.. " PT. PERENTJANA OJAJA in subconsultancywith ~ Yongma Engineering Co. Ltd and si'IPT. Epadascon Permata Engineering Consultant
CTC Office: JI. Ciniru VII No. 25, Kebayoran Baru, Jakarta Selatan, 12180 Phone /Fax: (021) 7229823
Cc: 1. Direktur Jenderal Bina Marga 2. lnspektorat Jenderal, Kementrian PU-PERA 3. Direktur Transportasi -: Bappenas . . 4. Direktur PenqelolaanKas Negara (PKN), Kementrian Keuangan 5. Direktur Pengembangan Jaringan Jalan, Dit.Jen Bina Marga 6. Direktur Jalan Bebas Hambatan, Perkotaan dan Fasilitasi Jalan Daerah, Dit.Jen Bina Marga 7. Direktur Pembangunan ·Jalan; Dit.Jen Bina Marga 8. Direktur Preservasi Jalan, Dit.Jen Bina Marga 9. Biro Perencanaan & KLN, Kementrian PU-PERA 10. Kepala Balai Besar Pelaksanaan Jalan Nasional II Medan 11. Kepala Balai Pelaksanaan Jalan Nasional Ill Padang 12. Kepala Balai Besar Pelaksanaan Jalan Nasional V Palembang 13. Kasubdit Keterpaduan Perencanaan & Sistem Jaringan, DPJJ - DJBM 14. Kasubdit Manajemen Konstruksi, DPJJ - DJBM 15. Kepala Satker Pembinaan Administrasi dan Pelaksanaan Pengendalian·PHLN 16. The World Bank Office, Jakarta 17. PT, Perentjana Djaja 18. Yongma Engineering Co, Ltd 19. PT. Epadascon Permata Engineering Consultant 20. File
Should you have any comment or additional information that need to be incorporated in the Report, please feel free to get in touch with us.
This report is reproduced and submitted in twenty (20) copies for distribution to all concerned authorities.
In compliance with Item No.3 (List of Documents To Be Delivered) of our Consultancy Contract, we submit herewith the Quarterly Progress Report covering the First (1st) Quarter of the Year 2019 (January, February, March 2019).
: Quarterly Progress Report for the First (1st) Quarter of the Year 2019 Subject
: Marhara Tua, S.Kom., S.T Officer In Charge PMU WINRIP
Attention
Directorate General of Highways, MPWli JI. Patimura 20 Kebayoran Baru ' Jakarta Selatan Indonesia
Jakarta, April 30, 2019 : 03 1 O/LHW/O/Q-1.201-9 - •' Our Ref.No. I Perentjana Djaja
Western Indonesia National Roads Improvement Project (WINRIP) IBRD Loan No. 84)43-~D
MINISTRY OF PUBLIC WORKS & HOUSING DIRECTORATE GENERAL OF HIGHWAYS
DIRECTORATE OF ROAD NETWORK DEVELOPMENT Core Team Consultant for
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 1
1 Executive Summary
1.1 Current Implementation Situation
1.1.1 Civil Works
Implementation of the WINRIP Project is scheduled to be implemented into three (3)Annual Work Programs (AWP's). The implementation starts with the preparation oftender documents (detailed design drawings including associated bidding documents),tendering stage (procurement of works) and the actual civil works constructionimplementation.
The original implementation schedules of the three (3) Annual Work Programs (AWPs)are scheduled in three (3) phases, namely ; AWP-1 to start in mid-2011 and to becompleted on the last quarter of 2014, AWP-2 is expected to begin in mid 2012 withtarget date of completion by mid-2016 and AWP-3 is expected to start during the earlypart of 2013 and to be completed during the middle part of 2017.
However, due to some unavoidable circumstances the original implementationschedules did not materialize.
All procurement processes for the sub-projects in WINRIP have been completed,except for Package 5A and Package 21A was recently awarded and is ongoing sinceJanuary 2019. The implementation of Package No.14 suffer delay and upto present stillunder construction.
In December 2018, the WINRIP was restructured to complete the works underpackages 5A and 21A and to activate the disaster risk response component. This willenable the rehabilitation and reconstruction of selected sections of national and sub-national roads in Central Sulawesi damaged by devastating earthquakes and tsunami inSeptember 2018. The sub-projects in Central Sulawesi consist of 3 (three) packagesnamely RR1, RR2 and Construction Supervision Consultant (CSC) which will be launchedin April 2019.
Based on the present status of the program implementation progress, a revisedimplementation schedule, the “Project Implementation Timeline” (as shown on Page 1-3) is to be implemented in order to accommodate the originally delayed schedule intothe remaining time frame of the WINRIP Program until the expiry date of the loanagreement by the end of February 2021. Shown on Page 1-4 is the current actualstatus of the implementation relative to the “Project Implementation Timeline”.
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 2
Table 1 - Implementation Status as of End of the 1st Quarter on March 31, 2019Pack
Package NameContract Under Termination Under Defect
Liability PeriodFHO
No. Sign Construct1 Krui - Biha √ Completed √
2 Padang Sawah - Sp.Empat √ Completed √
3 Manggopoh - Padang Sawah √ Completed √
4 Ipuh - Bantal √ Completed √5 Sp. Rampa - Poriaha √ Completed √6 Ps. Pedati - Kerkap √ Completed √7 Indrapura - Tapan √ Completed √8 Bts.Pariaman - Manggopoh √ Completed √
11 Bantal - Mukomuko √ Completed √12 Kambang - Indrapura √ Completed √13 Sp. Rukis - Tj.Kemuning √ Completed √14 Painan - Kambang √ √15 Sibolga - Bts.Tap Sel √ Completed √16 Seblat - Ipuh √ Completed √17 Sp.Gn.Kemala - Pg.Tampak √ Completed √19 Lais - Bintunan √ Completed √20 Lubuk Alung - Sicincin √ Completed √21 Lubuk Alung - Kuraijati √ √
21A Lubuk Alung - Kuraijati √ √
5A Penanganan Lereng Ruas Rampa -Poriaha √
T O T A L : 20 2 1 13 3Note: Package No.9 (Rantau Tijang – Kota Agung), Package No.10 Sp.Empat-Sp.Air Balam and Package No.18 (Mukomuko – Bts. Sumbar) are cancelled from the
program. Package 5A, Letter of Acceptance (LOA) has been issued by PPK to awarded bidder on March 18, 2019, expectation at least on April 1, 2019 willbe sign between PPK and PT. Girder Indonesia as awarded bidder.
2019 Quarterly Progress Report 1stQuarter : January-February-March
Western Indonesia National Roads Improvement Project 3
Length C'tion
Km Period J N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
CTC Core Team Consultant (CTC) 40 mth IMPLEMENTATION Time extension for sevices
DSC Design & Supervision Cslt (DSC) 42 mth IMPLEMENTATION Time extension for sevices
TAS TA for Dev.of Slope Stabilization, Design & M anagement PROCUREMENT
CSC Construction Supervision Cslt (CSC) PROCUREMENT
1 Krui - Biha 25.00 21 mth 8 Jan'14 9 Okt'15
2 Padang Sawah - Sp.Empat 40.90 24 mth 6 Jan'14 5 Jan'15
3 Manggopoh - Padang Sawah 32.00 24 mth 6 Jan'14 5 Jan'15
4 Ipuh - Bantal 42.40 24 mth 10 Jan'14 9 Jan'15
5 SIMPANG RAMPA - PORIAHA 11.10 18 mth 18 Jun'15 11 Feb'17
11 BANTAL - MUKOMUKO 50.10 24 mth 23 Feb'15 11 Feb'17
13 SP RUKIS - TJ KEMUNING 56.30 24 mth 11 Feb'17
17 Sp.Gn.KEMALA - Pg. TAMPAK 36.80 24 mth 04 Sep'15 23 Agt'17
6 PS. PEDATI - KERKAP 25.00 15 mth 11 Mar'15 02 Jun'16
19 LAIS - BINTUNAN 11.60 10 mth 11 Mar'15 08 May'16
15 SIBOLGA - BATAS TAPSEL 36.00 27 mth 20 Nov'15 06 Feb'18
7 INDRAPURA - TAPAN 19.50 21 mth PROC
8 BTS.Kt PARIAMAN-MANGGOPOH 46.80 24 mth
10 SIMPANG EMPAT - SP.AIR BALAM 61.70 The Road has been constructed by MPW within 2011-2013. Road condition is good. Proposed to be deleted from the list of WINRIP's work program
12 KAMBANG - INDRAPURA 55.20 24 mth
14 PAINAN – KAMBANG 31.50 21 mth
16 SEBLAT – IPUH 34.50 21 mth
20 LUBUK ALUNG – SICINCIN 14.60 18 mth
21 LUBUK ALUNG – KURAITAJI 16.80 18 mth
9 RANTAU TIJANG-KOTA AGUNG 42.00 The Road has been constructed by MPW within 2011-2013. Road condition is good. Proposed to be deleted from the list of WINRIP's work program
18 MUKOMUKO-BTS SUMBAR 25.80 The Road has been constructed by MPW within 2011-2013. Road condition is good. Proposed to be deleted from the list of WINRIP's work program
21A LUBUK ALUNG – KURAITAJI 5 mth PROC CONST 150 days
5A SIMPANG RAMPA - PORIAHA 10 mth PROC CONSTRUCTION 300
RR-01 Rehab & Recon Tompe-Dlm Kota Palu-Surumana PROC
RR-02 Rehab & Recon Palupi-Simoro, Kalukubula-Kalawara, Birobuli-Palolo, Akses Huntap PROC
Original target : 715.60 km ENVIRONMENT & SOCIAL SAFEGUARDRevised target : 586.10 km Prequalification Detail Eng Design LARAP Study
Road Safety Owner's Estimate Appraisal & Public Consultation
Procurement & Sign Contr Bid Document LARAP Implementation
Preparation for Commencement of Work
Standard Biding Document
NCB CONSTRUCTION
20212019 2020
CONSTRUCTION 540 days
CONSTRUCTION 540 days
19-Feb-16
Time for sevices
6-Nov-12
19-Jun-13 30-Nov-16
IMPLEMENTATION
PROC COW CONSTRUCTION
Rev-DED RS
Rev-DED RS
Rev-DED RS
ICB
ICB
NCB
NCB
ICB
ICB
ICB
ICB
NCB
NCB
NCB
Review DED & RS
Review DED & RS
Review DED & RS
PROC
PROCReview DED & RS PQ
PQ
Rev-DED RS
PROC
CONSTRUCTION 720 days
SBD & OE + BD CONSTRUCTION 300 + 125 days
CONSTRUCTION 810 days
CONSTRUCTION
PROC
PROC
CONSTRUCTION
CONSTRUCTION
SBD & OE + BD
CONSTRUCTION 720 days
CONSTRUCTION 720 days
PQ
RS
Proc
COW
SBD
DED RSA & REVISED DED OE & BD
DED
OE
BD
COW
NCB
COW
PROC COW
PROCDED CONSTRUCTION
Pack # PACKAGE NAME2012 2013
Review DED & RS PQ PROC
Review DED & RS PQ
DED
SBD & OE + BD
DED
DED RSA & REVISED DED OE & BD
DED RSA & REVISED DED OE & BD
DED
Review DED & RS
CONSTRUCTIONPROC
CONSTRUCTION 450 days
2014 2015 2016 2017 2018
CONSTRUCTION 640 + 93 days
CONSTRUCTION 540 days
ICB
ICB
ICB
ICB
ICB
ICB
CONSTRUCTION 730 days
CONSTRUCTION 730 days
CONSTRUCTION 730 days
Project Implementation Timeline
2019 Quarterly Progress Report 1stQuarter : January-February-March
Western Indonesia National Roads Improvement Project 4
Length C'tion
Km Period J N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
CTC Core Team Consultant (CTC) 40 mth IMPLEMENTATION Time extension for sevices
DSC Design & Supervision Cslt (DSC) 42 mth IMPLEMENTATION Time extension for sevices
TAS TA for Dev.of Slope Stabilization, Design & M anagement PROCUREMENT
CSC Construction Supervision Cslt (CSC) PROCUREMENT
1 Krui - Biha 25.06 21 mth 8 Jan'14
2 Padang Sawah - Sp.Empat 40.70 24 mth 6 Jan'14
3 Manggopoh - Padang Sawah 32.00 24 mth 6 Jan'14
4 Ipuh - Bantal 42.45 24 mth 10 Jan'14
5 SIMPANG RAMPA - PORIAHA 9.70 18 mth 18 Jun'15
11 BANTAL - MUKOMUKO 50.65 24 mth 23 Feb'15 19 May'17
13 SP RUKIS - TJ KEMUNING 56.27 24 mth
17 Sp.Gn.KEMALA - Pg. TAMPAK 36.15 24 mth 04 Sep'15
6 PS. PEDATI - KERKAP 20.88 15 mth 11 Mar'15
19 LAIS - BINTUNAN 10.80 10 mth 11 Mar'15 CONSTRUCTION 300+125+53 days 30 Jun '16
15 SIBOLGA - BATAS TAPSEL 36.00 27 mth 20 Nov'15
7 INDRAPURA - TAPAN 19.50 21 mth 10 Dec'15
8 BTS.Kt PARIAMAN-MANGGOPOH 46.80 24 mth PROC 23 Mar'16
12 KAMBANG - INDRAPURA 55.20 24 mth
14 PAINAN – KAMBANG 31.50 21 mth PROC 13 Aug'16
16 SEBLAT – IPUH 34.50 21 mth 08 Nov'16
20 LUBUK ALUNG – SICINCIN 14.60 18 mth 1 Sep'16
21 LUBUK ALUNG – KURAITAJI 16.23 18 mth 1 Sep'16
21A LUBUK ALUNG – KURAITAJI 5 mth PROC CONST 150
5A SIMPANG RAMPA - PORIAHA 10 mth PROCCONSTRUCTION 300
RR-01 Rehab & Recon Tompe-Dlm Kota Palu-Surumana PROC
RR-02 Rehab & Recon Palupi-Simoro, Kalukubula-Kalawara, Birobuli-Palolo, Akses Huntap PROC
Original target : 715.60 km ENVIRONMENT & SOCIAL SAFEGUARD1st Revised target : 640.00 km Prequalification Detail Eng Design LARAP Study
2nd Revised target : 578.99 km Road Safety Owner's Estimate Appraisal & Public Consultation
Procurement & Sign Contr Bid Document LARAP Implementation
Preparation for Commencement of Work
Standard Biding Document
Terminate
30-Nov-16
DED
Rev-DED RS
PROC
PROC
Rev-DED RS
Rev-DED RS
Rev-DED RS
CONSTRUCTION 450+240 days
CONSTRUCTION 540 - 53 + 179 days
CONSTRUCTION 540 - 53 + 59 days
CONSTRUCTION 730 + 90 days 31-May-16
2-Mar-18
28-Jul-18
CONSTRUCTION 720 - 71 days
CONSTRUCTION 630 days
18-Mar-18
#########
#########
PROC
17-Mar-16
CONSTRUCTION 540 + 445 days
CONSTRUCTION 730 + 105 days
CONSTRUCTION 730 + 75 days
ICB RSA & REVISED DED OE & BD
Review DED & RS SBD & OE + BD
DED RSA & REVISED DED OE & BD
DED
ICB CONSTRUCTION 810 - 37 + 181 days
14-Apr-16
NCB
ICB
NCB
NCB
DED
PROC
CONSTRUCTION 720 +104 daysICB
ICB
ICB
Review DED & RS
Review DED & RS SBD & OE + BD
RSA & REVISED DED OE & BD
28-Jan-17
CONSTRUCTION 630 - 114 + 168 days
PROC
PROC
2017 2018
SBD & OE + BD
PQ
RS
Proc
COW
SBD
DED
OE
BD
DED
NCB
NCB
DED
DED
CONSTRUCTION 630 + 151 days
23-May-16 CONSTRUCTION 720 - 132 + 209 days
NCB
NCB
Review DED & RS PQ
Review DED & RS PQ
PQ
Review DED & RS
Review DED & RS
PROC
CONSTRUCTION 720 + 127 days
CONSTRUCTION 720 + 212 days22-Jul-15
PQ PROC
ICB
ICB
ICB
ICB
ICB
#########CONSTRUCTION 640 + 93 days
Pack # PACKAGE NAME2012 2019 2020 2021
19-Feb-16
IMPLEMENTATION
Time for sevices
CONSTRUCTION 540 days
CONSTRUCTION 540 days
31-Jan-21
31-Dec-19
20-Dec-18
15-May-18
27-Dec-17
29-Dec-17
27-Jul-18
1-Jun-19
30-Jul-18
2013 2014 2015 2016
6-Nov-12
19-Jun-13
Actual Implementation Timeline of WINRIP
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 5
1.1.2 Consultancy Services
The technical assistance for consultancy of “Capacity Building For Disaster RiskReduction” has been deleted, but replaced by “Technical Assistance for Development ofSlope Stabilization, Design and Management”.
To accommodate the new consultancy assistance, allocated funds from Category 3 whichis originally intended for “Capacity Building for Disaster Risk Reduction” has beenrealigned to Category 2 to fund the implementation of the new technical assistance.
The new consultancy service has been added to Category 2 of loan regarding toAmendment No. 5 of Loan Agreement. This service named Construction SupervisionConsultant (CSC) to supervise 2 (two) sub-projects in Central Sulawesi Province. The sub-projects are civil works for rehabilitation and reconstruction of damaged road afterearthquake and tsunami hit that area.
TA Consultant PlannedMobilization
ContractSigned
ActualMobilization
CTC Jul 2012 5 Nov 2012 12 Nov 2012
DSC Jul 2012 11 Jun 2013 19 Jun 2013
Capacity Building for DisasterRisks Reduction
Cancelled
Development of SlopeStabilization, Design andManagement
June 2017 7 Jul 2017 12 Jul 2017
Capacity Building forEnvironmental Management Cancelled
Capacity Building forRoad Safety Cancelled
Construction SupervisionConsultant (CSC) August 2019
August 2019
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 6
1.2 Current Status of Loan
At the end of this quarter on March 31, 2019 some 76.83% or USD 192.08 million of theavailable loan had been disbursed, which is 4.61% under the revised forecastedexpenditures of 100% (USD 250.00 million) at the end of the quarter.
Total disbursements during this Quarter amounted to USD 0.19 million covering thepayments for "Statement of Work Accomplished' (MC) to civil works Contractors of theon-going construction packages. Details of the Disbursements and Expenditures Statusare presented in Appendix 1.
A more detailed and updated status of the loan are fully described and presented in twentyfourth (25th) Interim Financial Report covering the 1st Quarter (January-February-March) ofthe Year 2019 which is under preparation and will be submitted separately.
1.3 Current Problems and Action Required
Program Activity Responsibility
AWP-14 Nos. Completed and provisionally handed over. Under defects
liability period for seven hundred and thirty (730) days.Contractor, DSC andPPK
AWP-2 & AWP-3
2 Nos. Two (2) packages are under construction. One of themis way behind schedule with huge percentages ofnegative progress slippages. Contractor of theproblematic package shall resolve immediately thecurrent problems. PPK and DSC shall closely monitorthe activities of the Contractor.
12 Nos. Completed and provisionally handed over. Under defectsliability period for seven hundred and thirty (730) days.
3 Nos. Cancelled.1 No. Terminate.1 No Just finalized the procurement process, scheduled for
contract signature and commencement of work on April2019
Contractor, DSC
and PPK
Contractor, DSC and PPK
Capacity Building forDisaster Risks Reduction
Cancelled
Technical Assistance forDevelopment of SlopeStabilization, Design andManagement
Completed the Services
Capacity Building forEnvironmentalManagement
Cancelled
Capacity Building forRoad Safety Cancelled -
Construction SupervisionConsultant (CSC) Preparation for selection Balai, PIU, PMU, CTC
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 7
2 General2.1 Reporting Requirements
Quarterly Progress Reports: This is fourteenth (14th) Quarterly Progress Report asrequired and stipulated in CTC's consultancy contract and the Loan Agreement. Priorto the production of this report, Quarterly Progress Reports have been prepared andhave dealt with all aspects of the works. This report attempts to bring the situation upto date by covering overall progress up to the end of first (1st) Quarter of the Year2019
Financial Monitoring Reports: These have been prepared for each quarter since thebeginning of 2013 with the first Report, issued in May 2013, covering the periodJanuary — March 2013. Since that date quarterly reports have been prepared andsubmitted regularly.
Report Period Covered Date IssuedFinancial Monitoring Report No. 1 January 2013 – March 2013 May 15, 2013Financial Monitoring Report No. 2 April 2013 – June 2013 August 15, 2013Financial Monitoring Report No. 3 July 2013 – September 2013 November 15, 2013Financial Monitoring Report No. 4 October 2013 – December 2013 February 15, 2014Financial Monitoring Report No. 5 January 2014 – March 2014 May 15, 2014Financial Monitoring Report No. 6 April 2014 – June 2014 August 15, 2014Financial Monitoring Report No. 7 July 2014 – September 2014 November 15, 2014Financial Monitoring Report No. 8 October 2014 – December 2014 April 7, 2015Financial Monitoring Report No. 9 January 2015 – March 2015 August 31, 2015Financial Monitoring Report No. 10 April 2015 – June 2015 October 2, 2015Financial Monitoring Report No. 11 July 2015 – September 2015 December 16, 2015Financial Monitoring Report No. 12 October 2015 – December 2015 February 10, 2016Financial Monitoring Report No. 13 January 2016 – March 2016 June 8, 2016Financial Monitoring Report No. 14 April 2016 – June 2016 August 25, 2016Financial Monitoring Report No. 15 July 2016 – September 2016 December 2, 2016Financial Monitoring Report No. 16 October 2016 – December 2016 March 20, 2017Financial Monitoring Report No. 17 January 2017 – March 2017 June 14, 2017Financial Monitoring Report No. 18 April 2017 – June 2017 October 6, 2017Financial Monitoring Report No. 19 July 2017 – September 2017 March 15, 2018Financial Monitoring Report No. 20 October 2017 – December 2017 March 15, 2018Financial Monitoring Report No. 21 January 2018 – March 2018 May 30, 2018Financial Monitoring Report No. 22 April 2018 – June 2018 September 20, 2018Financial Monitoring Report No. 23 July 2018 – September 2018 December 10, 2018Financial Monitoring Report No. 24 October 2018 – December 2018 January 24, 2019Financial Monitoring Report No. 25 January 2019 – March 2019 April 23, 2019
CTC Monthly Progress Reports: These report have been prepared covering each fullmonth since January 2013. Subsequent reports have been submitted on a regularmonthly basis.Environmental Studies and Activity Reports: These report have been continuouslyupdated and submitted to PMU for submission to World Bank for Bank's issuance of NoObjection Letter (NOL). Appendix S-1 shows the summary of submitted of Reportscovering each contract package since inception of the Project.Social Impact Studies and Activity Reports: These report which mainly dealt with theimplementation of "Land Acquisition Resettlement Action Plan" (LARAP) have beencontinuously submitted to PMU for submission to World Bank for Bank's issuance ofNo Objection Letter (NOL). Appendix S-2 indicates the updated summary of all
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 8
submitted Reports.Anti-Corruption Action Plan (ACAP) : Community Development Activity Reports:These Reports have been prepared and continuously submitted to the Client.Appendix S-3 shows the summary of submitted Reports from the very first (1st)submittal up to latest report before the Quarter ended.Community Representative Observers (CRO) and Third Party Monitoring (TPM)Reports: These Reports were consolidated and reviewed by CTC as prepared andsubmitted by the appointed CRO's and TPMs of the respective contract package.Their reports were based on their actual observations and monitoring during pre-bid meetings, site visit and bid openings of every contract package under procurement.Appendix S-4 shows the updated summary of all reports which were forwarded to PMU.
2.2 Loan Status
The agreed allocation of loan funds from the original loan agreement together with the %disbursed by the World Bank to the end of the quarter date (March 31, 2019) is presentedin Table 2
Table 2
Category Description Loan RestructuringAmount US$
Total Disbursementfor the 1st Quarter of
2019
PreviousDisbursement
Total Disbursed byWB to End of
March 31, 2019 inUS$
% Disbursed
1Part 1 Betterment andCapacity Expansion of
National Roads.
205,000,000.00 0.00 182,458,575.04 182,458,575.04 89.00
2 Part 2
Implementation Support20,000,000.00 678,361.54 8,942,195.87 9,620,557.41 48.10
3Part 3
Road Sector InstitutionalDevelopment
0.00 0.00 0.00 0.00 0
4Part 4
Contingency for DisasterRisk Response
25,000,000.00 0.00 0.00 0.00 0
5 Unallocated 0.00 0.00 0.00 0.00 0
DA-A 8,099,048.16 *)
Original LoanAmount
250,000,000.00 678,361.54 191,400,770.91 200,178,180.61 80.07
*) Notes: That the request to refill the WINRIP Loan IBRD 8043-ID Initial Deposit amounting USD 7.569.000 in March 2019 (IFR Q1), hasbeen paid by The World Bank and entered into a special account at the beginning of April 2019. The ending balance of Special AccountUSD 8,099,048.16
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 9
2.3 Financial Management
S-Curve for Financial ProgressA report at the end of the quarter (March 31, 2019) is presented in Appendix 2
2.4 Project Cost MonitoringA detailed summary of the project cost monitoring in tabular format is presented asAppendix 3 at the end of this report.
2.5 World Bank Implementation Review Mission and Site Visit
During this 1st quarter, there was a World Bank supervision for implementation reviewtook place on January 21, 2019 with the kick off and wrap up meeting respectively.
An "Agreed Key Action Plans" for progress compliance monitoring of the status of theworks on monthly interval is shown in Table 3.
Table 3 “Agreed Key Action and Plans”
Status as of end of 1st Quarter (March 2019)
No. Outstanding Action By Whom Deadline Action
1 Package 5A – Launch the bid announcement. PMU January 25, 2019. Done2 Package 14 – Expedite budget revision. PMU/Balai III End of February 2019.3 Procurement – Carry out a training on Bank’s
procurement procedures in Palu for packages RR1,RR2 and Construction Supervision Consultant (CSC).
WB February 1, 2019.
4 Procurement – Publish the revised Procurement Plan,including packages RR1 and RR2, at the WINRIP’swebsite.
PMU/CTC January 31, 2019.
5 Procurement – Start the procurement process for theCSC.
PMU January 31, 2019.
6 Packages RR1 and RR2 – Arrange public consultationsto widely disseminate the Supplement to theEnvironmental and Social Management Framework(ESMF) among the affected people in Palu.
PMU/CTC End of January 2019. Done
7 Submit to the WB the confirmation letter reflecting PMU End of February 2019.
0
10
20
30
40
50
60
70
80
90
100
FIN
ANCI
AL P
ROG
RES
(%)
WINRIP FINANCIAL PROGRESSWESTERN INDONESIA ROAD IMPROVEMENT PROJECT
WB's Disburs Prognosis
Financial Schedule
Financial Actual
Financial Schedule revised
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 10
No. Outstanding Action By Whom Deadline Action
that sufficient budget will be allocated to conduct thesplitzing process.
8 Packages 12, 14 and 16 – Pay particular attention tothe quality of the civil works and reject them if thetechnical specification is not fully met.
PMU/CTC/DSC Continuously.
9 Packages 12, 14 and 16 – Verify that all the necessarysafety measures are properly implemented.
DSC Before issuing thecompletion certificate.
Done
10 Packages 16 – Send to the WB the signed amendment. PMU/CTC/DSC End of January 2019.
11 Package 21A – Ensure that sufficient and adequateequipment (as per technical specification) is deployedfor asphalt production and the basecamp is properlyestablished.
PMU/CTC End of January 2019. DoneRequires re-
check
12 Packages RR1 and RR2 – Incorporate the results of thepublic consultation into the Supplement to the ESMF,translate it into Bahasa and publicly disclose it.Accordingly, update the Project Management Manual(PMM) and the Project Implementation Plan (PIP).
PMU/CTC Mid-February 2019. Done
13 Packages RR1 and RR2 – Prepare the Environmentaland Social Management Plan (ESMP) for each packageas a part of the bidding documents.
PMU/CTC February 2019. Done
14 Packages RR1 and RR2 – Notify to the Bank when thetimeline for design preparation and KIAT and JICArevision.
PMU February 1, 2019.
15 Pavement investigation – Send to the WB the actionplan to fix the quality shortcomings observed duringthe DLP inspection for packages 2, 3, 4, 6, and 19.
PMU/CTC/DSC Mid-February 2019.
16 Maintenance/Safety – Monitor that vegetation isproperly trimmed on the shoulders for all thepackages, especially on the curves, to avoidendangering road users. Drainage maintenance andditch cleaning to be done regularly by contractors.
PMU/DSC/CTC Regularly.
17 Environmental safeguards – Collect and transport allthe solid wastes generated during the projectimplementation to the nearest landfill, e.g. TPA AieDingin, owned by City of Padang.
PMU January 31, 2019.
18 Environmental safeguards – Send to the WB the planfor completely cleaning-up the basecamp of package2.
PMU/DSC/CTC January 31, 2019.
19 Environmental safeguards – Send to the WB theenvironmental management and monitoring plan ofRKPPLs and UKL-UPL implementation quarterly andevery semester respectively for all packages.
PMU and CTC Quarterly and eachsemester.
Done
20 Environmental safeguards – Update the WINRIP’swebsite with all environmental documents includingRKPPLs, RKPPL and other monitoring reports, etc.
PMU and CTC Regularly. Done
21 Social safeguards – Submit to the WB the pendingLARAPs final implementation monitoring reports.
PMU and CTC Packages 13 and 21:beginning of February
2019.
Done
22 Social safeguards – Carry out the splitzing process forpackages 6, 13, 15, 17 and 19.
PMU and CTC March 2018.
23 Complaint Handling Unit (CHU) – Update theWINRIP’s website with all the received complaintsthrough the CHU to make it fully consistent with thecomplaints list handled by the CHU of the PMU.
PMU and CTC Regularly. DoneRegularly
24 TFAC – Send to the WB all the outstanding responses PMU/DSC/CTC Mid-February 2019.
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 11
No. Outstanding Action By Whom Deadline Action
for packages 1, 4, 5, 6, 8, 11, 13, 16, and 19.2526 Financial Management – Submit to the WB the
quarterly IFR for the period October to December2018.
PMU February 15, 2019. Done
27 Traffic data – Send to the Bank the FY2017 data.Inform to the WB about any methodological changein calculating the previous years’ traffic data.
PMU/CTC Mid-February 2019.
28 Perform final traffic surveys along the 18 packages. PMU/CTC March 2019.29 Submit regularly to the WB the quarterly progress
reports.PMU Quarterly. Done
Regularly30 Update the newsletter quarterly, including the list of
contracts, implementation progress, project relatedworkshops, and number, typology and status ofcomplaints; and send this newsletter to the WB.
PMU Regularly. DoneRegularly
31 Send the quarterly newsletter to the civil societyforum in each project province in hard copy orthrough an electronic mailing system.
PMU This activity must becarried out everycalendar quarter.
DoneRegularly
32 Submit to the GoI the project restructuring request. PMU November 30, 2018.(Letter Ref.: HL.0201-
Sj/1234).33 Submit to the Bank the project restructuring request. MoF December 14, 2017.
(Letter Ref.:S919/PR.2/2018).
34 Package 5A – Propose mitigation actions to avoidsimilar failures of the bidding process for the Bank’sprior review. Include the Bank's standard safeguardprovisions on Environmental, Social, Health andSafety (ESHS) and Gender-Based Violence (GBV) inthe bidding documents for the new bidding process.
PMU/CTC November 7, 2018.(Letter Ref.: HL.02.02-
BP/1147).
35 Packages 13, 14 and 15 – Implement the WB’s safetyrecommendations on how to treat the reduced widthsections.
December 2018.
36 Package 21A –Complete the procurement process. PMU January 2019.37 Environmental safeguards – Send to the WB the
basecamp demobilization update for the 18 packages(ongoing and completed).
PMU/DSC/CTC November 13, 2018.(Letter Ref.: HL.02.02-
BP/1180).
2.6 Project Steering Committee Meeting
No Steering Committee meeting during this quarter.
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 12
3 Project Management and Implementation
3.1 Procurement Status
(A) Civil Works
Civil Works are now being implemented in Annual Work Programs (AWP) which havebeen numbered AWP-1, AWP-2, and AWP-3.
All Contract Agreements for the four (4) AWP-1 contract packages were signed by theend of 2013 with actual work commencement on January 2014.
Under the other two (2) implementation programs, AWP-2 and AWP-3, fiveteen (15)packages were already procured, one (1) additional package is closely to complete theprocurement.
Table 4 Shows the actual pre-construction and procurement status under theimplementation schedules AWP-2 and AWP-3
Table 4
PackageNo. Package Name Status
AWP-2
5 Sp. Rampa - Poriaha PHO : March 18, 2018.
6 Ps. Pedati – Kerkap PHO : January 28, 2017.
7 Indrapura – Tapan PHO : January 26, 2018.
8 Bts. Pariaman – Manggopoh PHO : December 29, 2017.
11 Bantal – Mukomuko PHO : May 19, 2017.
12 Kambang - Indrapura PHO : July 28, 2018.
13 Sp. Rukis – Tj. Kemuning PHO : May 15, 2018
AWP-3
14 Painan — Kambang Under Construction
15Sibolga — Bts. Tapsel PHO: June 30, 2018
16Seblat - Ipuh PHO: October 1, 2018
17 Sp. Gn. Kemala – Pg. Tampak PHO : December 27, 2017.
19 Lais – Bintunan PHO : June 30, 2016.
20 Lubuk Alung – Sicincin PHO : March 2, 2018
21 Lubuk Alung - Kuraitaji Terminated.
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 13
PackageNo. Package Name Status
21ALubuk Alung – Kuraitaji(Penyelesaian)
Under Construction
5A Penanganan Lereng RuasJalan Rampa - Poriaha
Under Procurement
Note : Packages No.9, No.10 and No.18 are cancelled from the program.
Presented in Appendix 4 is the current status of procurement management.
(B) Services
The Core Team (CTC), Design & Supervision Consultant (DSC), and the others CapacityBuilding Consultancy status is discussed in Section 3.4. The new consultancy service forsupervise civil works in Central Sulawesi Province is still in preparation for selection byBalai.
3.2 Implementation Status – Civil Works
As of end of this reporting quarter, sixteen (16) of contract packages were previouslycompleted and currently under defects liability period for twenty four (24) monthseffective on the day the TOCs were issued and two (2) packages are currently underconstruction and 1 (one) Package was terminated
Details of each contract package are shown in Table 5.
2019 Quarterly Progress Report 1stQuarter : January-February-March
Western Indonesia National Roads Improvement Project 14
Table 5
ProgramContractPackage
#Contractor Name of Road Province Contract
Signed
Commencement of
Work
Original
TimeExtension/Contraction
Revised
ContractAmount
ContractTime
CompletionDate Contract Amount Contract
TimeCompletion
Date
AWP-1
1 PT. Jaya KonstruksiManggala Pratama Tbk Biha - Krui Lampung Nov 25,
2013 Jan 8, 2014 134,909,211,000 640 CD Oct 9, 2015 93 CD 149,193,782,000 733 CD Jan 20, 2016
2PT.Jaya Konstruksi ManggalaPratama Tbk
Padang Sawah – Sp.Empat including AirGadang
WestSumatera Dec 6, 2013 Jan 6, 2014 197,936,699,000 730 CD Jan 5, 2016 105 CD 247,572,130,000 835 CD Apr 14,
2016
3 PT. Jaya KonstruksiManggala Pratama Tbk
Manggopoh – PadangSawah
WestSumatera Dec 6, 2013 Jan 6, 2014 143,688,963,000 730 CD Jan 5, 2016 75 CD 183,452,130,000 805 CD Mar 17,
2016
4 PT. Waskita Karya and PT.Mulya Turangga (JO) Ipuh - Bantal Bengkulu Nov 14,
2013 Jan 13, 2014 186,936,750,000 730 CD Jan 12, 2016 90 CD 212,290,705,872 820 CD May 31,2016
AWP-2
5 PT. Nusa KonstruksiEnjiniring Tbk. Sp. Rampa - Poriaha North
SumateraMarch 17,
2015June 18,
2015 107,321,260,310 540 CD Dec 8, 2016 464 CD 130,143,384,830 1004 CD March 18,2018
6 PT. Waskita Karya (Persero)Tbk. Ps. Pedati - Kerkap Bengkulu Feb 27,
2015Mar 11,
2015 86,517,470,000 450 CD Jun 2, 2016 240 CD 118,444,156,000 690 CD Jan 28, 2017
7 PT. Adhi Karya Indrapura – Tapan WestSumatera
Nov 26,2015
Dec 10,2015 129,699,900,000 630 CD Aug 30,
2017 148CD 129,699,900,000 778 CD Jan 26, 2018
8 PT. PP/PT. Statika MitraSarana J.O
Bts. Kota Pariaman -Manggopoh
WestSumatera Jan 28, 2016 Mar 23,
2016 355,500,000,000 720 CD Mar 12,2018 -74 CD 378.042.000.000 646 CD Dec 29,
2017
11 PT. Hutama Karya/PT. DayaMulya J.O. Bantal – Mukomuko Bengkulu Dec 18,
2014Feb 23,
2015 228,899,717,000 720 CD Feb 11,2017 96 CD 263,656,603,000 816 CD May 19,
2017
12 PT. Lancar Jaya/PT. CahayaT.A. J.O Kambang – Indrapura West
Sumatera Jan 28, 2016 May 23,2016 358,650,400,000 720 CD May 12,
2018 77 CD 350,643,730,000 797 CD Dec 31,2018
13 PT. Waskita Karya (Persero)Tbk.
Sp. Rukis – TJ.Kemuning Bengkulu Dec 18,
2014July 22,
2015 292,700,000,000 720 CD July 10,2017 309 CD 305,889,100,000 1029 CD May 15,
2018
AWP-3
14 PT. Yasa PatriaPerkasa/Conbloc, JO Painan – Kambang West
Sumatera Jun 1, 2016 Aug 3, 2016 214,327,429,680 630 CD Apr 12,2018 94 CD 214,327,429,000 724 CD Jul 27, 2018
15 PT. PembangunanPerumahan (Persero) Sibolga – Bts. Tapsel North
SumateraJuly 13,
2015Nov 20,
2015 260,100,000,000 810 CD Feb 6, 2018 144 CD 205,270,428,803 954 CD Jun 30, 2018
16 KSO PT Yasa PP-MultiStructure Ipuh - seblat Bengkulu Oct 28, 2016 Nov 8, 2016 211,374,500,000 630 CD July 30,
2018 - 211,374,500,000 630 CD Oct 1, 2018
17 PT. Jaya KonstruksiManggala Pratama Tbk
Sp. Gunung Kemala –Pugung Tampak Lampung Nov 17,
2014 Sept 4, 2015 199,551,000,000 720 CD Aug 23,2017 126 CD 211,712,283,000 846 CD Dec 27,
2017
19 PT. Roda Tekindo Purajaya Bintunan - Lais Bengkulu Feb 27,2015
Mar 11,2015 33,689,452,000 300 CD Jan 4, 2016 178 CD 44,419,760.000 478 CD Jun 30, 2016
20 PT. Nindya Karya Lubuk Alung – Sicincin WestSumatera Jun 1, 2016 Sept 1, 2016 113,818,300,000 540 CD Feb 22,
2018 6 CD 113,818,300,000 546 CD March 2,2018
21 PT. Multi Structure Lubuk Alung – Kuraitaji WestSumatera Jun 1, 2016 Sept 1, 2016 126,301,900,000 540 CD Feb 22,
2018 126 CD 126,301,900,000 666 CD Terminated
21APT. NKE – MJP, KSO Kurai Taji – Lubuk
Alung (Lanjutan)West
SumateraDec 21,
2018 Jan 3, 2019 83,264,709,000 150 CD Jun 1, 2019 - - - -
2019 Quarterly Progress Report 1stQuarter : January-February-March
Western Indonesia National Roads Improvement Project 15
Activities done during this quarter on the on-going construction packages were repair andrestoration of deteriorated existing pavements, roadway excavation, asphalt paving,construction of stone masonry side ditches, stockpiling of raw material, production of crushaggregates, other minor works, finalization of “Field Engineering” surveys.
The five (5) contract packages under implementation program AWP-1 were alreadycompleted.
Under the implementation program AWP-2 and AWP-3, the eleven (11) packages werealready completed and now under defects liability period for two (2) years and the one (1)package was terminated by the employer (Package #21). There currently two (2) contractpackages (#14 and #21A) that are on-going construction implementation. Physical progressof that package are lagging far behind schedule with negative slippages, -6.88% to -11.99%.
Progress status of the on-going civil works contracts as of this reporting period are shown inTable 6.
Following are brief status of the on-going construction contract packages:
Package No. 1 : Biha – KruiThe contract package is completed on January 20, 2016 and provisionally handed over to theEmployer and “Defects Notification Period” of two (2) is completed on January 20, 2018 andfinally handed over to the Employer.
A more detailed previous status during the whole duration of the contract implementationof this Package is presented in ANNEX P-I Executive Summary Report.
Package No. 2 : Padang Sawah – Sp. Empat (Including Air Gadang Bridge)The contract package is completed on April 14, 2016 and provisionally handed over to theEmployer and currently Final Hand Over (FHO) inspection is still going on.
ANNEX P-2 Executive Summary Report present a more detailed status during the wholeduration of the contract implementation of the Contract Package.
Package No. 3 : Manggopoh – Padang SawahThe contract package is completed on March 17, 2016 and provisionally handed over to theEmployer on March 17, 2016 and currently Final Hand Over (FHO) inspection is still going on.
A more detailed status of the project progress during the whole duration of the contractimplementation are shown in ANNEX P-3 “Executive Summary Report”.
Package No. 4 : Ipuh – BantalThe contract package is completed on May 31, 2016 and provisionally handed over to the
Employer on May 31, 2016 and currently Final Hand Over (FHO) inspection is still going on.
ANNEX P-4 “Executive Summary Report” shows the details and status of the project.
2019 Quarterly Progress Report 1stQuarter : January-February-March
Western Indonesia National Roads Improvement Project 16
Table 6
ProgramContractPackage
#Contractor Name of Road
Target ProgressSchedule Ending
March 2019
Actual ProgressAccomplished Slippage Time Elapsed Remaining
Time Remarks
AWP-1
1 PT. Jaya Konstruksi ManggalaPratama Tbk Biha - Krui * - - - -
CompletedPHO : January 20, 2016
2PT. Jaya Konstruksi ManggalaPratama Tbk Padang Sawah – Sp.Empat
incl.Air Gadang * - -- - -Completed
PHO : April 14, 2016
3 PT. Jaya Konstruksi ManggalaPratama Tbk
Manggopoh – PadangSawah * - - - -
CompletedPHO : March 17, 2016
4 PT. Waskita Karya and PT. MulyaTurangga (JO) Ipuh - Bantal * - - - -
CompletedPHO : May 31, 2016
AWP-2
5 PT. Nusa Konstruksi Enjiniring Sp. Rampa - Poriaha 100% 94.61% -5.39% Contract amount reduced5.39% (Revised BOQ)
CompletedPHO : March 18, 2018
6 PT. Waskita Karya Tbk Ps. Pedati – Kerkap * - - - - CompletedPHO : January 28, 2017
7 PT. Adhi Karya Indrapura - Tapan * - - - -Completed
PHO : January 26, 2018
8 PT. PP/PT. Statika Mitra J.O Bts. Kota Pariaman –Manggopoh * - - - -
CompletedPHO : December 29, 2017
11 PT. Hutama Karya/ PT. DMT Mukomuko - Bantal * - - - -Completed
PHO : May 19, 2017
12 PT. Lancarjaya/PT. Cahaya T.A. JO Kambang – Indrapura 100% 97.77% -2.23% Contract amount reduced2.23% (Revised BOQ)
CompletedPHO : July 28, 2018
13 PT. Waskita Karya (Persero) Tbk Sp. Rukis – Tj. Kemuning * - - - - CompletedPHO : May 15, 2018
AWP-3
14 PT. Yasa – PT. Conbloc (JO) Painan – Kambang 100% 93.12% -6.88% 133.33% -241 CDBased on revised contract timeand schedule
15 PT. Pembangunan Perumahan(Persero) Sibolga – Bts. Tapsel 100% 78.92% -21.08% Contract amount reduced
21.08% (Revised BOQ)Completed
PHO : June 30, 2018
16 PT Yasa-Multi Structure, Jo Seblat –Ipuh * - - - -Completed
PHO : October 1, 2018
17 PT. Jaya Konstruksi ManggalaPratama Tbk Sp. Gn Kemala – Pg. Tampak * - - - - Completed
PHO : December 27, 2017
19 PT. Rodatekindo Purajaya Lais – Bintunan * - - - -Completed
PHO : June 30, 2016
20 PT. Nindya Karya Lubuk Alung – Sicincin * - - - -Completed
PHO : March 2, 201821 PT. Multi Structure Lubuk Alung – Kuraitaji 100% 55.79% -44.21% - - Contract To Be Terminated
21A PT. NKE – MJP, KSO Kurai Taji – Lubuk Alung(Lanjutan) 51.16% 39.17 -11.99 54.36% 68 CD Based on revised contract time and
schedule
* Under defects liability period for 720 calendar days
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 17
Package No. 5 : Sp. Rampa – Poriaha
The contract package is completed on March 18, 2018 and provisionally handed over to theEmployer and currently under “Defects Notification Period” until after two (2) yearsreckoned from the issuance of TOC.
ANNEX P-5 “Executive Summary Report” shows the Contractor’s Progress Schedule.
Package No. 6 : Kerkap – Ps. Pedati
The contract package is completed on January 26, 2017 and provisionally handed over tothe Employer and currently under “Defects Notification Period” until after two (2) yearsreckoned from the issuance of TOC.
ANNEX P-6 “Executive Summary Report” shows the complete details of the contractpackage.
Package No. 7: Indrapura – TapanThe contract package is completed on January 28, 2018 and provisionally handed over tothe Employer and currently under “Defects Notification Period” until after two (2) yearsreckoned from the issuance of the TOC.
ANNEX P-7 “Executive Summary Report” shows the complete details of the contractpackage.
Package No. 8 : Bts. Kota Pariaman - ManggopohThe contract package is completed on December 29, 2017 and provisionally handed over tothe Employer and currently under “Defects Notification Period” until after two (2) yearsreckoned from the issuance of the TOC.
ANNEX P-8 “Executive Summary Report” shows the complete details of the contractpackage.
Package No. 11 : Bantal - MukomukoThe completion date is on May 19, 2017 and the inspection for the provisional hand-over isalready done and the process verbal has been issued on May 19, 2017.
For more detailed of the Contract Package, refer to ANNEX P-11 “Executive SummaryReport”.
Package No. 12 : Kambang - IndrapuraThe package is under provisional hand over inspection since January 7, 2019 aftersubstantial completion of the works in the last month.
Details of the Contract Package are shown in ANNEX P-12 “Executive Summary Report”.
Package No. 13 : Sp. Rukis – Tj. KemuningThe contract package is completed on May 15, 2018 and provisionally handed over to theEmployer and currently under “Defects Notification Period” until after two (2) yearsreckoned from the issuance of the TOC.
Details of the work progress are shown in ANNEX P-13 “Executive Summary Reports.
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 18
Package No. 14: Painan - KambangThe work progress as of this quarter is achieved of 93.12%, much lagged behind theschedule, 100%.
This quarter work progress is only 0.67%, because the contractor is still much suffering witha serious lack of operation fund for which this troublesome reason of delayed workprogress is repeated and continued since May, 2018.
Remaining major works estimated by the contractor (as of March 2, 2019)
V-ditch (mortar stone works) : 3.250 m U-ditch (precast concrete) : 500 m Aggr. Class S : 13.350 m Concrete shoulder (K-250) : 4.750 m
ANNEX P-14 “Executive Summary Report” shows the complete details of the project.
Package No. 15: Sibolga – Bts. TapselThe contract package is completed on July 3, 2018 and provisionally handed over to theEmployer and currently under “Defects Notification Period” until after two (2) yearsreckoned from the issuance of TOC.
Detailed and work progresses of the contract package are shown in ANNEX P-15 “ExecutiveSummary Report”.
Package No. 16 : Seblat – IpuhThis package had been substantially completed in the last month. Hence the taking overinspection undertaken by the client.
ANNEX P-16 “Executive Summary Report” shows the complete details and work progressof the project.
Package No. 17 : Sp. Gunung Kemala – Pg. TampakThe contract package is completed on December 27, 2017 and provisionally handed over tothe Employer and currently under “Defects Notification Period” until after two (2) yearsreckoned from the issuance of the TOC.
ANNEX P-17 “Executive Summary Report” shows the complete details and work progressof the project.
Package No. 19 : Lais – BintunanThe contract package is completed on June 30, 2016 and provisionally handed over to theemployer and currently under “Defects Notification Period” until after two (2) yearsreckoned from the issuance of the TOC.
ANNEX P-19 Executive Summary Report present a more detailed status during the wholeduration of the contract implementation of the Contract Package.
Package No. 20 : Lubuk Alung - SicincinThe contract package is completed on March 2, 2018 and provisionally handed over to the
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 19
Employer and currently under “Defects Notification Period” until after two (2) yearsreckoned from the issuance of the TOC.
A more detailed status of the project progress during the whole duration of the contractimplementation are shown in ANNEX P-20 “Executive Summary Report”.
Package No. 21 : Lubuk Alung - KuraitajiThis Package was terminated by the client on 11, July 2018.2
ANNEX P-21 “Executive Summary Report” shows the Contractor’s schedule and workprogress.
Package No. 21A : Lubuk Alung – KuraitajiThe work progress as of this quarter is achieved of 39.17% which is lagged behind theschedule, 51.16%.
The actual work progress of Asphalt pavement (33.19%) is ahead over the scheduled, 31.44%but the other works are much lagged behind the scheduled, especially structure works (sch :8.23%, Act : 1.20%).Details of Contract Package are shown in ANNEX P-21A “Executive Summary Report”.
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 20
3.3 Variation Order Details
To date, amendements and/or variation orders for six (6) construction contract packageswere already processed and approved by Pejabat Pembuat Komitmen (PPK), theauthorize Office to approve financial disbursement.
The approved variations orders were due to the following reasons :
a) Change of Engineer’s Team Leader from V. Thiagarajah to Johnson Villar and fromJohnson Villar to Efren L. Baccani.
b) Change of PPK Sub Project Manager.
c) Contract amount revision due to Technical Justification of Field Engineeringresults.
d) Revision of time for completion (time extension).
e) Contract amount revision due to contract price adjustment (escalation of unitrates).
f) Change of Contractor’s authorize representative.
g) Deletion of unspent provisional sum amounting to Rp. 7.1 Billion and balancing ofquantity overruns/underruns.
h) Final Quantity.
i) Change Bank Account
In regards with additive/deductive cost variations, original cost of the twelve (12)construction contract packages increases by Rp. 218,401,529,000..
Presented in Table 7 are details of Variation Orders for the four (4) sub-projects underAWP-1 and fourteen (14) contract packages covered by AWP-2 and AWP-3
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 21
Table 7 – Details of Amendments (Variation Orders)
No.Packages
Original ContractAmount
(Rp)
AmendNo.
Variation +/-(Rp)
Revised ContractAmount (Rp) Variance % Time
Extension
ReasonFor
Change
1 134,909,211,000
1 0 134,909,211,000 0 - A
2 19,163,804,000 154,073,015,000 14.2 - C
3 0 154,073,015,000 0 - B
4 0 154,073,015,000 0 93 D
5 -13,817,995,000 140,255,020,000 -8,97 - G
6 0 140,255,020,000 0 - A&B
7 8,938,762,000 149,193,782,000 +6,37 - E
2 197,936,699,000
1 0 197,936,699,000 0 - A
2 0 197,936,699,000 0 - F
3 0 197,936,699,000 0 - B
4 28,776,518,000 226,713,217,000 14.54 - C
5 0 226,713,217,000 14.54 105 D
6 22,635,714,000 249,348,931,000 25.97 - E
7 0 249,348,931,000 25.97 - B
8 -1,776,801,000 247,572,130,000 -0.72% - E&H
3 143,688,963,000
1 0 143,688,963,000 0 - A
2 0 143,688,963,000 0 - F
3 0 143,688,963,000 0 - B
4 21,468,809,000 165,157,772,000 14.94 - C
5 0 165,157,772,000 14.94 75 D
6 18,783,100,000 183,940,872,000 11.37 - E
7 0 183,940,872,000 0 - H
8 -488,187,000 183,452,685,000 0 - E&H
4 186,936,750,000
1 0 186,936,750,000 0 - A
2 9,501,334,000 196,438,084,000 5.08 - C
3 0 196,438,084,000 5.08 - B
4 0 196,438,084,000 5.08 90 D
5 -1,535,905,000 194,902,179,000 -0.79 - H
6 17,388,526,872 212,290,705,872 8.92 - E
5 107,321,260,000
1 0 107,321,260,000 0 - A
2 0 107,321,260,000 0 224 D
3 0 107,321,260,000 0 - B
4 0 107,321,260,000 0 254 D
5 0 107,321,260,000 0 295 D
6 22,822,124,830 130,143,384,830 21.27% 357 C, D
7 0 130,143,384,830 0 455 D
8 0 130,143,384,830 0 67 D
9 -9,249,697,830 120,893,687,000 -8.62 - H
10 2,239,076,000 123,132,763,000 +2.09 - H
11 -78,810,000 123,132,763,000 *0.06% H
6 86,517,470,0001 0 86,517,470,000 0 - B, F
2 31,926,686,000 118,444,156,000 36.90% - C
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 22
No.Packages
Original ContractAmount
(Rp)
AmendNo.
Variation +/-(Rp)
Revised ContractAmount (Rp) Variance % Time
Extension
ReasonFor
Change
3 0 118,444,156,000 0 150 D
4 0 118,444,156,000 0 - C
5 0 118,444,156,000 0 - B
6 0 118,444,156,000 0 - H
7 129,699,900,000
1 0 129,699,900,000 0 - C
2 0 129,699,900,000 0 - C
3 0 129,699,900,000 0 - F
4 0 129,699,900,000 0 - B
5 0 129,699,900,000 0 - C
6 0 129,699,900,000 0 72 D
7 0 129,699,900,000 0 - C
8 0 129,699,900,000 0 91 D
9 0 129,699,900,000 0 - B
10 0 129,699,900,000 0 119 D
11 0 129,699,900,000 0 151 D
12 0 129,699,900,000 0 0 H
8 355,500,000,000
1 0 355,500,000,000 0 -81 D
2 0 355,500,000,000 0 - C
3 0 355,500,000,000 0 - A, B
4 0 355,500,000,000 0 - F
5 26,295,000,000 381,795,000,000 7.40% - C
6 -3,753,000,000 378,042,000,000 -1.06% - G
7 0 378,042,000,000 0 - A
8 0 378,042,000,000 0 - H
11 228,899,717,000
1 0 228,899,717,000 0 - B
2 33,711,586,000 262,611,303,000 14.73 - C
3 0 262,611,303,000 0 104 D
4 0 262,611,303,000 0 - H
12 358,650,400,000
1 0 358,650,400,000 0 -132 C&D
2 0 358,650,400,000 0 - A
3 0 358,650,400,000 0 - B
4 0 358,650,400,000 0 - A
5 0 358,650,400,000 0 78 D
13 292,700,000,000
1 0 292,700,000,000 0 - I
2 0 292,700,000,000 0 - B
3 0 292,700,000,000 0 - F
4 0 292,700,000,000 0 - C
5 0 292,700,000,000 0 - CF
6 0 292,700,000,000 0 - B
7 0 292,700,000,000 0 - A
8 0 292,700,000,000 0 107 D
9 0 292,700,000,000 0 137 D
10 0 292,700,000,000 0 173 D
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 23
No.Packages
Original ContractAmount
(Rp)
AmendNo.
Variation +/-(Rp)
Revised ContractAmount (Rp) Variance % Time
Extension
ReasonFor
Change
11 0 292,700,000,000 0 212 D
12 0 292,700,000,000 0 - B
13 0 292,700,000,000 0 242 D
14 0 292,700,000,000 0 272 D
15 0 292,700,000,000 0 290 D
16 13,186,100,000 305,886,100,000 4.50 299 C,D
17 0 305,886,100,000 0 0 H
14 214,322,429,000
1 0 214,322,429,000 0 - C
2 0 214,322,429,000 0 -114 D
3 0 214,322,429,000 0 - C
4 0 214,322,429,000 0 - B
5 0 214,322,429,000 0 - A
6 0 214,322,429,000 0 - B
7 0 214,322,429,000 0 54 D
8 0 214,322,429,000 0 - B
9 0 214,322,429,000 0 94 D
15 260,100,000,000
1 0 260,100,000,000 0 -37 C&D
2 0 260,100,000,000 0 0 C
3 0 260,100,000,000 0 0 B
4 0 260,100,000,000 0 0 C
5 0 260,100,000,000 0 0 CA
6 0 260,100,000,000 0 144 D
7 -50,705,383,000 209,394,617,000 -19.49 - H
8-4,124,188,000
205,270,429,000 -1.88 - H
16 211,374,500,000
1 0 211,374,500,000 0 - B
2 0 211,374,500,000 0 - C
3 0 211,374,500,000 0 - B
4 0 211,374,500,000 0 30 C
5 0 211,374,500,000 0 62
17 199,551,233,000
1 0 199,551,233,000 0 - B
2 0 199,551,233,000 0 - AF
3 0 199,551,233,000 0 38 CD
4 24,371,050,000 223,922,283,000 12.21% 81 CD
5 0 223,922,283,000 0 107 D
6 -12,210,000,000 211,712,283,000 -6.12% 126 DGH
19 33,689,452,000
1 0 33,689,452,000 0 - B
2 10,730,308,000 44,419,760,000 31.85 125 CD
3 0 44,419,760,000 0 178 CD
20 113,818,300,000
1 0 113,818,300,000 0 -54 C&D
2 0 113,818,300,000 0 - B
3 0 113,818,300,000 0 - C
4 0 113,818,300,000 0 - A
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 24
No.Packages
Original ContractAmount
(Rp)
AmendNo.
Variation +/-(Rp)
Revised ContractAmount (Rp) Variance % Time
Extension
ReasonFor
Change
5 0 113,818,300,000 0 - C
6 0 113,818,300,000 0 -7 D
7 0 113,818,300,000 0 - F
8 0 113,818,300,000 0 8 D
9 0 113,818,300,000 0 - H
21 126,301,900,000
1 0 126,301,900,000 0 -54 C&D
2 0 126,301,900,000 0 - B
3 0 126,301,900,000 0 - C
4 0 126,301,900,000 0 - A
5 0 126,301,900,000 0 126 D
21A 83,264,709,000 1 0 83,264,709,000 0 0 J
Reason For Change :A – Change of Engineer’s Team Leader from V. Thiagarajah to Johnson Villar.B – Change of PPK Sub Project Manager.C – Contract amount revision due to Technical Justification of Field Engineering results.D – Revision of time for completion (time extension/contraction).E – Contract amount revision due to contract price adjustments (escalation).F – Change of Contractor’s authorize representative.G –Deletion of unspent provisional sum amounting to Rp. 7.1 Billion and balancingof quantity overruns/underruns.H –Final quantity (overuns/underruns).I – Change Bank Account.J – Contract Change Order due to Technical Justification of Field Engineering results.
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 25
3.4 Consultancy ServicesTechnical Assistance for Core Team Consultant (CTC) to Support the ProjectManagement Unit.
Lead Consultant: PT. Perentjana Djaja
CTC Contract No. 06-20/CTC/TA/LN/8043/1112 was signed on 5 Nov 2012 betweenthe Ministry of Public Works , Directorate of Planning, DGH and PT. Perentjana Djaja,Yongma Engineering Co. Ltd, PT. Epadascon Permata Engineering Consultant, JV and thework commenced on 12 November 2012.
Amendment No.1 to original contract was signed on October 25, 2013.
Amendment No. 2 was officially approved, on September 3, 2014.
Amendment No. 3 has been approved on November 30, 2015.
Amendment No. 4 to the current CTC Contract was signed on March 4, 2016.
Amendment No. 5 to the current CTC contract was signed on April 10, 2017.
Amendment No. 6 to the current CTC contract was signed on December 8, 2017.
Amendment No. 7 to the current CTC contract was signed on April 30, 2018.
Amendment No. 8 to the current CTC contract was signed on November 29, 2018.
Amendment No. 9 to the current CTC contract was signed on January 9, 2019.
Amendment No. 10 to the current CTC contract was signed on March 8, 2019.
Presented in Table 8 is the current status of CTC contract.
Table 8Description USD IDR
Original Contract including 10% VAT 1,404,370 23,556,940,000
Amendment No.1 including 10% VAT 1,447,517 24,668,792,500
Variance Against Original Contract +3,07% +4,72%
Combine Variance Against Original Contract +4.12%
Amendment No. 2 including 10% VAT 1,509,117 24,704,544,150
Variance Against Original Contract +7,46% +4,87%
Combine Variance Against Original Contract +5.81%
Amendment No.3 including 10% VAT 1,473,917 26,328,054,500
Variance Against Original Contract +4.95% +11.76%
Combine Variance Against Original Contract +9.29%
Amendment No. 4 including 10% VAT 1,918,158 40,878,169,529
Variance Against Original Contract +36.58% +73.53%
Combine Variance Against Original Contract +60.12%
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 26
Description USD IDR
Amendment No. 5 including 10% VAT 1,595,403.33 41,545,386,446
Variance Against Original Contract 13.69% 76.36%
Combine Variance Against Original Contract 53.58%Amendment No. 6 including 10% VAT 1,819,253.33 48,653,875,746Variance Against Original Contract 29.54% 106.54%Combine Variance Against Original Contract 68.04%
Amendment No. 7 including 10% VAT 1,847,388.04 50,707,302,309
Variance Against Original Contract 31.55% 115.25%
Combine Variance Against Original Contract 73.40%
Amendment No. 8 including 10% VAT 1,867,738.03 51,239,410,810
Variance Against Original Contract 32.99% 117.51%
Combine Variance Against Original Contract 75.25%
Amendment No. 9 including 10% VAT 2,376,488.03 61,522,513,310
Variance Against Original Contract 69.22% 161.17%
Combine Variance Against Original Contract 115.19%
Amendment No. 10 including 10% VAT 2,376,488.03 61,522,513,310
Variance Against Original Contract 69.22% 161.17%
Combine Variance Against Original Contract 115.19%
Note : Combine variance (USD+IDR) is based on 1 USD = Rp. 9,558 exchange rate used during thetime of signing the original Contract Agreement.
Technical Assistance for Design & Supervision Consultant (DSC)
Lead Consultant: Renardet S.A
DSC Contract No. KU.03.01/PPK-PR/WINRIP/Bx/01/VI/2013 was signed on 11 Jun 2013between the Ministry of Public Works, Head of Regional Office for National RoadsImplementation, DGH and Renardet S.A. PT Cipta Strada, PT. Daya Creasi Mitrayasa, PT.Seecons and PT. Yodya Karya (Persero) Joint Venture and mobilized on 19 June 2013.
Table 9 shows the current status of DSC contract.
Table 9
Description USD IDR
Original Contract plus 10% VAT 902.660 57,000,575,500
Addendum No.1 plus 10% VAT 1,147,190 60,541,139,347
Variance Against Original Contract +27.09% +6.21%
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 27
Description USD IDR
Addendum No.2 plus 10% VAT 848,034 59,973,161,962
Variance Against Original Contract -6.05% +5.22%
Addendum No.3 plus 10% VAT 1,062,534 70,781,353,406
Variance Against Original Contract +17.71% +24.18%
Addendum No.4 plus 10% VAT 1,108,954 78,073,705,751
Variance Against Original Contract +22.85% +36.97%
Addendum No.5 plus 10% VAT 1,394,844 81,686,286,530
Variance Against Original Contract +54.53% 43.31%
Note :1)Addendum No.3 was approved by DGH on 22 December 2017 with World Bank concurrence
and issuance of No Objection Letter (NOL).
Technical Assistance for Development of Slope Stabilization, Design and Management:The TA’s objective is to provide technical support to DGH in improving their capacity forroad slope/embankment protection and management. It will include identification andinventory of the existing slope and embankment conditions, assessment of futurepotential land slide /road erosion problems, development of risk maps, prioritization ofhigh problem/high risk areas, and development of the Detail Engineering Design for alimited amount of areas in the Western corridor of Sumatra. It will also include the review(and revision) of the National Standard and Manual (NSPM) related to the slopeprotection, and capacity building.
Following the problem that arise in Civil Works of WINRIP especially in related to slopestability, the Consultant is assigned to design the slope stability in Package No. 5 : Sp.Rampa – Poriaha as one of the 5 (five) priority locations. The expected final outputs aredesign structure of slope stability and structure of road user safety against landslideinclude design drawing, bill of quantities and material specification to be additionalcontract for Package No. 05 above. Until this month the consultant had been completedthe evaluation for priotity location with highest risk based on Pusjatan Guideline. Thereare 5 locations with highest risk as follows: 1 location in North Sumatera (Ruas Rampa –Poriaha), 1 location in Lampung (Ruas Sp. Gunung Kemala – Pg Tampak), 1 Location inWest Sumatera (Ruas Bukit Putus – Teluk Bayur) and 2 location in Aceh (both on RuasBatas Kota Banda Aceh – Batas Aceh Barat). DED for slope treatment at Sp. Rampa –Poriaha and 4 (four) other design works have been complete.
For other assignment of TA, the consultant had been conducted desk study to identify,review and conduct a preliminary inventory of the road sections/areas that have alreadyslope and embankment problems and those that are prone to the erosions/landslides.Furthermore, field surveys have been conducted along west coast of Sumatera Island on526 spots identified by desk study, resulting from this survey and desk study would bepresented as the Risk Map of slope stability along West Coast of Sumatera Island. Reviewof some NSPMs related to slope treatment on road project had done.
The NSPM Product for Guidelines and Specifications have been presented in theworkshop on Jkt date, 28-May-2018 input from participants will be accommodated in the
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 28
final product. Capacity building - the final workshop that is planned to be held early Juneis canceled and delete from the contract.
Procurement Plan for consulting services is presented in Appendix 5.
3.5 Implementation of the Anti-Corruption Action Plan
Community Representative Officers (CRO)
To date, the selection of Community Representative Observers (CRO) has been 100%completed for all twenty (21) Packages, conducted until September 27, 2018. The overalltotal numbers of appointed CRO’s are forty two (42) individuals who were mostlyprofessional lecturers from different colleges or universities nearby to the projects.
A complete list of CROs appointed with their corresponding credentials can be found inAppendix 6 and the activities of the CROs since the inception of the Project, untilSeptember 2016 as shown in Appendix 7.
Third Party Monitors (TPM)
All of Third Party Monitors (TPM) for 20 Packages of WINRIP were appointed of sixty (60)TPM included package 21A. But package 10 (Sp. Empat – Sp. Air Balam) is removed fromthe list of WINRIP programs, so there are only 19 packages were been contracted.Therefore the number of TPM appointment to date become 57 have been approved. TheTPM for Package 5A did not appointed.
List of appointed TPM with their respective occupations and professional affiliations areshown in Appendix 8, while Appendix 9 shows the past to present activities/progress ofthe TPM.
Complaint Handling System (CHS)
The WINRIP website has been online, and available for reporting all aspects of the Anti-Corruption Action Plan including the registering of complaints by the general public. Thewebsite can be accessed at the URL address http://www.winrip-ibrd.com.
The CHS application has been completed. The application was put in sub-domain ofWINRIP website since February 2014. To access it, click on the sub-domain URL addresshttp://chs.winrip-ibrd.com. Appendix 10 and Appendix 11 show the Work Plan on CHSSystem and Work Activities on Publication/Disclosures.
The CHS team has been monitoring public complain via SiPP and WINRIP website.
During this quarter (October-November-December 2018) the complaint Handling Unit(CHU) was not received of any complaint from any parties.
Detail of CHS activities and the complaints records are shown in Appendix 10.
The Status of WINRIP’s Anti-Corruption Action Plan Activity could be found in Appendix11.A.
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 29
3.6 Implementation of the Environmental Management Plan and LARAPA project category is assigned to each package as either Category A, B or C depending onthe likely degree of influence on environmental issues with a brief explanation as follows:
Category A project is one which will have a significant negative impact on theenvironment and may have an influence on areas outside the actual project area. Aproject classified as such requires an Amdal (Andal, RKL&RPL) study.
Category B project is one which affects the people or the environment to some extent butwith a smaller impact than a Category A. The required environmental analysis is aUKL/UPL study only.
Category C project has minimal effect on the people or environment and anenvironmental analysis is not required. SPPL are used to handle any minor problem whichmay arise.
Details of packages that require environmental and social safeguard are given in Appendix13 and the following Table 10 provides a summary of the work involved in the 18 WINRIPpackages.
All the eighteen (18) packages require environmental impact investigations and studieswhich need the approval by Environmental Agency (BLH).
Eight (8) of the eighteen (18) packages are categorized under “Category A” projectswherein Amdal/EIA studies are required and have to be approved by World Bank. Theeight (8) packages are covered only by four (4) Amdal/EIA studies as some single studycovers a combination of two (2) or three (3) sub-projects as indicated in Table 10. While18 social studies (SLARAP and LARAP) require the approval of the World Bank. All the 18environmental studies for the eighteen (18) sub-projects including a separate study (UKL-UPL) for Air Gadang Bridge on Package No.2 were approved by BLH with 4 of these studies(Amdal/EIA) were granted No Objection Letter (NOL) from the World Bank while all the 18social studies (LARAP) were already issued No Objection Letter (NOL) from the WorldBank.
Appendix 12 details the list of Environmental Safeguard, Appendix 13 describes theEnvironmental Management Plan (EMP) Compliance and Appendix 14 is the status ofmonitoring the environmental mitigation up to the end of this Quarter.
Presented below Table 10 in a tabulated format is the current status of the environmentaland social studies.
Table 10Works
ProgramNo of
PackagesNo of Investigations Approval by Remarks
DLH World Bank
AWP-1 4 6
1 - Amdal
2 – UKL-UPL& 1DELH
2 - SPPL
1 - Amdal
2 – UKL-UPL
2 - SPPL
1– EIA /WBNOL
No Need
No Need
Coverage of SingleAmdal/EIA study arethe following Packages :
a) Packages 1 and 17b) Package 7,12 and
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 30
14c) Package 11 and 16d) Package No.08
One package have twostudies (UKL-UPL &DELH) is package No.05
AWP-2 7 7
2–Amdal +1 Amdal
4 – UKL-UPL
2–Amdal +
1 Amdal
4 – UKL-UPL
2 EIA/WBNOL
No Need
AWP-3 7 6
1 - Amdal
5 – UKL-UPL
1 – Amdal;
5 – UKL-UPL
1 - EIA
No Need
Total 18 19 Env=19 19 Env= 4,
Note: 1) UKL & UPL do not need a NOL from WB, and SPPL not necessary to submit to the WB.
2) Packages 9 and 18 to be deleted & package No.21 Terminated & continue with new package No.21 A
and No 05A (but the safeguard still use old safeguard)
Table 10.1Works Program No of Packages No of
InvestigationsApproval by Remarks
DLH World BankRoadsRehabilitation &ReconstructionOf PaluRecovery Works
RR – 01
Pantoloan-Tawaeli
Kebonsari-Tawaeli
Kebonsari-Tn.Runtuh
Jl.Yos Sudarso
Jl.Basuki Rahmat
Jl.Abdul Rahman Saleh
Watusampu - Ampera
Jl.Diponegoro
Jl.Malonda (Palu)
Ampera-Surumana
1 DELH Completed NY Not yet WB Nolissues
RR-02Palupi-Bangga-Simoro NA NY NY NYKalukubula - kalawara NA NY NY NYBiromaru - Palolo UKL-UPL Completed NY Done Upload at
Web WINRIPAcces Huntap Pombeww NA NY NY NYAcces Bridge Pombewe NA NY NY NY
NA NY NY Proses will bestarted on Oct2019
Total 5 4= Not started 2 Completed 4 =Not yetNOL
Note: Based on ESMF Adendum the UKL & UPL & DPLH need a NOL from WB
Palu Disaster Recovery Works
The package RR- No.01 package has been completed with the Environment EvaluationDocument (DELH) and has been established through the Decision of the Governor ofCentral Sulawesi Number: 660/773/KTHD-G.ST/ 2015 dated December 17, 2015.
One link of package RR-No.02 is Biromaru – Palolo has been completed with the UKL-UPLand another link are Palupi – Bangga - Samoro, segmen liquifaction Sibulaya & huntap
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 31
access not available yet for environment safeguard/document.
ESMF Addendum Consultation for RR-01 & RR-02 on Rehabilitation dan ReconstructionRoads post Dissaster & Tsunami palu – West Sumatera Province has been implemented on28 – 29 January 2019 at BPJN XIV office(Consultation with Stakeholeders, BPJN XIV, SatkerP2JN,PU,Bappeda,Sekda, DLH at loco government). and SMK N 1 Sigi (projectlocation/consultation with communities & informal leader).
Approximately, the construction implementation of the eighteen (18) civil works contractpackages affected 23,633 peoples with the removal of their improvements such ashouses, fruit trees, fences, terraces, entrance ramps and other obstruction within theroad right of way. In the end of this quarter, 23,632 have been compensated or 100% ofthe overall PAPs.
Likewise, the affected total land areas that requires acquisition is approximately 498,497square meters. To date, 498,497 square meters has been acquired. Overall progress ofland acquisition 100%.
Appendix 15 shows the status of overall land acquisition and Table 11 present thenumbers of Project Affected People (PAP) for each sub-project.
Table 11Package
No.Name Of Road Total PAP Compensated %
CompletedRemarks
1 Krui - Biha 2,815 2,815 100
2 Padang Sawah – Sp. Empat 442 442 100
3 Manggopoh – Pd. Sawah 1,338 1,338 100
4 Ipuh – Bantal 257 257 100
5 Sp. Rampa – Poriaha 92 92 100
6 Pasar Pedati – Kerkap 637 637 100
7 Indrapura – Tapan 813 913 100
8 Bts. Pariaman – Manggopoh 2,206 2,206 100
11 Bantal – Mukomuko 243 243 100
12 Kambang – Indrapura 2,873 2,873 100
13 Sp. Rukis – Tj. Kemuning 2,785 2,785 100 Updated
14 Painan – Kambang 2,137 2,137 100
15 Sibolga – Bts. Tapsel 1,852 1,852 100
16 Seblat – Ipuh 259 259 100
17 Sp. Gunung Kemala – Pg. Tampak 2,568 2,568 100
19 Lais – Bintunan 538 538 100
20 Lubuk Alung – Sicincin 950 950 100
21 Lubuk Alung – Kuraitaji 827 827 100 Updated
TOTAL 23,632 23.623 100
Note : The numbers of PAPs on each contract packages varies from time to time during thefinalization of the supporting documents for the payments of affected improvements.
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 32
4 Road Safety Audit
Road Safety Audits on all the eighteen (18) contract packages are subject to three (3) audit stagesduring the Design, Construction and Provisional Hand Over are as follows :
1. Road Safety Audit at Detailed Design Stage
Thirteen (13) Road Safety Audit at Detailed Engineering Design stage has been submitted toSub-Directorate of Road Safety and Environmental Engineering. Five (5) others was not carriedout of Road Safety Audit Detailed Engineering Design since the detailed engineering design hasbeen approved by Directorate General of Highways on 2010. As the obligation to fulfill of RoadSafety requirements, these five packages has been audit of road safety at the operation stageand was carried out by Balai III Padang (Packages #2, #3 and #4) and Balai V Palembang(Packages #1 and #7),
The Road Safety Audit as follows :a) Six (6) reports (Packages #5, #6, #11, #13, #15 and #19) done by CTC International
Senior Road Safety Auditb) Three (3) reports (Packages #7, #8 and #12) has been done by Sub-Directorate of Road
Safety and Environmental Engineering.c) Four (4) reports (Packages #14, #16, #20 and #21) has been done by CTC local road
safety engineer.d) Five (5) reports (Packages #1, #2, #3, #4 and #17) has been done by Balai III Padang and
Balai V Palembang as Road Safety Audit at operational stage.
2. Road Safety Audit at Construction Stage
Road Safety Audit at Construction Stage aim to check the Contractors performance related tothe implementation of traffic management and traffic safety. Seventeen (17) of Eighteen (18)contract packages were completed (packages #1, #2, #3, #4, #6, #7, #8, #11, #12 #13, #14, #15,#16, #17, #19, #20 and #21). No Road Safety Audit at construction on Package No.5 as therewas no traffic.
3. Road Safety Audit at Provisional Hand Over
Seventeen (17) Packages Road Safety Audit Report has been completed and submitted to PMU.The packages are : Packages #1, #2, #3, #4, #5, #6, #7, #8, #11,#12, #13, #14, #15, #16, #17, #19and #20.
There is no Road Safety Audit Provisional Hand Over on Package #21, since the packageterminated.
Shown on Appendix 16 is the current progress status of the “Road Safety Audits”.
2019 Quarterly Progress Report 1st Quarter : January-February-March
Western Indonesia National Roads Improvement Project 33
5 Workshops & Training
Presented in Appendix 17 is the Summary of Workshop and Trainings since the project started upto end of this quarter.
2019 Quarterly Progress Report 1st Quarter : January-February-March
Table Of Contents
1 Executive Summary .............................................................................................................. 1
1.1 Current Implementation Situation ............................................................................. 1
1.1.1 Civil Works............................................................................................................... 1
1.1.2 Consultancy Services .............................................................................................. 5
1.2 Current Status of Loan............................................................................................... 6
1.3 Current Problems and Action Required ...................................................................... 6
2 General................................................................................................................................ 7
2.1 Reporting Requirements ............................................................................................ 7
2.2 Loan Status ....................................................................................................... 8
2.3 Financial Management .............................................................................................. 9
2.4 Project Cost Monitoring ............................................................................................. 9
2.5 World Bank Implementation Review Mission and Site Visit ....................................... 9
2.6 Project Steering Committee Meeting ....................................................................... 11
3 Project Management and Implementation......................................................................... 12
3.1 Procurement Status ................................................................................................. 12
3.2 Implementation Status – Civil Works........................................................................ 13
3.3 Variation Order Details ........................................................................................ 20
3.4 Consultancy Services............................................................................................ 25
3.5 Implementation of the Anti-Corruption Act ion Plan ........................................... 28
3.6 Implementation of the Environmental Management Plan and LARAP........................... 29
4 Road Safety Audit ............................................................................................................... 32
5 Workshops & Training........................................................................................................ 33
2019 Quarterly Progress Report 1st Quarter : January-February-March
APPENDICES
Appendix S-1 : Summary of Studies and Reports (Environmental Activity)
Appendix S-2 : Summary of Studies and Reports (Social Activity)
Appendix S-3 : Community Development Activity Reports
Appendix S-4 : Community Representative Observers (CRO) Reports
Appendix 1 : Disbursement and Expenditures Status
Appendix 2 : Report At The End of The Quarter
Appendix 3 : Detailed Summary of the Project Cost Monitoring
Appendix 4 : Procurement Management of Civil Works
Appendix 5 : Procurement Plan for Consulting Services
Appendix 6 : List of Names of Community Representative Observers (CRO)
Appendix 7 : Anti Corruption Action Plan (ACAP)
Activity Progress of Community Representative Observers (CRO)
Appendix 8 : List of Appointed Third Party Monitors (TPM)
Appendix 9 : Progress of Third Party Monitoring (TPM) Activities
Appendix 10 : Complaints Handling Mechanism System (CHS)
Appendix 11 : Work Activities On Publication/Disclosure
Appendix 12 : Environmental Safeguards
Appendix 13 : Environmental Management Plan (EMP) Compliance
Appendix 14 : Status of Monitoring of Environmental Mitigation
Appendix 15 : Overall Land Acquisition Status as of End Quarter
Appendix 16 : Status of Road Safety Audits
Appendix 17 : Summary of Workshops and Trainings In 2013 up to End Quarter
2019 Quarterly Progress Report 1st Quarter : January-February-March
ANNEXESAnnex P-1 : Package No. 1 (Biha – Krui)
Annex P-2 : Package No. 2 (Pd. Sawah – Sp. Empat)
Annex P-3 : Package No. 3 (Manggopoh – Pd. Sawah)
Annex P-4 : Package No. 4 (Ipuh – Bantal)
Annex P-5 : Package No. 5 (Sp. Rampa – Poriaha)
Annex P-6 : Package No. 6 (Ps. Pedati – Kerkap)
Annex P-7 : Package No. 7 (Indrapura – Tapan)
Annex P-8 : Package No. 8 (Bts. Kota Pariaman - Manggopoh)
Annex P-11 : Package No. 11 (Bantal – Mukomuko)
Annex P-12 : Package No. 12 (Kambang - Indrapura)
Annex P-13 : Package No. 13 (Sp. Rukis – Tj. Kemuning)
Annex P-14 : Package No. 14 (Painan - Kambang)
Annex P-15 : Package No. 15 (Sibolga – Bts. Tapsel)
Annex P-16 : Package No. 16 (Seblat – Ipuh)
Annex P-17 : Package No. 17 (Sp. Gunung Kemala – Pugung Tampak)
Annex P-19 : Package No. 19 (Lais – Bintunan)
Annex P-20 : Package No. 20 (Lubuk Alung - Sicincin)
Annex P-21 : Package No. 21 (Lubuk Alung - Kuraitaji)
ANNEXES
Annex P-1 : Package No. 1
Annex P-2 : Package No. 2
Annex P-3 : Package No. 3
Annex P-4 : Package No. 4
Annex P-5 : Package No. 5
Annex P-6 : Package No. 6
Annex P-7 : Package No. 7
Annex P-8 : Package No. 8
Annex P-11: Package No.11
Annex P-12: Package No.12
Annex P-13: Package No.13
Annex P-14 : Package No.14
Annex P-15: Package No.15
Annex P-16: Package No.16
Annex P-17: Package No.17
Annex P-19 : Package No.19
Annex P-20 : Package No.20
Annex P-21 : Package No.21
5-Jul-15 Status : 25-Mar-19Contract
BALAI Amount Time ellaps Remaining
Plan (incl VAT) days days Target Highest Avg The latest
Actual IDR million % % % % % %
SIMPANG RAMPA - PORIAHA II 17-Mar-15 540 8-Mar-18 130,143 100.00 94.61 (5.39) Contract amount reduced 5.39 %PT. NUSA KONSTRUKSI ENJ Tbk. Medan 18-Jun-15 455 18-Mar-18 123,133 100 100 - Revised BOQ
SIBOLGA - Batas TAPSEL II 13-Jul-15 810 30-Jun-18 260,100 100.00 78.92 (21.08) Contract amount reduced 21.08 %
PT. PEMBANGUNAN PERUMAHAN Medan 20-Nov-15 144 205,270 100 100 - Revised BOQ
PADANG SAWAH-SIMPANG EMPAT III 6-Dec-13 730 19-Apr-16 247,572 100 100 -PT Jaya Konstruksi MP, Tbk Padang 6-Jan-14 105 14-Apr-16MANGGOPOH - PADANG SAWAH III 6-Dec-13 730 20-Mar-16 183,542 100 100 -PT Jaya Konstruksi MP, Tbk Padang 6-Jan-14 75 17-Mar-16BATAS KOTA PARIAMAN-MANGGOPOH III 28-Jan-16 720 31-Dec-17 378,042 100 100 -PT PP - STATIKA JO Padang 23-Mar-16 -71 29-Dec-17LUBUK ALUNG - SICINCIN III 1-Jun-16 540 2-Mar-18 113,818 100 100 -PT NINDYA KARYA Padang 1-Sep-16 8 2-Mar-18KURAI TAJI - LUBUK ALUNG III 1-Jun-16 540 28-Jun-18 68,733 100.00 54.42 (45.58) Contract is terminatedPT MULTI STRUCTURE Padang 1-Sep-16 126INDRAPURA-TAPAN III 26-Nov-15 630 28-Jan-18 129,700 100 100 -PT. ADHI KARYA Padang 10-Dec-15 151 26-Jan-18KAMBANG-INDERAPURA III 28-Jan-16 720 28-Jul-18 358,650 100.00 97.77 (2.23) Contract amount reduced 2.23 %PT LANCARJAYA MA-CAHAYA TA,JO Padang 23-May-16 77 31-Dec-18 350,644 100.00 100.00 - Revised BOQ
PAINAN - KAMBANG III 1-Jun-16 630 27-Jul-18 214,327 100.00 93.12 (6.88) 965 -241 6.88 9.72 3.21 0.67KSO YASA - CONBLOC Padang 3-Aug-16 94 133.33% -33.33%
IPUH - BANTAL III 14-Nov-13 730 11-Apr-16 212,290 100 100 -PT WASKITA KARYA - PT DMT, JO Padang 13-Jan-14 90 31-May-16KERKAP - PASAR PEDATI III 27-Feb-15 450 28-Jan-17 118,444 100 100 -PT. WASKITA KARYA Tbk Padang 11-Mar-15 240 28-Jan-17BANTAL - MUKOMUKO III 18-Dec-14 720 26-May-17 263,656 100 100 -PT. HUTAMA KARYA - PT. DMT, JO Padang 23-Feb-15 104 19-May-17 BINTUNAN-LAIS III 27-Feb-15 300 30-Jun-16 44,419 100 100 -PT RODATEKNINDO PURAJAYA Padang 11-Mar-15 178 30-Jun-16SEBLAT - IPUH III 28-Oct-16 630 30-Sep-18 211,375 100 100PT YASA - MULTI STRUCTURE, JO Padang 8-Nov-16 62SIMPANG RUKIS-TANJUNG KEMUNING III 18-Dec-14 720 15-May-18 305,886 100 100 -PT. WASKITA KARYA Padang 22-Jul-15 309 15-May-18
BIHA - KRUI V 25-Nov-13 640 10-Jan-16 149,193 100 100 -PT Jaya Konstruksi MP, Tbk Palembang 8-Jan-14 93 20-Jan-16Sp.Gn KEMALA-PUGUNG TAMPAK V 17-Nov-14 720 27-Dec-17 211,712 100 100 -PT Jaya Konstruksi MP, Tbk Palembang 4-Sep-15 126 27-Dec-17
KURAI TAJI - LUBUK ALUNG (Lanjutan) III 21-Dec-18 150 1-Jun-19 836,247 51.16 39.17 (11.99) 82 68 25.28 20.90 19.51 20.90PT. NKE - MJP, KSO Padang 3-Jan-19 54.36% 45.64%
21A
17
11
07
16
14
01
13
04
06
19
12
Actual Dev
Physical Progress (%)
SchTime
extension /contraction
CIVIL WORKS PROGRESSWESTERN INDONESIA ROAD IMPROVEMENT PROJECT (WINRIP)
Package No. & Name PROGRESS ACHIEVEMENTTime for
CompletionTOC/ PHO
Time for Completion
Contractor
21
02
CONTRACTSIGN DATE
COW
03
08
05
15
20
2 ESR CTC 25 Marc 2019_11CCE6B
PlanActual Nov Dec Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
LUBUK ALUNG - KURAI TAJI III 1-Jun-16 540 28-Jun-18 2.17 1.54 1.19 2.06 1.31 1.51 Terminate
PT MULTI STRUCTURE Padang 1-Sep-16 126
PAINAN - KAMBANG III 1-Jun-16 630 27-Jul-18 3.57 3.32 3.15 3.11 6.44 2.55 0.86 0.12 0.00 1.10 2.27 1.32 0.63 5.80 0.00 0.26 0.67KSO YASA - CONBLOC Padang 3-Aug-16 94 Improve
KURAI TAJI - LUBUK ALUNG (Lanjutan) III 21-Dec-18 150 1-Jun-19 0.16 18.27 20.90PT. NKE - MJP, KSO Padang 3-Jan-19 Improve
TOC/PHO
2018 2019
PROGRESS per MONTH (%)
CIVIL WORKS PROGRESS per MONTH(Ongoing Construction only)
WESTERN INDONESIA ROAD IMPROVEMENT PROJECT (WINRIP)
Extension
Time forCompletion
2017
21A
21
14
COWBALAI
CONTRACTSIGN DATEPackage No. & Name
Contractor
C:\Users\Tediero\AppData\Local\Temp\2 ESR CTC 25 Marc 2019_11CCE6B % Per MONTH
5-Jul-15 Status tanggal : 25-Mar-19Re Target Time for 25-Mar-19
BALAI Time ellaps Remaining maining Progress completion Est
Plan days days Target Highest Avg The latest progress per required Completion
Actual % % % % % % month month date
KURAI TAJI - LUBUK ALUNG III 1-Jun-16 540 28-Jun-18 100.00 54.42 (45.58) 46% Contract is terminatedPT MULTI STRUCTURE Padang 1-Sep-16 126
PAINAN - KAMBANG III 1-Jun-16 630 27-Jul-18 100.00 93.12 (6.88) 906 -182 7.82 9.72 3.29 1.14 7.82 7%KSO YASA - CONBLOC Padang 3-Aug-16 94 125.17% -25.17%
KURAI TAJI - LUBUK ALUNG III 21-Dec-18 150 1-Jun-19 51.16 39.17 (11.99) 23 127 25.28 20.90 19.51 20.90 60.83 20% 3 23-Jun-19KSO NKE-MJP Padang 3-Jan-19 14.77% 85.23%
Out put capacity in month of March 2019AC 8,000 tonRemaining AC 33,500 tonRequires time for completion 4.2 monthsRemaining time for completion 3 months
ESTIMATED COMPLETION DATES OF ONGOING PAKAGESWESTERN INDONESIA ROAD IMPROVEMENT PROJECT (WINRIP)
Package No. & Name CONTRACTSIGN DATE
Time forCompletion TOC/ PHO Physical Progress (%)
Time for ComplationPROGRESS ACHIEVEMENT
14
Timeextension /contraction
Sch
the remaining works (quantity) will be re-tendered
21A
to be estimated fromremaining quanity of majorworks
Actual DevContractor COW
21
ANNEX P-1
MONTH :
Package No. Time Elapsed (Days)
Name Time Elapsed (%)
Project Manager Scheduled Progress (%) 100.00 Contractor Actual Overall Progress (%) 100.00 Supervision Consultant Balance (%)Contract Sign Progress This Month (%) Commencement Date Time for Complation (Days) 733 Take Over Date Status date Original Contract Amount Rp. Accumulative Rp. 100% Final Contract Amount + Price Adj Rp.
Comp Add.2 Accum Actual Accum AccumTotal Total Last this to this Sch to
% % Month Month Month thisMonth
I G e n e r a l 8.25 7.22 7.54 7.54 7.54II D r a i n a g e 34.19 23.78 25.35 25.35 25.35III Earthworks 3.95 6.56 4.65 4.65 4.65
IV Pavement Widening &Shoulders
1.47 0.94 1.02 1.02 1.02
V Granular Pavement 9.22 7.04 7.49 7.49 7.49VI Asphalt Pavement 40.14 46.76 41.07 41.07 41.07VII S t r u c t u r e s 1.09 5.36 6.41 6.41 6.41
VIII Reinstatement &Minor Works
1.20 1.91 6.05 6.05 6.05
IX Day Work 0.14 0.12 0.09 0.09 0.09
X Routine MaintenanceWorks
0.36 0.32 0.33 0.33 0.33
TOTAL 100.00 100.00 100.0 - 100.0 100.0Note :
1. 100% completed on January 20162. Taking-Over Certificate issued on January 20, 20163. Defects Liability Periode until January 20, 2018
2016Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 250.22 0.87 1.69 5.62 11.11 18.06 24.50 31.58 38.99 46.36 52.53 60.68 67.46
31.90 35.31 40.53 47.72 56.69 65.59 75.18 84.21 94.42 100.0088.43 91.76 96.08 100.00
0.10 0.58 0.79 1.59 2.93 3.71 4.79 5.98 8.60 11.28 12.62 16.08 18.71 21.04 25.88 32.67 37.50 42.27 45.05 55.51 65.00 70.08 76.56 91.02 100.00(0.12) (0.29) (0.90) (4.03) (8.18) (14.35) (19.71) (25.60) (30.39) (35.08) (39.91) (44.60) (48.75) (14.27) (14.65) (15.06) (19.18) (23.31) (30.13) (28.70) (29.43) (18.34) (15.19) (5.06) -
0.48 0.21 0.80 1.34 0.78 1.08 1.19 2.62 2.68 1.34 3.46 2.63 2.33
MAJOR PROBLEMS ACTION TO BE TAKEN
01
TIM
E March 25, 2019
BIHA - KRUI
RENARDET S.A JV
Joko Wisargo, ST, MT
AMO
UN
T
8-Jan-1425-Nov-13
DISBURSEMENT (Incl VAT)
149,193,782,000
EXECUTIVE SUMMARY REPORTMar-19
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
25-Mar-19
PHYSICAL PROGRESS MONITORING TABLE2014 Year
20-Jan-16
PHYSICAL WORK PROGRESS BY CATEGORY
134,909,211,000
2015
PT JAYA KONSTRUKSI MP, Tbk
149,193,782,000
Actual Progress (%) Balance (%)
Div Description
The month of time for complation
Rivised Progress Schedul Add.1 (%) Original Progress Schedul (%)
Month
Rivised Progress Schedul Add.2 (%)
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
PHYS
ICAL
PRO
GRE
S (%
)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE # 01
Original
1st Revised Shc
2nd Revised Sch
ACTUAL
2 ESR CTC 25 Marc 2019_11CCE6B P-1
ANNEX P-2
MONTH :
Package No. Time Elapsed (Days) Name Time Elapsed (%) Project Manager Scheduled Progress (%) 100.00 Contractor PT JAYA KONSTRUKSI MP, Tbk Actual Overall Progress (%) 100.00 Supervision Consultant Balance (%)Contract Sign Progress This Month (%) Commencement Date Time for Complation (Days) 730 Time for Complation (Days) 835 Status date Take Over Date / FHO Accumulative Rp. 100% Original Contract Amount Rp. *) Include advance payment Final Contract Amount + Price Adj Rp.
Comp Accum Actual Accum AccumTotal Last this to this Sch to
% % Month Month Month thisMonth
I G e n e r a l 10.46 3.378 3.38 3.38 3.38
II D r a i n a g e 3.53 3.244 3.24 3.24 3.24
III Earthworks 4.44 4.691 4.69 4.69 4.69
IV Pavement Widening &Shoulders
2.26 1.948 1.95 1.95 1.95
V Granular Pavement 10.49 10.944 10.94 10.94 10.94
VI Asphalt Pavement 52.09 57.028 57.03 57.03 57.03
VII S t r u c t u r e s 14.35 16.115 16.12 16.12 16.12
VIII Reinstatement & MinorWorks
1.65 2.002 2.00 2.00 2.00
IX Day Work 0.12 0.108 0.11 0.11 0.11
X Routine MaintenanceWorks
0.62 0.541 0.54 0.54 0.54
TOTAL 100.00 100.00 100.00 - 100.00 100.00
Note :1. 100% completed on April 14, 20162. Taking-Over Certificate issued on April 14, 20163. Defects Liability Periode until April 14, 2018
Year Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Original Progress Schedul (%) 0.45 0.90 2.20 3.45 7.17 13.58 17.48 20.63 27.88 33.56 38.81 44.72 50.52 56.13 62.58 67.95 73.65 79.35 1st Revised Progress Schedul (%) 66.92 71.10 81.03 87.07 91.35 95.62 100.00 2nd Revised Progress Schedul (%) 92.53 95.62 96.75 97.25 98.21 100.00Actual - 0.13 1.02 2.19 4.11 5.96 9.69 13.85 22.55 25.61 31.45 33.73 40.41 44.25 49.98 55.715 58.61 58.35 63.76 71.36 77.80 83.27 92.53 93.20 92.85 95.73 96.83 100.00Balance (0.45) (0.77) (1.17) (1.26) (3.07) (7.62) (7.80) (6.78) (5.33) (7.95) (7.36) (10.99) (10.11) (11.88) (12.59) (12.23) (15.04) (8.57) (7.35) (9.67) (9.27) (8.08) (3.09) (2.41) (3.90) (1.52) (1.37)
0.89 1.17 1.91 1.86 3.72 4.17 8.69 3.07 5.84 2.28 6.68 3.84 38.29
The month of time for complation
DISBURSEMENT (Incl VAT)25-Mar-19
247,572,130,000
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description
PHYSICAL PROGRESS MONITORING TABLE2014 2015 2016
247,572,130,000
March 25, 2019PADANG SAWAH-SIMPANG EMPAT02
TIM
E
MAJOR PROBLEMS ACTION TO BE TAKEN
EXECUTIVE SUMMARY REPORT
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
Mar-19
197,936,699,000
Amandm04
06-Dec-136-Jan-14
14-Apr-16 14-Apr-18
ISMAN, ST
AMO
UN
T
RENARDET S.A JV
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
PHYS
ICAL
PRO
GRE
S (%
)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE # 02
ORIGINAL
1st Revised Sch
2nd Revised Sch
ACTUAL
2 ESR CTC 25 Marc 2019_11CCE6B P-2
ANNEX-P3
MONTH :
Package No. Time Elapsed (Days)
Name Time Elapsed (%) Project Manager Scheduled Progress (%) 100.00 Contractor Actual Overall Progress (%) 100.00 Supervision Consultant Balance (%)Contract Sign Progress This Month (%) Commencement Date Time for Complation (Days) 730 Time for Complation (Days) 805 Status date Take Over Date Accumulative Rp. 100.0% Original Contract Amount Rp. *) Include advance payment Final Contract Amount + Price Adj Rp.
Comp Revised Accum Actual Accum AccumTotal Total Last this to this Sch to
% % Month Month Month thisMonth
I G e n e r a l 10.21 10.21 2.39 2.39 2.39II D r a i n a g e 13.17 13.17 10.09 10.09 10.09III Earthworks 3.04 3.04 6.99 6.99 6.99
IV Pavement Widening &Shoulders
2.45 2.45 1.92 1.92 1.92
V Granular Pavement 11.27 11.27 11.25 11.25 11.25VI Asphalt Pavement 55.81 55.81 59.72 59.72 59.72VII S t r u c t u r e s 0.80 0.80 5.28 5.28 5.28
VIII Reinstatement &Minor Works
2.27 2.27 1.02 1.02 1.02
IX Day Work 0.22 0.22 0.69 0.69 0.69
X Routine MaintenanceWorks
0.76 0.76 0.65 0.65 0.65
TOTAL 100 100 100.0 - 100 100Note :
1. 100% completed on March 17, 20162. Taking-Over Certificate issued on March 17, 20163. Defects Liability Periode until March 17, 2018
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 270.26 1.00 1.67 2.45 4.78 7.45 10.70 14.27 21.53 30.10 36.95 44.01 51.62 58.67 65.63 73.03 79.97 87.04
70.14 74.54 82.69 89.96 95.17 97.89 100.0093.78 98.11 99.31 100.00
0.24 0.48 2.07 2.43 2.87 5.45 5.70 7.01 12.43 14.45 19.30 24.38 29.11 30.11 32.97 39.72 43.28 43.98 48.56 54.37 65.63 85.01 91.15 96.30 98.38 99.13 100.00(0.02) (0.52) 0.40 (0.02) (1.91) (2.00) (5.00) (7.26) (9.10) (15.65) (17.65) (19.63) (22.51) (28.56) (32.66) (33.31) (36.69) (26.16) (25.98) (28.32) (24.33) (10.16) (6.74) 2.52 0.27 (0.18) -
0.24 1.59 0.36 0.44 2.58 0.25 1.31 5.42 2.02 4.85 5.08 4.73 1.00
03
TIM
E March 25, 2019MANGGOPOH - PADANG SAWAH MAJOR PROBLEMS ACTION TO BE TAKENOpukenigara, ST
AMO
UN
T
RENARDET S.A JV06-Dec-13
PT JAYA KONSTRUKSI MP, Tbk
6-Jan-14
EXECUTIVE SUMMARY REPORT
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
Mar-19
DISBURSEMENT (Incl VAT)
17-Mar-1625-Mar-19
17-Mar-18
Div Description
183,452,685,000143,688,963,000
Balance (%)
2016
Rivised Progress Schedul (%)
183,452,685,000
Rivised Progress Schedul (%)
Actual Progress (%)
PHYSICAL PROGRESS MONITORING TABLE Year 2014 Month The month of time for complation
2015
PHYSICAL WORK PROGRESS BY CATEGORY
Original Progress Schedul (%)
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
PHYS
ICAL
PRO
GRE
S (%
)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE # 03
ORIGINAL
1st Revised Sch
2nd Revised Sch
ACTUAL
2 ESR CTC 25 Marc 2019_11CCE6B P-3
ANNEX P-4
MONTH :
Package No. Time Elapsed (Days) Name Time Elapsed (%) Project Manager Scheduled Progress (%) 100.00 Contractor PT WASKITA KARYA - DMT, JO Actual Overall Progress (%) 100.00 Supervision Consultant Balance (%)Contract Sign Progress This Month (%) Commencement Date Time for Complation (Days) 730 Time for Complation (Days) 820 Status date Take Over Date / FHO Accumulative Rp. 100.0% Original Contract Amount Rp. *) Include advance payment
Final Contract Amount + Price Adj Rp.
Comp Accum Actual Accum AccumTotal Last this to this Sch to
% Month Month Month thisMonth
I G e n e r a l 7.59 5.99 5.99 5.99II D r a i n a g e 12.26 8.18 8.18 8.18III Earthworks 3.58 3.06 3.06 3.06
IV Pavement Widening &Shoulders
3.39 3.05 3.05 3.05
V Granular Pavement 18.07 16.82 16.82 16.82VI Asphalt Pavement 49.27 47.02 47.02 47.02VII S t r u c t u r e s 2.55 4.82 4.82 4.82
VIII Reinstatement & MinorWorks
2.95 10.88 10.88 10.88
IX Day Work 0.14 0.00 0.00 0.00
X Routine MaintenanceWorks
0.20 0.18 0.18 0.18
TOTAL 100 100.0 - 100.00 100.00Note :
1. 100% completed on May 31, 20162. Taking-Over Certificate issued on May 31, 20163. Defects Liability Periode until May 31, 2018
Year Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Schedl Progress Original (%) 0.11 0.32 0.75 1.14 6.57 10.29 12.85 15.81 20.08 24.22 32.76 40.88 47.93 55.61 63.451st Revised Schedule (%) 28.57 37.28 48.18 56.89 64.18 73.78 84.47 91.89 98.53 2nd Revised Schedule (%) 61.23 62.14 76.26 86.77 96.29 100.0 Actual Progress (%) - 0.18 0.40 0.53 0.56 0.78 0.87 1.45 3.73 5.35 8.10 9.35 13.79 21.76 27.67 35.43 39.36 42.14 44.24 46.28 50.09 53.17 61.23 70.32 78.69 84.64 91.62 94.53 Balance (%) (0.11) (0.14) (0.35) (0.61) (6.01) (9.51) (11.98) (14.36) (16.35) (18.88) (24.66) (31.53) (34.14) (33.85) (0.91) (1.86) (8.81) (14.75) (19.95) (27.51) (34.38) (38.72) (37.30) 8.18 2.43 (2.13) (4.67) (5.47)
0.22 0.13 0.03 0.22 0.09 0.58 2.27 1.62 2.76 1.25 4.44 7.97
DISBURSEMENT (Incl VAT)
186,936,750,000212,290,705,872
PHYSICAL WORK PROGRESS BY CATEGORY
25-Mar-1931-May-18
Div Description
212,290,705,872
13-Jan-1414-Nov-13
2015
RENARDET S.A JV
AMO
UN
T
20162014PHYSICAL PROGRESS MONITORING TABLE
31-May-16
Fathoni Ikhsan, ST
EXECUTIVE SUMMARY REPORTMar-19
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS04
MAJOR PROBLEMS ACTION TO BE TAKENTIM
E March 25, 2019IPUH - BANTAL (42,4 km)
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
PHYS
ICAL
PRO
GRES
(%)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE # 04
ORIGINAL
1st Revised Sch
2nd Revised Sch
ACTUAL
2 ESR CTC 25 Marc 2019_11CCE6B P-4
ANNEX P-5
MONTH :
Package No. Time Elapsed (Days)
Name SIMPANG RAMPA - PORIAHA Time Elapsed (%) Project Manager Scheduled Progress (%) 100.00 Contractor PT. NUSA KONSTRUKSI ENJ Tbk. Actual Overall Progress (%) 100.00 Supervision Consultant Balance (%)Contract Sign Progress This Month (%) Commencement Date Time for Complation (Days) 1004 Take Over Date / FHO Status date Original Contract Amount Rp. Accumulative Rp. 100% Final Contract Amount Rp.
Comp Accum Actual Accum AccumTotal Last this to this Sch to this
% Month Month Month Month
I G e n e r a l 2.09 1.87 0.22 2.09 2.09II D r a i n a g e 2.02 2.03 (0.02) 2.02 2.02III Earthworks 41.93 41.83 0.11 41.93 41.93
IV Pavement Widening &Shoulders
1.15 1.14 0.00 1.15 1.15
V Granular Pavement 6.17 6.16 0.01 6.17 6.17VI Asphalt Pavement 25.93 25.91 0.02 25.93 25.93VII S t r u c t u r e s 18.07 18.06 0.02 18.07 18.07
VIII Reinstatement & MinorWorks
2.33 2.42 (0.09) 2.33 2.33
IX Day Work 0.31 0.23 0.07 0.31 0.31
X Routine MaintenanceWorks
- - -
TOTAL 100.0 99.65 0.35 100.00 100.00Note :
1. 100% completed on March 18, 20182. Taking-Over Certificate issued on Marh 18, 20183. Defects Liability Periode until March 17, 2020
Year Month Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Des Jan Feb Mar Apr May Jun Jul The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 Schedl Progress Original (%) 0.22 0.99 3.89 8.90 16.87 23.69 36.44 40.23 46.08 50.69 56.28 60.45 66.93 69.02 78.66 88.79 96.82 1001st Revised schedul 41.88 41.99 53.49 63.38 76.53 82.27 97.61 99.43 1002nd Revised schedul 99.7 1003rd Revised schedul 99.11 1004th Revised schedul 87.93 93.54 98.00 1005th Revised schedul 87.93 93.54 98.00 99.94 1006th Revised schedul 76.53 87.93 96.21 99.88 100 100 100 100 100 Actual Progress (%) - 0.57 1.09 1.69 2.72 3.08 3.53 5.77 7.37 10.11 16.66 18.44 26.83 28.19 30.00 31.28 35.23 35.25 42.73 43.50 45.99 48.20 51.22 56.42 62.37 67.2 71.58 75.05 71.94 74.31 84.73 86.30 88.09 91.20 96.85 100 Balance (%) (0.22) (0.42) (2.80) (7.20) (14.16) (20.61) (32.91) (34.45) (38.70) (40.58) (39.63) (42.02) (40.10) (40.83) (48.66) (57.51) (61.59) (6.63) 0.74 (9.99) (17.39) (28.32) (31.06) (41.19) (37.05) (32.8) (27.5) (24.9) (26.1) (25.6) (3.2) (9.9) (11.8) (8.8) (3.2) -Progress per month - 0.57 0.52 0.60 1.03 0.37 0.44 2.25 1.60 2.74 6.55 1.78 8.40 1.36 1.81 1.28 3.95 0.02 7.5 0.8 2.49 2.22 3.01 5.20 5.95 4.79 4.41 3.48 (3.12) 2.38 10.41 1.57 1.78 3.12 5.64 3.15
0.57 0.52 0.60 1.03 0.37 0.44 2.25 1.60 2.74 6.55 1.78 8.40 1.36
EXECUTIVE SUMMARY REPORT
05
TIM
E March 25, 2019MAJOR PROBLEMS ACTION TO BE TAKEN
Mar-19
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
2018
123,132,763,36918-Mar-18
20172015
107,321,260,310
PHYSICAL PROGRESS MONITORING TABLE
Div Description
2016
17-Mar-15
25-Mar-19
RENARDET S.A JV
AMO
UN
TSaleh Samsuri, ST
DISBURSEMENT (Incl VAT)18-Jun-15
PHYSICAL WORK PROGRESS BY CATEGORY
123,132,763,369
17-Mar-20
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
PHYS
ICAL
PRO
GRES
(%)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE # 05
Series1 Series2
Series3 Series4
Series5 Series6
Series7 Series8
2 ESR CTC 25 Marc 2019_11CCE6B P-05
ANNEX P-06
MONTH :
Package No. Time Elapsed (Days) Name Time Elapsed (%) Project Manager Scheduled Progress (%) 100.00 Contractor PT. WASKITA KARYA Tbk Actual Overall Progress (%) 100.00 Supervision Consultant RENARDET S.A JV PT. CIPTA STRADA Balance (%) Contract Sign Progress This Month (%) Commencement Date Time for Complation (Days) 450 240 Take Over Date / FHO Status dateFinal Contract Amount (Incl VAT) Rp. Accumulative Rp. 100.00%
Add Accum Actual Accum AccumLast this to this Sch to this
% Month Month Month Month
I G e n e r a l 1.69 1.69 1.69 1.69II D r a i n a g e 1.61 1.61 1.61 1.61III Earthworks 8.58 8.58 8.58 8.58
IV Pavement Widening &Shoulders
2.93 2.93 2.93 2.93
V Granular Pavement 16.48 16.48 16.48 16.48VI Asphalt Pavement 60.39 60.39 60.39 60.39VII S t r u c t u r e s 5.63 5.63 5.63 5.63
VIII Reinstatement & MinorWorks
2.15 2.15 2.15 2.15
IX Day Work - - - -
X Routine MaintenanceWorks
0.54 0.54 0.54 0.54
TOTAL 100 100.0 - 100.00 100.00
Note :1. 100% completed on January 28, 20172. Taking-Over Certificate issued on January 28, 2073. Defects Liability Periode until January 28, 2019
Year 2017 Month March Apr May June July August Sep Oct Nop Dec Jan Feb March Apr May June July August Sep Oct Nop Dec Jan The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Schedl Progress Original (%) 0.17 0.59 1.28 3.09 4.38 8.17 14.27 25.82 38.49 49.93 62.08 75.00 85.36 95.41 100.001st Revised schedul 56.000 60.47 74.94 100.002nd Revised schedul 58.86 70.27 79.80 88.09 96.07 100.0 Actual Progress (%) 0.07 0.33 0.76 1.04 1.18 2.27 10.03 15.13 18.75 20.54 23.04 25.89 27.55 32.701 36.020 39.34 45.15 56.31 64.44 74.87 87.78 91.23 100.0 Balance (%) -0.15 -0.26 -0.53 -2.04 -3.20 -5.90 -4.24 -10.69 -19.74 -29.38 -39.04 -49.11 -57.81 -62.71 -63.98 -21.12 -29.79 -2.56 -5.83 -4.93 -0.31 -4.84 0.00
0.42 0.29 0.13 1.10 7.76 5.09 3.62 1.79 2.49 2.85 1.67 5.15
25-Mar-1928-Jan-17DISBURSEMENT (Incl VAT)
ACTION TO BE TAKEN
AMO
UN
T
27-Feb-1511-Mar-15
Calendar Days +
Found some cracks on the surface of the pavement. DSC is conducting pavement investigation planned forcompletion in Oct 2018.
28-Jan-19
6
TIM
E March 25, 2019KERKAP - PASAR PEDATI (21 Km) MAJOR PROBLEMS
EXECUTIVE SUMMARY REPORTMar-19
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
PHYSICAL PROGRESS MONITORING TABLE2015
118,444,156,000
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description
2016
118,444,156,000
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
PHYS
ICAL
PRO
GRE
S (%
)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE # 06
Original Sch
1st Revised Sch
2nd Revised Sch
Actual
2 ESR CTC 25 Marc 2019_11CCE6B P-06
ANNEX P-07
MONTH :
Package No. Time Elapsed (Days) Name Time Elapsed (%) Sub Project Manager / PPK Scheduled Progress (%) 100.00 Contractor PT ADHI KARYA Actual Overall Progress (%) 100.00 Supervision Consultant Balance (%)Contract Sign Progress This Month (%) Commencement Date Time for Complation (Days) 780
Take Over Date / FHO Status dateFinal Contract Amount (Incl VAT) Rp. Accumulative Rp. 100%
Comp Accum Actual AccumTotal Last this to this
% % Month Month Month
I G e n e r a l 2.45 2.59 1.89 0.70 2.59 2.29II D r a i n a g e 21.84 19.36 12.26 7.10 19.36 12.80III Earthworks 5.38 7.49 7.29 0.20 7.49 7.29IV
Pavement Widening &Shoulders
1.09 0.72 0.37 0.35 0.72 0.42V Granular Pavement 9.22 7.51 7.48 0.04 7.51 7.07VI Asphalt Pavement 51.16 51.55 52.20 (0.66) 51.55 52.20VII S t r u c t u r e s 6.08 7.87 14.69 (6.81) 7.87 14.69VIII
Reinstatement & MinorWorks
2.48 2.53 1.59 0.94 2.53 2.86IX Day Work 0.09 0.18 0.18 - 0.18 0.18X
Routine MaintenanceWorks
0.20 0.20 0.19 0.01 0.20 0.20 TOTAL 100.0 100.00 98.14 1.86 100.00 100.00
Note :1. 100% completed on January 28, 20182. Taking-Over Certificate issued on January 28, 2083. Defects Liability Periode until January 28, 2020
Year 2015 Month Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Des Jan The month for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Original Progress Schedul (%) 0.16 0.31 0.59 0.67 1.24 1.92 3.90 5.63 8.72 16.79 24.44 32.37 43.74 50.84 62.90 72.65 80.61 87.11 94.03 98.20 100.0 100.0 100.0 100.0 1st Revised Progress Sch (%) 24.44 32.37 43.74 50.84 62.90 72.65 80.61 87.11 94.03 98.20 100.0 100.0 100.0 100.0 2nd Revised Progress Sch (%) 24.437 32.366 43.743 53.151 62.904 72.649 80.609 87.106 94.032 98.202 100.00 3rd Revised Progress Sch (%) 79.145 81.90 88.87 99.04 100.00 4th Revised Progress Sch (%) 90.36 100.00 5th Revised Progress Sch (%) 94.21 100.00 Actual Progress (%) 0.15 0.31 0.59 0.82 1.18 3.62 4.75 5.63 12.87 16.70 23.49 31.35 39.03 41.27 45.61 48.054 48.87 50.46 55.86 59.00 63.63 67.58 76.48 84.62 93.85 100.00 Balance (%) (0.01) - 0.00 0.15 (0.06) 1.70 0.85 0.00 4.15 (0.09) (0.95) (1.02) (4.71) (9.57) (17.29) (24.60) (31.74) (36.65) (38.17) (39.20) (18.26) (21.28) (22.56) (5.74) (6.15) 0.00Progress per month 0.31 0.28 0.23 0.36 2.44 1.14 0.88 7.24 3.83 6.79 7.86 7.68 2.24 4.34 2.44 0.82 1.59 5.41 3.14 4.63 3.95 8.90 8.14 9.23 6.15
0.59 0.23 0.36 2.44 1.14 0.88 7.24 3.83 6.79 7.86 7.68 2.24 37.65
2017
March 25, 2019MAJOR PROBLEMS ACTION TO BE TAKEN
2016
7
TIM
E
INDRAPURA - TAPAN
130,352,139,999
PHYSICAL PROGRESS MONITORING TABLE
PHYSICAL WORK PROGRESS BY CATEGORY
Div DescriptionAmandment
Accum Schto thisMonth
28-Jan-18 25-Mar-19
10-Dec-15
Filino Kalani, ST
AMO
UN
T
RENARDET S.A JV PT. SEECONS03-Dec-15
DISBURSEMENT (Incl VAT)
130,352,139,99928-Jan-20
EXECUTIVE SUMMARY REPORTMar-19
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
PHYS
ICAL
PRO
GRE
S (%
)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE # 07
ORIGINAL SCH
1st REVISED SCH
2nd REVISED SCH
3rd REVISED SCH
4th REVISED SCH
5th REVISED SCH
ACTUAL PROGRESS
2 ESR CTC 25 Marc 2019_11CCE6B P-07
ANNEX P-08
MONTH :
Package No. Time Elapsed (Days) Name Time Elapsed (%) Sub Project Manager / PPK Scheduled Progress (%) 100.00 Contractor PT. PP - STATIKA CONSORTIUM Actual Overall Progress (%) 100.00 Supervision Consultant Balance (%)
Contract Sign Progress This Month (%)
Commencement Date Time for Complation (Days) 646
Take Over Date / FHO Status date Original Contract Amount Rp. Accumulative Rp. 100.0% Final Contract Amount Rp.
Comp Actual Accumto to
Total this this% Month Month Month
I G e n e r a l 1.50 0.25 0.00 0.25 0.25II D r a i n a g e 9.75 10.00 0.03 10.04 10.01III Earthworks 5.32 4.91 0.01 4.92 4.92IV
Pavement Widening &Shoulders
1.63 2.05 0.28 2.33 1.93V Granular Pavement 10.77 9.93 0.00 9.93 9.93VI Asphalt Pavement 59.20 56.42 1.02 57.44 57.44VII S t r u c t u r e s 7.62 9.88 0.489 10.37 10.37VIII
Reinstatement & MinorWorks
3.43 2.52 1.206 3.73 3.82IX Day Work 0.05 0.00 0.000 0.00 0.00X
Routine MaintenanceWorks
0.19 0.19 0.002 0.19 0.20I.X.I Painting Bridge 0.54 0.59 0.025 0.61 0.61
TOTAL 100.0 96.75 3.07 100 100Note :
1. 100% completed on December 29, 20172. Taking-Over Certificate issued on December 29, 20173. Defects Liability Periode until December 29, 2019
Year Month Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Jan Feb The month for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Original Progress Schedul (%) 0.02 0.09 0.17 0.31 0.44 2.77 7.58 13.22 22.21 30.85 35.38 48.22 55.71 66.39 74.64 78.72 83.79 90.13 94.80 97.82 99.27 100.0 1st Revised Progress Schedul (%) 27.55 35.38 44.13 51.83 59.73 68.69 70.25 73.59 75.43 94.40 97.52 99.37 100.0 2nd Revised Progress Schedul (%) 79.0 82.61 87.54 94.64 100.0 Actual Progress (%) 0.27 1.12 2.37 3.59 6.21 9.69 18.79 28.40 32.15 37.93 47.48 57.22 65.01 68.99 74.73 79.93 84.86 82.62 88.05 96.75 100.0 Balance (%) 0.18 0.96 2.06 3.15 3.44 2.12 5.57 6.19 1.30 2.55 3.35 5.39 5.28 0.31 4.48 6.35 9.43 0.01 0.52 2.12 -Progress per month 0.00 0.27 0.85 1.25 1.22 2.62 3.48 9.10 9.61 3.75 5.78 9.55 9.75 7.79 3.98 5.74 5.20 4.93 (2.24) 5.43 8.70 3.25
0.94 1.25 1.22 2.62 3.48 9.10 9.61 3.75 5.78 9.55 9.75 7.79 58.80
2018Dec
Div DescriptionAccum
LastAccumSch to
thisMonth
PHYSICAL PROGRESS MONITORING TABLE2016 2017
PHYSICAL WORK PROGRESS BY CATEGORY
355,500,000,000
23-Mar-16
Opukenigara, ST
AMO
UN
T
DISBURSEMENT (Incl VAT)29-Dec-17 25-Mar-1929-Dec-19
378,042,000,000
EXECUTIVE SUMMARY REPORTMar-19
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS08
TIM
E March 25, 2019Bts Kota Pariaman - Manggopoh MAJOR PROBLEMS ACTION TO BE TAKEN
378,042,000,000
RENARDET S.A JV PT. SEECONS
28-Jan-16
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
PHYS
ICAL
PRO
GRE
S (%
)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE # 08
ORIGINAL SCH
1st REVISED SCH
2nd REVISED SCH
ACTUAL PROGRESS
ANNEX P-11
MONTH :
Package No. Time Elapsed (Days) Name Time Elapsed (%) Project Manager Scheduled Progress (%) 100.00 Contractor PT. HUTAMA KARYA, Tbk JO PT. DMT Actual Overall Progress (%) 100.00 Supervision Consultant RENARDET S.A JV PT. CIPTA STRADA Balance (%) Contract Sign Progress This Month (%) Commencement Date
Time for Complation (Days) 720 Calendar Days + 104 days
Take Over Date / FHO Status date Original Contract Amount Rp. Accumulative Rp. 100.0%Contr Amount + Price Adjustment Rp.
Accum Actual Accum AccumLast this to this Sch to this
% Month Month Month Month
I G e n e r a l 0.85 0.87 - 0.87 0.87II D r a i n a g e 2.49 2.88 2.88 2.88III Earthworks 11.27 10.58 - 10.58 10.58
IV Pavement Widening &Shoulders
3.60 3.22 0.17 3.40 3.40
V Granular Pavement 14.41 14.21 - 14.21 14.21VI Asphalt Pavement 52.35 53.27 0.00 53.27 53.65VII S t r u c t u r e s 9.88 11.02 0.03 11.06 10.59
VIII Reinstatement & MinorWorks
4.87 2.90 0.56 3.46 3.55
IX Day Work - - - - -
X Routine MaintenanceWorks
0.28 0.28 0.28 0.28
TOTAL 100.00 99.23 0.77 100.0 100.0
Note :1. 100% completed on May 19, 20172. Taking-Over Certificate issued on May 19, 20173. Defects Liability Periode until May 19, 2019
Year Month March Apr May June July August Sep Oct Nop Dec Jan Feb March Apr May June July August Sep Oct Nop Dec Jan Feb Mar Apr May The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Schedl Progress Original (%) 0.39 2.18 4.68 7.70 9.91 14.17 18.72 22.96
20.01 22.98 25.39 29.15 36.74 43.85 51.45 58.80 66.39 70.16 77.18 84.00 89.39 93.63 96.19 99.45 100.0075.54 92.39 95.86 98.98 100
Actual Progress (%) 1.477 5.59 6.59 9.13 10.00 11.28 15.09 17.23 23.22 24.82 26.84 33.04 38.87 44.59 51.81 56.74 58.88 65.03 71.00 74.78 84.85 86.28 87.49 89.78 96.37 99.23 100 Balance (%) 1.08 3.42 1.92 1.43 0.09 (2.89) (3.64) (2.78) 0.23 (0.56) (2.31) (3.70) (4.98) (6.86) (6.99) (9.65) (11.28) (12.15) (13.01) (14.61) (8.78) (9.91) (11.96) (2.61) 0.52 0.25 0.00Progress per month 4.12 1.00 2.54 0.87 1.28 3.80 2.15 5.99 1.61 2.02 6.20 5.83 5.71 7.22 4.93 2.14 6.15 5.97 3.79 10.07 1.43 1.21 2.28 6.60 2.86 0.77
1.00 2.54 0.87 1.28 3.80 2.15 5.99 1.61 2.02 6.20 5.83 5.71
DSC is conducting pavement investigation plannedfor completion in Oct 2018.
2 nd Rivised Progress Schedul (%)
2017
1 st Rivised Progress Schedul (%)
PHYSICAL PROGRESS MONITORING TABLE2015 2016
228,899,717,000
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description
263,656,603,000263,656,603,000
Amend-02
(i) Found some cracks on the surface of thepavement.(ii) Road Maintenance within the DNP is notimplemented
25-Mar-19
23-Feb-15
DISBURSEMENT (Incl VAT)
19-May-17
18-Dec-14 AMO
UN
T
19-May-19
EXECUTIVE SUMMARY REPORTMar-19
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS11
TIM
E March 25, 2019BANTAL - MUKOMUKO (50,6 Km) MAJOR PROBLEMS ACTION TO BE TAKEN
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
PHYS
ICAL
PRO
GRE
S (%
)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE # 11
Original Sch
1st Revised Sch
2nd Revised Sch
Actual
2 ESR CTC 25 Marc 2019_11CCE6B P-11
ANNEX P-13
MONTH :
Package No. Time Elapsed (Days)
Name SIMPANG RUKIS-TANJUNG KEMUNING Time Elapsed (%) Project Manager Paides Tabril, ST,MT Scheduled Progress (%) 100.00 Contractor PT. WASKITA KARYA Actual Overall Progress (%) 100.00 Supervision Consultant Balance (%)Contract Sign Progress This Month (%) Commencement Date Time for Complation (Days) 1028 Take Over Date / FHO Status date Final Contract Amount Rp. Accumulative Rp. 100% Final Contract Amount + Price Adj Rp.
Comp Accum Actual Accum AccumTotal Last this to this Sch to this
% Month Month Month MonthI G e n e r a l 0.41 0.309 - 0.409 0.41II D r a i n a g e 1.76 1.633 0.27 2.590 2.59III Earthworks 9.35 7.586 1.13 9.477 9.48
IV Pavement Widening &Shoulders 4.41 2.635 - 3.253 3.25
V Granular Pavement 17.19 14.052 0.06 14.115 14.12VI Asphalt Pavement 62.34 57.181 4.29 62.263 62.26VII S t r u c t u r e s 2.23 3.375 0.93 5.166 5.17
VIII Reinstatement & MinorWorks 2.14 1.529 0.51 2.553 2.55
IX Day Work - -
X Routine MaintenanceWorks 0.18 0.072 0.01 0.174 0.17
TOTAL 100.0 88.37 7.20 100.00 100.00Note :
1. 100% completed on May 15, 20182. Taking-Over Certificate issued on May 15, 20183. Defects Liability Periode until May 14, 2020
Year Month Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May June July Aug Sep Oct Nov Dec Jan Feb Mar Apr May The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 Schedl Progress Original (%) 0.02 0.21 1.65 4.18 6.69 9.61 14.62 20.36 26.94 33.58 41.24 47.87 50.63 58.32 63.60 68.28 72.97 77.66 82.62 86.79 91.19 95.75 99.36 99.74 1001st Revised Schedule (%) 0.20 0.90 2.20 4.00 5.80 7.50 9.50 11.50 13.30 15.40 16.13 20.18 24.00 27.82 32.00 36.44 41.47 46.63 54.87 63.48 72.34 81.13 90.08 97.87 1002nd Revised Schedule (%) 54.29 75.28 82.33 91.9 1003rd Revised Schedule (%) 68.39 76.55 1004th Revised Schedule (%) 84.86 97.34 1005th Revised Schedule (%) 79.34 86.47 94.76 100 Actual Progress (%) - 0.36 0.88 2.19 3.39 13.71 13.84 14.37 14.62 16.02 17.34 18.25 18.55 19.06 19.25 20.53 22.77 32.63 41.11 42.71 44.34 47.26 48.87 50.29 52.54 55.99 57.94 60.69 64.77 68.64 70.94 74.85 85.64 92.98 100 Balance (%) (0.02) 0.14 (0.77) (1.98) (3.30) 4.10 (0.78) (5.99) (12.32) (17.56) (23.90) (29.63) (32.08) (39.26) (44.34) (47.75) (50.20) (45.03) (41.51) (20.77) (28.01) (33.87) (41.21) (47.58) (22.74) (26.3) (34.0) (39.3) (11.8) (31.4) (26.4) (25.2) (0.8) (1.8) -Progress per month - 0.36 0.52 1.32 1.20 10.3 0.14 0.53 0.24 1.40 1.32 0.91 0.30 0.51 0.19 1.27 2.24 9.86 8.48 1.60 1.63 2.92 1.61 1.42 2.25 3.45 1.95 2.75 4.07 3.88 2.30 3.91 10.79 7.34 7.02
0.36 0.52 1.32 1.20 10.31 0.14 0.53 0.24 1.40 1.32 0.91 0.30 0.51
14-May-20
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description
PHYSICAL PROGRESS MONITORING TABLE2015 2016 2017 2018
DISBURSEMENT (Incl VAT)15-May-18 25-Mar-19
305,886,100,000 305,886,100,000
AMO
UN
T
RENARDET S.A JV18-Dec-1422-Jul-15
EXECUTIVE SUMMARY REPORTMar-19
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS13
TIM
E March 25, 2019MAJOR PROBLEMS ACTION TO BE TAKEN
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
PHYS
ICAL
PRO
GRES
(%)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE # 13
Series1
Series2
Series3
Series4
Series5
Series6
Series7
2 ESR CTC 25 Marc 2019_11CCE6B P-13
ANNEX P-15
MONTH :
Package No. Time Elapsed (Days) Name Time Elapsed (%) Project Manager Scheduled Progress (%) 100.00 Contractor PT. PEMBANGUNAN PERUMAHAN Actual Overall Progress (%) 100.00 Supervision Consultant Balance (%)Contract Sign Progress This Month (%) Commencement Date Time for Complation (Days) 953 Take Over Date / FHO Status date Original Contract Amount Rp. Accumulative Rp. 100% Final Contract Amount Rp. 78.92% Final Contract Amount + Price Adj Rp.
Comp Accum Actual Accum AccumTotal Last this to this Sch to this
% Month Month Month Month
I G e n e r a l 1.72 1.43 0.29 1.72 2.30II D r a i n a g e 0.41 0.38 0.03 0.41 5.13III Earthworks 7.76 7.28 0.27 7.55 6.34
IV Pavement Widening &Shoulders
2.71 1.91 0.80 2.71 2.16
V Granular Pavement 18.39 18.61 - 18.61 24.41VI Asphalt Pavement 57.17 55.13 2.04 57.17 40.48VII S t r u c t u r e s 7.58 7.35 0.24 7.58 16.75
VIII Reinstatement & MinorWorks
3.92 1.33 2.60 3.92 2.39
IX Day Work 0.34 0.01 0.33 0.34 0.04
X Routine MaintenanceWorks
- - - - -
TOTAL 100.0 93.40 6.60 100.00 100.00Note :
1. 100% completed on June 30, 20182. Taking-Over Certificate issued on June 30, 20183. Defects Liability Periode until June 29, 2018
Year
Month Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 Schedl Progress Original (%) 0.11 0.45 1.04 3.18 5.57 8.98 13.46 19.96 23.3 29.8 36.3 42.3 48.17 53.91 58.4 64.3 69.6 75.51 81.15 87.1 90.01 93.9 97.3 98.7 99.7 100.01st Revised Sch 7.4 11.8 14.1 18.5 23.8 30.1 37.5 44.4 49.9 57.0 63.5 70.2 77.5 84.7 88.2 93.1 97.6 99.4 100.02nd Revised Sch 80.66 82.67 83.68 86.39 88.64 92.16 98.37 1003rd Revised Sch 68.89 76.50 83.18 88.64 94.35 99.54 100 Actual Progress (%) 0.15 0.46 0.92 1.42 1.69 2.34 4.72 5.59 5.96 8.94 8.99 12.04 13.25 20.5 27.0 27.9 29.4 34.7 40.6 43.7 46.4 50.0 54.3 56.8 59.6 61.0 65.83 70.77 72.50 74.14 96.78 97.26 Balance (%) 0.03 0.02 (0.12) (1.76) (3.88) (6.64) (2.7) (6.2) (8.2) (9.5) (14.8) (18.0) (24.2) (23.9) (23.0) (29.2) (34.1) (35.5) (36.9) (40.9) (41.9) (43.1) (43.4) (35.3) (38.8) (39.0) (10.7) (12.4) (16.1) (20.2) (2.8) (2.4)Progress per month 0.3 0.5 0.5 0.5 0.3 0.6 2.4 0.9 0.4 3.0 0.0 3.1 1.2 7.3 6.5 0.9 1.6 5.2 5.9 3.2 2.6 3.6 4.3 2.6 2.8 1.4 4.8 4.9 1.7 1.6 22.6 0.5
0.32 0.46 0.50 0.27 0.65 2.38 0.87 0.37 2.99 0.04 3.05 1.21 7.27
2018
PHYSICAL PROGRESS MONITORING TABLE
Div Description
2015 2016 2017
AMO
UN
T
PHYSICAL WORK PROGRESS BY CATEGORY
30-Jun-18 25-Mar-19205,270,428,803
A Joint Venture of Renardet, S.A.13-Jul-1520-Nov-15
205,270,428,803
DISBURSEMENT (Incl VAT)
260,100,000,00029-Jun-20
Saleh Samsuri, ST
EXECUTIVE SUMMARY REPORT
PROGRESS STATUS15
TIM
E
Mar-19
PROJECT DATA SUMMARY OF WORK PROGRESSMarch 25, 2019
MAJOR PROBLEMS ACTION TO BE TAKENSIBOLGA - BTS. TAPSEL
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
PHYS
ICAL
PRO
GRES
(%)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE # 15
ORIGINAL SCH
1st REVISED SCH
2nd REVISED SCH
3rd REVISED SCH
ACTUAL PROGRESS
2 ESR CTC 25 Marc 2019_11CCE6B P-15
ANNEX P-17
MONTH :
Package No. Time Elapsed (Days)
Name PUGUNG TAMPAK-Sp.Gn KEMALA Time Elapsed (%) Project Manager Scheduled Progress (%) 100.00 Contractor PT. JAYA KONSTRUKSI MP, Tbk Actual Overall Progress (%) 100.00 Supervision Consultant Balance (%)Contract Sign Progress This Month (%) Commencement Date Time for Complation (Days) 846 Take Over Date / FHO Status date Original Contract Amount Rp. Accumulative Rp. 100% Final Contract Amount Rp.
Comp Accum Actual Accum AccumTotal Last this to this Sch to this
% Month Month Month Month
I G e n e r a l 8.05 1.514 0.296 1.810 1.810II D r a i n a g e 12.92 9.04 0.300 9.34 9.34III Earthworks 16.93 16.55 1.169 17.72 17.72
IV Pavement Widening &Shoulders 7.36 7.04 0.953 7.99 7.99
V Granular Pavement 4.09 2.69 0.100 2.79 2.79VI Asphalt Pavement 42.82 46.43 (0.005) 46.42 46.42VII S t r u c t u r e s 1.98 5.04 2.038 7.08 7.08
VIII Reinstatement & MinorWorks 5.30 3.338 2.922 6.260 6.26
IX Day Work 0.23 0.08 0.172 0.25 0.25
X Routine MaintenanceWorks 0.34 0.30 0.037 0.34 0.34
TOTAL 100.0 92.02 7.98 100.00 100.00Note :
1. 100% completed on December 27, 20172. Taking-Over Certificate issued on December 27, 20173. Defects Liability Periode until December 27, 2019
211,712,283,000.00 106.09
Year Month Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May June July August Sep Oct Nop Dec The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Schedl Progress Original (%) 0.18 0.70 1.18 1.51 2.39 3.80 6.10 10.09 14.15 18.21 21.04 26.32 33.01 39.79 46.73 54.12 61.80 69.15 75.00 80.05 85.25 90.26 95.19 100.0 1st Revised Progress Schedul (%) 50.59 55.87 62.09 68.69 75.33 79.35 85.57 91.8 100.0 2nd Revised Progress Sch Add-4 (%) 69.39 75.07 81.7 88.6 94.3 100.0 3rd Revised Progress Sch Add- (%) 69.39 75.07 81.7 88.6 94.3 94.3 100 Actual Progress (%) 0.921 1.13 1.42 3.05 3.45 4.11 6.16 9.54 13.81 16.99 17.41 20.33 28.34 33.32 38.86 41.34 49.01 53.30 61.37 66.06 72.73 77.53 73.41 78.69 84.78 87.52 92.02 100 Balance (%) 0.74 0.43 0.23 1.54 1.06 0.30 0.06 (0.55) (0.34) (1.23) (3.63) (5.99) (4.68) (6.47) (7.87) (12.78) (12.80) (2.57) (0.72) (2.63) (2.60) (1.82) (1.7) (3.05) (3.83) (6.81) (2.32)Progress per month 0.92 0.21 0.29 1.63 0.40 0.66 2.05 3.38 4.28 3.18 0.42 2.92 8.00 4.99 5.54 2.48 7.66 4.29 8.08 4.69 6.67 4.80 (4.12) 5.28 6.09 2.74 4.50 7.98
0.21 0.29 1.63 0.40 0.66 2.05 3.38 4.28 3.18 0.42 2.92 8.00 4.99
211,712,283,000
PHYSICAL PROGRESS MONITORING TABLE2015 2016 2017
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description
17
TIM
E March 25, 2019
MAJOR PROBLEMS ACTION TO BE TAKEN
RENARDET S.A JV17-Nov-144-Sep-15
DISBURSEMENT (Incl VAT)
AMO
UN
TJoko Wisargo, ST, MT
27-Dec-17 25-Mar-19199,551,233,000 211,712,283,000.00
27-Dec-19
EXECUTIVE SUMMARY REPORTMar-19
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
PHYS
ICAL
PRO
GRE
S (%
)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE # 17
ORIGINAL SCH
1st REVISED SCH
2nd REVISED SCH
3rd REVISED SCH
ACTUAL PROGRESS
2 ESR CTC 25 Marc 2019_11CCE6B P-17
ANNEX P-19
MONTH :
Package No. Time Elapsed (Days) Name Time Elapsed (%) Project Manager Yahya, ST Scheduled Progress (%) 100.0 Contractor Actual Overall Progress (%) 100.0 Supervision Consultant Balance (%) Contract Sign Progress This Month (%) Commencement Date Time for Complation (Days) 300 Calendar Days Final Time for Complation (Days) 477 Calendar Days Status date Take Over Date / FHO Accumulative Rp. 100% Original Contract Amount Rp. Final Contract Amount Rp.
Comp Accum Actual Accum AccumTotal Last this to this Sch to this
% Month Month Month Month
I G e n e r a l 0.43 0.32 0.32 0.32II D r a i n a g e 3.15 2.73 2.73 2.73III Earthworks 11.96 11.31 11.31 11.31
IV Pavement Widening &Shoulders
5.30 4.02 4.02 4.02
V Granular Pavement 10.69 8.82 8.82 8.82VI Asphalt Pavement 59.66 64.4 64.4 64.41VII S t r u c t u r e s 2.00 4.02 4.02 4.02
VIII Reinstatement & MinorWorks
6.79 4.35 4.35 4.35
IX Day Work
X Routine MaintenanceWorks
0.03 0.02 0.02 0.02
TOTAL 100.00 100.00 - 100 100.00Note :
1. 100% completed on 30 Jun 20162. Taking-Over Certificate issued on 30 Jun 20163. Defects Liability Periode until 30 Jun 2018
Year Month March April May June July Aug Sept Oct Nov Des Jan Feb March April May The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Schedl Progress Original (%) 0.12 1.40 8.96 18.40 21.37 23.62 37.37 58.19 87.25 100.00
43.60 52.20 67.79 79.68 98.93 100.00 Actual Progress (%) 0.15 1.30 6.28 14.54 16.21 22.41 28.90 49.74 57.15 57.48 52.77 77.34 80.78 97.14 100.00 Balance (%) 0.03 -0.10 -2.68 -3.86 -5.16 -1.21 -8.47 -8.45 -30.10 13.88 0.57 9.55 1.10 -1.79 0.00
4.98 8.26 1.67 6.20 6.49 20.84 7.42 0.32 (4.71) 24.57 3.44 16.36
25-Mar-1944,419,760,829
27-Feb-1511-Mar-15
RENARDET S.A JV
30-Jun-16
DISBURSEMENT (Incl VAT)
AMO
UN
T
PT RODATEKNINDO PURAJAYA
33,689,452,00030-Jun-18
FHO is not conducted yet
44,419,760,000
Rivised Progress Schedul Add.1 (%)
2016PHYSICAL PROGRESS MONITORING TABLE
Div
2015
Description
PHYSICAL WORK PROGRESS BY CATEGORY
EXECUTIVE SUMMARY REPORTMar-19
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS 19
TIM
E March 25, 2019 BINTUNAN-LAIS MAJOR PROBLEMS ACTION TO BE TAKEN
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
PHYS
ICAL
PRO
GRES
(%)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE # 19
ORIGINAL
REVISED SCH
ACTUAL
2 ESR CTC 25 Marc 2019_11CCE6B P-19
ANNEX P-20
MONTH :
Package No. Time Elapsed (Days) 935 Name Time Elapsed (%) 100.00% Project Manager Andi Mulya Rusli, ST, MT Scheduled Progress (%) 100.00 Contractor 'PT Nindya Karya (Persero) Actual Overall Progress (%) 100.00 Supervision Consultant RENARDET S.A JV PT.Yodya (Persero) Balance (%) Contract Sign Progress This Month (%) Commencement Date Time for Complation (Days) 547 Calendar Days Take Over Date / FHO Status dateFinal Contract Amount (Incl VAT) Rp. Accumulative Rp. 100%Final Contract Amount + Price Adj Rp.
Comp Accum Actual Accum AccumTotal Last this to this Sch to this
% Month Month Month Month
I G e n e r a l 0.90 0.60 - 0.60 0.69II D r a i n a g e 32.44 27.92 - 27.92 27.92III Earthworks 6.64 4.75 - 4.75 3.74
IV Pavement Widening &Shoulders
3.78 1.56 - 1.56 1.51
V Granular Pavement 9.52 6.66 - 6.66 6.66VI Asphalt Pavement 42.49 42.28 2.74 45.02 45.02VII S t r u c t u r e s 1.83 5.63 2.28 7.91 9.28
VIII Reinstatement & MinorWorks
1.93 0.24 2.60 2.84 3.78
IX Day Work 0.04 - 0.10 0.10 0.09
X Routine MaintenanceWorks
0.43 0.24 0.18 0.42 0.41
TOTAL 100.00 89.88 7.89 97.77 99.12Note :
1. 100% completed on March 2, 20182. Taking-Over Certificate issued on March 2, 20183. Defects Liability Periode until March 1, 2020
Year Month Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb March The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Schedl Progress Original (%) 0.30 0.57 4.81 12.51 19.71 30.61 45.72 57.80 68.70 71.89 77.79 84.28 89.32 95.60 98.79 100.00 1st Revised Progress Schedul (%) 0.23 0.52 4.41 10.83 18.56 30.61 42.24 55.64 67.61 71.88 76.86 82.61 88.27 94.64 97.91 100.00 2nd Revised Progress Schedul (%) Add 3 0.23 0.51 4.33 10.47 16.67 25.51 34.93 45.42 52.47 56.70 61.73 68.56 76.09 85.65 95.41 100.00 3rd Revised Progress Schedul (%) 81.63 87.66 100.00 4th Revised Progress Schedul (%) 86.36 92.12 99.12 100.00 Actual Progress (%) 0.39 0.63 3.77 13.60 16.95 23.14 33.37 46.78 54.23 57.73 58.83 59.02 64.70 73.69 79.99 83.00 89.88 97.77 100.00 Balance (%) 0.09 0.06 (1.04) 1.09 (2.76) (7.47) (12.35) (8.86) (13.39) (14.15) (2.89) (9.54) (11.39) (11.97) (15.43) (17.00) (2.24) (1.35) -Progress per month 0.39 0.24 3.14 9.83 3.35 6.19 10.23 13.41 7.45 3.50 1.10 0.18 5.68 8.99 6.30 3.01 6.88 7.89 2.23
3.14 9.83 3.35 6.19 10.23 13.41 7.45 3.50 1.10 0.18 5.68 8.99
Div Description
PHYSICAL PROGRESS MONITORING TABLE
PHYSICAL WORK PROGRESS BY CATEGORY
2016 2017
113,931,519,0002-Mar-18
(i) Found some cracks on the surface of thepavement
AMO
UN
T
1-Jun-161-Sep-16
DISBURSEMENT (Incl VAT)
2018
25-Mar-19113,931,519,000
March 1, 2020
EXECUTIVE SUMMARY REPORTMar-19
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS20
TIM
E March 25, 2019LubuK Alung - Sicincin (14,60 km) MAJOR PROBLEMS ACTION TO BE TAKEN
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
PHYS
ICAL
PRO
GRE
S (%
)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE # 20
ORIGINAL SCH
1st REVISED SCH
2nd REVISED SCH
3rd REVISED SCH
4th REVISED SCH
ACTUAL PROGRESS
2 ESR CTC 25 Marc 2019_11CCE6B P-20
ANNEX P-12
MONTH :
Package No. Time Elapsed (Days) 1036 Name Time Elapsed (%) 130.15 Sub Project Manager / PPK Filino Kalani, ST Scheduled Progress (%) 100.00 Contractor Actual Overall Progress (%) 100.00
Balance (%) Supervision Consultant RENARDET S.A JV PT. Daya Creasi Mitrayasa Progress This Month (%) Contract Sign Commencement Date Take Over Date Status date Time for Complation (Days) 796 Calendar Days Accumulative Rp. 100.00% Contract Amount (Incl VAT) Rp.REV Contract Amount (Incl VAT) Rp. 97.8%
Add. Accum Actual Accum AccumTotal Last this to this Sch to
% Month Month Month thisMonth
I G e n e r a l 2.45 0.80 - 0.80 2.11II D r a i n a g e 4.93 5.21 0.52 5.73 6.35III Earthworks 5.42 4.87 - 4.87 4.87
IV Pavement Widening &Shoulders
1.51 1.71 - 1.71 1.75
V Granular Pavement 13.88 14.62 - 14.62 14.62VI Asphalt Pavement 58.61 55.53 - 55.53 55.53VII S t r u c t u r e s 9.00 7.86 0.72 8.58 9.47
VIII Reinstatement & MinorWorks
4.03 3.58 0.30 3.88 5.11
IX Day Work 0.04 0.01 - 0.01 0.05
X Routine MaintenanceWorks
0.13 0.13 0.13 0.13
TOTAL 100.00 94.32 1.54 95.86 100
Note :
May June July August Sept October Nov Des January Feb March April May June July August Sept October Nov Des January Feb March April May June July Sept Nov Dec1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 29 30 310.09 0.58 0.84 1.26 1.61 4.10 8.31 14.09 21.50 31.99 44.07 56.50 71.44 77.99 77.99 80.17 82.88 85.50 89.12 91.76 94.29 97.31 99.45 99.78 100.00
1.50 2.34 4.93 9.39 15.87 27.24 40.55 54.23 70.99 77.90 80.34 83.37 86.33 90.58 95.17 100.01.50 2.27 4.92 9.51 17.87 23.46 28.68 35.12 47.91 55.53 63.68 77.09 88.00 96.16 99.21 100.0
50.76 54.74 61.52 67.07 75.33 87.88 96.04 100.00 100.00 100.00 100.000.192 0.44 0.87 0.98 1.05 1.97 2.13 4.02 4.03 4.99 5.928 7.35 9.72 11.93 13.39 15.68 17.53 20.88 23.13 25.98 30.02 41.22 49.65 63.24 72.28 73.47 76.95 86.57 94.32 100.00
0.10 (0.14) 0.03 (0.28) (0.45) (0.37) (2.80) (5.37) (11.84) (22.25) (34.62) (46.88) (61.27) (65.97) (50.28) (61.41) (70.47) (75.28) (76.08) (74.02) (24.72) (20.31) (17.42) (12.09) (15.60) (22.57) (23.05) (13.43) (5.68)Progress per month 0.43 0.11 0.07 0.91 0.17 1.89 0.01 0.96 0.94 1.42 2.37 2.21 1.46 2.29 1.85 3.35 2.25 2.85 4.04 11.19 8.43 13.59 9.04 1.19 3.48 6.29 7.76
0.25 0.43 0.11 0.07 0.91 0.17 1.89 0.01 0.96 0.94 1.42 2.37 2.21
1st Rivised Progress Sch Add.1 (%)
350,643,730,000
23-May-16 DISBURSEMENT (Incl VAT)28-Jul-18 25-Mar-19
350,643,730,000
The month of time for complation
358,650,400,000
Actual Progress (%) Balance (%)
2nd Rivised Progress Sch Add.2 (%)
Original Progress Schedul (%)
Month
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description
PHYSICAL PROGRESS MONITORING TABLE
Year 2016 2017 2018
3rd Rivised Progress Sch (%)
EXECUTIVE SUMMARY REPORTMar-19
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS12
TIM
E March 25, 2019Kambang - Indrapura MAJOR PROBLEMS ACTION TO BE TAKEN
AMO
UN
T
PT. LANCARJAYA MANDIRI ABADI - PT.CAHAYA TUNGGAL ABADI , JO.
28-Jan-16
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
PHYS
ICAL
PRO
GRE
S (%
)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE # 12
Original Sch
1st Revised Sch
2nd Revised Sch
3rd Revised Sch
Actual
C:\Users\Tediero\AppData\Local\Temp\2 ESR CTC 25 Marc 2019_11CCE6B P-12
ANNEX P-16
MONTH :
Package No. 16 Time Elapsed (Days) 867
Name Seblat - Ipuh Time Elapsed (%) 125.11
Project Manager Fathoni Ikhsan, ST Scheduled Progress (%) 100.00 Contractor KSO PT Yasa - Multi Structure Actual Overall Progress (%) 100.00 Supervision Consultant A Joint Venture of Renardet, S.A. Balance (%)Contract Sign Progress This Month (%) Commencement Date Time for Complation (Days) 693 Take Over Date Status date Contract Amount (Incl VAT) Rp. Accumulative Rp. 100%Price Adjustment Rp.
Comp Add.2 Accum Actual Accum AccumTotal Total Last this to this Sch to
% % Month Month Month thisMonth
I G e n e r a l 1.40 1.51 1.42II D r a i n a g e 13.85 13.71 12.90III Earthworks 6.57 5.95 6.18IV
Pavement Widening &Shoulders
2.32 2.30 2.00V Granular Pavement 10.85 10.97 10.86VI Asphalt Pavement 51.52 53.55 51.87VII S t r u c t u r e s 8.41 8.46 11.14VIII
Reinstatement &Minor Works
4.79 3.25 3.34IX Day Work 0.05 0.05 0.05X
Routine MaintenanceWorks
0.24 0.24 0.24 TOTAL 100.00 100.00 - - - 100
Note :
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 260.07 0.26 0.57 4.03 8.73 12.40 17.12 21.87 25.29 30.86 36.98 43.59 52.25 58.94 63.06 69.89 75.30 80.70 86.70 92.22 100.0
1st REVISED Schedul (%) 0.16 0.34 0.62 1.05 2.47 4.31 7.08 10.63 14.96 20.69 24.96 29.89 37.24 46.45 53.45 62.17 70.31 80.83 90.54 100.0 100.0 100.0 100.0 100.0 100.0 100.00.18 0.260 0.407 1.04 2.17 4.90 8.68 12.11 17.57 23.76 23.95 37.68 46.55 52.08 53.60 62.48 70.47 76.47 82.64 84.89 89.48 89.50 85.68 89.85 91.52 100.000.11 - (0.16) (2.99) (0.31) 0.59 1.61 1.48 2.61 3.07 (1.01) 7.79 9.32 5.63 0.15 0.31 0.16 (4.36) (7.90) (15.11) (10.52) (10.50) (14.32) (10.15) (8.48) -
Progress per month 0.18 0.08 0.15 0.63 1.13 2.73 3.78 3.43 5.46 6.19 0.18 13.74 8.87 5.53 1.52 8.88 7.99 6.00 6.17 2.25 4.59 0.01 (3.82) 4.17 1.67 8.480.08 0.15 0.63 1.13 2.73 3.78 3.43 5.46 6.19 0.18 13.74 8.87 5.53
PHYSICAL WORK PROGRESS BY CATEGORY
Balance (%)
28-Oct-168-Nov-16
2016 2017 Month The month of time for complation Original Progress Schedul (%)
Actual Progress (%)
Div Description
PHYSICAL PROGRESS MONITORING TABLE2018
MAJOR PROBLEMS
211,374,500,000
Year
EXECUTIVE SUMMARY REPORTMar-19
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
DISBURSEMENT (Incl VAT)1-Oct-18 25-Mar-19
211,374,500,000
ACTION TO BE TAKEN
AMO
UN
TTI
ME March 25, 2019
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
PHYS
ICAL
PRO
GRE
S (%
)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE # 16
Original
1st Revised Sch
Actual
C:\Users\Tediero\AppData\Local\Temp\2 ESR CTC 25 Marc 2019_11CCE6B P-16
ANNEX P-14
MONTH :
Package No. Time Elapsed (Days) 964 Name Time Elapsed (%) 133.15 Sub Project Manager / PPK Rahmat Donal, ST, MT Scheduled Progress (%) 100.00 Contractor 'PT YASA - CONBLOC, JV Actual Overall Progress (%) 93.12 Supervision Consultant RENARDET S.A JV Balance (%) (6.88) Contract Sign Progress This Month (%) 0.67 Commencement Date Time for Complation (Days) 724 Calendar Days Take Over Date Status date Contract Amount (Incl VAT) Rp. Accumulative Rp. 85.31%Price Adjustment Rp.
Comp Accum Actual Accum AccumTotal Last this to this Sch to
% Month Month Month thisMonth
I G e n e r a l 1.17 0.73 - 0.73 1.03II D r a i n a g e 14.61 4.61 0.09 4.70 6.13III Earthworks 7.28 7.11 0.06 7.17 7.29
IV Pavement Widening &Shoulders
2.68 3.60 0.11 3.71 5.39
V Granular Pavement 12.61 13.60 0.04 13.64 13.60VI Asphalt Pavement 54.22 57.62 0.13 57.75 57.62VII S t r u c t u r e s 2.73 2.39 - 2.39 4.12
VIII Reinstatement &Minor Works
4.39 2.48 0.24 2.72 4.51
IX Day Work 0.04 0.04 - 0.04 0.04
X Routine MaintenanceWorks
0.28 0.28 - 0.28 0.28
TOTAL 100.00 92.45 0.67 93.12 100.0
Note :
August Sept October Nov Des January Feb March April May June July August Sept October Nov Des Feb March April May June JuL Oct Nov Dec Jan Feb Mar1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 19 20 21 22 23 24 27 28 29 30 31 320.17 0.34 0.51 0.94 2.02 4.47 7.12 10.30 14.85 21.63 29.98 38.68 47.74 54.09 63.68 71.43 79.18 92.51 97.49 100.00.17 0.56 0.72 1.78 5.87 10.05 15.36 20.60 28.07 32.72 37.80 45.12 53.79 66.71 80.65 92.59 100.00.17 0.56 0.72 1.78 5.87 10.05 15.36 20.60 28.07 32.72 37.80 43.57 53.79 66.71 80.65 92.59 100.0
64.64 83.08 87.87 97.79 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.00.18 0.47 2.65 3.83 3.94 5.96 9.27 15.63 19.18 28.90 32.89 36.88 46.05 52.18 55.75 59.32 62.64 68.90 75.34 77.89 78.75 79.92 79.92 84.61 85.24 92.45 92.18 92.45 93.120.00 (0.09) 1.92 2.05 (1.92) (4.09) (6.09) (4.96) (8.89) (3.82) (4.91) (6.69) (7.74) (14.53) (24.90) (33.27) (37.36) (14.18) (12.52) (19.90) (21.25) (20.08) (20.1) (15.4) (14.8) (7.6) (7.8) (7.6) (6.9)
Progress per month 0.18 0.29 2.18 1.19 0.11 2.02 3.31 6.37 3.54 9.72 3.99 3.99 9.16 6.14 3.57 3.57 3.32 3.11 6.44 2.55 0.86 1.17 - 1.32 0.63 7.20 (0.26) 0.26 0.670.29 2.18 1.19 0.11 2.02 3.31 6.37 3.54 9.72 3.99 3.99 9.16 6.14
PHYSICAL WORK PROGRESS BY CATEGORY
2018
Actual Progress (%) Balance (%)
20172016 Year
Month
1st Revise Progress Schedul (%)
The month of time for complation Original Progress Schedul (%)
2nd Revise Progress Schedul (%) 3rd Revise Progress Schedul (%)
PHYSICAL PROGRESS MONITORING TABLE
AMO
UN
T
14
TIM
E March 25, 2019 Painan - Kambang
EXECUTIVE SUMMARY REPORTMar-19
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
Div Description
MAJOR PROBLEMS ACTION TO BE TAKEN
• PPK / Satker / BPJN-III clarification to the contractor
1-Jun-163-Aug-16
DISBURSEMENT (Incl VAT)25-Mar-1927-Jul-18
214,322,429,680 182,848,006,452
• The contractor lacks of perational fund
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
PHYS
ICAL
PRO
GRES
(%)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE # 14
Original Sch
1st Revised Shc
2nd Revised Sch
3rd Revised Sch
Actual
C:\Users\Tediero\AppData\Local\Temp\2 ESR CTC 25 Marc 2019_11CCE6B P-14
ANNEX P-21
MONTH :
Package No. Time Elapsed (Days) 935 Name Time Elapsed (%) 140.60 Project Manager Opukenigara, ST Scheduled Progress (%) 100.00 Contractor 'PT Multi Structur Actual Overall Progress (%) 54.42 Supervision Consultant RENARDET S.A JV PT. CIPTA STRADA Balance (%) (45.58) Contract Sign Progress This Month (%) Terminate Commencement Date Time for Complation (Days) 665 Calendar Days Take Over Date Status date Contract Amount (Incl VAT) Rp. Accumulative Rp. 89.60%Est FINAL Contract Amount (Incl VAT) Rp.
Comp Accum Actual Accum AccumTotal Last this to this Sch to this
% Month Month Month Month
I G e n e r a l 3.34 1.96 - 1.96 3.34II D r a i n a g e 28.82 13.60 - 13.60 28.82III Earthworks 5.39 5.26 - 5.26 5.39
IV Pavement Widening &Shoulders
2.35 - - - 2.35
V Granular Pavement 7.92 7.50 - 7.50 7.92VI Asphalt Pavement 41.26 19.9 - 19.9 41.26VII S t r u c t u r e s 8.01 5.81 - 5.81 8.01
VIII Reinstatement & MinorWorks
2.57 0.25 - 0.25 2.57
IX Day Work 0.04 - - - 0.04
X Routine MaintenanceWorks
0.30 0.10 - 0.10 0.30
TOTAL 100.00 54.42 - 54.42 100.00Note :
Year Month Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Schedl Progress Original (%) 0.56 2.40 4.37 12.27 21.33 28.48 37.16 43.98 50.80 55.91 62.73 71.26 76.82 82.58 94.28 100.0 1st Revised Progress Schedul (%) 2.05 3.03 9.86 20.07 28.23 35.21 42.76 50.07 55.91 61.52 69.07 75.59 81.76 91.81 100.0 2nd Revised Progress Sch Add-3 (%) 48.35 53.35 60.57 70.25 77.68 84.95 93.34 100.0 3rd Revised Progress Sch (%) 51.09 57.14 64.67 72.11 82.28 91.94 100.00 Actual Progress (%) 0.78 1.94 2.20 3.25 13.38 15.66 21.25 22.41 34.91 39.33 40.53 42.24 43.10 45.46 47.63 49.17 50.36 52.42 53.73 55.24 57.90 54.42 Balance (%) 0.22 (0.11) (0.83) (6.61) (6.69) (12.57) (13.96) (20.35) (15.16) (16.58) (20.04) (28.01) (34.58) (39.49) (45.71) (50.83) (6.78) (12.25) (18.38) (27.04) (34.04) (45.58)Progress per month 0.78 1.16 0.26 1.05 10.13 2.28 5.59 1.16 12.50 4.42 1.20 1.71 0.86 2.36 2.17 1.54 1.19 2.06 1.31 1.51 2.66
0.26 1.05 10.13 2.28 5.59 1.16 12.50 4.42 1.20 1.71 0.86 2.36
Div Description
PHYSICAL PROGRESS MONITORING TABLE
PHYSICAL WORK PROGRESS BY CATEGORY
2016 2017
28-Jun-18126,301,900,000
Contract is terminated
AMO
UN
T
1-Jun-161-Sep-16
DISBURSEMENT (Incl VAT)
2018
Require new procurement for remaining quantity
25-Mar-1961,587,414,000
68,733,493,980
EXECUTIVE SUMMARY REPORTMar-19
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS21
TIM
E March 25, 2019LubuK Alun - Kuraitaji (16,80 km) MAJOR PROBLEMS ACTION TO BE TAKEN
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
PHYS
ICAL
PRO
GRE
S (%
)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE # 21
ORIGINAL SCH
1st REVISED SCH
2nd REVISED SCH
3rd REVISED SCH
ACTUAL PROGRESS
2 ESR CTC 25 Marc 2019_11CCE6B P-21
ANNEX P21A
MONTH :
Package No. Time Elapsed (Days) 81 Name Time Elapsed (%) 54.00 Project Manager Opukenigara, ST Scheduled Progress (%) 51.16 Contractor NKE - MJP, KSO Actual Overall Progress (%) 39.17 Supervision Consultant RENARDET S.A JV PT. CIPTA STRADA Balance (%) (11.99) Contract Sign Progress This Month (%) 20.90 Commencement Date Time for Complation (Days) 150 Calendar Days Take Over Date Status date Contract Amount (Incl VAT) Rp. Accumulative Rp.
Comp Accum Actual Accum AccumTotal Last this to this Sch to this
% Month Month Month MonthI G e n e r a l 0.95 0.16 0.02 0.18 0.85II D r a i n a g e 8.25 0.19 0.56 0.74 5.23III Earthworks 0.79 0.14 0.02 0.16 0.77
IV Pavement Widening &Shoulders
3.83 - - - -
V Granular Pavement 0.96 0.26 0.66 0.92 0.96VI Asphalt Pavement 62.26 14.7 18.51 33.19 31.44VII S t r u c t u r e s 15.20 0.41 0.79 1.20 8.23
VIII Reinstatement & MinorWorks
7.54 2.43 0.33 2.76 3.56
IX Day Work 0.11 - - - 0.06
X Routine MaintenanceWorks
0.11 0.00 0.02 0.02 0.06
TOTAL 100.00 18.27 20.90 39.17 51.16Note :
Year Month Jan Feb Mar Apr May Jun The month of time for complation 1 2 3 4 5 6 Schedl Progress Original (%) 0.87 26.81 56.33 82.85 99.56 100.00Rev - 1 Schedule Progress (%) 0.87 24.16 51.16 79.67 99.56 100.00 Actual Progress (%) 0.160 18.27 39.17 Balance (%) (0.71) (5.89) (11.99)Progress per month 0.16 18.11 20.9
20.90 (39.17) - - - - - - - - - -
2019
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description
PHYSICAL PROGRESS MONITORING TABLE
DISBURSEMENT (Incl VAT)1-Jun-19 25-Mar-19
83,624,709,000
EXECUTIVE SUMMARY REPORTMar-19
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS21 A
TIM
E March 25, 2019LubuK Alun - Kuraitaji (16,80 km) MAJOR PROBLEMS ACTION TO BE TAKEN
AMO
UN
T
21-Dec-183-Jan-19
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6
PHYS
ICAL
PRO
GRES
(%)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE # 21A
ORIGINAL SCH
1st REVISED SCH
ACTUAL
C:\Users\Tediero\AppData\Local\Temp\2 ESR CTC 25 Marc 2019_11CCE6B P-21A
Appendix S-1 As of 31 March 2019
1 2 3 5 6 7 8 9
1 Krui - Bha Lampung 1 SPPL November 2010 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013 /NOL
2 AMDAL Environmental Feasibility : 12 Oct 2012
Environmental permits: 21 Nov 2012 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013/NOL
3 Monitoring of Integration
AMDAL into Design - 1X 15 August 2014 NN NN
4 AMDAL Implementation Report
(PIU to BLH) - each 6month
17 April 2015 ; 6 Oct2015 ; 21 Feb 2019
29 April 2015 ; 19 Oct2015
11 Mei 2015 ; 14 Des2015
5 RKPPL - 1X 28 Jan 2015 06 Feb 2015 23 Feb 2015/NOL
6 RKPPL Implementation Report - Quarter 3 July 2015 ; 13 Nov
2015 ; 4 Feb 2016 ; 17Feb 2016
31 July 2015 ; 24 Nov2015 ; Informal to WB 4
& 17 Feb 2016
13 August 2015:14 Dec 15 ; 19 Feb
2016
7 HIV - AIDS Campaign Report - 1X 8 January 2016 15 March 2016 NN
2 Padang Sawah - Sp Empat Sumatera Barat 1 SPPL Nov. 2013 1X - 20 Jan 2014 14 April 2014/NOL
Jembatan Air Gadang Sumatera Barat 2 UKL & UPL Recommendation: Nov 2013 1X - 09 June 2014 08 Auguts 2014/NOL
3 UKL&UPL Implementation
Report (PIU to BLH) - each 6month
17 April 2015 ; 6 Oct2015 ; 28 Jun 2016
29 April 2015 ; 19 Oct2015 : 21 Juli 2016
11 Mei 2015 ; 14 Des2015 ; 22 Juli 2016
4 RKPPL - 1X 11 Dec 2014 19 Dec 2014 30 Jan 2015/NOL
5 RKPPL Implementation Report
(Base camp improvementespecially for pack No.02)
- Quarter
3 July 2015 ; 13 Nov2015 ; 4 Feb 2016 ; 17Feb 2016 ; 28 Jun 2016
& 21 Jan 2019
31 July 2015 ; 24 Nov2015 ; Informal to WB 4& 17 Feb 2016 ; 21 Juli
2016
13 August 2015:14 Dec 15 ; 19 Feb2016 ; 22 Juli 2016
6 HIV - AIDS Campaign Report - 1X 8 January 2016 15 March 2016 NN
3 Manggopoh - Padang Sawah Sumatera Barat 1 SPPL 30 Dec 2013 1X - 20 Jan 2014 14 April 2014
2 SPPL Implementation Report
(PIU to BLH) - each 6month
17 April 2015 29 April 2015 11 Mei 2015
3 RKPPL - 1X 11 Dec 2014 19 Dec 2014 30 Jan 2015/NOL
4 RKPPL Implementation Report - Quarter 3 July 2015 ; 13 Nov
2015 ; 4 Feb 2016 ; 17Feb 2016
31 July 2015 ; 24 Nov2015 ; Informal to WB 4
& 17 Feb 2016
13 August 2015:14 Dec 15 ; 19 Feb
2016
5 HIV - AIDS Campaign Report - 1X 8 January 2016 15 March 2016 NN
4 Ipuh - Bantal Bengkulu 1 SPPL (Initial study) 20 Dec 2013 1X April 2013 - -
2 UKL & UPL Environmental permits : 6 Des 2014 1X - 06 Feb 2015
(Environment permits) 23 Feb 2015
3 UKL&UPL Implementation
Report (PIU to BLH) - each 6month
17 April 2015 ; 6 Oct2015 ; 28 Juni 2016
29 April 2015 ; 19 Oct2015 : 21 Juli 2016
11 Mei 2015 ; 14 Des2015 ; 22 Juli 2016
4 RKPPL - 1X 28 Jan 2015 06 Feb 2015 23 Feb 2015/NOL
5 RKPPL Implementation Report - Quarter 3 July 2015 ; 13 Nov
2015 ; 4 Feb 2016 ; 17Feb 2016 ; 28 Jun 2016
31 July 2015 ; 24 Nov2015 ; Informal to WB 4& 17 Feb 2016 ; 21 Juli
2016
13 August 2015:14 Dec 15 ; 19 Feb2016 ; 22 Juli 2016
4
Correspondence of Environmental Safeguard and Reporting on CTC WINRIP
Date of Recomendation/Environmental Permits
No ofPackage
Name of Link Province Sent to WBCTC Letters to PMUDurations
Environmental Activity, CTC WINRIP
WB NOL/LettersEnvironmental Safeguard
1 2 3 5 6 7 8 94
Date of Recomendation/Environmental Permits
No ofPackage
Name of Link Province Sent to WBCTC Letters to PMUDurations WB NOL/LettersEnvironmental Safeguard
6 HIV - AIDS Campaign Report - 1X 8 January 2016 15 March 2016 NN
5 Sp. Rampa - Poriaha Sumut 1 UKL & UPL Recommendation : 8 Dec 2011 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013
2 Monitoring of Integration
UKL&UPL into Design - 1X 11 Nov 2014 NN NN
3 UKL&UPL Implementation
Report (PIU to BLH) - each 6month
28 Jun 2016; 31Auguts 2017
21 Juli 2016; 28 Sept2017
22 Juli 2016; WB file
4 RKPPL - 1X 26 April 2016 13 May 2016 30 Juni 2016
6 RKPPL Implementation Report - Quarter
4 Feb 2016 ; 17 Feb2016 ; 28 Jun 2016;11Nov 2016; 2 Jun 2017;31 August 2017 ; 8 Nov2017; 21 Mei 2018; 14
Agustus 2018
Informal to WB 4 & 17Feb 2016 : 21 Juli 2016;28 Nov 2016 ; 15 Mar2017 (informal) ; 9 Jun2017; 28 Sept 2017 ; 04
Des 2017; 19 Maret 2018-informal; 31 Agustus
2018
19 Feb 2016 ; 22 Juli2016; 19 Des 2016; 18Juli 2017; WB file ; 12
Jan 2018 (ask torevised report); 4 Juli2018, 17 September
2018
6 HIV - AIDS Campaign Report - 1X 29 February 2016 15 March 2016 NN
7 Improvement Base Camp
Management
30 Januari 2018; 15Feb 2018 (infomal 13
Feb) ;6 March 2018; 23March 2018; 9 April2018; 15 Mei 2018
7 Februari 2018;informal 13 Feb 2018;
informal 6 March 2018;informal 22 March 2018 ;10 April 2018 -informal;16 Mei 2018-informal
12 Februari 2018
6 Ps. Pedati - Kerkap Bengkulu 1 UKL & UPL Recommendation : 9 Nov 2011 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013
2 Monitoring of Integration
UKL&UPL into Design - 1X 29 Oct 2015 NN NN
3 UKL&UPL Implementation
Report (PIU to BLH) - Quarter 28 Jun 2016 21 Juli 2016 ; 20 Nov
2016 (informal) 22 Juli 2016
4 RKPPL - one time 4 Nov 2015 24-Nov-15 14 Des 2016 (NOL)
5 RKPPL Implementation Report Quarter 13 Nov 2015 ; 4 Feb
2016 ; 17 Feb 2016 ; 28Jun 2016 ; 11 Nov 2016
24 Nov 2015; Informalto WB 4 & 17 Feb 2016;
21 Juli 2016; 28 Nov2016 ; 15 Mar 2017
(informal)
14 Des 2016 (NOL) ; 19Feb 2016 ; 22 Juli
2016; 19 Des 2016
6 HIV - AIDS Campaign Report - 1X 12 February 2016 15 March 2016 NN
7 Indrapura - Tapan Sumatera Barat 1 AMDAL Environmental feasibility : 05 Feb 2014 ;
environmental permits : 5 Feb 2014 1X - 09 June 2014 08 August 2014
2 Monitoring of Integration
AMDAL into Design - 1X 2 Dec 2015 NN NN
3 AMDAL Implementation Report
(PIU to BLH) - each 6month
1 March 2017 13 April 2017 17 April 2017
4 RKPPL - 1X 27 Feb 2017 20 March 2017 5 April 2017
5 RKPPL Implementation Report Quarter
15 Mar 2017(informal) ; 2 Jun 2017;31 August 2017; 8 Nov
2017
15 Mar 2017 (informal); 9 Jun 2017; 28 Sept2017; 4 Des 2017; 19Maret 2018-Informal
5 April 2017 ; 18 Juli2017; WB file ;12 Jan2018 (ask to revised
report)
6 HIV - AIDS Campaign Report - 1X 29 Sept 2016 13 October 2016 NN
7 Improvement Base Camp
Management
30 Januari 2018; 15Feb 2018 (infomal 13Feb); 6 March 2018
7 Februari 2018;informal 13 Feb 2018;informal 6 March 2018
12 Feb 2018
1 2 3 5 6 7 8 94
Date of Recomendation/Environmental Permits
No ofPackage
Name of Link Province Sent to WBCTC Letters to PMUDurations WB NOL/LettersEnvironmental Safeguard
8 Bts. Kota Pariaman - Manggopoh Sumatera Barat 1 AMDAL Environmental permits : 23 July 2013 1X - 20 Jan 2014 14 April 2014
2 Monitoring of Integration
AMDAL into Design - 1X 6 Oct 2015 NN NN
3 AMDAL Implementation Report
(PIU to BLH) - each 6month
29 Sept 2016 ; 08November 2017
13 October 2016; 4 Des2017
12 Jan 2018
4 RKPPL - 1X 02 November 2016 14 November 2016 23 November 2016
5 RKPPL Implementation Report Quarter
15 Mar 2017(informal) ; 2 Jun 2017;31 August 2017; 8 Nov
2017
15 Mar 2017 (informal); 9 Jun 2017: 28 Sept2017 ; 4 Des 2017; 19Maret 2018-informal
18 Juli 2017; WB file;12 Jan 2018 (ask to
revised report)
6 HIV - AIDS Campaign Report - 1X 11 November 2016 ; 6
April 2017 28 November 2016; 13
April 2017 NN
11 Bantal - Mukomuko Bengkulu 1 AMDAL Environmental permits : 3 April 2014 1X - 09 June 2014 08 August 2014
2 Monitoring of Integration
AMDAL into Design - 1X 10 Dec 2014 NN NN
3 AMDAL Implementation Report
(PIU to BLH) - each 6month
28 Jun 2016 ; 31August 2017
29 April 2016 (informal)& 21 Juli 2016 (formal) ;5 Des 2016 informal ; 28
Sept 2017
22 Juli 2016; WB file
4 RKPPL - 1X 10 Des 2015 23-Dec-15 8 Jan 2016/NOL
5 RKPPL Implementation Report Quarter
13 Nov 2015 ; 4 Feb2016 ; 17 Feb 2016 ; 28Jun 2016 ; 11 Nov 2016;15 Mar 2017 (informal); 2 Jun 2017; 31 August
2017
24 Nov 2015; Informalto WB 4 & 17 Feb 2016;
21 Juli 2016; 28 Nov2016 ; 15 Mar 2017
(informal) ; 9 Jun 2017:28 Sept 2017
14 Des 2016 (NOL) ; 19Feb 2016 ; 12 Juli
2016; 19 Des 2016 ; 18Juli 2017; WB file
6 HIV - AIDS Campaign Report - 1X 8 January 2016 15 March 2016 NN
12 Kambang - Indrapura Sumatera Barat 1 AMDAL Environmental Feasibility : 05 Feb 2014 ;
Environmental permits : 5 Feb 2014 1X - 09 June 2014 08 August 2014
2 Monitoring of Integration
AMDAL into Design - 1X 2 Dec 2015 NN NN
3 AMDAL Implementation Report
(PIU to BLH) - each 6month
1 March 2017 13 April 2017 17 April 2017
4 RKPPL - 1X 27 Feb 2017 ; 8 May
2017 (Rev RKPPL) 20 March 2017 ; 29 May
2017 (Rev RKPPL) 5 April 2017 ; 18 Juli
2017
5 RKPPL Implementation Report Quarter
15 Mar 2017(informal) ; 2 Jun 2017;31 August 2017; 8 Nov2017; 21 Mei 2018; 14
Agustus 2018: 5November 2011; 7 Feb
2019.
15 Mar 2017 (informal); 9 Jun 2017: 28 Sept2017; 4 Des 2017; 19
Maret 2018-informal; 29Juni 2018; 31 Agustus2018; 13 Nov 2018;12
Feb 2019.
5 April 2017 ; 18 Juli2017; WB file ; 12 Jan2018 (ask to revised
report); 4 Juli 2018, 17September 2018
6 HIV - AIDS Campaign Report - 1X 29 Sept 2016 13 October 2016 NN
1 2 3 5 6 7 8 94
Date of Recomendation/Environmental Permits
No ofPackage
Name of Link Province Sent to WBCTC Letters to PMUDurations WB NOL/LettersEnvironmental Safeguard
7 Improvement Base Camp
Management
30 Januari 2018; 15Feb 2018 (infomal 13
Feb) ; 26 Feb 2018(informal 21 feb); 6
March 2018; 23 March2018; 9 April 2018; 15Mei 2018; 7 Juni 2018
7 Februari 2018;informal 13 Feb 2018;infomal 21 Feb 2018;
informal 6 March 2018;informal 22 March 2018 ;10 April 2018-informal;16 Mei 2018-informal; 7
Juni 2018-informal
12 Feb 2018
13 Sp. Rukis - Tj. Kemuning Bengkulu 1 UKL & UPL Recommendation : 31 Jan 2012 (Link of SpRukis Mana-Bts Kab Kaur & 4 Feb 2012 (Bts
Kaur - Tj Kemuning) 1X - 09 June 2014 08 August 2014
2 Monitoring of Integration
UKL&UPL into Design - 1X 6 Oct 2015 NN NN
3 UKL&UPL Implementation
Report (PIU to BLH) - each 6month
28 Jun 2016; 31August 2017
21 Juli 2016; '28 Sept2017
22 Juli 2016; WB file
4 RKPPL - 1X 4 Nov 2015 24-Nov-15 14 Dec 2015/NOL
5 RKPPL Implementation Report Quarter
4 Feb 2016 ; 17 Feb2016 ; 28 Jun 2016 : 11
Nov 2016; 15 Maret2017 ; 2 Jun 2017: 31August 2017; 8 Nov
2017; 21 Mei 2018; 14Agustus 2018
Informal to WB 4 & 17Feb 2016 : 21 Juli 2016;
28 Nov 201615; Mar2017 (informal) ; 9 Jun2017: 28 Sept 2017; 4Des 2017; 19 Maret
2018; 29 Juni 2018;31Agustus 2018
19 Feb 2016 ; 22 Juli2016; 19 Des 2016 ; 18Juli 2017; WB file; 12
Jan 2018 (ask torevised report); 4 Juli2018, 17 September
2018
6 HIV - AIDS Campaign Report - 1X 12 February 2016 15 March 2016 NN
7 Improvement Base Camp
Management
30 Januari 2018; 6March 2018 ; 9 April2018; 15 Mei 2018; 7
Juni 2018
7 Februari 2018; 6March 2018; 10 April
2018-informal; 16 Mei2018-informal; 7 Juni
2018
12 Feb 2018
14 Painan - Kambang Sumatera Barat 1 AMDAL Environmental Feasibility : 05 Feb 2014 ;
Environmental permits : 5 Feb 2014 1X - 09 June 2014 08 August 2014
2 Monitoring of Integration
AMDAL into Design - 1X 2 Dec 2015 NN NN
3 AMDAL Implementation Report
(PIU to BLH) - each 6month
1 March 2017 13 April 2017 17 April 2017
4 RKPPL - 1X 10 Feb 2017 28 Feb 2017 17 March 2017
5 RKPPL Implementation Report Quarter
15 Mar 2017(informal) ; 2 Jun 2017;31 August 2017; 8 Nov2017; 21 Mei 2018; 14
Agustus 2018; 5November 2011; 7 Feb
2019.
15 Mar 2017 (informal); 9 Jun 2017; 28 Sept2017; 4 Des 2017; 19
Maret 2018-informal; 29Juni 2018; 31 Agustus2018; 13 Nov 2018;12
Feb 2019.
17 March 2017 ; 18Juli 2017; WB file ; 12
Jan 2018 (ask torevised report); 4 Juli2018, 17 September
2018
6 HIV - AIDS Campaign Report - 1X 21 Des 2016 28 Des 2016 NN
7 Improvement Base Camp
Management
30 Januari 2018; 15Feb 2018 (infomal 13
Feb) ; 26 Feb 2018(informal 21 feb); 6
Macrh 2018; 23 March2018; 9 April 2018; 15Mei 2018; 7 Juni 2018
7 Februari 2018;informal 13 Feb 2018;infomal 21 Feb 2018;
informal 6 March 2018;22 March 2018; 10 April2018-informal; 16 Mei2018-informal; 7 Juni
2018-informal
12 Feb 2018
1 2 3 5 6 7 8 94
Date of Recomendation/Environmental Permits
No ofPackage
Name of Link Province Sent to WBCTC Letters to PMUDurations WB NOL/LettersEnvironmental Safeguard
15 Sibolga - Bts. Tapsel Sumut 1 UKL & UPL Recommendation : 8 Dec 2011 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013
2 Monitoring of Integration
UKL&UPL into Design - 1X 11 Nov 2014 NN NN
3 UKL&UPL Implementation
Report (PIU to BLH) - each 6month
28 Jun 2016; 31August 2017
21 Juli 2016; '28 Sept2017
22 Juli 2016; WB file
4 RKPPL - 1X 02 November 2016 14 November 2016 23 November 2016
5 RKPPL Implementation Report Quarter
28 Juni 2016 : 11 Nov2016; 15 Mar 2016
(informal) ; 2 Jun 2017;31 August 2017; 8 Nov2017; 21 Mei 2018; 14
Agustus 2018
21 Juli 2016; 28 Nov2016; 15 Mar 2017
(informal) ; 9 Jun 2017;28 Sept 2017; 4 Des
2017; 19 Maret 2018-informal; 29 Juni 2018;
31 Agustus 2018
22 Juli 2016; 19 Des2016 ; 18 Juli 2017;
WB file; 12 Jan 2018(ask to revised report);
4 Juli 2018, 17September 2018
6 HIV - AIDS Campaign Report - 1X 29 February 2016 15 March 2016 NN
7 Improvement Base Camp
Management
30 Januari 2018; 15Feb 2018 (infomal 13
Feb) ; 26 Feb 2018(informal 21 feb); 6Macrh 2018; 9 April
2018; 15 Mei 2018; 7Juni 2018
7 Februari 2018;informal 13 Feb 2018;infomal 21 Feb 2018;
informal 6 March 2018;10 April 2018-informal;16 Mei 2018-informal; 7
Juni 2018-informal
12 Feb 2018
16 Sebelat-Ipuh Inc.Air Lalang & AirGunung Bridges
Bengkulu 1 AMDAL Environmental permits : 3 April 2014 1X - 09 June 2014 08 August 2014
2 Monitoring of Integration
AMDAL into Design - 1X 10 Dec 2014 NN NN
3 AMDAL Implementation Report
(PIU to BLH) - each 6month
31 August 2017 ; 08November 2017
28 September 2017 WB file
4 RKPPL - 1X 2 June 2017 ; 15
September 2017 (RevRKPPL)
9 June 2017; 28 Sept2017
18 Juli 2017; 25 Okt2017 NOL RKPPL RV
5 RKPPL Implementation Report Quarter
2 Jun 2017; 31 Agustus2017; 8 Nov 2017; 21Mei 2018; 14 Agustus
2018; 5 November2011; 7 Feb 2019.
9 Jun 2017; 28 Sept2017; 4 Des 2017; 19
Maret 2018-informal; 29Juni 2018; 31 Agustus
2018 ; 13 Nov 2018;12Feb 2019.
18 Juli 2017; WB file;12 Jan 2018 (ask to
revised report); 4 Juli2018, 16 September
2018
6 HIV - AIDS Campaign Report - 1X 13 June 2017 10 Juli 2017 NN
7 Improvement Base Camp
Management
26 Feb 2018 (informal22 Feb 2018); 6 March2018; 9 April 2018; 15Mei 2018; 7 Juni 2018
Informal 22 Feb 2018;Informal 6 March 2018;10 April 2018-informal;16 Mei 2018-informal; 7
Juni 2018-informal
12 Februari 2018
17 Sp. Gunung Kemala-Pg. Tampak,Inc Way Tauu Bridge
Lampung 1 AMDAL Environmental Feasibility : 12 Oct 2012
Environmental permits: 21 Nov 2012 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013
2 Monitoring of Integration
AMDAL into Design - 1X 11 Nov 2014 NN NN
3 AMDAL Implementation Report
(PIU to BLH) - each 6month
28 Jun 2016; 31August 2017
21 Juli 2016 ; 28 Sept2016 ; 20 Nov 2016; 28
Sept 2017 &21 Feb 2019 22 Juli 2016; WB file
4 RKPPL - 1X 26 April 2016 13 May 2016 30 Juni 2016
1 2 3 5 6 7 8 94
Date of Recomendation/Environmental Permits
No ofPackage
Name of Link Province Sent to WBCTC Letters to PMUDurations WB NOL/LettersEnvironmental Safeguard
5 RKPPL Implementation Report Quarter
28 Juni 2016 : 11 Nov2016;15 Mar 2017
(informal) ; 2 Jun 2017;31 August 2017; 8 Nov
2017
21 Juli 2016; 28 Nov2016 ;15 Mar 2017
(informal) ; 9 Jun 2017;28 Sept 2017; 4 Des
2017; 19 Maret 2018-informal & 4 March 2019
22 Juli 2016; 19 Des2016 ; 18 Juli 2017;
WB file; 12 Jan 2018(ask to revised report)
6 HIV - AIDS Campaign Report - 1X 8 January 2016 15 March 2016 NN
19 Lais- Bintunan Bengkulu 1 UKL & UPL Recommendation : 9 Nov 2011 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013
2 Monitoring of Integration
UKL&UPL into Design - 1X 6 Oct 2015 NN NN
3 UKL&UPL Implementation
Report (PIU to BLH) - each 3month
28 Jun 2016 21 Juli 2016 ; 20 Nov
2016 (informal) 22 Juli 2016
4 RKPPL - 1X 4 Nov 2015 24-Nov-15 14 Dec 2015/NOL
5 RKPPL Implementation Report Quarter 13 Nov 2015 ; 4 Feb
2016 ; 17 Feb 2016 ; 28Jun 2016 ; 11 Nov 2016
24 Nov 2015; Informalto WB 4 & 17 Feb 2016:
21 Juli 2016; 28 Nov2016
14 Des 2016 (NOL) ; 19Feb 2016 ; 22 Juli
2016; 19 Des 2016
6 HIV - AIDS Campaign Report - 1X 12 February 2016 15 March 2016 NN
20 Lubuk Alung - Sincin Sumatera Barat 1 UKL & UPL Recommendation : 27 Dec 2011 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013
2 Monitoring of Integration
UKL&UPL into Design - 1X 29 Oct 2015 NN NN
3 UKL&UPL Implementation
Report (PIU to BLH) - each 6month
2 June 2017 ; 8November 2017
9 June 2017; 4 Des 2017 18 Juli 2017; 12 Jan
2018
4 RKPPL - 1X 10 Feb 2017 28 Feb 2017 17 March 2017
5 RKPPL Implementation Report Quarter
15 Mar 2017(informal); 2 Juni 2017;31 August 2017; 8 Nov
2017; 21 Mei 2018
15 Mar 2017 (informal);9 Juni 2017; 28 Sept2017; 4 Des 2017; 19
Maret 2018-Informal; 29Juni 2018
17 March 2017 ; 18Juli 2017; WB file; 12
Jan 2018 (ask torevised report); 4 Juli
2018 6 HIV - AIDS Campaign Report - 1X 6 April 2017 13 April 2017 NN
7 Improvement Base Camp
Management
15 Feb 2018 (informal13 Feb 2018); 6 March
2018; 23 March 2018; 9April 2018;15 Mei 2018;
7 Juni 2018
informal 13 Feb 2018;informal 6 March 2018;22 Mar 2018 ; 10 April-informal ; 16 Mei 2018-Informal; 7 Juni 2018-
informal;
12 Feb 2018
21 Lubuk Alung - Kuraitaji Sumatera Barat 1 UKL & UPL Recommendation : 27 Dec 2011 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013
2 Monitoring of Integration
UKL&UPL into Design - 1X 29 Oct 2015 NN NN
3 UKL&UPL Implementation
Report (PIU to BLH) - each 6month
2 June 2017 ; 8November 2017
9 June 2017; 4 Des 2017 18 Juli 2017; 12 Jan
2018
4 RKPPL - 1X 27 Feb 2017 ; 8 May
2017 (Rev RKPPL) 20 March 2017 ; 29 May
2017 (Rev RKPPL) 5 April 2017 ; 18 Juli
2017
5 RKPPL Implementation Report Quarter
15 Mar 2017 (informal); 2 Juni 2017; 31 August
2017; 8 Nov 2017; 21Mei 2018
15 Mar 2017 (informal) ;9 Juni 2017; 28 Sept2017; 4 Des 2017; 19
Maret 2018-informal; 29Juni 2018
5 April 2017 ; 18 Juli2017; WB file; 12 Jan2018 (ask to revisedreport); 4 Juli 2018
1 2 3 5 6 7 8 94
Date of Recomendation/Environmental Permits
No ofPackage
Name of Link Province Sent to WBCTC Letters to PMUDurations WB NOL/LettersEnvironmental Safeguard
6 HIV - AIDS Campaign Report - 1X 6 April 2017 13 April 2017 NN
7 Improvement Base Camp
Management
15 Feb 2018 (informal13 Feb 2018); 6 march
2018; 23 March 2018; 9April 2018; 15 Mei
informal 13 Feb 2018;informal 6 March 2018;
informal 22 March 2018 ;10 Mar 2018-informal;
12 Feb 2018
21 A Lubuk Alung - Kuraitaji West Sumatera UKL&UPL Implementation
Report (PIU to BLH) NY
RKPPL NY
RKPPL Implementation Report NY
HIV - AIDS Campaign Report NY
Improvement Base CampManagement
NY
5:00 AM Sp.Rampa - Poriaha (SlopeProtection)
North Sumatera UKL&UPL Implementation
Report (PIU to BLH) NYS
RKPPL NYS
RKPPL Implementation Report NYS
HIV - AIDS Campaign Report NYS
Improvement Base CampManagement
NYS
CERC Rehabilitation & Reconstruction Roads Pasca Earthquake & Tsunami - Palu - Central Sulawesi Province
Preparations Central Sulawesi Laporan Pelaksanaan Konsultasi
ESMF18-Feb-19
1 RR-No.01 Kab Donggala DELH Recommendation : Dec 2015 24 Jan 2019 (informal)
Monitoring of IntegrationUKL&UPL into Design
NY input (informal) on WBmeeting 1 March 2019
UKL&UPL ImplementationReport (PIU to BLH)
NYS
RKPPL NYS
RKPPL Implementation(Quarterly)
NYS
HIV - AIDS Campaign Report NYS
Improvement Base CampManagement
NYS
2 RR-No.02 Kab.Sigi UKL & UPL & DPLH Recommendation : 7 April 2016 24 Jan 2019 (informal)
Monitoring of IntegrationUKL&UPL into Design
NYS
UKL&UPL ImplementationReport (PIU to BLH)
NYS
RKPPL NYS
RKPPL Implementation(Quarterly)
NYS
HIV - AIDS Campaign Report NYS
NEW PROJECT AT WINRIP ORIGINAL PACKAGES
1 2 3 5 6 7 8 94
Date of Recomendation/Environmental Permits
No ofPackage
Name of Link Province Sent to WBCTC Letters to PMUDurations WB NOL/LettersEnvironmental Safeguard
Improvement Base CampManagement
NYS
Keterangan :
incl. 1 Document Studi Amdal
incl. 1 Document Studi Amdal
NYS: Not Yet Started incl. 1 Document Studi Amdal
NY : Not Yet
NN : Not Need
UP : Under Process
Appendix S-2 As of March 2019
NOL Not Yet NOL
1 Krui - Biha 1 Studi LARAP (2,815 WTP) 19 Desember 2012 4 Januari 20131 Monitoring LARAP 2 April 2013 10 April 2013 18 April 20131 Monitoring LARAP Rev 18 Juni 2013 21 Juni 2013 26 Juni 20132 Monitoring LARAP 2 Oktober 2015 16 Oktober 2015 20 Oktober 2015
2 Pd. Sawah - Sp. Empat 1 Studi LARAP (414 WTP) 12 Desember 2012 13 Desember 20121 Monitoring LARAP 2 April 2013 10 April 2013 '18 April 20132 Monitoring LARAP Rev 5 Juli 2013 15 Juli 2013 19 Juli 20133 Monitoring LARAP 28 Januari 2015 06 Februari 2015 12 Februari 2015
2a Pd. Sawah - Sp. Empat Studi LARAP Tambahan (52 WTP) 10 Juli 2014 10 Juli 2014 21 Juli 2014
3 Manggopoh - Pd. Sawah 1 Studi LARAP (1,338 WTP) 12 Desember 2012 13 Desember 20121 Monitoring LARAP 2 April 2013 5 April 2013 18 April 2013
Monitoring LARAP Rev 18 Juni 2013 21 Juni 2013 26 Juni 20132 Monitoring LARAP - 25 Februari 2014 5 Maret 20143 Monitoring LARAP 10 Juni 2014 19 Juni 2014 23 Juni 20144 Monitoring LARAP 28 Januari 2015 06 Februari 2015 12 Februari 20155 Monitoring LARAP 26 Februari 2015 06 Maret 2015 17 Maret 20156 Monitoring LARAP 2 Oktober 2015 16 Oktober 2015 20 Oktober 2015
4 Ipuh - Bantal 1 Studi LARAP (257 WTP) 23 November 2012 10 Desember 20121 Monitoring LARAP (157 WTP) 23 Desember 2013 24 Desember 2013 6 Januari 2014
Dilaporkan 261 2 Monitoring LARAP (70 WTP) - 25 Februari 2014 5 Maret 20143 Monitoring LARAP (34 WTP) 23 Januari 2015 06 Februari 2015 12 Februari 2015
5 Sp. Rampa - Poriaha 1 Studi LARAP (92 WTP) 30 Agustus 2013 10 September 2013 16 September 20132 Studi LARAP (Action Plan Signed) 29 Oktober 2013 6 November 2013 12 November 20131 Additional LARAP 23 Desember 2015 08 Januari 2016
Dilaporkan 92 1 Monitoring LARAP ( 68 WTP) 16 November 2016 28 November 2016 30 November 2016Additional LARAP 20 Februari 2017 20 Maret 2017Revision Additional LARAP 8 September 2017
2 Monitoring LARAP ( seluruhnya 92 WTP) 5 Oktober 2018 16 Oktober 2018 23 Oktober 2018
6 Ps. Pedati - Kerkap 1 Studi LARAP (637 WTP) 29 Oktober 2013 13 November 2013 20 November 20132 Studi LARAP rev 30 Desember 2013 9 Januari 2014 16 Januari 20143 Studi LARAP (Action Plan Signed) 25 Februari 2014 21 Mei 2014 30 Mei 20141 Monitoring LARAP (546 WTP) 5 Maret 2015 16 Maret 2015 23 Maret 2015
Dilaporkan 637 1a Kelengkapan Monitoring LARAP (dok Appraisal) 13 Mei 2015 29 Mei 2015 -2 Monitoring LARAP ( 91 WTP) 8 Desember 2015 15 Desember 2015 05 Januari 2016
7 Indarapura - Tapan 1 Studi LARAP (878 WTP) 3 September 2014 24 September 2014 14 Oktober 2014
Summary of Studies and ReportsSocial Impact Activity, CTC WINRIP
Number ofPackage
Name of LinkNo ofdoc
Document CTC Letter to PMU Sent to WB (DPJJ-WB)Response from World Bank
NOL Not Yet NOL
Number ofPackage
Name of LinkNo ofdoc
Document CTC Letter to PMU Sent to WB (DPJJ-WB)Response from World Bank
2 Studi LARAP (Action Plan Signed) 16 Februari 2015 06 Maret 2015 17 Maret 20151 Monitoring LARAP (276 WTP) 29 Februari 2016 10 Februari 2016 16 Maret 20162 Monitoring LARAP (207 WTP) 20 Juli 2016 21 Juli 2016 15 Agustus 2016
Dilaporkan 813 3 Monitoring LARAP (89 WTP) 10 November 2016 11 November 20164 Monitoring LARAP (61 WTP) 6 Januari 2017 16-Jan-17 26 Januari 20175 Monitoring LARAP (20 WTP) 31 Mei 2017 5 Juni 2017 22 Juni 20176 Monitoring LARAP (160 WTP) 16-Nov-18 4 Desember 2018 14 Desember 2018
8 1 Studi LARAP (2,206 update dari 2,339 WTP) 23 Juli 2014 7 Agustus 2014 12 Agustus 20142 Studi LARAP (Action Plan Signed), informal sending 18 September 2015 -1 Monitoring LARAP (840 WTP) 25 Januari 2016 14 Januari 2016 8 Maret 2016
Dilaporkan 2206 2 Monitoring LARAP (926 WTP) - 09 Mei 20163 Monitoring LARAP (440 WTP) 19 Desember 2016 9 Januari 20174 Monitoring LARAP (440 WTP) 19 Desember 2016 9 Januari 2017
9 Rantau Tijang - Kota Agung
10 SP. Empat - Air Balam Studi LARAP (2,915 WTP) 23 Juli 2014 7 Agustus 2014 12 Agustus 20141 Monitoring LARAP (1.421 WTP) 25 Januari 2016 14 Januari 2016 8 Maret 2016
11 Bantal - Muko Muko 1 Studi LARAP (243 WTP) 29 Oktober 2013 13 November 2013 20 November 20132 Studi LARAP rev 30 Desember 2013 9 Januari 2014 16 Januari 20143 Studi LARAP (Action Plan Signed) 25 Februari 2014 21 Mei 2014 30 Mei 20141 Monitoring LARAP (81 WTP) 19 November 2014 2 Desember 2014 2 Desember 20142 Monitoring LARAP (58 WTP) 23 Januari 2015 06 Februari 2015 12 Februari 2015
2a Kelengkapan Monitoring LARAP (Strip Map) 13 Mei 2015 29 Mei 2015 -Dilaporkan 243 3 Monitoring LARAP (15 WTP) 8 Desember 2015 15 Desember 2015 05 Januari 2016
4 Monitoring LARAP ( 89 WTP) 21 Oktober 2016 26 Oktober 2016 28 Oktober 2016
12 Kambang - Indrapura 1 Studi LARAP (2,873 WTP) 3 September 2014 24 September 2014 14 Oktober 20142 Studi LARAP (Action Plan Signed) 16 Februari 2015 06 Maret 2015 17 Maret 20151 Monitoring LARAP (216 WTP) 26 Mei 2016 7 Juni 2016
Dilaporkan 2873 2 Monitoring LARAP (60 WTP) 2 November 2016 11 November 2016 11 November 20163 Monitoring LARAP (88 WTP) 23 Januari 2017 9 Februari 2017 13 Februari 20174 Monitoring LARAP (265 WTP) 31 Mei 2017 5 Juni 2017 22 Juni 20175 Monitoring LARAP (286) 6 September 2017 14 September 2017 09 Oktober 20176 Monitoring LARAP (1954) 16 November 2018 4 Desember 2018 14 Desember 2018
13 Sp. Rukis - Tj Kemuning 1 Studi LARAP (3,040 WTP) 29 Oktober 2013 13 November 2013 20 November 20132 Studi LARAP rev 30 Desember 2013 9 Januari 2014 16 Januari 20143 Studi LARAP (Action Plan Signed) 25 Februari 2014 21 Mei 2014 30 Mei 20141 Monitoring LARAP (149 WTP) 06 Juli 2015 31 Juli 2015 18 Agustus 20152 Monitoring LARAP (40 WTP) 22 September 2015 12 Oktober 2015 13 Oktober 20153 Monitoring LARAP (193 WTP) 25 Januari 2016 23 Februari 2016 8 Maret 2016
Bts Kota Pariaman - Manggopoh
NOL Not Yet NOL
Number ofPackage
Name of LinkNo ofdoc
Document CTC Letter to PMU Sent to WB (DPJJ-WB)Response from World Bank
4 Monitoring LARAP (188 WTP) 20 September 2016 6 Oktober 2016 12 Oktober 2016Dilaporkan 2179 5 Monitoring LARAP (333 WTP) 8 November 2016 14 November 2016 18 November 2016
6 Monitoring LARAP (1.090 WTP) 20 Februari 2017 20 Maret 20177 Monitoring LARAP (186 WTP) 17 Mei 2017 19 Mei 2017 23 Mei 20178 Monitoring LARAP (606 WTP) 26-Mar-19
14 Painam - Kambang 1 Studi LARAP (2,220 WTP) 28 November 2014 18 Desember 2014 18 Desember 20142 Studi LARAP (Action Plan Signed) 16 Februari 2015 06 Maret 2015 17 Maret 20151 Monitoring LARAP (126 WTP) 20 Juli 2016 20 Juli 2016 01 Agustus 2016
Dilaporkan 2137 2 Monitoring LARAP (62 WTP) 3 November 2016 11 November 2016 11 November 20163 Monitoring LARAP (220 WTP) 20 Februari 2017 20 Maret 20174 Monitoring LARAP (59 WTP) 14 Juni 2017 19 Juni 2017 14 Juli 20175 Monitoring LARAP (414 WTP) 6 September 2017 14 September 2017 09 Oktober 20176 Monitoring LARAP (384 WTP) 16 Maret 2018 5 April 2018 13 April 20187 Monitoring LARAP (872 WTP) 16 Maret 2018 20 Desember 2018 8 Januari 2019
15 Sibolga - Bts. Tapsel 1 Studi LARAP (1,852 WTP) 22 Oktober 2013 28 Oktober 20132 Studi LARAP rev (Action Plan Signed) 15 Januari 2014 30 Januari 2014 9 Februari 20141 Monitoring LARAP (43 WTP) 16 October 2015 16 November 2015 16 November 20152 Monitoring LARAP (72 WTP) 25 Januari 2016 23 Februari 2016 8 Maret 20163 Monitoring LARAP (237 WTP) 29 Februari 2016 15 Maret 2016 16 Maret 20164 Monitoring LARAP (55 WTP) 18 April 2016 13 Mei 2016 19 May 2016
Dilaporkan 1852 5 Monitoring LARAP (34 WTP) 13 Juni 2016 8 Agustus 2016 18 Agustus 20166 Monitoring LARAP (127 WTP) 4 Januari 2017 16 Januari 2017 26 Januari 20177 Monitoring LARAP (134 WTP) 14 Juni 2017 19 Juni 2017 14 Juli 20178 Monitoring LARAP (815 WTP) 4 April 2018 16 April 2018 9 Mei 20189 Monitoring LARAP (335 WTP) 28 September 2018 16 Oktober 2018 23 Oktober 2018
16 Sebelat - Ipuh 1 Studi LARAP (259 WTP) 29 Oktober 2013 13 November 2013 20 November 20132 Studi LARAP rev 30 Desember 2013 9 Januari 2014 16 Januari 20143 Studi LARAP (Action Plan Signed) 25 Februari 2014 21 Mei 2014 30 Mei 20141 Monitoring LARAP (139 WTP) 23 Januari 2015 06 Februari 2015 12 Februari 2015
1a Kelengkapan Monitoring LARAP (Strip Map) 13 Mei 2015 29 Mei 2015 -2 Monitoring LARAP (102 WTP) 8 Desember 2015 15 Desember 2015 05 Januari 2016
Dilaporkan 259 Update LARAP Monitoring Report 11 Mei 2016 7 Juni 20163 Monitoring LARAP ( 18 WTP) 24 Oktober 2016 10 November 2016 11 November 2016
17 Sp. Gunung Kemala - Pg. Tampak 1 Studi LARAP (2,568 WTP) 5 September 2013 10 September 2013 16 September 20132 Studi LARAP rev (Action Plan Signed) 29 Oktober 2013 6 November 2013 12 November 20131 Monitoring LARAP (154 WTP) 21 September 2015 12 Oktober 2015 13 Oktober 20152 Monitoring LARAP (735 WTP) 8 Desember 2015 15 Desember 2015 05 Januari 2016
Dilaporkan 2568 3 Monitoring LARAP (1,156 WTP) 8 November 2016 14 November 2016 18 November 20164 Monitoring LARAP (462 WTP) 29 Maret 2017 17 April 2017
NOL Not Yet NOL
Number ofPackage
Name of LinkNo ofdoc
Document CTC Letter to PMU Sent to WB (DPJJ-WB)Response from World Bank
5 Monitoring LARAP (61 WTP) 28 September 2018 16 Oktober 2018 23 Oktober 2018
18 Muko-Muko - Bts Sumbar
19 Lais - Bintunan 1 Studi LARAP (538 WTP) 29 Oktober 2013 13 November 2013 20 November 20132 Studi LARAP rev 30 Desember 2013 9 Januari 2014 16 Januari 20143 Studi LARAP (Action Plan Signed) 25 Februari 2014 21 Mei 2014 30 Mei 20141 Monitoring LARAP (266 WTP) 5 Maret 2015 16 Maret 2015 23 Maret 2015
1a Kelengkapan Monitoring LARAP (dok Appraisal) 13 Mei 2015 29 Mei 2015 -Dilaporkan 538 2 Monitoring LARAP (208 WTP) 8 Desember 2015 15 Desember 2015 05 Januari 2016
3 Monitoring LARAP (64 WTP) 9 November 2016 13 Desember 2016
20 Lubuk Alung - Sicincin 1 Studi LARAP (950 WTP) 28 November 2014 18 Desember 2014 18 Desember 20141 Monitoring LARAP (670 WTP) 8 September 2016 19 September 2016 26 September 2016
Dilaporkan 950 2 Monitoring LARAP (280 WTP) 13 Februari 2017 18 April 2017
21 Lubuk Alung - Kuraitaji 1 Studi LARAP (908 WTP) 28 November 2014 18 Desember 2014 18 Desember 2014
1 Monitoring LARAP (515 WTP)01 Agustus 2016 01 Agustus 2016
01 Agustus 2016 (Nonformal)
Dilaporkan 827 2 Monitoring LARAP (236 WTP) 19 Desember 2016 24 Januari 20173 Monitoring LARAP (76 WTP) 6-Mar-19
Page 1 of 4
Community Development Activity ReportsCTC WINRIP
As of End of March, 2018
Appendix S-3
No. Number ofReport Activity Date of Activity CTC Transmittal
Letter No.Date of Submission
Report
1 14-06/01 Workshop of Bid Documment Evaluation February 28 – March 1,2013 14_06/YKB/O/069 October 8, 2013
2 14-06/02 Socialization for CRO Selection AWP 1 April 9, 2013 (Padang)April 11, 2013 (Palembang) 14_06/YKB/O/069 October 8, 2013
3 14-06/03 Workshop of World Bank Procurement Guidelines forWINRIP April 24 – 25, 2013 14_06/YKB/O/069 October 8, 2013
4 14-06/04 CRO Selection and Training, Package No. 01 and 04 May 23, 2013 14_06/YKB/O/069 October 8, 2013
5 14-06/05 CRO Selection and Training, Package No. 02 and 03 May 27, 2013 14_06/YKB/O/069 October 8, 2013
6 14-06/06 CRO Mentoring for Site Visit, Package No. 02 and 03 June 10 – 11, 2013 14_06/YKB/O/069 October 8, 2013
7 14-06/07 CRO Mentoring for Site Visit, Package No. 04 June 12 – 13, 2013 14_06/YKB/O/069 October 8, 2013
8 14-06/08 CRO Mentoring for Bid Submission and Bid Opening,Package No. 02 and 03 July 18, 2013 14_06/YKB/O/069 October 8, 2013
9 14-06/09 Socialization for TPM Selection, Package No. 01 February 14, 2014 14_06/CTA/O/220 October 1, 2014
10 14-06/10 Socialization for TPM Selection, Package No. 02 and 03 February 18, 2014 14_06/CTA/O/220 October 1, 2014
11 14-06/11 Socialization for TPM Selection, Package No. 04 March 3, 2014 14_06/CTA/O/220 October 1, 2014
12 14-06/12 TPM Selection, Package No. 01 March 5, 2014 14_06/CTA/O/220 October 1, 2014
Page 2 of 4
No. Number ofReport Activity Date of Activity CTC Transmittal
Letter No.Date of Submission
Report
13 14-06/13 TPM Selection, Package No. 02 and 03 March 7, 2014 14_06/CTA/O/220 October 1, 2014
14 14-06/14 TPM Selection, Package No. 04 March 10, 2014 14_06/CTA/O/220 October 1, 2014
15 14-06/15 TPM Training, Package No. 01 June 5 -6, 2014 14_06/CTA/O/266 December 17, 2014
16 14-06/16 TPM Training, Package No. 02 and 03 June 17 – 18, 2014 14_06/CTA/O/266 December 17, 2014
17 14-06/17 TPM Training, Package No. 04 July 7 – 8, 2014 14_06/CTA/O/266 December 17, 2014
18 14-06/18 CRO Selection and Training, Package No. 17 July 17, 2014 14_06/CTA/O/231 November 3, 2014
19 14-06/19 CRO Selection and Training, Package No. 05 August 20, 2014 14_06/CTA/O/231 November 3, 2014
20 14-06/20 CRO Selection and Training, Package No. 11 and 13 September 1, 2014 14_06/CTA/O/231 November 3, 2014
21 14-06/21 CRO Selection and Training, Package No. 06 and 19 November 27, 2014 14_06/CTA/O/266 December 17, 2014
22 14-06/21.A TPM Selection for Package No. 17 December 4, 2015 14_06/CTA/O/415 November 11, 2015
23 14-06/22 CRO Selection and Training, Package No. 15 December 16, 2014 14_06/CTA/O/285 January 21, 2015
24 14-06/23 TPM Selection for Package No. 11 and 13 December 22, 2014 14_06/CTA/O/314 April 7, 2015
25 14-06/24 TPM Socialization for Package No. 05 and 15 January 28, 2015 14_06/CTA/O/314 April 7, 2015
26 14-06/25 TPM Training, Package No. 11 and 13 March 11 – 13, 2015 14_06/CTA/O/325 May 18, 2015
27 14-06/14A Complaint Handling Unit Report per May 2014 Per May 2014 14_06/CTA/O/327 May 18, 2015
Page 3 of 4
No. Number ofReport Activity Date of Activity CTC Transmittal
Letter No.Date of Submission
Report
28 14-06/26 Complaint Handling Unit Report per May 2015 Per May 2015 14_06/CTA/O/327 May 18, 2015
29 14-06/26.A TPM Selection for Package No. 05 and 15 April 9, 2015 14_06/CTA/O/415 November 11, 2015
30 14-06/27 TPM Selection for Package No. 06 and 19 May 5, 2015 14_06/CTA/O/343 June 22, 2015
31 14-06/28 CRO Selection and Training No. 07, 08, 10, and 12 June 12, 2015 14_06/CTA/O/343 June 22, 2015
32 14-06/29 TPM Training, Package No. 06 and 19 June 4 – 5, 2015 14_06/CTA/O/351 July 8, 2015
33 14-06/30 TPM Monitoring Report Package No. 01 August 19 – 20, 2015 14_04/CTA/O/367 August 26, 2015
34 14-06/31 TPM Training, Package No. 05 and 15 October 9, 2015 14_06/CTA/O/408 October 27, 2015
35 14-06/32 TPM Training, Package No. 17 October 22, 2015 14_06/CTA/O/411 October 29, 2015
36 14-06/33 CRO Selection and Training Package No. 16 November 4, 2015 14_06/CTA/450 January 21, 2016
37 14-06/34 CRO Selection and Training Package No. 14, 20,21 November 17, 2015 14_06/CTA/O/429 December 7, 2015
38 14-06/35 Selection of Third Party Monitoring (TPM) Package No.07 and 12 December 22, 2015 14_06/CTA/O/445 January 11, 2016
39 14-06/36 Selection of Third Party Monitoring (TPM) Package No.16 December 29, 2015 14_06/CTA/O/445 January 11, 2016
40 14-06/37 Selection of Third Party Monitoring (TPM) Package No.08 and 10 January 14, 2016 14_06/CTA/O/456 January 29, 2016
41 14-06/38 Socialization of Third Party Monitoring (TPM) PackageNo. 14, 20, and 21 April 27, 2016 14_06/CTA/O/516 June 14, 2016
42 14-06/39 Selection of Third Party Monitoring (TPM) Package No.20 and 21 May 26, 2016 14_06/CTA/O/516 June 14, 2016
Page 4 of 4
Notes:
Reports are made by Community Development Team, CTC WINRIP, submitted to PMU WINRIP.
No. Number ofReport Activity Date of Activity CTC Transmittal
Letter No.Date of Submission
Report
43 14-06/40 Preparatory Training of Third Party Monitoring (TPM)Packages No. 07 and 08 June 9, 2016 14_06/CTA/O/527 June 24, 2016
44 14-06/41 TPM Training Package 12 & 14 September 27, 2016 14-06/JJS/O/584 October 20, 2016
45 14-06/42 TPM Training Package 20 & 21 October 13, 2016 14-06/JJS/O/584 October 20, 2016
46 14-06/43 TPM Training Package 16 April 27, 2017 14-06/JJS/O/695 May 09, 2017
47 14-06/44 Selection and Training of CRO Package 21A September 27, 2018 14-06/JJS/O/ Oct. 18, 2018
48 14-06/45 Selection of TPM for Package 21A February 21 , 2019 14-06/LWH/0/951 Feb. 28, 2019
Page 1 of 5
CRO ReportsCommunity Development, CTC WINRIP
As of End of March, 2019Appendix S-4
No. Activity Date of Activity Composed By CTC Transmittal LetterNo.
Date of SubmissionReport
1 Monitoring of Pre-Bid Meeting and Site Visit, PackageNo. 17 July 18, 2014 Y. Martono Hadi 14_06/CTA/O/242
November 18, 2014
2 Monitoring of Bid Opening, Package No. 17 August 15, 2014 Y. Martono Hadi 14_06/CTA/O/242 November 18, 2014
3 Monitoring of Pre-Bid Meeting and Site Visit, PackageNo. 05 August 21, 2014 Medis Sejahtera 14_06/CTA/O/227 October 8, 2014
4 Monitoring of Pre-Bid Meeting and Site Visit, PackageNo. 11 September 8, 2014 Hesti Aulia Sari, ST 14_06/CTA/O/227 October 8, 2014
5 Monitoring of Pre-Bid Meeting and Site Visit, PackageNo. 13 September 8, 2014 Hot Maria, ST 14_06/CTA/O/227 October 8, 2014
6 Monitoring of Bid Opening, Package No.05 September 22, 2014 Medis Sejahtera, ST., MT 14_06/CTA/O/227 October 8, 2014
7 Monitoring of Bid Opening, Package No.11 October 3, 2014 Hesti Aulia Sari, ST 14_06/CTA/O/270 January 7, 2015
8 Monitoring of Bid Opening, Package No.13 October 3, 2014 Hot Maria, ST 14_06/CTA/O/270 January 7, 2015
9 Monitoring of Pre-Bid Meeting and Site Visit, PackageNo. 19 December 5, 2014 Hesti Aulia Sari, ST 14_06/CTA/O/285 January 21, 2015
10 Monitoring of Pre-Bid Meeting and Site Visit, PackageNo. 06 December 5, 2014 Hot Maria, ST 14_06/CTA/O/292 February 3, 2015
11 Monitoring of Bid Opening, Package No.06 December 29, 2014 Hot Maria, ST 14_06/CTA/O/312 March 25, 2015
12 Monitoring of Bid Opening, Package No.19 December 29, 2014 Hesti Aulia Sari, ST 14_06/CTA/O/312 March 25, 2015
13 Monitoring of Pre-Bid Meeting and Site Visit, PackageNo. 15 January 26, 2015 Ir. M. Koster Silaen, MT 14_06/CTA/O/346 July 3, 2015
14 Monitoring of Pre-Bid Meeting and Site Visit, PackageNo. 07 June 15 – 16, 2015 Ir. Riswandi, M.Si 14_06/CTA/O/351 July 8, 2015
15 Monitoring of Pre-Bid Meeting and Site Visit, PackageNo. 12 June 15 – 16, 2015 Syaiful Amri, SST., MT 14_06/CTA/O/352 July 14, 2015
Page 2 of 5
Notes:
Reports are composed by Community Representative Observer (CRO, submitted to PMU WINRIP through Community Development CTC WINRIP.
16 Monitoring of Pre-Bid Meeting and Site Visit, PackageNo. 08 June 15 – 16, 2015 Ir. M. Nursyaifi Yulius, MT 14_06/CTA/O/359 August 6, 2015
17 Monitoring of Pre-Bid Meeting and Site Visit, PackageNo. 10 June 15 – 16, 2015 Ir. Drs. Heldi, MT.,Ph.D 14_06/CTA/O/359 August 6, 2015
18 Monitoring of Bid Opening, Package No.15 February 23, 2015 Ir. M. Koster Silaen, MT 14_06/CTA/O/365 August 26, 2015
19 Monitoring of Pre-Bid Meeting and Site Visit, PackageNo. 16 November 5, 2015 Besperi, ST., MT 14_06/CTA/O/419 November 25, 2015
20 Monitoring of Pre-Bid Meeting and Site Visit, PackageNo. 20 November 18, 2015 Ir. Riswandi, M. Si 14_06/CTA/O/442 January 6, 2016
21 Monitoring of Bid Opening, Package No.07 August 13, 2015 Ir. Riswandi, M.Si 14_06/CTA/O/448 January 19, 2016
22 Monitoring of Bid Opening, Package No.12 August 13, 2015 Syaiful Amri, SST.,MT 14_06/CTA/O/448 January 19, 2016
23 Monitoring of Pre-Bid Meeting and Site Visit, PackageNo. 14 November 18, 2015 Ir. Alzahri, MT 14_06/CTA/O/454 January 25, 2016
24 Monitoring of Pre-Bid Meeting and Site Visit, PackageNo. 21 November 18, 2015 Jafril Tanjung, DR., Eng 14_06/CTA/O/456 January 29, 2016
25 Monitoring of Bid Opening, Package No.08 August 13, 2015 Ir. M. Nursyaifi Yulius, MT 14_06/CTA/O/465 February 17, 2016
26 Monitoring of Bid Opening, Package No.14 January 5, 2016 Ir. Alzahri, MT 14_06/CTA/O/500 May 10, 2016
27 Monitoring of Bid Opening, Package No.20 January 5, 2016 Ir. Riswandi, M.Si 14_06/CTA/O/500 May 10, 2016
28 Monitoring of Bid Opening, Package No.21 January 5, 2016 Jafril Tanjung, DR., Eng 14_06/CTA/O/506 May 31, 2016
29 Monitoring of Bid Opening, Package No.16 January 5, 2016 Anggi Nidya Sari, ST., MT 14_06/CTA/O/903 September, 2016
30 Monitoring of Pre- Bid Meeting, Package No.05A January 5, 2016 Ernie Shinta Sitanggang, ST,MT 14_06/LHW/O/941 April 25, 2019
Page 3 of 5
TPM ReportsCommunity Development, CTC WINRIP
As of End of March 2019
No. Activity Date of Activity Composed By CTC Transmittal LetterNo.
Date of SubmissionReport
1 Monitoring Report Phase I Package No. 04 August 2015 TPM Package No. 04(Universitas Bengkulu) 14_06/CTA/O/409 October 27, 2015
2 Monitoring Report Phase I Package No. 03 June 2015 TPM Package No. 03(Universitas Bung Hatta) 14_06/CTA/O/415 November 11, 2015
3 Monitoring Report Phase I Package No. 01 April – August 2015 TPM Package No. 01(Universitas Bandar Lampung) 14_06/CTA/O/420 November 26, 2015
4 Monitoring Report Phase I Package No. 02 September 2015 TPM Package No. 02(Politeknik Negeri Padang) 14_06/CTA/O/437 December 21, 2015
5 Monitoring Report Phase II Package No. 03 October 2015 TPM Package No. 03(Universitas Bung Hatta) 14_06/CTA/O/487 April 15, 2016
6 Monitoring Report Phase II Package No. 04 December 2015 TPM Package No. 04(Universitas Bengkulu) 14_06/CTA/O/518 June 16, 2016
7 Monitoring Report Phase I Package No. 11 October - November 2015 TPM Package No. 11(Universitas Bengkulu) 14_06/CTA/O/518 June 16, 2016
8 Monitoring Report Phase I Package No. 06 November 2015 TPM Package No. 06(Universitas Bengkulu) 14_06/CTA/O/518 June 16, 2016
9 Monitoring Report Phase III Package No. 04 March – April 2016 TPM Package No. 04(Universitas Bengkulu) 14_06/CTA/O/526 June 23, 2016
10 Monitoring Report Phase II Package No.01 August 2015 TPM Package No. 01(Universitas Bandar Lampung) 14_06/CTA/O/569 September 19, 2016
11 Monitoring Report Phase II Package No.11 March 2016 TPM Package No.11(Universitas Bengkulu) 14_06/CTA/O/569 September 19, 2016
12 Monitoring Report Phase III Package No.01 December 15 – Jan 2016 TPM Package No. 01(Universitas Bandar Lampung) 14_06/CTA/O/569 September 19, 2016
Page 4 of 5
13 Monitoring Report Phase III Package No.03 February – March 2016 TPM Package No. 02(Universitas Bung Hatta) 14_06/CTA/O/569 September 19, 2016
No. Activity Date of Activity Composed By CTC Transmittal LetterNo.
Date of SubmissionReport
14 Monitoring Report Phase II Package No.06 April – May 2016 TPM Package No. 06(Universitas Bengkulu) 14_06/CTA/O/661 March 13, 2017
15 Monitoring Report Phase III Package No.06 Dec - January 2017 TPM Package No. 06(Universitas Bengkulu) 14_06/CTA/O/661 March 13, 2017
16 Monitoring Report Phase III Package No.11 September 2016 TPM Package No. 11(Universitas Bengkulu) 14_06/CTA/O/661 March 13, 2017
17 Monitoring Report Phase I Package No. 17 May 2016 TPM Package No. 17(Universitas Bandar Lampung) 14_06/CTA/754 October 20, 2017
18 Monitoring Report Phase II Package No. 17 January 2017 TPM Package No. 17(Universitas Bandar Lampung) 14_06/CTA/754 October 20, 2017
19 Monitoring Report Phase I Package No. 21 March 2017 TPM Package No. 21(Universitas Andalas Padang) 14_06/LHW/800 February 2, 2018
20 Monitoring Report Phase II Package No. 21 July 2017 TPM Package No. 21(Universitas Andalas Padang) 14_06/LHW/800 February 2, 2018
21 Monitoring Report Phase I Package No. 05 December 2016TPM Package No. 05
(Universitas Graha NusantaraPadangsidempuan)
14_06/LHW/836 April 17, 2018
22 Monitoring Report Phase II Package No. 05 June 2017TPM Package No. 05
(Universitas Graha NusantaraPadangsidempuan)
14_06/LHW/836 April 17, 2018
23 Monitoring Report Phase I Package No. 20 February 2017 TPM Package No. 20(Universitas Bung Hatta Padang)
24 Monitoring Report Phase II Package No.20 November 2017 TPM Package No. 20(Universitas Bung Hatta Padang)
25 Monitoring Report Phase III Package No.20 February 2018 TPM Package No. 20(Universitas Bung Hatta Padang)
26 Monitoring Report Phase I Package No. 08 March 2017 TPM Package No. 08(Universitas Bung Hatta Padang)
27 Monitoring Report Phase II Package No.08 September 2017 TPM Package No. 08(Universitas Bung Hatta Padang)
Page 5 of 5
Notes:
Reports are composed by Third Party Monitoring (TPM) Team, submitted to PMU WINRIP through Community Development CTC WINRIP.
28 Monitoring Report Phase III Package No.08 April 2018 TPM Package No. 08(Universitas Bung Hatta Padang)
30 Monitoring Report Phase I Package No. 13 September 2018 TPM Package No. 13(Universitas Bengkulu)
31 Monitoring Report Phase II Package No.13 September 2018 TPM Package No. 13(Universitas Bengkulu)
32 Monitoring Report Phase III Package No.13 September 2018 TPM Package No. 13(Universitas Bengkulu)
33 Monitoring Report Phase I Package No. 16 September 2018 TPM Package No. 16(Universitas Bengkulu)
34 Monitoring Report Phase II Package No.16 September 2018 TPM Package No. 16(Universitas Bengkulu)
35 Report and Selection of TPM Package 21A February 2019 University Of Bung Hatta Padang 16-06/LHW/0/951 February 28, 2019
in USDDetail of Loan Expenditures RemainingCategory Allocation Disbursement Current Cumulative Loan
Quarter to date Allocation1 2 3 4 5 6 7 8 = 3 - 6 9 = 8 *0,7
1 Civil Works under part 1 of the project 205,000,000.00 181,805,053.78 0.00 181,805,053.78 52,372,474.01 23,194,946.22
01. Krui - Biha 7,863,998.85 0.00 7,863,998.85 0.00 0.0002. Padang Sawah - Sp.Empat/Inc Air Gadang Brgd 13,162,825.29 0.00 13,162,825.29 0.00 0.0003. Manggopoh - Padang Sawah 9,765,532.12 0.00 9,765,532.12 0.00 0.0004. Ipuh - Bantal 11,316,624.87 0.00 11,316,624.87 0.00 0.0017. Sp.Gng Kemala - Pugung Tampak 11,187,157.20 0.00 11,187,157.20 0.00 0.0005. Simpang Rampa - Poriaha 8,579,261.55 0.00 6,293,445.95 2,285,815.60 1,600,070.9211. Bantal - Mukomuko 13,876,205.50 0.00 13,876,205.50 0.00 0.0013. Sp Rukis - Tj Kemuning 23,454,051.00 0.00 15,604,716.85 7,849,334.15 5,494,533.9106. Ps. Pedati - Kerkap 6,255,217.88 0.00 6,255,217.88 0.00 0.0019. Lais - Bintunan 2,326,279.16 0.00 2,326,279.16 0.00 0.0015. Sibolga - Batas Tapsel 19,954,872.00 0.00 10,542,477.82 9,412,394.18 6,588,675.9308. Bts.Kota Pariaman - Manggopoh 19,935,768.39 0.00 19,935,768.39 0.00 0.0010. Simpang Empat - Sp.Air Balam07. Indrapura - Tapan 9,350,065.79 0.00 6,754,055.62 2,596,010.17 1,817,207.1212. Kambang - Indrapura 25,855,107.34 0.00 17,488,018.01 8,367,089.33 5,856,962.5314. Painan - Kambang 16,286,741.38 0.00 9,388,149.85 6,898,591.53 4,829,014.0716. Seblat - Ipuh 16,909,960.00 0.00 10,763,195.93 6,146,764.07 4,302,734.8520. Lubuk Alung - Sicincin 8,578,485.27 0.00 5,878,793.05 2,699,692.22 1,889,784.5521. Lubuk Alung - Kuraitaji 9,519,374.20 0.00 3,402,591.44 6,116,782.76 4,281,747.9318. Mukomuko - Batas Sumbar **09. Rantau Tijang - Kota Agung **
2Goods, Non Consulting Services, ConsultingServices and Incremental Operating Cost underpart 2 of the project
20,000,000.00 10,804,126.83 190,292.82 10,274,078.65 9,725,921.35 9,195,873.17
3Goods, Non Consulting Services, ConsultingServices and Incremental Operating Cost underpart 3 of the project
0.00 0.00 0.00 0.00 0.00 0.00
4Goods, Non Consulting Services, ConsultingServices and Incremental Operating Cost underpart 4 of the project
25,000,000.00 0.00 0.00 0.00 25,000,000.00 25,000,000.00
5 Unallocated 0.00 0.00 0.00 0.00 0.00 0.00
250,000,000.00 192,609,180.61 190,292.82 192,079,132.43 87,098,395.36 57,390,819.39
Note : Ending Balance for Special Account Eof March 2019 USD 541,813.17
Western Indonesia National Roads Improvement ProjectDisbursement and Expenditures StatusFor the Quarter ending March 31, 2019
IBRD Loan No. 8043 - ID
LoanCat
Remaining Amount ofContract
Expenditures not yetreplenish
Form 1 - E
Appendix No.2Western Indonesia National Roads Improvement ProjectProject Report Format - 2Report for the quarter ended on 31-03-2019
Particulars ( Amount in US $ )
Bank Fund disbursed till date I 200,178,180.61Total Project Uses till date II 260,196,057.71World Bank Share @ 70% for CW III 181,805,053.78World Bank Share @ 100% for TA IV 9,858,301.32World Bank Share @ 100% for IOC V 594,305.17Ending Balance Special Account VI 8,099,048.16Funds Undisbursed to date VII 49,821,819.39
Forecast for Project payments for the next 6 months VIII -World Bank Share @ 70% for CW IX -World Bank Share @ 100% for TA X -World Bank Share @ 100% for IOC XI -Fund Undisbursed for next 6 month 49,821,819.39Net Funds required from the Bank -
Forecast for DIPA from GOI for the 6 months XII -
Mar-14
CTC WINRIP
Disbursement Contract Procurement Contract Supplier/ Nationality Contract Contract Amount Payment realization Code Cat. Category Description Method /ii Number /iii Contractor Currency Value Invoiced No. SP2D/WA Date of SP2D Amount(Rp) Amount (US$) (Rp.) (US$) Comp.
No Description to date1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1. CIVIL WORKS
1 CIVIL WORKS ICB Krui - Biha PT. JAYA KONSTRUKSI INDONESIA IDR 149,193,782,000.00 27-Dec-13 3,102,911,853 146,090,870,147
01-26/04-WINRIP-WP1/CE/A/8043/11-13 MANGGALA PRATAMA 2-Jan-14 9,443,644,770 773,498.63 136,647,225,377
Tanggal 14 November 2013 20-Jun-14 385,839,106 136,261,386,271
3-Jul-14 1,174,292,924 100,033.47 135,087,093,347
30-Sep-14 527,162,987 134,559,930,360
29-Oct-14 1,604,409,090 133,901.61 132,955,521,270
18-Nov-14 425,049,074 132,530,472,196
16-Dec-14 1,293,627,617 104,577.82 131,236,844,579
4-Dec-14 1,062,799,456 130,174,045,123
16-Dec-14 3,234,607,041 261,488.04 126,939,438,082
26-Mar-15 760,025,552 126,179,412,530
7-Apr-15 2,313,121,244 178,826.54 123,866,291,286
30-Mar-15 2,500,939,071 121,365,352,215
7-Apr-15 7,611,553,695 588,446.36 113,753,798,520
5-Jun-15 1,658,385,311 112,095,413,209
25-Jun-15 5,047,259,643 380,954.01 107,048,153,566
9-Jul-15 3,395,857,119 103,652,296,447
15-Jul-15 10,335,217,319 780,487.63 93,317,079,128
28-Jul-15 1,111,274,527 92,205,804,601
24-Jul-15 3,382,139,867 254,277.11 88,823,664,734
24-Aug-15 769,214,079 88,054,450,655
8-Sep-15 2,341,086,329 165,952.11 85,713,364,326
15-Sep-15 2,723,498,444 82,989,865,882
28-Sep-15 8,288,908,308 569,684.42 74,700,957,574
13-Nov-15 2,034,310,771 72,666,646,803
16-Nov-15 6,191,380,606 458,383.11 66,475,266,197
2-Dec-15 1,329,067,062 65,146,199,135
15-Dec-15 4,044,986,712 291,698.76 61,101,212,423
14-Dec-15 1,515,000,000 59,586,212,423
22-Dec-15 15,900,000,000 1,138,805.33 43,686,212,423
29-Dec-15 5,122,768,175 38,563,444,248
29-Mar-16 4,301,903,142 326,297.26 34,261,541,106
26-May-16 2,221,619,283 32,039,921,823
22-Jun-16 6,761,449,993 512,464.00 25,278,471,830
26-May-16 1,612,932,730 23,665,539,100
22-Jun-16 4,908,925,700 372,057.43 18,756,613,400
24-May-17 2,055,915,260 16,700,698,140
17-May-17 6,257,133,400 472,165.21 10,443,564,740
LOAN 104,435,647,400 7,863,998.85 10,443,564,740GOI 34,314,569,860
2 CIVIL WORKS ICB Padang Sawah - Sp.Empat PT. JAYA KONSTRUKSI INDONESIA IDR 247,572,130,000.00 30-Dec-13 4,552,544,077 243,019,585,923
Including Air Gadang Bridge MANGGALA PRATAMA 2-Jan-14 13,855,568,930 1,134,865.17 229,164,016,993
39-06/02-WINRIP-WP1/CE/A/8043-ID/12-13 23-Jun-14 577,715,230 228,586,301,763
Tanggal 06 December 2013 14-Jul-14 1,225,456,548 106,644.90 227,360,845,215
10-Sep-14 662,017,142 226,698,828,073
30-Sep-14 2,521,001,709 211,015.46 224,177,826,364
4-Nov-14 2,141,055,147 222,036,771,217
4-Dec-14 6,536,641,989 535,132.38 215,500,129,228
2-Dec-14 4,797,630,309 210,702,498,919
16-Dec-14 14,601,483,549 1,180,394.79 196,101,015,370
13-Mar-15 3,036,091,659 193,064,923,711
7-Apr-15 9,240,278,960 714,362.50 183,824,644,751
17-Jun-15 3,634,751,210 180,189,893,541
26-May-15 11,062,286,290 846,387.63 169,127,607,251
18-Jun-15 3,423,796,910 165,703,810,341
26-Jun-15 10,420,251,466 788,576.62 155,283,558,875
Western Indonesia National Roads Improvement ProjectContract Expenditure Report Goods and Works)
for the quarter ended March 31, 2019IBRD Loan 8043 - ID
Remaining amount Of Contr. Note
590770D
001/01-WINRIP/17
415066J
002/01-WINRIP/17
425690J
003/01-WINRIP/17
433621J
004/01-WINRIP/17
436754J
005/01-WINRIP/17
150171302000620
006/01-WINRIP/17
150171302000657
007/01-WINRIP/17
150171302001652
008/01-WINRIP/17
150171302002396
009/11-WINRIP/17
150171302002624
010/01-WINRIP/17
150171302003134
011/01-WINRIP/17
150171302003619
012/01-WINRIP/17
150171302004876
013/01-WINRIP/17
150171302005381
014/01-WINRIP/17
150171302005945
015/01-WINRIP/17
150171302006280
015-A/01-WINRIP/17
160171302002021
016/01-WINRIP/17
160171302002020
017/01-WINRIP/17
170171302001882
018/01-WINRIP/17
040668I
002/02-WINRIP/06
079428I
003/02-WINRIP/06
092390I
004/02-WINRIP/06
611285K
005/02-WINRIP/06
617797K
006/02-WINRIP/06
150101302000227
007/02-WINRIP/06
150101302000553
008/02-WINRIP/06
150101302000291
009/02-WINRIP/06
Form 3 - C
Page 1252 of 1261 4/30/2019-10:11 AM
CTC WINRIP
Disbursement Contract Procurement Contract Supplier/ Nationality Contract Contract Amount Payment realization Code Cat. Category Description Method /ii Number /iii Contractor Currency Value Invoiced No. SP2D/WA Date of SP2D Amount(Rp) Amount (US$) (Rp.) (US$) Comp.
No Description to date1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Western Indonesia National Roads Improvement ProjectContract Expenditure Report Goods and Works)
for the quarter ended March 31, 2019IBRD Loan 8043 - ID
Remaining amount Of Contr. Note
Form 3 - C
1-Jul-15 4,184,037,410 151,099,521,465
24-Jul-15 12,734,026,900 957,373.65 138,365,494,565
4-Sep-15 2,500,030,310 135,865,464,255
16-Sep-15 7,608,787,900 533,950.03 128,256,676,355
15-Oct-15 4,148,810,610 124,107,865,745
30-Oct-15 12,626,814,900 931,043.72 111,481,050,845
12-Nov-15 2,687,415,450 108,793,635,395
20-Nov-15 8,179,090,500 597,275.49 100,614,544,895
7-Dec-15 8,378,943,700 92,235,601,195
15-Dec-15 25,501,133,000 1,838,979.81 66,734,468,195
7-Mar-16 681,051,160 66,053,417,035
14-Mar-16 2,072,764,400 158,431.89 63,980,652,635
6-Apr-16 1,572,309,670 62,408,342,965
21-Apr-16 4,785,290,300 365,736.04 57,623,052,665
6-Apr-16 1,942,482,710 55,680,569,955
21-Apr-16 5,911,903,900 451,842.24 49,768,666,055
12-May-16 1,195,703,760 48,572,962,295
27-May-16 3,639,098,400 267,521.75 44,933,863,895
16-Jun-16 1,362,934,160 43,570,929,735
29-Jun-16 4,154,313,564 309,376.94 39,416,616,171
22-Jun-16 2,607,201,996 36,809,414,175
29-Jun-16 7,934,962,595 590,926.62 28,874,451,580
29-Nov-16 2,855,067,280 26,019,384,300
5-Dec-16 8,689,335,200 642,987.66 17,330,049,100
LOAN 173,300,491,000 13,162,825.29 17,330,049,100GOI 56,941,589,900
3 CIVIL WORKS ICB Manggopoh - Padang Sawah PT. JAYA KONSTRUKSI INDONESIA IDR 183,452,685,000.00 30-Dec-13 3,304,846,149 180,147,838,851
40-06/03-WINRIP-WP1/CE/A/8043-ID/12-13 MANGGALA PRATAMA 2-Jan-14 10,058,227,410 823,837.12 170,089,611,441
Tanggal 06 December 2013 12-Jun-14 874,188,600 169,215,422,841
30-Jun-14 1,854,339,454 154,130.12 167,361,083,387
10-Sep-14 452,231,941 166,908,851,446
16-Oct-14 2,142,280,848 176,551.91 164,766,570,598
4-Nov-14 1,056,538,775 163,710,031,823
3-Dec-14 3,242,758,578 265,734.54 160,467,273,245
2-Dec-14 2,598,814,340 157,868,458,905
10-Dec-14 7,909,434,949 643,566.72 149,959,023,956
24-Mar-15 2,035,856,558 147,923,167,398
7-Apr-15 6,196,085,177 479,017.02 141,727,082,221
5-May-15 3,747,867,347 137,979,214,874
26-May-15 11,406,552,794 872,727.83 126,572,662,080
18-Jun-15 2,327,836,290 124,244,825,790
26-Jun-15 7,084,719,142 536,152.50 117,160,106,648
31-Jul-15 2,547,451,480 114,612,655,168
27-Jul-15 7,753,113,200 581,759.83 106,859,541,968
8-Sep-15 2,368,489,630 104,491,052,338
16-Sep-15 7,208,446,700 505,855.91 97,282,605,638
13-Oct-15 3,814,452,020 93,468,153,618
16-Oct-15 11,609,201,800 878,021.62 81,858,951,818
13-Nov-15 2,138,953,770 79,719,998,048
20-Nov-15 6,509,859,300 475,380.41 73,210,138,748
14-Dec-15 5,079,605,660 68,130,533,088
15-Dec-15 15,459,669,400 1,114,853.21 52,670,863,688
10-Mar-16 982,207,180 51,688,656,508
14-Mar-16 2,989,326,200 228,489.35 48,699,330,308
5-Apr-16 1,329,094,560 47,370,235,748
21-Apr-16 4,045,070,400 309,161.60 43,325,165,348
27-Apr-16 1,697,026,940 41,628,138,408
9-May-16 5,164,864,600 391,871.37 36,463,273,808
29-Nov-16 2,366,264,610 34,097,009,198
150101302001366
010/02-WINRIP/06
150101302001771
011/02-WINRIP/06
150101302002244
012/02-WINRIP/06
150101302002653
013/02-WINRIP/06
150101302003211
014/02-WINRIP/06
160101302000241
015/02-WINRIP/06
160101302000541
016/02-WINRIP/06
160101302000542
017/02-WINRIP/06
160101302000663
018/02-WINRIP/06
160101302001295
019/02-WINRIP/06
160101302001363
020/02-WINRIP/06
160101302003373
021/02-WINRIP/06
040667I
003/03-WINRIP/06
079428I
004/03-WINRIP/06
092449I
005/03-WINRIP/06
611286K
006/03-WINRIP/06
617798K
007/03-WINRIP/06
150101302000275
008/03-WINRIP/06
150101302000536
009/03-WINRIP/06
150101302000921
010/03-WINRIP/06
150101302001367
011/03-WINRIP/06
150101302001811
012/03-WINRIP/06
150101302002228
013/03-WINRIP/06
150101302002681
014/03-WINRIP/06
150101302003186
015/03-WINRIP/06
160101302000268
016/03-WINRIP/06
160101302000540
017/03-WINRIP/06
160101302000743
018/03-WINRIP/06
160101302003372
Page 1253 of 1261 4/30/2019-10:11 AM
CTC WINRIP
Disbursement Contract Procurement Contract Supplier/ Nationality Contract Contract Amount Payment realization Code Cat. Category Description Method /ii Number /iii Contractor Currency Value Invoiced No. SP2D/WA Date of SP2D Amount(Rp) Amount (US$) (Rp.) (US$) Comp.
No Description to date1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Western Indonesia National Roads Improvement ProjectContract Expenditure Report Goods and Works)
for the quarter ended March 31, 2019IBRD Loan 8043 - ID
Remaining amount Of Contr. Note
Form 3 - C
5-Dec-16 7,201,674,900 532,904.76 26,895,334,298
14-Dec-16 1,060,606,502 25,834,727,796
14-Dec-16 3,241,038,828 244,238.04 22,593,688,968
20-Dec-16 1,899,314,378 20,694,374,590
14-Dec-16 5,780,522,020 435,608.29 14,913,852,570
11-Dec-17 512,470,820 14,401,381,750
11-Dec-17 1,559,693,800 115,669.97 12,841,687,950
LOAN 128,416,879,500 9,765,532.12 12,841,687,950GOI 42,194,117,550
4 CIVIL WORKS ICB Ipuh - Bantal PT. WASKITA KARYA - DAYA INDONESIA IDR 212,290,705,872.00 16-Dec-13 4,299,545,250 207,991,160,622
01-26/04-WINRIP-WP1/CE/A/8043/11-13 MULIA TURANGGA JO 23-May-14 13,085,572,500 1,142,944.58 194,905,588,122
Tanggal 14 November 2013 SARI, Jo 18-Dec-14 3,574,973,902 191,330,614,220
17-Dec-14 8,341,605,771 665,412.08 182,989,008,450
18-Mar-15 3,116,950,024 179,872,058,426
7-Apr-15 7,272,883,390 562,263.89 172,599,175,036
22-Apr-15 4,856,427,624 167,742,747,412
4-May-15 11,331,664,457 878,491.70 156,411,082,955
19-Jun-15 5,419,957,509 150,991,125,446
1-Jul-15 12,646,567,523 951,656.82 138,344,557,923
30-Jul-15 2,507,276,647 135,837,281,276
7-Aug-15 5,850,312,175 434,999.79 129,986,969,101
11-Nov-15 571,150,974 129,415,818,127
20-Nov-15 9,939,288,848 725,813.40 119,476,529,279
16-Dec-15 3,811,666,448 115,664,862,831
18-Dec-15 17,230,209,100 1,232,489.93 98,434,653,731
3-Jun-16 7,744,867,686 90,689,786,045
9-May-16 23,571,336,436 1,788,417.03 67,118,449,609
7-Dec-16 6,683,310,047 60,435,139,562
20-Dec-16 20,340,508,835 1,522,607.14 40,094,630,727
7-Dec-16 2,241,375,059 37,853,255,668
20-Dec-16 6,821,576,265 510,635.25 31,031,679,403
31-Dec-17 3,999,361,181 27,032,318,222
22-Dec-17 12,171,968,810 900,893.26 14,860,349,412
LOAN 148,603,494,110 11,316,624.87 14,860,349,412GOI 48,826,862,351
5 CIVIL WORKS ICB Pugung Tampak-Simpang PT. JAYA KONSTRUKSI INDONESIA IDR 211,712,283,800.00 12-Dec-14 4,589,678,359 207,122,605,441
Gunung Kemala MANGGALA PRATAMA 16-Dec-14 6,846,000,000 553,435.73 200,276,605,441
07-17/17-WINRIP-AWP2/CE/8043-ID/11-14 9-Mar-15 7,122,586,310 549,709.52 193,154,019,131
Tanggal 17 November 2014 0-Jan-00 486,778,919 192,667,240,212
18-Dec-15 1,481,501,057 105,972.89 191,185,739,155
28-Dec-15 736,408,597 190,449,330,558
29-Mar-16 2,241,243,558 169,997.24 188,208,087,000
27-Apr-16 436,054,136 187,772,032,864
8-Apr-16 1,327,121,284 100,868.08 186,444,911,580
14-Jun-16 2,343,162,994 184,101,748,586
20-Jun-16 7,131,365,636 537,810.38 176,970,382,950
28-Jun-16 1,898,632,009 175,071,750,941
13-Jul-16 5,778,445,245 442,928.50 169,293,305,696
8-Aug-16 972,495,225 168,320,810,471
19-Aug-16 2,959,768,075 227,097.99 165,361,042,396
22-Sep-16 1,142,112,785 164,218,929,611
28-Sep-16 3,475,995,434 267,158.21 160,742,934,177
28-Oct-16 1,961,954,692 158,780,979,485
7-Nov-16 5,971,166,454 459,851.09 152,809,813,031
2-Dec-16 1,801,951,832 151,007,861,199
14-Dec-16 5,484,201,227 413,278.16 145,523,659,972
8-Dec-16 1,273,769,543 144,249,890,429
20-Dec-16 3,876,689,913 290,193.12 140,373,200,516
019/03-WINRIP/06
160101302003842
020/03-WINRIP/06
160101302004034
021/03-WINRIP/06
170101304004175
022/03-WINRIP/06
254931Y
004/04-WINRIP/26
141401303000328
005/04-WINRIP/26
151401303000013
006/04-WINRIP/26
151401303000069
007/04-WINRIP/26
151401303000111
008/04-WINRIP/26
151401303000151
009/04-WINRIP/26
151401303000452
010/04-WINRIP/26
151401303000591
011/04-WINRIP/26
161401303000201
012/04-WINRIP/26
161401303000466
013/04-WINRIP/26
161401303000467
014/04-WINRIP/26
17140340201294
015/04-WINRIP/26
438732J
001/17-WINRIP/17
001A/17-WINRIP/17
150171302006023.00
002/17-WINRIP/17
150171302006263
003/17-WINRIP/17
160171302001476
004/17-WINRIP/17
160171302002410
005/17-WINRIP/17
160171302002679
006/17-WINRIP/17
160171302003345
007/17-WINRIP/17
160171302004309
008/17-WINRIP/17
160171302005108
009/17-WINRIP/17
160171302006060
010/17-WINRIP/17
160171302006461
011/17-WINRIP/17
Page 1254 of 1261 4/30/2019-10:11 AM
CTC WINRIP
Disbursement Contract Procurement Contract Supplier/ Nationality Contract Contract Amount Payment realization Code Cat. Category Description Method /ii Number /iii Contractor Currency Value Invoiced No. SP2D/WA Date of SP2D Amount(Rp) Amount (US$) (Rp.) (US$) Comp.
No Description to date1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Western Indonesia National Roads Improvement ProjectContract Expenditure Report Goods and Works)
for the quarter ended March 31, 2019IBRD Loan 8043 - ID
Remaining amount Of Contr. Note
Form 3 - C
15-Dec-16 1,733,878,870 138,639,321,646
10-Feb-17 5,277,022,648 397,665.61 133,362,298,998
16-Mar-17 1,729,539,150 131,632,759,848
14-Mar-17 5,263,814,804 395,003.36 126,368,945,044
28-Apr-17 2,120,835,556 124,248,109,488
2-May-17 6,454,716,910 487,774.27 117,793,392,578
8-Jun-17 1,722,914,763 116,070,477,815
5-Jun-17 5,243,653,626 395,628.01 110,826,824,189
19-Jun-17 3,485,008,692 107,341,815,497
16-Jun-17 10,606,548,192 802,310.76 96,735,267,305
28-Jul-17 1,367,660,860 95,367,606,445
1-Aug-17 4,162,446,097 313,933.64 91,205,160,348
31-Aug-17 3,108,717,565 88,096,442,783
31-Aug-17 9,461,314,327 712,394.72 78,635,128,456
27-Oct-17 2,503,285,276 76,131,843,180
23-Oct-17 6,358,694,316 472,659.95 69,773,148,864
5-Dec-17 1,260,000,000 93,708.16 68,513,148,864
28-Nov-17 4,267,221,925 64,245,926,939
5-Dec-17 12,987,197,161 965,878.12 51,258,729,778
8-Dec-17 4,248,468,592 47,010,261,186
11-Dec-17 12,930,121,800 958,923.30 34,080,139,386
15-Dec-17 2,328,603,496 31,751,535,890
22-Dec-17 7,087,054,121 524,539.57 24,664,481,769
15-Dec-17 2,434,691,254 22,229,790,515
22-Dec-17 7,409,929,905 548,436.82 14,819,860,610
LOAN 148,198,598,100 11,187,157.20 14,819,860,610GOI 48,693,825,090
6 CIVIL WORKS ICB Bantal - Muko muko PT. HUTAMA KARYA - DAYA INDONESIA IDR 263,656,603,000.00 3-Feb-15 5,264,693,491 258,391,909,509
07-26/11-WINRIP-WP2/CE/A/8043/12-14 MULIA TURANGGA Jo 17-Feb-15 16,022,980,190 1,261,155.46 242,368,929,319
Tanggal 18 December 2014 30-Apr-15 3,485,711,256 238,883,218,063
19-May-15 8,133,326,264 624,439.63 230,749,891,799
3-Jul-15 1,189,179,908 229,560,711,891
15-Jul-15 2,774,753,120 209,541.85 226,785,958,771
3-Sep-15 1,203,976,691 225,581,982,080
16-Sep-15 2,809,278,947 197,142.38 222,772,703,133
30-Oct-15 376,793,584 222,395,909,549
12-Nov-15 3,869,659,266 285,562.63 218,526,250,283
2-Dec-15 3,152,046,193 215,374,204,090
15-Dec-15 11,292,672,085 814,355.81 204,081,532,005
16-Dec-15 2,716,519,950 201,365,012,055
18-Dec-15 8,267,669,415 591,392.66 193,097,342,640
3-Jun-16 8,345,519,808 184,751,822,832
28-Apr-16 25,399,408,111 1,931,660.82 159,352,414,721
3-Jun-16 3,192,299,603 156,160,115,118
3-Jun-16 9,715,694,444 714,231.75 146,444,420,674
24-Jun-16 1,898,871,278 144,545,549,396
13-Jul-16 5,779,172,445 442,984.24 138,766,376,951
12-Oct-16 4,038,309,643 134,728,067,308
21-Nov-16 12,290,507,609 922,849.35 122,437,559,699
16-Nov-16 8,130,799,683 114,306,760,016
23-Nov-16 24,745,912,071 1,850,715.14 89,560,847,945
7-Dec-16 4,842,774,317 84,718,073,628
13-Dec-16 14,738,878,354 1,110,691.66 69,979,195,274
9-Mar-17 3,350,629,214 66,628,566,060
14-Mar-17 10,197,567,168 765,238.42 56,430,998,892
6-Apr-17 3,885,434,370 52,545,564,522
13-Apr-17 11,825,235,037 894,766.57 40,720,329,485
13-Jul-17 2,307,010,979 38,413,318,506
19-Jul-17 6,773,801,707 511,384.70 31,639,516,799
160171302006621
012/17-WINRIP/17
170171302000764
013/17-WINRIP/17
170171302001396
014/17-WINRIP/17
170171302002191
015/17-WINRIP/17
170171302002406
016/17-WINRIP/17
170171302003065
017/17-WINRIP/17
170171302003732
018/17-WINRIP/17
170171302004807
019/17-WINRIP/17
019-A/17-WINRIP/17
170171302005592
020/17-WINRIP/17
170171302005902
021/17-WINRIP/17
170171302006275
022/17-WINRIP/17
170171302006274
023/17-WINRIP/17
151401303000002
001/11-WINRIP/26
151401303000073
002/11-WINRIP/26
151401303000130
003/11-WINRIP/26
151401303000226
004/11-WINRIP/26
151401303000421
005/11-WINRIP/26
151401303000561
006/11-WINRIP/26
151401303000592
007/11-WINRIP/26
161401303000202
008/11-WINRIP/26
161401303000203
009/11-WINRIP/26
161401303000237
010/11-WINRIP/26
161401303000390
011/11-WINRIP/26
161401303000432
012/11-WINRIP/26
161401303000465
013/11-WINRIP/26
171401303000011
014/11-WINRIP/26
171401303000026
015/11-WINRIP/26
171401303000085
016/11-WINRIP/26
Page 1255 of 1261 4/30/2019-10:11 AM
CTC WINRIP
Disbursement Contract Procurement Contract Supplier/ Nationality Contract Contract Amount Payment realization Code Cat. Category Description Method /ii Number /iii Contractor Currency Value Invoiced No. SP2D/WA Date of SP2D Amount(Rp) Amount (US$) (Rp.) (US$) Comp.
No Description to date1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Western Indonesia National Roads Improvement ProjectContract Expenditure Report Goods and Works)
for the quarter ended March 31, 2019IBRD Loan 8043 - ID
Remaining amount Of Contr. Note
Form 3 - C
13-Jul-17 3,020,029,984 28,619,486,815
19-Jul-17 9,191,395,605 693,899.71 19,428,091,210
24-Oct-17 240,419,000 19,187,672,210
27-Oct-17 731,710,000 54,192.72 18,455,962,210
LOAN 184,559,621,838 13,876,205.50 18,455,962,210GOI 60,641,018,952
7 CIVIL WORKS ICB Sp. Rukis - Tanjung Kemuning PT. WASKITA KARYA INDONESIA IDR 305,886,100,000.00 13-Mar-15 6,732,100,000 299,154,000,000
01-26/13-WINRIP-WP2/CE/A/8043/12-14 24-Mar-15 20,489,000,000 1,574,865.49 278,665,000,000
Tanggal 18 December 2014 19-Nov-15 1,407,008,900 277,257,991,100
3-Dec-15 4,282,201,000 311,682.15 272,975,790,100
8-Dec-15 4,668,711,350 268,307,078,750
18-Dec-15 14,209,121,500 1,016,389.24 254,097,957,250
28-Dec-15 2,622,152,950 251,475,804,300
13-Jan-16 7,980,465,500 575,583.52 243,495,338,800
19-Oct-16 3,334,611,093 240,160,727,707
18-Oct-16 10,148,816,370 781,760.62 230,011,911,337
14-Dec-16 3,406,880,187 226,605,031,150
16-Dec-16 10,368,765,785 784,383.52 216,236,265,365
28-Dec-16 5,054,326,038 211,181,939,327
30-Jan-17 15,382,731,420 1,160,260.33 195,799,207,907
18-Jun-17 2,610,876,683 193,188,331,224
8-May-17 7,946,146,425 599,121.35 185,242,184,799
31-Aug-17 5,975,075,355 179,267,109,444
22-Sep-17 18,185,011,950 1,378,487.87 161,082,097,494
14-Nov-17 5,309,102,362 155,772,995,132
27-Nov-17 16,158,137,625 1,202,689.81 139,614,857,507
18-Dec-17 3,817,605,607 135,797,251,900
22-Dec-17 11,618,799,675 859,951.13 124,178,452,225
3-Jul-18 5,872,074,225 - 118,306,378,000
19-Jul-18 17,871,530,250 1,248,099.05 100,434,847,750
30-Oct-18 16,025,588,100 - 84,409,259,650
20-Dec-18 48,773,529,000 3,375,330.73 35,635,730,650
31-Oct-18 3,517,690,150 - 32,118,040,500
19-Dec-18 10,706,013,500 736,112.04 21,412,027,000
LOAN 214,120,270,000 15,604,716.85 21,412,027,000GOI 70,353,803,000
8 CIVIL WORKS NCB Lais - Bintuan PT INDONESIA IDR 44,419,760,000.00 20-Mar-15 1,162,286,094 43,257,473,906
05-26/19-WINRIP-WP2/CE/A/8043/02-15 RODATEKNINDO 13-Apr-15 3,537,392,460 274,046.52 39,720,081,446
Tanggal 27 February 2015 PURAJAYA 20-Oct-15 1,389,046,533 38,331,034,913
12-Nov-15 4,227,532,927 311,972.03 34,103,501,986
15-Dec-15 1,434,270,673 32,669,231,313
15-Dec-15 4,365,171,613 314,788.46 28,304,059,700
15-Dec-15 443,094,343 27,860,965,357
19-Dec-15 1,348,548,000 96,462.66 26,512,417,357
3-Jun-16 3,076,823,460 23,435,593,897
9-May-16 9,364,245,316 710,489.02 14,071,348,581
15-Jun-16 1,524,859,292 12,546,489,289
24-Jun-16 4,640,876,104 350,731.27 7,905,613,185
7-Dec-16 675,337,370 7,230,275,815
1-Dec-16 2,055,374,604 152,464.55 5,174,901,211
7-Dec-16 510,827,240 4,664,073,971
1-Dec-16 1,554,691,600 115,324.65 3,109,382,371
LOAN 31,093,832,624 2,326,279.16 3,109,382,371GOI 10,216,545,005
9 CIVIL WORKS NCB Ps.Pedati - Kerkap PT. WASKITA KARYA INDONESIA IDR 118,444,156,000.00 9-Apr-15 2,984,852,715 115,459,303,285
04-26/06-WINRIP-WP2/CE/A/8043/02-15 22-Apr-15 9,084,334,350 709,104.23 106,374,968,935
Tanggal 27 February 2015 18-Nov-15 1,596,911,310 104,778,057,625
171401303000086
017/11-WINRIP/26
171401303000179
018/11-WINRIP/26
150161301001510
001/13-WINRIP/26
150161301013494
002/13-WINRIP/26
150161301015079
003/13-WINRIP/26
15016130105955
004/13-WINRIP/26
160161301013068
005/13-WINRIP/26
160161301017725
006/13-WINRIP/26
160161301018036
007/13-WINRIP/26
170161301019396
008/13-WINRIP/26
170161301013481
009/13-WINRIP/26
170161301018924
010/13-WINRIP/26
170161301022063
011/13-WINRIP/26
180161301011775
012/13-WINRIP/26
180161301020322
013/13-WINRIP/26
180161301020341
014/13-WINRIP/26
151401301000031
001/19-WINRIP/26
151401301000625
002/19-WINRIP/26
151401301000820
003/19-WINRIP/26
151401301000819
004/19-WINRIP/26
161401303000324
005/19-WINRIP/26
161401303000340
006/19-WINRIP/26
161401303000683
007/19-WINRIP/26
161401303000684
008/19-WINRIP/26
151401301000070
001/06-WINRIP/26
151401301000681
Page 1256 of 1261 4/30/2019-10:11 AM
CTC WINRIP
Disbursement Contract Procurement Contract Supplier/ Nationality Contract Contract Amount Payment realization Code Cat. Category Description Method /ii Number /iii Contractor Currency Value Invoiced No. SP2D/WA Date of SP2D Amount(Rp) Amount (US$) (Rp.) (US$) Comp.
No Description to date1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Western Indonesia National Roads Improvement ProjectContract Expenditure Report Goods and Works)
for the quarter ended March 31, 2019IBRD Loan 8043 - ID
Remaining amount Of Contr. Note
Form 3 - C
3-Dec-15 4,860,164,860 353,749.53 99,917,892,765
16-Dec-15 1,387,928,758 98,529,964,007
18-Dec-15 4,224,131,002 302,155.29 94,305,833,005
3-Jun-16 1,135,953,659 93,169,879,346
9-May-16 3,457,250,264 262,310.34 89,712,629,082
30-Jun-16 3,760,614,927 85,952,014,155
13-Jul-16 11,445,349,777 877,307.20 74,506,664,378
19-Aug-16 2,168,738,201 72,337,926,177
7-Sep-16 6,600,507,567 502,666.02 65,737,418,610
14-Sep-16 2,221,614,316 63,515,804,294
20-Sep-16 6,761,434,874 517,522.76 56,754,369,420
24-Nov-16 4,119,862,968 52,634,506,452
1-Dec-16 12,538,713,378 930,102.62 40,095,793,074
13-Dec-16 3,341,223,118 36,754,569,956
20-Dec-16 10,168,939,924 761,205.17 26,585,630,032
4-Aug-17 3,162,348,114 23,423,281,918
10-Aug-17 9,624,537,744 726,270.58 13,798,744,174
4-Aug-17 1,362,107,794 12,436,636,380
10-Aug-17 4,145,545,460 312,824.14 8,291,090,920
LOAN 82,910,909,200 6,255,217.88 8,291,090,920GOI 27,242,155,880
10 CIVIL WORKS ICB Simpang Rampa - Poriaha PT. NUSA KONSTRUKSI INDONESIA IDR 123,132,763,370.00 30-Jul-15 2,468,388,987 120,664,374,383
01-09/05-WINRIP-WP2/CE/A/8043/05-15 ENJINIRING Tbk 5-Oct-15 7,512,488,222 515,224.49 113,151,886,161
Tanggal 00 May 2015 28-Dec-15 4,595,650,107 108,556,236,054
1-Jul-16 2,342,128,075 106,214,107,979
29-Sep-16 17,851,399,464 1,377,210.26 88,362,708,515
23-Dec-16 2,075,490,753 86,287,217,762
20-Dec-16 9,580,288,601 717,141.15 76,706,929,161
16-Jun-17 2,540,469,158 74,166,460,003
19-Jun-17 7,731,862,654 585,038.03 66,434,597,349
15-Aug-17 1,543,394,630 64,891,202,719
23-Aug-17 4,697,288,005 353,498.50 60,193,914,714
13-Oct-17 1,264,739,402 58,929,175,312
23-Oct-17 3,849,206,875 286,122.56 55,079,968,437
22-Dec-17 3,477,930,713 51,602,037,724
13-Dec-17 10,585,006,520 785,354.39 41,017,031,204
22-Dec-17 1,749,713,584 39,267,317,620
22-Dec-17 5,325,215,257 394,139.24 33,942,102,363
12-Jul-18 1,014,563,896 32,927,538,467
23-Jul-18 3,087,803,164 215,237.92 29,839,735,303
7-Nov-18 3,504,273,602 - 26,335,461,701
30-Oct-18 10,665,180,527 702,234.11 15,670,281,174
31-Oct-18 327,765,887 - 15,342,515,287
30-Oct-18 997,548,353 65,927.46 14,344,966,934
28-Nov-18 1,416,026,779 12,928,940,155
19-Dec-18 4,309,646,717 296,317.84 8,619,293,438
LOAN 86,192,934,359 6,293,445.95 8,619,293,438GOI 28,320,535,573
11 CIVIL WORKS ICB Sibolga - Batas Tapsel PT. PEMBANGUNAN INDONESIA IDR 205,270,429,000.00 20-Nov-15 5,982,300,000 199,288,129,000
02-03/15-WINRIP-WP2/CE/A/8043/07-15 PERUMAHAN 16-Nov-15 18,207,000,000 1,347,967.72 181,081,129,000
Tanggal 13 July 2015 13-Apr-16 720,897,373 180,360,231,627
24-Jun-16 1,775,322,914
12-Oct-16 7,597,192,178 588,747.08 170,987,716,535
5-Dec-16 904,460,579 170,083,255,956
12-Dec-16 2,752,706,110 207,955.44 167,330,549,846
22-Dec-16 8,039,671,896 159,290,877,950
12-Dec-16 24,468,566,640 1,831,616.64 134,822,311,310
19-May-17 2,775,002,463 132,047,308,847
002/06-WINRIP/26
151401301000820
003/06-WINRIP/26
161401303000325
004/06-WINRIP/26
161401303000400
005/06-WINRIP/26
161401301000489
006/06-WINRIP/26
161401301000549
007/06-WINRIP/26
161401303000669
008/06-WINRIP/26
161401303000696
009/06-WINRIP/26
171401301000119
010/06-WINRIP/26
171401301000120
011/06-WINRIP/26
150041303004697
001-A/05-WINRIP/03
150041303011347
160041303005002
002/05-WINRIP/03
160041303012524
003/05-WINRIP/03
170041303004264
004/05-WINRIP/03
170041303006430
005/05-WINRIP/03
170041303008864
006/05-WINRIP/03
170041303012747
007/05-WINRIP/03
170041303012748
008/05-WINRIP/03
180041303006343.00
009/05-WINRIP/03
180041303010531
010/05-WINRIP/03
180041303010213
011/05-WINRIP/03
180041303011295
012/05-WINRIP/03
150041302005417
001/15-WINRIP/03
160041302001277
160041302002826
002/15-WINRIP/03
160041302006156
003/15-WINRIP/03
160041302006662
004/15-WINRIP/03
170041302002177
Page 1257 of 1261 4/30/2019-10:11 AM
CTC WINRIP
Disbursement Contract Procurement Contract Supplier/ Nationality Contract Contract Amount Payment realization Code Cat. Category Description Method /ii Number /iii Contractor Currency Value Invoiced No. SP2D/WA Date of SP2D Amount(Rp) Amount (US$) (Rp.) (US$) Comp.
No Description to date1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Western Indonesia National Roads Improvement ProjectContract Expenditure Report Goods and Works)
for the quarter ended March 31, 2019IBRD Loan 8043 - ID
Remaining amount Of Contr. Note
Form 3 - C
22-May-17 8,445,659,670 636,159.96 123,601,649,177
21-Jun-17 2,641,650,119 120,959,999,058
5-Jul-17 8,039,804,710 606,411.58 112,920,194,348
25-Aug-17 2,491,146,008 110,429,048,340
29-Aug-17 7,581,748,720 570,871.83 102,847,299,620
20-Oct-17 2,429,859,518 100,417,440,102
23-Oct-17 7,395,224,620 549,708.22 93,022,215,482
29-Nov-17 4,741,708,129 88,280,507,353
13-Dec-17 14,431,285,609 1,070,729.01 73,849,221,744
22-Dec-17 2,814,508,588 71,034,713,156
13-Dec-17 8,565,895,703 635,546.50 62,468,817,453
13-Jul-18 14,286,705,783 997,744.66 48,182,111,670
13-Jul-18 4,560,225,984 318,473.77 43,621,885,686
6-Nov-18 4,694,203,329 - 38,927,682,357
6-Nov-18 1,498,359,966 - 37,429,322,391
8-Nov-18 10,172,819,420 686,564.04 23,914,005,161
28-Dec-18 2,360,609,933 21,553,395,228
6-Nov-18 3,342,497,810 - 34,086,824,581
19-Dec-18 7,184,465,015 493,981.37 14,368,930,213
LOAN 143,689,300,162 10,542,477.82 14,368,930,213GOI 47,212,198,625
12 CIVIL WORKS NCB Indrapura - Tapan PT. ADHI KARYA INDONESIA IDR 130,352,140,000.00 15-Dec-15 4,474,646,550 125,877,493,450
01-06/07-WINRIP-AWP II/CE/A/8043/12-15 28-Dec-15 13,618,489,500 1,005,277.15 112,259,003,950
Tanggal 03 Desember 2015 21-Jun-16 843,958,320 111,415,045,630
24-Jun-16 2,568,568,800 194,117.96 108,846,476,830
25-Oct-16 2,031,522,840 106,814,953,990
26-Oct-16 6,182,895,600 476,266.80 100,632,058,390
14-Dec-16 4,543,603,540 96,088,454,850
14-Dec-16 13,828,358,600 1,042,076.76 82,260,096,250
5-Sep-17 3,559,521,952 78,700,574,298
13-Jun-17 10,833,327,680 819,093.28 67,867,246,618
5-Sep-17 1,475,318,072 66,391,928,546
5-Jul-17 4,490,098,480 338,670.87 61,901,830,066
24-Nov-17 2,815,082,792 59,086,747,274
30-Nov-17 8,567,643,280 636,573.54 50,519,103,994
8-Dec-17 2,940,802,505 47,578,301,489
11-Dec-17 8,950,268,495 663,769.54 38,628,032,994
20-Mar-18 2,967,363,940 - 35,660,669,054
19-Mar-18 9,031,107,645 660,216.95 26,629,561,409
8-Jun-18 2,687,607,638 - 23,941,953,771
23-Jul-18 8,179,675,420 570,171.16 15,762,278,351
20-Jul-18 1,491,548,851 - 14,270,729,500
23-Jul-18 4,539,496,500 316,429.42 9,731,233,000
11-Dec-18 150,015,200 - 9,581,217,800
19-Dec-18 456,568,000 31,392.19 9,124,649,800
Loan 91,246,498,000 6,754,055.62 9,124,649,800GOI 29,980,992,200
13 CIVIL WORKS ICB Bts.Kota Pariaman - Manggopoh PP - STATIKA CONSORTIUM INDONESIA IDR 378,042,000,000.00 17-Mar-16 24,885,000,000 1,910,996.77 353,157,000,000
01-06/07-WINRIP-AWP II/CE/A/8043/12-15 5-Apr-16 8,176,500,000
Tanggal 28 January 2016 28-Jun-16 809,863,810 344,170,636,190
13-Jul-16 2,464,802,900 188,931.70 341,705,833,290
24-Aug-16 1,841,477,290 339,864,356,000
7-Sep-16 5,604,496,100 426,814.11 334,259,859,900
15-Sep-16 1,924,915,770 332,334,944,130
27-Sep-16 5,858,439,300 449,508.12 326,476,504,830
24-Oct-16 2,888,959,850 323,587,544,980
31-Oct-16 8,792,486,500 678,327.92 314,795,058,480
22-Nov-16 6,915,459,680 307,879,598,800
005/15-WINRIP/03
170041302003109
006/15-WINRIP/03
170041302004408
007/15-WINRIP/03
170041302005760
008/15-WINRIP/03
170041302006798
009/15-WINRIP/03
170041302007703
010/15-WINRIP/03
011/15-WINRIP/03
012/15-WINRIP/03
180041302006431
180041302006432
014/15-WINRIP/03
180041302007081
180041302006433
015/15-WINRIP/03
150101302003482
001/07-WINRIP/06
160101302001327
002/07-WINRIP/06
160101302002849
003/07-WINRIP/06
160101302003843
004/07-WINRIP/06
170101302002652
005/07-WINRIP/06
170101302002653
006/07-WINRIP/06
170101302003817
007/07-WINRIP/06
170101302004089
008/07-WINRIP/06
180101302000597
009/07-WINRIP/06
180101302001632
010/07-WINRIP/06
180101302001949.00
011/07-WINRIP/06
180101302004024
012/07-WINRIP/06
001/08-WINRIP/06
160101302000511
160101302001419
002/08-WINRIP/06
160101302002125
003/08-WINRIP/06
160101302002338
004/08-WINRIP/06
160101302002844
005/08-WINRIP/06
160101302003297
Page 1258 of 1261 4/30/2019-10:11 AM
CTC WINRIP
Disbursement Contract Procurement Contract Supplier/ Nationality Contract Contract Amount Payment realization Code Cat. Category Description Method /ii Number /iii Contractor Currency Value Invoiced No. SP2D/WA Date of SP2D Amount(Rp) Amount (US$) (Rp.) (US$) Comp.
No Description to date1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Western Indonesia National Roads Improvement ProjectContract Expenditure Report Goods and Works)
for the quarter ended March 31, 2019IBRD Loan 8043 - ID
Remaining amount Of Contr. Note
Form 3 - C
5-Dec-16 21,047,051,200 1,557,425.73 286,832,547,600
9-Dec-16 7,679,496,220 279,153,051,380
14-Dec-16 23,372,379,800 1,761,294.63 255,780,671,580
9-Mar-17 5,402,003,560 250,378,668,020
16-Mar-17 16,440,880,400 1,236,807.37 233,937,787,620
12-Apr-17 7,796,130,140 226,141,657,480
13-Apr-17 23,727,352,600 1,795,350.53 202,414,304,880
10-May-17 4,161,307,660 198,252,997,220
10-May-17 12,664,849,400 955,332.99 185,588,147,820
16-Jun-17 9,038,757,350 176,549,390,470
22-Jun-17 27,509,261,500 2,079,152.10 149,040,128,970
1-Aug-17 2,673,284,250 146,366,844,720
4-Aug-17 8,136,082,500 613,395.85 138,230,762,220
22-Aug-17 2,413,942,920 135,816,819,300
7-Sep-17 7,346,782,800 553,680.22 128,470,036,500
27-Sep-17 3,613,524,480 124,856,512,020
28-Sep-17 10,997,683,200 828,076.44 113,858,828,820
23-Oct-17 3,631,323,720 110,227,505,100
30-Oct-17 11,051,854,800 819,141.33 99,175,650,300
22-Nov-17 5,909,619,540 93,266,030,760
27-Nov-17 17,985,798,600 1,338,727.10 75,280,232,160
21-Dec-17 7,725,610,760 67,554,621,400
27-Dec-17 23,512,728,400 1,744,655.96 44,041,893,000
18-Jan-18 4,347,483,000 - 39,694,410,000
19-Jan-18 13,231,470,000 998,149.52 26,462,940,000
Loan 264,629,400,000 19,935,768.39 26,462,940,000GOI 86,949,660,000
14 CIVIL WORKS ICB Kambang - Indrapura INDONESIA IDR 350,643,730,000.00 16-Jun-16 8,248,959,200 342,394,770,80002-06/12-WINRIP-WP2/CE/A/8043-ID/01-16 28-Apr-16 25,105,528,000 1,909,310.82 317,289,242,800
Tanggal 28 January 2016 28-Oct-16 833,097,260 316,456,145,54026-Oct-16 2,535,513,400 195,309.92 313,920,632,14014-Dec-16 1,469,306,240 312,451,325,90020-Dec-16 4,471,801,600 334,740.74 307,979,524,3006-Sep-17 3,801,157,560 304,178,366,7405-Jul-17 11,568,740,400 872,585.64 292,609,626,340
13-Sep-17 3,041,494,792 289,568,131,54825-Sep-17 9,256,723,280 701,054.47 280,311,408,2688-Dec-17 3,244,348,950 277,067,059,31811-Dec-17 9,874,105,500 732,283.11 267,192,953,81819-Dec-17 809,107,938 266,383,845,88022-Dec-17 2,462,502,420 182,259.07 263,921,343,46030-Jan-18 2,358,028,080 - 261,563,315,38031-Jan-18 7,176,607,200 541,222.26 254,386,708,1808-Jun-18 2,894,476,032 - 251,492,232,14810-Jul-18 8,809,274,880 614,443.39 242,682,957,26826-Sep-18 11,658,293,176 - 231,024,664,09211-Jul-18 35,481,761,840 2,488,202.09 195,542,902,25226-Sep-18 9,774,777,544 - 185,768,124,70825-Jul-18 29,749,322,960 2,068,510.84 156,018,801,74826-Sep-18 6,749,584,508 - 149,269,217,24023-Aug-18 20,542,213,720 1,417,193.08 128,727,003,5202-Oct-18 4,256,908,540 - 124,470,094,98012-Oct-18 12,955,808,600 855,790.25 111,514,286,380
26-12-2018 21,508,518,080 90,005,768,30021-Dec-18 65,460,707,200 4,575,112.33 24,545,061,100
Loan 245,450,611,000 17,488,018.01 24,545,061,100GOI 80,648,057,900
15 CIVIL WORKS NCB Painan - Kambang KSO YASA - CONBLOC INDONESIA IDR 214,327,429,680.00 25-Nov-16 7,394,296,324 206,933,133,35603-06/14-WINRIP-AWP-III/CE/A/8043-ID/06-16 13-Jul-16 22,504,380,116 1,725,002.31 184,428,753,240
Tanggal 01 Juni 2016 29-Nov-16 783,927,400 183,644,825,840
006/08-WINRIP/06
160101302003764
007/08-WINRIP/06
170101302000387
008/08-WINRIP/06
170101302000800
009/08-WINRIP/06
170101302001172
010/08-WINRIP/06
170101302001174
011/08-WINRIP/06
170101302002211
012/08-WINRIP/06
170101302002501
013/08-WINRIP/06
170101302002943
014/08-WINRIP/06
170101302003309
015/08-WINRIP/06
170101302003794
016/08-WINRIP/06
170101302004495
017/08-WINRIP/06
180101302000031
018/08-WINRIP/06
PT LANCARJAYA MANDIRIABADI - PT CAHAYA TUNGGAL
ABADI Jo
160101304005270001/12-WINRIP/06160101304013439002/12-WINRIP/06160101304017808003/12-WINRIP/06 170101304010918004/12-WINRIP/06170101304011412005/12-WINRIP/06170101304017299006/12-WINRIP/06170101304018600007/12-WINRIP/06180101304000191008/12-WINRIP/06180101304007503009/12-WINRIP/06
180101304012620.00010/12-WINRIP/06
180101304012618.00011/12-WINRIP/06
180101304012619.00012/12-WINRIP/06180101304012999013/12-WINRIP/06180101304020510014/12-WINRIP/06
160101304015571001/14-WINRIP/06160101304015860
Page 1259 of 1261 4/30/2019-10:11 AM
CTC WINRIP
Disbursement Contract Procurement Contract Supplier/ Nationality Contract Contract Amount Payment realization Code Cat. Category Description Method /ii Number /iii Contractor Currency Value Invoiced No. SP2D/WA Date of SP2D Amount(Rp) Amount (US$) (Rp.) (US$) Comp.
No Description to date1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Western Indonesia National Roads Improvement ProjectContract Expenditure Report Goods and Works)
for the quarter ended March 31, 2019IBRD Loan 8043 - ID
Remaining amount Of Contr. Note
Form 3 - C
23-Nov-16 2,385,866,000 178,435.87 181,258,959,84014-Dec-16 8,701,791,940 172,557,167,90014-Dec-16 26,483,714,600 1,995,758.47 146,073,453,3005-Sep-17 1,870,609,550 144,202,843,75013-Jun-17 5,693,159,500 430,452.10 138,509,684,25012-Sep-17 1,996,288,680 136,513,395,57015-Sep-17 6,075,661,200 462,273.54 130,437,734,37027-Oct-17 1,290,152,340 129,147,582,0301-Nov-17 3,926,550,600 290,597.29 125,221,031,43027-Nov-17 1,574,824,260 123,646,207,17030-Nov-17 4,792,943,400 356,114.38 118,853,263,7708-Dec-17 1,959,976,970 116,893,286,80011-Dec-17 5,965,147,300 442,387.07 110,928,139,50026-Feb-18 2,254,503,240 - 108,673,636,26028-Feb-18 6,861,531,600 504,858.48 101,812,104,66016-Mar-18 1,627,351,660 - 100,184,753,00019-Mar-18 4,952,809,400 362,073.94 95,231,943,6008-Jun-18 2,167,127,160 - 93,064,816,44010-Jul-18 6,595,604,400 460,040.76 86,469,212,0408-Oct-18 2,393,172,310 - 84,076,039,73010-Jul-18 7,283,567,900 508,025.94 76,792,471,83017-Oct-18 1,330,361,630 - 75,462,110,20024-Oct-18 4,048,926,700 267,857.02 71,413,183,50019-Dec-18 6,710,658,020 - 64,702,525,48019-Dec-18 20,423,741,800 1,404,272.68 44,278,783,680
Loan 127,993,604,516 9,388,149.85 44,278,783,680GOI 42,055,041,484
16 CIVIL WORKS NCB Lubuk Alung - Sicincin PT NINDYA KARYA (Persero) INDONESIA IDR 113,931,519,000.00 28-Sep-16 3,926,731,350 110,004,787,65014-06/20-WINRIP-AWP-III/CE/A/8043-ID/06-16 13-Jul-16 11,950,921,500 916,060.21 98,053,866,150
Tanggal 01 Juni 2016 9-Dec-16 2,454,364,270 95,599,501,88014-Dec-16 7,469,804,300 562,909.14 88,129,697,58019-Apr-17 2,392,052,900 85,737,644,68020-Apr-17 7,280,161,000 550,151.97 78,457,483,68014-Jun-17 3,163,340,650 75,294,143,03016-Jun-17 9,627,558,500 728,257.07 65,666,584,53020-Oct-17 2,143,459,010 63,523,125,52026-Oct-17 6,523,570,900 484,627.51 56,999,554,6208-Dec-17 1,650,046,680 55,349,507,94011-Dec-17 5,021,881,200 372,432.60 50,327,626,74020-Dec-17 4,829,651,780 45,497,974,96022-Dec-17 14,698,940,200 1,087,923.93 30,799,034,76024-May-18 1,809,994,660 - 28,989,040,10024-May-18 5,508,679,400 390,492.62 23,480,360,70012-Sep-18 2,499,657,250 - 20,980,703,4507-Sep-18 7,607,652,500 512,230.84 13,373,050,95012-Sep-18 1,308,910,450 - 12,064,140,5007-Sep-18 3,983,640,500 268,222.50 8,080,500,00019-Dec-18 26,040,370 - 8,054,459,63020-Dec-18 79,253,300 5,484.66 7,975,206,330
Loan 79,752,063,300 5,878,793.05 7,975,206,330GOI 26,204,249,370
17 CIVIL WORKS NCB Lubuk Alung - Kuraitaji PT MULTI STRUCTURE INDONESIA IDR 126,301,900,000.00 19-Sep-16 4,357,415,550 121,944,484,45015-06/21-WINRIP-AWP-III/CE/A/8043-ID/06-16 13-Jul-16 13,261,699,500 1,016,533.77 108,682,784,950
Tanggal 01 Juni 2016 17-Feb-17 799,298,990 107,883,485,96017-Feb-17 2,432,649,100 183,416.20 105,450,836,86019-Mar-17 1,161,811,190 104,289,025,67016-Mar-17 3,535,947,100 266,000.69 100,753,078,57016-May-17 975,449,320 99,777,629,25022-May-17 2,968,758,800 223,618.47 96,808,870,45016-Jun-17 3,383,751,490 93,425,118,96019-Jun-17 10,298,374,100 779,235.33 83,126,744,860
002/14-WINRIP/06160101304017854003/14-WINRIP/06170101304010893004/14-WINRIP/06170101304011353005/14-WINRIP/06170101304014061006/14-WINRIP/06170101304015829007/14-WINRIP/06170101304017269008/14-WINRIP/06180101304001073009/14-WINRIP/06180101304002231010/14-WINRIP/06
180101304007421.00011/14-WINRIP/06
180101304013481.00012/14-WINRIP/06180101304014078013/14-WINRIP/06180101304019928014/14-WINRIP/06
160101303004531001/20-WINRIP/06160101303006545002/20-WINRIP/06170101303001520003/20-WINRIP/06170101303002922004/20-WINRIP/06170101303005893005/20-WINRIP/06170101303007549006/20-WINRIP/06170101303008170007/20-WINRIP/06180101303002778008/20-WINRIP/06180101303005406009/20-WINRIP/06180101303005407010/20-WINRIP/06180101303009329011/20-WINRIP/06
160101303004336001/21-WINRIP/06170101304000753002/21-WINRIP/06170101304001566003/21-WINRIP/06170101304004793004/21-WINRIP/06170101304006642005/21-WINRIP/06
Page 1260 of 1261 4/30/2019-10:11 AM
CTC WINRIP
Disbursement Contract Procurement Contract Supplier/ Nationality Contract Contract Amount Payment realization Code Cat. Category Description Method /ii Number /iii Contractor Currency Value Invoiced No. SP2D/WA Date of SP2D Amount(Rp) Amount (US$) (Rp.) (US$) Comp.
No Description to date1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Western Indonesia National Roads Improvement ProjectContract Expenditure Report Goods and Works)
for the quarter ended March 31, 2019IBRD Loan 8043 - ID
Remaining amount Of Contr. Note
Form 3 - C
3-Aug-17 776,339,930 82,350,404,93010-Aug-17 2,362,773,700 178,295.63 79,987,631,2303-Oct-17 676,228,290 79,311,402,9406-Oct-17 2,058,086,100 153,336.77 77,253,316,8408-Dec-17 642,535,590 76,610,781,25011-Dec-17 1,955,543,100 145,026.93 74,655,238,15020-Dec-17 901,627,370 73,753,610,78022-Dec-17 2,744,083,300 203,099.94 71,009,527,48030-Jan-18 490,647,500 - 70,518,879,98031-Jan-18 1,493,275,000 112,615.01 69,025,604,9808-Jun-18 663,090,230 - 68,362,514,7506-Jul-18 2,018,100,700 141,412.70 66,344,414,050
Loan 45,129,290,500 3,402,591.44 66,344,414,050GOI 14,828,195,450
18 CIVIL WORKS NCB Seblat - Ipuh PT. YASA PATRIA PERKASA INDONESIA IDR 211,374,500,000.00 13-Dec-16 4,375,452,150 206,999,047,85005-26/16-WINRIP-WP3/CE/A/8043/10-16 MULTI STRUCTURE 20-Dec-16 13,316,593,500 996,825.62 193,682,454,350
Tanggal 28 October 2016 12-Apr-17 1,196,163,760 192,486,290,59019-Apr-17 3,640,498,400 276,025.35 188,845,792,19013-Jul-17 2,799,032,150 186,046,760,04019-Jul-17 8,518,793,500 643,121.96 177,527,966,54021-Jul-17 1,581,824,954 175,946,141,58628-Jul-17 4,814,249,860 362,874.04 171,131,891,72611-Aug-17 2,525,150,205 168,606,741,52121-Aug-17 7,685,239,754 577,533.61 160,921,501,76715-Sep-17 1,891,456,299 159,030,045,46825-Sep-17 5,756,606,126 435,974.42 153,273,439,34224-Oct-17 3,290,903,541 149,982,535,80127-Oct-17 10,015,793,386 741,800.72 139,966,742,41513-Nov-17 4,110,893,647 135,855,848,76817-Nov-17 12,511,415,449 928,766.64 123,344,433,31930-Nov-17 2,824,933,312 120,519,500,0077-Dec-17 8,597,623,124 639,371.10 111,921,876,8836-Feb-18 1,912,620,131 - 110,009,256,75220-Feb-18 5,821,017,791 431,122.63 104,188,238,96118-Apr-18 3,270,137,357 - 100,918,101,60416-Mar-18 9,952,591,955 728,060.86 90,965,509,6495-Apr-18 3,355,863,871 - 87,609,645,77816-Apr-18 10,213,498,736 745,837.50 77,396,147,04215-May-18 1,887,821,446 - 75,508,325,59621-May-18 5,745,543,530 410,278.74 69,762,782,0669-Jul-18 3,808,356,579 65,954,425,48717-Jul-18 11,590,650,459 811,329.31 54,363,775,02815-Oct-18 1,739,057,746 - 52,624,717,28219-Oct-18 5,292,784,445 350,469.11 47,331,932,83717-Dec-18 8,046,467,852 - 39,285,464,98519-Dec-18 24,489,249,985 1,683,804.32 14,796,215,000
Loan 147,962,150,000 10,763,195.93 14,796,215,000GOI 48,616,135,000
Loan 2,447,685,595,609 181,805,053.78 338,079,467,924
GOI 804,239,553,190
NOTES:
VAT for Loan portion is not collected/i: This Report provides procurement information for the project from inception to the latest reporting date./ii: Each method in Procurement Guidelines should be shown separately
ICB : International Competitive BiddingNCB : National Competitive BiddingNS : National ShopingDC : Direct Contracting
170101304009268006/21-WINRIP/06170101304012443007/21-WINRIP/06170101304017108008/21-WINRIP/06170101304018714009/21-WINRIP/06180101304000187010/21-WINRIP/06180101304007497011/21-WINRIP/06
161401301000697001/16-WINRIP/26171401301000035002/16-WINRIP/26171401301000101003/16-WINRIP/26171401301000109004/16-WINRIP/26171401301000125005/16-WINRIP/26171401301000156006/16-WINRIP/26171401301000187007/16-WINRIP/26171401304000007008/16-WINRIP/26171401304000026009/16-WINRIP/26181401304000002010/16-WINRIP/26181401304000090011/16-WINRIP/26
181401304000027.00012/16-WINRIP/26
181401304000036.00013/16-WINRIP/26
181401304000053.00
T O T A L CIVIL WORKS 3,590,004,616,722.00
014/16-WINRIP/26181401304000133015/16-WINRIP/26181401304000241016/16-WINRIP/26
Page 1261 of 1261 4/30/2019-10:11 AM
Procurement Plan of Civil WorksWestern Indonesia National Roads Improvement Project (WINRIP)Executing Agency: Directorate General of Highways , Ministry of Public Works and Housing. Updated March 31, 201915000 Edit 250112
Qualification Schedule Submission Notification Contractor
Sub - Project Link No. Length Criteria Actual of of(Km) IDR (x10
⁶) USD million (Pre/Post) Application Qualification IDR
A W P - 11 Krui - Biha Lampung 053.0 25.06 163,534.85 10.90 ICB Pre Prior Schedule 12-Jan-11 09-Feb-11 09-May-11 07-Aug-11 15-Dec-11 09-Feb-12 13-Sep-12 28-Feb-13 01-Mar-13 07-Mar-13 18-Apr-13 05-May-13 19-May-13 18-Jun-13
179,888.33 Revised 17-May-13 27-May-13 08-Jul-13 10-Sep-13 24-Sep-13 14-Nov-13 06-Dec-13 07-Sep-15Actual 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 25-Nov-13 08-Jan-14 09-Oct-15
733 10-Jan-16 149,193,782,000Date of Taking Over Certificate 20-Jan-16
2 Padang Sawah - Sp.Empat West Sumatera 047.2 40.70 228,772.24 15.25 ICB Pre Prior Schedule 12-Jan-11 09-Feb-11 09-May-11 07-Aug-11 15-Dec-11 09-Feb-12 13-Sep-12 28-Feb-13 01-Mar-13 07-Mar-13 18-Apr-13 05-May-13 19-May-13 18-Jun-13Including Air Gadang Bridge 0.10 251,649.47 Revised 17-May-13 27-May-13 08-Jul-13 10-Sep-13 24-Sep-13 14-Nov-13 06-Dec-13 06-Dec-15
Actual 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 06-Dec-13 06-Jan-14 05-Jan-16835 19-Apr-16 247,572,130,000
Date of Taking Over Certificate 14-Apr-16
3 Manggopoh - Padang Sawah West Sumatera 047.1 32.00 167,678.40 11.18 ICB Pre Prior Schedule 12-Jan-11 09-Feb-11 09-May-11 07-Aug-11 15-Dec-11 09-Feb-12 13-Sep-12 28-Feb-13 01-Mar-13 07-Mar-13 18-Apr-13 05-May-13 19-May-13 18-Jun-13184,446.24 Revised 17-May-13 27-May-13 08-Jul-13 10-Sep-13 24-Sep-13 14-Nov-13 06-Dec-13 06-Dec-15
Actual 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 06-Dec-13 06-Jan-14 05-Jan-16805 20-Mar-16 183,452,685,000
Date of Taking Over Certificate 17-Mar-16
4 Ipuh - Bantal Bengkulu 015.1 42.45 247,105.24 16.47 ICB Pre Prior Schedule 12-Jan-11 09-Feb-11 09-May-11 07-Aug-11 15-Dec-11 09-Feb-12 13-Sep-12 28-Feb-13 01-Mar-13 07-Mar-13 18-Apr-13 05-May-13 19-May-13 18-Jun-13271,815.76 Revised 17-May-13 27-May-13 08-Jul-13 10-Sep-13 24-Sep-13 14-Nov-13 06-Dec-13 06-Dec-15
Actual 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 14-Nov-13 13-Jan-14 12-Jan-16820 11-Apr-16 212,290,705,872
Date of Taking Over Certificate 31-May-16
Sub Total AWP - 1 807,090.72 53.81 792,509,302,872A W P - 2 and 3
24317 Sp.Gng Kemala - Pugung Tampak Lampung 061.1 36.15 255,269.25 17.02 ICB Pre Prior Schedule 30-Sep-13 14-Oct-13 30-Sep-13 14-Oct-13 06-Nov-13 18-Dec-13 22-Jan-14 06-Feb-14 10-Feb-14 02-Dec-13 16-Dec-13 17-Feb-14 01-Apr-14 30-Apr-14 14-May-14 7-Jul-14 11-Aug-14 31-Jul-16
Revised 19-May-14 2-Jun-14 9-Jun-14 14-Feb-14 28-Feb-14 16-Jun-14 28-Jul-14 1-Sep-14 15-Sep-14 8-Nov-14 13-Dec-14 1-Dec-16Actual 30-Sep-13 10-Oct-13 30-Sep-13 10-Oct-13 11-Nov-13 30-Dec-13 28-Feb-14 13-Jun-14 25-Jun-14 19-Dec-14 7-Jan-14 4-Jul-14 15-Aug-14 10-Oct-14 14-Oct-14 17-Nov-14 4-Sep-15 23-Aug-17
846 27-Dec-17 211,712,283,000Date of Taking Over Certificate 26-Dec-17
5 Simpang Rampa - Poriaha North Sumatera 015. 9.70 152,870.49 10.19 ICB Pre Prior Schedule 06-Nov-13 20-Nov-13 06-Nov-13 20-Nov-13 22-Nov-13 6-Jan-14 7-Feb-14 21-Feb-14 24-Feb-14 2-Dec-13 16-Dec-13 4-Mar-14 15-Apr-14 19-May-14 2-Jun-14 23-Jul-14 22-Aug-14 12-Feb-16Revised 26-May-14 9-Jun-14 16-Jun-14 2-Jun-14 16-Jun-14 23-Jun-14 4-Aug-14 8-Sep-14 22-Sep-14 15-Nov-14 20-Dec-14 11-Jun-16Actual 07-Nov-13 15-Jul-14 07-Nov-13 18-Nov-13 23-Dec-13 10-Feb-14 9-Jun-14 15-Jul-14 22-Jul-14 18-Jul-14 22-Jul-14 11-Aug-14 22-Sep-14 18-Nov-14 27-Jan-15 17-Mar-15 18-Jun-15 8-Dec-16
995 08-Mar-18Date of Taking Over Certificate 18-Mar-18 123,132,763,000
11 Bantal - Mukomuko Bengkulu 015.2 50.65 246,499.55 16.43 ICB Pre Prior Schedule 06-Nov-13 20-Nov-13 06-Nov-13 20-Nov-13 22-Nov-13 6-Jan-14 7-Feb-14 21-Feb-14 24-Feb-14 2-Dec-13 16-Dec-13 4-Mar-14 15-Apr-14 19-May-14 2-Jun-14 23-Jul-14 22-Aug-14 11-Aug-16Revised 26-May-14 9-Jun-14 16-Jun-14 2-Jun-14 16-Jun-14 23-Jun-14 4-Aug-14 8-Sep-14 22-Sep-14 15-Nov-14 20-Dec-14 8-Dec-16Actual 07-Nov-13 25-Jun-14 07-Nov-13 18-Nov-13 23-Dec-13 10-Feb-14 16-Jun-14 25-Jun-14 11-Jul-14 21-Jul-14 6-Aug-14 22-Aug-14 3-Oct-14 4-Nov-14 13-Nov-14 18-Dec-14 23-Feb-15 11-Feb-17
824 26-May-17 263,656,603,000Date of Taking Over Certificate 19-May-17
13 Sp Rukis - Tj Kemuning Bengkulu 006.1 56.27 316,304.67 21.09 ICB Pre Prior Schedule 06-Nov-13 20-Nov-13 06-Nov-13 20-Nov-13 22-Nov-13 6-Jan-14 7-Feb-14 21-Feb-14 24-Feb-14 2-Dec-13 16-Dec-13 4-Mar-14 15-Apr-14 19-May-14 2-Jun-14 23-Jul-14 22-Aug-14 11-Aug-16Revised 26-May-14 9-Jun-14 16-Jun-14 2-Jun-14 16-Jun-14 23-Jun-14 4-Aug-14 8-Sep-14 22-Sep-14 15-Nov-14 20-Dec-14 8-Dec-16Actual 07-Nov-13 25-Jun-14 07-Nov-13 18-Nov-13 23-Dec-13 10-Feb-14 16-Jun-14 25-Jun-14 11-Jul-14 21-Jul-14 6-Aug-14 22-Aug-14 3-Oct-14 4-Nov-14 18-Nov-14 18-Dec-14 22-Jul-15 10-Jul-17
1029 15-May-18 305,886,100,000Date of Taking Over Certificate 15-May-18
6 Ps. Pedati - Kerkap Bengkulu 010.0 20.88 92,127.40 6.14 NCB Post Post Schedule 13-Nov-13 27-Nov-13 13-Nov-13 27-Nov-13 04-Dec-13 03-Jan-14 02-Feb-14 16-Feb-14 16-Mar-14 15-Apr-14 9-Jul-15Revised 14-Nov-14 28-Nov-14 5-Dec-14 4-Jan-15 22-Feb-15 8-Mar-15 30-May-16Actual 21-Nov-13 - 19-Nov-14 24-Nov-14 29-Dec-14 - - 3-Mar-15 11-Mar-15 2-Jun-16
690 28-Jan-17 118,444,156,000Date of Taking Over Certificate 30-Jan-17
19 Lais - Bintunan Bengkulu 009.1 10.80 35,886.28 2.39 NCB Post Post Schedule 13-Nov-13 27-Nov-13 13-Nov-13 27-Nov-13 04-Dec-13 03-Jan-14 02-Feb-14 16-Feb-14 16-Mar-14 15-Apr-14 9-Feb-15Revised 14-Nov-14 28-Nov-14 5-Dec-14 4-Jan-15 22-Feb-15 8-Mar-15 1-Jan-16Actual 21-Nov-13 - 19-Nov-14 24-Nov-14 29-Dec-14 - - 3-Mar-15 11-Mar-15 4-Jan-16
478 30-Jun-16 44,419,760,000Date of Taking Over Certificate 30-Jun-16
15 Sibolga - Batas Tapsel North Sumatera 016.1 36.00 376,479.38 25.10 ICB Post Prior Schedule 13-Nov-13 27-Nov-13 27-Dec-13 10-Jan-14 17-Jan-14 28-Feb-14 30-Mar-14 13-Apr-14 11-May-14 10-Jun-14 28-Aug-16Revised 16-Dec-13 30-Dec-13 14-Nov-14 28-Nov-14 15-Jan-15 26-Feb-15 31-Mar-15 14-Apr-15 22-Jun-15 10-Aug-15 27-Oct-17Actual 30-Dec-13 28-Feb-14 18-Dec-14 23-Dec-14 12-Jan-15 23-Feb-15 4/24/2015 7-May-15 3-Jul-15 20-Nov-15 6-Feb-18
954 30-Jun-18Date of Taking Over Certificate 03-Jul-19 205,270,429,000
8 Bts.Kota Pariaman - Manggopoh West Sumatera 024.0 46.80 379,034.45 25.27 ICB Post Prior Schedule 14-Jul-14 28-Jul-14 04-Aug-14 18-Aug-14 25-Aug-14 06-Oct-14 10-Nov-14 24-Nov-14 17-Jan-15 16-Feb-15 5-Feb-17Revised 01-Dec-14 15-Dec-14 11-Mar-15 25-Mar-15 1-Apr-15 15-May-15 22-Jun-15 6-Jul-15 11-Sep-15 30-Oct-15 18-Oct-17Actual 18-Dec-14 22-Dec-14 12-May-15 26-May-15 28-May-15 13-Aug-15 9-Oct-15 9-Dec-15 28-Jan-16 23-Mar-16 12-Mar-18
649 31-Dec-17 381,795,000,000Date of Taking Over Certificate 29-Dec-17
10 Simpang Empat - Sp.Air Balam West Sumatera 034.1 61.70 515,842.21 34.39 ICB Post Prior Schedule 14-Jul-14 28-Jul-14 04-Aug-14 18-Aug-14 25-Aug-14 06-Oct-14 10-Nov-14 24-Nov-14 17-Jan-15 16-Feb-15 5-Feb-17Revised 01-Dec-14 15-Dec-14 11-Mar-15 25-Mar-15 1-Apr-15 15-May-15 22-Jun-15 6-Jul-15 11-Sep-15 30-Oct-15 18-Oct-17Actual 18-Dec-14 22-Dec-14 12-May-15 26-May-15 28-May-15 13-Aug-15 9-Oct-15 22-Feb-16
7 Indrapura - Tapan West Sumatera 019.0 19.50 178,600.23 11.91 NCB Post Prior Schedule 14-Jul-14 28-Jul-14 04-Aug-14 18-Aug-14 25-Aug-14 29-Sep-14 3-Nov-14 17-Nov-14 29-Dec-14 28-Jan-15 19-Oct-16Revised 01-Dec-14 15-Dec-14 11-Mar-15 25-Mar-15 1-Apr-15 6-May-15 11-Jun-15 25-Jun-15 21-Aug-15 4-Sep-15 25-May-17Actual 18-Dec-14 22-Dec-14 12-May-15 26-May-15 28-May-15 13-Aug-15 9-Oct-15 12-Oct-15 3-Dec-15 10-Dec-15 30-Aug-17
781 28-Jan-18Date of Taking Over Certificate 28-Jan-18
12 Kambang - Indrapura West Sumatera 017.2 55.20 451,810.58 30.12 ICB Post Prior Schedule 14-Jul-14 28-Jul-14 04-Aug-14 18-Aug-14 25-Aug-14 06-Oct-14 10-Nov-14 24-Nov-14 17-Jan-15 16-Feb-15 5-Feb-17Revised 01-Dec-14 15-Dec-14 11-Mar-15 25-Mar-15 1-Apr-15 6-May-15 11-Jun-15 25-Jun-15 21-Aug-15 4-Sep-15 23-Aug-17Actual 18-Dec-14 22-Dec-14 12-May-15 26-May-15 28-May-15 13-Aug-15 9-Oct-15 26-Nov-15 28-Jan-16 23-May-16 12-May-18
798 29-Jul-18
14 Painan - Kambang West Sumatera 017.1 31.50 267,588.30 17.84 NCB Post Prior Schedule 01-Oct-14 15-Oct-14 01-Oct-14 15-Oct-14 22-Oct-14 26-Nov-14 31-Dec-14 14-Jan-15 25-Feb-15 11-Mar-15 30-Nov-16Revised 10-Jul-15 24-Jul-15 10-Aug-15 24-Aug-15 2-Nov-15 16-Dec-15 13-Jan-16 27-Jan-16 2-Mar-16 16-Mar-16 5-Dec-17Actual 10-Sep-15 22-Oct-15 22-Oct-15 2-Nov-15 5-Jan-16 22-Mar-16 4-Apr-16 1-Jun-16 3-Aug-16 24-Apr-18
684 17-Jun-18
PT. PP (Persero), Tbk.
PT. Nusa KonstruksiEnjiniring, Tbk.
PT. Waskita Karya(Persero), Tbk.
Amendments
214,327,429,680
CANCELED
Amendments
Amendments
Amendments
Amendments
Amendments
355,500,000,000PT. PP (Persero), Tbk.- PT.Statika Mitrasarana, J.O.
260,100,000,011
PT. Adhi Karya (Persero),Tbk. 129,699,900,000
PT. Lancarjaya MandiriAbadi - PT. Cahaya TunggalAbadi, J.O.
358,650,400,000
630 KSO YASA - CONBLOC
720
Amendments
Amendments
Amendments
Amendments
Amendments
143,688,963,000
186,936,750,000
810
720
720
630
PT. Waskita Karya(Persero), Tbk. and PT.
Daya Mulia Turangga, J.O.
300
Amendments
Amendments
33,689,452,000
PT. Waskita Karya(Persero), Tbk.
Ref. No. Province Procurement Method
Estimated CostEE
(Incl. VAT)
Estimated CostEE
(Incl. VAT)
Bid Evaluation Report ContractSignature
DateWB NOL
640
730
730
730
720
540
720
720
450
WB Prior/Post
Rewiew
Design
Submission Date
WB NOLDate
Evalt.QualificationReport Bidding Document Commenc
ementDate
Construction
Period(day)
SubmissionDate NOL Date
PT. Jaya KonstruksiManggala Pratama, Tbk.
SubmissionDate
PT. Jaya KonstruksiManggala Pratama, Tbk.
Amendments
197,936,699,000
Amendments
PT. Rodateknindo Purajaya.
86,517,470,000
PT. Jaya KonstruksiManggala Pratama, Tbk.
107,321,260,310
228,899,717,000
199,551,233,000
292,700,000,000
Invitationfor Bids
Date
BidOpening
DateWB NOLDate
SubmissionDate
PT. Hutama Karya (Persero)and PT. Daya Mulia
Turangga, J.O.
Contract Amount(Incl. VAT10%)Completion
Date
134,909,211,000
PT. Jaya KonstruksiManggala Pratama, Tbk.
WB NOLDate
Submission Date
PQ Document Invitation forPre-
qualification
C:\Users\Tediero\AppData\Local\Temp\Appendix 4 - Proc Plan WINRIP CivilWorks 20190331_5A5938
Qualification Schedule Submission Notification Contractor
Sub - Project Link No. Length Criteria Actual of of(Km) IDR (x10
⁶) USD million (Pre/Post) Application Qualification IDR
Ref. No. Province Procurement Method
Estimated CostEE
(Incl. VAT)
Estimated CostEE
(Incl. VAT)
Bid Evaluation Report ContractSignature
DateWB NOL
WB Prior/Post
Rewiew
Design
Submission Date
WB NOLDate
Evalt.QualificationReport Bidding Document Commenc
ementDate
Construction
Period(day)
SubmissionDate NOL Date Submission
Date
Invitationfor Bids
Date
BidOpening
DateWB NOLDate
SubmissionDate
Contract Amount(Incl. VAT10%)Completion
DateWB NOLDate
Submission Date
PQ Document Invitation forPre-
qualification
16 Seblat - Ipuh, Including Bengkulu 009.4 34.50 269,559.20 17.97 NCB Post Prior Schedule 01-Oct-14 15-Oct-14 01-Oct-14 15-Oct-14 22-Oct-14 26-Nov-14 31-Dec-14 14-Jan-15 25-Feb-15 11-Mar-15 31-Jan-17Air Lalang & Air Guntung Bridge 0.060 Revised 10-Jul-15 24-Jul-15 10-Aug-15 24-Aug-15 22-Oct-15 19-Nov-15 17-Dec-15 31-Dec-15 4-Feb-16 18-Feb-16 9-Jan-18
Actual 4-Sep-15 22-Oct-15 30-Sep-15 22-Oct-15 22-Oct-15 19-Nov-15 11-Jan-16 24-Aug-16 28-Oct-16 8-Nov-16 30-Sep-18
20 Lubuk Alung - Sicincin West Sumatera 002.0 14.60 131,302.20 8.75 NCB Post Prior Schedule 01-Oct-14 15-Oct-14 01-Oct-14 15-Oct-14 22-Oct-14 26-Nov-14 31-Dec-14 14-Jan-15 11-Feb-15 25-Feb-15 18-Aug-16Revised 10-Jul-15 24-Jul-15 10-Aug-15 24-Aug-15 2-Nov-15 16-Dec-15 13-Jan-16 27-Jan-16 2-Mar-16 16-Mar-16 6-Sep-17Actual 25-Aug-15 22-Oct-15 22-Oct-15 2-Nov-15 5-Jan-16 22-Mar-16 23-Mar-16 1-Jun-16 1-Sep-16 22-Feb-18
548 2-Mar-18Date of Taking Over Certificate 02-Mar-18
21 Lubuk Alung - Kuraitaji West Sumatera 027.0 16.23 164,629.30 10.98 NCB Post Prior Schedule 01-Oct-14 15-Oct-14 01-Oct-14 15-Oct-14 22-Oct-14 26-Nov-14 31-Dec-14 14-Jan-15 11-Feb-15 25-Feb-15 18-Aug-16Revised 10-Jul-15 24-Jul-15 10-Aug-15 24-Aug-15 2-Nov-15 16-Dec-15 13-Jan-16 27-Jan-16 2-Mar-16 16-Mar-16 6-Sep-17Actual 25-Aug-15 22-Oct-15 22-Oct-15 02-Nov-15 05-Jan-16 22-Mar-16 23-Mar-16 01-Jun-16 1-Sep-16 22-Feb-18
666 28-Jun-18 TERMINATED
18 Mukomuko - Batas Sumbar Bengkulu 015.3 25.80 69,233.00 4.62 NCB Post Prior ScheduleRevised
Actual
9 Rantau Tijang - Kota Agung Lampung 026.1 42.00 149,831.00 9.99 NCB Post Prior ScheduleRevisedActual
5A 65,726.63 4.38 NCB Post Post Schedule 06-Mar-18 20-Mar-18 19-Mar-18 02-Apr-18 16-Apr-18 16-May-18 - - 27-Jun-18 2-Jul-18 150 29-Nov-18
Actual 13-Mar-18 15-Mar-18 10-Apr-18 18-Apr-18 24-Apr-18 16-May-18
79,780.00 5.32 NCB Post Post RebiddingSchedule 30-Aug-18 20-Sep-18 11-Oct-18 - 1-Nov-18 15-Nov-18 180 13-May-19Rebidding
Actual 30-Aug-18 20-Sep-18 07-Nov-18 09-Jan-19
78,933.34 5.26 2ndRebidding 28-Jan-19 18-Feb-19 04-Mar-19 - 28-Mar-19 11-Apr-19 300 4-Feb-20Rebidding
Actual 30-Jan-19 21-Feb-19 05-Mar-19 -
21A West Sumatera 027.0 16.23 99,019.00 6.60 NCB Post Post Schedule 20-Aug-18 31-Aug-18 21-Sep-18 - 24-Sep-18 15-Oct-18 5-Nov-18 - 26-Nov-18 10-Dec-18 9-May-19Revised 1-Oct-18 - 11-Oct-18 1-Nov-18 30-Nov-18 21-Dec-18 3-Jan-19 1-Jun-19
Actual
RR01 Central Sulawesi 48.43 204,322.19 13.62 NCB Post Post Schedule 25-Feb-19 11-Mar-19 14-Mar-19 - 18-Mar-19 8-Apr-19 29-Apr-19 - 4-Jun-19 18-Jun-19 10-Oct-20Revised
Actual
RR02 Central Sulawesi 32.74 177,636.23 11.84 NCB Post Post Schedule 25-Feb-19 11-Mar-19 14-Mar-19 - 18-Mar-19 8-Apr-19 29-Apr-19 - 4-Jun-19 18-Jun-19 10-Oct-20Revised -
Actual
Sub Total AWP - 2 & 3 4,612,778.23 307.52 2,563,351,040,680
Total AWP - 1 , 2 & 3 5,419,868.95 361.32 3,355,860,343,552USD 223,724,023
Note: USD 156,606,8161 USD = (Exchange rate assumption for RAPBN FY 2019, Ministry of Finance)
Tompe - Dalam Kota Palu -Surumana
Palupi-Simoro, Kalukubula -Kalawara, Birobuli - Palolo and
Akses Huntap
North Sumatera 015. 0.69
Penanganan Lereng Ruas Sp.Rampa - Poriaha
Amendments
480
480
018. 019.020.
no bidders pass the qualification
150KSO PT. Nusa Konstruksi
Enjiniring, Tbk. - PT.Multikon Jagad Perkasa
83,264,709,000
540
no bidders pass the qualification
540
113,818,300,000Amendments
PT. Multi Structure 126,301,900,000
Lubuk Alung - Kuraitaji(Penyelesaian)
692KSO. PT. Yasa PatriaPerkasa - PT. Multi
Structure211,374,500,000
PT. Nindya Karya (Persero)
Rp15,000.00
CANCELED
CANCELED
C:\Users\Tediero\AppData\Local\Temp\Appendix 4 - Proc Plan WINRIP CivilWorks 20190331_5A5938
Procurement Plan of Implementation SupportWestern Indonesia National Roads Improvement Project (WINRIP)Executing Agency: Directorate General of Highways , Ministry of Public Works and Housing.
Ref.No. Contract Description Project Cost
(US$)Procurement
Method
Review byBank
(Prior/Post)Schedule
Preparationof Draft
REOI
EOIadvertised in
MPWWebsite
Dateline ofEOI
Submission
SubmissionRFP to WB WB NOL to RFP
Opening ofFinancialProposal
FinalEvaluation
Report
ContractSign
Service Startdate Consultant Remarks
Allocated Original Addendum Actual Submission WB NOL Submission WB NOL Submission Submission WB NOL Original Addendum
2 Implementation Support
Schedule 14-Nov-10 05-Dec-10 23-Jan-11 12-Feb-11 12-Mar-11 02-Apr-11 23-Apr-12 04-Jun-12 22-Jul-12 05-Aug-12 12-Aug-12 15-Sep-12 29-Sep-12 22-Oct-12 12-Nov-12
Actual 26-Nov-10 7-Jun-11 7-Jul-11 30-Jan-12 7-Mar-12 9-Dec-11 6-Mar-12 20-Mar-14 30-Apr-12 14-Jun-12 29-Jun-12 27-Aug-12 3-Sep-12 21-Sep-12 12-Oct-12 5-Nov-12 16-Nov-12
Schedule 11-Dec-11 08-Jan-12 27-Feb-12 26-Mar-12 07-May-12 28-May-12 08-Oct-12 22-Oct-12 05-Nov-12 12-Nov-12 19-Nov-12 26-Nov-12 01-Apr-13 18-Apr-13 02-May-13
Actual 26-Nov-10 7-Jun-11 7-Jul-11 4/2/2012 10-Aug-12 20-Jan-12 23-May-12 31-Aug-14 23-Oct-12 20-Dec-12 21-Feb-13 5-Mar-13 13-Mar-13 25-Mar-13 19-Apr-13 11-Jun-13 25-Jun-13
Schedule 15-Dec-15 22-Dec-15 19-Jan-16 29-Jan-16 12-Feb-16 05-Feb-16 19-Feb-16 26-Feb-16 08-Apr-16 06-May-16 20-May-16 03-Jun-16 17-Jun-16 15-Jul-16 29-Jul-16 12-Aug-16 26-Aug-16 12
Revised 24-Jun-16 15-Jul-15 04-Aug-16 01-Aug-16 08-Aug-16 18-Aug-16 26-Aug-16 29-Aug-16 28-Sep-16 21-Oct-16 04-Nov-16 21-Nov-16 25-Nov-16 05-Dec-16 16-Dec-16 13-Jan-17 23-Jan-17 11
2nd Revised 02-Nov-16 05-Dec-16 09-Jan-17 23-Jan-17 18-Apr-17 28-Apr-17 10-May-17 17-May-17 14-Jun-17 19-Jun-17 11
Actual 24-Jun-16 15-Jul-15 4-Aug-16 18-Aug-16 23-Sep-16 2-Sep-16 27-Oct-16 2-Nov-16 5-Dec-16 12-Jan-17 7-Apr-17 20-Apr-17 15-May-17 19-May-17 15-Jun-17 7-Jul-17 13-Jul-17 11 17
Schedule 25-Feb-19 04-Mar-19 19-Mar-19 - - 26-Mar-19 - 27-Mar-19 25-Apr-19 13-May-19 - 27-May-19 30/5/19 06-Jun-19 - 01-Jul-19 08-Jul-19 18
Revised
T O T A L
Date ofReceipt ofProposals
Prior
Evaluation and Short List Technical EvaluationReport Negotiation & Draft Contract
Prior
Theissuance
RFP to theshortlisted
firms
QCBS
QCBS
PT. Perentjana Djaja,Yongma Eng. Co. Ltdand PT. Epadascon
Permata EngineeringConsultant
Renardet S.A., PT.Cipta Strada, PT. DayaCreasi Mitrayasa, PT.Seecons, PT. Yodya
Karya (Persero)
Serviceperiod untilJanuary 31,2021
Serviceperiod untilJanuary 31,2020
Post
Updated March 31, 2019
PT. Egis InternationalIndonesia, PT.
Disiplan Consult, PT.Widya Graha Asana.
98.83
80
USD 155,300. +IDR
6,577,000,000.
USD 83,150. + IDR5,425,375,000. QCBS Prior
Period (Month)
40
42
Contract(US$)
(excl. VAT)
USD 2,160,443 +IDR
55,929,557,554
USD 1,268,040 +IDR
74,260,260,482
USD 1,276,700 +IDR
21,415,400,000
USD 820,600+
IDR51,818,705,000
d Construction Supervision Consultant (CSC) QCBS
20,000,000
Technical Assistance for Development of SlopeStabilization, Design and Management, Western
Indonesia Roadsc
aCore Team Consultant (Project Management,Technical Assistant, Enviromental & Social Aspectand Road safety Audit)
bDesign and Supervision Consultant (Design AWP-2 & 3 and Construction Supervision of Civil WorksProject)
C:\Users\Tediero\AppData\Local\Temp\Appendix 5 - Proc Plan WINRIP Consultants 20190331_4F6AC4
No.
Pac
kage
Nam
e of
Pack
age
Sele
ctio
n Da
te
Trai
ning
Dat
e
Loca
tion
Telp. Email
Date
of P
re-B
idM
eetin
g an
d Si
teVi
sit
Date
of B
idO
peni
ng
No
Obj
ectio
nLe
tter
from
Wor
ldBa
nk
Anno
unce
men
tof
Bid
Win
ner
Pre-
Bid
Mee
ting
Bid
Ope
ning
1 Ir. Lukman MuizziJl. Poltek Grya Mitra A-5 RT07/RW 02, Bukit Lama,Palembang
08127118508 [email protected] of MuhammadiyahPalembang University
2 Ir. WahidinPerum Politeknik NegeriSriwijaya
08127853585 [email protected] of Politeknik NegeriSriwijaya
1 Ir. Masril Syukur, M.ScJl. Handayani I No. 11, Steba,Padang
081267170435 [email protected]
Head Admission ofProcurement ConstructionCommittee of AndalasUniversity
2 Darwizal Daoed, MTKomplek Pelangi Indah BlokC4/4, Kuranji, Padang
08126603921 [email protected]
Lecturer of AndalasUniversity
1Ir. Jafril Tanjung, MT.,DR.,Eng
Jl. Banuaran Gg. Mesjid RayaNo. 47, Padang
08126623930 [email protected] of AndalasUniversity
2 Prof. Dr. Ir. Zaidir,MSKomp. Cendana Perak KopiBlok A-9, Padang
08126622012 [email protected] of ProcurementServices Unit of AndalasUniversity
1 Sartika Nisumanti, ST.,MTJl. Anggrek Raya No. 629,Palembang
081377924368 [email protected] of Indo GlobalMandiri University
2 Ir. Zainuddin Muchtar,MTJl. Putri Kembang Dadar No.110, B. Sibuntang,Palembang
08179766579 [email protected]
Lecturer of Politeknik NegeriSriwijaya
1Ir. Yohanes Martono Hadi,MT
Jl. Bungur No. 3/4 Blok TC 1,Way Halim Permai, TanjungKarang, Bandar Lampung
0816414590 [email protected] of LampungUniversity
2 Ofik Taufik Purwadi, ST.,MTJl. Z.A. Pagar Alam No. 26,Bandar Lampung
081279647013 [email protected] of LampungUniversity
1Medis Sejahtera Surbakti,ST., MT
Jl. Perpustakaan No. 1,University of NorthSumatera.
081396565879 [email protected] of University ofNorth Sumatera
2 Josep Admika Ginting, STJl. Industri No. 75, TanjungMorawa.
0811638886 [email protected] of EngineeringLearning and Training CenterMedan
Package
Sept 18,2013
Sept 18,2013
Sept 18,2013
Sept 18,2013
July18,
2014
Aug21,
2014NCB
Oct 14,2014
Feb. 02,2015 ˅
Des16,
2013
Sept22,
2014
Oct 16,2014
Aug 20,2014
BBPJN I Office, Jl. SaktiLubis No. 1, Medan
6North
Sumatera05
Sp. Rampa -Poriaha
Aug 20,2014
5 Lampung 17
Sp. GunungKemala -PugungTampak
July 17,2014
Aug15,
2014
June25,
2014
July 17,2014
Satker PJN II Office, Jl.Wolter MongonsidiNo. 220 B, Bandar
Lampung
03Manggopoh -Pd. Sawah
May 27,2013
May 27,2013
BBPJN II Office, Jl. JatiNo. 109 Padang
2West
Sumatera02
Pd. Sawah -Simp. Empat
May 27,2013
May 27,2013
May 23,2013
BBPJN III Office, Jl. H.M. Noerdin Pandji No.
78 Palembang4 Bengkulu 04 Ipuh - Bantal
May 23,2013
WestSumatera
3
Nov 26,2013
Nov 26,2013
Oct 28,2013
BBPJN II Office, Jl. JatiNo. 109 Padang
May20,
2013
July18,
2013
May 23,2013
May20,
2013
July18,2013
May17,2013
July18,2013
June10,
2013
June10,
2013
June10,
2013
June10,
2013
CRO's Address
CRO's Contact
CRO's Occupation
CRO Selection and Training
Appendix 6.A List of Names of Community Representative Observers (CROs)
May17,
2013
BBPJN III Office, Jl. H.M. Noerdin Pandji No.
78 Palembang
July18,
20131 Lampung 01 Krui - Biha
Date
of I
nvita
tion
to B
id
No Province
May23,
2013
CRO's Involvement in BiddingProcess
Name of Selected CRO
Nov 12,2013
Reports Related toCRO's Activity
˅
˅
˅
˅
˅
˅
˅
˅
˅
˅
˅
No.
Pac
kage
Nam
e of
Pack
age
Sele
ctio
n Da
te
Trai
ning
Dat
e
Loca
tion
Telp. Email
Date
of P
re-B
idM
eetin
g an
d Si
teVi
sit
Date
of B
idO
peni
ng
No
Obj
ectio
nLe
tter
from
Wor
ldBa
nk
Anno
unce
men
tof
Bid
Win
ner
Pre-
Bid
Mee
ting
Bid
Ope
ning
Package
CRO's Address
CRO's Contact
CRO's Occupation
CRO Selection and Training
Date
of I
nvita
tion
to B
id
No Province
CRO's Involvement in BiddingProcess
Name of Selected CRO
Reports Related toCRO's Activity
1 Hesti Aulia Sari, STJl. Mahakam Raya No. 27 Rt.9 Rw. 3, Kota Bengkulu.
085266724618 [email protected]
Assisstant of Lecturer ofBengkulu University
2 Rendesti Nofy Yelizar, STJl. R.A. Kartini Rt. 7 No. 01,Bengkulu Utara.
081373447043 [email protected]
Assisstant of Lecturer ofBengkulu University
1 Hot Maria AngelinaJl. Beo No. 60 Rt. 05 Rw. 02,Perumnas Lingkar Barat,Bengkulu.
085788095319 [email protected] of Lecturer ofBengkulu University
2 Muhammad Fauzi, ST., MT
Jl. Unib Permai Blok 1 No. 50, Pematang Gubernur,Muara Bangkahulu,Bengkulu.
081367690429 [email protected] of BengkuluUniversity
1 Muhammad Fauzi, ST., MT
Jl. Unib Permai Blok 1 No. 50, Pematang Gubernur,Muara Bangkahulu,Bengkulu.
081367690429 [email protected] of BengkuluUniversity
2 Hot Maria Angelina, STJl. Beo No. 60 Rt. 05 Rw. 02,Perumnas Lingkar Barat,Bengkulu.
085788095319 [email protected] of Lecturer ofBengkulu University
1 Hesti Aulia Sari, STJl. Mahakam Raya No. 27 Rt.9 Rw. 3, Kota Bengkulu. 085266724618
Assisstant of Lecturer ofBengkulu University
2 Agung Febrianto, STDwi Tunggal RT 02/RW 003,Curup Utara - Bengkulu.
085366851999 [email protected]
Assisstant of Lecturer ofBengkulu University
1Ernie Shinta Y. Sitanggang,ST., MT
Jl. Eka Surya PerumahanTaman Monaco Blok E No.17, Medan Johor.
081264881193 [email protected]
Lecturer of Politeknik NegeriMedan
2 Ir. M. Koster Silaen, MTJl. Pintu Air IV No. 296/41Komplek Politeknik NegeriMedan.
081376506226 [email protected] of Politeknik NegeriMedan
1 Ir. Riswandi, M.SiJl. Lubuk Bayu No. 1 KurauPagang Nanggalo, Padang.
08126713602 [email protected]
Lecturer of Politeknik NegeriPadang
2 Apwiddhal, ST.,MTJl. Garuda No. 1 Air TawarTimur, Padang. 081374698872 [email protected]
Lecturer of Politeknik NegeriPadang
Jun. 12,2015 ˅BBPJN I Office, Jl. Sakti
Lubis No. 1, MedanJan 9,2015
Feb23,
2015
Feb 12,2015 ˅
NCBFeb 12,
2015
Sept 8,2014
Sept 8,2014
May. 7,2015
Dec29,
2014
Nov 18,2014
Oct 3,2014
Dec29,
2014
12West
Sumatera
NCB
Jan 26,2015
11North
SUmatera15
Sibolga - BatasTapsel
Dec 16,2014
Dec 16,2014
Dec 5,2014
10 Bengkulu 19 Lais - BintunanNov 27,
2014Nov 27,
2014
Satker PJN I Bengkulu,Jl. Ir. Rustandi
Sugianto Km. 12+225,Pulau Baai, Bengkulu
Nov24,
2014
9 Bengkulu 06Pasar Pedati -Kerkap
Nov 27,2014
Nov 27,2014
Satker PJN I Bengkulu,Jl. Ir. Rustandi
Sugianto Km. 12+225,Pulau Baai, Bengkulu
Nov24,
2014
Dec 5,2014
8 Bengkulu 13Sp. Rukis -TanjungKemuning
Sept 1,2014
Sept 1,2014
Satker PJN I Bengkulu,Jl. Ir. Rustandi
Sugianto Km. 12+225,Pulau Baai, Bengkulu
Nov 13,2014
Nov 14,2014 ˅
Nov 28,2014 ˅
Aug22,
2014
Oct 3,2014
Aug22,
2014
Satker PJN I Bengkulu,Jl. Ir. Rustandi
Sugianto Km. 12+225,Pulau Baai, Bengkulu
Sept 1,2014
Sept 1,2014
7 Bengkulu 11Bantal -Mukomuko ˅
˅
˅
˅
˅
˅
Nov 13,2015 ˅ ˅Jun 12,
2015Jun 12,2015
BBPJN II Office, Jl. JatiNo. 109 Padang
Jun 1,2015
Jun 15,2015
Aug13,
201507
Indrapura -Tapan
Oct 12,2015
No.
Pac
kage
Nam
e of
Pack
age
Sele
ctio
n Da
te
Trai
ning
Dat
e
Loca
tion
Telp. Email
Date
of P
re-B
idM
eetin
g an
d Si
teVi
sit
Date
of B
idO
peni
ng
No
Obj
ectio
nLe
tter
from
Wor
ldBa
nk
Anno
unce
men
tof
Bid
Win
ner
Pre-
Bid
Mee
ting
Bid
Ope
ning
Package
CRO's Address
CRO's Contact
CRO's Occupation
CRO Selection and Training
Date
of I
nvita
tion
to B
id
No Province
CRO's Involvement in BiddingProcess
Name of Selected CRO
Reports Related toCRO's Activity
1M. Nursyaifi Yulius, MT (Mgt)
Jl. Gadih Rantih Ujung No.20B, Padang.
08126608128 [email protected] of Bung HattaUniversity
2 Ir. Alzahri, MT Komp. Polamas Blok W5,Padang.
082388122008 [email protected] of Bung HattaUniversity
1 Ir. Drs. Heldi, M.SiJl. Bandes Parak SigarangNo. I 3,Kuranji, Padang.
081363428468 [email protected] of Bung HattaUniversity
2 Ir. Afrizal Naumar, MT Jl. Ulak Karang, Padang. 081363418758Lecturer of Bung HattaUniversity
1 Syaiful Amri, SST.,MTJl. Andalas Gg. Sarga IndahNo. 43, Padang.
081363435968 [email protected]
Lecturer of Politeknik NegeriPadang
2 B. Army, ST.,MTTaman Bamaran Indah BlokP No. 3. Padang
085274352715 [email protected] of Politeknik NegeriPadang
1 Besperi, ST., MTJl. WR. Supratman, KandangLimun - Bengkulu.
Lecturer of BengkuluUniversity
2 Anggi Nidya Sari, ST., MTJl. Halmahera RT 2 RW 3 No.5, Bengkulu.
082180708080 [email protected] of BengkuluUniversity
1 M. Nursyaifi Yulius, MT (Mgt)Jl. Gadih Rantih Ujung No.20B, Padang.
08126608128 [email protected] of Bung HattaUniversity
2 Ir. Alzahri, MTKomp. Polamas Blok W5,Padang. 082388122008 [email protected]
Lecturer of Bung HattaUniversity
1 Ir. Riswandi, M.SiJl. Lubuk Bayu No. 1 KurauPagang Nanggalo, Padang.
08126713602 [email protected]
Lecturer of Politeknik NegeriPadang
2 Syaiful Amri, SST.,MTJl. Andalas Gg. Sarga IndahNo. 43, Padang.
081363435968 [email protected]
Lecturer of Politeknik NegeriPadang
1Ir. Jafril Tanjung, MT.,DR.,Eng
Jl. Banuaran Gg. Mesjid RayaNo. 47, Padang
08126623930 [email protected]
Lecturer of AndalasUniversity
2 T. Ophiyandri, PhDJl. Belibis Blok C No. 17, AirTawar - Padang.
Lecturer of AndalasUniversity
1 Ernie Shinta Sitanggang, ST,MT
Jl. Eka Surya PerumahanTaman Monaco Blok E No.17, Medan Johor.
081264881193 [email protected]
Lecturer of Politeknik NegeriMedan
March16,
2018
April27,
2018
May16,
2018-
May 21.2018 ˅ ˅
2 M. Koster Silaen, MTJl. Pintu Air IV No. 296/41Komplek Politeknik NegeriMedan.
081376506226 [email protected] of Politeknik NegeriMedan
Sept03,
2018
Sept10,
2018
Sept17,
2018-
Oct 15,2018 -
1M. Nursyaifi Yulius, MT(Mgt), PhD
Jl. Gadih Rantih Ujung No.20B, Padang. 08126608128 [email protected]
Lecturer of Bung HattaUniversity
2 Ir. Drs. Heldi, M.Si PhDJl. Bandes Parak SigarangNo. I 3,Kuranji, Padang.
081363428468 [email protected] of Bung HattaUniversity
20North
Sumatera05A
SlopeProtection of
Road Segmentof Rampa –
Poriaha /Mungkur
Dec 16,2014
Dec 16,2014
BBPJN II Office, Jl.Sakti Lubis No. 1,
Medan
Apr 4.2016
May 3.2016 ˅
16
17
18
19
Bengkulu
WestSumatera
20Lubuk Alung -Sicincin
Nov. 17,2015
21Lubuk Alung -Kuraitaji
Nov. 17,2015
14Painan -Kambang
Nov. 17,2015
Sept.26,
2016˅
˅
Nov18,
2015
Jan 5,2016
Mar 23,2016
May 3.2016 ˅ ˅
Nov. 17,2015
BBPJN II Office, Jl. JatiNo. 109 Padang
Nov 2,2015
Nov18,
2015
Jan 5,2016
Nov. 17,2015
BBPJN II Office, Jl. JatiNo. 109 Padang
Nov 2,2015
Nov18,
2015
Jan 5,2016
Mar 23,2016
May 3.2016 ˅ ˅
Nov. 17,2015
BBPJN II Office, Jl. JatiNo. 109 Padang
Nov 2,2015
˅16 Seblat - IpuhNov. 4,2015
Nov. 4,2015
Satker PJN I Bengkulu,Jl. Ir. Rustandi
Sugianto Km. 12+225,Pulau Baai, Bengkulu
Oct22,
2015
Nov 5,2015
Nov19,
2015
Augt 31,2016
13
14
15
WestSumatera
Jun 12,2015
08Bts. Pariaman -Manggopoh
Jun 12,2015
BBPJN II Office, Jl. JatiNo. 109 Padang
May28,
2015
Jun 15,2015
Aug13,
2015
Dec 9,2015
Jan 5,2016 ˅ ˅
Dele
ted
from
WIN
RIP
Prog
ram
˅
Dele
ted
from
the
prog
ram
Jun 12,2015
Jun 12,2015
BBPJN II Office, Jl. JatiNo. 109 Padang
12Kambang -Indrapura
May28,
2015
Jun 15,2015
Aug13,
2015
Nov 26,2015
Dec 29,2015 ˅ ˅
Jun 12,2015
Jun 12,2015
10Sp. Empat - Sp.Air Balam
BBPJN II Office, Jl. JatiNo. 109 Padang
May28,
2015
Jun 15,2015
Aug13,
2015
Feb 22,2016
Nov. 23,2018 - ˅21
WestSumatera
21ALubuk Alung -Kuraitaji
Sept.27,
2018
Sept. 27,2018
Satker PJN I WestSumatera, Jl. Kathib
Sulaiman No. 9Padang
Oct.11,
2018
Oct.18,
2018
Oct.25,
2018-
No ProvinceNo. of
packageName of Package Name of Appointed CRO Occupation of Appointed CRO
1. Ir. Lukman Muizzi Lecturer of Muhammadiyah Palembang University
2. Ir. Wahidin Lecturer of Politeknik Negeri Sriwijaya
1. Ir. Masril Syukur, M.Sc Head Admission of Procurement Construction Committee of Andalas University
2. Darwizal Daoed, MT.,DR.,Eng Lecturer of Andalas University
1. Ir. Jafril Tanjung,MT.,DR.Eng Lecturer of Andalas University
2. Prof. Dr. Zaidir, MS Head of Procurement Services Unit of Andalas University
1. Sartika Nisumanti, ST.,MT Lecturer of Indo Global Mandiri University
2. Ir. Zainuddin Muchtar, MT Lecturer of Politeknik Negeri Sriwijaya
1. Ir. Yohanes Martono Hadi, MT Lecturer of Lampung University
2. Ofik Taufik Purwadi, ST.,MT Lecturer of Lampung University
1. Medis Sejahtera Surbakti, ST., MT Lecturer of University of North Sumatera
2. Josep Admika Ginting, ST Trainer
1. Hesti Aulia Sari, ST Assisstant of Lecturer of Bengkulu University
2. Rendesti Nofy Yelizar, ST Assisstant of Lecturer of Bengkulu University
1. Hot Maria Angelina, ST Assisstant of Lecturer of Bengkulu University
2. Muhammad Fauzi, ST., MT Lecturer of Bengkulu University
1. Muhammad Fauzi, ST., MT Lecturer of Bengkulu University
2. Hot Maria Angelina, ST Assisstant of Lecturer of Bengkulu University
1. Hesti Aulia Sari, ST Assisstant of Lecturer of Bengkulu University
2. Agung Febrianto, ST Assisstant of Lecturer of Bengkulu University
1. Ernie Shinta Y. Sitanggang, ST., MT Lecturer of Politeknik Negeri Medan
2. Ir. M. Koster Silaen, MT Lecturer of Politeknik Negeri Medan
7 11 Bantal - Mukomuko
Bengkulu
11 North Sumatera 15 Sibolga - Batas Tapsel
9 06 Pasar Pedati - Kerkap
10 19 Lais - Bintunan
Bengkulu
3 03 Manggopoh - Pd. Sawah
Appendix 6.B List of Appointed CRO and their Occupation
2 02 Pd. Sawah - Simp. Empat
1 Lampung 01 Krui - Biha
West Sumatera
4 Bengkulu 04 Ipuh - Bantal
5 Lampung 17Sp. Gunung Kemala -
Pugung Tampak
6 North Sumatera 05 Sp. Rampa - Poriaha
8 13Sp. Rukis - Tanjung
Kemuning
No ProvinceNo. of
packageName of Package Name of Appointed CRO Occupation of Appointed CRO
1. Ir. Riswandi, M.Si Leturer of Politeknik Negeri Padang
2. Apwiddhal, ST.,MT Leturer of Politeknik Negeri Padang
1. M. Nursyaifi Yulius, MT (Mgt) Lecturer of Bung Hatta University
2. Ir. Alzahri, MT Lecturer of Bung Hatta University
1. Ir. Drs. Heldi, M.Si Lecturer of Bung Hatta University
2. Ir. Afrizal Naumar, MT Lecturer of Bung Hatta University
1. Syaiful Amri, SST.,MT Leturer of Politeknik Negeri Padang
2. B. Army, ST.,MT Leturer of Politeknik Negeri Padang
1. Besperi, ST., MT Lecturer of Bengkulu University
2. Anggi Nidya Sari, ST., MT Lecturer of Bengkulu University
1. M. Nursyaifi Yulius, MT (Mgt) Lecturer of Bung Hatta University
Ir. Alzahri, MT Lecturer of Bung Hatta University
2. Ir. Riswandi, M.Si Leturer of Politeknik Negeri Padang
1. Syaiful Amri, SST.,MT Leturer of Politeknik Negeri Padang
1. Ir. Jafril Tanjung, MT.,DR.Eng Lecturer of Andalas University of Padang
2. T. Ophiyandri, PhD Lecturer of Andalas University of Padang
1. Ernie Shinta Y. Sitanggang, ST., MT Lecturer of Politeknik Negeri Medan
2. Ir. M. Koster Silaen, MT Lecturer of Politeknik Negeri Medan
1. M. Nursyaifi Yulius, MT(Mgt), PhD Lecturer of Bung Hatta University
2. Ir. Drs. Heldi, M.Si, h Lecturer of Bung Hatta University
North Sumatera 05ASlope Protection of Road
Segment of Rampa –Poriaha / Mungkur
20
18 20 Lubuk Alung - Sicincin
19 21 Lubuk Alung - Kuraitaji
West Sumatera
16 Bengkulu 16 Seblat - Ipuh
17 14 Painan - Kambang
Kambang - Indrapura
21 West Sumatera 21A Lubuk Alung - Kuraitaji
12 07 Indrapura - Tapan
13 08 Bts. Pariaman - Manggopoh
West Sumatera
14 Sp. Empat - Sp. Air Balam10
15 12
No Province No. ofPackage
Name of Package SelectionDate
TrainingDate
Location Remarks
5 Lampung 17SP. Gunung Kemala -
Pugung Tampak July 17, 2014July 17,
2014Satker PJN II Office, Jl. Wolter Mongonsidi
No. 220 B, Bandar LampungAttended by 2 candidates from Lampung University, 1 candidate be the Primary CRO and another bethe Secondary CRO. CRO Training was held directly after the selection process.
6 NorthSumatera 05 Sp. Rampa - Poriaha Aug 20, 2014
Aug 20,2014 BBPJN I Office, Jl. Sakti Lubis No. 1, Medan
Attended by 2 candidates, one from University of North Sumatera and another from EngineeringLearning and Training Center (ELTC). The Primary CRO is the one from University of North Sumatera,and the Secondary CRO is the one from ELTC. CRO Training was held directly after the selection process.
7 11 Bantal - Mukomuko Sept 1, 2014 Sept 1,2014
Attended by 4 candidates from Bengkulu University. For Package number 11, a Primary CRO and aSecondary CRO selected from Bengkulu University. CRO Training was held directly after the selectionprocess.
8 13 Sp. Rukis - TanjungKemuning
Sept 1, 2014 Sept 1,2014
Attended by 4 candidates from Bengkulu University. For Package number 13, a Primary CRO and aSecondary CRO selected from Bengkulu University. CRO Training was held directly after the selectionprocess.
9 06 Pasar Pedati - KerkapAttended by 4 candidates from Bengkulu University. For Package number 06, a Primary CRO and aSecondary CRO selected from Bengkulu University. CRO Training was held directly after the selectionprocess.
10 19 Lais - BintunanAttended by 4 candidates from Bengkulu University. For Package number 19, a Primary CRO and aSecondary CRO selected from Bengkulu University. CRO Training was held directly after the selectionprocess.
Nov 27,2014
Satker PJN I Bengkulu, Jl. Ir. RustandiSugianto Km. 12+225, Pulau Baai, Bengkulu
Bengkulu
Bengkulu Nov 27, 2014
Satker PJN I Bengkulu, Jl. Ir. RustandiSugianto Km. 12+225, Pulau Baai, Bengkulu
Appendix 6.C CRO Selection and Training Process
BBPJN III Office, Jl. H. M. Noerdin Pandji No.78 Palembang
BBPJN II Office, Jl. Jati No. 109 Padang
May 23, 2013
May 27, 2013
3West
Sumatera 03 Manggopoh - Pd. Sawah
Ipuh - BantalBBPJN III Office, Jl. H. M. Noerdin Pandji No.
78 Palembang
Attended by 6 candidates, 2 candidates from Politeknik Negeri Sriwijaya, 1 candidate fromMuhammadiyah Palembang University, 2 candidates from Indo Global Mandiri Palembang University,and 1 candidate from Palembang University. For Package number 01, a Primary CRO selected fromMuhammadiyah Palembang University and a Secondary CRO selected from Politeknik Negeri Sriwijaya.CRO Training was held directly after the selection process.
Attended by 4 candidates from Andalas University. For Package number 02, a Primary CRO and aSecondary CRO selected from Andalas University. CRO Training was held directly after the selectionprocess.
Attended by 4 candidates from Andalas University. For Package number 03, a Primary CRO and aSecondary CRO selected from Andalas University. CRO Training was held directly after the selectionprocess.
Attended by 6 candidates, 2 candidates from Politeknik Negeri Sriwijaya, 1 candidate fromMuhammadiyah Palembang University, 2 candidates from Indo Global Mandiri Palembang University,and 1 candidate from Palembang University. For Package number 04, a Primary CRO selected from IndoGlobal Mandiri University and a Secondary CRO selected from Politeknik Negeri Sriwijaya. CRO Trainingwas held directly after the selection process.
May 23, 2013
May 23,2013
May 27,2013
May 23,2013
Krui - Biha
Pd. Sawah - Simp. Empat
4 Bengkulu 04
1 Lampung 01
2West
Sumatera 02
No Province No. ofPackage
Name of Package SelectionDate
TrainingDate
Location Remarks
11North
Sumatera 15 Sibolga - Batas Tapsel Dec 16, 2014Dec 16,
2014 BBPJN I Office, Jl. Sakti Lubis No. 1, MedanAttended by 2 candidates from State Polytecnic of Medan, 1 candidate be the Primary CRO and anotherbe the Secondary CRO. CRO Training was held directly after the selection process.
12 07 Indrapura - Tapan Jun 12, 2015Jun 12,2015
Attended by 4 candidates from State Polytecnic of Padang and 4 candidates from Bung HattaUniversity. For Package 07, a Primary CRO and a Secondary CRO selected from State Polytecnic ofPadang. CRO Training was held directly after the selection process.
13 08Bts. Pariaman -
Manggopoh Jun 12, 2015Jun 12,2015
Attended by 4 candidates from State Polytecnic of Padang and 4 candidates from Bung HattaUniversity. For Package 08, a Primary CRO and a Secondary CRO selected from Bung Hatta University.CRO Training was held directly after the selection process.
14 10 Sp. Empat - Sp. Air Balam Jun 12, 2015Jun 12,2015
Attended by 4 candidates from State Polytecnic of Padang and 4 candidates from Bung HattaUniversity. For Package 10, a Primary CRO and a Secondary CRO selected from Bung Hatta University.CRO Training was held directly after the selection process.
15 12 Kambang - Indrapura Jun 12, 2015Jun 12,2015
Attended by 4 candidates from State Polytecnic of Padang and 4 candidates from Bung HattaUniversity. For Package 12, a Primary CRO and a Secondary CRO selected from State Polytecnic ofPadang. CRO Training was held directly after the selection process.
16 Bengkulu 16 Seblat - IpuhNov. 04,
2015Nov. 04,
2015Satker PJN I Bengkulu, Jl. Ir. Rustandi
Sugianto Km. 12+225, Pulau Baai, Bengkulu
Attended by 2 candidates from Bengkulu University. For Package number 16, a Primary CRO and aSecondary CRO selected from Bengkulu University. CRO Training was held directly after the selectionprocess.
17 14 Painan - Kambang Nov. 17,2015
Nov. 17,2015
Attended by 6 candidates: 2 from State Polytecnic of Padang, 2 from Bung Hatta University, and 2 fromAndalas University. For Package 14, a Primary CRO and a Secondary CRO selected from Bung HattaUniversity. CRO Training was held directly after the selection process.
18 20 Lubuk Alung - SicincinNov. 17,
2015Nov. 17,
2015
Attended by 6 candidates: 2 from State Polytecnic of Padang, 2 from Bung Hatta University, and 2 fromAndalas University. For Package 20, a Primary CRO and a Secondary CRO selected from State Polytecnicof Padang. CRO Training was held directly after the selection process.
19 21 Lubuk Alung - KuraitajiNov. 17,
2015Nov. 17,
2015
Attended by 6 candidates: 2 from State Polytecnic of Padang, 2 from Bung Hatta University, and 2 fromAndalas University. For Package 21, a Primary CRO and a Secondary CRO selected from Andalas StateUniversity of Padang. CRO Training was held directly after the selection process.
20 NorthSumatera 05A
Slope Protection of RoadSegment of Rampa –Poriaha / Mungkur
Dec 16, 2014Dec 16,
2014 BBPJN I Office, Jl. Sakti Lubis No. 1, MedanAttended by 2 candidates from State Polytecnic of Medan, 1 candidate be the Primary CRO and anotherbe the Secondary CRO. CRO Training was held directly after the selection process.
21 WestSumatera
21A Lubuk Alung - Kuraitaji Sept. 27,2018
Sept. 27,2018
Satker PJN I Office, Jl. Kathib Sulaiman No.9, Padang
Attended by 3 candidates from Bung Hatta University, 1 candidate be the Primary CRO and another bethe Secondary CRO. CRO Training was held directly after the selection process.
WestSumatera
BBPJN II Office, Jl. Jati No. 109 Padang
BBPJN II Office, Jl. Jati No. 109 PadangWestSumatera
Appendix 6.D
Date of Pre-Bid Meeting
Date of BidOpening
Announcement Dateof Bid Winner
1 Lampung 01 Krui - Biha May 17, 2013 June 10, 2013 July 18, 2013 Nov 12, 20131. Attending Pre-Bid Meeting on June 10, 2013, and Site Visit on June 13, 2013.2. Attending Bid Opening on July 18, 2013.
2 West Sumatera 02Pd. Sawah -Simp. Empat
May 20, 2013 June 10, 2013 July 18, 2013 Nov 26, 20131. Attending Pre-Bid Meeting on June 10, 2013, and Site Visit on June 11, 2013.2. Attending Bid Opening on July 18, 2013.
3 West Sumatera 03Manggopoh -
Pd. SawahMay 20, 2013 June 10, 2013 July 18, 2013 Nov 26, 2013
1. Attending Pre-Bid Meeting on June 10, 2013, and Site Visit on June 11, 2013.2. Attending Bid Opening on July 18, 2013.
4 Bengkulu 04 Ipuh - Bantal May 17, 2013 June 10, 2013 July 18, 2013 Oct 28, 20131. Attending Pre-Bid Meeting on June 10, 2013, and Site Visit on June 13, 2013.2. Attending Bid Opening on July 18, 2013.
5 Lampung 17SP. Gunung
Kemala -Pugung Tampak
June 25, 2014 July 18, 2014 Aug 15, 2014 Oct 16, 20141. Attending Pre-Bid Meeting on July 18, 2014, and Site Visit on July 19, 2014.2. Attending Bid Opening on August 15, 2014.
6 North Sumatera 05Sp. Rampa -
PoriahaDes 16, 2013 Aug 21, 2014 Sept 22, 2014 Feb. 02, 2015
1. Attending Pre-Bid Meeting on August 21, 2014, and Site Visit on August 22, 2014.2. Attending Bid Opening on Sepetmber 22, 2014.
7 Bengkulu 11Bantal -
MukomukoNov 14, 2014
1. Attending Pre-Bid Meeting on September 8, 2014, and Site Visit on September 9, 2014.2. Attending Bid Opening on October 3, 2014.
8 Bengkulu 13Sp. Rukis -Tanjung
KemuningNov 28, 2014
1. Attending Pre-Bid Meeting on September 8, 2014, and Site Visit on September 9, 2014.2. Attending Bid Opening on October 3, 2014.
9 Bengkulu 06Pasar Pedati -
Kerkap
10 Bengkulu 19 Lais - Bintunan
11 North Sumatera 15Sibolga - Batas
TapselDec 23, 2014 Jan 26, 2015 Feb 03, 2015 Jun. 12, 2015
1. Attending Pre-Bid Meeting and Site Visit on January 26, 2015.2. Attending Bid-Opening on February 23, 2015.
CRO's Involvement in the Bidding Process
Oct 3, 2014
1. Attending Pre-Bid Meeting and Site Visit on December 5, 2014.2. Attending Bid Opening on December 29, 2014.
Sept 8, 2014Aug 22, 2014
Reports of CRO Activity
Dec 29, 2014Nov 24, 2014 Dec 5, 2014 Feb 12, 2015
No ProvinceNo. of
PackageName ofPackage
Date ofInvitation to
Bid
Date of Pre-Bid Meeting
Date of BidOpening
Announcement Dateof Bid Winner
CRO's Involvement in the Bidding ProcessReports of CRO ActivityNo Province
No. ofPackage
Name ofPackage
Date ofInvitation to
Bid
12 07 Indrapura -Tapan
Jun 1, 2015 Jun 15, 2015 Aug 13, 2015 Nov. 13, 20151. Attending Pre-Bid Meeting and Site Visit on June 15, 2015.2. Attending Bid Opening on Augustus 13, 2015,
13 08Bts. Pariaman -
ManggopohMay 28, 2015 Jun 15, 2015 Aug 13, 2015 Jan. 5, 2016
1. Attending Pre-Bid Meeting and Site Visit on June 15, 2015.2. Attending Bid Opening on Augustus 13, 2015.
14 10 Sp. Empat - Sp.Air Balam
May 28, 2015 Jun 15, 2015 Aug 13, 2015 Under Process1. Attending Pre-Bid Meeting and Site Visit on June 15, 2015.2. Attending Bid Opening on Augustus 13, 2015.
15 12 Kambang -Indrapura
May 28, 2015 Jun 15, 2015 Aug 13, 2015 Dec. 29, 20151. Attending Pre-Bid Meeting and Site Visit on June 15, 2015.2. Attending Bid Opening on Augustus 13, 2015.
16 Bengkulu 16 Seblat - Ipuh Oct 22, 2015 Nov 5, 2015 Nov 19, 2015 Under Process1. Attending Pre-Bid Meeting and Site Visit on November 5, 2015.2. Attending Bid Opening on November 19, 2015.
17 14Painan -
KambangNov 2, 2015 Nov 18, 2015 Jan 5, 2016 May 3, 2016
1. Attending Pre-Bid Meeting and Site Visit on November 18, 2015.2. Attending Bid Opening on January 5, 2015.
18 20Lubuk Alung -
SicincinNov 2, 2015 Nov 18, 2015 Jan 5, 2016 May 3, 2016
1. Attending Pre-Bid Meeting and Site Visit on November 18, 2015.2. Attending Bid Opening on January 5, 2015.
19 21Lubuk Alung -
KuraitajiNov 2, 2015 Nov 18, 2015 Jan 5, 2016 May 3, 2016
1. Attending Pre-Bid Meeting and Site Visit on November 18, 2015.2. Attending Bid Opening on January 5, 2015.
16-Mar-18 24-Apr-18 16-May-18 21-May-181. Attending Pre-Bid Meeting on April 24, 2018. 2.Attending Bid-Opening on May 16, 2018.
3-Sep-18 10-Sep-18 17-Sep-18 15-Oct-181. Attending Pre-Bid Meeting on September 10, 2018.2. Attending Bid-Opening on September 17, 2018.
21 West Sumatera 21ALubuk Alung -
KuraitajiOct. 11, 2018 Oct. 18, 2018 Oct. 25, 2018 Nov. 23, 2018
1. Attending Pre-Bid Meeting on October 18, 2018.2. Attending Bid-Opening on October 25, 2018.
West Sumatera
20 North Sumatera 05A
Slope Protection ofRoad Segment of
Rampa – Poriaha /Mungkur
West Sumatera
No.
Pac
kage
Nam
e of
Pack
age
Sele
ctio
n Da
te
Trai
ning
Dat
e
Loca
tion
Telp. Email
Date
of P
re-B
idM
eetin
g an
d Si
teVi
sit
Date
of B
idO
peni
ng
No
Obj
ectio
nLe
tter
from
Wor
ldBa
nk
Anno
unce
men
tof
Bid
Win
ner
Pre-
Bid
Mee
ting
Bid
Ope
ning
1 Ir. Lukman MuizziJl. Poltek Grya Mitra A-5 RT07/RW 02, Bukit Lama,Palembang
08127118508 [email protected] of MuhammadiyahPalembang University
2 Ir. WahidinPerum Politeknik NegeriSriwijaya
08127853585 [email protected] of Politeknik NegeriSriwijaya
1 Ir. Masril Syukur, M.ScJl. Handayani I No. 11, Steba,Padang
081267170435 [email protected]
Head Admission ofProcurement ConstructionCommittee of AndalasUniversity
2 Darwizal Daoed, MTKomplek Pelangi Indah BlokC4/4, Kuranji, Padang
08126603921 [email protected]
Lecturer of AndalasUniversity
1Ir. Jafril Tanjung, MT.,DR.,Eng
Jl. Banuaran Gg. Mesjid RayaNo. 47, Padang
08126623930 [email protected] of AndalasUniversity
2 Prof. Dr. Ir. Zaidir,MSKomp. Cendana Perak KopiBlok A-9, Padang
08126622012 [email protected] of ProcurementServices Unit of AndalasUniversity
1 Sartika Nisumanti, ST.,MTJl. Anggrek Raya No. 629,Palembang
081377924368 [email protected] of Indo GlobalMandiri University
2 Ir. Zainuddin Muchtar,MTJl. Putri Kembang Dadar No.110, B. Sibuntang,Palembang
08179766579 [email protected]
Lecturer of Politeknik NegeriSriwijaya
1Ir. Yohanes Martono Hadi,MT
Jl. Bungur No. 3/4 Blok TC 1,Way Halim Permai, TanjungKarang, Bandar Lampung
0816414590 [email protected] of LampungUniversity
2 Ofik Taufik Purwadi, ST.,MTJl. Z.A. Pagar Alam No. 26,Bandar Lampung
081279647013 [email protected] of LampungUniversity
1Medis Sejahtera Surbakti,ST., MT
Jl. Perpustakaan No. 1,University of NorthSumatera.
081396565879 [email protected] of University ofNorth Sumatera
2 Josep Admika Ginting, STJl. Industri No. 75, TanjungMorawa.
0811638886 [email protected] of EngineeringLearning and Training CenterMedan
Package
Sept 18,2013
Sept 18,2013
Sept 18,2013
Sept 18,2013
July18,
2014
Aug21,
2014NCB
Oct 14,2014
Feb. 02,2015 ˅
Des16,
2013
Sept22,
2014
Oct 16,2014
Aug 20,2014
BBPJN I Office, Jl. SaktiLubis No. 1, Medan
6North
Sumatera05
Sp. Rampa -Poriaha
Aug 20,2014
5 Lampung 17
Sp. GunungKemala -PugungTampak
July 17,2014
Aug15,
2014
June25,
2014
July 17,2014
Satker PJN II Office, Jl.Wolter MongonsidiNo. 220 B, Bandar
Lampung
03Manggopoh -Pd. Sawah
May 27,2013
May 27,2013
BBPJN II Office, Jl. JatiNo. 109 Padang
2West
Sumatera02
Pd. Sawah -Simp. Empat
May 27,2013
May 27,2013
May 23,2013
BBPJN III Office, Jl. H.M. Noerdin Pandji No.
78 Palembang4 Bengkulu 04 Ipuh - Bantal
May 23,2013
WestSumatera
3
Nov 26,2013
Nov 26,2013
Oct 28,2013
BBPJN II Office, Jl. JatiNo. 109 Padang
May20,
2013
July18,
2013
May 23,2013
May20,
2013
July18,2013
May17,2013
July18,2013
June10,
2013
June10,
2013
June10,
2013
June10,
2013
CRO's Address
CRO's Contact
CRO's Occupation
CRO Selection and Training
Appendix 6.A List of Names of Community Representative Observers (CROs)
May17,
2013
BBPJN III Office, Jl. H.M. Noerdin Pandji No.
78 Palembang
July18,
20131 Lampung 01 Krui - Biha
Date
of I
nvita
tion
to B
id
No Province
May23,
2013
CRO's Involvement in BiddingProcess
Name of Selected CRO
Nov 12,2013
Reports Related toCRO's Activity
˅
˅
˅
˅
˅
˅
˅
˅
˅
˅
˅
No.
Pac
kage
Nam
e of
Pack
age
Sele
ctio
n Da
te
Trai
ning
Dat
e
Loca
tion
Telp. Email
Date
of P
re-B
idM
eetin
g an
d Si
teVi
sit
Date
of B
idO
peni
ng
No
Obj
ectio
nLe
tter
from
Wor
ldBa
nk
Anno
unce
men
tof
Bid
Win
ner
Pre-
Bid
Mee
ting
Bid
Ope
ning
Package
CRO's Address
CRO's Contact
CRO's Occupation
CRO Selection and Training
Date
of I
nvita
tion
to B
id
No Province
CRO's Involvement in BiddingProcess
Name of Selected CRO
Reports Related toCRO's Activity
1 Hesti Aulia Sari, STJl. Mahakam Raya No. 27 Rt.9 Rw. 3, Kota Bengkulu.
085266724618 [email protected]
Assisstant of Lecturer ofBengkulu University
2 Rendesti Nofy Yelizar, STJl. R.A. Kartini Rt. 7 No. 01,Bengkulu Utara.
081373447043 [email protected]
Assisstant of Lecturer ofBengkulu University
1 Hot Maria AngelinaJl. Beo No. 60 Rt. 05 Rw. 02,Perumnas Lingkar Barat,Bengkulu.
085788095319 [email protected] of Lecturer ofBengkulu University
2 Muhammad Fauzi, ST., MT
Jl. Unib Permai Blok 1 No. 50, Pematang Gubernur,Muara Bangkahulu,Bengkulu.
081367690429 [email protected] of BengkuluUniversity
1 Muhammad Fauzi, ST., MT
Jl. Unib Permai Blok 1 No. 50, Pematang Gubernur,Muara Bangkahulu,Bengkulu.
081367690429 [email protected] of BengkuluUniversity
2 Hot Maria Angelina, STJl. Beo No. 60 Rt. 05 Rw. 02,Perumnas Lingkar Barat,Bengkulu.
085788095319 [email protected] of Lecturer ofBengkulu University
1 Hesti Aulia Sari, STJl. Mahakam Raya No. 27 Rt.9 Rw. 3, Kota Bengkulu. 085266724618
Assisstant of Lecturer ofBengkulu University
2 Agung Febrianto, STDwi Tunggal RT 02/RW 003,Curup Utara - Bengkulu.
085366851999 [email protected]
Assisstant of Lecturer ofBengkulu University
1Ernie Shinta Y. Sitanggang,ST., MT
Jl. Eka Surya PerumahanTaman Monaco Blok E No.17, Medan Johor.
081264881193 [email protected]
Lecturer of Politeknik NegeriMedan
2 Ir. M. Koster Silaen, MTJl. Pintu Air IV No. 296/41Komplek Politeknik NegeriMedan.
081376506226 [email protected] of Politeknik NegeriMedan
1 Ir. Riswandi, M.SiJl. Lubuk Bayu No. 1 KurauPagang Nanggalo, Padang.
08126713602 [email protected]
Lecturer of Politeknik NegeriPadang
2 Apwiddhal, ST.,MTJl. Garuda No. 1 Air TawarTimur, Padang. 081374698872 [email protected]
Lecturer of Politeknik NegeriPadang
Jun. 12,2015 ˅BBPJN I Office, Jl. Sakti
Lubis No. 1, MedanJan 9,2015
Feb23,
2015
Feb 12,2015 ˅
NCBFeb 12,
2015
Sept 8,2014
Sept 8,2014
May. 7,2015
Dec29,
2014
Nov 18,2014
Oct 3,2014
Dec29,
2014
12West
Sumatera
NCB
Jan 26,2015
11North
SUmatera15
Sibolga - BatasTapsel
Dec 16,2014
Dec 16,2014
Dec 5,2014
10 Bengkulu 19 Lais - BintunanNov 27,
2014Nov 27,
2014
Satker PJN I Bengkulu,Jl. Ir. Rustandi
Sugianto Km. 12+225,Pulau Baai, Bengkulu
Nov24,
2014
9 Bengkulu 06Pasar Pedati -Kerkap
Nov 27,2014
Nov 27,2014
Satker PJN I Bengkulu,Jl. Ir. Rustandi
Sugianto Km. 12+225,Pulau Baai, Bengkulu
Nov24,
2014
Dec 5,2014
8 Bengkulu 13Sp. Rukis -TanjungKemuning
Sept 1,2014
Sept 1,2014
Satker PJN I Bengkulu,Jl. Ir. Rustandi
Sugianto Km. 12+225,Pulau Baai, Bengkulu
Nov 13,2014
Nov 14,2014 ˅
Nov 28,2014 ˅
Aug22,
2014
Oct 3,2014
Aug22,
2014
Satker PJN I Bengkulu,Jl. Ir. Rustandi
Sugianto Km. 12+225,Pulau Baai, Bengkulu
Sept 1,2014
Sept 1,2014
7 Bengkulu 11Bantal -Mukomuko ˅
˅
˅
˅
˅
˅
Nov 13,2015 ˅ ˅Jun 12,
2015Jun 12,2015
BBPJN II Office, Jl. JatiNo. 109 Padang
Jun 1,2015
Jun 15,2015
Aug13,
201507
Indrapura -Tapan
Oct 12,2015
No.
Pac
kage
Nam
e of
Pack
age
Sele
ctio
n Da
te
Trai
ning
Dat
e
Loca
tion
Telp. Email
Date
of P
re-B
idM
eetin
g an
d Si
teVi
sit
Date
of B
idO
peni
ng
No
Obj
ectio
nLe
tter
from
Wor
ldBa
nk
Anno
unce
men
tof
Bid
Win
ner
Pre-
Bid
Mee
ting
Bid
Ope
ning
Package
CRO's Address
CRO's Contact
CRO's Occupation
CRO Selection and Training
Date
of I
nvita
tion
to B
id
No Province
CRO's Involvement in BiddingProcess
Name of Selected CRO
Reports Related toCRO's Activity
1M. Nursyaifi Yulius, MT (Mgt)
Jl. Gadih Rantih Ujung No.20B, Padang.
08126608128 [email protected] of Bung HattaUniversity
2 Ir. Alzahri, MT Komp. Polamas Blok W5,Padang.
082388122008 [email protected] of Bung HattaUniversity
1 Ir. Drs. Heldi, M.SiJl. Bandes Parak SigarangNo. I 3,Kuranji, Padang.
081363428468 [email protected] of Bung HattaUniversity
2 Ir. Afrizal Naumar, MT Jl. Ulak Karang, Padang. 081363418758Lecturer of Bung HattaUniversity
1 Syaiful Amri, SST.,MTJl. Andalas Gg. Sarga IndahNo. 43, Padang.
081363435968 [email protected]
Lecturer of Politeknik NegeriPadang
2 B. Army, ST.,MTTaman Bamaran Indah BlokP No. 3. Padang
085274352715 [email protected] of Politeknik NegeriPadang
1 Besperi, ST., MTJl. WR. Supratman, KandangLimun - Bengkulu.
Lecturer of BengkuluUniversity
2 Anggi Nidya Sari, ST., MTJl. Halmahera RT 2 RW 3 No.5, Bengkulu.
082180708080 [email protected] of BengkuluUniversity
1 M. Nursyaifi Yulius, MT (Mgt)Jl. Gadih Rantih Ujung No.20B, Padang.
08126608128 [email protected] of Bung HattaUniversity
2 Ir. Alzahri, MTKomp. Polamas Blok W5,Padang. 082388122008 [email protected]
Lecturer of Bung HattaUniversity
1 Ir. Riswandi, M.SiJl. Lubuk Bayu No. 1 KurauPagang Nanggalo, Padang.
08126713602 [email protected]
Lecturer of Politeknik NegeriPadang
2 Syaiful Amri, SST.,MTJl. Andalas Gg. Sarga IndahNo. 43, Padang.
081363435968 [email protected]
Lecturer of Politeknik NegeriPadang
1Ir. Jafril Tanjung, MT.,DR.,Eng
Jl. Banuaran Gg. Mesjid RayaNo. 47, Padang
08126623930 [email protected]
Lecturer of AndalasUniversity
2 T. Ophiyandri, PhDJl. Belibis Blok C No. 17, AirTawar - Padang.
Lecturer of AndalasUniversity
1 Ernie Shinta Sitanggang, ST,MT
Jl. Eka Surya PerumahanTaman Monaco Blok E No.17, Medan Johor.
081264881193 [email protected]
Lecturer of Politeknik NegeriMedan
March16,
2018
April27,
2018
May16,
2018-
May 21.2018 ˅ ˅
2 M. Koster Silaen, MTJl. Pintu Air IV No. 296/41Komplek Politeknik NegeriMedan.
081376506226 [email protected] of Politeknik NegeriMedan
Sept03,
2018
Sept10,
2018
Sept17,
2018-
Oct 15,2018 -
1M. Nursyaifi Yulius, MT(Mgt), PhD
Jl. Gadih Rantih Ujung No.20B, Padang. 08126608128 [email protected]
Lecturer of Bung HattaUniversity
2 Ir. Drs. Heldi, M.Si PhDJl. Bandes Parak SigarangNo. I 3,Kuranji, Padang.
081363428468 [email protected] of Bung HattaUniversity
20North
Sumatera05A
SlopeProtection of
Road Segmentof Rampa –
Poriaha /Mungkur
Dec 16,2014
Dec 16,2014
BBPJN II Office, Jl.Sakti Lubis No. 1,
Medan
Apr 4.2016
May 3.2016 ˅
16
17
18
19
Bengkulu
WestSumatera
20Lubuk Alung -Sicincin
Nov. 17,2015
21Lubuk Alung -Kuraitaji
Nov. 17,2015
14Painan -Kambang
Nov. 17,2015
Sept.26,
2016˅
˅
Nov18,
2015
Jan 5,2016
Mar 23,2016
May 3.2016 ˅ ˅
Nov. 17,2015
BBPJN II Office, Jl. JatiNo. 109 Padang
Nov 2,2015
Nov18,
2015
Jan 5,2016
Nov. 17,2015
BBPJN II Office, Jl. JatiNo. 109 Padang
Nov 2,2015
Nov18,
2015
Jan 5,2016
Mar 23,2016
May 3.2016 ˅ ˅
Nov. 17,2015
BBPJN II Office, Jl. JatiNo. 109 Padang
Nov 2,2015
˅16 Seblat - IpuhNov. 4,2015
Nov. 4,2015
Satker PJN I Bengkulu,Jl. Ir. Rustandi
Sugianto Km. 12+225,Pulau Baai, Bengkulu
Oct22,
2015
Nov 5,2015
Nov19,
2015
Augt 31,2016
13
14
15
WestSumatera
Jun 12,2015
08Bts. Pariaman -Manggopoh
Jun 12,2015
BBPJN II Office, Jl. JatiNo. 109 Padang
May28,
2015
Jun 15,2015
Aug13,
2015
Dec 9,2015
Jan 5,2016 ˅ ˅
Dele
ted
from
WIN
RIP
Prog
ram
˅
Dele
ted
from
the
prog
ram
Jun 12,2015
Jun 12,2015
BBPJN II Office, Jl. JatiNo. 109 Padang
12Kambang -Indrapura
May28,
2015
Jun 15,2015
Aug13,
2015
Nov 26,2015
Dec 29,2015 ˅ ˅
Jun 12,2015
Jun 12,2015
10Sp. Empat - Sp.Air Balam
BBPJN II Office, Jl. JatiNo. 109 Padang
May28,
2015
Jun 15,2015
Aug13,
2015
Feb 22,2016
Nov. 23,2018 - ˅21
WestSumatera
21ALubuk Alung -Kuraitaji
Sept.27,
2018
Sept. 27,2018
Satker PJN I WestSumatera, Jl. Kathib
Sulaiman No. 9Padang
Oct.11,
2018
Oct.18,
2018
Oct.25,
2018-
No ProvinceNo. of
packageName of Package Name of Appointed CRO Occupation of Appointed CRO
1. Ir. Lukman Muizzi Lecturer of Muhammadiyah Palembang University
2. Ir. Wahidin Lecturer of Politeknik Negeri Sriwijaya
1. Ir. Masril Syukur, M.Sc Head Admission of Procurement Construction Committee of Andalas University
2. Darwizal Daoed, MT.,DR.,Eng Lecturer of Andalas University
1. Ir. Jafril Tanjung,MT.,DR.Eng Lecturer of Andalas University
2. Prof. Dr. Zaidir, MS Head of Procurement Services Unit of Andalas University
1. Sartika Nisumanti, ST.,MT Lecturer of Indo Global Mandiri University
2. Ir. Zainuddin Muchtar, MT Lecturer of Politeknik Negeri Sriwijaya
1. Ir. Yohanes Martono Hadi, MT Lecturer of Lampung University
2. Ofik Taufik Purwadi, ST.,MT Lecturer of Lampung University
1. Medis Sejahtera Surbakti, ST., MT Lecturer of University of North Sumatera
2. Josep Admika Ginting, ST Trainer
1. Hesti Aulia Sari, ST Assisstant of Lecturer of Bengkulu University
2. Rendesti Nofy Yelizar, ST Assisstant of Lecturer of Bengkulu University
1. Hot Maria Angelina, ST Assisstant of Lecturer of Bengkulu University
2. Muhammad Fauzi, ST., MT Lecturer of Bengkulu University
1. Muhammad Fauzi, ST., MT Lecturer of Bengkulu University
2. Hot Maria Angelina, ST Assisstant of Lecturer of Bengkulu University
1. Hesti Aulia Sari, ST Assisstant of Lecturer of Bengkulu University
2. Agung Febrianto, ST Assisstant of Lecturer of Bengkulu University
1. Ernie Shinta Y. Sitanggang, ST., MT Lecturer of Politeknik Negeri Medan
2. Ir. M. Koster Silaen, MT Lecturer of Politeknik Negeri Medan
7 11 Bantal - Mukomuko
Bengkulu
11 North Sumatera 15 Sibolga - Batas Tapsel
9 06 Pasar Pedati - Kerkap
10 19 Lais - Bintunan
Bengkulu
3 03 Manggopoh - Pd. Sawah
Appendix 6.B List of Appointed CRO and their Occupation
2 02 Pd. Sawah - Simp. Empat
1 Lampung 01 Krui - Biha
West Sumatera
4 Bengkulu 04 Ipuh - Bantal
5 Lampung 17Sp. Gunung Kemala -
Pugung Tampak
6 North Sumatera 05 Sp. Rampa - Poriaha
8 13Sp. Rukis - Tanjung
Kemuning
No ProvinceNo. of
packageName of Package Name of Appointed CRO Occupation of Appointed CRO
1. Ir. Riswandi, M.Si Leturer of Politeknik Negeri Padang
2. Apwiddhal, ST.,MT Leturer of Politeknik Negeri Padang
1. M. Nursyaifi Yulius, MT (Mgt) Lecturer of Bung Hatta University
2. Ir. Alzahri, MT Lecturer of Bung Hatta University
1. Ir. Drs. Heldi, M.Si Lecturer of Bung Hatta University
2. Ir. Afrizal Naumar, MT Lecturer of Bung Hatta University
1. Syaiful Amri, SST.,MT Leturer of Politeknik Negeri Padang
2. B. Army, ST.,MT Leturer of Politeknik Negeri Padang
1. Besperi, ST., MT Lecturer of Bengkulu University
2. Anggi Nidya Sari, ST., MT Lecturer of Bengkulu University
1. M. Nursyaifi Yulius, MT (Mgt) Lecturer of Bung Hatta University
Ir. Alzahri, MT Lecturer of Bung Hatta University
2. Ir. Riswandi, M.Si Leturer of Politeknik Negeri Padang
1. Syaiful Amri, SST.,MT Leturer of Politeknik Negeri Padang
1. Ir. Jafril Tanjung, MT.,DR.Eng Lecturer of Andalas University of Padang
2. T. Ophiyandri, PhD Lecturer of Andalas University of Padang
1. Ernie Shinta Y. Sitanggang, ST., MT Lecturer of Politeknik Negeri Medan
2. Ir. M. Koster Silaen, MT Lecturer of Politeknik Negeri Medan
1. M. Nursyaifi Yulius, MT(Mgt), PhD Lecturer of Bung Hatta University
2. Ir. Drs. Heldi, M.Si, h Lecturer of Bung Hatta University
North Sumatera 05ASlope Protection of Road
Segment of Rampa –Poriaha / Mungkur
20
18 20 Lubuk Alung - Sicincin
19 21 Lubuk Alung - Kuraitaji
West Sumatera
16 Bengkulu 16 Seblat - Ipuh
17 14 Painan - Kambang
Kambang - Indrapura
21 West Sumatera 21A Lubuk Alung - Kuraitaji
12 07 Indrapura - Tapan
13 08 Bts. Pariaman - Manggopoh
West Sumatera
14 Sp. Empat - Sp. Air Balam10
15 12
No Province No. ofPackage
Name of Package SelectionDate
TrainingDate
Location Remarks
5 Lampung 17SP. Gunung Kemala -
Pugung Tampak July 17, 2014July 17,
2014Satker PJN II Office, Jl. Wolter Mongonsidi
No. 220 B, Bandar LampungAttended by 2 candidates from Lampung University, 1 candidate be the Primary CRO and another bethe Secondary CRO. CRO Training was held directly after the selection process.
6 NorthSumatera 05 Sp. Rampa - Poriaha Aug 20, 2014
Aug 20,2014 BBPJN I Office, Jl. Sakti Lubis No. 1, Medan
Attended by 2 candidates, one from University of North Sumatera and another from EngineeringLearning and Training Center (ELTC). The Primary CRO is the one from University of North Sumatera,and the Secondary CRO is the one from ELTC. CRO Training was held directly after the selection process.
7 11 Bantal - Mukomuko Sept 1, 2014 Sept 1,2014
Attended by 4 candidates from Bengkulu University. For Package number 11, a Primary CRO and aSecondary CRO selected from Bengkulu University. CRO Training was held directly after the selectionprocess.
8 13 Sp. Rukis - TanjungKemuning
Sept 1, 2014 Sept 1,2014
Attended by 4 candidates from Bengkulu University. For Package number 13, a Primary CRO and aSecondary CRO selected from Bengkulu University. CRO Training was held directly after the selectionprocess.
9 06 Pasar Pedati - KerkapAttended by 4 candidates from Bengkulu University. For Package number 06, a Primary CRO and aSecondary CRO selected from Bengkulu University. CRO Training was held directly after the selectionprocess.
10 19 Lais - BintunanAttended by 4 candidates from Bengkulu University. For Package number 19, a Primary CRO and aSecondary CRO selected from Bengkulu University. CRO Training was held directly after the selectionprocess.
Nov 27,2014
Satker PJN I Bengkulu, Jl. Ir. RustandiSugianto Km. 12+225, Pulau Baai, Bengkulu
Bengkulu
Bengkulu Nov 27, 2014
Satker PJN I Bengkulu, Jl. Ir. RustandiSugianto Km. 12+225, Pulau Baai, Bengkulu
Appendix 6.C CRO Selection and Training Process
BBPJN III Office, Jl. H. M. Noerdin Pandji No.78 Palembang
BBPJN II Office, Jl. Jati No. 109 Padang
May 23, 2013
May 27, 2013
3West
Sumatera 03 Manggopoh - Pd. Sawah
Ipuh - BantalBBPJN III Office, Jl. H. M. Noerdin Pandji No.
78 Palembang
Attended by 6 candidates, 2 candidates from Politeknik Negeri Sriwijaya, 1 candidate fromMuhammadiyah Palembang University, 2 candidates from Indo Global Mandiri Palembang University,and 1 candidate from Palembang University. For Package number 01, a Primary CRO selected fromMuhammadiyah Palembang University and a Secondary CRO selected from Politeknik Negeri Sriwijaya.CRO Training was held directly after the selection process.
Attended by 4 candidates from Andalas University. For Package number 02, a Primary CRO and aSecondary CRO selected from Andalas University. CRO Training was held directly after the selectionprocess.
Attended by 4 candidates from Andalas University. For Package number 03, a Primary CRO and aSecondary CRO selected from Andalas University. CRO Training was held directly after the selectionprocess.
Attended by 6 candidates, 2 candidates from Politeknik Negeri Sriwijaya, 1 candidate fromMuhammadiyah Palembang University, 2 candidates from Indo Global Mandiri Palembang University,and 1 candidate from Palembang University. For Package number 04, a Primary CRO selected from IndoGlobal Mandiri University and a Secondary CRO selected from Politeknik Negeri Sriwijaya. CRO Trainingwas held directly after the selection process.
May 23, 2013
May 23,2013
May 27,2013
May 23,2013
Krui - Biha
Pd. Sawah - Simp. Empat
4 Bengkulu 04
1 Lampung 01
2West
Sumatera 02
No Province No. ofPackage
Name of Package SelectionDate
TrainingDate
Location Remarks
11North
Sumatera 15 Sibolga - Batas Tapsel Dec 16, 2014Dec 16,
2014 BBPJN I Office, Jl. Sakti Lubis No. 1, MedanAttended by 2 candidates from State Polytecnic of Medan, 1 candidate be the Primary CRO and anotherbe the Secondary CRO. CRO Training was held directly after the selection process.
12 07 Indrapura - Tapan Jun 12, 2015Jun 12,2015
Attended by 4 candidates from State Polytecnic of Padang and 4 candidates from Bung HattaUniversity. For Package 07, a Primary CRO and a Secondary CRO selected from State Polytecnic ofPadang. CRO Training was held directly after the selection process.
13 08Bts. Pariaman -
Manggopoh Jun 12, 2015Jun 12,2015
Attended by 4 candidates from State Polytecnic of Padang and 4 candidates from Bung HattaUniversity. For Package 08, a Primary CRO and a Secondary CRO selected from Bung Hatta University.CRO Training was held directly after the selection process.
14 10 Sp. Empat - Sp. Air Balam Jun 12, 2015Jun 12,2015
Attended by 4 candidates from State Polytecnic of Padang and 4 candidates from Bung HattaUniversity. For Package 10, a Primary CRO and a Secondary CRO selected from Bung Hatta University.CRO Training was held directly after the selection process.
15 12 Kambang - Indrapura Jun 12, 2015Jun 12,2015
Attended by 4 candidates from State Polytecnic of Padang and 4 candidates from Bung HattaUniversity. For Package 12, a Primary CRO and a Secondary CRO selected from State Polytecnic ofPadang. CRO Training was held directly after the selection process.
16 Bengkulu 16 Seblat - IpuhNov. 04,
2015Nov. 04,
2015Satker PJN I Bengkulu, Jl. Ir. Rustandi
Sugianto Km. 12+225, Pulau Baai, Bengkulu
Attended by 2 candidates from Bengkulu University. For Package number 16, a Primary CRO and aSecondary CRO selected from Bengkulu University. CRO Training was held directly after the selectionprocess.
17 14 Painan - Kambang Nov. 17,2015
Nov. 17,2015
Attended by 6 candidates: 2 from State Polytecnic of Padang, 2 from Bung Hatta University, and 2 fromAndalas University. For Package 14, a Primary CRO and a Secondary CRO selected from Bung HattaUniversity. CRO Training was held directly after the selection process.
18 20 Lubuk Alung - SicincinNov. 17,
2015Nov. 17,
2015
Attended by 6 candidates: 2 from State Polytecnic of Padang, 2 from Bung Hatta University, and 2 fromAndalas University. For Package 20, a Primary CRO and a Secondary CRO selected from State Polytecnicof Padang. CRO Training was held directly after the selection process.
19 21 Lubuk Alung - KuraitajiNov. 17,
2015Nov. 17,
2015
Attended by 6 candidates: 2 from State Polytecnic of Padang, 2 from Bung Hatta University, and 2 fromAndalas University. For Package 21, a Primary CRO and a Secondary CRO selected from Andalas StateUniversity of Padang. CRO Training was held directly after the selection process.
20 NorthSumatera 05A
Slope Protection of RoadSegment of Rampa –Poriaha / Mungkur
Dec 16, 2014Dec 16,
2014 BBPJN I Office, Jl. Sakti Lubis No. 1, MedanAttended by 2 candidates from State Polytecnic of Medan, 1 candidate be the Primary CRO and anotherbe the Secondary CRO. CRO Training was held directly after the selection process.
21 WestSumatera
21A Lubuk Alung - Kuraitaji Sept. 27,2018
Sept. 27,2018
Satker PJN I Office, Jl. Kathib Sulaiman No.9, Padang
Attended by 3 candidates from Bung Hatta University, 1 candidate be the Primary CRO and another bethe Secondary CRO. CRO Training was held directly after the selection process.
WestSumatera
BBPJN II Office, Jl. Jati No. 109 Padang
BBPJN II Office, Jl. Jati No. 109 PadangWestSumatera
Appendix 6.D
Date of Pre-Bid Meeting
Date of BidOpening
Announcement Dateof Bid Winner
1 Lampung 01 Krui - Biha May 17, 2013 June 10, 2013 July 18, 2013 Nov 12, 20131. Attending Pre-Bid Meeting on June 10, 2013, and Site Visit on June 13, 2013.2. Attending Bid Opening on July 18, 2013.
2 West Sumatera 02Pd. Sawah -Simp. Empat
May 20, 2013 June 10, 2013 July 18, 2013 Nov 26, 20131. Attending Pre-Bid Meeting on June 10, 2013, and Site Visit on June 11, 2013.2. Attending Bid Opening on July 18, 2013.
3 West Sumatera 03Manggopoh -
Pd. SawahMay 20, 2013 June 10, 2013 July 18, 2013 Nov 26, 2013
1. Attending Pre-Bid Meeting on June 10, 2013, and Site Visit on June 11, 2013.2. Attending Bid Opening on July 18, 2013.
4 Bengkulu 04 Ipuh - Bantal May 17, 2013 June 10, 2013 July 18, 2013 Oct 28, 20131. Attending Pre-Bid Meeting on June 10, 2013, and Site Visit on June 13, 2013.2. Attending Bid Opening on July 18, 2013.
5 Lampung 17SP. Gunung
Kemala -Pugung Tampak
June 25, 2014 July 18, 2014 Aug 15, 2014 Oct 16, 20141. Attending Pre-Bid Meeting on July 18, 2014, and Site Visit on July 19, 2014.2. Attending Bid Opening on August 15, 2014.
6 North Sumatera 05Sp. Rampa -
PoriahaDes 16, 2013 Aug 21, 2014 Sept 22, 2014 Feb. 02, 2015
1. Attending Pre-Bid Meeting on August 21, 2014, and Site Visit on August 22, 2014.2. Attending Bid Opening on Sepetmber 22, 2014.
7 Bengkulu 11Bantal -
MukomukoNov 14, 2014
1. Attending Pre-Bid Meeting on September 8, 2014, and Site Visit on September 9, 2014.2. Attending Bid Opening on October 3, 2014.
8 Bengkulu 13Sp. Rukis -Tanjung
KemuningNov 28, 2014
1. Attending Pre-Bid Meeting on September 8, 2014, and Site Visit on September 9, 2014.2. Attending Bid Opening on October 3, 2014.
9 Bengkulu 06Pasar Pedati -
Kerkap
10 Bengkulu 19 Lais - Bintunan
11 North Sumatera 15Sibolga - Batas
TapselDec 23, 2014 Jan 26, 2015 Feb 03, 2015 Jun. 12, 2015
1. Attending Pre-Bid Meeting and Site Visit on January 26, 2015.2. Attending Bid-Opening on February 23, 2015.
CRO's Involvement in the Bidding Process
Oct 3, 2014
1. Attending Pre-Bid Meeting and Site Visit on December 5, 2014.2. Attending Bid Opening on December 29, 2014.
Sept 8, 2014Aug 22, 2014
Reports of CRO Activity
Dec 29, 2014Nov 24, 2014 Dec 5, 2014 Feb 12, 2015
No ProvinceNo. of
PackageName ofPackage
Date ofInvitation to
Bid
Date of Pre-Bid Meeting
Date of BidOpening
Announcement Dateof Bid Winner
CRO's Involvement in the Bidding ProcessReports of CRO ActivityNo Province
No. ofPackage
Name ofPackage
Date ofInvitation to
Bid
12 07 Indrapura -Tapan
Jun 1, 2015 Jun 15, 2015 Aug 13, 2015 Nov. 13, 20151. Attending Pre-Bid Meeting and Site Visit on June 15, 2015.2. Attending Bid Opening on Augustus 13, 2015,
13 08Bts. Pariaman -
ManggopohMay 28, 2015 Jun 15, 2015 Aug 13, 2015 Jan. 5, 2016
1. Attending Pre-Bid Meeting and Site Visit on June 15, 2015.2. Attending Bid Opening on Augustus 13, 2015.
14 10 Sp. Empat - Sp.Air Balam
May 28, 2015 Jun 15, 2015 Aug 13, 2015 Under Process1. Attending Pre-Bid Meeting and Site Visit on June 15, 2015.2. Attending Bid Opening on Augustus 13, 2015.
15 12 Kambang -Indrapura
May 28, 2015 Jun 15, 2015 Aug 13, 2015 Dec. 29, 20151. Attending Pre-Bid Meeting and Site Visit on June 15, 2015.2. Attending Bid Opening on Augustus 13, 2015.
16 Bengkulu 16 Seblat - Ipuh Oct 22, 2015 Nov 5, 2015 Nov 19, 2015 Under Process1. Attending Pre-Bid Meeting and Site Visit on November 5, 2015.2. Attending Bid Opening on November 19, 2015.
17 14Painan -
KambangNov 2, 2015 Nov 18, 2015 Jan 5, 2016 May 3, 2016
1. Attending Pre-Bid Meeting and Site Visit on November 18, 2015.2. Attending Bid Opening on January 5, 2015.
18 20Lubuk Alung -
SicincinNov 2, 2015 Nov 18, 2015 Jan 5, 2016 May 3, 2016
1. Attending Pre-Bid Meeting and Site Visit on November 18, 2015.2. Attending Bid Opening on January 5, 2015.
19 21Lubuk Alung -
KuraitajiNov 2, 2015 Nov 18, 2015 Jan 5, 2016 May 3, 2016
1. Attending Pre-Bid Meeting and Site Visit on November 18, 2015.2. Attending Bid Opening on January 5, 2015.
16-Mar-18 24-Apr-18 16-May-18 21-May-181. Attending Pre-Bid Meeting on April 24, 2018. 2.Attending Bid-Opening on May 16, 2018.
3-Sep-18 10-Sep-18 17-Sep-18 15-Oct-181. Attending Pre-Bid Meeting on September 10, 2018.2. Attending Bid-Opening on September 17, 2018.
21 West Sumatera 21ALubuk Alung -
KuraitajiOct. 11, 2018 Oct. 18, 2018 Oct. 25, 2018 Nov. 23, 2018
1. Attending Pre-Bid Meeting on October 18, 2018.2. Attending Bid-Opening on October 25, 2018.
West Sumatera
20 North Sumatera 05A
Slope Protection ofRoad Segment of
Rampa – Poriaha /Mungkur
West Sumatera
APPENDIX 7
Anti Corruption Action Plan (ACAP)
Activity Progress of Community Representative Observers(CRO)
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
Appendix 7 ACAP Activity ProgressActivities Progress of Community Representative Observers (CROs)
January 2013 – March 2019
No Subject of Activities Date of Finish/completed
1. Orientation and studied of WINRIP documents and Development of Works Plan January 2013
2 Prepared of Workshop of Procurement Document Evaluation. February 2013
3. Conducted Workshop of Procurement Document Evaluation for POKJA, Satker/PPK, BalaiBBPJN and PMU.
Febr. 28, 2013 –March 01, 2013
4. Provided of Term of Reference (TOR) of the CRO's Selection and Guidelines for CRO’sSelection
March 1, 2013
5. Provided the Materials (Slide Presentation/Power-point) of General Explanations aboutWINRIP and the CRO’s selection and
March 8, 2013
6. Provided Training Materials for CROs. March 8, 2013
7. Sending an official letter No. Hm.0603/Bp-11/0175/2013, from the Director of Planning asChairman of PMU to Head of BBPJN II & III, about the Selection of CROs/WPM, + TOR andGuidelines Document
March 11, 2013
8 Preparation of Socialization on CROs selection in BBPJN II Padang for package 02 PadangSawah – Simpang Empat and package 03 Manggopoh - Padang Sawah, and Socialization onCROs selection in BBPJN III Palembang for package 01 Krui – Biha and package 04 Ipuh –Bantal.
March 31, 2013
9. Socialization on CROs selection in BBPJN II Padang for package 02 Padang Sawah – SimpangEmpat and package 03 Manggopoh - Padang Sawah
April 9, 2013
10 Socialization on CROs selection in BBPJN III Palembang for package 01 Krui – Biha andpackage 04 Ipuh – Bantal.
April 11, 2013
11. Sent the Invitation letter from Head of BBPJN III to Rector of Universities /Head of Colleges inPalembang, about selection of the CROs for package 01. Krui – Biha (Prov. Lampung) andpackage 04. Ipuh – Bantal (Prov. Bengkulu).
May 17, 2013
12. Sent the Invitation letter from Head of BBPJN II to Rector of Universities /Head of Colleges inPadang, about selection of the CROs for package 02. Padang Sawah – Simpang Empat andpackage 03. Manggopoh - Padang Sawah (Prov. Sumatera Barat).
May 20, 2013
13. Selection of CROs for Packages Krui – Biha Province Lampung and Ipuh – Bantal ProvinceBengkulu, and training for selected CROs in BBPJN III Palembang
May 23, 2013
14. Selection of WPM/CROs for Packages Manggopoh – Padang Sawah and Padang Sawah –Simpang Empat, and training for selected CROs in BBPJN II Padang
May 27, 2013
15. Sending an official letter No. Hm.0603/Bp-11/0175/2013, from the Director of Planning asChairman of PMU to Head of BBPJN II & III, about the Selection of CROs/WPM, + TOR andGuidelines Document
May 28, 2013
16. Guiding the Balai Besar Pelaksanaan Jalan Nasional (Balai) II Padang to compose theApplication Letter for Approval of selected CROs for Package 03. Manggopoh – PadangSawah, package 02. Padang Sawah – Simpang Empat, and Balai III Palembang for Package 01.Krui – Biha Province Lampung and Package 04. Ipuh – Bantal Province Bengkulu.
May 29, 2013
17. Compiling summary of the results of Selection the Community Representative Observers(CROs)/ Wakil Pengamat dari Masyarakat (WPM) and the Training activities for selectedCROs for four Packages AWP-1
June 1 - 9, 2013
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
No Subject of Activities Date of Finish/completed
18. Assist PMU to prepare the Approval letter of selected CROs for four AWP-1 Packages, andprepare of the Decree on Establishment the CROs of AWP-1 WINRIP from Director ofPlanning DGH, as the Chairman of PMU.
June 1 - 9, 2013
19. Monitor and observation the Pre-Bid Meeting and Site Visit activities of Procurement Processthat held by the Procurement Committee, in BBPJN II and III, on 10 June 2013 by CROs inimplementing their tasks on the
June 10 - 16,2013
20. Evaluate of the CROs observation on Pre-Bid Meeting and Site Visit activities Jun.17 - 23, 2013
21. Examine the report of CROs on the monitoring and observation of Pre-Bid Meeting and SiteVisit at the packages of Annual Works Program - 1 (AWP-1) WINRIP.
Modify the template of monitoring the report of the CROs, to be more focused and moresystematically
June 24 - 30,2013
22. Monitor /Observe of Bids Submission and Bids Opening for four packages AWP-1 byCommunity Representative Observers (CROs) for Package 01, 02, 03, and 04
July 18, 2013
23. Monitoring and examined of the CRO’s Report on the monitoring and observation of BidSubmission and Bid Opening activities for four packages of Annual Works Program - 1 (AWP-1) WINRIP, which have been carried out on July 18, 2013
August, 2013
24 Preparation on the Socialization of CROs selection to the Procurement Committee (POKJA) ofSumatera Utara province, for package Simpang Rampa – Poriaha and package Sibolga – BatasTapanuli Selatan
October 2013
25 Monitored /Observed of Procurement progress on Commencement of Bid Winners for fourpackages AWP-1 (Package 01, 02, 03, and 04) and informed to related CommunityRepresentative Observers (CROs).
November 2013
26 Carried out the dissemination of CROs selection to the Procurement Committee (POKJA) ofSumatera Utara province, for package Simpang Rampa – Poriaha. in Balai (BBPJN) I Medanand in Project Management (Satker) Office.
November 19 –20, 2013
27 Carried out the CROs selection for package 17: Simpang Gunung Kemala – Pugung Tampak inLampung..
July 17, 2014
28 Carried out the CROs selection for package 05: Simpang Rampa – Poriaha in North Sumateraprovince.
August 20, 2014
29 Carried out the CROs selection for package 11: Bantal – Mukomuko, and package 13:Simpang Rukis – Tanjung Kemuning in Bengkulu province.
Sept. 1, 2014
30 Ms. Hesti Aulia Sari, ST, CRO for Package 11: Bantal - Mukomuko, meet the invitation of theProcurement Committee (Pokja of Procurement Unit/Unit Layanan Pengadaan BBPJN III,PIU/Satker PJN Region I Bengkulu Province).
Oct. 03, 2014
31 Ms. Hot Maria Angelina, ST, CRO for Package 13: Simpang Rukis - Tanjung Kemuning wasattended Bid-Opening meeting meet the invitation by the Procurement Committee (Pokja ofProcurement Unit/Unit Layanan Pengadaan BBPJN III, PIU/Satker PJN Region II BengkuluProvince).
Oct. 03, 2014
32 Carried out the CROs selection for package 06: pasar Pedati –Kerkap and package 19: Lais -Bintunan in Bengkulu province.
Nov. 27, 2014
33 The elected CROs (Ms. Hot Maria Angelina, ST and Ms. Hesti Aulia Sari, ST) attanded Pre-BidMeeting and site visit for package 06 (Pasar Pedati – Kerkap) and package 19 (Lais –Bintunan), Bengkulu Province
Dec. 05, 2014
34 The Community Development team CTC WINRIP has carried out the selection of CROs forPackage 15: Sibolga – Batas Tapanuli Selatan. The Elected CRO is Ernie Shinta Y. Sitanggang,ST, MT, and Ir. M. Koster Silaen, MT as the substitute CRO (both from Politeknik NegeriMedan / State Polytechnic of Medan)
Dec. 16, 2014,
35 The elected CROs for package 06 (Pasar Pedati – Kerkap) and package 19 (Lais – Bintunan)Bengkulu Province was attanded the Bid-Opening Meeting.
Dec. 29, 2014
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
No Subject of Activities Date of Finish/completed
36 Ir. M. Koster Silaen, MT as the substitute CRO of Package 15: Sibolga – Batas Tapanuli Selatanwas attended the Pre-Bid Meeting.
Jan. 26, 2015
37 Ir. M. Koster Silaen, MT as the substitute CRO of Package 15: Sibolga – Batas Tapanuli Selatanwas attended the Bid Opening Meeting
Feb. 23, 2015
38 The Community Development team CTC WINRIP has carried out the selection of CROs forfour packages WINRIP in West Sumatera province, as follow; The appointed CRO for Package 07: Indrapura – Tapan, is Ir. Riswandi, M.Si, and
Apwiddhal, ST, MT as the substitute CRO, both from State Polytechnic of Padang(Politeknik Negeri Padang).
The appointed CRO for Package 08: Batas Pariaman – Manggopoh, is M. Nursyaifi Yulius,MT (Mgt), and Ir. Alzahri, MT as the substitute CRO, both from Bung Hatta University ofPadang (Universitas Bung Hatta Padang).
The appointed CRO for Package 10: Simpang Empat – Simpang Air Balam, is Ir. Drs. Heldi,M.Si, and Ir. Afrizal Naumar, MT as the substitute CRO, both from Bung Hatta University ofPadang (Universitas Bung Hatta Padang).
The appointed CRO for Package 12: Kambang – Indrapura, is Syaiful Amri, SST, MT, and B.Army, ST, MT as the substitute CRO, both from State Polytechnic of Padang (PoliteknikNegeri Padang)
June 12, 2015
39 The appointed CRO Ir. Riswandi, M.Si for Package 07: Indrapura – Tapan, and the appointedCRO Syaiful Amri, SST, MT for Package 12: Kambang – Indrapura were attended the Pre-BidMeeting and Site Visit as invited by the Procurement Committee (Pokja) of PIU/Satker PJNRegion II of West Sumatera ProvinceThe appointed CRO M. Nursyaifi Yulius, MT (Mgt) for Package for Package 08: Batas Pariaman– Manggopoh, , and the appointed CRO Ir. Drs. Heldi, M.Si for Package 10: Simpang Empat –Simpang Air Balam were attended the Pre-Bid Meeting and Site Visit as invited by theProcurement Committee (Pokja) of PIU/Satker PJN Region I of West Sumatera Province.
June. 15-16, 2015
40 The appointed CRO Ir. Riswandi, M.Si for Package 07: Indrapura – Tapan, and the appointedCRO Syaiful Amri, SST, MT for Package 12: Kambang – Indrapura were sent the ObservationReport on Pre-Bid Meeting and Site Visit.
July. 02, 2015
41 The appointed CRO M. Nursyaifi Yulius, MT (Mgt) for Package for Package 08: Batas Pariaman– Manggopoh, , and the appointed CRO Ir. Drs. Heldi, M.Si for Package 10: Simpang Empat –Simpang Air Balam were sent the Observation Report on Pre-Bid Meeting and Site Visit.
July. 10, 2015
42 The CRO for Package 07: Indrapura – Tapan (Ir. Riswandi, M.Si), and the CRO for Package 12:Kambang – Indrapura (Syaiful Amri, SST, MT) were attended the Bid Opening Meeting.
August 13, 2015
43 The CRO for Package for Package 08: Batas Pariaman – Manggopoh (M. Nursyaifi Yulius, MT(Mgt), and the CRO for Package 10: Simpang Empat – Simpang Air Balam (Ir. Drs. Heldi, M.Si)were attended the Bid Opening Meeting.
August 13, 2015
44 Selection of CROs for packages 16 (Sebelat – Ipuh) in Bengkulu province, as follow; The appointed CRO for Package 16 is Mr. Besperi, ST, MT, and and Ms. Anggi Nidya Sari,
ST., MT as the substitute CRO. Both of them were from Bengkulu University.
Nov,.4-5, 2015
45 Selection of CROs for packages 14, 20, and 21 in West Sumatera province, as follow; The Elected CRO for Package 14 (Painan - Kambang) were Mr. M. Nursyaifi Yulius, MT
(Mgt), and Mr. Ir. Alzahri, MT, as the substitute CRO, both of them were from Bung HattaUniversity.
The Elected CRO for Package 20 (Lubuk Alung - Sicincin), were Mr. Ir. Riswandi, M.Si andMr. Syaiful Amri, SST., MT, as the substitute CRO, both of them were from StatePolitechnic of Padang (Politeknik Negeri Padang).
The Elected CRO for Package 21 (Lubuk Alung - Kuraitaji) were Mr. Jafril Tanjung, DR. Engand Mr. Ophiyandri, Ph.D as the substitute CRO, both of them were from AndalasUniversity
Nov,.16-17, 2015
46 The substitute CRO for Package 16: Sebelat – Ipuh, Ms. Anggi Nidya Sari, ST., MT wasattended the Pre-Bid Meeting and Site Visit as invited by the Procurement Committee (Pokja)of PIU/Satker PJN Region I of Bengkulu Province.
Nov. 05, 2015
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
No Subject of Activities Date of Finish/completed
47 The substitute CRO for Package 14: Painan - Kambang, Mr. Ir. Alzahri, MT was attended thePre-Bid Meeting and Site Visit as invited by the Procurement Committee (Pokja) ofPIU/Satker PJN Region II of West Province.
Nov. 18, 2015
48 The Elected CRO for Package 20 (Lubuk Alung - Sicincin), Mr. Ir. Riswandi, M.Si, was attendedthe Pre-Bid Meeting and Site Visit as invited by the Procurement Committee (Pokja) ofPIU/Satker PJN Region I of West Sumatera Province.
Nov. 18, 2015
49 The Elected CRO for Package 21 (Lubuk Alung - Kuraitaji), Mr. Jafril Tanjung, DR. Eng, wasattended the Pre-Bid Meeting and Site Visit as invited by the Procurement Committee (Pokja)of PIU/Satker PJN Region I of West Sumatera Province.
Nov. 18, 2015
50 The substitute CRO for Package 16: Sebelat – Ipuh, Ms. Anggi Nidya Sari, ST., MT wasattended the Bid Opening Meeting, invited by the Procurement Committee (Pokja) ofPIU/Satker PJN Region I of Bengkulu Province.
Nov. 19, 2015
51 The substitute CRO for Package 16: Sebelat – Ipuh, Ms. Anggi Nidya Sari, ST., MT, was sentthe observation report on Pre-Bid Meeting and Site Visit
Nov. 25, 2015
52 The CRO for Package 14: Painan - Kambang, Mr. Ir. Alzahri, MT was attended the Bid OpeningMeeting as invited by the Procurement Committee (Pokja) of PIU/Satker PJN Region II ofWest Province.
Jan. 05, 2016
53 The Elected CRO for Package 20 (Lubuk Alung - Sicincin), Mr. Ir. Riswandi, M.Si, was attendedthe Bid Opening Meeting as invited by the Procurement Committee (Pokja) of PIU/Satker PJNRegion I of West Sumatera Province.
Jan. 05, 2016
54 The Elected CRO for Package 21 (Lubuk Alung - Kuraitaji), Mr. Jafril Tanjung, DR. Eng, wasattended the Bid Opening Meeting as invited by the Procurement Committee (Pokja) ofPIU/Satker PJN Region I of West Sumatera Province.
Jan. 05, 2016
55 The Elected CRO for Package 20 (Lubuk Alung - Sicincin), Mr. Ir. Riswandi, M.Si, was sent theObservation Report on Pre-Bid Meeting and Site Visit.
Jan. 06, 2016
56 The CRO for Package 07: Indrapura – Tapan (Ir. Riswandi, M.Si), was sent the ObservationReport on Bid Opening and Bid Winner Announcement.
Jan. 19, 2016
57 The CRO for Package 12: Kambang – Indrapura (Syaiful Amri, SST, MT) was sent theObservation Report on Bid Opening and Bid Winner Announcement.
Jan. 19, 2016
58 The CRO for Package 14: Painan - Kambang, (Mr. Ir. Alzahri, MT) was sent the observationreport on Pre-Bid Meeting and Site Visit.
Jan. 25, 2016
59 The Elected CRO for Package 21 (Lubuk Alung - Kuraitaji), Mr. Jafril Tanjung, DR. Eng, wassent the Observation on Pre-Bid Meeting and Site Visit.
Jan. 29, 2016
60 The CRO for Package for Package 08: Batas Pariaman – Manggopoh (M. Nursyaifi Yulius, MT(Mgt), was sent the Observation Report on Bid Opening and Bid Winner Announcement.
Feb. 17, 2016
61 The CRO for Package 14: Painan - Kambang, (Mr. Ir. Alzahri, MT), was sent the ObservationReport on Bid Opening and Bid Winner Announcement
May 10, 2016
62 The Elected CRO for Package 20 (Lubuk Alung - Sicincin), Mr. Ir. Riswandi, M.Si, was sent theObservation Report on Bid Opening and Bid Winner Announcement
May 10, 2016
63 The Elected CRO for Package 21 (Lubuk Alung - Kuraitaji), Mr. Jafril Tanjung, DR. Eng, wassent the Observation on Bid Opening and Bid Winner Announcement
May 31, 2016
64 The substitute CRO for Package 16: Sebelat – Ipuh, Ms. Anggi Nidya Sari, ST., MT, was sentthe observation report on Bid Opening Meeting and the Announcement of Bid-Winner forPackage 16 (Seblat – Ipuh) in Bengkulu Province
September 2016
65 Appointment of the CROs for procurement process of package 05A (Slope Protection of RoadSegment of Rampa – Poriaha / Mungkur in North Sumatera Province,. The appointed CRO isMrs. Ernie Shinta Sitanggang, ST, MT., as the main CRO, and Mr. Ir. M. Koster Silaen, MT, asthe reserve / replacement
April 24, 2018
66 Provide Agreement Letter of establishment the CROs for Package 05A that was signed byDirector of Roads Network Development, Directorate of Highway.
April 25, 2018
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
No Subject of Activities Date of Finish/completed
67 The appointed CRO, Mrs. Ernie Shinta Sitanggang, ST, MT was attended the Pre-Bid meeting,as the step of procurement process of package 05A, in Balai Besar Pelaksanaan JalanNasional (BBPJN) / National Roads Implementation Agency II Medan
April 27, 2018
68 The pointed CRO of package No. 05A ((Slope Stabilization of Roads Link Simpang Rampa -Poriaha/Mungkur) Mr. Ir. Koster Silaen, MT accompanied by Community DevelopmentOfficer of CTC WINRIP (Mr. Yakobus) attended the Pre-Bid Meeting by ProcurementCommittee that was carried out in Satker PJN Wilayah II office of North Sumatera Province inMedan
Sept. 10, 2018,
69 The selection of Community Representative Observers (CROs) for WINRIP Package No. 21A(Lubuk Alung – Kuraitaji) in West Sumatera Province, in the office of Satker PJN Region I ofWest Sumatera Province. The pointed CRO for this package is Ir. M. Syaifi Yulius, M(Mgt),PhD, Lecturer from Pascasarjana of Bung Hatta University of Padang, and as the SubstituteCRO is Ir. Drs. Heldi, MSi, PhD.
Sept. 27, 2018
70 The Substitute CRO of package No. 21A (Lubuk Alung – Kuraitaji) Ir. Drs. Heldi, M.Si, PhDattended the Pre-Bid Meeting by Procurement Committee in Satker PJN Wilayah II office ofWest Sumatera Province in Padang
Oct., 18, 2018,
I II III I II III I II III
1 Dr. Ir. Hery RiyantoJl. Duku D2 No. 9, Kel.Beringin Raya, Kemiling-B. Lampung
08127218266 [email protected] of BandarLampung University
V V V V V -
2 Ir. Sugito, MTJl. Sukardihamdani,Palapa 5A No. 29A,Bandar Lampung
08218143644 [email protected] of BandarLampung University
V V V V V -
3 Ir. Juniardi, MTJl. U. Surapati Gg.Mataram No. 1, BandarLampung
085225168058 [email protected] Dep. of CivilEngineering of BandarLampung University
V V V V V -
1 Syaiful Amri,SST., MTJl. Andalas Gg. SargaIndah No. 43, Padang
081363435968 [email protected] of PoliteknikNegeri Padang
V V V V V -
2 Ir. Syaifullah Ali,MTKomp. Pelangi Indah B5/5Korong Gadang, Kuranji
08126601952 [email protected] of PoliteknikNegeri Padang
V V V V V -
3 Ir. Riswandi, M.SIJl. Lubuk Bayu No. 1Kurao, Pagang Nanggalo,Padang
08126713602 [email protected] of PoliteknikNegeri Padang
V V V V V -
1 Ir.M. Nursyaifi Yulius,MTJl. Gadih Rantih UjungNo. 20 B, Padang
08126608128 [email protected] of Bung HattaUniversity
V V V V V -
2 Alzahri, ST.,MTKomp. Polamas Blok W5,Alai Parak Kopi, Padang
08126721639 [email protected] of Bung HattaUniversity
V V V V V -
3 Ir. Heldi, M.ScParak Jigarang No. 1/3 RT03/05 Kuanji, Padang
081363428468 [email protected] of Bung HattaUniversity
V V V V V -
1 Muhammad Fauzi,ST.,MTJl. Unib Permai Blok I No.50, Pematang Gubernur -Bengkulu
08137690429 [email protected] of BengkuluUniversity
V V V V V -
2 Hardiansyah, ST.,MTRT01/RW 004 SumurDewa-Slebar, Bengkulu
081368008820 [email protected] of BengkuluUniversity
V V V V V -
3 Agung Febrianto,STRT 02/RW 003, DwiTunggal - Curup Utara,Bengkulu
085366851999 [email protected] staff of BengkuluUniversity
V V V V V -
1 Ir. Y. Martono Hadi, MTJl. Bungur No. 3 WayHalim, Bandar Lampung.
0816414590 [email protected] of LampungUniversity
V V V V V -
2 Ofik Taufik Purwadi, ST., MTJl. Swadaya 7 No. 56Gunung Terang, BandarLampung.
081279647013 [email protected] of LampungUniversity
V V V V V -
3 Tas'an Junaidi, ST., MTJl. Padat Karya RT 06/RW01 Rajabasa Raya, B.Lampung.
081369109125 [email protected] of LampungUniversity
V V V V V -
1 Muhammad Fauzi,ST.,MTJl. Unib Permai Blok I No.50, Pematang Gubernur -Bengkulu
08137690429 [email protected] of BengkuluUniversity
V V V - - -
2 Hesti Aulia Sari, STJl. P. Natadiraja No. 20Kel. Gedang, GadingCempaka - Bengkulu
085266724618 [email protected] staff of BengkuluUniversity
V V V - - -
3 Hot Maria Angelina, STJl. Beo No. 60 PerumnasLingkar Barat, KotaBengkulu.
085788095319 [email protected] staff of BengkuluUniversity
V V V - - -
1 Hardiansyah, ST., MTJl. Hibrida 15 No. 43,Sidomulyo, GadingCempaka - Bengkulu.
081368008820 [email protected] of BengkuluUniversity
V V - - -
V V
Bengkulu 13Sp. Rukis - Tj.
KemuningDec 22,
2014March 11-12, 2015
Satker PJN I Office, Jl.Ir. Rustandi Sugianto
Km 12+225, PulauBaai-Bengkulu
March 11-12, 2015
Satker PJN I Office, Jl.Ir. Rustandi Sugianto
Km 12+225, PulauBaai-Bengkulu
VVV
-
Appendix 8.A List of Names of Third Party Monitoring (TPM)
Package Observed TPM Selection and Training TPM Contact
June 18-19, 2014
Satker PJN I, Jl. KhatibSulaiman No. 9,
Padang
1 Lampung 01 Krui - BihaMarch 5,
2014June 5-6,
2014
Satker PJN II Office,Jl. W. R. MongonsidiNo. 220 B, Bandar
Lampung
2West
Sumatera02
Pd. Sawah - Simp.Empat
March 7,2014
V V V
Site Visit
V
3West
Sumatera03
Manggopoh - Pd.Sawah
March 7,2014
June 18-19, 2014
No ProvinceNo. Package
Sele
ctio
nD
ate
Trai
ning
Dat
e
Name of Selected TPM
TPM Involvement
CoordinationMeeting
Satker PJN I Office, Jl.Khatib Sulaiman No.
9, Padang
-Oct. 22,
2015
Satker PJN II Office,Jl. W. R. MongonsidiNo. 220 B, Bandar
Lampung
VV
- -
V V V
VV V
Reports Relatedto TPM's ActivityTPM's Occupation
LocationTPM's Address
Telp. Email
7
6 Bengkulu 11Bantal -
MukomukoDec 22,
2014
Satker PJN I Office, Jl.Ir. Rustandi Sugianto
Km 12+225, PulauBaai-Bengkulu
4July 7-8,
2014Bengkulu 04 Ipuh - Bantal
March10, 2014
5 Lampung 17Sp. Gunung
Kemala - PugungTampak
Dec 04,2014
I II III I II III I II III
Package Observed TPM Selection and Training TPM Contact
Site VisitNo Province
No. Package
Sele
ctio
nD
ate
Trai
ning
Dat
e
Name of Selected TPM
TPM Involvement
CoordinationMeeting
Reports Relatedto TPM's ActivityTPM's Occupation
LocationTPM's Address
Telp. Email
2 Agung Febrianto, STJl. Asrama I Gang SetiaBudi No. 5, Curup -Bengkulu.
085366851999 [email protected] staff of BengkuluUniversity
V V - - -
3 Nanda Pratama, STJl. Hibrida 2 RT 06 RT 07Kelurahan Sidomulyo,Bengkulu.
085266724617 [email protected] staff of BengkuluUniversity
V V - - -
1 Sahrul Harahap, STJl. Bakti Kopri Gg. Asri,Padangsidempuan.
081376919899 [email protected] of GrahaNusantara University
V V V - - -
2Asroi Benny Noor Harahah,ST., MT
Jl. Bakti Abdi I No. 5,Padangsidempuan.
081260244024 [email protected] of GrahaNusantara University
V V V - - -
3 M. Yusuf Parlagutan Lubis, STJl. Thamrin No. 1,Padangsidempuan.
08139661661 [email protected] of GrahaNusantara University
V V V - - -
1 Ahmad Rafii, STJl. Imam Bonjol Gg. Surya,Pdg.sidempuan.
081370511188 [email protected] of GrahaNusantara University
V V - - -
2 Roy Efendi Subarja, STJl. Dwikora II,Padangsidempuan.
08126320644 [email protected] of GrahaNusantara University
V V - - -
3 Masitoh Hasibuan, STJl. Sisingamangaraja Gg.Magabe, Pdg. sidempuanSelatan.
082369328301 [email protected] of GrahaNusantara University
V V - - -
1 Dr. Muhammad Fauzi,ST.,MTJl. Unib Permai Blok I No.50, Pematang Gubernur -Bengkulu
08137690429 [email protected] of BengkuluUniversity
V V V - - -
2 Hesti Aulia Sari, STJl. P. Natadiraja No. 20Kel. Gedang, GadingCempaka - Bengkulu
085266724618 [email protected] staff of BengkuluUniversity
V V V - - -
3 Anggi Nidya Sari, ST., M.EngJl. Halmahera RT 02 RW03 No. 5, Bengkulu.
082180708080 [email protected] of BengkuluUniversity
V V V - - -
1 Dr. Khairul Amri, ST., MTJl. Hibrida 15 Gg. Mandiri5 No. 25, Bengkulu.
081367719694 [email protected] of EngineeringFaculty, BengkuluUniversity
V - - - - -
2 Nanda Pratama, STJl. Hibrida 2 RT 06 RT 07Kelurahan Sidomulyo,Bengkulu.
085266724617 [email protected] staff of BengkuluUniversity
V - - - - -
3 Desti Eka Putri, STJl. WR. Supratman,Kandang Limun, KotaBengkulu.
081919493764 [email protected] staff of BengkuluUniversity
V - - - - -
1 Ir. Riswandi, M.SIJl. Lubuk Bayu No. 1Kurao, Pagang Nanggalo,Padang
08126713602 [email protected] of PoliteknikNegeri Padang
V V V - - -
2 Syaiful Amri,SST., MTJl. Andalas Gg. SargaIndah No. 43, Padang
081363435968 [email protected] of PoliteknikNegeri Padang
V V V - - -
3 Apwiddhal, ST,.MTJl. Gapura No. 1 Air TawarTimur, Padang
81374698872 [email protected] of PoliteknikNegeri Padang
V V V - - -
1 Syaiful Amri,SST., MTJl. Andalas Gg. SargaIndah No. 43, Padang
081363435968 [email protected] of PoliteknikNegeri Padang
V V - - -
2 Ir. Riswandi, M.SIJl. Lubuk Bayu No. 1Kurao, Pagang Nanggalo,Padang
08126713602 [email protected] of PoliteknikNegeri Padang
V V - - -
- -
V V
Bengkulu 13Sp. Rukis - Tj.
KemuningDec 22,
2014March 11-12, 2015
Satker PJN I Office, Jl.Ir. Rustandi Sugianto
Km 12+225, PulauBaai-Bengkulu
Sibolga - Bts.Tapsel
-
-
-
V
Apr 9,2015
Oct. 9,2015
Graha NusantaraUniversity, Jl. Dr.
Sutomo,Padangsidempuan
- - -
-
VV
Sp. Rampa -Poriaha
Apr 9,2015
7
8North
Sumatera05
Oct. 9,2015
Graha NusantaraUniversity, Jl. Dr.
Sutomo,Padangsidempuan
10 Bengkulu 06Ps. Pedati -
KerkapMay 5,2015
June 4 -5,2015
Satker PJN I Office, Jl.Ir. Rustandi Sugianto
Km 12+225, PulauBaai-Bengkulu
V V
9North
Sumatera15
-11 Bengkulu 19 Lais - BintunanMay 5,2015
June 4 -5,2015
Satker PJN I Office, Jl.Ir. Rustandi Sugianto
Km 12+225, PulauBaai-Bengkulu
- -
12West
Sumatera07
Indrapura -Tapan
Dec. 22,2015
Jun. 9,2016
Satker PJN II, Jl. S.Parman No. 129A,
Padang
13West
Sumatera12
Kambang -Indrapura
Dec. 22,2015
Will besheduled
later
Satker PJN II, Jl. S.Parman No. 129A,
Padang- -
I II III I II III I II III
Package Observed TPM Selection and Training TPM Contact
Site VisitNo Province
No. Package
Sele
ctio
nD
ate
Trai
ning
Dat
e
Name of Selected TPM
TPM Involvement
CoordinationMeeting
Reports Relatedto TPM's ActivityTPM's Occupation
LocationTPM's Address
Telp. Email
3 B. Army, ST,. MTTaman Bamaran IndahBlok P No. 3 Padang
085274352715 [email protected] of PoliteknikNegeri Padang
V V - - -
1 Dr. Muhammad Fauzi, ST.,MTJl. Unib Permai Blok I No.50, Pematang Gubernur -Bengkulu
08137690429 [email protected] of BengkuluUniversity
V V - - -
2 Deri Saputra, STPerumnas BentiringIndah, Muara Bangkahulu- Bengkulu
08992212213 [email protected]. Lecturer of BengkuluUniversity
V V - - -
3 M. Ridwan Sami, STJl. Batang Hari 6 No. 26,Bengkulu
082281767448 [email protected]. Lecturer of BengkuluUniversity
V V - - -
1 Ir.M. Nursyaifi Yulius,MTJl. Gadih Rantih UjungNo. 20 B, Padang
08126608128 [email protected] of Bung HattaUniversity
V V V - - -
2 Alzahri, ST.,MTKomp. Polamas Blok W5,Alai Parak Kopi, Padang
08126721639 [email protected] of Bung HattaUniversity
V V V - - -
3 Yendri Nursami, S. TiJl. Tepi Banjir Kanal No. 9A, Sawahan Timur -Padang
085217374888 [email protected] of Bung HattaUniversity
V V V - - -
1 Ir. Drs. Heldi, M.SiParak Jigarang No. 1/3 RT03/05 Kuanji, Padang
081363428468 [email protected] of Bung HattaUniversity
- - -
2 Ir. Afrizal Naumar, MTJl. Raya Kurao No. 1Padang
081363418758 [email protected] of Bung HattaUniversity
- - -
3 Yul Cherlina Z., ST., MTJl. Anshar No. 29 A, RT02/RW 05, Dadok -Tunggul Hitam, Padang
081363424638 [email protected] of Bung HattaUniversity
- - -
1 Dr. Ir. Wardi, M.SiWisma Utama Blok D4No. 4, Lubuk Begalung -Kota Padang.
081374332825 [email protected] of Bung HattaUniversity
V V V - - -
2 Ir. Drs. Heldi, M.Si., Ph.DParak Jigarang No. 1/3 RT03/05 Kuanji, Padang.
081363428468 [email protected] of Bung HattaUniversity
V V V - - -
3 Asril Yazid, STKomp. Griya Lestari BlokD8, Batung Taba LubegPadang.
08126733441 [email protected] of Bung HattaUniversity
V V V - - -
1 Dr. Ir. Bambang Istijono, MEJl. Tenggiri No. 171 C,Ulak Karang Selatan,Padang.
0811664421 [email protected] of AndalasUniversity
V V - - -
2 Benny Hidayat, ST., MT.,Ph.DKomplek Kampus LimauManis, Padang.
081249814406 [email protected] of AndalasUniversity
V V - - -
3Taufika Ophiyandri,ST.,M.Sc.,Ph.D
Jl. Belibis Blok C No. 17,Air Tawar - Padang.
0811665723 [email protected] of AndalasUniversity
V V - - -
1 Ir. M. Nursyaifi Yulius,M(Mgt)Satker PJN II, Jl. S.Parman No. 129A,
Padang
Jl. Gadih Rantih UjungNo. 20 B, Padang
08126608128 [email protected] of Bung HattaUniversity
V V - - -
2 Alzahri, ST.,MTBPJN III Padang, Jl.Jati No.109 Padang
Komp. Polamas Blok W5,Alai Parak Kopi, Padang
08126721639 [email protected] of Bung HattaUniversity
V V - - -
3 Ir. Drs. Heldi, M.Sc, PhDParak Jigarang No. 1/3 RT03/05 Kuanji, Padang
081363428468 [email protected] of Bung HattaUniversity
V V - - -
1 Ir. M. Nursyaifi Yulius,M(Mgt) Jl. Gadih Rantih UjungNo. 20 B, Padang
08126608128 [email protected] of Bung HattaUniversity
- - - - -
19West
Sumatera14
Painan -Kambang
Augt. 12,2016
Sept. 27,2016
- - -
-
16West
Sumatera10
Sp. Empat - Sp.Air Balam
Jan. 14,2016
Will besheduled
later
Satker PJN I, Jl. KhatibSulaiman No. 9,
Padang- - -
15West
Sumatera08
Bts. Pariaman -Manggopoh
Jan. 14,2016
Jun. 9,2016
Satker PJN I, Jl. KhatibSulaiman No. 9,
Padang- -
-19West
Sumatera21A
Lubuk Alung -Kuraitaji
Feb. 20 –22, 2019
Feb. 20 –22, 2019
- -Satker PJN I, Jl. Kathib
Sulaiaman No. 09,Padang
Dec. 29,2015
Will besheduled
later
-
Satker PJN I Office, Jl.Ir. Rustandi Sugianto
Km 12+225, PulauBaai-Bengkulu
V V -
13West
Sumatera12
Kambang -Indrapura
Dec. 22,2015
Will besheduled
later
Satker PJN II, Jl. S.Parman No. 129A,
Padang- -
14 Bengkulu 16
V
18West
Sumatera21
Lubuk Alung -Kuraitaji
May. 26,2016
Will besheduled
later
Satker PJN I, Jl. KhatibSulaiman No. 9,
PadangV V -
17West
Sumatera20
Lubuk Alung -Sicincin
May. 26,2016
Will besheduled
later
Satker PJN I, Jl. KhatibSulaiman No. 9,
PadangV V
Seblat - Ipuh
I II III I II III I II III
Package Observed TPM Selection and Training TPM Contact
Site VisitNo Province
No. Package
Sele
ctio
nD
ate
Trai
ning
Dat
e
Name of Selected TPM
TPM Involvement
CoordinationMeeting
Reports Relatedto TPM's ActivityTPM's Occupation
LocationTPM's Address
Telp. Email
2 Dr. Ir. Wardi, M.SiWisma Utama Blok D4No. 4, Lubuk Begalung -Kota Padang
081374332825 [email protected] of Bung HattaUniversity
- - - - -
3 Ir. Drs. Heldi, M.Sc, PhDParak Jigarang No. 1/3 RT03/05 Kuanji, Padang
081363428468 [email protected] of Bung HattaUniversity
- - - - -
-19West
Sumatera21A
Lubuk Alung -Kuraitaji
Feb. 20 –22, 2019
Feb. 20 –22, 2019
- -Satker PJN I, Jl. Kathib
Sulaiaman No. 09,Padang
No ProvinceNo.
PackagePackage Name of Selected TPM Occupation
1. Dr. Ir. Hery Riyanto Lecturer of Bandar Lampung University
2. Ir. Sugito, MT Lecturer of Bandar Lampung University
3. Ir. Juniardi, MT Head Department of Civil Engineering of Bandar Lampung University
1. Syaiful Amri,SST., MT Lecturer of Politeknik Negeri Padang
2. Ir. Syaifullah Ali,MT Lecturer of Politeknik Negeri Padang
3. Ir. Riswandi, M.SI Lecturer of Politeknik Negeri Padang
1. Ir.M. Nursyaifi Yulius,MT Lecturer of Bung Hatta University
2. Alzahri, ST.,MT Lecturer of Bung Hatta University
3. Ir. Heldi, M.Sc Lecturer of Bung Hatta University
1. Muhammad Fauzi,ST.,MT Lecturer of Bengkulu University
2. Hardiansyah, ST.,MT Lecturer of Bengkulu University
3. Agung Febrianto,ST Lecturer staff of Bengkulu University
1. Ir. Y. Martono Hadi, MT Lecturer of Lampung University
2. Ofik Taufik Purwadi, ST., MT Lecturer of Lampung University
3. Tas'an Junaidi, ST., MT Lecturer of Lampung University
1. Muhammad Fauzi,ST.,MT Lecturer of Bengkulu University
2. Hesti Aulia Sari, ST Lecturer staff of Bengkulu University
3. Hot Maria Angelina, ST Lecturer staff of Bengkulu University
1. Hardiansyah, ST., MT Lecturer of Bengkulu University
2. Agung Febrianto, ST Lecturer staff of Bengkulu University
3. Nanda Pratama, ST Lecturer staff of Bengkulu University
1. Sahrul Harahap, ST Lecturer of Graha Nusantara University
2. Asroi Benny Noor Harahah, ST., MT Lecturer of Graha Nusantara University
3. M. Yusuf Parlagutan Lubis, ST Lecturer of Graha Nusantara University
1. Ahmad Rafii, ST Lecturer of Graha Nusantara University2. Roy Efendi Subarja, ST Lecturer of Graha Nusantara University
Appendix 8.B List of TPM's Occupation
5 Lampung 17Sp. Gunung Kemala -
Pugung Tampak
2 West Sumatera 02Pd. Sawah - Simp.
Empat
3 West Sumatera 03Manggopoh - Pd.
Sawah
4 Bengkulu 04 Ipuh - Bantal
1 Lampung 01 Krui - Biha
6 Bengkulu 11 Bantal - Mukomuko
7 Bengkulu 13Sp. Rukis - Tj.
Kemuning
8 North Sumatera 05 Sp. Rampa - Poriaha
9 North Sumatera 15 Sibolga - Bts. Tapsel
No ProvinceNo.
PackagePackage Name of Selected TPM Occupation
3. Masitoh Hasibuan, ST Lecturer of Graha Nusantara University1. Dr. Muhammad Fauzi,ST.,MT Lecturer of Bengkulu University2. Hesti Aulia Sari, ST Lecturer staff of Bengkulu University3. Anggi Nidya Sari, ST., M.Eng Lecturer of Bengkulu University1. Dr. Khairul Amri, ST., MT Dean of Engineering Faculty, Bengkulu University2. Nanda Pratama, ST Lecturer staff of Bengkulu University3. Desti Eka Putri, ST Lecturer staff of Bengkulu University1. Ir. Riswandi, M.SI Lecturer of Politeknik Negeri Padang2. Syaiful Amri,SST., MT Lecturer of Politeknik Negeri Padang3. Apwiddhal, ST,.MT Lecturer of Politeknik Negeri Padang1. Syaiful Amri,SST., MT Lecturer of Politeknik Negeri Padang2. Ir. Riswandi, M.SI Lecturer of Politeknik Negeri Padang3. B. Army, ST,. MT Lecturer of Politeknik Negeri Padang1. Dr. Muhammad Fauzi, ST.,MT Lecturer of Bengkulu University2. Deri Saputra, ST Ass. Lecturer of Bengkulu University3. M. Ridwan Sami, ST Ass. Lecturer of Bengkulu University1. Ir.M. Nursyaifi Yulius,MT Lecturer of Bung Hatta University2. Alzahri, ST.,MT Lecturer of Bung Hatta University3. Yendri Nursami, S. Ti Lecturer of Bung Hatta University1. Ir. Drs. Heldi, M.Si Lecturer of Bung Hatta University2. Ir. Afrizal Naumar, MT Lecturer of Bung Hatta University3. Yul Cherlina Z., ST., MT Lecturer of Bung Hatta University1. Dr. Ir. Wardi, M.Si Lecturer of Bung Hatta University2. Ir. Drs. Heldi, M.Si.,Ph.D Lecturer of Bung Hatta University3. Asril Yazid, ST Lecturer of Bung Hatta University1. Dr. Ir. Bambang Istijono, ME Lecturer of Andalas University2. Benny Hidayat, ST., MT.,Ph.D Lecturer of Andalas University3. Taufika Ophiyandri, ST.,M.Sc.,Ph.D Lecturer of Andalas University1. Ir. M. Nursyaifi Yulius,M (Mgt) Lecturer of Bung Hatta University2. Alzahri, ST.,MT Lecturer of Bung Hatta University3. Ir. Drs. Heldi, M.Sc, PhD Lecturer of Bung Hatta University1. Ir. M. Nursyaifi Yulius,M (Mgt) Lecturer of Bung Hatta University2. Dr. Ir. Wardi, M.Si Lecturer of Bung Hatta University3. Ir. Drs. Heldi, M.Sc, PhD Lecturer of Bung Hatta University
19 West Sumatera 21ALubuk Alung -
Sicincin
19 West Sumatera 14 Painan - Kambang
9 North Sumatera 15 Sibolga - Bts. Tapsel
10 Bengkulu 06 Ps. Pedati - Kerkap
11 Bengkulu 19 Lais - Bintunan
14 Bengkulu 16 Seblat - Ipuh
12 West Sumatera 07 Indrapura - Tapan
13 West Sumatera 12Kambang -Indrapura
15 West Sumatera 08Bts. Pariaman -
Manggopoh
16 West Sumatera 10Sp. Empat - Sp. Air
Balam
17 West Sumatera 20Lubuk Alung -
Sicincin
18 West Sumatera 21Lubuk Alung -
Kuraitaji
Date Location Training Date Location
1 Lampung 01 Krui - BihaMarch 5,
2014
Satker PJN II Office, Jl. W. R.Mongonsidi No. 220 B, BandarLampung
June 5-6, 2014Satker PJN II Office, Jl. W. R. Mongonsidi No. 220B, Bandar Lampung
Elected TPM team was from University of BandarLampung.
2West
Sumatera02 Pd. Sawah - Simp. Empat Elected TPM team was from Politeknik Negeri Padang.
3West
Sumatera03 Manggopoh - Pd. Sawah
Elected TPM team was from University of Bung HattaPadang.
4 Bengkulu 04 Ipuh - BantalMarch 10,
2014
Satker PJN I Office, Jl. Ir. RustandiSugianto Km 12+225, Pulau Baai-Bengkulu
July 7-8, 2014Satker PJN I Office, Jl. Ir. Rustandi Sugianto Km12+225, Pulau Baai-Bengkulu
Elected TPM team was from Bengkulu University.
5 Lampung 17Sp. Gunung Kemala -
Pugung TampakDec 04, 2014
Satker PJN II Office, Jl. W. R.Mongonsidi No. 220 B, BandarLampung
Oct. 22, 2015Satker PJN II Office, Jl. W. R. Mongonsidi No. 220B, Bandar Lampung
Elected TPM team was from Lampung University
6 Bengkulu 11 Bantal - Mukomuko Elected TPM team was from Bengkulu University
7 Bengkulu 13 Sp. Rukis - Tj. Kemuning Elected TPM team was from Bengkulu University
8North
Sumatera05 Sp. Rampa - Poriaha Elected TPM team was from Graha Nusantara University
9North
Sumatera15 Sibolga - Bts. Tapsel Elected TPM team was from Graha Nusantara University
10 Bengkulu 06 Ps. Pedati - Kerkap Elected TPM team was from Bengkulu University
11 Bengkulu 19 Lais - Bintunan Elected TPM team was from Bengkulu University
12West
Sumatera07 Indrapura - Tapan Jun. 9, 2016 BBPJN II Office, Jl. Jati No. 109 Padang Elected TPM team was from Politeknik Negeri Padang.
13West
Sumatera12 Kambang - Indrapura Sept. 27, 2016 BBPJN III Office, Jl. Jati No. 109 Padang Elected TPM team was from Politeknik Negeri Padang.
14 Bengkulu 16 Seblat - Ipuh Dec. 29, 2015Satker PJN I Office, Jl. Ir. RustandiSugianto Km 12+225, Pulau Baai-Bengkulu
Will be sheduledlater
Will be decided later Elected TPM team was from Bengkulu University
15West
Sumatera08
Bts. Pariaman -Manggopoh
Jan. 14, 2016 Jun. 9, 2016 BBPJN II Office, Jl. Jati No. 109 Padang Elected TPM team was from Bung Hatta University
16West
Sumatera10 Sp. Empat - Sp. Air Balam Jan. 14, 2016 - - Elected TPM team was from Bung Hatta University
17West
Sumatera20 Lubuk Alung - Sicincin
May. 26,2016
Oct. 13, 2016 BPJN III Office, Jl. Jati No. 109 Padang Elected TPM team was from Bung Hatta University
June 18-19, 2014
Satker PJN I Office, Jl. Khatib SulaimanNo. 9 Padang
Dec. 22, 2015Satker PJN II, Jl. S. Parman No. 129A,Padang
Apr 9, 2015Graha Nusantara University, Jl. Dr.Sutomo, Padangsidempuan
Oct. 9, 2015
Satker PJN I Office, Jl. Khatib SulaimanNo. 9 Padang
BBPJN II Office, Jl. Jati No. 109 PadangSatker PJN I Office, Jl. Khatib SulaimanNo. 9 Padang
March 7,2014
Satker PJN I Office, Jl. Ir. RustandiSugianto Km 12+225, Pulau Baai-Bengkulu
March 11 -12,2015
Satker P2JN Bangkulu Province, Jl. Ir. RustandiSugianto Km 12+225, Pulau Baai - Bengkulu
Dec 22, 2014
TPM TrainingRemarks
Appendix 8.C List of Selection and Training of TPM
PackageNo ProvinceNo.
Package
TPM Selection
PPK 12 Sibolga CS; PIA Hotel Pandan Beach,Tapanuli Tengah
May 5, 2015Satker PJN I Office, Jl. Ir. RustandiSugianto Km 12+225, Pulau Baai-Bengkulu
June 4 - 5, 2015Satker PJN I Office, Jl. Ir. Rustandi Sugianto Km12+225, Pulau Baai-Bengkulu
Date Location Training Date Location
TPM TrainingRemarksPackageNo Province
No.Package
TPM Selection
18West
SumateraLubuk Alung - Kuraitaji
May. 26,2016
Oct. 13, 2016 BPJN III Office, Jl. Jati No. 109 Padang Elected TPM team was from Andalas University
19West
Sumatera14 Painan - Kambang Agt. 12, 2016
Satker PJN II, Jl. S. Parman No. 129A,Padang
Sept. 27, 2016 BBPJN III Office, Jl. Jati No. 109 Padang Elected TPM team was from Bung Hatta University
Satker PJN I Office, Jl. Khatib Sulaiman No. 9Padang
Elected TPM team was from Bung Hatta UniversityWest
Sumatera20 21 Lubuk Alung - Sicincin Feb. 21, 2019
Satker PJN I Office, Jl. Khatib SulaimanNo. 9 Padang
Satker PJN I Office, Jl. Khatib SulaimanNo. 9 Padang Feb. 22, 2019
I II III I II III IV V VI VII VIII I II III Final
1. Dr. Ir. Hery Riyanto V V V V V
2. Ir. Sugito, MT V V V V V
3. Ir. Juniardi, MT V V V V V
1. Syaiful Amri,SST., MT V V V V V
2. Ir. Syaifullah Ali,MT V V V V V
3. Ir. Riswandi, M.SI V V V V V
1. Ir. M. Nursyaifi Yulius,MT V V V V V
2. Alzahri, ST.,MT V V V V V
3. Ir. Heldi, M.Sc V V V V V
1. Muhammad Fauzi,ST.,MT V V V V V
2. Hardiansyah, ST.,MT V V V V V
3. Agung Febrianto,ST V V V V V
1. Ir. Y. Martono Hadi, MT V V V
2. Ofik Taufik Purwadi, ST., MT V V V
3. Tas'an Junaidi, ST., MT V V V
1. Muhammad Fauzi,ST.,MT V V V
2. Hesti Aulia Sari, ST V V V
3. Hot Maria Angelina, ST V V V
1. Hardiansyah, ST., MT V V V
2. Agung Febrianto, ST V V V
3. Nanda Pratama, ST V V V
1. Sahrul Harahap, ST V V V
2. Asroi Benny Noor Harahah, ST., MT V V V
3. M. Yusuf Parlagutan Lubis, ST V V V
1. Ahmad Rafii, ST V V V
2. Roy Efendi Subarja, ST V V V
3. Masitoh Hasibuan, ST V V V
1. Dr. Muhammad Fauzi,ST.,MT V V V
2. Hesti Aulia Sari, ST V V V
3. Anggi Nidya Sari, ST., M.Eng V V V
1. Dr. Khairul Amri, ST., MT V X X
2. Nanda Pratama, ST V X X
3. Desti Eka Putri, ST V X X
1. Ir. Riswandi, M.Si V V V
2. Syaiful Amri,SST., MT V V V
5 Lampung 17
Sp. GunungKemala -PugungTampak
V
V
V V
V
6 Bengkulu 11Bantal -
Mukomuko
7 Bengkulu 13Sp. Rukis - Tj.
Kemuning
Appendix 8.D Status of TPM Activities and Reporting
2West
Sumatera02
Pd. Sawah -Simp. Empat
Site Visit
1 Lampung 01 Krui - Biha
TPM Involvement Reports of TPM ActivityName of Selected TPMNo Province
V V V
No.Package
Package Coordination Meeting
4 Bengkulu 04 Ipuh - Bantal
3West
Sumatera03
Manggopoh -Pd. Sawah
V V V
V V V
X X X
V
V V
9North
Sumatera15
Sibolga - Bts.Tapsel
On
Proc
ess
8North
Sumatera05
Sp. Rampa -Poriaha
V
V V
11 Bengkulu 19 Lais - Bintunan X X X
10 Bengkulu 06Ps. Pedati -
KerkapV
On
Proc
ess
12West
Sumatera07
Indrapura -Tapan
I II III I II III IV V VI VII VIII I II III Final
Site Visit
1 Lampung 01 Krui - Biha
TPM Involvement Reports of TPM ActivityName of Selected TPMNo Province
V V V
No.Package
Package Coordination Meeting
3. Apwiddhal, ST,.MT V V V
1. Syaiful Amri,SST., MT V V V
2. Ir. Riswandi, M.Si V V V
3. B. Army, ST,. MT V V V
1. Dr. Muhammad Fauzi,ST.,MT V V
2. Deri Saputra, ST V V
3. M. Ridwan Sami, ST V V
V14 Bengkulu 16 Seblat - Ipuh V
On
Proc
ess
13West
Sumatera12
Kambang -Indrapura
On
Proc
ess
12West
Sumatera07
Indrapura -Tapan
I II III I II III IV V VI VII VIII I II III Final
Site Visit
1 Lampung 01 Krui - Biha
TPM Involvement Reports of TPM ActivityName of Selected TPMNo Province
V V V
No.Package
Package Coordination Meeting
1. Ir.M. Nursyaifi Yulius,MT V V V
2. Alzahri, ST.,MT V V V
3. Yendri Nursami, S. Ti V V V
1. Ir. Drs. Heldi, M.Si
2. Ir. Afrizal Naumar, MT
3. Yul Cherlina Z., ST., MT
1. Dr. Ir. Wardi, M.Si V V V
2. Ir. Drs. Heldi, M.Si.,Ph.D V V V
3. Asril Yazid, ST V V V
1. Dr. Ir. Bambang Istijono, ME V V
2. Benny Hidayat, ST., MT.,Ph.D V V
3. Taufika Ophiyandri, ST.,M.Sc.,Ph.D V V
1. Ir. M. Nursyaifi Yulius, M(Mgt) V V V
2. Alzahri, ST.,MT V V V
3. Ir. Drs. Heldi, M.Sc, PhD V V V
1. Ir. M. Nursyaifi Yulius, M(Mgt)
2. Dr. Ir. Wardi, M.Si
3. Ir. Drs. Heldi, M.Sc, PhD
20West
Sumatera21A
Lubuk Alung -Kuraitaji
19West
Sumatera14
Painan -Kambang
On
Proc
ess
15West
Sumatera08
Bts. Pariaman -Manggopoh
V V V
16West
Sumatera10
Sp. Empat -Sp. Air Balam
17West
Sumatera20
Lubuk Alung -Sicincin
V V V
18West
Sumatera21
Lubuk Alung -Kuraitaji
V V
1 Dr. Ir. Hery RiyantoJl. Duku D2 No. 9, Kel. BeringinRaya, Kemiling-B. Lampung
08127218266 [email protected] of BandarLampung University
2 Ir. Sugito, MTJl. Sukardihamdani, Palapa 5ANo. 29A, Bandar Lampung
08218143644 [email protected] of BandarLampung University
3 Ir. Juniardi, MTJl. U. Surapati Gg. MataramNo. 1, Bandar Lampung
085225168058 [email protected] Dep. of CivilEngineering of BandarLampung University
1 Syaiful Amri,SST., MTJl. Andalas Gg. Sarga Indah No.43, Padang
081363435968 [email protected] of PoliteknikNegeri Padang
2 Ir. Syaifullah Ali,MTKomp. Pelangi Indah B5/5Korong Gadang, Kuranji
08126601952 [email protected] of PoliteknikNegeri Padang
3 Ir. Riswandi, M.SIJl. Lubuk Bayu No. 1 Kurao,Pagang Nanggalo, Padang
08126713602 [email protected] of PoliteknikNegeri Padang
1 Ir.M. Nursyaifi Yulius,MTJl. Gadih Rantih Ujung No. 20B, Padang
08126608128 [email protected] of Bung HattaUniversity
2 Alzahri, ST.,MTKomp. Polamas Blok W5, AlaiParak Kopi, Padang
08126721639 [email protected] of Bung HattaUniversity
3 Ir. Heldi, M.ScParak Jigarang No. 1/3 RT03/05 Kuanji, Padang
081363428468 [email protected] of Bung HattaUniversity
1 Muhammad Fauzi,ST.,MTJl. Unib Permai Blok I No. 50,Pematang Gubernur - Bengkulu
08137690429 [email protected] of BengkuluUniversity
2 Hardiansyah, ST.,MTRT01/RW 004 Sumur Dewa-Slebar, Bengkulu
081368008820 [email protected] of BengkuluUniversity
3 Agung Febrianto,STRT 02/RW 003, Dwi Tunggal -Curup Utara, Bengkulu
085366851999 [email protected] staff of BengkuluUniversity
1 Ir. Y. Martono Hadi, MTJl. Bungur No. 3 Way Halim,Bandar Lampung.
0816414590 [email protected] of LampungUniversity
2 Ofik Taufik Purwadi, ST., MTJl. Swadaya 7 No. 56 GunungTerang, Bandar Lampung.
081279647013 [email protected] of LampungUniversity
Telp. EmailNo Province
Package Observed
Name of Selected TPMTPM Selection and Training
TPM's AddressTPM Contact
TPM's Occupation
1 Lampung 01 Krui - BihaMarch 5,
2014June 5-6,
2014
Satker PJN II Office,Jl. W. R. Mongonsidi
No. 220 B, BandarLampung
No. Package SelectionDate
Training Date Location
June 18-19, 2014
Satker PJN I Office, Jl.Khatib Sulaiman No.
9, Padang
Satker PJN I, Jl. KhatibSulaiman No. 9,
Padang
3West
Sumatera03
Manggopoh - Pd.Sawah
March 7,2014
2West
Sumatera02
Pd. Sawah - Simp.Empat
March 7,2014
June 18-19, 2014
Oct. 22,2015
Satker PJN II Office,Jl. W. R. Mongonsidi
No. 220 B, BandarLampung
Satker PJN I Office, Jl.Ir. Rustandi Sugianto
Km 12+225, PulauBaai-Bengkulu
5 Lampung 17Sp. Gunung
Kemala - PugungTampak
Dec 04,2014
4 Bengkulu 04 Ipuh - BantalMarch 10,
2014July 7-8,
2014
Appendix 8.D List of Data of Third Party Monitoring (TPM)
Telp. EmailNo Province
Package Observed
Name of Selected TPMTPM Selection and Training
TPM's AddressTPM Contact
TPM's OccupationNo. Package Selection
DateTraining Date Location
3 Tas'an Junaidi, ST., MTJl. Padat Karya RT 06/RW 01Rajabasa Raya, B. Lampung.
081369109125 [email protected] of LampungUniversity
1 Muhammad Fauzi,ST.,MTJl. Unib Permai Blok I No. 50,Pematang Gubernur - Bengkulu
08137690429 [email protected] of BengkuluUniversity
2 Hesti Aulia Sari, STJl. P. Natadiraja No. 20 Kel.Gedang, Gading Cempaka -Bengkulu
085266724618 [email protected] staff of BengkuluUniversity
3 Hot Maria Angelina, STJl. Beo No. 60 PerumnasLingkar Barat, Kota Bengkulu.
085788095319 [email protected] staff of BengkuluUniversity
1 Hardiansyah, ST., MTJl. Hibrida 15 No. 43,Sidomulyo, Gading Cempaka -Bengkulu.
081368008820 [email protected] of BengkuluUniversity
2 Agung Febrianto, STJl. Asrama I Gang Setia BudiNo. 5, Curup - Bengkulu.
085366851999 [email protected] staff of BengkuluUniversity
3 Nanda Pratama, STJl. Hibrida 2 RT 06 RT 07Kelurahan Sidomulyo,Bengkulu.
085266724617 [email protected] staff of BengkuluUniversity
1 Sahrul Harahap, STJl. Bakti Kopri Gg. Asri,Padangsidempuan.
081376919899 [email protected] of GrahaNusantara University
2 Asroi Benny Noor Harahah, ST., MTJl. Bakti Abdi I No. 5,Padangsidempuan.
081260244024 [email protected] of GrahaNusantara University
3 M. Yusuf Parlagutan Lubis, STJl. Thamrin No. 1,Padangsidempuan.
08139661661 [email protected] of GrahaNusantara University
1 Ahmad Rafii, STJl. Imam Bonjol Gg. Surya,Pdg.sidempuan.
081370511188 [email protected] Lecturer of GrahaNusantara University
2 Roy Efendi Subarja, STJl. Dwikora II,Padangsidempuan.
08126320644 [email protected] of GrahaNusantara University
3 Masitoh Hasibuan, STJl. Sisingamangaraja Gg.Magabe, Pdg. sidempuanSelatan.
082369328301 [email protected] of GrahaNusantara University
1 Dr. Muhammad Fauzi,ST.,MTJl. Unib Permai Blok I No. 50,Pematang Gubernur - Bengkulu
08137690429 [email protected] of BengkuluUniversity
2 Hesti Aulia Sari, STJl. P. Natadiraja No. 20 Kel.Gedang, Gading Cempaka -Bengkulu
085266724618 [email protected] staff of BengkuluUniversity
Oct. 22,2015
Satker PJN II Office,Jl. W. R. Mongonsidi
No. 220 B, BandarLampung
5 Lampung 17Sp. Gunung
Kemala - PugungTampak
Dec 04,2014
March 11-12, 2015
Satker PJN I Office, Jl.Ir. Rustandi Sugianto
Km 12+225, PulauBaai-Bengkulu
Satker PJN I Office, Jl.Ir. Rustandi Sugianto
Km 12+225, PulauBaai-Bengkulu
7 Bengkulu 13Sp. Rukis - Tj.
KemuningDec 22,
2014
6 Bengkulu 11Bantal -
MukomukoDec 22,
2014March 11-12, 2015
Oct. 9,2015
Graha NusantaraUniversity, Jl. Dr.
Sutomo,Padangsidempuan
Graha NusantaraUniversity, Jl. Dr.
Sutomo,Padangsidempuan
9North
Sumatera15
Sibolga - Bts.Tapsel
Apr 9,2015
8North
Sumatera05
Sp. Rampa -Poriaha
Apr 9,2015
Oct. 9,2015
Satker PJN I Office, Jl.Ir. Rustandi Sugianto
Km 12+225, PulauBaai-Bengkulu
10 Bengkulu 06 Ps. Pedati - KerkapMay 5,2015
June 4 -5,2015
Telp. EmailNo Province
Package Observed
Name of Selected TPMTPM Selection and Training
TPM's AddressTPM Contact
TPM's OccupationNo. Package Selection
DateTraining Date Location
3 Anggi Nidya Sari, ST., M.EngJl. Halmahera RT 02 RW 03 No.5, Bengkulu.
082180708080 [email protected] of BengkuluUniversity
1 Dr. Khairul Amri, ST., MTJl. Hibrida 15 Gg. Mandiri 5 No.25, Bengkulu.
081367719694 [email protected] of EngineeringFaculty, BengkuluUniversity
2 Nanda Pratama, STJl. Hibrida 2 RT 06 RT 07Kelurahan Sidomulyo,Bengkulu.
085266724617 [email protected] staff of BengkuluUniversity
3 Desti Eka Putri, STJl. WR. Supratman, KandangLimun, Kota Bengkulu.
081919493764 [email protected] staff of BengkuluUniversity
1 Ir. Riswandi, M.SIJl. Lubuk Bayu No. 1 Kurao,Pagang Nanggalo, Padang
08126713602 [email protected] of PoliteknikNegeri Padang
2 Syaiful Amri,SST., MTJl. Andalas Gg. Sarga Indah No.43, Padang
081363435968 [email protected] of PoliteknikNegeri Padang
3 Apwiddhal, ST,.MTJl. Gapura No. 1 Air TawarTimur, Padang
81374698872 [email protected] of PoliteknikNegeri Padang
1 Syaiful Amri,SST., MTSatker PJN II, Jl. S.Parman No. 129A,
Padang
Jl. Andalas Gg. Sarga Indah No.43, Padang
081363435968 [email protected] of PoliteknikNegeri Padang
2 Ir. Riswandi, M.SIBPJN II Padang Jl. Jati
109 PadangJl. Lubuk Bayu No. 1 Kurao,Pagang Nanggalo, Padang
08126713602 [email protected] of PoliteknikNegeri Padang
3 B. Army, ST,. MTTaman Bamaran Indah Blok PNo. 3 Padang
085274352715 [email protected] of PoliteknikNegeri Padang
1 Dr. Muhammad Fauzi, ST.,MTJl. Unib Permai Blok I No. 50,Pematang Gubernur - Bengkulu
08137690429 [email protected] of BengkuluUniversity
2 Deri Saputra, STPerumnas Bentiring Indah,Muara Bangkahulu - Bengkulu
08992212213 [email protected]. Lecturer of BengkuluUniversity
3 M. Ridwan Sami, STJl. Batang Hari 6 No. 26,Bengkulu
082281767448 [email protected]. Lecturer of BengkuluUniversity
1 Ir.M. Nursyaifi Yulius,MTJl. Gadih Rantih Ujung No. 20B, Padang
08126608128 [email protected] of Bung HattaUniversity
2 Alzahri, ST.,MTKomp. Polamas Blok W5, AlaiParak Kopi, Padang
08126721639 [email protected] of Bung HattaUniversity
June 4 -5,2015
Satker PJN I Office, Jl.Ir. Rustandi Sugianto
Km 12+225, PulauBaai-Bengkulu
Satker PJN I Office, Jl.Ir. Rustandi Sugianto
Km 12+225, PulauBaai-Bengkulu
11 Bengkulu 19 Lais - BintunanMay 5,2015
10 Bengkulu 06 Ps. Pedati - KerkapMay 5,2015
June 4 -5,2015
Sept. 27,2016
Satker PJN II, Jl. S.Parman No. 129A,
Padang
13West
Sumatera12
Kambang -Indrapura
Dec. 22,2015
12West
Sumatera07 Indrapura - Tapan
Dec. 22,2015
Jun. 9,2016
Satker PJN I Office, Jl.Ir. Rustandi Sugianto
Km 12+225, PulauBaai-Bengkulu
15West
Sumatera08
Bts. Pariaman -Manggopoh
Jan. 14,2016
14 Bengkulu 16 Seblat - IpuhDec. 29,
2015
Will besheduled
later
Jun. 9,2016
Satker PJN I, Jl. KhatibSulaiman No. 9,
Padang
Telp. EmailNo Province
Package Observed
Name of Selected TPMTPM Selection and Training
TPM's AddressTPM Contact
TPM's OccupationNo. Package Selection
DateTraining Date Location
3 Yendri Nursami, S. TiJl. Tepi Banjir Kanal No. 9 A,Sawahan Timur - Padang
085217374888 [email protected] of Bung HattaUniversity
1 Ir. Drs. Heldi, M.SiParak Jigarang No. 1/3 RT03/05 Kuanji, Padang
081363428468 [email protected] of Bung HattaUniversity
2 Ir. Afrizal Naumar, MT Jl. Raya Kurao No. 1 Padang 081363418758 [email protected] of Bung HattaUniversity
3 Yul Cherlina Z., ST., MTJl. Anshar No. 29 A, RT 02/RW05, Dadok - Tunggul Hitam,Kota Padang
081363424638 [email protected] of Bung HattaUniversity
1 Dr. Ir. Wardi, M.SiWisma Utama Blok D4 No. 4,Lubuk Begalung - Kota Padang.
081374332825 [email protected] of Bung HattaUniversity
2 Ir. Drs. Heldi, M.Si., Ph.DParak Jigarang No. 1/3 RT03/05 Kuanji, Padang.
081363428468 [email protected] of Bung HattaUniversity
3 Asril Yazid, STKomp. Griya Lestari Blok D8,Batung Taba Lubeg Padang.
08126733441 [email protected] of Bung HattaUniversity
1 Dr. Ir. Bambang Istijono, MEJl. Tenggiri No. 171 C, UlakKarang Selatan, Padang.
0811664421 [email protected] of AndalasUniversity
2 Benny Hidayat, ST., MT.,Ph.DKomplek Kampus Limau Manis,Padang.
081249814406 [email protected] of AndalasUniversity
3Taufika Ophiyandra, ST., M.Sc.,Ph.D
Jl. Belibis Blok C No. 17, AirTawar - Padang.
0811665723 [email protected] of AndalasUniversity
1 Ir. M. Nursyaifi Yulius,M (Mgt)Satker PJN II, Jl. S.Parman No. 129A,
Padang
Jl. Gadih Rantih Ujung No. 20B, Padang
08126608128 [email protected] of Bung HattaUniversity
2 Alzahri, ST.,MTBPJN II Padang Jl. Jati
109 PadangKomp. Polamas Blok W5, AlaiParak Kopi, Padang
08126721639 [email protected] of Bung HattaUniversity
3 Ir. Drs. Heldi, M.Sc, PhDParak Jigarang No. 1/3 RT03/05 Kuanji, Padang
081363428468 [email protected] of Bung HattaUniversity
1 Ir. M. Nursyaifi Yulius,M (Mgt)Wisma Utama Blok D4 No. 4,Lubuk Begalung - Kota Padang.
081374332825 [email protected] of Bung HattaUniversity
2 Dr. Ir. Wardi, M.SiKomp. Polamas Blok W5, AlaiParak Kopi, Padang
08126721639 [email protected] of Bung HattaUniversity
3 Ir. Drs. Heldi, M.Sc, PhDParak Jigarang No. 1/3 RT03/05 Kuanji, Padang
081363428468 [email protected] of Bung HattaUniversity
20West
Sumatera21A
Lubuk Alung -Kuraitaji
Feb. 21,2019
Feb. 21,2019
Satker PJN I, Jl. KhatibSulaiman No. 9,
Padang
19West
Sumatera14 Painan - Kambang
Augt 12,2016
Sept. 27,2016
15West
Sumatera08
Bts. Pariaman -Manggopoh
Jan. 14,2016
Satker PJN I, Jl. KhatibSulaiman No. 9,
Padang18
WestSumatera
21Lubuk Alung -
KuraitajiMay. 26,
2016
Will besheduled
later
Will besheduled
later
Satker PJN I, Jl. KhatibSulaiman No. 9,
Padang
Satker PJN I, Jl. KhatibSulaiman No. 9,
Padang
17West
Sumatera20
Lubuk Alung -Sicincin
May. 26,2016
16West
Sumatera10
Sp. Empat - Sp. AirBalam
Jan. 14,2016
Will besheduled
later
Jun. 9,2016
Satker PJN I, Jl. KhatibSulaiman No. 9,
Padang
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
Appendix 9The Progress of Third Party Monitoring (TPM) Activities
January 2013 – March 2019 and Works Plan for Next Steps
No Subject of Activities Target Completed
1. Preparation the initial draft of ToR of selection the TPM Dec, 2013 Dec, 2013
2. Providing the TPM selection guidelines. Dec, 2013 Dec, 2013
3. Providing the Training Materials for the TPM Dec, 2013 Dec, 2013
4. Preparing the official letter from the Director of Planning as Chairman ofPMU to Head of BBPJN II & III, about the Selection of TPM. Jan, 2014 Jan. 24, 2014
5. Preparing the official letter from the Director of Planning as Chairman ofPMU to Universities, about the Selection of TPM. Jan., 2014 Jan 29, 2014
6. Preparing the official letter from the Official in Charge/Ketua PelaksanaHarian PMU to Satker/PPK, about the Selection of TPM Jan, 2014 Jan 13, 2014
7.Preparing the official letter from the Official in Charge/Ketua PelaksanaHarian PMU to Universities and Satker/PPK, about the Socialization ofTPM Selection for Package 01, 02, & 03
Feb. 2014 Feb. 07, 2014Feb. 13, 2014
8. Socialization of the TPM selection for package 01: Krui - Biha. Feb. 2014 Febr. 14, 2014
9. Socialization of the TPM selection for package 02: Padang Sawah –Simpang Empat and package 03: Manggopoh – Simpang Empat Feb. 2014 Febr. 18, 2014
10.Preparing the official letter from the Director of Planning as Chairman ofPMU to University of Bengkulu, about the Selection of TPM for package04: Ipuh - Bantal.
Jan, 2014 Febr. 19, 2014
11. Help the PMU on formulating the TPM Evaluation Team March 2014 Febr. 25, 2014
12. Implementation of selection of the TPM for four AWP-1 packages by TPMEvaluation Team March 2014 March 10, 2014
13. Delivery of the Preparatory Training for elected TPM for package 01: Krui– Biha in Lampung June 2014 June 5 - 6, 2014
14Delivery of the Preparatory Training for elected TPM for package 02:Padang Sawah – Simpang Empat, and package 03: Mangopoh – PadangSawah in West Sumatera
June 2014 June 17-18, 2014
15 Delivery of the Preparatory Training for elected TPM for package 04: Ipuh– Bantal in Bengkulu July 2014 July 7 – 8, 2014
16 Approval process of elected TPM July 2014 July 7 – 8, 2014
17 Assist PMU to prepare the Decree on Establishment the TPM of AWP-1WINRIP from Director of Planning DGH, as the Chairman of PMU.
August 2014 Sept. 1, 2014
18
Sending the Coordination Letter from Director of Planning, DirectorateGeneral of Highways to the Head of BBPJN Region I Medan, aboutSelection of the Third Party Monitoring (TPM) for package 05 (SimpangRampa – Poriaha, and package 15 (Sibolga – Tapanuli Selatan border) inNorth Sumatera.
October 2014 Oct, 07, 2014
19
Sent the Information Letter about participation of Third Party Monitoring(TPM) on WINRIP, from Director of Planning, Directorate General ofHighways to the University of Lampung (UNILA) for package 17 (SimpangGunung Kemala – Pugung Tampak) in Lampung Province.
October 2014 Oct, 03, 2014
20
Sent the Information Letter about participation of Third Party Monitoring(TPM) on WINRIP, from Director of Planning, Directorate General ofHighways to the University of Sumatera Utara (USU) for package 05(Simpang Rampa – Poriaha) in North Sumatera Province
October 2014 Oct, 03, 2014
21
Sent the Information Letter about participation of Third Party Monitoring(TPM) on WINRIP, from Director of Planning, Directorate General ofHighways to the University of Bengkulu (UNIB) for package 11 (Bantal –Mukomuko) and package 13 (Simpang Rukis - Tanjung Kemuning) inBengkulu Province.
October 2014 Oct, 20, 2014
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
No Subject of Activities Target Completed
22Selection of the Third Party Monitoring (TPM) for packages 17 (SimpangGunung Kemala – Pugung Tampak) Lampung Province November 2014 Dec. 4, 2014
23 Selection of the Third Party Monitoring (TPM) for packages 11, and 13,Bengkulu Province
December 2014 Dec. 22, 2014
24 Socialization and Explaination of the Third Party Monitoring (TPM) forpackages 05, and 15 in Universitas Graha Nusantara Padang-sidempuan
January 2015 Jan, 28, 2015
25 Socialization and Explaination of the Third Party Monitoring (TPM) forpackages 05, and 15 in Universitas Sumatera Utara Medan
January 2015 Jan, 30, 2015
26
The Employment Agreement or Memorandum of Understanding betweenTPM (packages 01, 02, 03, and 04) with the CTC WINRIP (PT. PlannersDjaja) has been signed. November 2014 Feb. 26, 2015
27Delivery of the Preparatory Training for elected TPM for package 11:Bantal – Mukomuko and package 13: Simp. Rukis – Tj. Kemuning, inBengkulu
January 2015 March 11-12,2015
28 Selection of the Third Party Monitoring (TPM) for packages 05, and 15,Northern Sumatera Province March 2015 April 9, 2015
29 Selection of the Third Party Monitoring (TPM) for packages 06, and 19, inBengkulu Province May 2015 May 5, 2015
30Delivery of the Preparatory Training for elected TPM for package 06:Pasar Pedati – Kerkap and package 19: Lais – Bintunan, in BengkuluProvince
June 2015 June 4-5, 2015
31 The TPM of package 01 (Krui - Biha) has been doing site observations (fieldvisit) for the first phase July 2015
32 TPM package 02 (Padang Sawah - Simpang Empat) and package 03(Mangopoh - Padang Sawah), had conducted a field visit for first phase July 2015
33 The TPM of package 01 (Krui - Biha) has been done site observations (fieldvisit) for the second phase
3rd week ofAugust 2015
34 The TPM of package 04 (Ipuh - Bantal) has been done site observations(field visit) for the first phase
4th of August2015
35 The Community Development Team of CTC WINRIP has monitored theTPM’s Activity on TPM Package 01 Krui - Biha Agt. 19 -21, 2015
36 The Community Development Team of CTC WINRIP has monitored theTPM’s Activity on TPM Package 04 Ipuh - Bantal Agt. 27 -28, 2015
37The Community Development Team of CTC WINRIP has monitored theTPM’s Activity on TPM Package 02 (Padang Sawah – Simpang Empat)package 03 (Manggopoh Padang Sawah)
Sept. 10 - 11,2015
38The TPM of Package 02 (Padang Sawah – Simpang Empat) an package 03(Manggopoh Padang Sawah) had been done site observations (field visit)for the first phase
Sept, 2015
39Delivery of the Preparatory Training for appointed TPM for package 05:Sp. Rampa – Poriaha and package 15: Sibolga – Batas Tapsel in NorthSumatera Province
October 9, 2015
40 Delivery of the Preparatory Training for appointed TPM for package 17:Sp. Gunung Kemala – Pugung Tampak in Lampung Province Oct. 22, 2015
41 TPM package 04 Ipuh – Bantal has submitted their Field Visit MonitoringReport to PMU WINRIP Oct. 27, 2015
42 TPM package 03 Maggopoh – Padang Sawah has submitted their FieldVisit Monitoring Report to PMU WINRIP Nov. 11, 2015
43 TPM package 01 Krui – Biha has submitted their Field Visit MonitoringReport to PMU WINRIP Nov. 26, 2015
44The Community Development Team of CTC WINRIP has monitored theTPM’s Activity on TPM Package 11 (Bantal – Mukomuko) package 13(Simpang Rukis – Tanjung Kemuning) in Bengkulu Province
Dec. 03-04, 2015
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
No Subject of Activities Target Completed
45 Selection of the Third Party Monitoring (TPM) for packages 07 and 12 inWest Sumatera Province Dec. 22, 2015
46 Selection of the Third Party Monitoring (TPM) for package 16 in BengkuluProvince Dec. 29, 2015
47 Selection of the Third Party Monitoring (TPM) for packages 08 and 10 inWest Sumatera Province Jan. 14, 2016
48The Community Development Team of CTC WINRIP has monitored theTPM’s Activity on TPM Package 04 (Ipuh – Bantal) and package 11 (Bantal– Mukomuko) in Bengkulu Province
Apr. 6-8, 2016
49The Community Development Team of CTC WINRIP has monitored theTPM’s Activity on TPM Package 02 (Padang Sawah – Simpang Empat) andpackage 03 (Manggopoh – Padang Sawah) in West Sumatra Province
Apr. 20-22, 2016
50The Community Development Team of CTC WINRIP has carry out ofSocialization of the TPM for package 14, 20, 21 to Andalas University ofpadang in BBPJN II Padang.
Apr. 27, 2016
51Community Development team has monitored the TPM activity onpackage 06 (Pasar Pedati – Kerkap) and package 19 (Lais – Bintunan) inBengkulu Province.
May 18–20, 2016
52Community Development team has carry out of TPM selection for package20 (Lubuk Alung - Sicincin) and package 21 (Lubuk Alung – Kuraitaji) inWest Sumatera Province
May 26, 2016
53Community Development team has delivered of the Preparatory Trainingfor appointed TPM for package 07and package 08 in West SumateraProvince
June 9, 2016
54Community Development team has monitored the TPM activity onpackage 05 (Simpang Rampa – Poriaha) and package 15 (Sibolga – BatasTapsel) in North Sumatera Province.
June 20–22, 2016
55 Community Development team has monitored the TPM activity onpackage 17 (Simpang Gn. Kemala – Pugung Tampak) in Lampung Province. July 27–29, 2016
56 Community Development team has carry out of TPM selection for package14 (Painan – Kambang) in West Sumatera Province Agt. 11–13, 2016
57 Community Development team has monitored the TPM activity onpackage 06 (Pasar Pedati – Kerkap) in Bengkulu. Agt. 24–26, 2016
58Community Development team has delivered of the Preparatory Trainingfor appointed TPM for package 12 and package 14 in West SumateraProvince
Sept. 27, 2016
59Community Development team has delivered of the Preparatory Trainingfor appointed TPM for package 20 and package 21 in West SumateraProvince
Oct. 13, 2016
60Community Development team has monitored the TPM activity onpackage 07 (Indrapura – Tapan) and package 12 (Kambang – Indrapura) inWest Sumatera Province.
Nov. 16–19, 2016
61 Community Development team has monitored the TPM activity onpackages 13 (Simpang Rukis – Tanjung Kemuning) in Bengkulu Proince. Nov. 28–30, 2016
62 Community Development team has monitored the TPM activity onpackage 05 (Simpang Rampa – Poriaha) in Nort Sumatera Province. Dec. 15 - 17, 2016
63 Community Development team has monitored the TPM activity onpackage 08 (Bt. Kota Pariaman – Manggopoh) in West Sumatera Province. Dec. 22 - 24, 2016
64 Community Development team has monitored the TPM activity onpackage 06 (Ps. Pedati – Kerkap) in Bengkulu Province. Dec. 29 - 31, 2016
65
Community Development team was facilitation TPM for package 04 (Ipuh- Bantal) and package 11 (Bntal – Mukomuko) of Bengkulu Province,meeting with Management of PT. Perentjana Djaja, on topic ofreimbursement of TPM monitoring cost.
Jan. 16, 2017
66Community Development team has monitored the TPM activity onpackage 20 (Lubuk Alung – Sicincin) and package 21 (Lubuk Alung –Kuraitaji) in West Sumatera Province.
March 2 - 4, 2017
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
No Subject of Activities Target Completed
67 Community Development team has monitored the TPM activity onpackage 14 (Painan – Kambang) in West Sumatera Province.
March 15 - 17, 2017
68 Community Development team has monitored the TPM activity onpackage 17 (Simp. Gng Kemala – Pugung Tampak) in Lampung Province.
March 22 - 24, 2017
69 Community Development team has monitored the TPM activity onpackage 12 (Kambang – Indrapura) in West Sumatera Province.
April 10 - 12, 2017
70 Community Development team has delivered of the Preparatory Trainingfor appointed TPM for package 16 in Bengkulu Province
April 27, 2017
71 Develop Report of Preparatory Training for TPM of package 16 (Sebelat -Ipuh) in Bengkulu
May 2, 2017
72 Develop Evaluation Report on Implementation of Third Party Monitoring(TPM) from the project beginning up to May 2017
May 4-8, 2017
73Prepare draft Special Report of the Implementation of Anti-CorruptionAction Plan (ACAP) as a part of draft CTC WINRIP Final Report or ProjectCompleting Report
Begin on May 9,2017
74Prepare the response to Supreme Audit Board / Badan PemeriksaKeuangan (BPK) Republic of Indonesia findings on funding the Third PartyMonitoring from Provisional Sums.
May 29-30, 2017
75Community Development team has monitored the TPM activity onpackage 15 (Sibolga – Batas Tapsel) and package 05 (Simpang Rampa –Poriaha) in North Sumatera Province.
June 13 - 17, 2017
76 Community Development team has monitored the TPM activity onpackage 16 (Seblat – Ipuh) in Bengkulu Province.
July 26 - 28, 2017
77Community Development team has monitored the TPM activity onpackage 08 (Batas Kota Pariaman – Manggopoh) in West SumateraProvince.
Agt. 28 - 30, 2017
78 Community Development team has monitored the TPM activity onpackage 14 (Painan –Kambang) in West Sumatera Province.
Sept. 14 - 16, 2017
79 Community Development team has monitored the TPM Activity forPackage 12 (Kambang – Indrapura) phase 2, in West Sumatera Province. Oct. 04 – 06, 2017
80Community Development team has monitored the TPM Activity forPackage 17 (Simpang Gunung Kemala – Pugung Tampak) phase 3, inLampung Province.
Oct. 16 – 18, 2017
81 Community Development team has monitored the TPM Activity forPackage 20 (Lubuk Alung – Sicincin) phase 2, in West Sumatera Province Oct. 26 – 28, 2017
82 Community Development team has monitored the TPM Activity forPackage 21 (Lubuk Alung – Kuraitaji) phase 2, in West Sumatera Province. Nov. 15 – 17, 2017
83 Community Development team has monitored the TPM Activity forPackage 07 (Indrapura – Tapan) phase 2, in West Sumatera Province Nov. 22 – 24, 2017
84Community Development team has monitored the TPM Activity for thirdphase of Package 08 (Batas Kota Pariaman – Manggopoh), in WestSumatera Province.
Dec. 13 – 15, 2017
85Community Development team has monitored the TPM Activity forsecond phase of Package 13 (Simpang Rukis – Tanjung Kemuning) inBengkulu Province
Dec. 20 - 22, 2017
86 Community Development team has monitored th TPM Activity for thirdphase of Package 07 (Indrapura – Tapan)in West Sumatera Province Jan. 22 – 25, 2018
87 Community Development team has monitored th TPM Activity for thirdphase of Package 20 (Lubuk Alung – Sicincin) in West Sumatera Province Feb. 7 – 9, 2018
88Community Development team has monitored the TPM Activity for thirdphase of Package 05 (Simpang Rampa – Poriaha) in North SumateraProvince
Feb. 21 – 23, 2018
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
No Subject of Activities Target Completed
89Community Development team has monitored the TPM Activity forsecond phase of Package 15 (Sibolga – Batas Tapsel) in North SumateraProvince
March 21 – 23,2018
90 Community Development team has monitored the TPM Activity forsecond phase of Package 16 (Seblat – Ipuh), in Bengkulu Province.
March 26 - 282018
91Community Development team has monitored TPM Activity for secondphase of package 13 (Simpang Rukis – Tanjung Kemuning) in BengkuluProvince.
April 19 – 22, 2018
92 Community Development team has monitored TPM Activity for thirdphase of package 12 (Kambang – Indrapura) in West Sumatera Province. May 03 – 06 2018
93 Community Development team has monitored TPM Activity for secondphase of package 14 (Painan - Kambang) in West Sumatera Province. May 22 – 24 2018
94 Community Development team has monitored TPM Activity for thirdphase of package 15 (Sibolga – Batas Tapsel) in North Sumatera Province. July 11 – 13, 2018
95 Community Development team has monitored TPM Activity for thirdphase of package 16 (Seblat - Ipuh) in Bengkulu Province. July 25 – 27, 2018
96 Community Development team has monitored TPM Activity observed ofpackage 16 (Seblat - Ipuh) in Bengkulu Province. Oct 18 – 20, 2018
97
Community Development Officer of CTC WINRIP and Third PartyMonitoring (TPM) team from State Polytechnic of Padang was monitoredand observed to the project field Package No. 12 (Kambang – Indrapura)in West Sumatera Province.
Nov. 15 - 17 2018
98
Community Development Officer of CTC WINRIP and Third PartyMonitoring (TPM) team from Bung Hatta University of Padang wasmonitored and observed to the project field Package No. 14 (Painan -Kambang) in West Sumatera Province.
Nov. 23 - 25 2018
99Community Development Officer of CTC WINRIP monitored the activitiesof Third Party Monitoring (TPM) of packages 08, 14, and 20 in WestSumatera Province on developing the TPM Monitoring Reports.
Nov. 28 - 30 2018
100 Selection of the Third Party Monitoring (TPM) for packages 21A in WestSumatera Province Feb. 20 – 22, 2019
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
Appendix 10Works Plan on Complaints Handling Mechanism System (CHS) Activities.
No Subject of Activities / Item of Tasks Completion Plan/Progress Condition
1 Review of Minister Decree of Public Works No. 323/2005 concerning the procedures ofHandling input from communities on the environment of the Ministry of Public Works April 18, 2013
2 Preparation of Complaints Register and the complaints address (developing of web site ofWINRIP) and provided ACAP to inputting data in the web site.
Completed on themiddle of Feb. 2014.
3 Preparation of Complaint Handling Procedure (already available on the websiteapplication http://www.winrip-ibrd.com) April 2014
4The completion of the Initial investigation of a complaint Procedure, and the procedurefor the investigation of Complaints, as well as the conclusion of investigation (alreadyavailable on the website application http://www.winrip-ibrd.com)
April 2014
5 Monitored and noted the public complaints via SiPP website and WINRIP website, butuntil December 2014 have no complaint about the WINRIP programs December 2014
6
Clarification of Community complaint for package 02 & 03 by Jejak Media Group (JMG) byMr. Buyung on gravel aggregate materials, routine maintenance, and watering work site(dust pollution). It has been followed up by PPK 09 and PPK 10 to hold a clarificationmeeting, followed by the elements PPK, Supervision Consultant (DSC), and Jejak MediaGroup (JMG).
March 23, 2015
7
Clarification of information of work implementation on package 04: Ipuh - Bantal wasunfavorable, by TPM member (Mr. Hardiansyah, ST, MT). The information obtained fromthe local mass media. The problem is that the people around the location of the packageIpuh - Bantal especially road users complained about the excavation of road widening isleft open for an extended period of time without equipped with signs and safety fence,felt very dangerous, especially when driving at night, and according to the informationsome of the riders had been an accident which the vehicle plunged into the hole dug.This information has been followed up by PPK 01 Bengkulu together with the SupervisionConsultant (DSC Field Team) to instruct the Contractor to install traffic signs and safetyfences in places that endanger of road user
March 26, 2015
8
On May 11, 2015, Mr. Dr. M. Fauzi, ST, MT,, the main observer of the Third PartyMonitoring for Package 11 (Bantal - Mukomuko) Bengkulu Province, conveyinginformation from local newspaper clippings (Koran Rakyat Bengkulu) containing news thata 1.5-year-old toddler fell and nearly drowned in the excavation of the road wideningPackage 11 (Bantal - Mukomuko) which flooded about 80 cm deep. That is because theexcavation is situated in the location residential and not immediately undertaken, andwere not given the signs and safety fence.The complaint was submitted to the PMU and forwarded to the related PIU / PPK to beclarified.Until the end of May there has been no follow-up report to the complaint from the PIU /PPK 01 linked.
May 11, 2015
9
The CHS team has been received the copy of complaints letter from Tender Participantson package 08 to the Procurement Committee. Disclaimer of submitted by the tenderparticipants of package 08 (Batas Kot Pariaman – Manggopoh) PT. Adhi Karya (Persero)Tbk – PT. Yasa Patria Perkasa, JO by letter No: ADHI-YASA/12/I/2016 dated January 12,2016, to the Procurement Committee concerning to the results of Bid Evaluation Report(BER) section III, clause 4, point 4.2 (b): Specific Construction Experience in Key Activitiesspecifically on the experience of aggregate base production.
Jan. 15, 2016
10
CHS team has been received the other similar complaint to the Procurement Committeewas submitted by the same tender participant of package 12: Painan – Kambang (PT. AdhiKarya (Persero) Tbk – PT. Yasa Patria Perkasa, JO) by letter No: ADHI-YASA/11/I/2016dated January 4, 2016. The content of complaint was the similar subject i.e. the results ofBid Evaluation Report (BER) section III, clause 4, point 4.2 (b): Specific ConstructionExperience in Key Activities specifically on the experience of aggregate base production
Jan. 15, 2016
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
No Subject of Activities / Item of Tasks Completion Plan/Progress Condition
11
CHS team has been received the complaints from Riki Susanato (Konsorsium Nasional LSMProvinsi Bengkulu) dated February 02, 2016. Riki Susanato and Edy Novriansyah had sent aletter No: 06/Khusus/XII/2015 dated December 11, 2015 on a request for publicinformation related to the documents of WINRIP project in Bengkulu province. But thisrequest was unable to fulfill by Satker PJN Wil. I of Bengkulu Province, especially inrelation to Contract Document / Letter of Agreement between the ProjectImplementation Unit of WINRIP for Bengkulu Province with the Contractors.By not granting of the request of the documents, then Riki Susanto delivered thecomplaint through the Complaint Handling System (CHS) of WINRIP website (www.winrip-ibrd.com). The complaint was submitted to the PMU WINRIP and the relevantstakeholders to immediately follow-up.
Feb. 02, 2016
12
On January 20, 2016, there was a World Bank letter No. 281 on reviewing Bid EvaluationReport (BER) for Package 16: Seblat – Ipuh in Bengkulu Province. World Bank has and havecomments on the Bina Marga proposed rejection of the five lower priced bidders.As a follow up of these comments, on February 10, 2016 has been held DiscussionMeeting to respond to the letter. Meeting followed by elements from the WB, PMU, PokjaPJN Reg. 1 of Bengkulu Province. Clarification should be explained in the revision of BERand sent to World Bank.
January 20, 2016February 10, 2016
13
The Complaint from Civil Society of villages in around the project STA 28+900 (DesaPondok Kandang, Desa Pondok Suguh, dan Desa Karya Mulya) was submitted through aletter of district head (Surat Camat) of Pondok Suguh, No. 620.52/56/K.05/IV/2016 datedApril 11, 2016, sent to the Supervision Consultants (Field Team DSC of Package 04) on therequest of one extra culvert / box culvert again, because the existing culvert in small sizeand its surface less downward, which is predicted when it rains the water could not floweasily or drained from the settlement and the Villages will be flooded
April 11, 2016
14
Complaint by Buyung Fajri from Jejak Community sent to PMU WINRIP" via [email protected] on subject of performance audit of PT, JAYA KONTRUKSI MP.Tbkthat was Addendum until April 19, 2016 but the work is still ongoing until April 23 2016,how it could happen, we ask for explanation
May 11, 2016,
15
Complaint by Buyung Fajri from Jejak Community sent to PMU WINRIP" via [email protected] on subject evaluation of stone masonry works on bridgeapproach of Air Gadang Bridge in package 02 (Padang Sawah – Simpang Empat) WestSumatera Province. The stone masonry works by contractor PT. JAYA KONTRUKSI MP.Tbkis bed quality, did not match to the specification
May 14, 2016
16
Complaint by Buyung Fajri from Jejak Community sent to PMU WINRIP" via [email protected] and to Menteri PUPERA by e-mail minister of Public Works and onsubject of the National Road in Pasaman Barat - West Sumatra province, many of themwere which seriously damaged.
May 17, 2016
17Complaint by Buyung Fajri from Jejak Community sent to PMU WINRIP" via [email protected] on subject that Air Gadang Bridge until May 31, 2016 is not yet befinished.
May 31, 2016
18
The Community Development Officer and Information Management Specialist wasmeeting with World Bank (Mr. Andri Wibisono) on topic of completeness the WINRIPwebsite included Complaint Handling System (CHS). The main subject is the completenessof the website application program, the completeness data sources, and the applicableand accessible of this website, so everyone can access or find the data that they needs.
August 2, 2016
19
On January 30, 2017 Complaint Unit has received one complaint from someone namedBuyung Fajri from Non-Government Organization “JEJAK Community”. It is complained ofis that, the contract value is not listed on the information board and workers of heavyequipment Operators are not using personal safety (K3) i.e helmet
January 30, 2017
20Complaint Unit has received one complaint from Buyung Fajri from Non-GovernmentOrganization “JEJAK Community” thru email dated February 15, 2017, regarding theimplementation of WINRIP Packages No.21 Lubuk Alung – Kuraitaji
February 15, 2017
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
No Subject of Activities / Item of Tasks Completion Plan/Progress Condition
21On February 16, 2017, Complaint Unit has received one complaint from Buyung Fajri (Non-Government Organization “JEJAK Community”) thru email, regarding the maintenance ofWINRIP Packages No.03 Manggopoh – Padang Sawah
February 16, 2017
22
Complaint Handling Unit of CTC has received public complaints from Buyung Fajri (Non-Government Organization “JEJAK”), thru email on March 5, 14, and 21, 2017, regardingthe condition of retaining wall on approach road of Air Gadang Bridge in Packages No. 02Padang Sawah – Simpang Empat. This package has been PHO on April 14, 2016 is nowentered the maintenance period.
March 5, 14, and21, 2017
23Complaint Handling Unit of CTC has received public complaints from Buyung Fajri (Non-Government Organization “JEJAK”), thru email on March 21, 2017, regarding theimplementation of WINRIP Packages No.21 Lubuk Alung – Kuraitaji
March 21, 2017
24
On April 6, 2017 was complaint from Berita Harian Sumbar http://sumbar.auditpos.com(Non-Government Organization), thru email to the World Bank’s Highway Engineer Mr.Agus Sjamsudin ([email protected]) regarding the implementation of Package20 Lubuk Alung – Sicincin on concrete reinforcement of drainage structure was not inaccordance with the specification, and the bad quality of mortar for retaining wall
April 6, 2017ClarifiedApril 13, 2017
25
Complaint Handling Unit of CTC has received public complaints from Buyung Fajri (Non-Government Organization “JEJAK”), thru email on April 7, 2017 and April 23, 2017,regarding the implementation of WINRIP Packages No.21 Lubuk Alung – Kuraitaji. TheContractor PT. MULTI STRUCTURE ignores the road user's safety.
April 7, 2017April 23, 2017
26Prepare the Response of the complaints from Mr. Buyung Fajri (Non-GovernmentOrganization “JEJAK”) of April 23, 2017 regarding the implementation of WINRIP PackagesNo.21 Lubuk Alung – Kuraitaji
May 2, 2017
27
Complaint Handling Unit of CTC has received public complaints thru [email protected] on July 10, 2017, regarding the implementation of package 12(Kambang - Indrapura) in West Sumatera Province, on subject of Asphalt pavementquality.
July 10, 2017
28
The Complaint Handling Unit of PMU has received one public complaints submitted by Mr.Buyung Fajri (Non-Government Organization "JEJAK") thru email([email protected]), regarding the implementation of WINRIP Package No. 12:Kambang – Indrapura in West Sumatera Province.The Subject of complaint is the Contractor PT. LMA - CTA, performs paving/asphaltingwork at the night and during the rain. This would reduce the quality of work is not inaccordance with specifications
August 20, 2017
29 The Complaint Handling Unit has received one complaint from NGO “Portal Bengkulu”regarding implementation of Package 16 (Sebelat – Ipuh) Dec. 19, 2017
30
The public complaints submitted by Mr. Yudha from “Masyarakat Transportasi Indonesia”(Indonesian Transportation Society) of West Sumatera Province, thru WhatsApp to theMinister of Public Works and Housing, on January 30, 2018 regarding the implementationof WINRIP Package No. 21: Lubuk Alung – Kuraitaji in West Sumatera Province.The subject of the complaint is that package 21 (Lubuk Alung - Kuraitaji) should be finished(Professional Hand Over "PHO") or take over on December 31, 2017. The reality ofimplementation progress is only about 50%, even execution time is extended or anaddendum of time. This is an indication that something is wrong with the implementationof the package.Up to June 2018 the PMU/PIU has not provided information on the answer to thecomplaint
Jan. 30, 2018
31
The complaints submitted by Mr. Agung Anwari thru email <[email protected]>to the PMU WINRIP ([email protected]) dated October 19, 2018 regarding theimplementation of WINRIP Package No. 12: Kambang - Indrapura in West SumateraProvince,The Subject of complaint is cheating trick of PT. LMA - CTA as Contractor on package 12WINRIP (Kambang – Indrapura), performs cheating trick regarding the implementation ofPackage 12:1. Part of structure especially mortar channel and retaining wall, the dimension not
October 19, 2018
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
No Subject of Activities / Item of Tasks Completion Plan/Progress Condition
appropriate with the design and mortar is not appropriate with the techniquespecification.
2. Widening excavation depth should be 60 cm (25 cm for selected, 20 cm for aggregatebase B and 15 cm for aggregate base A). But, in implementation there are manylocations did not reach to 60 cm (only 30-45 cm). Thus, contractor has been “steal” tothe excavation nor pile of excavation because it is still billed to the state 60 cm. if itless of depth excavation means less of foundation layer. The examples of “stealexcavation depth” locations as follows:a. Sta. 12 – Sta. 15 (L/R), the executor of the work is Sartono from PPb. Sta. 19 – Sta. 21 (L/R), the executor of the work is Suryadi from LMAc. Sta. 24 – Sta. 27 (L/R), the executor of the work is Jondra from LMAd. Sta. 37+300 (L/R), the executor of the work is Yudi from LMA. At this location
only using aggregate base A.3. Asphalt paving
Asphalt paving should be layer by layer, begin with AC Base leveling, AC Base, ACBinder, AC Wearing. AC Base leveling pavement process should be appropriate withthe existing (as wide as existing and maximum thickness 5 cm), after that, prime coatand take coat process, and last AC Base pavement process with maximum thickness7.5 cm and wideness 7 m. But, at package 12 AC Base leveling and AC Baseimplemented at once not layered. Implemented all process at once means it haseliminated one (1) item that is take coat (which is still billed to the state). If Asphaltpavement implemented at once, can it guarantee the asphalt density?The examples of “steal take coat and asphalt pavement at once” locations (AC Baseleveling + AC Base) as follows:a. Sta. 0+000 – 0+580 (Pasar Kambang)b. Sta. 3+760 – 5+700 (Lakitan Bridge)c. Sta. 5+700 – 6+900 (Lakitan Bridge – Koto Raya Bridge)d. Sta. 6+925 – 8+150 (Koto Raya Bridge – Karang tengah – Lakitan Selatan)e. Sta. 29+480 – 30+100 (SMKN 1 Linggo Sari Baganti – Lagan)f. Sta. 30+500 – 31+050 (in front of SPBU Lagan – Tandikat Bridge)g. Sta. 31+080 – 31+320 (Tandika Pusangga Utara Bridge)
All the cheating above implemented before Idul Fitri 1439 H and still working until now.Policy maker of “steal implementation work” are:1. Immanuel Riberitas (PP)2. Dasril (GS of PT. LMA)3. Refly (chief inspector consultant PT. YASA)Other than that “steal” implementation work, package No. 12 has other broken work asfollows:1. Regarding Health and Safety of Works (Kesehatan dan Keselamatan Kerja “K3”), there
are illegal levies to K3 members by coordinator of K3 that is Rafik and Wulanregarding office hour arrangement (on setting mandatory working hours andovertime hours).
2. The omission by GS of PT. LMA (Dasril) against one of the community relationsofficers named Irwanto (retired Army) who traded (buy-and-sell) materials belongingto the project package No. 12 for personal interest.
3. The daily labor problem since project begin at 2016 has occurred, such as if laborworking at holiday or week end, they not paid and also on Idul Fitri holidayallowances they never get benefits.
Other Activity
1 The establishment of the settlement Commission Handling the Complaint under theInspectorate General of the Ministry of Public Works (Executing Agency) if it necessary
Will establish if there is acase that needs specialhandling
2Preparation of the device for Executing Agency such as: Procedures announcement ofpenalties, procedures for the annual Survey, Procedure Annual Independent Review, theprocess of Auctions
Done by ProcurementSpecialist and theContract ExaminerCommittee
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
No Subject of Activities / Item of Tasks Completion Plan/Progress Condition
3 The development of a code of conduct and actions for Implementing Institutions/Implementing Agency (Bidders, Suppliers, contractors and Consultants)
Done by PMU of DGH
4 Support the PMU in the Management and Monitoring of the implementation policy inhandling public complaints
Have been carried outthroughout projectimplementation period
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
Appendix 11
Works Activities on Publication / Disclosure Activities
No Subject of Activities / Item of Tasks Completion Plan/Progress Condition
1 Conducted Workshop of Procurement Document Evaluation for POKJA,Satker/PPK, Balai BBPJN and PMU
February 28, 2013– March 01, 2013
2 Conducted Workshop of World Bank Guidelines of Procurement for WINRIP tothe POKJA, Satker/PPK, Balai BBPJN and PMU
April 24 – 25, 2013
3 Review training materials on Project Management Manual (PMM), especiallyCHAPTER XI of the anti-Corruption Action Plan (ACAP)
First updating April 29, 2013
4 The second Review of training materials on Project Management Manual(PMM), Chapter I - XII
Second updating onDecember 18, 2013
5 The third Review of training materials on Project Management Manual (PMM),Chapter I - XII
third updating onApril, 2014
6. Preparing Method Transparency to the Public, and Improvement the proceduresto the Public Disclosure through information media (website).
Establishment of InformationSystem (MIS) was finish on
March 2014
7. The updating of Project Management Manual (PMM), Chapter 3, 9, 11, and 13,has been held in Bogor June 2014
8 Delivery of the Preparatory Training for elected TPM for AWP-a packages: 01,02, and 03 June 2014
9 Delivery of the Preparatory Training for elected TPM for AWP-a packages: 04 July 2014
10 The implementation of Dissemination/training of the PMM to Stakeholders forPackages 01, 02, 03, and 04
September 10 - 11 2014
11Inputting / upload / update of data/documents/reports of the CommunityRepresentative Observers (CROs) activities for packages 01, 02, 03, 04, 17, 11,13, 05, 06, 19, and 15 into the WINRIP’s website.
From Augt 2013 – April, 2015
12Inputting / upload / update of data/documents/reports of the Third PartyMonitoring (TPM) activities for packages 01, 02, 03, 04, 17, 11, and 13 into theWINRIP’s website.
From Augt 2013 – April, 2015
13Inputting / upload / update of data/documents/reports of Procurement ofContractors for packages 01, 02, 03, 04, 17, 11, 13, 05, 06, and 19 into theWINRIP’s website.
From Augt 2013 – April, 2015
14Inputting / upload / update of data/documents/reports of Environmentalactivities for packages 01, 02, 03, 04, 17, 11, 13, 05, 06, and 19 into the WINRIP’swebsite.
From Augt 2013 – April, 2015
15Inputting / upload / update of data/documents/reports of Social Safeguard /LARAP for packages 01, 02, 03, 04, 17, 11, 13, 05, 06, and 19 into the WINRIP’swebsite.
From Augt 2013 – April, 2015
16Inputting / upload / update of Progress Report/ Actual Status (fisichal worksand financial) of each package that has been contracted (packages 01, 02, 03,and 04) into the WINRIP’s website.
From Augt 2013 – April, 2015
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
No Subject of Activities / Item of Tasks Completion Plan/Progress Condition
17 Inputting / upload of Monthly Progress Report (MPR December 2012 – December2014) into the WINRIP’s website.
Every Month
18 Inputting / upload of Quarterly Progress Report (QPR December 2012 –December 2014) into the WINRIP’s website.
Every Three Months
19 Delivery the IFM Training for Stakeholders (Official and staff of Satker, Officialand staff of PPK) packages 01, 02, 03, and 04.
26 – 27 November 2014
20 Publish the Quarterly Newsletter on official website of MPW and WINRIP’swebsite
Every three months forQuarterly Newsletter October –
December 2015
21 Delivery the IFM Training for Stakeholders (Official and staff of Satker, Officialand staff of PPK) packages 05, 11, 13, and 17.
Feb. 11 - 12, 2015
22 Report of Technical and Financial Audit Consultants (TFAC) for Packages 02 and03 has been received from TFAC Team
Feb. 27, 2015
23
Delivery of the Preparatory Training for elected TPM for package 11: Bantal –Mukomuko and package 13: Simp. Rukis – Tj. Kemuning, in Bengkulu. Thistraining followed the elements of TPM, Satker/PPK, Contractors, SupervisionConsultants, and Balai BBPJN III Palembang.This training is intended to provide an explanation of the scope of duties of TPMand provide information to all elements involved in the implementation of theproject that the community be involved in monitoring the implementation ofthe project which is represented by the TPM, in accordance with the LoanAgreement.
March 11 – 12, 2015
24 Publish the Quarterly Newsletter on official website of MPW and WINRIP’swebsite
Every three months forQuarterly Newsletter January –
March 2015
25Delivery of PMM Socialization to Stakeholders (Balai BBPJN III, PIU/PPK,contractors and Supervision Consultants ‘DSC’) for four Packages (06, 11, 13,and 19) in Bengkulu Province
May 6 – 7, 2015
26
Delivery of the Preparatory Training for elected TPM and Work Plan for manageand monitor the Environment / Rencana Kerja Pengelolaan dan PemantauanLingkungan (RKPPL) for package 06: Ps. Pedati – Kerkap and package 19: Lais –Bintunan, in Bengkulu. This training followed the elements of TPM, Satker/PPK,Contractors, Supervision Consultants, and Balai BBPJN III Palembang.
June 4 – 5, 2015
27 Publish the Quarterly Newsletter on official website of MPW and WINRIP’swebsite
Every three months forQuarterly Newsletter April –
June 2015
28 The Mid-Term Report of the first semester 2015 has been written by the early ofJuly 2015
July, 2015
29 Delivery of PMM Training for Stakeholders (PPK, contractors and SupervisionConsultants ‘DSC’) for Packages 17, 05, and 15
November 23 – 24, 2015
30Inputting / upload / update of data/documents/reports of the CommunityRepresentative Observers (CROs) activities for packages 07, 08, 10, 12, 14, 16,20 and 21 into the WINRIP’s website.
From May – Dec, 2015
31Inputting / upload / update of data/documents/reports of the Third PartyMonitoring (TPM) activities for packages 05, 06, 07, 12, 15, 19 and 16 into theWINRIP’s website.
December, 2015
32Inputting / upload / update of data/documents/reports of Procurement ofContractors for packages 07, 08, 10, 12, 14, 16, 20 and 21 into the WINRIP’swebsite.
From June – Dec, 2015
33 Inputting / upload / update of data/documents/reports of Environmentalactivities for 07, 08, 10, 12, 14, 16, 20 and 21 into the WINRIP’s website.
From May – Dec, 2015
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
No Subject of Activities / Item of Tasks Completion Plan/Progress Condition
34Inputting / upload / update of data/documents/reports of Social Safeguard /LARAP for packages for 07, 08, 10, 12, 14, 16, 20 and 21 into the WINRIP’swebsite.
From May – Dec, 2015
35Inputting / upload / update of Progress Report/ Actual Status (physically works,financial and audits) of each package that has been contracted (packages 05, 06,07, 11, 13, 15, 17 and 19) into the WINRIP’s website.
From May – Dec, 2015
36Inputting / upload / update of data/documents/reports of the CommunityRepresentative Observers (CROs) activities for packages 14, 20 and 21 into theWINRIP’s website.
January, 2016
37Inputting / upload / update of data/documents/reports of the Third PartyMonitoring (TPM) activities for packages 14, 20, and 21 into the WINRIP’swebsite.
December, 2015
38 Updated the Project Management Manual (PMM) Chapter III : Planning andProgramming
January, 2016
39 Review and Updated of the Project Management Manual (PMM) Chapter IX :Performance Monitoring and Evaluation,
March, 2016
40 Review and Updated of the Project Management Manual (PMM) Chapter XI:Anti-Corruption Action Plan (ACAP)
April, 2016
41Review and Updated of Power-point presentation of the Project ManagementManual (PMM) Chapter IX : Performance Monitoring and Evaluation, Chapter XI:Anti-Corruption Action Plan (ACAP)
June, 2016
42
The Information Management Specialist and Community Development Officerimmediately follow up the results of the meeting with World Bank to becompleted and perfected. The results of that meeting be used as an ingredientof Kick-off and Wrap-up Meeting, which would then be inserted in the Final AdieMemoire of August 11, 2016
August 11, 2016
43
Delivery of PMM Socialization to Stakeholders (Balai BPJN III, PIU/Satker Region Iand II of West Sumatera, PPK 06 (pack. 20), PPK 10 (Pack. 08 & 21), PPK 14(Pack. 14), PPK 15 (Pack. 07), contractors and Supervision Consultants ‘DSC’) forfour Packages (07, 08, 14, 20, and 21) in West Sumatera Province
Augt. 29 –31, 2016
44 Delivery of TPM Preparatory Training for packages 12 and 14 in Padang, WestSumatera
Sept. 26 – 28, 2016
45The CTC (Community Development Team) has been carried out preparatorytraining for Third Party Monitoring (TPM) of packages 20 and 21 in Padang, WestSumatera.
October 13, 2016
46 Review and identify the changing of Project Management Manual (PMM)Modules from Revision-1 version to Revision-2. Oct. 18 - 24, 2016
47Prepare draft of Agreement Letter of Director of Roads Net WorkingDevelopment on establishment of Working Group /Task Force for updating andimprovement of the PMM.
Oct. 25 - 27, 2016
48 Prepare draft proposal of Price Adjustment /Escalation Workshop for theWINRIP Oct. 28 – Nov. 14, 2016
49 During January 2017 all CTC Professional were prepare the updating the ProjectManagement Manual (PMM) January 2017
50During February 2017 all CTC Professional were updated the ProjectManagement Manual (PMM) for revision 2. The Community DevelopmentOfficer was updated Chapters III, IX, XI, and XIII.3.
February 2017
51Prepare the response to Supreme Audit Board / Badan Pemeriksa Keuangan(BPK) Republic of Indonesia findings on funding the Third Party Monitoring fromProvisional Sums, and meeting with BPK
May 29-30, 2017
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
No Subject of Activities / Item of Tasks Completion Plan/Progress Condition
52During January 2018 the Community Development Officer was updated theProject Management Manual (PMM) for last final update of Chapters III, IX, XI,and XIII.3.
Jan. 15 – 19, 2018
53During March 2018 the Community Development Officer in collaboration withInformation Management Specialist was updated the list of Complaint Handlingin website of WINRIP (www.winrip-ibrd.com)
March 2018
54
On April 2018 the Community Development Officer in collaboration withInformation Management Specialist was updated the data of CROs of Package05A Slope Protection of Roads Segment of Rampa – Poriaha in North SumateraProvince in website of WINRIP (www.winrip-ibrd.com)
April 2018
55 During August 2018 the Community Development Officer was updated theProject Management Manual (PMM) Chapters III, IX, XI, and XIII.3. August 2018
56During September 2018, input data CROs for Package No. 05A ((SlopeStabilization of Roads Link Simpang Rampa - Poriaha/Mungkur) in NorthSumatera) and Package 21A (Lubuk Alung – Kuraitaji) in West Sumatera.
September 2018
57 During October 2018, input data CROs for Package No. 21A (Lubuk Alung –Kuraitaji) in West Sumatera October 2018
Activities Plan for Next Step
1 Delivering the other training programs of WINRIP shall inline of projectimplementation progress.
Depend on projectimplementation progress
2 Public Expose on ACAP to the civil society forum in each project location (eachpackage)
Before the construction worksstarted
3 Monitoring of the implementation of disclosure and transparency of informationto each package during contraction period.
Plan for three time monitoringto field for each package during
contraction period
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
Appendix 11.AStatus of Anti-Corruption Action Plan
Edition: March 2019RISKAREA
NoACTIONS STATUS (as of March 31, 2019)
Enha
nced
Dis
clos
ure
and
Tran
spar
ency
-
1 MPWH will provide the contact information forcomplaints related to WINRIP in the PIP, PMM, andMPWH website and in the bidding documents.
Complaint Handling System has been established, written in PMM(Chapter 11.4), and published on DGH website(http://binamarga.pu.go.id) linked to WINRIP website(http://www.winrip-ibrd.com).Contact information is provided in the Bidding Documents Chapter 2:Instruction to Bidders (Instruksi Kepada Peserta Lelang - IKP 34).
2 Work Programs and Procurement Plan published on theofficial MPWH website and made it available to thepublic.
Work Programs and Procurement Plan available in the MPWHwebsite (http://eproc.pu.go.id) and in the WINRIP website (onhttp://www.winrip-ibrd.com, click Pengadaan to see all the data onProcurement Plan, Procurement Information, and List of Contractawarded).- Procurement data for package 05A and 21A is under process
uploading in to the website.3 Procurement Plan updated annually. The last version as draft has been updated on October 31, 2018
4 Quarterly newsletter published on the official website ofMPWH, including information concerning the list ofcontracts, implementation progress, project-relatedworkshops and the number, typology, and status ofcomplaints.
Quarterly newsletter is updated every three months. Threenewsletters were published in 2015 (the first one corresponds to theperiod between January and March, 2015); and three newsletterswere also published in 2016. The latest newsletter (July – September,2018) has been published on the WINRIP website(http://www.winrip-ibrd.com) linked to DGH website(http://binamarga.pu.go.id).These newsletters include the summary of the physical worksimplementation progress, the list of the trainings/workshops hold,and other relevant information on contracting aspects.
5 Quarterly newsletter sent by MPWH to the civil societyforum in each project province in hard copy or throughan electric mailing system.
The Quarterly Newsletter is always sent to the civil society forum: i.e.Indonesian Road Development Association/ HimpunanPengembangan Jalan Indonesia (HPJI) and Indonesian TransportationSociety/Masyarakat Transportasi Indonesia (MTI) in central level andto the provincial level where the WINRIP project are developed, by e-mail.The latest newsletter of October – December 2018 has been publishedand been sent to the civil society forum by e-mail and by mail in earlyof January 2019.For the next newsletter of August – December 2018 is under prepare.
6 Bidding documents, short-list of consultants andrequests for proposals (this provision does not includeactual bids and proposals), issued in accordance with theprocurement provisions of the loan agreement, areavailable to any member of public promptly uponrequest, subject to payment of a reasonable fee forproducing bidding documents and request for proposals.The documents are available until a year aftercompletion of the contract for the goods, works orservices in question.
The Bidding Documents such as: Standard Bidding Document, BidInvitations, Instruction to Bidders, General Specifications, DetailedEngineering Design/Drawing, General Condition of Contracts, SpecialCondition, Bill of Quantity, Owner Estimate, etc, are available onMPWH website (http://eproc.pu.go.id) and some of them were alsouploaded in WINRIP website (http://www.winrip-ibrd.com). Packages 01, 02, 03, 04, 05, 06, 07, 08, 11, 12, 13, 14, 15, 16, 17,
19, 20, and 21 have been already awarded. Packages 09, 10 and 18 were cancelled from list of WINRIP Program. The bidding of Package 05A (Slope Protection of Road Segment in
Rampa – Poriaha / Mungkur in North Sumatera Province, on April27, 2018 is failed. Re-bid for this package was held on September2018. The bidding was failure and that was no winner. So that thepackage should be re-bidding again.
The Bidding for Package 21A was appointed the winner and thecontract was sign on 21 December 2018.
7 Information as follows published in UNDB on-line, andon MPWH website within two weeks of contract award
ICB Contract Award Notices for packages 01, 02, 03, 04, 05, 08, 11,12, 13, 15, and 17 were published in UNDB on-line and on the
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
RISKAREA
NoACTIONS STATUS (as of March 31, 2019)
(after Bank’s no objection): (a) name of each bidder whosubmitted a bid; (b) bid prices as read out at the bidopening; (c) name and evaluated prices of each bid; (d)name of bidders whose bids were rejected and thereasons for rejection; and (e) name of the winningbidders and the prices, as well as the duration andsummary scope of the contract awarded.
MPWH website (http://www.PU.go.id). NCB Contract Award Notices for packages 06, 07, 14, 16, 19, 20,
and 21 were published on the MPWH website. The second procurement process of Package 05A is failed, because
only one offer to enter the bid document. The Procurement of package 21A appointed the winner and the
contract was sign on 21December 2018.
8 List of all contracts awarded in the three monthspreceding the date of the request by any person orcompany request are available, including the name ofthe contractor/ supplier/ consultant, the contractamount, the number of bidders/proposals, theprocurement method and the purpose of the contract.
All this information is available on the WINRIP website. However, norequest from any person or company has been received.The physical progress data of the under-construction packages hadbeen completed including contract changes such as review design,CCO, technical justification, memorandum, addendum, etc.
9 Final audit reports (financial or otherwise, includingqualified audit reports) and all formal responses of theGovernment in relation to such reports should bepublicly available on the MPWH website within onemonth after the report is accepted as final.
The Final Audit for the years 2012, 2013 2014, and 2015 have beencompleted, and the related reports uploaded on the WINRIP website.Moreover, DGH has sent the audit results response to the Bank.The Final Audit for 2016 had been held by BPK, and the Findings hasbeen followed-up by DGH and the related parties, and the AuditResponse Report has been sent to the Bank by December 18, 2017.The BPK’s Audit Finding Report for 2017, not yet been received bythe DGH.
10 Financial, technical, and physical progress of the projectmonitored by an IT system (integrated SiPP) as publiclyaccessible project monitoring system.
These reports are available on the WINRIP website: The financial, technical, and physical progress have been
completed with information of contractors’ names, number ofcontract, date of contract, contract volume/amount, duration ofcontract, etc.
The tutorial guidance has been developed and sent by MISspecialist.
The financial progress report is updated every three months as theIFR quarterly report.
The technical and physical progress is updated every month as theMonthly Progress Report, and every three months as the QuarterlyProgress Report.
Enha
nced
Civ
il So
ciet
y O
vers
ight
11 Representatives of civil society groups invited to attendthe public bid openings and other key procurementsteps. Community Representative Observers (CROs)invited from local universities or other selectedindependent institutions. Attendance list for theprocurement/selection process signed.
The CROs for 19 packages (01, 02, 03, 04, 05, 06, 07, 08, 10, 11, 12,13, 14, 15, 16, 17, 19, 20, 21) have been appointed, and haveattended the required meeting (Pre-Bid Meeting and Bid OpeningMeeting). Attendances list are available.
The CRO for package 05A has been appointed on April 24, 2018,and has been attended the Pre-Bid meeting on April 27, 2018.
The Substitute CRO, Mr. Ir. Koster Silaen, MT was attended thePre-Bid Meeting of Re-Bid package No. 05A in Satker PJN Region IIoffice in Medan, on September 11, 2018.
The CRO for package 21A has been appointed on September 27,2018,
The Substitute CRO (Ir. Drs. Heldi, M.Si, PhD) has been attendedthe Pre-Bid meeting on October 18, 2018.
12 Guidelines on appropriate procedures for the aboveprovided in the PMM.
The Appropriate procedures are written in PMM Chapter 11.2, and inthe TOR of CROs Selection.
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
RISKAREA
NoACTIONS STATUS (as of March 31, 2019)
13 Third Party Monitoring (TPM) mechanism established.This mechanism includes regular sharing of informationwith the media.
TPM for 19 packages had been selected (packages 01, 02, 03, 04,05, 06, 07, 08, 10, 11, 12, 13, 14, 15, 16, 17, 19, 20, and 21).
TPM Letter of Agreement for the above-mentioned 19 packageshad been signed.
The Agreement of TPM operational funding between TPM and CTC(PT. Perentjana Djaja) has been signed for the above-mentioned 18packages.
Packages 09, 10, 18 were cancelled from the list of WINRIP program. TPM for packages of 21A were appointed on 21 February 2019 and
TPM for package 05Aunder preparing to selection.
14 Annual Accountability Meetings held. First meeting heldat the province level before procurement of contractorsor service providers.
The Annual Accountability Meetings were held through the followingactivities: Coordination meeting at the Regional level (Balai- BBPJN) and in
each province. Public Expose of LARAP to the community around the project area. Socialization of projects during selection of CROs and TPM at local
universities near project sites and in the same province. (Detail datesof socialization meeting and training of the CROs and TPM can befound in the Monthly or Quarterly Report of WINRIP on the WINRIPwebsite).
Public expose and dissemination of information to inhabitantsaround the project is delivered through Project Information Board.
PMM workshop has been carried out in:o Padang on September 12, 2014 for packages 01, 02, 03, and 04.o Bengkulu on May 6 – 7, 2015 for packages 06, 11, 13, and 19.o Bogor on November 24 – 25, 2015 for packages 05, 15, and 17.o Padang on August 29 – 30, 2016, for packages 07, 08, 12, 14, 20,
and 21.o Bengkulu on April 27, 2017 for package 16.o
Enha
nced
Com
plai
nts H
andl
ing
Mec
hani
sm
15 Enhanced complaints handling mechanism, whichincludes maintaining project complaint log and filing tomonitor status of follow-up of each complaint,established by the MPWH.
A Complaint Handling System has been established, written in PMM(Chapter 11.4), and published on WINRIP website (http://chs.winrip-ibrd.com).
16 Complaints received acknowledged to the complainantby the PIU within seven (7) days of receipt with a copy toPMU, DGH and then World Bank. Bid-related complaintsreceived during bid evaluation period responded afterthe contract award. All complaints handling componentincluded in the MPWH website, and updated on amonthly basis.
24 complaints have been followed up to March 2019. Complaints are handled by the Secretariat of CHU under PMU
WINRIP. Dispute resolution of complaints will be handled by different
institutions (PPK, Satker, Inspectorate General, Komisi PenyelesaianPengaduan), depending on the type of complaints (i.e. generalmatters, technical matters, or specific matters).
17 Information concerning the alternative conduits forcomplaints (telephone hotline, dedicated email addressand PO Box) widely disseminated.
The information of complaint procedures has been disseminated tothe different institutions related to project implementation (PPK,Satker, Contractors, Engineer/ Supervision Consultants) during PMMworkshops and to the CROs & TPM during introductory training.The PPKs published the complaint procedures through their ProjectInformation Board.
18 Strict procedures to ensure anonymity of informants. The procedures ensure anonymity of informants.
19 Recording and appropriate referral of all incomingcomplaints undertaken by MPWH with each casegenerating an automatic, standard format report to theBank.
It has been established on the WINRIP website (http://chs.winrip-ibrd.com).
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
RISKAREA
NoACTIONS STATUS (as of March 31, 2019)
Miti
gatin
g Co
llusi
on, F
orge
ryan
d Fr
aud
Risk
s
20 “Semi E-Tendering” on the MPWH official public websiteused by MPWH for both, works and consultant services.Key information (see list) published on the officialwebsite (www.pu.go.id): (a) invitation for bids; (b)download of bidding documents; (c) bid clarifications; (d)minutes of bid opening; (e) information of contractaward.
Semi e-procurement was applied before November 2014 and full e-procurement was applied afterward.
21 All specifications defined in the bidding documents, andall clarifications sought through written correspondenceand replies sent to all bidders.
Done.
22 Key indicators of submitted bids analyzed by MPWH,through CTC. Short technical report for each group ofbidding (the bidding packages simultaneously invited)prepared and shared with the Bank.
Short technical reports for each contracted package have beenindividually prepared and shared with the Bank except for thepackages under AWP-1 (packages 01, 02, 03, and 04), where a groupreport was prepared.
23 Contracts awarded within original bid validity period. There were six (6) contracts awarded within the original bid validityperiod (packages 04, 06, 11, 13, 17, and 19).
Twelve (12) contracts were awarded after the original bid validityperiod (packages 01, 02, 03, 05, 07, 08, 12, 14, 15, 16, 20, and 21).
Bidding for package 05A was failed bidding, so that should take re-bid for the 3rd time.
Bidding for package 21A is contracted on 21 December 2018..
24 Guidelines for preparation of specifications/selectioncriteria in the bidding documents and request forproposals prepared to ensure compliance with the BankGuidelines.
Done.
25 FIDIC arrangements used by MPWH with theindependent supervision consultant having responsibilityas the “Engineer” in the works contracts.
Done.
26 Criteria for nominating procurement committeesestablished by MPWH. Each Project Implementation Unitincludes a specified procurement officer and financialmanagement officer.
Done.
27 Procedures to maintain proper project and procurementfiling established by MPWH, including filing ofadvertisements, bidding documents/request forproposals, clarifications/addenda to biddingdocument/request for proposals, minutes of bidopening, evaluation reports, contract award and finalcontract documents, and also for regular review ofaccounting reports, including all supporting documents(i.e. travel report, receipts, etc.).
Done.
28 Regular interim audits conducted by third parties, whichinclude review of procurement process and results.
Done.
Sanc
tions
and
Rem
edie
s 29 Remedial actions and sanctions for cases of fraud andcorruption that are reported and for which evidence isfound established by MPWH.
No cases of fraud and corruption have been encountered so far.However, in one bidding process a bidder was rejected because thebidding commission considered that some of the submittedinformation was not genuine.
30 Information regarding fraud, corruption, collusion and/orcoercive practice cases (resulting in the termination ofthe contract and possibly other penalties), where lessonsare learned and funds are retrieved, widelydisseminated.
It will be done if there are such cases.
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project
RISKAREA
NoACTIONS STATUS (as of March 31, 2019)
31 Disbursement to any given contract/location suspendedor stopped completely if cases of corruption not dealtwith effectively.
It will be done if there are such cases.
Status, 31 March 2019
Length Width Safeguard RKPPLDoc
Integration ofAmdal/UKL-UPL/SPPLin Design
HIV-AIDsSocialization Quarry Owner
(Km) (m) DocRequirement Status Status Status Status Remarks Status Remarks License Base camp
Management Owner/Env License
1 Krui - Biha 25 7 CompleteAmdal Complete Complete Complete 10
Nov 2015 OK period 3 on21 Feb 2019 OK Regularly Complete
Base camp has beendemobilization
/no contaminated soil
TP/Complete
2Pdg.Sawah-Sp.Empat,incl.Air Gadang Bridge (100m)
40.9 7 CompleteUKL-UPL Complete Complete Complete
17 Nov 2015 OK period 3 on17 Jan 2019 OK Regularly Complete
Base camp has beendemobilization
/no contaminated soil
TP/Complete
3 Manggopoh-Pdg.Sawah 32 7 CompleteUKL-UPL Complete Complete Complete
17 Nov 2015 OK period 3 on17 Jan 2019 OK Regularly Complete
Base camp has beendemobilization
/no contaminated soil
TP/Complete
4 Ipuh - Bantal 42.4 7 CompleteUKL-UPL Complete Complete Complete
4 Dec 2015 OK period 3 on29 Dec 2018 OK Regularly P
(APBN)
Used for APBN project/Partially Done,
contaminated soil
TP/Complete
5 Sp. Rampa - Poriaha 11.1 6 CompleteUKL-UPL Complete Complete Complete
28 Jan 2016 OK
Period 4Process submitto DLHKab.Tapteng(receipt letters)
OK Regularly Complete
Done (Infrastructure,housekeeping & B3storage/TPSimproved/AMP, ST &Weight vehicle not yetmoved
TP/Complete
6 Pasar Pedati Kerkap 25 7 CompleteUKL-UPL Complete Complete Complete
11 Jan 2016 OK period 3 on 29Dec 2018 OK Regularly Complete
Base camp has beendemobilization/no contaminated soil
TP/Complete
7 Indrapura - Tapan PHO 28January 2018 19.5 7 Complete
Amdal Complete Complete Complete6 Sep 2016 OK
RKL-RPLimplementationon PHOreceived by DLH26 Nov 2018
OK Regularly Complete
Done (Infrastructure,housekeeping & B3Storahe improved, butthe AMP pool iscurrently open and WBrequest the pool must beclosed
TP/Complete
8Bts. Kota Pariaman -Manggopoh PHO 31 Dec2017
46.8 7 CompleteAmdal Complete, Complete Complete
4 Oct 2016 OK
RKL-RPLimplementationon PHOreceived by DLH26 Nov 2018
OK Regularly Complete
Done (Infrastructure,housekeeping & B3Storage. improved/Suitable as SOP /good
TP/Complete
11 Bantal - Muko Muko (PHO) 50.1 6 CompleteAmdal Complete, Complete, Complete,
5 Dec 2015 OK period 3 on 29Jan 2019 (PHO) OK Regularly Complete
Base camp has beendemobilization
/no contaminated soil
TP/Complete
12Kambang - Indrapura(Proses PHO)25 January 2019
55.2 6 CompleteAmdal Complete Complete Complete
6 Sep 2016 OK
RKL-RPLimplementationon PHOreceived by DLH26 Nov 2018
OK Regularly Complete
Done (Infrastructure,housekeeping & B3storage TPS improvedbut AMP, ST & Weightvehicle not yet movedfrom Base Camp 2
TP/Complete
13 Sp. Rukis - Tj.Kemuning 56.3 7 CompleteUKL-UPL Complete Complete Complete
14 Jan 2016 OK
UKL - UPLimplementationon PHO submitto PMU on 29Nov 2018
OK Regularly CompleteDone (Infrastructure,housekeeping & B3storage improved
TP/Complete
14 Painan - Kambang 31.5 7 CompleteAmdal Complete Complete
Complete29 November
2016OK
RKL-RPLimplementationon PHOreceived by DLH26 Nov 2018
OK(on
going) Regularly Complete
Partiarly Done, (solarspilled & TPS wall need iimproved
TP/Complete
Appendix 12
Pack.No. Loan Package Name
Amdal/UKL-UPL/DELH/DPLHimplementation
for BLH, WB
RKPPLimplementation
(Quarterly report)
Status & Progress of Environmental Safeguard on WINRIP
Base Camp
Status, 31 March 2019
Length Width Safeguard RKPPLDoc
Integration ofAmdal/UKL-UPL/SPPLin Design
HIV-AIDsSocialization Quarry Owner
(Km) (m) DocRequirement Status Status Status Status Remarks Status Remarks License Base camp
Management Owner/Env License
Appendix 12
Pack.No. Loan Package Name
Amdal/UKL-UPL/DELH/DPLHimplementation
for BLH, WB
RKPPLimplementation
(Quarterly report)
Status & Progress of Environmental Safeguard on WINRIP
Base Camp
15 Sibolga - Bts.Tap Sel 36 7 UKL-UPL Complete, Complete Complete27 Jan 2016 OK
Period 4Process submitto DLHKab.Tapteng(receipt letters)
OK(on
going) Regularly Complete Done housekeeping
improvedTP/
Complete
Seblat - Ipuh including 34.5 6
Air Lalang & Air GuntungBridge(PHO 12 February 2019)
64 m 6
19 Lais - Bintunan 11.6 7 CompleteUKL-UPL Complete Complete Complete
12 Jan 2016 OK period 3 on 29Dec 2019 (PHO) OK Regularly P (APBN)
Used for APBN project/Partially Done,
contaminated soil
TP/Complete
20 Lubuk Alung - Sicincin 14.6 7 CompleteUKL-UPL Complete Complete Complete
8 March 2017 OKperiod 3 on17 Jan 2019(PHO)
OK Regularly CompleteBase camp has been
demobilization/no contaminated soil
TP/Complete
21 Lubuk Alung - Kuraijati 16.8 7 CompleteUKL-UPL Complete, Complete Complete
8 March 2017 OKperiod 3 on17 Jan 2019(PHO)
OK Regularly Complete Done (Infrastructure &Housekeeping improved)
TP/Complete
21 A Lubuk Alung - Kuraijati(New Contractor) 16.8 7 Complete
UKL-UPL under review Complete Complete26 March 2019 OK
period 3 on17 Jan 2019(PHO)
NY Regularly Process
Infrastructure of solar &asphalr tank & oil tap atdrainage has been built
TPS on process
TP/Complete but CTC notyet received the quarry
License
05A Slope Protection (Biddingprocess) 11.1
CompleteUKL-UPL &
DELHNYS NYS NYS NYS NYS NYS NYS NYS NYS NYS
Palu Disaster Recovery WorksRR-01 Pantoloan-Tawaeli 1.77 NYS NYS NYS NYS NYS NYS NYS NYS NYS NYS
Kebonsari-Tawaeli 5.21Kebonsari-Tn.Runtuh 10.82Jl.Yos Sudarso 1.50Jl.Basuki Rahmat 1.80Jl.Abdul Rahman Saleh 1.20Watusampu - Ampera 14.94Jl.Diponegoro 2.68Jl.Malonda (Palu) 8.56Ampera-Surumana 0.26
RR-02 Palupi-Bangga-Simoro 18.88 UKL-UPL NYS NYS NYS NYS NYS NYS NYS NYS NYS NYSKalukubula-Kalawara 0.98 -Biromaru-Palopo 5.48 -Acces Huntap-Pombewe,incl.bridge acces Huntap 4.09 -
NYS : Not Yet started: Project PHO
Regularly
OK
OKComplete, Complete9 May 2017Complete
RKL-RPLimplementationongoing submitto PMU on 9Nov 2018
OK(on
going)
Project Terminated
Period 4 submitDLH on 21 Feb2019
TP/Complete
17Sp.Gunung Kemala -Pg.Tampak PHO 27Dec 2017
CompleteAmdal Complete , Complete
10 Nov 2015
CompleteAmdal
Complete36.8 6
Note :
OK Regularly
16
DELH
Contractor/Complete
Base camp has beendemobilization/no contaminated soil
CompleteDone (Infrastructure,housekeeping & TPSimproved
Complete
APPENDIX No.13
No. Package Loan Package Name PROVINSI Contractor Road SafetyMeasurement
Awareness &Readiness to EMP
DocumentsAvailability Camp Cleanliness Labour
CampDisposal of Waste
(Sludges)Handling of
BitumenPollution Control
Measures Vehicle Management Disposal ofWastewater
Total ScoreObtained Rangking (%) Level Remarks
AWP - 1
AWP - 2 dan AWP - 3
17 Sp.Gunung Kemala - Pg. Tampak Lampung PT.JACON 3 2 6 3 2 2 2 2 2 2 26 3 PHO
5 Sp. Rampa - Poriaha North Sumatera PT.NKE 3 2 6 3 2 3 2 3 2 3 29 3 PHO
13 Sp Rukis - Tj Kemuning Bengkulu Waskita Karya PT. 3 2 6 3 2 3 2 3 2 3 29 3 PHO
15 Sibolga - Bts Tap Sel North Sumatera PT.PP 3 2 6 2 2 2 2 2 2 2 24 2 PHO
8 Bts. Kota Pariaman - Manggopoh West Sumatera PT.PP - PT.Statika 3 3 6 3 3 3 2 3 3 3 33 4 PHO
7 Indrapura - Tapan West Sumatera PT.Adhi Karya 3 2 6 3 2 3 2 3 2 3 29 3 PHO
12 Kambang - Indrapura West Sumatera PT. LMA 2 2 6 3 2 3 2 3 2 2 27 3
14 Painan -Kambang West Sumatera PT.YASA-Conbloc 2 2 6 3 2 3 2 3 2 2 27 3 on going
Seblat - Ipuh including
Air Lalang & Air Guntung Bridge
20 Lubuk Alung - Sicincin West Sumatera PT Nindya Karya 3 2 6 3 2 3 2 3 2 3 29 3 PHO
21 Lubuk Alung -Kurataji Sumatera Barat PT.Multi Structure 1 2 6 2 2 3 2 2 2 2 24 3 TERMINATED
21 A Lubuk Alung -Kurataji West Sumatera NKE 1 2 6 3 2 3 2 3 2 2 26 3 on going
05 A Slope Protection North Sumatera NYS - - - - - - - - - - - - NYS
RR-01 National Roads Central Sulawesi NYS - - - - - - - - - - - - NYS
RR-02 Provincial Roads Central Sulawesi NYS - - - - - - - - - - - - NYS
EMP Compliance on WINRIP (January to 31 March 2019)
Contractor Performance on EMP
16 Bengkulu PT.YASA-Multistructure 2 2 6 3 2 3 2 3 2 2 27 3
Rehabilitation & Reconstruction post Dissaster & Tsunami Palu - Central Sulawesi
PHO
Civil Work
APPENDIX No.14
Status as of 31 March 2019
Length Width
(Km) (m)
AWP - 1AWP - 2 dan AWP - 3
17 Sp.Gunung Kemala - Pg.Tampak Lampung 36.8 36 - - - - - - - - - - - - The project has been PHO. Base camp has been demobilization /no contaminated soil
5 Sp. Rampa - Poriaha North Sumatera 9.7 6 - - - - - - - - - - - - The project has been PHO. No contaminated soil and AMP, ST & Weight vehicle not yet moved
13 Sp Rukis - Tj Kemuning Bengkulu 56.3 7 - - - - - - - - - - - - The project has been PHO. No contaminated soil
15 Sibolga - Bts Tap Sel North Sumatera 36 7 - - - - - - - - - - - - The project has been PHO. Housekeeping improved
8 Bts. Kota Pariaman -Manggopoh West Sumatera 46.8 7 - - - - - - - - - - - - The project has been PHO. No contaminated soil
7 Indrapura - Tapan West Sumatera 19.5 7 - - - - - - - - - - - - The project has been PHO, No contaminated soil but the AMP pool is currently open and WB request the pool must be closed
12 Kambang - Indrapura West Sumatera 55.2 7 - - - - - - - - - - - - The project has been PHO. No contaminated soil and (Infrastructure, housekeeping & B3 storage TPS improved but AMP, ST & Weight vehicle not yet moved from Base Camp 2
14 Painan -Kambang West Sumatera 31.5 7 X X X - - - - - - - - - CTC not yet received the monitoring report from DSC for Jan to March 2019. solar spilled at AMP and TPS wall need improved
Seblat - Ipuh including 34.5 6 - - - - - - - - - - - - Air Lalang & Air Guntung Bridge 64 m 6
20 Lubuk Alung - Sicincin West Sumatera 14.6 7 - - - - - - - - - - - - The project has been PHO. No contaminated soil
21 Lubuk Alung -Kurataji West Sumatera 16.8 7 - - - - - - - - - The project has been Terminated
21 A Lubuk Alung -Kurataji West Sumatera 16.8 7 X X X - - - - - - - - - CTC not yet received the monitoring report from DSC for Jan to March 2019. Infrastructure of solar & asphalr tank & oil tap at drainage has been built TPS on process
05 A Slope Protection North Sumatera 25 6 NYS NYS NYS NYS NYS NYS NYS NYS NYS NYS NYS NYS The project Not yet started
Palu Disaster Recovery WorksRR-01 National Roads Central
Sulawesi 48.44 NYS NYS NYS NYS NYS NYS NYS NYS NYS NYS NYS NYS The project Not yet started
RR-02 Provincial Roads CentralSulawesi 29.43 NYS NYS NYS NYS NYS NYS NYS NYS NYS NYS NYS NYS The project Not yet started
PHO√ = Available Terminated
May
16 Bengkulu The project has been PHO. No contaminated soil
Jun Jul Aug Sep
STATUS OF MONITORING OF ENVIRONMENTAL MITIGATION ON WINRIP YEAR 2019
Note : X = Not Available
PAKET WINRIP, IBRD LOAN NO. 8043-ID STATUS DAN JADWAL PELAKSANAAN
No. Package Loan Package Name PROVINSI Oct Nov RemarksJan DecFeb Mar Apr
Appendix 14 Evaluasi kinerja DSC in Env Mon Quarter Jan To March 2019ok_5276D5
(Km) (m) (m2) Rp/m2 (m2) Rp/m2 (m2) Rp/m2 (m) Rp/m (m2) Rp/m2 (m2) Rp/m2 (m2) Rp/m2 Rod Rp/rod
AWP - 1
1 Krui - Bha Lampung 25 7 Widening 2,815 2011 28,763 882 0 2,445 0 0 0 653 12-15 2,815 28,763 50,000 882 500,000 0 2,445 80,000 0 0 0 653 50,000
Pdg Sawah - Sp Empat 40.9 7 Widening 431 2011 Not LA 2,110 0 342 0 0 0 873 12-15 431 Not LA 2,110 0 342 100,000 0 0 0 873 50,000
Including Air Gadang Bridge 100 m 7 New 11 2011 2,048 410 0 0 0 0 0 72 12-15 11 2,048 50,000 410 700,000 0 0 0 0 0 74 60,000
3 Manggopoh - Pdg Sawah West
Sumatera32 7 Widening 1,338 2011 Not LA 668 0 15 0 1,421 661 5,324 12-15 1,338 Not LA 668 700,000 0 0 0 1,421 120,000 661 200,000 5324 60,000
4 Ipuh - Bantal Bengkulu 42.4 7 Widening 257 2011 Not LA 307 673 504 9 2,632 7 (tomb) 82 13-14 257 Not LA 307 250,000 673 400,000 504 85,000 9 75,000 2,632 100,000 7 tomb 1,8 M 82 50,000
AWP - 2 dan AWP - 3
17 Sp.Gunung Kemala - Pg. Tampak Lampung 36.8 6 Widening 2,568 2013 236,342 2,269 83,462 412 486 2,214 34,601 4,930 15-17 2,568 236,342 375,000 2,269 500,000 83,462 250,000 412 110,000 486 75,000 2,214 100,000 34,601 100,000 4,930 69,700
5 Sp. Rampa - Poriaha North
Sumatera9.7 6 Widening 92 2016 94,739 271 7,689 2017 92 94,739 0 271 1,927,175 3,175 167408
11 Bantal - Mukomuko Bengkulu 50.1 6 Widening 243 2013 Not LA 410 413 249 17 2,937 35 2 15-16 243 1.576 500,000 228 400,000 219 300,000 54 275,000 1536 100,000 0 143 400,000
13 Sp Rukis - Tj Kemuning Bengkulu 56.3 7 Widening 3,040 2013 86,966 2,196 0 1,575 0 0 0 363 15-17 3,040 62,717 250,000 3,752 400,000 1,396 350,000 8,954 315,000 207 325,000 2,203 100,000 668 2252 425000
6 Ps Pedati - Kerkap Bengkulu 20.9 7 Widening 637 2013 4,719 0 2,925 4,169 4,399 0 0 2015 637 3,613 221,000 684 203,300 1827 239,850 2,479 696,200 4291 157,000 165 451,000 138 135,000
19 Lais- Bintunan Bengkulu 10.8 7 Widening 538 2013 30,015 0 652 3,276 0 1,381 379 15-16 538 9,638 110,500 201 650,000 1073 425,000 4,121 310,000 1421 115,000 124 300,000 608 125,000
15 Sibolga - Bts Tap Sel North
Sumatera36 7 Widening 1,852 2013 24,763 3,499 1,192 1,763 0 0 0 385 15-17 1,852 24,763 160,000 3,816 400,000 1,803 200,000 2,161 350,000 8 250,000 594 80,000
8 Bts. Kota Pariaman - Manggopoh West
Sumatera46.8 7 Widening 2,206 2014 Not LA 8,352 0 3,673 8,771 7,863 15-16 2,339 Not LA 726 850,000 2567 400,000 2866 100,000 843 85,000 750.82 120,000 404 450,000 31,079 150,000
10 Sp Empat - Sp Air Balam West
Sumatera61.7 7 Widening 2,915 2014 Not LA 11,523 0 2,613 0 11,538 4,369 2015 1,421 Not LA 2,138 850,000 2,843 400,000 1099 100,000 29 275,000 375 120,000 8,247 150,000
7 Indrapura - Tapan West
Sumatera19.5 7 Widening 813 2014 Not LA 746 2,191 2,130 636 2,109 115 1,172 16-17 878 Not LA 1868 285,000 2,185 378,000 2130 150,000 636 225,000 2118 122,000 1172 150,000
12 Kambang - Indrapura West
Sumatera55.2 7 Widening 2,873 2014 Not LA 2,057 0 32,741 0 17,144 3,225 16-17 2,873 Not LA 612 295,000 965 410,000 1718 175,000 60 390,000 829 125,000 56 210,000
14 Painan -Kambang West
Sumatera31.5 7 Widening 2,137 2014 Not LA 10,474 0 21,735 0 20,988 0 1,044 16-17 2,242 Not LA 898 800,000 1,157 450,000 1,593 210,000 105 405,000 1,310 135,000 1,767 215,000
Seblat - Ipuh including 34.5 6 Widening 254 2013 1,345 658 98 232 0 0 0 33 254 1345 **) 275 480,000 1160 198,000 432 396,000 968 209,000 1047 330,000
Air Lalang & Air Guntung Bridge 64 m 6 New 5 10,280 5 10280 **) 0
20 Lubuk Alung - Sicincin West
Sumatera14.6 7 Widening 950 2014 Not LA 528 0 294 0 0
2600 m(canal)
16-17 950 Not LA 958 900,000 1,342 450,000 2,614 150,000 661 285,000 1,395 130,000 4,711 150,000
21 Lubuk Alung -Kurataji West
Sumatera16.8 7 Widening 827 2014 Not LA 361 0 284 0 0
433 m(canal)
0 16-17 908 Not LA 388 950,000 1,552 465,000 796 160,000 415 283,000 2,100 135,000 222 110,000 4,005 155,000
18 Mukomuko - Bts. Sumbar (replacedto Sibolga - Sorkam)
Bengkulu 25.8 6 Widening NA
9 Rantau Tijang - Kota Agung (replacedto Biha - Bengkunat)
Lampung 42 7 Widening NA
**): hibah
As March 31, 2019
Trees
Appendix No. 15A. Western Indonesia National Roads Improvement Projet Summary of Land Acquisition for WINRIP Packages Based on LARAP
Compensation
Household
Land House BuildingType
Length Width
Year
Terrace Fence Foundation Pavement
Land Acquistion Plan
16 Bengkulu
PackageNumber
Package Province
2 West
Sumatera
*): kawasan HP
OthersHousehol
dYear Land (m2) House (m2)
Terrace(m2)
Fence(m)
Foundation(m) Pavement (m2) Others Trees
15-16
AWP - 11 Krui - Bha Lampung 28,763 28,763 0 100.0
Padang Sawah - Sp Empat Not LA Including Air Gadang Bridge 2,048 2,048 0 100.0
3 Manggopoh - Padang Sawah Sumatera Barat Not LA4 Ipuh- Bantal Bengkulu Not LA
AWP - 2 and AWP - 317 Sp.Gunung Kemala - Pg. Tampak Lampung 236,342 236,342 0 100.005 Sp. Rampa - Poriaha Sumatera Utara 94,739 94,739 0 100.00
11 Bantal - Mukomuko Bengkulu Not LA13 Sp Rukis - Tj Kemuning Bengkulu 86,966 62,717 24249 72.16 Ps Pedati - Kerkap Bengkulu 4,719 4,719 0 100.0
19 Lais- Bintunan Bengkulu 30,015 30,015 0 100.015 Sibolga - Bts Tap Sel Sumatera Utara 24,763 24,763 0 100.08 Bts. Kota Pariaman - Manggopoh Sumatera Barat Not LA
10 Sp Empat - Sp Air Balam Sumatera Barat Not LA7 Indrapura - Tapan Sumatera Barat Not LA
12 Kambang - Indrapura Sumatera Barat Not LA14 Painan -Kambang Sumatera Barat Not LA
Seblat - Ipuh including 1,345 1,345 0 100.0 Air Lalang & Air Guntung Bridge 10,280 10,280 0 100.0
20 Lubuk Alung - Sicincin *) Sumatera Barat Not LA21 Lubuk Alung -Kurataji *) Sumatera Barat Not LA
18 Mukomuko - Bts. Sumbar (DELETE) Bengkulu DELETE
9 Rantau Tijang - Kota Agung (DELETE) Lampung DELETE
Appendix No 15. Western Indonesia National Roads Improvement Projet Overall Land Acquisition Status as Dec 31, 2018
Total Area to beAcquired through
LA Act (underprocess)
Progress(%)
2 Sumatera Barat
16 Bengkulu
Total Area tobe Acquired
(m2)
TotalAcquired
(m2)
PackageNumber
Package Province
As March 31, 2019
m2 HHs m2 HHs m2 HHs m2 HHs m2 HHs m2 HHs
1 Krui - Bha Lampung 25 7 Widening 2,815 2011 28,763 384 1,534 0 1,918 882 88 0 0 2,445 245 1,540 154 2,941 294 1,452 117 898 0 0 0 0 0
Padang Sawah - Sp Empat 40.9 7 Widening 431 2011-2012 Not LA 2,110 106 0 0 342 20 758 76 695 87 455 114 402 28 0 0 0 28
Including Air Gadang Bridge 100 m 7 New 11 2,048 11 11 0 410 21 0 0 0 0 0 0 21 0 0 0 0 0
3 Manggopoh - Padang Sawah West Sumatera 32 7 Widening 1,338 2011-2012 Not LA 668 33 0 0 15 2 0 1,421 71 661 33 140 124 0 0 0 124
4 Ipuh- Bantal Bengkulu 42.4 7 Widening 257 2013 Not LA 307 15 673 34 504 25 9 1 2,632 132 7 (tomb) 7 214 0 0 0 0 0
17 Sp.Gunung Kemala - Pg. Tampak Lampung 36.8 6 Widening 2,568 2015-2017 236,342 473 1,891 0 2,363 2,269 113 83,462 4,173 412 486 2,214 34,601 4,287 0 0 0 0 0
5 Sp. Rampa - Poriaha North Sumatera 9.7 6 New Road 92 2016-2018 94,739 0 0 0 0 271 14 14 0 0 7 0 7
11 Bantal - Mukomuko Bengkulu 50.1 6 Widening 243 2015-2016 Not LA 0 0 0 410 21 413 21 249 12 17 2 2,937 147 35 3 205 0 0 0 0 0
13 Sp Rukis - Tj Kemuning Bengkulu 56.3 7 Widening 3,040 2015-2017 62,717 418 1,672 0 2,091 3,752 188 1,396 70 8,954 448 207 10 2,203 110 668 33 859 0 0 0 0 0
6 Ps Pedati - Kerkap Bengkulu 20.9 7 Widening 637 2015 4,719 47 180 0 227 0 0 2,925 146 4,169 208 4,399 220 0 0 575 0 0 0 0 0
19 Lais- Bintunan Bengkulu 10.8 7 Widening 538 2015 30,015 92 369 0 462 0 0 652 33 3,276 164 0 0 1,381 69 0 0 265 0 0 0 0 0
15 Sibolga - Bts Tap Sel North Sumatera 36 7 Widening 1,852 2016-2018 24,763 248 991 0 1,238 3,816 382 1,803 90 2,161 144 112 6 445 45 368 18 684 0 64 0 18 82
8 Bts. Kota Pariaman - Manggopoh West Sumatera 46.8 7 Widening 2,206 2015 Not LA 0 0 0 0 8,552 428 0 0 3,673 184 0 0 8,771 439 0 0 1,050 0 0 0 0 0
10 Sp Empat - Sp Air Balam West Sumatera 61.7 7 Widening NA
7 Indrapura - Tapan West Sumatera 19.5 7 Widening 813 2016-2017 Not LA 0 0 0 0 4,013 201 6,784 339 19,206 960 0 9,401 470 0 0 1,970 0 48 0 0 48
12 Kambang - Indrapura West Sumatera 55.2 7 Widening 2,873 2016-2017 Not LA 0 0 0 0 2,057 103 4,658 233 22,741 1,137 0 27,144 1,357 0 0 2,830 0 72 0 0 72
14 Painan -Kambang West Sumatera 31.5 7 Widening 2,137 2016-2017 Not LA 0 0 0 0 10,474 524 0 0 21,735 1,087 0 20,988 1,049 0 0 2,660 0 0 0 0 0
Seblat - Ipuh including 34.5 6 Widening 259 2016 1,345 0 0 0 0 658 33 98 5 232 12 0 0 0 0 49 0 0 0 0 0
Air Lalang & Air Guntung Bridge 64 m 6 New 10,280 0 5 0 5 0 0 0 0 0 0 0 0
20 Lubuk Alung - Sicincin West Sumatera 14.6 7 Widening 950 2016-2017 Not LA 0 0 0 0 528 26 0 0 294 15 0 0 0 0 41 0 15 0 0 15
21 Lubuk Alung -Kurataji West Sumatera 16.8 7 Widening 827 2016-2017 Not LA 0 0 0 0 361 18 0 0 284 14 0 0 0 0 32 0 8 0 0 8
18 Mukomuko - Bts. Sumbar Bengkulu 25.8 6 Widening NA
9 Rantau Tijang - Kota Agung Lampung 42 7 Widening NA
TOTAL 23,887 495,731 1,661 6,653 11 8,303 41,538 2,312 102,864 5,143 90,692 4,676 3,129 249 87,572 4,489 38,240 326 17,195 152 207 7 18 384
Total Affected Non-Land Economic Displacement HHs 359
36
23,851
Length(Km)
Width (m) House Terrace (m2) FenceTotal AffectedHHs
Year
Structure, Trees, and Plant
Western Indonesia National Roads Improvement ProjetSummary of Land Acquisition for WINRIP
PackageNumber
Package Province Type
Land Acquired
HHs RentersTotal HHs
Displacement
HHs InformalOccupant
Foundation Pavement OthersStreet
vendors (HH)Total HHs
Total Severely Affected HHs
Total Slightly Affected HHs
PKL(individual
s)
HHs Displacement
AWP - 1
AWP - 2 dan AWP - 3
Land Owners
m2 HHs (Title)HHs
(No Title)
HHslosing>20
%
HHslosing<20
%
2 West Sumatera
16 Bengkulu
Appendix 16. Road Safety Audit Progresss March 2019)
Site VisitSubmission of
ReportSite Visit
Submission ofReport
Site VisitSubmission of
Report1. No Road Safety Audit at Design Stage.
2. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Dec, 2014
3. RSA at PHO stage by CTC, February, 2016
Date 13-Nov-14 29-Dec-14 13-Nov-14 29-Dec-14 11-Feb-16 22-Feb-161. No Road Safety Audit at Design Stage.
2. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Dec, 2014
3. RSA at PHO stage by CTC, April, 2016
Date 9-Oct-14 5-Nov-14 9-Oct-14 5-Nov-14 6-Apr-16 12-Apr-161. No Road Safety Audit at Design Stage.
2. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Dec, 2014
3. RSA at PHO stage by CTC, March, 2016
Date 9-Oct-14 5-Nov-14 9-Oct-14 5-Nov-14 17-Mar-16 23-Mar-161. No Road Safety Audit at Design Stage.
2. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Dec, 2014
3. RSA at PHO stage by CTC, April, 2016
Date 13-Nov-14 29-Dec-14 13-Nov-14 29-Dec-14 14-Apr-16 26-Apr-161. Technical Advisory Report by International RSA CTC, Sept 2013
2. RSA at PHO stage by CTC, March, 2018
Date 08-May-13 17-Sep-13 28-Feb-18 26-Mar-181. Technical Review & RSA at Design Stage done by International RSA CTC
2. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Sep, 2015
3. RSA at PHO stage by CTC, November, 2016
Date 18-Jul-13 17-Sep-13 25-Aug-15 8-Sep-15 18-Nov-16 19-Dec-161. Technical Advisory Report by International RSA CTC, Sept 2013
27-Sep-13 2. Road Safety Audit by Dit. EA & RS, May 2014
3. RSA at Construction stage by CTC, December, 2016
Date Apr-14 May-14 8-Dec-16 22-Dec-16 27-Dec-17 5-Jan-18 4. RSA at PHO stage by CTC, January, 2018
1. Technical Advisory Report by CTC, Sept 2013
27-Sep-13 2. Road Safety Audit by Dit. EA & RS, May 2014
3. RSA at Construction stage by CTC, August 2017
Date Apr-14 May-14 26-Jul-17 25-Aug-17 7-Dec-17 11-Dec-17 4. RSA at PHO stage by CTC, December 2017
1. Technical Review & RSA at Design Stage by International RSA CTC , Jul, 2013
2. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Dec, 2015
3. RSA at PHO stage by CTC, April 2017
Date 18-Jul-13 18-Jul-13 17-Dec-15 29-Dec-15 11-Apr-17 24-Apr-071. Technical Advisory Report by International RSA CTC, Sept 2013
27-Sep-13 2. Road Safety Audit by Dit. EA & RS, May 2014
3. RSA at Construction stage by CTC, January 2018
Date Apr-14 May-14 17-Jan-18 6-Feb-18 28-Aug-18 10-Sep-181. Technical Advisory Report by International RSA CTC, Sept 2013
2. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Mar, 2017
3. RSA at PHO stage by CTC, April, 2018
Date 18-Jul-13 18-Jul-13 23-Mar-17 3-Apr-17 5-Apr-18 20-Apr-181. RSA DED Report by CTC, June, 2015
2. RSA at Construction stage by CTC, January 2018
3. RSA at PHO stage by CTC, September, 2018
Date 15-Apr-15 15-Jun-15 16-Jan-18 30-Jan-18 30-Aug-18 12-Sep-181. Technical Advisory Report by International RSA CTC, Sept 2013
2. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Aug, 2017
3. RSA at PHO stage by CTC, August, 2018
Date08-May-1321-Aug-13
23-Sep-13 28-Aug-17 25-Sep-17 24-Jul-18 6-Aug-18
1. RSA DED Report by CTC, Sept, 2014
2. RSA at Construction stage by CTC, January 2018
3. RSA at PHO stage by CTC, August, 2018
Date 14-Aug-14 1-Sep-14 29-Jan-18 15-Feb-18 26-Jul-18 8-Aug-181. No Road Safety Audit at Design Stage.
2. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, May, 2017
3. RSA at PHO stage by CTC, October, 2017
110,237Process
100%
Process100%
118,993Process
100%
15 #17 Sp.Gng Kemala–Pg.Tampak
14 #16 Seblat – Ipuh
255,269Process
100%
13 #15 Sibolga – Bts TapSel
316,304.8Process
100%
12 #14 Painan – Kambang
11 #13 SP.Rukis - TJ.Kemuning
376,479
438,675Process
100%
262,611Process
100%
10 #12 Kambang – Indrapura
9 #11 Bantal - Mukomuko
175,812Process
100%
8 #8 Bts.Pariaman – Manggopoh
7 #7 Indrapura – Tapan
374,647Process
100%
92,127Process
100%
152,870Process
100%
No RSA at Const. Stage
6 #6 PS.Pedati - Kerkap
5 #5 Sp.Rampa – Poriaha
247,105Process
100%
167,678Process
100%
4 #4 Ipuh - Bantal
3 #3 Manggopoh -Padangsawah
228,772Process
100%
163,535Process
100%
2 #2 Padangsawah - Simpangempat
1 #1 Biha - Krui
EstimatedCost /
Excl.VAT(mil. RP)
Road Safety AuditTotal Process
(%)Remarks
StatusDesign Stage Construction Stage PHO StageNo
PkgNo.
Name of Sub-project
Site VisitSubmission of
ReportSite Visit
Submission ofReport
Site VisitSubmission of
Report
EstimatedCost /
Excl.VAT(mil. RP)
Road Safety AuditTotal Process
(%)Remarks
StatusDesign Stage Construction Stage PHO StageNo
PkgNo.
Name of Sub-project
Date 17-18 May 2017 18-Jul-17 3-Oct-17 30-Nov-17
1. Technical Advisory Report by International RSA CTC, Sept 2013
2. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Sep, 2015
3. RSA at PHO stage by CTC, May, 2016
Date 18-Jul-13 17-Sep-13 25-Aug-15 8-Sep-15 19-May-16 24-May-161. RSA DED Report by CTC, June, 2015
2. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Jul, 2017
3. RSA at PHO stage by CTC, January, 2018
Date 15-Apr-15 15-Jun-15 27-Jul-15 25-Aug-15 15-Jan-18 24-Jan-181. RSA DED Report by CTC, June, 2015
2. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Jul, 2017
Date 15-Apr-15 15-Jun-15 25-Jul-15 25-Aug-15
Notes :Road Safety Engineering Review by CTC
Road Safety Audit by International RSA CTC
Road Safety Audit by Dit. EA & RS DGH
Road Safety Audit by CTC
No Road Safety Audit
65,788Process
100%
54,557Process
100%
TERMINATION by DGH
No RSA at DED. Stage
18 #21 Lubuk Alung - Kuraitaji
35,886Process
100%
17 #20 Lubuk Alung – Sicincin
16 #19 Lais - Bintuan
15 #17 Sp.Gng Kemala–Pg.Tampak 255,269 100%
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project 1
Appendix 17
LIST OF WORKSHOP/TRAINING IMPLEMENTATION
No Workshop/Training Target ImplementationDate
1 Procurement Training All Pokja related to WINRIP 1 – 2 November 2012
2 Workshop of Bid DocumentsEvaluation
Balai II & III Pokja in 4 provinces related to WINRIP
27 Feb. – 1 March2013
3 Project Management Manual(PMM) Update Meeting All stakeholders related to WINRIP 18 – 19 March 2014
4 World Bank ProcurementGuideline
PMU WINRIP Balai, Pokja, Satker, PPK in 4 provinces
related to WINRIP23 – 24 April 2013
5 Training of RKPPL and TPM Satker, PPK, Contractor,DSC, and TPMof Package No. 01 (Krui – Biha)
5 – 6 June 2014
6 Socialization of ProjectManagement Manual (PMM)
Balai, Satker, PPK, Contractor, and DSCrelated to Package No. 01, 02, 03, and04
12 – 14 June 2014
7 Training of RKPPL and TPM
Balai, Satker, PPK, Contractor, DSC andTPM related to Package No. 02 (Pd.Sawah – Sp. Empat)
Balai, Satker, PPK, Contractor, DSC andTPM related to Package No. 03(Manggopoh – Pd. Sawah)
18 – 19 June 2015
8 Training of RKPPL and TPM Balai, Satker, PPK, Contractor, DSC and
TPM related to Package No. 04 (Ipuh –Bantal)
7 – 8 July 2015
9 Socialization of ProjectManagement Manual (PMM)
Balai, Satker, PPK, Contractor, and DSCrelated to Package No. 01, 02, 03, and04
10 – 11 Sept., 2014
10 Training of Interim FinancialReport (IFR)
Financial staff of Satker of Package No.01, 02, 03, and 04
26 – 27 Nov., 2014
11 Training of Interim FinancialReport (IFR)
Financial staff of Satker of Package No.05, 11, 13, 17
11 – 12 Feb., 2015
12 Training of RKPPL and TPM Balai, Satker, PPK, Contractor, DSC andTPM related to Package No. 11 and 13 11 – 12 March 2015
13 Socialization of ProjectManagement Manual (PMM)
Balai, Satker, PPK, Contractor, and DSCrelated to Package No. 06, 11, 13, and19
6 – 7 May 2015
14 Training of RKPPL and TPM
Balai, Satker, PPK, Contractor, DSC andTPM related to Package No. 06 and 19
Balai, Satker, PPK, Contractor, and DSCrelated to Package No. 17
4 – 5 June 2015
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project 2
No Workshop/Training Target ImplementationDate
15 Training of Interim FinancialReport (IFR)
Financial staff of Satker of Package No.06, 19, and 17 5 – 6 August 2015
16 Training of RKPPL Balai, Satker, PPK, Contractor, and DSCrelated to Package No. 05 and 15 7 – 8 October 2015
17 Training of TPM Balai, Satker, PPK, Contractor, DSC andTPM related to Package No. 05 and 15 9 October 2015
18 Training of TPM Balai, Satker, PPK, Contractor, DSC andTPM related to Package No. 17 22 October 2015
19 Socialization of HIV - Aids Contractor and all workers in PackageNo. 01 and 17, Lampung Province
10 November 2015
20 Socialization of HIV - Aids Contractor and all workers in PackageNo. 02 and 03, West Sumatera Province
17 November 2015
21 Socialization of ProjectManagement Manual (PMM)
Balai, Satker, PPK, Contractor, and DSCrelated to Package No. 05, 15, and 17 23 – 24 Nov., 2015
22 Socialization of HIV - AIDS Contractor and all workers in PackageNo. 04, Bengkulu Province 4 December 2015
23 Socialization of HIV - AIDS Contractor and all workers in PackageNo. 11, Bengkulu Province 5 December 2015
24 Socialization of HIV – AIDS Contractor and all workers in PackageNo. 06, Bengkulu Province 12 January 2016
25 Socialization of HIV – AIDS Contractor and all workers in PackageNo. 19, Bengkulu Province
13 January 2016
26 Socialization of HIV – AIDS Contractor and all workers in PackageNo. 13, Bengkulu Province
14 January 2016
27 Socialization of HIV – AIDS Contractor and all workers in PackageNo. 15, North Sumatera Province 27 January 2016
28 Socialization of HIV – AIDS Contractor and all workers in PackageNo. 05, North Sumatera Province 28 January 2016
29 Training of Interim FinancialReport (IFR)
Financial staff of Satker/PPK of PackageNo. 07, 08, 10, and 12 April 12 – 13, 2016
30 Training of RKPPL Balai, Satker, PPK, Contractor, and DSC
(Field Supervision Team) related toPackage No. 07, 08, and 12
May 26 – 27, 2016
31 Training of TPM Balai, Satker, PPK, Contractor, DSC andTPM related to Package No. 07 and 08
9 June 2016
32 Training of Interim FinancialReport (IFR)
Financial staff of Satker from PJN I andSatker PJN II and financial staf of PPKPackage No. 05,15,14,20 and 21
July 20 -21, 2016
33 Socialization of ProjectManagement Manual (PMM)
Balai, Satker, PPK, Contractor, and DSCrelated to Package No. 07,12,08,14,20and 21
29 – 30 Agust., 2016
34 Training of TPM Balai, Satker, PPK, Contractor, DSC andTPM related to Package No. 12 and 14 27 September 2016
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project 3
No Workshop/Training Target ImplementationDate
35 Socialization of HIV – AIDS Contractor and all workers in PackageNo. 14, West Sumatera Province 4 October, 2016
36 Training of TPM Balai, Satker, PPK, Contractor, DSC andTPM related to Package No. 20 and 21 13 October 2016
37 Training of RKPPL Balai, Satker, PPK, Contractor, and DSC
(Field Supervision Team) related toPackage No. 14, 20 and 21
26 - 27 Oct., 2016
38 Workshop Pra Construstion
Package 07,12,14,20,21,16 and 08 fromBengkulu Province
Kick Off Meeting “Technical AuditPackage 07”
21 November, 2016
39 Training of RKPPL Balai,Satker,PPK,Contractor and DSC
(Field Supervision Team related toPackage 16
18 – 19 Jan., 2017
40 Workshop PMM Stake holder of Direktorate GeneralBina Marga 1 – 2 Feb., 2017
41 Socialization of HIV - AIDS Contractor and all workers in PackageNo. 8, West Sumatera Province 7 March 2017
42 Socialization of HIV - AIDS Contractor and all workers in Package
No.20 and Package 21, West SumateraProvince
8 March 2017
43 Training of TPM Balai, Satker, PPK, Contractor, DSC and
TPM related to Package No. 16,Bengkulu Province
27 April 2017
44 Socialization of HIV - AIDS Contractor and all workers in PackageNo. 16, Bengkulu Province
14 – 16 May 2017
45 Review of Quality ManagementTraining
PPK, Satker, DSC and Contractor inPackage 21,20,14,12,08 and 07 WestSumatera Province , and from Package16 Bengkulu Province
4 September 2017
46 Base Camp Training QualityManagement
PPK, Satker, DSC and ContractorPackage 21 and 20 5 September 2017
47 Base Camp Training QualityManagement
PPK, Satker, DSC and ContractorPackage 12 and 14 06 September 2017
48 Base Camp Training QualityManagement
PPK, Satker, DSC and ContractorPackage 07 07 September 2017
49 Base Camp Training QualityManagement
PPK, Satker, DSC and ContractorPackage 16 08 September 2017
50 Review of Quality ManagementTraining
PPK, Satker, DSC and Contractor inPackage 05 and 15 North Sumatera
10 September 2017
51 Base Camp Training QualityManagement
PPK, Satker, DSC and ContractorPackage 05 and 15
11 September 2017
2019 Quarterly Progress Report 1st Quarter: January-February-March
Western Indonesia National Roads Improvement Project 4
No Workshop/Training Target ImplementationDate
52 Review of Quality ManagementTraining
PPK, Satker, DSC and Contractor inPackage 13 Bengkulu Province and 17Lampung Province
12 September 2017
53 Base Camp Training QualityManagement
PPK, Satker, DSC and ContractorPackage 13 13 September 2017
54 Base Camp Training QualityManagement
PPK, Satker, DSC and ContractorPackage 17 14 September 2017
55Socialization follow-up ofForeign Loans and Grants(PHLN) monitoring system
Dit. PJJ; PMU WINRIP; PMU RRDP: PMUJICA, CHINA, KOREA; Tim SistemMonitoring PHLN.
02 October 2017
56
Workshop on Contract andConstruction ManagementDevelopment on WINRIPPackages
Official of Dit. PJJ, official of Dit.Preservation, PMU WINRIP, PIUWINRIP, CTC WINRIP
12 December 2017
57Technical Assistance Trainingfor Quality Assurance forPackages 12 and 14
Official of PPK and Staff, SupervisionConsultants, and Contractors 25 – 29 March 2018
58
Technical Assistance Trainingfor Quality Assurance Package13 and Package 16 in BengkuluProvince
Official of PPK and Staff, SupervisionConsultants, and Contractors 01 – 05 April 2018
59
Technical Assistance Trainingfor Quality Assurance Package05 and Package 15 in NorthSumatera Province
Official of PPK and Staff, SupervisionConsultants, and Contractors 09 – 11 April 2018