,000 160,000 DWT between 160,000 - 320,000 DWT Over 320,000 DWT

  • 8/11/2019 1_SS Sawant

    3/36

    10/11/2012 3

    LOADING/UNLOADING AT JETTY

  • 8/11/2019 1_SS Sawant

    4/36

    LOADING / UNLOADING THROUGH

    SHIP TO SHIP LIGHTERAGE (STS)

  • 8/11/2019 1_SS Sawant

    5/36

    SPM SYSTEM

  • 8/11/2019 1_SS Sawant

    6/36

  • 8/11/2019 1_SS Sawant

    7/36

    SPM SYSTEM

  • 8/11/2019 1_SS Sawant

    8/36

    A SINGLE POINT MOORING (SPM) IS A COMPLETE SELFCONTAINED OFFSHORE MARINE TERMINAL, WHICH

    PROVIDES THE FACILITY OF MOORING AND

    TRANSFERRING OF CARGO OF TANKERS.

    SPM MOORS A TANKER TO A SINGLE POINT AND ALLOW

    THE VESSEL TO WEATHERVANE ABOUT THAT POINT.

    PROVIDES DIRECT TRANSFER OF CARGO WITHOUT PORT

    FACILITY.

    IT IS ANCHORED TO

    SEABED AND IS

    CONNECTED TO SUBSEA

    PIPELINE THROUGH

    SUBSEA HOSES.

    UNLOADING RATE VARIESFROM 2K TO 12K m3/HR.

    SINGLE POINT MOORING (SPM)

  • 8/11/2019 1_SS Sawant

    9/36

  • 8/11/2019 1_SS Sawant

    10/36

  • 8/11/2019 1_SS Sawant

    11/36

  • 8/11/2019 1_SS Sawant

    12/36

    SINGLE POINT MOORING (SPM)

    MARINE HOSES CRITICAL LINK BETWEEN TANKER, SBM, AND OFFSHORE

    PIPELINE FOR DISCHARGING CARGO

    CAN WITHSTAND SEVERE WEATHER CONDITIONS

    A NUMBER OF HOSES JOINED TOGETHER IS TERMED AS

    HOSE STRING

    C d Oil U l di f T k

  • 8/11/2019 1_SS Sawant

    13/36

    Crude Oil Unloading from Tanker

    through SPM System

    CRUDE OIL TANKER

    FLOATING HOSE STRINGS

    UNDERBUOY HOSE STRINGS

    PIPELINE END MANIFOLD

    OFFSHORE / ONSHORE PIPELINE

    SHORE TANKAGES

    SPM SYSTEM

  • 8/11/2019 1_SS Sawant

    14/36

  • 8/11/2019 1_SS Sawant

    15/36

  • 8/11/2019 1_SS Sawant

    16/36

    SPM SYSTEM

  • 8/11/2019 1_SS Sawant

    17/36

    SAFETY IN SBM OPERATIONS

    PRE-TANKER BERTHING CHECKS

    Inspection of mooring hawsers - check for any visible damage,

    ensure sound health

    Inspection of floating hoses check for any damage, loose flangebolts, leakage / breakage and ensure they are streaming freely.

    Inspection of underbuoy hoses- integrity & configuration

    Check all valves in SPM on deck, in central chamber, subsea

    valves and functioning of hydraulic control unit

    Ensure that all hatches on SPM deck are closed tightly.

    Ensure that SPM turntable is rotating freely.

    Check for mooring hawsers and hose pick up arrangements andensure that there is no entanglement or fouling of mooring gears.

  • 8/11/2019 1_SS Sawant

    18/36

    BOARDING THE TANKER

    Confirm from the tanker that the pilot ladder or gangway is secured

    properly before boarding.

    Before boarding the tanker it should be ensured that shipspersonnel

    is standby at the boarding point on the tanker.

    Life jackets should always be put on while boarding or disembarking

    from a tanker. or during any tranfer of personnel form one vessel to

    another.

    SAFETY IN TANKER / SBM OPERATIONS

  • 8/11/2019 1_SS Sawant

    19/36

    S.No.

    Description

    Yes

    No

    N/A

    1

    Are SMOKING regulations being observed?

    2

    Are GALLEY requirements being observed?

    3

    Are NAKED LIGHT regulations being observed?

    4 Are electrical cables to portable equipment disconnected from power?

    5 Are the ships main transmitting aerial switches off?

    6 Are hand torches of an approved type?

    7 Are portable VHF/UHF transceiver sets of approved design?

    8 Are all external doors and ports in the amidship accommodation closed?

    9Are all doors and ports in the aft accommodation, which are required to be closed in fact

    closed?

    10 Are ventilators suitably trimmed with regard to prevailing wind conditions?

    11

    Are unsafe air conditioning intakes closed?

    12

    Are window type air conditioning units disconnected?

    13

    Is the Ship securely moored and agreement reached on use of tug for pull-backoperation?

    14 Are cargo/bunker hoses in good condition?

    15 Are cargo/bunker hoses properly rigged?

    16 Are unused cargo/bunker connections blanked?

    17 Is the stern discharge line (if fitted) blanked?

    18 Is sea and overboard discharge valves (when not in use) closed and lashed?

    19 Are scuppers effectively plugged?

    20

    Is the agreed ship/shore communication on Ch 12 and 07 working?

    21

    Are all cargo/bunker tank lids closed?

    22 Is the agreed tank venting system being used?

    23 Are fire hoses and equipment ready for use?

    24 Is Ship Emergency Fire Control Plan located externally?

    25 Are emergency towing wired correctly positioned?

    26

    Is the ship ready to move under its own power?

    27Is round-the-clock watch being maintained by the Ship on the SPM, its floating hoses

    and at the manifold?

    28 Have the procedures for cargo and ballast handling agreed?

    29 Has the emergency shutdown procedure been agreed?

    30

    Is there provision for emergency escape possibility?

    31 Are sufficient personnel onboard and ashore to deal with an emergency?

    32 Have measures been taken to ensure sufficient Pump Room ventilation?

    33 Is the Inert Gas system fully operational and in good working order?

    34Are all persons for cargo operations aware that in case of failure of IG system, dischargeoperations are to cease and Terminal to be advised?

    35Have the fixed and portable oxygen analyzers been calibrated and are they working

    properly?

    36

    Is the pre-arrival COW checklist, as contained in the approved COW manual,satisfactorily completed?

    37Is the COW checklist for use before, during and after COW, as contained in the

    approved COW Manual available and agreed to be used?

    Ship/Shore Safety Check LIST

  • 8/11/2019 1_SS Sawant

    20/36

    Safety During Loading / Unloading

    The following checks are mandatory prior to start and

    during cargo unloading / loading operation:

    Ship is securely moored to the berth.

    Ship is having a valid ISPS (International Ship and Port

    Security) certificate and log is maintained for all persons

    boarding alighting from the vessel.

    No naked flames / light is in use anywhere during cargo

    operation.

    Smoking is done in specified designated areas only.

    All electrical connection and transmissions are secured /

    switched off.

    Hand torches / VHF communication sets are fire safe.

  • 8/11/2019 1_SS Sawant

    21/36

    Safety During Loading / Unloading

    Cargo and Bunker hoses are in good condition and properlyrigged.

    All unused valves / connections are closed or blanked.

    Communication system between ship and shore is working

    and understood. Ensure hot work is prohibited during cargo, ballast, tank

    cleaning, gas free operations.

    All cargo / bunker lids are closed.

    Fire hoses and equipment are ready for use.

    Ships Emergency Fire control plan is located externally and

    at an accessible place.

    Emergency Towing wires correctly positioned at Forward and

    Aft.

  • 8/11/2019 1_SS Sawant

    22/36

    Safety During Loading / Unloading

    Time required for the vessel to move under her own power.

    Cargo and berth planning during heavy rain and storm.

    Effective watch on the deck, ER, Pump room, Shore etc. to

    meet any eventuality.

    Cargo and Ballast handling procedure.

    Inert Gas system is fully operational.

    Effective ventilation in all enclosed spaces especially in the

    pump room.

    Fixed and portable oxygen / HC analyzer in use before entry

    into enclosed spaces.

    Crude Oil Washing procedure is agreed and understood by

    all concerned.

  • 8/11/2019 1_SS Sawant

    23/36

  • 8/11/2019 1_SS Sawant

    24/36

    CARGO TRANSFER

    Pumping should begin slowly at first until it has been

    verified that oil is reaching the designated tanks and that

    the whole system is operating satisfactorily.

    The hose strings and the area around the SPM buoy

    should be inspected from the mooring launch for any

    leakage.

    When it has been firmly established that the total system

    is operating correctly, the pumping rate may be

    increased.

    SAFETY IN TANKER / SBM OPERATIONS

  • 8/11/2019 1_SS Sawant

    25/36

  • 8/11/2019 1_SS Sawant

    26/36

    10 O CLOCK

    11 O CLOCK

    09 O CLOCK

    01 O CLOCK

    02 O CLOCK

    12 O CLOCK

    03 O CLOCK

    MONITORING OF SPM POSITION

  • 8/11/2019 1_SS Sawant

    27/36

  • 8/11/2019 1_SS Sawant

    28/36

    CARGO TRANSFER

    Keep a constant watch on the prevailing weather conditions and

    weather forecast reports. Wind criteria normally is 30 knots, stop

    loading/discharging at 35 knots, disconnect hoses at 40 Knotsand cast off from the terminal beyond that.

    Hoses may get trapped under the ships bulbous bow and even

    be pushed further down in adverse weather condition if one is not

    careful. Ships hull has barnacles / hard marine growth which can

    spear/cut the hoses and cause pollutions.

    Keep a tug boat ready with divers to clear the hoses if required,

    SAFETY IN TANKER / SBM OPERATIONS

  • 8/11/2019 1_SS Sawant

    29/36

  • 8/11/2019 1_SS Sawant

    30/36

    CARGO TRANSFER

    Load on the mooring hawsers is to be regularly monitored and to

    keep load on both hawsers nearly equal.

    Pull back operation through pull back tug is to be monitored

    round-the-clock especially during rough / choppy weather and

    during change of tide.

    SAFETY IN TANKER / SBM OPERATIONS

  • 8/11/2019 1_SS Sawant

    31/36

  • 8/11/2019 1_SS Sawant

    32/36

  • 8/11/2019 1_SS Sawant

    33/36

    TANKER PUL BACK OPERATION

  • 8/11/2019 1_SS Sawant

    34/36

    Tanker / SPM operations need constant vigil,monitoring and supervision with closecoordination of all concerned groups / stakeholders

    Main objectives is to ensure timely availabilityof crude oil to refineries, arrange for smooth

    tanker berthing & discharge operations, withsafety as paramount.

    Effective coordination would ensure safe &efficient operations.

    Safety in Tanker and SPM operations

  • 8/11/2019 1_SS Sawant

    35/36

    Thank you

  • 8/11/2019 1_SS Sawant

    36/36

    37

    OFFSHORE SYSTEM

    Codes and Standards:

    American Bureau of Shipping (ABS) - Rules for building andclassifying SPMs

    Oil Companies International Marine Forum (OCIMF) Standards

    BS8010 and DNV-submarine pipeline

    ANSI B 31.4Liquid petroleum transportation piping system

    API 1104-Welding of pipes & related facilities

    AP1110- Pressure testing of liquid petroleum pipelines

    API 111-Design, Construction, Operation and Maintenance ofOffshore Hydrocarbon Pipelines

    OISD 135-Inspection of loading and unloading hoses for

    petroleum products &139 Inspection of pipelines Offshore