Steam TurbineMechanical Maintenance

Routine TurbineMaintenance

Training Lesson 

 ALSTOM (Switzerland) Ltd  ABCD 

7/23/2019 01 220043enC Routine Turbine Maintenance

http://slidepdf.com/reader/full/01-220043enc-routine-turbine-maintenance 2/8

  Steam Turbine Routine Turbine Mechanical Maintenance Maintenance 

Power Plant Training Center

CSXA220043enC  Page 2 

ABCD

 We reserve all rights in this document and in the information contained therein.Reproduction, use or disclosure to third parties without express authority is strictlyforbidden.

Copyright© by ALSTOM (Switzerland) Ltd 2007

This is a training lesson. It provides overall information about the specific systemonly.

 All mentioned / attached values and settings are for information only. The valuesmight be changed during commissioning.

For actual values please refer to the Instruction Manual.

7/23/2019 01 220043enC Routine Turbine Maintenance

http://slidepdf.com/reader/full/01-220043enc-routine-turbine-maintenance 3/8

  Steam Turbine Routine Turbine Mechanical Maintenance Maintenance 

Power Plant Training Center

CSXA220043enC  Page 3 

ABCD

Table of Contents

Module Objectives .............................................................................................................................. 4 

Introduction ........................................................................................................................................ 5 

Routine Maintenance Schedules ........................................................................................................... 5 

Every Two Weeks ............................................................................................................................. 5 

Every Month..................................................................................................................................... 5 

Every Three Months.......................................................................................................................... 5 

Every Six Months .............................................................................................................................. 6 

Once a Year .................................................................................................................................... 6 

Other Maintenance Checks ................................................................................................................. 6 

Summary............................................................................................................................................ 7 

7/23/2019 01 220043enC Routine Turbine Maintenance

http://slidepdf.com/reader/full/01-220043enc-routine-turbine-maintenance 4/8

  Steam Turbine Routine Turbine Mechanical Maintenance Maintenance 

Power Plant Training Center

CSXA220043enC  Page 4 

ABCD

Module Objectives

Upon completion of this section, the trainee should be able to:

•  List the checks, which should be performed on the turbine every 2 weeks.

•  List the checks, which should be performed on the turbine every month.

•  List 5 turbine checks, which should be made every 3 months.

•  Describe 3 turbine checks, which must be made every 6 months.

•  Describe 5 maintenance checks, which must be made, on the turbine once a

year.

•  State how often the following tasks must be performed:•   Verifying the correct functioning of the AMOT temperature elements;•  Exchanging the hydraulic accumulator bladders and high pressure hoses;•  Overhauling the jacking oil pumps.

7/23/2019 01 220043enC Routine Turbine Maintenance

http://slidepdf.com/reader/full/01-220043enc-routine-turbine-maintenance 5/8

  Steam Turbine Routine Turbine Mechanical Maintenance Maintenance 

Power Plant Training Center

CSXA220043enC  Page 5 

ABCD

Introduction

In addition to regular visual inspections and operational supervision, certain tasksmust be carried out at the intervals shown below. The results of the tests, checks,measurements, etc. should be recorded in a log.The list shows only highlights of important tasks. For full details, refer to specificmaintenance instructions in the Operation Manuals and Service DocumentationManuals supplied with your unit.

Routine Maintenance Schedules

Every Two Weeks

•  Switch on stand-by equipment.

•  Perform partial or full stroke tests on valves.

•  Perform the simulated (electronic) overspeed test.

Every Month

•  Inspect turbine insulation.

•  Check pressure switches with the trip function.

•  Check lube oil appearance and water content.

•  Inspect packing; tighten as needed.

Every Three Months

•  If applicable, check sliding behaviour; improve sliding properties by greasing.

•  Check the clearances of down-holding and fixation elements.

•  Check for proper contact to base plates.

•  Compare actual valve strokes to control room indications.

•  Measure seal air supply pressure after the orifice.

•  Check the filling pressure of the hydraulic accumulators.

•  If it is possible to do so during operation, test the fluid level switches.

• 

Measure shaft current at the ground brush.

7/23/2019 01 220043enC Routine Turbine Maintenance

http://slidepdf.com/reader/full/01-220043enc-routine-turbine-maintenance 6/8

  Steam Turbine Routine Turbine Mechanical Maintenance Maintenance 

Power Plant Training Center

CSXA220043enC  Page 6 

ABCD

Every Six Months

• 

Check the condition and setting of the steam piping hangers.•  Grease the motor bearings according to instructions of the manufacturer.

•  Tighten flanges, excluding the controlled, pre-stressed flanges.

Once a Year

•  Check the pre-stress of the anchor bolts.

•  Check turbine supervisory equipment for correct functioning and indication.

•  Using an optical level, record foundation deflection.

•  Record reference measurements on the spring-loaded foundations.

•  Record gland clearances; shaft standstill is required.

•  Using a vacuum, clean out all wire junction boxes and computer cabinets.

•  Check contact of grounding cables.

•  Measure shaft lift with jacking oil.

•  Check the pedestal and gland seal system under pressure.

•  Record control valve characteristics and compare them to commissioningvalues.

•  Make an endoscopic inspection of turbine internals.

•  Compare steam pressure readings to valve strokes and power output.

•  Take a lube oil sample and have it analyzed in a laboratory according tospecification HTGD 90 117.

•  Record reference measurements for the rotor/casing and casing/pedestals. Thisrequires a cold unit.

Other Maintenance Checks

•   Verify the correct functioning of the AMOT temperature elements every 2-3years.

•  Exchange hydraulic accumulator bladders and high pressure hoses every 3-4years.

•  Overhaul the jacking oil pumps every 3-4 years.

7/23/2019 01 220043enC Routine Turbine Maintenance

http://slidepdf.com/reader/full/01-220043enc-routine-turbine-maintenance 7/8

  Steam Turbine Routine Turbine Mechanical Maintenance Maintenance 

Power Plant Training Center

CSXA220043enC  Page 7 

ABCD

Summary

This section list important maintenance tasks, outside the scope of overhauls, whichshould be at specified regular intervals.

To ensure that you understand the topic covered, review each question in theObjectives (page 4).

7/23/2019 01 220043enC Routine Turbine Maintenance

http://slidepdf.com/reader/full/01-220043enc-routine-turbine-maintenance 8/8

  Steam Turbine Routine Turbine Mechanical Maintenance Maintenance 

Power Plant Training Center

CSXA220043enC  Page 8 

ABCD

Blank Page