Routine Maintenance(V100R003C00 02)

download Routine Maintenance(V100R003C00 02)

of 59

Transcript of Routine Maintenance(V100R003C00 02)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    1/59

    Quidway S9300 Terabit Routing Switch

    V100R003C00

    Routine Maintenance

    Issue 02

    Date 2010-07-15

    HUAWEI TECHNOLOGIES CO., LTD.

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    2/59

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    3/59

    Copyright Huawei Technologies Co., Ltd. 2010. All rights reserved.

    No part of this document may be reproduced or transmitted in any form or by any means without prior written

    consent of Huawei Technologies Co., Ltd.

    Trademarks and Permissions

    and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.

    All other trademarks and trade names mentioned in this document are the property of their respective holders.

    Notice

    The purchased products, services and features are stipulated by the contract made between Huawei and the

    customer. All or part of the products, services and features described in this document may not be within the

    purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,and recommendations in this document are provided "AS IS" without warranties, guarantees or representations

    of any kind, either express or implied.

    The information in this document is subject to change without notice. Every effort has been made in the

    preparation of this document to ensure accuracy of the contents, but all statements, information, and

    recommendations in this document do not constitute the warranty of any kind, express or implied.

    Huawei Technologies Co., Ltd.

    Address: Huawei Industrial Base

    Bantian, Longgang

    Shenzhen 518129

    People's Republic of China

    Website: http://www.huawei.com

    Email: [email protected]

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    i

    http://www.huawei.com/
  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    4/59

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    5/59

    About This Document

    Intended Audience

    This document describes routine maintenance for the S9300 device in terms of routine

    maintenance items, maintenance guidelines, maintenance records, and dangerous operations.

    This document describes the procedure and method for routine maintenance for the S9300

    device.

    This document is intended for:

    l Network monitoring engineers

    l On-site maintenance engineers

    l System maintenance engineers

    Symbol Conventions

    The symbols that may be found in this document are defined as follows.

    Symbol Description

    DANGER

    Indicates a hazard with a high level of risk, which if not

    avoided, will result in death or serious injury.

    WARNING

    Indicates a hazard with a medium or low level of risk, which

    if not avoided, could result in minor or moderate injury.

    CAUTION

    Indicates a potentially hazardous situation, which if not

    avoided, could result in equipment damage, data loss,

    performance degradation, or unexpected results.

    TIP Indicates a tip that may help you solve a problem or save

    time.

    NOTE Provides additional information to emphasize or supplement

    important points of the main text.

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance About This Document

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    iii

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    6/59

    Command Conventions

    The command conventions that may be found in this document are defined as follows.

    Convention Description

    Boldface The keywords of a command line are in boldface.

    Italic Command arguments are in italics.

    [ ] Items (keywords or arguments) in brackets [ ] are optional.

    { x | y | ... } Optional items are grouped in braces and separated by

    vertical bars. One item is selected.

    [ x | y | ... ] Optional items are grouped in brackets and separated by

    vertical bars. One item is selected or no item is selected.

    { x | y | ... }* Optional items are grouped in braces and separated by

    vertical bars. A minimum of one item or a maximum of all

    items can be selected.

    [ x | y | ... ]* Optional items are grouped in brackets and separated by

    vertical bars. Several items or no item can be selected.

    & The parameter before the & sign can be repeated 1 to n times.

    # A line starting with the # sign is comments.

    Change History

    Updates between document issues are cumulative. Therefore, the latest document issue contains

    all updates made in previous issues.

    Changes in Issue 02 (2010-07-15)

    Based on issue 01 (2010-04-30), the document is updated as follows:

    The following information is modified:

    l 2.2 Routine Maintenance Tasks and Operations

    l 2.3.2 Cleaning the Fan Frame

    l 2.4.1 Backing Up the Configuration Files

    l 2.4.2 Restoring the Configuration Files

    l 3.2 Risky Command Executions

    l 4 Common Maintenance Commands

    l 5 Reference for Routine Maintenance Items and Operations

    About This Document

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance

    iv Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 02 (2010-07-15)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    7/59

    Changes in Issue 01 (2010-04-30)

    Initial commercial release.

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance About This Document

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    v

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    8/59

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    9/59

    Contents

    About This Document...................................................................................................................iii

    1 Routine Maintenance Overview.............................................................................................1-1

    1.1 Objective of Routine Maintenance..................................................................................................................1-2

    1.2 Maintenance Specifications.............................................................................................................................1-21.3 Classification of Routine Maintenance...........................................................................................................1-3

    1.3.1 Daily Routine Maintenance....................................................................................................................1-3

    1.3.2 Periodic Routine Maintenance...............................................................................................................1-4

    2 Routine Maintenance Items.....................................................................................................2-1

    2.1 Routine Maintenance Items.............................................................................................................................2-2

    2.2 Routine Maintenance Tasks and Operations...................................................................................................2-3

    2.3 Cleaning the Equipment................................................................................................................................2-11

    2.3.1 Cleaning the Air Filter..........................................................................................................................2-12

    2.3.2 Cleaning the Fan Frame.......................................................................................................................2-132.3.3 Cleaning the Boards.............................................................................................................................2-16

    2.4 Backing Up and Restoring Configuration Files............................................................................................2-17

    2.4.1 Backing Up the Configuration Files.....................................................................................................2-17

    2.4.2 Restoring the Configuration Files........................................................................................................2-19

    2.5 Grounding System Maintenance...................................................................................................................2-20

    2.5.1 Checking the Grounding System..........................................................................................................2-20

    2.5.2 Measuring the Grounding Resistance..................................................................................................2-20

    3 Risky Operations........................................................................................................................3-1

    3.1 Risky Hardware Operations............................................................................................................................3-2

    3.2 Risky Command Executions...........................................................................................................................3-3

    4 Common Maintenance Commands........................................................................................4-1

    5 Reference for Routine Maintenance Items and Operations..............................................5-1

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance Contents

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    vii

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    10/59

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    11/59

    Figures

    Figure 2-1 Removing an air filter.......................................................................................................................2-12

    Figure 2-2 Installing an air filter........................................................................................................................2-13

    Figure 2-3 Removing a fan module....................................................................................................................2-14

    Figure 2-4 Installing a fan module.....................................................................................................................2-15

    Figure 2-5 Arrangement of probes of an earth resistance tester.........................................................................2-21

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance Figures

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    ix

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    12/59

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    13/59

    Tables

    Table 2-1 List of routine maintenance items........................................................................................................2-2

    Table 2-2 Routine maintenance tasks and operations.......................................................................................... 2-3

    Table 3-1 Risky hardware operations...................................................................................................................3-2

    Table 3-2 Risky command executions..................................................................................................................3-3

    Table 4-1 Common maintenance commands....................................................................................................... 4-1

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance Tables

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    xi

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    14/59

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    15/59

    1 Routine Maintenance OverviewAbout This Chapter

    This chapter describes the principles and specifications for routine maintenance and

    classification of routine maintenance items, and provides the forms used in routine maintenance.

    1.1 Objective of Routine Maintenance

    Routine Maintenance is preventive maintenance measure conducted during the normal operation

    of the device. Routine Maintenance helps to discover the defects or possible faults of the device

    and rectify them, on time. Routine maintenance guarantees long-term, stable, and reliable

    operation of the device.

    1.2 Maintenance Specifications

    This section describes the principles of routine maintenance, including the following:

    specifications for the environment of the equipment room, requirements for the maintenance

    personnel, specifications for maintenance, specifications for maintenance terminals, and the

    other specifications.

    1.3 Classification of Routine Maintenance

    This section describes the classification of routine maintenance tasks.

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 1 Routine Maintenance Overview

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    1-1

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    16/59

    1.1 Objective of Routine Maintenance

    Routine Maintenance is preventive maintenance measure conducted during the normal operation

    of the device. Routine Maintenance helps to discover the defects or possible faults of the device

    and rectify them, on time. Routine maintenance guarantees long-term, stable, and reliable

    operation of the device.

    NOTE

    This manual describes the procedure for maintaining the device through the command line interface (CLI).

    To maintain the device through the Huawei network management system (NMS), refer to the relevant

    manual.

    1.2 Maintenance Specifications

    This section describes the principles of routine maintenance, including the following:

    specifications for the environment of the equipment room, requirements for the maintenance

    personnel, specifications for maintenance, specifications for maintenance terminals, and the

    other specifications.

    Pay attention to the following specifications while maintaining the device:

    Specifications for the Environment of the Equipment Room

    Adhere to the following rules:

    l Maintain the environment of the equipment room in compliance with the related industry

    standards.l Keep the room clean, tidy, dust-proof, and moisture-proof.

    l Take precautions to prevent the growth of fungi and mildew.

    l Take precautions to prevent the entry of rodents and insects into the room.

    Requirements for the Maintenance Personnel

    Maintenance personnel should meet the following requirements:

    l Only trained maintenance personnel can undertake maintenance tasks.

    l The maintenance personnel must be familiar with maintenance theory, and be good at basic

    operation skills and emergency handling skills.

    During maintenance, the personnel must strictly follow the operation procedures and

    industry safety standards to prevent accidents.

    Specifications for Maintenance

    Adhere to the following rules:

    l Establish scientific and strict regulations to ensure effective device maintenance.

    l Carry out a check periodically and maintain the records.

    l

    Manage management-level passwords properly and change them regularly to ensuresecurity. Assign different passwords to maintenance personnel to ensure system security.

    1 Routine Maintenance Overview

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance

    1-2 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 02 (2010-07-15)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    17/59

    l Record all the significant operations, such as board switching, system resetting, and

    software loading. Before performing such operations, analyze the situation and take backup

    emergency and security measures.

    l Authorize and control the modification of data, back up the data before modification, and

    maintain modification records.l Wear anti-static wrist straps while operating the device. If a board is faulty, store it in an

    anti-static bag.

    Specifications for Maintenance Terminals

    Adhere to the following rules:

    l Do not install invalid firewall software and anti-virus software on the maintenance terminal.

    Other Specifications

    Adhere to the following rules:

    l Ensure the availability of spare parts, especially the boards. In case of failure, replace the

    faulty part.

    l Return the faulty part to the Huawei local office or the sales agent of Huawei for repair.

    l If the fault cannot be rectified, contact the Huawei Customer Service Center or the local

    Huawei office for technical assistance.

    1.3 Classification of Routine Maintenance

    This section describes the classification of routine maintenance tasks.

    According to the maintenance period, routine maintenance is classified into two types: daily

    routine maintenance and periodic routine maintenance.

    1.3.1 Daily Routine Maintenance

    1.3.2 Periodic Routine Maintenance

    1.3.1 Daily Routine Maintenance

    Daily routine maintenance is carried out by the ordinary maintenance personnel.

    The daily routine maintenance items are:

    l Alarm system

    l Operation status of the device

    Daily routine maintenance is performed to:

    l Locate alarms or other problems and solve them promptly. This helps in the stable

    functioning of the device and lowers the failure rate.

    l Find out the faults on the links or connections quickly and solve them to ensure normal

    provision of services.

    l

    Have real-time information about the operation of the device and the network. This helpsto improve the efficiency of troubleshooting.

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 1 Routine Maintenance Overview

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    1-3

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    18/59

    1.3.2 Periodic Routine Maintenance

    Periodic routine maintenance is relatively complex. It must be carried out by the maintenance

    personnel who have undergone professional trainings.

    The periodic routine maintenance items are:

    l Power supply

    l Grounding resistance

    l Dust on the device

    Periodic maintenance is done to:

    l Ensure the secure and stable operation of the device for a long period.

    l Check for problems such as device aging, function failures, and performance degradation.

    You can do this by regularly checking, testing and cleaning the devices and creating a

    backup of the data.

    1 Routine Maintenance Overview

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance

    1-4 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 02 (2010-07-15)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    19/59

    2 Routine Maintenance ItemsAbout This Chapter

    This chapter lists the routine maintenance items.

    2.1 Routine Maintenance Items

    The following are the maintenance cycle and maintenance items.

    2.2 Routine Maintenance Tasks and Operations

    This section describes the recommended cycle, operations, and references for routine

    maintenance.

    2.3 Cleaning the EquipmentThis section describes how to remove dust from air filter, fan frame, and boards.

    2.4 Backing Up and Restoring Configuration Files

    This section describes how to back up and restore configuration files.

    2.5 Grounding System Maintenance

    How to maintain the grounding system.

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 2 Routine Maintenance Items

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    2-1

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    20/59

    2.1 Routine Maintenance Items

    The following are the maintenance cycle and maintenance items.

    NOTE

    l The installation tools, meters, and related devices are not delivered with the S9300.

    l Meters must be calibrated before use.

    The stable running of the S9300 depends on the network planning and the routine maintenance.

    In addition, fast location of the hidden hazards is necessary.

    The routine maintenance items are the references and suggestions for maintenance of the running

    environment, software and hardware of the S9300.

    In routine maintenance, you can maintain the S9300 according to the maintenance items. Inaddition, you can add or delete the routine maintenance items according to the actual networking

    and environment of the equipment room.

    Table 2-1 lists all the routine maintenance items mentioned in this document.

    Table 2-1 List of routine maintenance items

    MaintenanceCycle

    Maintenance Item

    Daily Logs and alarms

    Temperature and voltage

    Fan and power supply

    CPU usage and memory usage

    Monthly Configuration files

    Available space on the CF card

    License information

    System time

    Interface traffic

    Board running status

    OSPF/IS-IS/BGP neighbor status

    Routing information

    Management-level user control

    Telnet control

    Anti-attack detect

    FTP password control

    2 Routine Maintenance Items

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance

    2-2 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 02 (2010-07-15)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    21/59

    MaintenanceCycle

    Maintenance Item

    Change of the login password

    Backup of configuration files and log files

    Temperature and humidity in the equipment room

    Quarterly Cleaning of air filters

    Yearly Cleaning of fan frames, and boards

    2.2 Routine Maintenance Tasks and Operations

    This section describes the recommended cycle, operations, and references for routinemaintenance.

    Table 2-2 Routine maintenance tasks and operations

    MaintenanceTask

    RecommendedCycle

    Operation Guide Standards for Reference Result

    Equip

    me

    nt

    roo

    m

    Ambienttemperatu

    re

    Monthly

    View the thermometerin the equipment room.

    l Long-term operatingtemperature: 0C-45C;

    Short-term operating

    temperature: -5C-55C.

    l If the temperature in the

    equipment room cannot

    meet the requirement for a

    long time, the carrier may

    need to repair or replace the

    air conditioning.

    l Check that the refrigeration

    function is normal andswitch of the air

    conditioning is well

    contacted.

    NOTEShort-term operating conditions

    mean that the continuous

    working time does not exceed 48

    hours and the accumulated time

    per year does not exceed 15

    days.

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 2 Routine Maintenance Items

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    2-3

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    22/59

    MaintenanceTask

    Recommended

    Cycle

    Operation Guide Standards for Reference Result

    Ambient

    humidity

    Mont

    hly

    View the hygroscope in

    the equipment room.

    l Normally, the relative

    humidity in long-term

    operating environment is

    between 5%RH and 85%

    RH, non-condensing; that

    in short-term operating

    environment is between

    0%RH and 95%RH, non-

    condensing.

    l If the relative humidity ofthe equipment room is

    high, the carrier may need

    to install a dehumidifier. If

    the relative humidity of the

    equipment room is low, the

    carrier may need to install

    a humidifier.

    Ba

    sic

    inf

    orma

    tio

    n

    Alarms Daily Run the display alarm

    all command to view the

    alarms related to hot

    backup, restart, hotswapping of boards,

    removal and installation

    of fans and power

    modules, abnormal

    temperature, abnormal

    clock, and chip

    exception.

    Run the display

    trapbuffer command to

    view the alarms in the

    buffer.

    l No alarm is generated.

    l If an alarm is generated,

    record it. If a major alarm

    or more serious alarm is

    generated, analyze and

    process it immediately.

    Logs Daily Run the display

    logbuffer command.

    l There are no repeated logs.

    l If a lot of repeated logs

    occur, analyze and process

    them immediately.

    2 Routine Maintenance Items

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance

    2-4 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 02 (2010-07-15)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    23/59

    MaintenanceTask

    Recommended

    Cycle

    Operation Guide Standards for Reference Result

    Configura

    tion files

    Mont

    hly

    Run the display

    current-configuration

    and display saved-

    configuration

    commands to view and

    save the current

    configuration.

    Run the compare

    configuration

    command to comparethe current

    configuration with the

    saved configuration.

    Run the dir and display

    startup commands.

    l The current configuration

    must be the same as the

    saved configuration.

    l The configuration must

    meet the user

    requirements.

    l The configuration file

    names, file size, and file

    saving time on the master

    and slave MPUs must be

    the same.

    Files in

    the CF

    card

    Mont

    hly

    Run the dir command. l All the files in the CF card

    must be useful; otherwise,

    delete the undesired files

    by using the delete/

    unreserved commands.

    License

    informati

    on

    Mont

    hly

    Run the display license

    command.

    l The license is activated and

    the current time is earlier

    than "Run time."

    Patch

    informati

    on

    Mont

    hly

    Run the dir and display

    patch-information

    commands.

    l The installed patches must

    meet the requirements. The

    latest patch released by

    Huawei corresponding to

    the product is

    recommended.

    l The patches have taken

    effect. That is, the value of"Total Patch Unit" is the

    same as the value of

    "Running Patch Unit."

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 2 Routine Maintenance Items

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    2-5

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    24/59

    MaintenanceTask

    Recommended

    Cycle

    Operation Guide Standards for Reference Result

    Ru

    nni

    ng

    stat

    us

    of

    the

    equ

    ip

    ment

    Temperat

    ure

    Daily Run the display

    temperature { all |

    slot } ordisplay health

    command.

    l The temperature of each

    module should be between

    the upper limit and lower

    limit. That is, the value of

    "Status" is "normal."

    Voltage Daily Run the display

    voltage {all | slot } or

    display health

    command.

    l The voltage of a board

    should be between the

    upper limit and lower limit.

    That is, the value of

    "Status" is "normal."

    Fan status Daily Run the display fan or

    display health

    command.

    l The value of "present" is

    "YES."

    l The value of "register" is

    "YES."

    Power

    status

    Daily Run the display power,

    display power system,

    ordisplay health

    command.

    l The value of "State" is

    "On."

    l If the "Present" field of the

    power supply is "YES", the

    value of State should be

    Supply.

    System

    time

    Mont

    hly

    Run the display clock

    command.

    l Check the system date and

    time. The system time must

    be the same as the local

    time. (The difference is less

    than five minutes.)

    l If the system time is

    incorrect, run the clock

    command to change the

    time or run NTP.

    CPU

    usage

    Daily Run the display cpu-

    usage [ slave | slotslot-

    id] ordisplay health

    command.

    l The value of "CPU Usage"

    should be smaller than the

    value of "Upper Limit."

    l If the CPU usage remains

    high, check the device to

    locate the problem.

    2 Routine Maintenance Items

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance

    2-6 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 02 (2010-07-15)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    25/59

    MaintenanceTask

    Recommended

    Cycle

    Operation Guide Standards for Reference Result

    Memory

    usage

    Daily Run the display

    memory-usage [slave |

    slotslot-id] ordisplay

    health command.

    l The memory usage should

    be smaller than the value of

    "Upper Limit."

    l If the memory usage

    remains high, check the

    device to locate the

    problem.

    Interface

    traffic

    Mont

    hly

    Run the display

    interface command.

    l If the current interface

    traffic is more than 80% ofthe interface bandwidth,

    record the event and find

    out the reason.

    l Check whether there are

    errored packets in the

    inbound or outbound

    direction. Pay attention to

    the increase of errored

    packets and check the

    interval of errored packets.

    Boardrunning

    status

    Monthly

    Run the display devicecommand.

    Run the display reset-

    reason command.

    l The value of "Online"should be "Present."

    l The value of "Power"

    should be "PowerOn."

    l The value of "Register"

    should be "Registered."

    l The value of "Alarm"

    should be "Normal."

    l No board is reset

    abnormally.

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 2 Routine Maintenance Items

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    2-7

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    26/59

    MaintenanceTask

    Recommended

    Cycle

    Operation Guide Standards for Reference Result

    Active/

    standby

    switchove

    r

    Mont

    hly

    Run the display

    switchover state

    command.

    l When the software and

    hardware of the device are

    normal and the software

    versions are consistent, the

    following information

    should be displayed (Take

    the S9312 for example):

    Slot 7 HA FSM State

    (master): realtime or

    routine backup.

    Slot 8 HA FSM State

    (slave): receiving realtime

    or routine data.

    l If no slave MPU is

    installed, the following

    information is displayed:

    "Slot D HA FSM State

    (master): waiting for the

    slave to be inserted."

    Startupfile Monthly Run the displaystartup command.

    l

    The startup file should becorrect.

    System

    software

    and board

    software

    versions

    Mont

    hly

    Run the display

    version orcheck

    version all command.

    l Normally, the displayed

    system software and board

    software versions meet the

    requirements. If two MPUs

    are installed, the software

    versions of the active and

    standby MPUs must be the

    same.

    Ro

    uting

    inf

    or

    ma

    tio

    n

    OSPF

    neighborstatus

    Mont

    hly

    Run the display ospf

    peer command.

    Run the display ospf

    peer last-nbr-down

    command.

    l The value of "State" should

    be "Full."

    l The neighbor relationship

    should be retained for at

    least one day.

    l Normally, no neighbor is in

    Down state.

    IS-IS

    neighbor

    status

    Mont

    hly

    Run the display isis

    peer command.

    l The value of "State" should

    be "Up."

    2 Routine Maintenance Items

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance

    2-8 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 02 (2010-07-15)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    27/59

    MaintenanceTask

    Recommended

    Cycle

    Operation Guide Standards for Reference Result

    BGP peer

    status

    Mont

    hly

    Run the display bgp

    peer command.

    l The value of "State" should

    be "Established."

    Routing

    informati

    on

    Mont

    hly

    Run the display ip

    routing-table

    command. Compare the

    routing information

    with that displayed the

    last time and check

    whether the routes

    change greatly.

    Run the ping ortracert

    command for some

    routing entries.

    l The routing table should

    contain the default route.

    l On all the devices running

    the same routing protocol

    at the same layer of a

    network, the routing

    entries should be almostidentical. If static routing is

    configured, the routing

    entries in the routing tables

    of different devices may

    differ.

    Us

    er

    ma

    nag

    em

    entand

    sec

    urit

    y

    ma

    nag

    em

    ent

    Managem

    ent-level

    user

    control

    Mont

    hly

    Run the display

    current-configuration

    | include super

    password command.

    l The super user password

    must be set in the system

    and the password should be

    in cipher text.

    l If the password setting is

    incorrect, run the superpassword command to set

    the super user password in

    cipher text.

    Telnet

    control

    Mont

    hly

    Run the display

    current-configuration

    | include password

    command.

    l The Telnet user password

    and the super user

    password must be

    different.

    l The password should be in

    cipher text.

    Attack

    defense

    detection

    Mont

    hly

    Run the display

    current-configuration

    | includecpcar

    command.

    l The attack defense

    function should be

    configured.

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 2 Routine Maintenance Items

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    2-9

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    28/59

    MaintenanceTask

    Recommended

    Cycle

    Operation Guide Standards for Reference Result

    FTP

    password

    control

    Mont

    hly

    Run the display

    current-configuration

    | include password

    command.

    l The FTP user password

    and the super user

    password must be

    different.

    l The password should be in

    cipher text.

    Changing

    login

    password

    Mont

    hly

    Run the local-user

    usernamepassword

    cipherpasswordcommand in the AAA

    view.

    For the user that adopts

    local password

    authentication, run the

    set authentication

    password command to

    change the password.

    l The password is a string of

    at least 6 characters, in

    cipher text.l The password is changed at

    least once a quarter.

    Backup of

    configurat

    ion file

    Mont

    hly

    Back up the

    configuration file to the

    server.l To back up the

    configuration file

    through TFTP, run

    the tftpput

    command in the user

    view.

    l To back up the

    configuration file

    through FTP, run the

    get command in the

    FTP client view.For details, see 2.4.1

    Backing Up the

    Configuration Files.

    l The configuration file

    saved on the server is the

    same as that on the device.

    2 Routine Maintenance Items

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance

    2-10 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 02 (2010-07-15)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    29/59

    MaintenanceTask

    Recommended

    Cycle

    Operation Guide Standards for Reference Result

    Backup of

    log file

    Mont

    hly

    Back up the log file to

    the server.

    l Run the save logfile

    command to save the

    log file to the CF

    card.

    l To back up the log

    file through TFTP,

    run the tftpput

    command in the user

    view. To back up the

    log file through FTP,

    run the get command

    in the FTP client

    view.

    The methods of backing

    up the configuration file

    and log file are the same.

    For details, see 2.4.1

    Backing Up the

    Configuration Files.

    l The log file saved on the

    server is the same as that on

    the device.

    Cle

    ani

    ng

    Cleaning

    the air

    filter

    Quar

    terly

    For details, see 2.3.1

    Cleaning the Air

    Filter.

    l The air filter should be

    clean.

    Cleaning

    the fan

    frame

    Yearl

    y

    For details, see 2.3.2

    Cleaning the Fan

    Frame.

    l The fan frame should be

    clean.

    Cleaning

    the board

    Ever

    y two

    years

    Replace the boards with

    spare boards one by one,

    and remove dust from

    the boards. For details,see 2.3.3 Cleaning the

    Boards.

    l The boards should be

    clean.

    l It is recommended that you

    clean the boards every two

    years.

    2.3 Cleaning the Equipment

    This section describes how to remove dust from air filter, fan frame, and boards.

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 2 Routine Maintenance Items

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    2-11

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    30/59

    WARNING

    l Take ESD preventive measures. For example, you must operate at an antistatic workbench

    and wear antistatic clothes and wrist straps.l To ensure heat dissipation and ventilation of the system, and prevent the air filter from being

    covered by dust, clean the air filter every three months. If the equipment room is dusty, clean

    it more frequently.

    2.3.1 Cleaning the Air Filter

    2.3.2 Cleaning the Fan Frame

    2.3.3 Cleaning the Boards

    2.3.1 Cleaning the Air Filter

    Context

    The air filter of the S9300 prevents dust in the air so that the heat dissipation and ventilation

    conditions in the chassis are good.

    The air filter does not needpower and is hot swappable. It is convenient for cleaning.

    Tools

    l ESD-preventive wrist straps or gloves

    l Cross screwdriver

    Procedure

    Step 1 Remove the air filter.

    1. Wear the ESD-preventive wrist strap and connect the grounding terminal to the ESD jack

    on the rack.

    2. Loosen the captive screws of the air filter anti-clockwise with a Phillips screwdriver, as

    shown in Figure 2-1.

    3. Grasp the handle of the air filter and pull out the air filter, as shown in Figure 2-1.

    Figure 2-1 Removing an air filter

    2 Routine Maintenance Items

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance

    2-12 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 02 (2010-07-15)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    31/59

    Step 2 Clean the air filter.

    1. Dust off air filter.

    2. Flap and vacuum the air filter or wash the air filter and dry it.

    Step 3 Install the air filter.

    1. Insert the clean and dry air filter into the chassis, as shown in Figure 2-2.

    2. Tighten the captive screws of the air filter with a Phillips screwdriver, as shown in Figure

    2-2.

    Figure 2-2 Installing an air filter

    ----End

    2.3.2 Cleaning the Fan Frame

    Context

    During the operation of the device, the fan, the controlling circuit board and some other parts of

    the fan frame absorb the dust in the air. When dust is accumulated, the operation of the fan frame

    will be unstable. In addition, the accumulated dust becomes the pollution source of the service

    cabinet and hence threats the stable operation of the device. To ensure the stable operation of

    the device, clean all the fan frames every year.

    Precautions

    DANGER

    Do not put your hands into the running fans!

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 2 Routine Maintenance Items

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    2-13

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    32/59

    CAUTION

    The operation must be completed within five minutes; otherwise, the safety and stability of the

    device will be severely affected because of the high temperature.

    Tools

    l ESD-preventive wrist strap or ESD-preventive gloves

    l Phillips screwdriver

    Procedure

    Step 1 Clean the spare fan frame.

    Clean the fan, controlling circuit board and other parts of the spare fan frame with clean cottonpledget, antistatic soft brush and vacuum cleaner. There should be no dust on the fan frame after

    cleaning.

    Step 2 Replace the fan frame to be cleaned.

    1. Check the position of the fan frame to be cleaned.

    Before removing a fan frame that is to be replaced, check the position of the fan frame, for

    example, the cabinet and chassis where the fan frame is installed. Then, find out the fan

    frame to be replaced in the chassis and attach a label to the panel to identify the fan frame.

    2. Wear the ESD-preventive wrist strap and connect the grounding terminal to the ESD jack

    on the rack.

    3. Remove the fan frame to be replaced from the chassis.

    a. Loosen the four captive screws on both sides of the fan frame with a Phillips

    screwdriver, as shown in Figure 2-3.

    b. Grasp the handles on the two sides of the fan frame and pull out the fan frame, as

    shown in Figure 2-3.

    Figure 2-3 Removing a fan module

    4. Locate the spare fan frame in the chassis.

    2 Routine Maintenance Items

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance

    2-14 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 02 (2010-07-15)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    33/59

    a. Grasp the handles on the two sides of the fan frame and push the fan frame into the

    chassis, as shown in Figure 2-4. When you push the fan frame, align the locating

    holes on the panel of the fan frame with the bolts on the chassis. Push the fan frame

    gently until the panel of the fan frame touches the two sides of the chassis.

    b. Tighten the captive screws clockwise with a Phillips screwdriver to secure the fanframe in the chassis, as shown in Figure 2-4.

    Figure 2-4 Installing a fan module

    5. Verify the function of the new fan frame.

    In normal situations, after a new fan frame is inserted into the chassis, the fans immediately

    start to operate to blow air into the chassis. In this case, you can check whether the fan

    frame functions normally as follows:

    l If the STATUS indicator on the panel of the fan module is green and blinks at the

    frequency of 0.5 Hz, it indicates that the fan frame runs normally. If the indicator is red,

    it indicates that the fan frame is abnormal.

    l Run the display fan command to view the running status of the new fan frame. If the

    output is displayed as follows, it indicates that the new fan frame works normally. Take

    the S9312 for example:

    display fan

    -------------------------------------------------------------

    FanId FanNum present register Speed MODE

    -------------------------------------------------------------

    17 [1-0] YES YES 100% AUTO18 [1-0] YES YES 100% AUTO

    19 [1-0] YES YES 100% AUTO

    20 [1-0] NO NO 0% AUTO

    The preceding output information indicates that the fan frame status is restored to normal.

    If the fan frame is still abnormal, contact the Huawei local office for technical support.

    NOTE

    The fan IDs of the S9300 correspond to the fan frames on the S9300. The fan frame with a small ID is in

    the upper part of the chassis, and the fan frame with a large ID is in the lower part of the chassis. For

    example, on the S9312, the fan frame with the ID being 17 is on the top of the chassis, and the other fan

    frames are below it.

    Step 3 Clean the replaced fan frame.

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 2 Routine Maintenance Items

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    2-15

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    34/59

    Clean the fan, controlling circuit board, and other parts of the spare fan frame with clean cotton

    pledget, antistatic soft brush, and vacuum cleaner. This fan frame is used as the spare one after

    cleaning.

    ----End

    2.3.3 Cleaning the Boards

    Context

    During the operation of the device, dust accumulates on the boards because of air convection in

    the process of heat dissipation. More dust accumulates on boards if the air is not clean and the

    relative humidity is low. When dust is accumulated, the heat dissipation and the electric

    insulation of boards are affected. This threatens the stable operation of the device.

    To ensure the stable operation of the device, clean all the boards every two years.

    Tools

    You can choose the tools according to the actual situation:

    l Dust cleaner

    l Detergent

    l ESD-preventive wrist straps or gloves

    Precautions

    WARNING

    l Take ESD preventive measures during the whole process of routine maintenance. For

    example, perform operations on an antistatic workbench and wear antistatic clothes and wrist

    straps.

    l Use the detergent that conforms to the industry standard; otherwise, the board may be

    damaged.

    CAUTION

    Removing boards that are in service may affect the operation of services. Therefore, clean the

    boards when traffic volume is low, for example, between 2:00 a.m. and 4:00 a.m.

    Procedure

    Step 1 Prepare spare boards.

    You must prepare a spare board for each board in the cabinet before you clean all the boards.

    2 Routine Maintenance Items

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance

    2-16 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 02 (2010-07-15)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    35/59

    Step 2 Replace boards.

    Replace a board with the spare board. You can start removing the dust from the board only when

    the spare one is running normally.

    For details about how to replace boards, see Quidway S9300 Terabit Routing Switch PartsReplacement.

    Step 3 Remove dust.

    The process of cleaning the boards should be such that the physical attributes and electrical

    attributes of the boards are protected. The two ways to clean dust are as follows:

    l Using the vacuum

    Brush dust off the board surface with a clean and dry antistatic soft brush and align the dust

    intake of a vacuum with the brush. In this case, dust is removed immediately when it is

    brushed off.

    This method features simple operation and low cost. But it is difficult to remove harmful gasthat is adsorbed on the board surface.

    l Using the detergent

    Use the anhydrous, erosion-free, non-conductive, and highly volatile detergent such as

    Isopropyl Alcohol (IPA) to remove dust from boards.

    CAUTION

    It is recommended that you wear respirator when you use the detergent such as IPA.

    This method helps to remove dust and harmful gases that are adsorbed on the board surface.

    It, however, is a complex operation and involves high cost.

    Step 4 Reuse boards.

    Due to the limited number of spare boards, you can use the cleaned boards to replace the dirty

    ones.

    ----End

    2.4 Backing Up and Restoring Configuration FilesThis section describes how to back up and restore configuration files.

    2.4.1 Backing Up the Configuration Files

    2.4.2 Restoring the Configuration Files

    2.4.1 Backing Up the Configuration Files

    Context

    You can back up the configuration files by using the following ways:

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 2 Routine Maintenance Items

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    2-17

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    36/59

    Procedure

    l Copying the screen directly

    In the CLI, run the display current-configuration command. Copy all the display to txt

    documents, then back up the configuration files to the hard disk of the maintenance terminal.l Backing up the configuration files through TFTP

    1. Copy the configuration files in the CF card directly.

    This action is to back up the current configuration files that are stored in the CF card

    of the router.

    After startup of the device, use the following commands to back up the configuration

    files in the CF card of the router.

    save cfcard:/config.cfg

    Are you sure to save the configuration to flash:/config.cfg?[Y/N]:y

    Now saving the current configuration to the slot 4 ......

    Save the configuration successfully. copy config.cfg cfcard:/backup.cfg

    Copy flash:/config.cfg to cfcard:/backup.cfg?[Y/N]:y

    100% complete/

    Info: Copied file flash:/config.cfg to cfcard:/backup.cfg...Done.

    2. Assign an IP address for the router.

    The router acts as the TFTP client.

    Connect the router to the maintenance terminal. Establish the Telnet environment and

    assign an IP addresses for the interface. A reachable route must exist between the

    TFTP client and the TFTP server.

    3. Start the TFTP server application program.

    Start the TFTP server application in the PC. Set the path, the IP address, and the port

    number of the TFTP server to download the configuration files.

    4. Transfer the configuration files.

    In the user view, run the tftp command.

    tftp 10.110.24.209 put config.cfg

    Info: Transfer file in binary mode.

    Uploading the file to the remote TFTP server. Please wait.../

    TFTP: Uploading the file successfully.

    3501 bytes send in 1 second.

    l Backing up the configuration files through FTP

    1. Connect the router to the maintenance terminal, establish the Telnet environment and

    assign an IP address for the interface.

    2. Start the FTP service.

    The router acts as the FTP server.

    Start the FTP server on the router. Create an FTP user whose username is router and

    password is 123. Authorize the user to visit cfcard:\.

    system-view

    [Quidway] ftp server enable

    [Quidway] aaa

    [Quidway-aaa] local-user router password cipher 123

    [Quidway-aaa] local-user router ftp-directory cfcard:/[Quidway-aaa] local-user router service-type ftp

    2 Routine Maintenance Items

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance

    2-18 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 02 (2010-07-15)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    37/59

    3. Initiate an FTP connection to the router from the maintenance terminal.

    On the PC, establish an FTP connection with the router through the FTP client. For

    example, the IP address of the router is 10.110.24.254.

    C:\Documents and Setting\Administrator> ftp 10.110.24.254Connected to 10.110.24.254.

    220 FTP service ready.

    User (10.110.24.254:(none)): router

    331 Password required for router.

    Password:

    230 User logged in.

    4. Set the parameters.

    After the FTP user passes authentication, the FTP client prompts "ftp>". Enter

    binary and specify the directory for storing the configuration files on the FTP client.

    ftp>binary

    200 Type set to I.

    ftp> lcd c:\temp

    Local directory now C:\temp.

    5. Transfer the configuration files.

    Run the get command on the PC to download the configuration files to the local

    specified directory and save them as backup.cfg.

    ftp> get config.cfg backup.cfg

    200 Port command okay.

    150 Opening ASCII mode data connection for config.cfg.

    226 Transfer complete.

    ftp: 1021 bytes received in 0.06Seconds 60.02Kbytes/sec.

    ftp>

    6. Check whether the config.cfg and backup.cfg files are of the same size. If they are

    of the same size, the backup is successful.

    ----End

    2.4.2 Restoring the Configuration Files

    Context

    You can restore the configuration files through the following ways:

    NOTE

    After restoring the configuration files, restart the device to make the configuration files take effect. Run

    the startup saved-configuration command to specify the configuration file for next startup. If theconfiguration file name is unchanged, you do not need to run this command. Then run the reboot command

    to restart the device.

    Procedure

    l Restoring the configuration files saved in the CF card

    This operation is to restore the configuration files saved in the CF card of the device as the

    configuration files of the current system.

    Run the following commands when the device works normally.

    copy cfcard:/backup.cfg cfcard:/vrpcfg.zipCopy cfcard:/backup.cfg to cfcard:/vrpcfg.zip?[Y/N]:y

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 2 Routine Maintenance Items

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    2-19

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    38/59

    100% complete/

    Info: Copied file cfcard:/backup.cfg to cfcard:/vrpcfg.zip...Done.

    l Restoring the configuration files saved in the PC through TFTP

    The device works as the TFTP client. The restoration procedure is similar to that ofbacking

    up the configuration files through TFTP. Run the tftpget command to download theconfiguration files saved in the PC to the CF card of the device.

    l Restoring the configuration files saved in the PC through FTP

    The device acts as the FTP server. The restoration procedure is similar to that ofbacking

    up the configuration files through FTP. Run the put command to upload the

    configuration files saved in the PC to the CF card of the device.

    ----End

    2.5 Grounding System Maintenance

    How to maintain the grounding system.

    2.5.1 Checking the Grounding System

    2.5.2 Measuring the Grounding Resistance

    2.5.1 Checking the Grounding System

    To maintain the grounding system, check the following:

    l Check the electrical contact between the metallic parts and the cabinet body. The metallic

    parts and the cabinet body must be well contacted. The contact points such as screw holes,

    guide lanes, and lifting ears cannot be painted. Otherwise, bad electrical contact may occur.

    l Check the grounding terminals at the front and back doors and the side doors. These

    terminals must be well connected with the grounding wires.

    l Check the grounding buses of combined neighboring cabinets. If cabinets are combined,

    the neighboring cabinets must be connected by a grounding bus.

    l Check the yellow and green protecting grounding cables. One end of a grounding cable

    should connect the PGND grounding bus of the power distribution cabinet in the equipment

    room, and the other end connects the grounding terminal of the cabinet. The screws that

    fix the grounding cable must be secure.

    2.5.2 Measuring the Grounding ResistanceNOTE

    The grounding resistance of a comprehensive communication building should be no more than 1 ; that

    of a common communication station should be no more than 5 ; that of the place with high earth

    resistibility should be no more than 10 .

    To measure the grounding resistance, use an earth resistance tester. Figure 2-5 shows the arrangement of

    the probes of an earth resistance tester.

    2 Routine Maintenance Items

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance

    2-20 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 02 (2010-07-15)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    39/59

    Figure 2-5 Arrangement of probes of an earth resistance tester

    NOTE

    l Position the current probe and the voltage probe in a manner that is perpendicular to the wires of a

    grounding net or underground metallic pipes.

    l Do not measure the grounding resistance immediately after a rain.

    l The distance between the current probe and the rim of a grounding net is d1 and the length

    of the maximum diagonal line of a grounding net is D. d1 should be 4-5 times as much as

    D.

    l The distance between the probe and the side of a grounding net is d2. d2 is 50%-60% of

    d1.

    l During measurement, move the voltage probe along the line connecting the grounding net

    and the current probe three times; the distance of each movement is 5% of d1. If the threeresistance values are similar, it means that the grounding resistance is normal.

    NOTE

    If measuring d1 is difficult, you can take 2D instead of d1 and take D instead of d2 in a place where the

    earth resistibility is the same. In a place where the resistibility is different, you can take 3D instead of d1

    and take 1.7D instead of d2.

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 2 Routine Maintenance Items

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    2-21

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    40/59

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    41/59

    3 Risky OperationsAbout This Chapter

    This appendix describes the operations that may cause human injury or equipment fault.

    3.1 Risky Hardware Operations

    The following hardware operations may affect the service running and hardware safety or harm

    the human body; therefore, perform the following operations with caution.

    3.2 Risky Command Executions

    Only trained and qualified personnel can run the commands listed in this section.

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 3 Risky Operations

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    3-1

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    42/59

    3.1 Risky Hardware Operations

    The following hardware operations may affect the service running and hardware safety or harm

    the human body; therefore, perform the following operations with caution.

    Table 3-1 Risky hardware operations

    Item Sub-item Consequences of Mal-operations

    Operations

    on boards

    Hot swapping the in-

    service active main board

    is prohibited.

    l When the standby main board runs normally,

    data synchronization between the active

    board and the standby one requires a certain

    period. When the active main board is

    plugged out, the system performs automatic

    switchover. The latest data on the active main

    board, however, cannot be backed up entirelyto the standby main board. This results in

    wrong statistics and data loss.

    l When the standby main board fails, removing

    the in-service active main board results in

    interruption of part of or even all services.

    Pressing the Reset button

    on the main board at will is

    prohibited.

    l Pressing the Reset button on the panel forces

    the board to reset its hardware. This operation

    can be carried out only by the qualified

    personnel when fatal faults occur in the

    system.

    l If the Reset button on the panel is pressed by

    mistake, the main board will be reset. Its

    results are the same as those of removing the

    in-service active main board.

    Inserting or removing

    boards without wearing an

    antistatic wrist strap is

    prohibited.

    l Electrostatic discharge on human body

    damages electrical components on the board.

    l If the maintenance personnel insert or remove

    boards without wearing an antistatic wrist

    strap, the board may be damaged or may not

    run properly.

    Debugging the serial port

    of the board through the

    serial cable is prohibited.

    Only Huawei engineers can use the debugging

    serial port. Otherwise, abnormality of board

    program or board resetting may be caused.

    Operations

    for cable

    Installing or removing

    network cables inside the

    cabinet at will is

    prohibited.

    l The network cables inside the cabinet are used

    for communication between the host and the

    maintenance terminal.

    l Installing and removing the cables inside the

    cabinet at will may cause the maintenance

    terminal to fail to log in to the switch.

    3 Risky Operations

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance

    3-2 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 02 (2010-07-15)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    43/59

    Item Sub-item Consequences of Mal-operations

    Operations

    for power

    supply

    Switching on or switching

    off the power supply in the

    power distribution frame of

    the cabinet at will is

    prohibited.

    l Only in the case of upgrading, expansion,

    parts replacement or fatal faults, the

    maintenance personnel can operate the power

    supply following the guidelines.

    l Operations at will may cause fatal faults such

    as shut-down of the device and interruption of

    the services.

    3.2 Risky Command Executions

    Only trained and qualified personnel can run the commands listed in this section.

    Table 3-2 Risky command executions

    Classification Command Function Consequences of Mal-operations

    Reboot reboot Rebooting the

    system

    This command can be used only

    in the case of office deployment

    or upgrading. Otherwise, the

    services carried by the device

    will be interrupted.

    Schedule reboot schedule reboot Rebooting the

    system onschedule

    This command can be used only

    in the case of office deploymentor upgrading. Otherwise, the

    services carried by the device

    will be interrupted.

    Reboot slave restart Restart the slave

    main control

    board.

    Only trained and qualified

    personnel can run this command

    during deployment or upgrade.

    Forcible

    switchover

    slave switchover The switchover

    is performed

    forcibly.

    If the data on the master board

    and slave board is not

    synchronized, the configuration

    data is lost and services areinterrupted.

    Formatting formatdevice-

    name

    Formatting the

    storage device

    Running this command causes

    the loss of all the files on the

    specified storage device, and the

    files cannot be restored.

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 3 Risky Operations

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    3-3

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    44/59

    Classification Command Function Consequences of Mal-operations

    Deletion delete [ /

    unreserved ]

    filename

    Deleting the

    specified files in

    the storage

    device

    Running this command deletes

    the specified files in the storage

    device of the switch. If you use

    the unreserved command when

    deleting files, the files cannot be

    restored.

    User interface authentication-

    mode

    Authenticating

    the login users

    When setting user

    authentication on the console

    port and the VTY interface, if

    the mode is password orAAA,

    you must configure the

    password or user name for

    logging in to the router.

    System

    maintenance

    startup Setting the host

    file for next

    startup

    In the active/standby mode,

    configure the large files for the

    next startup on the active and

    standby main boards at the same

    time. Otherwise, the switch will

    restart repeatedly.

    System

    maintenance

    upgrade Upgrading a

    board

    Running this command will

    interrupt the services.

    System

    maintenance

    power off slot

    slot-id

    Powering off a

    board

    Running this command will

    power off a board and interruptthe services.

    System

    maintenance

    reset commands Clearing data

    and resetting

    hardware

    Running a reset command will

    clear the specified data. For

    example, running the reset

    logbuffer command can clear

    the data in the log buffer;

    running the reset slot command

    can reset an LPU to interrupt

    services.

    System

    maintenance

    save Saving data If the save operation is

    performed improperly, the

    configuration data will be lost or

    wrong.

    3 Risky Operations

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance

    3-4 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 02 (2010-07-15)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    45/59

    4 Common Maintenance CommandsThis appendix describes the commonly used commands for routine maintenance.

    Table 4-1 shows the common maintenance commands.

    Table 4-1 Common maintenance commands

    Command Function

    dir Displays the information on the specified file

    or directory in the storage device of the

    S9300.

    display alarm {slot-id| all } Displays alarms.

    display bgp peer Displays the information on BGP peers.

    display clock Displays the current date and time of the

    S9300.

    display cpu-usage Displays the information on CPU usage.

    display current-configuration Displays the current valid parameters of the

    S9300.

    display fan Displays the status of the fan.

    display fib Displays the total number of the FIB entries.

    display device [ pic-status| slot-id] Displays the basic information on the router.

    display ftp-server Displays the parameters of the current FTP

    server.

    display interface Displays the operating status and statistics of

    an interface.

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 4 Common Maintenance Commands

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    4-1

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    46/59

    Command Function

    display ip interface [ interface-type

    interface-number]

    Displays the detailed IP-related

    configurations and statistics of an interface.

    The packets, bytes, and multicast packets

    transmitted and received, and broadcast

    packets received, sent, and discarded are

    included.

    display ip routing-table Displays the brief information of the IPv4

    routing table.

    display isis peer Displays the IS-IS peer relationship.

    display logbuffer Displays the record in the log buffer.

    display memory-usage Displays the CPU usage of the router.

    display ospf[process-id] brief Displays the brief information of OSPF.

    display ospf[process-id] peer Displays OSPF neighbors.

    display ripprocess-idneighbor Displays RIP neighbors.

    display patch-information Displays the status of the patch.

    display power Displays the status of the power supply.

    display saved-configuration Displays the configuration files for next

    startup of the router.

    display startup Displays the system software and theconfiguration file names related to the current

    and next startup.

    display switchover state Displays the backup status of the active and

    standby boards.

    display temperature Displays the status of the slot temperature

    sensor.

    display trapbuffer Displays the record in the alarm buffer.

    display voltage slotslot-id Displays the status of voltage sensor in the

    specified slot.

    display version Displays the version of system software.

    ping Displays IP network connection.

    You can check whether the host is reachable.

    tracert Tests the gateways the packets pass through

    from the host to the destination.

    You can check the network connection to

    locate the faults.

    4 Common Maintenance Commands

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance

    4-2 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 02 (2010-07-15)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    47/59

    5 Reference for Routine Maintenance Itemsand Operations

    This section describes the routine maintenance items and operations that are not used often.

    Maintenance Item Operation Guide

    Standards forReference Result

    Interface and

    link status

    Run the display

    interface brief

    command.

    l The interface or link in

    use is in Up state, and

    the interface not in use

    is in Down state.

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 5 Reference for Routine Maintenance Items and Operations

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    5-1

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    48/59

    Maintenance Item Operation Guide

    Standards forReference Result

    Interface

    configuration

    Run the display

    interface ordisplay

    current-

    configuration

    command.

    Check the status and

    configurations of the

    interface.

    l No command except

    shutdown can be run

    on the interface in

    Down state.

    l The interface in Up

    state must be

    configured.

    l After two query

    operations, the Input

    and Output packets onan interface in Up state

    should be increased

    every time. If no

    traffic is transmitted

    or received on the

    interface, the packets

    are not increased.

    l After two query

    operations, the

    number of discarded

    packets should be the

    same as the number oferrored packets. That

    is, there are no packets

    newly discarded or

    new errored packets.

    l The operating modes,

    including speeds and

    duplex modes, on the

    two ends must be the

    same.

    5 Reference for Routine Maintenance Items and Operations

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance

    5-2 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 02 (2010-07-15)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    49/59

    Maintenance Item Operation Guide

    Standards forReference Result

    Interface

    description

    Run the display

    interface

    command.

    l The description of the

    active interfaces

    should comply with

    the description

    standards of

    customers.

    l If the customers do not

    have the description

    standards, following

    the rule: Local device

    name-Local port

    number->Peer device

    name-Port number-//

    Interface speed.

    IP interface Run the display ip

    interface brief

    command.

    l Check the IP address

    of the interface.

    l The displayed

    information includes

    IP address, physical

    status of the interface,

    protocol status, and

    interface description.

    IP address Run the display

    interfacecommand.

    l For the IP addresses of

    the interfaces betweennetwork devices, the

    subnet mask contains

    30 bits.

    MTU Run the display

    interface

    command.

    l The MTU is the same

    as the MTU of the

    connected interface.

    Statistics on

    an interface

    Run the display ip

    interface

    command. After

    five minutes, run the

    command again.

    Then collect data

    twice and compare

    the data.

    l If the system runs

    normally, the data

    does not change when

    you run the command

    for the second time

    and the value is equal

    to or smaller than 500.

    Mirroring

    port

    Run the display

    port-mirroring

    command.

    l If a mirroring port is

    not used, run the undo

    observe-port

    command to delete it.

    FTP port Run the display ftp-

    server command.

    l The FTP port not in

    use should be shut

    down.

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 5 Reference for Routine Maintenance Items and Operations

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    5-3

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    50/59

    Maintenance Item Operation Guide

    Standards forReference Result

    Cleaning View the outside

    and inside of the

    chassis, the air filter

    in the chassis, the

    floor, and the table

    top.

    l No obvious dust

    exists.

    l If the air filter is

    covered by dust, clean

    or replace it in time;

    otherwise, the heat

    dissipation in the

    chassis is affected.

    Heat

    dissipation

    View the heat

    dissipation

    condition in the

    chassis.

    l When the device

    works normally, all

    the fans should

    operate normally

    (except for the fansthat are being

    cleaned). Power off

    the fans will increase

    the temperature of the

    device, and the boards

    may be damaged.

    l Do not place anything

    at the air intake of the

    chassis and clean the

    fans and air filter

    periodically.

    Cable layout View the cable

    layout in the chassis.

    l The power cables

    should be separated

    from the service

    cables. The cables

    should be deployed

    orderly.

    Cable label View the cable

    labels in the chassis.

    l The labels are clean,

    correct, and

    standardized.

    Appearance

    of the chassis

    Check whether the

    chassis is complete.

    l Check whether the

    chassis is complete.

    The chassis should not

    be damaged or go

    moldy. The blank

    panel is installed in the

    empty slot.

    5 Reference for Routine Maintenance Items and Operations

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance

    5-4 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 02 (2010-07-15)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    51/59

    Maintenance Item Operation Guide

    Standards forReference Result

    Heat

    dissipation in

    the chassis

    Check whether heat

    dissipation in the

    chassis is normal.

    l The air intake is not

    covered by dust and

    the heat dissipation in

    the chassis is normal.

    If the air filter is

    covered by dust, clean

    it in time. It is

    recommended to clean

    the air filter quarterly.

    For details, see 2.3.1

    Cleaning the Air

    Filter.

    Undesired

    configuration

    s

    Run the display

    current-

    configuration

    command.

    l All the configurations

    should be useful;

    otherwise, delete the

    undesired

    configurations.

    Power supply

    backup

    Check whether the

    power supplies are

    backed up.

    l The S9312 and S9306

    both have four power

    supplies and the

    S9303 has two power

    supplies. The switches

    of the power supplies

    that work in backup

    mode are in On state.

    l If there is no backup

    power supplies, record

    the event.

    Fire

    protection

    Check the key

    components such as

    chassis, subrack,

    and cabling trough.

    l No fire risk exists and

    all the fire protection

    facilities are normal.

    Guard against

    theft

    Check the doors,

    windows, and

    security mesh of theequipment room.

    l All the doors,

    windows, and security

    meshes are normal.

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 5 Reference for Routine Maintenance Items and Operations

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    5-5

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    52/59

    Maintenance Item Operation Guide

    Standards forReference Result

    OSPF Router

    ID

    Run the display

    current-

    configuration

    configuration ospf

    ordisplay router

    id command.

    l The router ID should

    be the address of the

    Loopback interface.

    l If no address is

    assigned to the

    Loopback interface,

    you must specify the

    router ID as the

    address of an uplink

    interface or the

    interface with

    minimum probability

    of being Down.

    l The configured router

    ID must be the same as

    the router ID used by

    OSPF.

    Importing

    OSPF routes

    Run the display

    current-

    configuration

    configuration ospf

    command.

    l You are advertised to

    run the network

    command. You can

    also configure the

    device to import

    routes.

    OSPF virtuallink

    Run the displayospf vlink

    command.

    l Using OSPF virtuallinks is prohibited.

    OSPF stub

    area

    Run the display

    current-

    configuration

    configuration ospf

    command.

    l The import-route

    command cannot be

    used in a stub area.

    OSPF errored

    packets

    Run the display

    ospf error

    command. After

    five minutes, run the

    command again.

    Then collect data

    twice and compare

    the data.

    l In the normal

    situation, the collected

    data does not increase.

    Importing IS-

    IS routes

    Run the display

    current-

    configuration

    configuration isis

    command.

    l You are advertised to

    run the network-

    entity command. You

    can also configure the

    device to import

    routes.

    5 Reference for Routine Maintenance Items and Operations

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance

    5-6 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 02 (2010-07-15)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    53/59

    Maintenance Item Operation Guide

    Standards forReference Result

    ISIS system

    ID

    Run the display

    current-

    configuration

    configuration isis

    ordisplay current-

    configuration |

    include network-

    entity command.

    l The system ID is an

    extension of the

    address of the

    Loopback interface.

    l If the Loopback

    interface is not

    assigned an address,

    set the system ID to

    the address of the

    uplink interface.

    IS-IS address Run the display

    current-

    configurationconfiguration isis

    command.

    l Normally, up to three

    areas can be

    configured.

    Advertising

    BGP routes

    Run the display

    current-

    configuration

    configuration bgp

    command.

    l Do not advertise the IP

    routes through the

    import-route

    command, except the

    VPN routes.

    l Run the networkand

    ip route-staticip-

    address { mask| mask-

    length } null0commands to

    aggregate routes

    manually, and then

    advertise the routes.

    Static routes Run the display ip

    routing-table

    protocol static

    command.

    l Avoid redundant

    static routes.

    IBGP peers Run the display

    current-

    configuration

    configuration bgp

    command.

    l To keep the protocol

    stability, you are

    advised to set up peer

    relationship by using

    Loopback interfaces,

    which are always Up.

    CCC

    connections

    Run the display vll

    ccc command.

    l The value of "state"

    should be "up."

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 5 Reference for Routine Maintenance Items and Operations

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    5-7

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    54/59

    Maintenance Item Operation Guide

    Standards forReference Result

    SVC VLL Run the display

    mpls static-l2vc

    command.

    l The value of "AC

    Status" should be

    "up."

    l The value of "VC

    State" should be "up."

    VLL

    connection in

    Martini mode

    Run the display

    mpls l2vc

    command.

    l The value of "Session

    State" of the LDP

    session should be

    "up."

    l The value of "AC

    Status" should be

    "up."

    l The value of "VC

    State" should be "up."

    VLL

    connection in

    Kompella

    mode

    Run the display

    mpls l2vpn

    connection

    command.

    l When all the L2VPN

    connections in

    Kompella mode are

    checked, the value of

    "connections" should

    be "up."

    l When the L2VPN

    connection in

    Kompella mode on thespecified interface is

    checked, the value of

    "local vc state" should

    be "up" and the value

    of "remote vc state"

    should be "up."

    VPLS

    connections

    Run the display

    vpls connection

    command.

    l The value of

    "VCState" should be

    "up."

    VPN routes Run the display ip

    routing-table vpn-instance command.

    l The routes destined

    for the peer CE exist.

    Routing

    attribute sent

    or received by

    a VPN

    instance

    Run the display ip

    vpn-instance

    verbose command.

    l The values of "Export

    VPN Targets" and

    "Import VPN Targets"

    should be correct.

    5 Reference for Routine Maintenance Items and Operations

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance

    5-8 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 02 (2010-07-15)

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    55/59

    Maintenance Item Operation Guide

    Standards forReference Result

    BPDU tunnel

    status

    Run the display

    bpdu-tunnel global

    config command in

    the system view to

    check the global

    BPDU

    configuration.

    Run the display stp

    [ interface

    interface-type

    interface-number1

    [ tointerface-

    number2 ] [ brief ]

    command to checkwhether the device

    can send or receive

    the STP BPDUs.

    l The value of

    "BridgeRole" of the

    CE should be

    "customer." The value

    of "BridgeRole" of the

    PE should be

    "provider."

    l If the value of "Status"

    of an interface is

    "Normal," it indicates

    that no loop exists in

    the VLAN where the

    interface resides.

    l If the value of "BPDU

    Sent" is not 0, it

    indicates that the

    interface can send the

    STP BPDUs.

    l If the value of "BPDU

    Received" is not 0, it

    indicates that the

    interface can receive

    the STP BPDUs.

    MSTP status Run the display stpbriefcommand.

    l

    The STP status of thespecified port and the

    root port should be

    "FORWARDING."

    l The STP status of the

    backup root port

    should be

    "DISCARDING."

    Quidway S9300 Terabit Routing Switch

    Routine Maintenance 5 Reference for Routine Maintenance Items and Operations

    Issue 02 (2010-07-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    5-9

  • 7/30/2019 Routine Maintenance(V100R003C00 02)

    56/59

    Maintenance Item Operation Guide

    Standards forReference Result

    LDT loop

    detection

    Run the display

    loop-detection

    command.

    Run the display

    loop-detection

    [ interface

    { interface-type

    interface-number|

    interface-name }]

    command.

    When the LDT functions

    are configured normally,

    l If no ports are

    displayed in

    "Following ports are

    block for loop" and

    "Following ports are

    shutdown for loop," it

    indicates that no loop

    exists in the VLAN

    where loop detection

    is enabled.

    l If the value of "Status"

    is "Normal," it

    indicates that no loop

    exists in the VLAN

    where the interface

    resides.

    Smart Link

    status

    Run the display

    smart-link group

    command.

    l The value of

    "Member" of the

    Smart Link group is

    correct.

    l The master interface

    should be in ACTIVEstate.

    l The slave interface

    should be in

    INACTIVE state.

    RRPP status Run the display

    rrpp verbose

    domain command

    on the active node.

    l The value of "Ring

    State" should be

    "Complete."

    l The value of "Port

    status" of the primary

    port should be "