1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1...

22
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2 L. Cremaldi, CM17 CERN, Feb 24, 2007

Transcript of 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1...

Page 1: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

1

CKOV1 at the MICE Experiment

•CKOV1 to perform mu/pi id w TOF0/TOF1.•Progress since CM16•CKOV1 Fabrication and Installation

TOF0 CKOV1 TOF1 EMCALTOF2

L. Cremaldi, CM17 CERN, Feb 24, 2007

Page 2: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

2

2 Threshold Aerogel Counters2 Threshold Aerogel Counters

Aerogel Counter

L. Cremaldi, CM17 CERN, Feb 24, 2007

Page 3: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

3

A

B

C

ISIS Beam Line ISIS Beam Line

Page 4: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

4

Magnetic Shielding- 2D Model

9.4%

4.6% 3.4%

3.3%

58%

48% 41%

17%

Btube = 10%BZ + 60% BBZg , B <5g

BZ

B

L. Cremaldi, CM17 CERN, Feb 24, 2007

Page 5: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

5

- H20 fraction is negligible.- Tested with low energy betas.- Background may be dominated by-rays, etc.

L. Cremaldi, CM17 CERN, Feb 24, 2007

Page 6: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

6

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

Rate Tests

L. Cremaldi, CM17 CERN, Feb 24, 2007

Page 7: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

7

Rate Tests

L. Cremaldi, CM17 CERN, Feb 24, 2007

Page 8: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

8

Number of Photo Electrons vs Frequency

0

10

20

30

40

50

60

70

0 1000 2000 3000 4000 5000 6000 7000

Frequency (kHz)

# of PE

8in 5PE8in 10PE8in 15PE8in 20PE8in 25PE5in 5PE8inTB

Transistor base prototype

Resistive base

RCA 8854 Transistor base

L. Cremaldi, CM17 CERN, Feb 24, 2007

Page 9: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

9

Transistor Base Transistor Base

L. Cremaldi, CM17 CERN, Feb 24, 2007

Page 10: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

10

CKOV1 Electronics

•CAEN V1724 8 Channel 14 bit 100 MS/s FlashADC 250-500 ps t resolution•CAEN V1290 TDC 25 ps t resolution

20 ns.div

L. Cremaldi, CM17 CERN, Feb 24, 2007

Page 11: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

11

-Machining- UM-Nickel Plating-Ready in Spring '07 for light tests

Light Box AssemblyLight Box Assembly

L. Cremaldi, CM17 CERN, Feb 24, 2007

Page 12: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

12

-Needed June/July ‘07.-Aerogel order in Mar’07-4mo lead time?-Assembly in Mississippi-Ship to RAL in Jul ’07

Radiator Box AssemblyRadiator Box Assembly

L. Cremaldi, CM17 CERN, Feb 24, 2007

Page 13: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

13L. Cremaldi, CM17 CERN, Feb 24, 2007

- CKOV1 Platform Design-GG -Decision should be made if RAL or US responsiblity.

Page 14: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

14

-Magnetic shields and PMT assemblies from Treste.-Mu-metal shield needs modification and re-annealing.-10 PMTs checked at Trieste before shipping to RAL. (UM)

PMT + Shield AssemblyPMT + Shield Assembly

L. Cremaldi, CM17 CERN, Feb 24, 2007

Page 15: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

15

Mirror Flashing Concept Mirror Flashing Concept

•Mirror aluminized in 2 sections.

•Large Vacuum vessel.

Page 16: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

16

Mirror Fabrication

•CERN Facility - Andre Braem - meeting next week•FNAL Facility - Eileen Hahn - Lab7

Large Vacuum Chamber- Off Line.Small Chamber- On Line.

90cm id

38cm id

L. Cremaldi, CM17 CERN, Feb 24, 2007

44cm id

60cm od

Page 17: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

17

quartz fiber PMT

DAQGate

LED Pulser

LED Pulser•Non-linear Response•Sensitive to LED Vapp•Adequate for Monitoring•Calibration of 1-Photon

•LEDs mounted near PMTs•Pulser fanned out at CKOV1•Two BNC control lines.

VME/NIMPULSER

L. Cremaldi, CM17 CERN, Feb 24, 2007

Page 18: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

18

Alignment & Self Calibration - 1,2 PE most probable in PMT 1-4.- Small correlation with muon x,y.- Data 1,2 pe signals self calibrating- Some Alignment of CKOV1 by balancing PMT light yield.

L. Cremaldi, CM17 CERN, Feb 24, 2007

Page 19: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

19

CKOV1 Services - 12 45m signal cables RG-58 type. 8 CKOV1 signals 2-Pulser 2 spare Should terminate at a patch panel in the Control Room.

- 10 SHV type high voltage cables. - HV supply not specified yet, may start with something simple Lecroy 4032??

-4 Low voltage Monitor cables for humidity sensor, gas flow, etc

-Dry air supply for mirror box or silica gel packs.

- NIM Crate for Pulser and checkout.

ckov1

Contr

Room

45m

Page 20: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

20

CKOV1 ScheduleCKOV1 Schedule

Mar Apr May Jun Jul Aug Sep Oct ‘07

Light Box

Aerogel Order

Mirror

Assemble

PMT Check + Housing to RAL

PMT Bases(FNAL)

Radiator Box

Mirror Assembly

Nickle Plate

CKOV1 Stand (RAL)

Mu-metal Shield Mod(??)

L. Cremaldi, CM17 CERN, Feb 24, 2007

Radiator Box

Page 21: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

21

Hardware/Software Experience

•TOF + CKV systems installed by hardware experts. H2 Testbeam CERN

• User analysis by software experts FNAL.

•Specialization, wave of the future!

L. Cremaldi, CM17 CERN, Feb 24, 2007

Page 22: 1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

22

Full Scale Model of the Royal Crown

L. Cremaldi, CM17 CERN, Feb 24, 2007